Phoenix - S4HANA - AP353 FD Report-RMC001-Report Equipment Performance v1.00-x
Phoenix - S4HANA - AP353 FD Report-RMC001-Report Equipment Performance v1.00-x
RMC001
Report Equipment Performance
MCD
AP353 – Functional Design Report
RMC001 – Report Equipment Performance
DOCUMENT INFORMATION
General Information
Project Name BPR and SAP S/4HANA Implementation
Phoenix_S4HANA_AP353 FD Report-RMC001-Report Equipment
Document Name
Performance BUMA v1.00
Version 1.00
Document History
Version Author Reason for Change Date Effective
0.01 Masitha Rahmawati Initial Document 31 October 2017
0.02 Winny Saputra Review Document 10 November 2017
- Change HM Non-Productive into HM
Unidentified
- Update formula for Deviation HM
WH
- Update formula for WR Non-
0.03 Masitha Rahmawati 27 November 2017
Production, CM Non-Production, CT
Non-Production
- Update formula for QTY WR, QTY
CM, QTY CT
- Add column unit
1.00 Winny Saputra Final Document 27 November 2017
TABLE OF CONTENT
1. GENERAL REQUIREMENT...........................................................................................................3
2. TECHNICAL INFORMATION........................................................................................................3
3. EXISTING / SAMPLE REPORTS OR RELATED TRANSACTION........................................................4
4. DESIGN.....................................................................................................................................4
4.1. Flow Diagram......................................................................................................................4
4.2. Detailed Description of New Report/Changes to Existing Enhancement...........................5
4.3. Detail Structure...................................................................................................................5
4.4. Detail Logic..........................................................................................................................5
4.5. Pre-Processing / Post-Processing Dependencies................................................................5
4.6. Data Inclusion/Exclusion.....................................................................................................5
4.7. Design Constraints..............................................................................................................6
4.8. Report Layout......................................................................................................................6
5. SELECTION CRITERIA...............................................................................................................26
6. ERROR HANDLING...................................................................................................................27
7. COMPONENT TEST REQUIREMENT..........................................................................................27
1. GENERAL REQUIREMENT
User Requirement:
Report Equipment Performance used only for displaying data.
Report Equipment Performance will display performance data of all equipment in Master
Equipment based on selected Site.
Data HM will be displayed depends on selected time. Data HM will only be calculated if HM’s
entry time is in range of selected From Date & Time and To Date & Time, else it will not be
calculated.
Data Fuel Usage and HM Fuel will be interfaced from SAP.
Report only shows equipment if Equipment ever has status INPR in between selected date
and time.
Data MTBS and MTTR will still be displayed although the selection area is less than 60 hours.
2. TECHNICAL INFORMATION
Functional Description of Report
The purpose of this functional design is to generate Report Equipment Performance. Forming
elements of Report Equipment Performance is obtained from three main transaction modules, Hour
Meter, Working Hour, and Hourly Production.
Summary Level : Summary
Output : Screen
Frequency : Daily
Processing Type : Batch
Owner : Engineering
Audience : Supervisor MCD - Engineering, Supervisor MCD – Operation,
Supervisor Plant
Business Driver : BUMA
Priority : High
Complexity : High
Design Assumptions :
Several assumptions are used for MCD application development, those assumptions are:
1. The development items will be made into web application.
2. The development will be using technologies such as, .NET, SQL Server 2016, Telerik version
2017, and using PRISM as a framework.
3. Report can be export to Excel with file type .xlsx
4. Report will be built using batch processing. There will be temporary table to store data and
calculation needed for Report Equipment Performance.
5. This report relies on the accuracy of transaction data MTC stored in custom table that is
accessible for user to update/refresh the transaction table.
Open Issues
N/A
4. DESIGN
4.
4.1. Flow Diagram
Hour
Display Report
Equipment
Performance data
End
Interface SAP
Data Fuel Usage and HM Fuel is retrieved form Module Interface Inbound. Module interface
Inbound will be explained in this document: Phoenix_S4HANA_AP357 FD Interface-
IMC011-Inbound Fuel Usage & HM Fuel v1.00
RMC001_Report
Equipment Performance v1.00.xlsx
based on Equipment on
selected Site
11 Equipment Group N/A Equipment Group is
retrieved from Equipment
Group in Equipment Setting
based on Equipment in
selected Site
12 Equipment N/A Equipment Category is
Category retrieved from Master
Equipment.
13 Equipment Class N/A Equipment Class is
retrieved from Equipment
Hierarchy.
14 Unit Status N/A Unit Status is retrieved from
latest Unit Status in
Transaction Run INPR,
despite the selected date.
15 Total Ready Hours DurationTime ID Total Duration all activity
Productive (Hours) ¿ included to Time ID that has
1104 +1105+1106 +¿ Time Category "PR-
1201+1202+1203+¿ Productive" in Record Work
1301 ¿ Hour based on Equipment,
selected Site and Date
16 Total Ready Hours DurationTime ID Total Duration all activity
Non-Productive ¿ included to Time ID that has
(Hours) 1404+1405+ 1406+¿ Time Category "NP-Non
1407+1501+1502+¿ Productive" in Record Work
1503+1601+1602 ¿ Hour based on Equipment,
selected Site and Date
17 Total Ready Hours Total Productive +¿
(Hours) Total Non Productive
18 Total Delay DurationTime ID Total Duration all activity
Operating (Hours) ¿ included to Time ID that has
2105+2106 ¿ Time Category "DO-Delay
Operating" in Record Work
Hour based on Equipment,
selected Site and Date
19 Total Working Total Ready Hours+ ¿ N/A
Hours (Hours) Total Delay Operating
20 Total Delay Non DurationTime ID Total Duration all activity
Operating In Plan ¿ included to Time ID that has
(Hours) 2205+2206+ 2207+2208+¿ Time Category "IP-In Plan"
2209+2210+2211 ¿ in Record Work Hour based
on Equipment, selected Site
and Date
21 Total Delay Non DurationTime ID Total Duration of all
Operating Unplan ¿ activities included to Time
(Hours) 2305+2306+ 2307+2308+¿ ID that has Time Category
2309+2310+2311+ 2312+ ¿ "UP-Un Plan" in Record
2312+2313+2314+ 2315+¿ Work Hour based on
2316+2317+ 2318+2319+¿ Equipment, selected Site
2320+2321+2322+2323+¿ and Date
2324+ 2325+2326+2327+¿
2328+2329+2330+ 2331+¿
2332+2333 ¿
22 Total Delay Non Total Delay NonOperating∈Plan +¿ N/A
Operating Delay Operating Un Plan
23 Total Standby In DurationTime ID Total Duration of all
Budget (Hours) ¿ activities included to Time
3103+3104 ¿ ID that has Time Category
"IB-In Budget" in Record
Work Hour based on
Equipment, selected Site
and Date
24 Total Standby Non DurationTime ID Total Duration of all
Budget (Hours) ¿ activities included to Time
3205+3206+3207 +3208+¿ ID that has Time Category
3209+3210+3211+ 3212+ ¿ "NB-Non Budget" in Record
3213+3214+ 3215+3216+¿ Work Hour based on
3217+3218+3219+ 3220+ ¿ Equipment, selected Site
3221+3222 ¿ and Date
25 Total Standby Total Standby ∈Budget + ¿ N/A
(Hours) Total Standy Non Budget
26 Total Non-Working Total Delay NonOperating+¿ N/A
Hours (Hours) Total Standby
27 Down - Breakdown N/A Show duration (Start Time
Schedule (Hours) deviation) of activity which
5101 MTC Time ID = 5101 in Record
Schedule Work Hour based on
Equipment, selected Site
and Date.
28 Down - Breakdown N/A Show duration (Start Time
Schedule (Hours) deviation) of activity which
5102 Tire Schedule Time ID = 5102 in Record
Work Hour based on
Equipment, selected Site
and Date.
29 Total Breakdown DurationTime ID (5101+ 5102) N/A
Schedule (Hours)
30 Down - Breakdown N/A Show duration (Start Time
Schedule (Hours) deviation) of activity which
5201 MTC Time ID = 5201 in Record
Unschedule Work Hour based on
Equipment, selected Site
and Date.
31 Down - Breakdown N/A Show duration (Start Time
Schedule (Hours) deviation) of activity which
5202 Tire Time ID = 5202 in Record
Unschedule Work Hour based on
Equipment, selected Site
and Date.
32 Down - Breakdown N/A Show duration (Start Time
Unschedule deviation) of activity which
Performance.
- WR Ready Hours is
total duration of activities
that has Time ID with
Time Reason “Ready”
and SD Material “WR” in
Record Work Hour in
range of selected From
Date and From Time to
To Date and To Time.
- Ready Hours
Productive is total
duration of activities that
has Time ID with Time
Category “Productive” in
in range of selected
From Date and From
Time to To Date and To
Time.
58 HM CM (Hours) (HM OPR x CM Ready Hours) - HM OPR is retrieved
Ready Hours Productive from field HM OPR in
Report Equipment
Performance.
- WR Ready Hours is
total duration of activities
that has Time ID with
Time Reason “Ready”
and SD Material “CM” in
Record Work Hour in
range of selected From
Date and From Time to
To Date and To Time.
- Ready Hours
Productive is total
duration of activities that
has Time ID with Time
Category “Productive” in
in range of selected
From Date and From
Time to To Date and To
Time.
59 HM CT (Hours) (HM OPR x CT Ready Hours) - HM OPR is retrieved
Ready Hours Productive from field HM OPR in
Report Equipment
Performance.
- WR Ready Hours is
total duration of activities
that has Time ID with
Time Reason “Ready”
and SD Material “CT” in
Record Work Hour in
range of selected From
Equipment
Performance.
- Total Hours is retrieved
from field Total Hours in
Report Equipment
Performance.
- Total Down is retrieved
from field Total Down in
Report Equipment
Performance.
65 WR Production Total - Ritasi WR Production
(BCM) – Tidak ¿ is retrieved from Ritasi
dibuatkan element Production ¿orWeight WR Production ) which SD Material is
pembentuk di WR in Record Hourly
report Production in range of
Note: selected From Date and
Ritasi and capacity will be ignored if From Time to To Date
there is weight and To Time. (not
include ticked General
data)
- Capacity WR
Production is retrieved
from Capacity which SD
Material is WR in
Record Hourly
Production in range of
selected From Date and
From Time to To Date
and To Time. (not
include ticked General
data)
- Weight WR Production
is retrieved from Weight
which SD Material is
WR in Record Hourly
Production in range of
selected From Date and
From Time to To Date
and To Time. (not
include ticked General
data)
66 CM Production Total - Ritasi CM Production
(Ton) – Tidak ¿ is retrieved from Ritasi
dibuatkan element Production ¿orWeight CM Production ) which SD Material is CM
pembentuk di in Record Hourly
report Production in range of
Note: selected From Date and
Ritasi and capacity will be ignored if From Time to To Date
there is weight and To Time. (not
include ticked General
data)
- Capacity CM
Production is retrieved
from Capacity which SD
Material is CM in Record
Hourly Production in
range of selected From
Date and From Time to
To Date and To Time.
(not include ticked
General data)
- Weight CM Production
is retrieved from Weight
which SD Material is CM
in Record Hourly
Production in range of
selected From Date and
From Time to To Date
and To Time. (not
include ticked General
data)
67 CT Production Total - Ritasi CT Production is
(Ton) – Tidak ¿ retrieved from Ritasi
dibuatkan element Production ¿orWeight CT Production) which SD Material is CT
pembentuk di in Record Hourly
report Production in range of
Note: selected From Date and
Ritasi and capacity will be ignored if From Time to To Date
there is weight and To Time. (not
include ticked General
data)
- Capacity CT
Production is retrieved
from Capacity which SD
Material is CT in Record
Hourly Production in
range of selected From
Date and From Time to
To Date and To Time.
(not include ticked
General data)
- Weight CT Production
is retrieved from Weight
which SD Material is CT
in Record Hourly
Production in range of
selected From Date and
From Time to To Date
and To Time. (not
include ticked General
data)
68 WR Non- Total - Ritasi WR is retrieved
Production (BCM) ( Ritasi WR x Capacity WR) from Ritasi which SD
– Tidak dibuatkan Material is WR and
Or
Production in Report
Equipment
Performance.
- Ritasi WR Production
is retrieved from Total
Ritasi WR Production in
Report Equipment
Performance.
75 Truck Factor CM CM Production - CM Production is
(Ton) Ritasi CM Produciton retrieved from CM
Production in Report
Equipment
Performance.
- Ritasi CM Production
is retrieved from Total
Ritasi CM Production in
Report Equipment
Performance.
76 Truck Factor CT CT Production - CT Production is
(Ton) Ritasi CT Production retrieved from CT
Production in Report
Equipment
Performance.
- Ritasi CT Production is
retrieved from Total
Ritasi CT Production in
Report Equipment
Performance.
77 PTY WR WR Production - WR Production is
Productive Ready Hours Productive WR retrieved from WR
(BCM/Hours) Production in Report
Equipment
Performance.
- Ready Hours
Productive WR is total
duration of activities that
has Time ID with Time
Category “Productive”
and SD Material WR in
range of selected From
Date and From Time to
To Date and To Time.
78 PTY CM CM Production - CM Production is
Productive Ready Hours Productive CM retrieved from CM
(Ton/Hours) Production in Report
Equipment
Performance.
- Ready Hours
Productive CM is total
duration of activities that
has Time ID with Time
Category “Productive”
and SD Material CM in
range of selected From
Date and From Time to
To Date and To Time.
79 PTY CT Productive CT Production - CT Production is
(Ton/Hours) Ready Hours Productive CT retrieved from CT
Production in Report
Equipment
Performance.
- Ready Hours
Productive CT is total
duration of activities that
has Time ID with Time
Category “Productive”
and SD Material CT in
range of selected From
Date and From Time to
To Date and To Time.
80 PTY WR WR( Production+ Non Production) - WR Production is
(BCM/Hours) WR ℜ a dy Hours retrieved from WR
Production in Report
(Productive+ Non Productive)
Equipment Performance
in range of selected
From Date and From
Time to To Date and To
Time.
- WR Non-Production is
retrieved from WR Non-
Production in Report
Equipment Performance
in range of selected
From Date and From
Time to To Date and To
Time.
- WR Ready Hours is
total duration of
activities that has Time
ID with Time Reason
“Ready” and SD
Material “WR” in Record
Work Hour in range of
selected From Date and
From Time to To Date
and To Time.
81 PTY CM CM ( Production+ Non Production) - CM Production is
(Ton/Hours) CM Ready Hours retrieved from CM
Production in Report
( Productive+ Non Productive)
Equipment Performance
in range of selected
From Date and From
Time to To Date and To
Time.
- CM Non-Production is
retrieved from CM Non-
Production in Report
Equipment Performance
in range of selected
From Date and From
Time to To Date and To
Time.
- CM Ready Hours is
total duration of
activities that has Time
ID with Time Reason
“Ready” and SD
Material “CM” in Record
Work Hour in range of
selected From Date and
From Time to To Date
and To Time
82 PTY CT CT ( Production+ Non Production) - CT Production is
(Ton/Hours) CT Ready Hours retrieved from CT
Production in Report
( Productive + Non Productive)
Equipment Performance
in range of selected
From Date and From
Time to To Date and To
Time.
- CT Non-Production is
retrieved from CT Non-
Production in Report
Equipment Performance
in range of selected
From Date and From
Time to To Date and To
Time.
- CT Ready Hours is total
duration of activities that
has Time ID with Time
Reason “Ready” and SD
Material “CT” in Record
Work Hour in range of
selected From Date and
From Time to To Date
and To Time.
83 PTY WR Blasting WR Production(type Blasting ) - WR Production (type
(BCM/Hours) Activity WR Blasting( Ho u rs) Blasting) is retrieved
from WR Production
which SD Material is
WR and WR Type is
Blasting in Record
Hourly Production in
range of selected From
Date and From Time to
5. SELECTION CRITERIA
Cb01
Dt02 Btn01
Rb01
Dt01
Cb02 Cb03
Control Action /
Ref. Control Response Remarks
Type Event
1. Cb01 Combobox N/A N/A Filled with Site
2. Rb01 Radio Button On Selected If “Days” selected Options:
- From Time and To Time - Days
will be disabled and has - Hours
no value
If “Hours” selected
- From Date and To Date
will always has same date
(can only select for 1 day)
- Enabled From Time and
To Time
3. Dt01 Date Picker On Selected If “Hours” selected Filled with From
- To Date = From Date Date
4. Dt02 Date Picker On Selected If “Hours” selected Filled with To Date
- From Date = To Date
5. Cb02 Combobox N/A N/A Filled with From
Time with format
xx:00
6. Cb03 Combobox N/A N/A Filled with To Time
with format xx:00
7. Btn01 Button On Click Display Report Equipment N/A
Performance based on
selected Site, From Date,
From Time, To Date, To Time
6. ERROR HANDLING
Test Data
N/A