GUIDELINES:
The minimum requirements for buildings targeting 1-Star or 2-Stars GSAS rating within MANATEQ certified
districts (hereinafter referred to as “The Projects”) for Special Economical Zones, Logistic Parks and Warehousing
Parks are falling under two groups; namely:
Note for Owners: GSAS Checklist is developed in collaboration with MANATEQ and comprises minimum
descriptive requirements for achieving GSAS certification. These minimum requirements which are usually
considered part of the standard design deliverables by consultants are set to avoid extra incurred fees or charges
pertaining to GSAS.
REQUIREMENTS:
Table 1: Energy & Water Prescriptive Requirements
Compliance Evidence/
Description Drawing
[ ] Reference No.
ENVELOPE
1. WALL U-VALUE
a. Commercial/Residential/Workers Accommodation/Mosques
Recommendation: External walls insulation shall have an overall
U-value of ≤ 0.30 w/m2 deg K.
Compliance Evidence/
Description Drawing
[ ] Reference No.
ENVELOPE (Continued)
a. Commercial/Residential/Workers Accommodation/Mosques
Recommendation: use of Extruded Poly Styrene (EPS) 75mm, Poly Urethane
(PU) 50mm or other equivalent insulating materials available in the local
market;
3. ROOF U-VALUE
a. Commercial/Residential/Workers Accommodation/Mosques
Recommendation: Roof insulation shall have an overall
U-value of ≤ 0.25 w/m2 deg K.
Compliance Evidence/
Description Drawing
[ ] Reference No.
ENVELOPE (Continued)
a. Commercial/Residential/Workers Accommodation/Mosques
Recommendation: use of Extruded Poly Styrene (EPS) 100mm, Poly Urethane
Foam (PUF) 100mm or other equivalent insulating materials available in the
local market;
Compliance Evidence/
Description Drawing
[ ] Reference No.
ENVELOPE (Continued)
5. GLAZING
b. U-value
b.1) Light Industry
Recommendation: Use of standard double-glazing
windows available in the local market with U-value of ≤ 2.20 w/m2 deg K.
b.2) Commercial/Residential/Mosque
Recommendation: Use of standard double-glazing windows available
in the local market with U-value of ≤ 1.80 w/m2 deg K.
c. Solar Transmittance
c.1) Light Industry
Recommendation: Solar transmittance value of ≤ 0.30
c.2) Commercial/Residential/Mosque
Recommendation: Solar transmittance value of ≤ 0.25
Compliance Evidence/
Description Drawing
[ ] Reference No.
a. Light Industry
Recommendation: Minimum Energy Efficiency Ratio (EER)
should be more than or equal to 2.0 kW/kW
b. Commercial/Residential/Mosque
Recommendation: Minimum Energy Efficiency Ratio (EER)
should be more than or equal to 3.0 kW/kW
4. VENTILATION FANS
The buildings fans should be controlled to be off during non working hours.
Compliance Evidence/
Description Drawing
[ ] Reference No.
LIGHTING
a. Workshops
Recommendation: Lighting power density should not exceed to 12.0 W/m2
b. Warehouses
Recommendation: Lighting power density should not exceed to 7.0 W/m2
c. Commercial
Recommendation: Lighting power density should not exceed to 9.0 W/m2
d. Residential
Recommendation: Lighting power density should not exceed to 6.5 W/m2
e. Mosque
Recommendation: Lighting power density should not exceed to 10.0 W/m2
Note: Use of LED, CFL, T5 lightings or other equivalent efficient fix es.
Compliance Evidence/
Description Drawing
[ ] Reference No.
Low fl w faucets
2. FLUSH
Toilets: Dual Flush: 6 Liters for the main button, 3 liters for the sub button
3. IRRIGATION
Note: The Domestic hot water system efficiency should be not less than 0.8
REQUIREMENTS:
Table 2: Qatar Construction Specification Requirements
Compliance Evidence/
Description Drawing
[ ] Reference No.
INDOOR ENVIRONMENT
1. THERMAL COMFORT
Recommendation: Comply with ASHRAE Standards or equivalent.
2. NATURAL VENTILATION
Recommendation: Comply with ASHRAE Standards or equivalent.
3. MECHANICAL VENTILATION
Recommendation: No existence of equipment with efficiency less than specified
in ASHRAE 90.1-2010.
1. RECYCLING MANAGEMENT
Recommendation:
• Collect and store recyclable materials.
• Sorting and storage area should be located close to the truck loading area.
• Sorting and storage area must be properly isolated and ventilated to reduce
negative heath impact for users and visitors on site.
REQUIREMENTS:
Table 3: Project Criteria Submission*
Compliance Evidence/
Description Drawing
[ ] Reference No.
URBAN CONNECTIVITY
1. [UC.5] SEWER AND WATERWAY CONTAMINATION
Recommendation:
• Collect and remove all toxic or harmful substances include any solids,
sludge, floating debris, oil, scum or any substances associated with
industrial process.
SITE
3. [S.15] PATHWAYS
Recommendation:
• Provide at least one accessible paved pathway that connects all built spaces,
parking areas and other facilities onsite.
• Ensure that all pathways feature adequate signage at all intersections and at
regular intervals along unbroken length of a pathway.
INDOOR ENVIRONMENT
FEES:
Discounted GSAS certification fees is considered for plots within MANATEQ Special Economic Zones districts as per
fee schedule published in the MOU Service Agreement between GORD and MANATEQ as follows:
Plot Sub-Developers shall pay 7500 QAR as a lump sum fee for Design Certification Letter of Conformance (LOC) to
GORD. Fee is paid per building irrespective of total built up area of the building within the plot.
Plot Sub-Developers shall pay 7500 QAR as a lump sum fee for Design Certification Conformance to Design Audits
(CDA) to GORD. Fee is paid per building irrespective of total built up area of the building within the plot.