RQ Pura
RQ Pura
Lokasi : Dimensi
H = 4.00 m Bf =
Brw = 2.40 m Hrw =
b1 = 0.20 m b2 =
b4 = 0.20 m b5 =
h1 = 0.50 m h2 =
h4 = 1.00 m hwt =
hwt
hwn = 1.477 m
q = 1.5 t/m2 Kh =
hwn gbt = 2.2 t/m3 gw =
gc = 2.4 t/m3
hwl Tanah Timbun
gsoil = 1.80 t/m3 a =
gsat = 2.00 t/m3 a =
f = 30.0 o
b =
c = 0 t/m2
m = 0.60
Uplift Coefficient
Um = 1
(Unit Length)
2.50 m L = 1.00 m
3.50 ofset = 0.05 m
1.00
0.20 m b3 = 1.00 m
0.80 m
0.50 m h3 = 2.00 m
2.422 m hwl = 1.00 m
0.24
1.00 t/m3
0
0
0
1.1 Dimension
1.2 Parameter
q = 1.50 t/m2
gbt = 2.20 t/m3
gw = 1.00 t/m3
gc = 2.4 t/m3
Tanah timbun Tanah dibawah fondasi Tanah existing depan
gsoil = 1.80 gs' = 1.00 t/m3 gsoil = 1.66
gsat = 2.00 cB = 0.00 t/m2 gsat = 1.73
c = 0.00 fB = 30.00 o c = 0.00
f = 30.00 m = 0.60 f = 8.00
Um = 1
b = 0 o
(Karena tanah timbunan tidak bersudut)
d = 0 o (Pada normal condition
= 20.00 o (for structural analysis in normal condition, d = 2/3 f)
= 15.00 o (for structural analysis in seismic condition, d = 1/2 f)
F = 13.496 o ( = Arc tan(Kh) ) Kh = 0.24
2. Perhitungan Stabilitas
4 5
pa2
pa2
4.00
3
qa2
pa1
2
pa3
1 pa4
1.00
1.00
6
o
No Koef x L x t x g = W x X =
1 1 x 2.40 x 0.50 x 2.20 = 2.64 x 1.25 =
2 0.5 x 0.20 x 2.00 x 2.20 = 0.44 x 0.38 =
3 1 x 2.00 x 2.00 x 2.20 = 8.80 x 1.45 =
4 0.5 x 0.20 x 1.00 x 2.20 = 0.22 x 1.58 =
5 1 x 0.80 x 1.00 x 2.20 = 1.76 x 2.05 =
6 1 x 2.50 x 0.50 x 2.4 = 3.00 x 2.3 =
Total Berat dan Momen tanpa uplift 16.86
Gaya uplift
Pu1 0.5 x 2.50 x 1.00 x -1.00 = -1.25 x 1.6666667 =
Pu2 0.5 x 2.50 x 1.477 x -1.00 = -1.85 x 0.83 =
Total Berat dan Momen dengan uplift 13.76
B. Beban Horizontal
Cos2(f-a)
Ka =
Sin(f+d) x Sinf 2
Cos2a x Cos(a+d) x 1+
Cos(a+d) x Cosa
a = 0 d = 0.000 o
Cos2(f -a) = 0.750 Sin(f+d) = 0.500
Cos2a = 1.000 Sinf = 0.500
Cos(a+d) = 1.000 Cosa = 1.000
Cos2(f+a)
Kp =
Sin(f+d) x Sinf 2
Cos2a x Cos(a -d) x 1-
Cos(a -d) x Cosa
a = 0.000 o d = 0.000 o
Cos2(f+a) = 0.750 Sin(f+d) = 0.139
Cos2a = 1.000 Sinf = 0.139
Cos(a -d) = 1.000 Cosa = 1.000
Kp = 1.012
Perhtungan Momen
No q x h x Koef = H x Y = Momen
Pa1 0.50 x 4.00 x 1.00 = 2.00 x 2.00 = 4.00 t.m/m
Pa2 1.51 x 2.52 x 0.50 = 1.91 x 2.32 = 4.43 t.m/m
Pa3 0.50 x 1.48 x 1.00 = 0.74 x 0.74 = 0.55 t.m/m
Pa4 0.49 x 1.48 x 0.50 = 0.36 x 0.49 = 0.18 t.m/m
Pw1 1.48 x 1.48 x 0.50 = 1.09 x 0.49 = 0.54 t.m/m
qw2 1 x 1.00 x -0.50 = -0.50 x 0.3333333 = -0.17 t.m/m
qp1 0.7385465 x 1.00 x -0.50 = -0.37 x 0.3333333 = -0.12 t.m/m
Total gaya horizontal dan Momen 5.23 ton 9.40 t.m/m
C. Check Stabilitas
B = 2.50
B 2.50
e = - X = - 1.049 = 0.201 m < B/6 =
2 2
SF guling = SWxX = 27.09 = 2.88 OK Dinding pasangan batu kali mampu menahan g
SHxY 9.40
# Dengan Uplift
B = 2.50
B 2.50
e = - X = - 1.022 = 0.228 m < B/6 =
2 2
SF guling = SWxX = 23.46 = 2.50 OK Dinding pasangan batu kali mampu menahan g
SHxY 9.40
B = 2.50 m z = 1.00 m L =
a = 1.00 b = 0.50
Shape of footing a
1 strip 1.00
2 square 1.30
3 rectangular, B x L 1.17
(B < L) (= 1.09 + 0.21 B/L)
(B > L) (= 1.09 + 0.21 L/B)
4 circular, diameter = B 1.30
Nc = 7.0 Nq = 1.4 Ng =
f Nc Nq Ng
0 5.7 0.0 0.0
5 7.0 1.4 0.0
10 9.0 2.7 0.2
15 12.0 4.5 2.3
20 17.0 7.5 4.7
25 24.0 13.0 9.5
30 36.0 23.0 20.0
35 57.0 44.0 41.0
37 70.0 50.0 55.0
39 > 82.0 50.0 73.0
(a x c x Nc) = 0.000
qu = 1.022t/m2
16.860 6x 0.201
q2 = x (1 - ) = 3.491 t/m2 > qa =
2.50 2.50
Reaction of Foundation Soil in Case 1
3.491 t/m2
9.997 t/m2 - t/m2
pa4 pw1
qa4 qw1
WxX
3.3 t.m/m
0.168667 t.m/m
12.76 t.m/m
0.348333 t.m/m
3.608 t.m/m
6.9 t.m/m
27.085 t.m/m
-2.083333 t.m/m
-1.538542 t.m/m
23.46313
ton/m
ton/m
ton/m
ton/m
ton/m
ton/m
ton/m
t.m/m
t.m/m
t.m/m
t.m/m
t.m/m
t.m/m
t.m/m
t.m/m
0.417 m OK !
0.417 m OK !
b
0.50
0.40
0.40
0.30
0.0
rmal condition)
smic condition)
- t/m2