CRS SEC - 10632 - Warranty Inspection Procedure For Transformers
CRS SEC - 10632 - Warranty Inspection Procedure For Transformers
SEC
Page 1 of 2
Comments Resolution Sheet
Contract No. 4400004078 SEC letter No: SEC/AT/HAIL-2CC/10632 Date: 30/09/2021
Al Toukhi Ref. No: H-AT-SEC-E10415 Date: 10/10/2021
CONVERSION OF HAIL-2 PP SIMPLE
Project Title CYCLE EXTENSION III TO COMBINED Doc/Dwg Code: HAIL2CC-00-BF-EDC-AT-0104 Rev: 01
CYCLE
Doc Name: Warranty Inspection Procedures for Transformers Doc status: NA
Item SEC Comments AT Response
No. SEC/AT/HAIL-2CC/10632
8 No load loss and No load Current measurement. This was done during commissioning work and it is Not related to warranty inspection
9 Line Terminal ac withstand test with PD measurement. This was done during commissioning work and it is Not related to warranty inspection
10 Temperature test. This was done during commissioning work and it is Not related to warranty inspection
11 Induced voltage with stand test &Induced voltage test with PD measurement. This was done during commissioning work and it is Not related to warranty inspection
12 Measurement of single phase short circuit impedance with 60Hz, 380v This was done during commissioning work and it is Not related to warranty inspection
13 Measurement of single phase excitation current with 60 Hz, 380v This was done during commissioning work and it is Not related to warranty inspection
14 Magnetic Balance Test with 60 Hz, 380v This was done during commissioning work and it is Not related to warranty inspection
15 Frequency Response Test. This was done during commissioning work and it is Not related to warranty inspection
16 Testing all Mechanical protection devices and control circuits This was done during commissioning work and it is Not related to warranty inspection
17 Oil Leakage Test This was done during commissioning work and it is Visual inspection