Operation Process Chart

Group: C Part number: 1


Title: Cattery House Date: October 29, 2021 
Prepared by: K.B. CABUCOS

Upper House 1 Upper House 2 Lower Box


Dwg. 300 Dwg.200 Dwg.100
Playball Station
Up.HouseDesign

0.10 Cut into Cut into


300 length
1.30 200 length 0.07 103 Drill to hole 1.20 100 Heat the glue gun
1.00 303 Cut to make the side
a circle
Pin two balloon
Glue to Cut to make Cut to make
0.05 104 stick to make a
make a 0.35 301 a hole 1.00 201 a hole and
Cut to make two holes
2.60 304 mat of cats’ ear pole 3.10 101
popsicle
sticks
Glue to attach the
0.10 302 Mold to make a
edge and popsicle To paint the 2.15 105
Glue to the ball using straw
top of the sticks in the side 0.40 202 popsicles
0.15 102 Glue to join egg tray
0.10 305 hole of the hole sticks
Attached the ball
0.30 106 to the pole
Glue to join
Ins. 3
0.20 203 in the box 0.40
0.25 Ins. 1

0.20 Ins. 2 106 0.25


G2 Glue to join
203
Glue to join 2.00 D1 Decorate
0.19
G1

0.10 Ins. 4
D1

Event Number Time


Operations 20 17.01

Inspections 4 0.95

---------Summary of Cattery House Operation Process Chart Summary of Proposed Cattery House Operation Process Chart

The cattery home project went through without a hitch, but there are still areas where it
may be improved to make it even better. There are actions in the diagram that are
extraneous to the process, such as flipping or gathering the materials, as well as
operations that may be combined into one, such as cutting holes or glueing. The current
OPC is unappealing to the eye; it requires refinement and should be rearranged to
create a more user-friendly chart.

The cattery house's suggested and improved operation procedure chart. The
researchers look for ways to reduce needless operations such as flipping the cardboard
and the preparation procedure; they also combine activities that can be combined; and
they rearrange the process so that they begin with an activity that is simple to perform.
Where in the present OPC the starting point is UpperHouse 1 which is complicated to do
so in the proposed OPC the starting Point is the lower house where there is a little
operation and so -on so forth
Next please
As indicated in the proposed chart, the proposed operation process chart resulted in an
acceptable result in terms of removing superfluous motions and reducing time. Where
the proposed OPC has a 20 out of 25 operating rating and a 4 out of 5 inspection rating.
The planned OPC has a 17.01 out of 19.13 operation time and a 0.95 out of 1.15
inspection time. As a result, if the proposed cattery house is used in the project, it will
have a substantial impact.

The presentation is done the group is now open for questions and suggestions