1 Offered Transmitters shall be Foundation Field bus type and shall be used at
unmanned platform wellheads.
2 All Field bus transmitters shall satisfy, as minimum, the requirement of the Field bus
registration laboratory and in case of Field bus Foundation, shall have FF "tick mark".
All FF transmitters shall be registered with Field bus Foundation having passed the
interoperability tests as per ITK 4.01 as minimum. Documentary evidence to this
effect shall have to be submitted.
3 Field bus electronic transmitters shall be Foundation Field bus H1 compliant bus
powered device having output as FF compliant digital communication and shall have
LAS (Link Active Scheduler) capability to ensure communication during primary LAS
failure (LAS backup).
4 Foundation Field bus transmitters shall comply with ISA S50.02 and IEC-61158
standard.
5 Foundation Field bus transmitter shall be compatible to use along with Foundation
Field bus accessories such as FISCO power supply, spur connector, short circuit
protectors, bus terminator etc. for Intrinsically safe H-1 field bus implemented using
Field bus Intrinsically Safe Concept (FISCO).
6 Foundation Field bus transmitters shall have intrinsically safe/FISCO (Field bus
Intrinsic Safety Concept) approval from statutory body and shall be suitable for use in
Class I, Division 1, Group D, temperature class T3 hazardous area.
8 Field bus transmitter shall work with voltages of 9-32 VDC. Transmitters shall be
compatible with FISCO power supply module and should function satisfactorily with
such power supply module.
Technical Specifications
10 Field bus transmitter shall have standard function blocks including AI (Analog Input) as
minimum.
11 DD and CFF files for field bus transmitter according with foundation field bus FF-524
and FFf-103 respectively shall be provided.
13 Transmitter shall run complete diagnostic routine. in the event of detection of failure,
the output shall be driven to predefined value.
14 Transmitter shall be configured to store its tag number, calibration range & other
specifications / data which will be useful for history record purpose.
17 Effect of static pressure on the differential pressure transmitter in either direction shall
be negligible.
18 Transmitter shall be provided with external zero adjustment and shall have integral
vent/drain.
Technical Specifications
21 The material of elastomers used in instruments shall be suitable for the specified
service. Use of asbestos or asbestos-bearing materials shall not be used.
22 All materials of construction shall meet the requirements specified in NACE MR-01-75
latest edition wherever applicable.
23 Transmitter’s meter body and electronics housing material shall be SS-316 and it shall
resist shock, vibration, corrosion and moisture.
25 Foundation Field bus protocol shall be field proven and shall have following features
as a minimum:
♦ It shall allow for multi masters (for example, two, primary and a secondary) for
configuration, calibration, diagnosis & maintenance.
♦ The primary could be host computer like HMI (Human Machine Interface) and
secondary could be hand held Configurator (HHC).
Technical Specifications
1.0 GENERAL:
The site conditions include exposure to hydrocarbons, h2s (in case the process
fluid is sour), moist, salt laden atmosphere, seawater spray, sunlight, monsoon
rainfall, temperature, humidity, wind, fungal growth, vibration and shock, emi
and rfi. All instruments shall be designed to withstand these conditions during
shipment, storage, installation & commissioning and operation period.
All instrumentation shall be suitable for the overall climatic conditions with
particular attention to site ambient conditions as given below.
5°C to 50°C
Ambiant Température Range :
45 % to 95 % at 32 °C
Relative Humidity :
1.2. Definitions:
Foundation field bus is the name of field bus developed by the field bus
foundation and it is a digital, two-way multidrop communication link.
The main communication highway between devices on field bus network and
act as a source of main supply to spurs on the network.
Branch line connecting to the trunk that is a final circuit and can vary in length
from 1m to 120m.
Wherever edition is not mentioned, latest edition prior to issue of tender shall
be followed.
British Standards
Indian Standard
electrical insulation.
IS-1554- Pvc insulated (heavy duty) electric cables-working voltage
PART I up to and including 1100 v.
IS-2147 Degree of protection provide by enclosures for low voltage
switch gear and control gear
IS-2148 Flame proof enclosures for electrical apparatus.
IS-5831 PVC insulation and sheath of electric cables.
IS-6474 Polyethylene insulation & sheath of electric cables
IS-10661 Specifications for glass fibre reinforced polyster chemical
resistant
2.1 All instruments shall have high MTBF (mean time before failure).
Project: Neelam Redevelopment Project
2.3 All instruments and items shall be suitable for use in a harsh marine
environment, which is saline and corrosive.
2.4 The offered instruments shall be passive to radio transmissions. Band pass
and / or band stop filters shall be fitted as necessary to ensure immunity to RFI
as per IEC 801.
2.6 All fittings, fasteners, brackets, clamps, tube clips, conduit, cable glands etc
shall be of SS316 as minimum.
2.7 Drain ports of all instruments covered under this job shall be terminated in a
common existing drain at each platform. The attached instrument hook-up
drawings does not indicate this requirement.
2.8 All offered items shall have local support capability in India. This includes the
spare parts and maintenance support.
2.9 All microprocessor based instruments/ systems which maintain their own real
time calendar shall be V2K compliant as individual and also when integrated
with RTU. All systems/ equipment must be compliant to requirements of
BSI/DSC-PD-2000-1.
(3) Flange face finish shall be as per paragraphs 6.4.4.1, 6.4.4.2 and 6.4.4.3
of ANSI/ASME B 16.5. The face finish wherever specified in data sheets
shall have serrations as follows;
• Serrated finish:
(4) Grooves of ring type joint flanges shall be octagonal as per ANSI/ ASME
B 16.20.
2.11 Ranges for instruments shall be selected in general, such that in normal
process operation, the indication shall remain in between 40% to 60% of span
for linear and 60% to 80% of span for square root inputs.
(4) Approvals other than above shall neither be offered nor be acceptable.
(1) All field transmitters shall be intrinsically safe type. All Fieldbus devices
shall be intrinsically safe/FISCO certified to be used in intrinsically safe
installation.
(1) All the field instruments shall be “dust proof” and “weatherproof” having
IP-65 compliance as per IEC-60529 / IS-2147 and secure against the
ingress of fumes, dampness, insects and vermin.
(2) External surfaces shall be suitably treated with epoxy painting to provide
protection against marine corrosive atmosphere.
(3) Items, their accessories, supports etc shall be suitable for installation and
operation under extremely saline, humid and harsh marine environments
and shall be tropicalised and treated to protect against the environmental
conditions specified elsewhere. It may be noted that the application is
prone for salt formation and rusting.
(4) All internal and external parts, which are not inherently corrosion resistant
by choice of material, shall be prepared and finished by plating or paint
finish.
5.1 Introduction:
Project: Neelam Redevelopment Project
Power supply of 230 VAC +/- 10%, 50hz shall be available at single point for
process complex and bridge connected platforms instrumentation.
(2) Field bus field transmitters (i.e. PT, TT, DPT) shall be used to monitor the
various wellhead parameters.
(3) Solenoid Valve shall be used for remote control of individual well and
emergency shut down of unmanned platform wells.
(4) SCADA system integrated with RTUs (Remote terminal Unit) shall be
implemented for monitoring and control of unmanned wellheads.
(5) Each unmanned wellhead shall have dedicated RTU. All the field devices
at each unmanned wellheads shall be connected to RTU via FFJB
(Foundation Fieldbus Junction Box). Further, RTU shall communicate to
associated process complex SCADA master via existing Radio link.
(6) Process platform and bridge connected wellhead platform devices shall be
connected to Process platform RTU via existing TIJB (Telemetry Interface
Junction Box).
(7) Unmanned Platform RTU and Foundation Fieldbus Junction box (FFJB)
shall be located in Telemetry Room at unmanned wellhead while process
complex RTU shall be located in Control Room at Process complex, which
are designated as safe areas.
Project: Neelam Redevelopment Project
(8) FISCO power supply for Fieldbus instruments shall be installed in FFJB
while junction boxes for Fieldbus devices (Type-1 & Type-2 JBs) shall be
located in field.
5.4 Configuration:
c) SOVs for remote well control and for remote shut down operation (ESD &
FSD) shall be connected to RTU in point to point hardwired configuration.
5.5.1 General:
(1) In general, Field bus configuration shall comply the requirements specified
in the various standards like IEC 61158-2, IS-5831, ISA-S50.02.
(4) All the devices must, as minimum, satisfy the requirements of the fieldbus
registration laboratory and all have FF “check mark” logo. All Fieldbus
devices shall be registered with FF having passed the interoperability tests
as per ITK 4.01 as minimum.
(5) Chicken foot / Tree topology shall be adopted. Same shall be carried out
with the help of field junction boxes and spur connectors. Daisy chain
topology shall not be used.
(6) Various aspects like instrument & JB locations, hazardous area, Plot plan,
trunk cable distance, spur cable distance, cable parameters, voltage drop,
power supply current capacity, spur short-circuit current, current
consumption of each device, location of device on fieldbus, host
limitations, minimum operating voltage of device etc shall be taken into
account while finalising the configuration.
(9) While designing the fieldbus segment, 20% spare shall be considered.
Spare capacity shall be maintained at all levels including Spur connector,
Project: Neelam Redevelopment Project
Junction box, bus segment, bulk power supply, field bus power supply /
conditioner, host / FF interface etc. such that any addition in future shall
be carried out without any addition of hardware / software.
(10) All required accessories like Spur connectors with short-circuit protection,
Junction box to mount spur connectors, Junction Boxes, cables, cable
glands, Power supplies, Barriers, Repeaters, Power conditioners, Surge
Protection devices, bus terminators etc. shall be supplied to meet the
overall functional and maintenance requirements.
5.5.2 Interoperability:
(1) All Foundation Fieldbus devices shall be interoperable with the RTU to
take advantage of the associated advanced diagnostic features and asset
management capabilities.
(2) To ensure that full interoperability exists, all FF devices shall only be
selected in accordance with the RTU’s Host Interoperability System
Testing (HIST) Device Listing.
(1) FISCO power supply shall provide power to fieldbus devices Contractor
shall also consider power conditioner in addition to FFPS, if required.
5.5.3.3 Repeaters:
(1) The LAS is responsible for coordinating all the communication on the field
bus.
Project: Neelam Redevelopment Project
(2) The primary LAS shall reside in RTU H-1 interface cards.
(3) The FF / Host interface module will act as primary LAS (Link Active
Scheduler). In addition, field primary back-up LAS shall be identified and
configured in each bus segment Each fieldbus segment shall be
configured for automatic fail-over to the field primary back-up LAS in the
event of primary LAS failure.
(1) All trunk and spur connections in the field shall be terminated in ‘wiring
blocks’ specifically made for Foundation Fieldbus networks. The wiring
blocks shall be mounted in field mounted weather proof and explosion
proof junction boxes. (Type-2)
(2) The wiring block shall have two dedicated connections for the Fieldbus
trunk cable.
(3) Integral short circuit protector for spur connections shall be provided.
(4) Wiring block / spur connector shall have an indicator to provide status of
each spur connection indicating when spur is shorted and is in over
current mode. It shall also provide an indication when bus power is
available.
(1) Individual field bus segments coming out from various Spur connector
junction boxes shall be grouped in Type-1 Junction Box mounted in the
field.
5.5.4 Cable:
Individually shielded twisted pair with overall screened armoured cable shall be
used as fieldbus cable.
5.5.5 Grounding:
(1) The instrument shield shall be terminated at the host end of the network in
the FFJB and shall not be connected to ground at any other place.
(2) In case of multi home run cables, cable shields from different networks
shall not be connected together.
Project: Neelam Redevelopment Project
(1) Allowable network and segment loading shall be determined by the lower
value of below given three parameters.
(2) Spare:
(1) The macro cycle shall have 50% unscheduled time as minimum for non-
deterministic bus communications such as alarm transmission, set point
changes etc
(2) The macrocycle shall be sufficiently fast to obtain a representative
sampling of the true process changes.
All existing transmitters for lift gas service on unmanned platform as well as on
bridge-connected platforms shall be configured in the HART Point-to-Point
configuration.
All transmitters to measure process parameters on process complex shall also
be configured in HART point-to-point configuration.
a) Contractor shall arrange required power supply for field devices, one-in-
two-out barriers etc. from the owner supplied single point power tie-in
point (24 VDC). All required distribution shall be carried out by the
contractor.
b) Contractor shall replace existing barriers with new one-in-two-out barriers
for the interface/parameter signals.
c) All the multi pair cables from the field shall be terminated on one-in-two-
out barriers, to be installed in existing telemetry interface panels (TIJB)
located at Control room.
d) Signals from the one-in-two-out barriers shall be repeated to RTU located
in control room, with the help of single / multi pair cables.
(1) Each field device shall be connected to a junction box through single pair
signal or control cables and then further to telemetry room/control room
through multi pair cables.
(2) Separate junction boxes shall be used for the following type of signals:
All pulsed signals shall be routed directly to telemetry room / control room
without the use of intermediate junction boxes, in general.
(3) Intrinsically safe wiring philosophy shall be followed for hart based
transmitters while, non-is wiring philosophy shall be followed for sovs.
Suitable flow signal converters shall be provided for test separator existing
flow meter.
(4) Separate cables and cable trays shall be provided for is and non-is
signals. Is and non-is cables shall not be run in a common tray.
(5) 20% spare capacity shall be provided for cables, junction boxes, trays for
the future.
(6) Arial distance between process tapping point and field instrument shall be
up-to 15 meters.
(7) Location of the scada mtu, rtu, field instruments, field junction boxes, tijb,
cable & tube route shall be finalized in consultation with ongc
representatives from respective area/ location.
7.0 Compliance:
7.1 Contractor shall ensure that all the instrumentation offered is completely
suitable for the ambient conditions, process data and functional requirements
as specified in this specifications / attachments / annexures / datasheets.
Selection of model number is solely contractor’s responsibility. If at any stage,
the offered instrumentation is found unsuitable for the specified operating
conditions, the contractor shall replace the same with suitable model to meet
the specification without any time and / or cost implication.
7.2 Contractor shall ensure that the offer includes all the accessories / special
cables / fittings and any other items required for the satisfactory installation and
commissioning/safe operation / online maintenance / smooth functioning. Any
such items / requirements discovered at a later date, even after ONGC’s review
of documents, shall be supplied by the contractor without any time & cost
implications to ongc.
Project: Neelam Redevelopment Project
7.3 If any instrument item is supplied by an agent, contractor shall get in writing
from their principals/manufacturer, the guarantee and undertaking with respect
to quotation/quantity /selection and performance of the offered items and
submit the same to ONGC.
8.1 Contractor shall submit the procedure to protect and preserve the items being
purchased during transportation and storage at the construction site. Adequate
export (sea worthy) packing shall be provided to protect against rust, corrosion
and damage during transportation and storage.
8.2 Contractor shall submit preliminary shipping / packing list indicating number of
boxes, estimated size of package, volume, etc.
8.3 All moving parts shall be suitably locked to arrest movement during
transportation, with proper identification. All ports and openings shall be sealed.
Threaded connection shall be plugged with molded plastic caps or plug. It is
contractor’s responsibility to ensure all items are adequately protected during
shipment.
8.4 Instruments shall be supplied in sealed heavy plastic bags containing desiccant
material during shipment. All parts, subject to moisture, shall be suitable for
tropical conditions.
Project: Neelam Redevelopment
Project
Technical Specifications
However, alternative method of Non-IS Trunk and Intrinsically Safe Spurs (Field bus
Barrier) concept may also be considered.
1 All Foundation Field bus (FF) hardware shall be used with intrinsically safe H-1 field bus
implemented using Field bus Intrinsically Safe Concept (FISCO). Necessary statutory
certifications for individual Foundation Field bus (FF) hardware components shall be
provided by contractor as applicable.
2 All Foundation Field bus (FF) hardware shall be FISCO certified for use in intrinsically
safe application. Hazardous area as Class I, Division 1, Group D, Temp class T3 shall
be considered.
3 Foundation Field bus (FF) hardware shall comply with Field bus standards like ISA
S50.02, IEC-61158.
4 All Foundation Field bus (FF) hardware shall have minimum one year comprehensive on
site warranty/ guarantee.
5 Bidder shall propose Foundation Fieldbus network configuration inline with "Foundation
Fieldbus implementation philosophy" provided in “engineering design criteria” of
technical document. Foundation Fieldbus hardware specifications given below are
indicative only, and bidder may consider these hardware components and additional
components if any, as required to suit their proposed Foundation Fieldbus network
configuration.
1 FISCO power supply shall provide power to fieldbus devices. Contractor shall consider
power conditioner in addition to FFPS, if required.
2 FISCO power supply shall comply with IEC 61158-1 criteria and performance
requirements.
3 Power supply shall be load sharing and output current limiting type. It shall also provide
input/output power supply isolation.
Project: Neelam Redevelopment
Project
Technical Specifications
6 Repeaters shall be utilised to join FF segment together. More than one segment shall be
multi dropped and connected to common FF / Host interface of RTU.
7 FISCO power supply, repeaters, power conditioner etc. shall be installed in FFJB
(Foundation Fieldbus Junction Box) located in the Telemetry room.
1 All trunk and spur connections in the field shall be terminated in spur connector -‘wiring
blocks’ specifically made for Foundation Fieldbus networks.
2 The wiring block shall have two dedicated connections for the Fieldbus trunk cable.
3 Integral short circuit protector for each spur connections shall be provided.
4 Wiring block / spur connector shall have an indicator to provide status of each spur
connection indicating when spur is shorted and is in over current mode. It shall also
provide an indication when bus power is available.
5 The wiring blocks shall be installed in hazardous area in explosion proof junction box.
2 All the terminators located in the field shall be installed in a junction box (preferably in
spur connection Junction Box).
Technical Specifications
FFJB shall be supplied along with necessary accessories like terminal box, toggle
switch, supporting channel, PVC wire ways etc. duly mounted in FFJB with complete
wiring. All accessories for installing Field bus hardware components and other items to
be installed in FFJB shall be part of FFJB supply.
2 FFJB shall be weather proof to IP-65 or better as per IEC-529/IS-2147 and secure
against the ingress of fumes, dampness, insects and vermin.
3 FFJB shall be fabricated using SS 316 sheet supported by ss 316 structural members.
Material used for ffjb construction shall be free from surface defects or other evidence
of poor quality materials or poor handling or storage conditions. All edges, folds and
bends shall be free from irregularities and stress cracks.
All internal braces and supports, hinges, screws shall also be of SS316. Contact of
dissimilar metals shall be avoided wherever possible and where contact unavoidably
occurs, manufacturer shall indicate the proposed precautionary measures against
galvanic action are proposed.
4 FFJB shall be floor mounted, self-standing type and fully enclosed construction.
5 FFJB shall be provided with removable eyebolts and blanking plugs, for lifting
purpose.
6 Contractor shall carry out FFJB sizing, keeping in view the maintenance clearances
and easiness, based on the total number of field instruments, FISCO power supply,
isolating barriers and other Foundation Field bus accessories to be installed. Although
the FFJB dimensions shall be guided by the actual requirement, typical dimensions of
750mm (H) x 750mm (W) x 500mm (D) shall be kept in mind while finalizing the FFJB
size.
Project: Neelam Redevelopment
Project
Technical Specifications
Required accessories such terminals, fuses, toggle switches, etc shall be provided in
installed and fully wired condition for these 25 % spare capacity.
9 Power supply distribution to the field instruments shall be from FFJB. Provision for
incoming power supply feeder shall be considered by Contractor.
10 Fluorescent lamps with door switch shall be installed inside the panel at suitable
locations and shall be actuated by door switch.
11 Cable entries to FFJB shall be from bottom only with appropriate cable glands.
Enclosure shall be provided with a removable, bottom entry split gland plates sized for
the addition of 25% extra cables.
13 Design, wiring and layout of the ffjb shall be subject to review and approval by ongc or
appointed engineering consultant.
14 01 mm2 multi-stranded, 600 grade pvc insulated copper conductor shall be used for
wiring in general.
Power wiring and earth wiring shall be not less than 2 mm2-stranded copper.
15 All wiring shall be housed in covered, flame retardant type plastic raceways for easy
accessibility, maintenance, repair and removal. at least 25% additional space shall be
considered for future wiring.
16 All wiring shall be adequately supported and protected. separate wire ways shall be
provided for intrinsically safe wires and non-intrinsically safe & power wiring.
intrinsically safe wiring and terminals shall be of light blue colour and shall be
separated from non-intrinsically safe terminals at least by 50 mm.
Project: Neelam Redevelopment
Project
Technical Specifications
• Analog Signals
• Digital Signals & Power
• Field Bus
18 All wiring to/ from the field shall terminate at a terminal strip.
minimum distance between gland plate and terminal strip shall be 300 mm and
between terminal strip and ffjb top shall be 100 mm.
19 Terminals shall be captive screw and strap compression type, made of high-grade
melamine suitable for 4 mm2 or less cable conductor size. fused terminal shall be used
wherever necessary.
20 Sufficient number of terminal box shall be provided to terminate all the pairs of multi-
cable (including spare pairs) and shields of individual pairs.
21 Terminals shall be of 600 volt, channel mount type with identifying terminal numbers.
22 A minimum 1” x 1.4” copper ground bus bar insulated from cabinet structure shall run
the entire length of cabinet near floor level. compression type terminals suitable for 4.0
awg copper ground cable shall be provided at each end of the bar for connection to
platform ground.
23 Ground wiring shall be directly connected to ground bus bar by means of suitable wire
lugs. no intermediate terminals are allowed.
24 All incoming power feeders shall be terminated on separate terminals suitable for the
incoming feeder size. these shall be suitably covered for protection against accidental
shorting and for human safety.
25 Wiring within the cabinet shall be protected from wear and tear, against accidental
cuts, and from contact with cabinet parts or surfaces.
26 Laminated photocopy of wiring diagram shall be pasted inside the panel door.
a document pocket shall also be provided for storage of documentation.
Project: Neelam Redevelopment
Project
Technical Specifications
28 All items inside the ffjb shall have proper identification as per ONGC philosophy to be
finalized during detail engineering.
Project: Neelam Redevelopment
Project
Technical Specifications
2 The single pair armoured field cables shall be directly terminated on the explosion
proof solenoid valves mounted inside the cabinet. Accordingly, the bottom side of the
cabinet shall be provided with removable gland plates through which these single pair
field cables shall be routed using rubber grommets. Left and right side of the cabinet
shall have bulk head fittings for entry and exit of tubings for solenoid valves.
3 SOV cabinet shall be weather proof to IP-65 or better as per IEC-529/IS-2147 and
secure against the ingress of fumes, dampness, insects and vermin.
4 SOV cabinet shall be fabricated using SS 316 sheet supported by SS 316 structural
members.
Material used for cabinet construction shall be free from surface defects or other
evidence of poor quality materials or poor handling or storage conditions. All edges,
folds and bends shall be free from irregularities and stress cracks.
All internal braces and supports, hinges, screws shall also be of SS316. Contact of
dissimilar metals shall be avoided wherever possible and where contact unavoidably
occurs, manufacturer shall state what precautions against galvanic action are
proposed.
5 Contractor shall carry out SS Cabinet sizing, keeping in view the maintenance
clearances and easiness, based on the total number of field solenoid valves and other
accessories to be installed. Although the SS Cabinet dimensions shall be guided by
the actual requirement, typical dimensions of 750mm (H) x 750mm (W) x 500mm (D),
shall be kept in mind while finalizing the cabinet size.
Technical Specifications
Technical Specifications
Technical Specifications
Technical Specifications
3 Power Supply Field bus monitor shall be bus powered from field
bus shall not require any external battery or
power source.
Technical Specifications
Technical Specifications
3 Oxygen, temperature index and Oxygen index of PVC 30% and temperature
acid gas generation, smoke index over 250 deg c.
density
Acid gas generation shall be maximum 20% by
weight as per IEC 754-1
.
Smoke density rating shall be max. 60 % as per
ASTM-d 2843.
5 Armouring and its requirements All cables shall be armoured type. Armour over
inner jacket of galvanized steel wire/ flat as per
IS-1554 part I / IEC 502.
Technical Specifications
15 Branch Cable type Shielded, single pair/ single triad cable 1.5 mm2
conductor size shall be used as branch cable.
16 Multi pair Cable type Individually and overall shielded, 12 pair cable
with 1.5 mm2 conductor size shall be used as
multi-pair cable.
Technical Specifications
For the cables in is circuit, cable parameters shall be matched considering the entity
parameters of is circuit.
20 Branch Cable type Shielded, single pair cable / 4 core cable with 1.5
mm2 conductor size shall be used as branch
cable.
Project: Neelam Redevelopment
Project
Technical Specifications
Technical Specifications
3. Smart valve positioner shall be suitable for Linear or Rotary motion control
valves.
4. Smart valve positioner shall have changeable flow characteristics.
6. It shall be equipped with pressure gauge for monitoring the input and output
pressure.
7. It shall be compatible with existing control valves.
11. It shall have on-board memory for storing the diagnostic parameters, valve
signature, etc.
12. It shall have position feedback facility.
13. The equipment shall be equipped with software required for FF alarms
monitoring, online friction & dynamic performance monitoring, diagnostics, etc.
14 It shall be have the facility for remote operation/ calibration/configuration/
diagnostics using Field Communicator
15. Mounting Mounting on new control valves
17. Flow Characterization Linear, equal percentage (50:1 and 30:1), quick
opening, camflex eq%
user defined, tight shut-off and full open.
Project: Neelam Redevelopment
Project
Technical Specifications
20. Position Alarms Block alarm, process alarm and event update
Technical Specifications