Professional Documents
Culture Documents
Kalyanpur AFR Shed BOQ-Column and Truss
Kalyanpur AFR Shed BOQ-Column and Truss
Kalyanpur AFR Shed BOQ-Column and Truss
3 SC-DC-AFRS-S-1006
7 SC-DC-AFRS-S-1010 150
8 SC-DC-AFRS-S-1011 250
17 SC-DC-AFRS-S-1021 150
0 1610 1140
Qty mtr 0 36 30
ISMB 200 ISMB 150 ISMC 400 ISMC 150 ISMC 125
10000 27000
150
600
800 50
1600 100
150
200
600
200
200
150
150
800 50
150
1000 0 0 0 800
0 0 0 0 790
0 0 0 10390 26600
96 0 0 0 120
KALYANPUR
700
2100
400
800
700
700
2200
700
400
350
350
400
350
0 0 0 0 3290
0 0 0 0 4280
36 0 0 0 0
KALYANPUR AFR SHED-Weight in Kgs
1250
100
300
50
100
100
100
300
100
50
50
50
50
50
0 2650 0 0
0 465 0 0
0 0 0 0
0 1360 0 0
0 825 0 0
0 240 0 0
Plate 25 Thk Plate 20 Thk Plate 16 Thk Plate 12 Thk
2000
400 1700
1000 4500
125 500
300 1200
400 1700
400 1700
1000 4600
400 1800
200 950
200 800
200 950
150 600
200 950
4975 0 0 23950
1500 0 0 6095
1570 0 0 5720
940 0 0 6130
965 0 0 6005
0 0 0 6
Plate 10 Thk Plate 8 Thk Plate 6Thk 16 Dia Sag Rod 12 Dia Sag Rod
100 250
300 600
25 75
50 200
150 250
100 300
350 600
100 300
50 150
50 150
50 150
50 100
50 200
500 1000 0 0 0
630 1000 0 0 0
2080 2560 0 0 0
0 0 0 0 0
25 THK Grating 32∅ MEDIUM PIPE 25∅ MEDIUM PIPE
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
Kalyanpur Cement-AFR Shed
Labour Payment
Hydra/Crane Rent
Advance Receipt
2,656,500.00 0.00
2,656,500.00 2,656,500.00
Day3 Day4 Day5 Day6 Day7
50,000.00
1,500.00 1,500.00
2,655,000.00
100,000.00
285,000.00
-2,200,000.00
50,000.00
1,500.00 1,500.00
2,655,000.00
100,000.00
1,500.00 1,500.00
285,000.00
50,000.00
60,000.00
100,000.00
1,500.00 1,500.00
2,655,000.00
285,000.00
-3,776,000.00
50,000.00
1,500.00 1,500.00
100,000.00
2,655,000.00
1,500.00 1,500.00
285,000.00
-3,776,000.00
50,000.00
60,000.00
100,000.00
1,500.00 1,500.00
2,655,000.00
50,000.00
285,000.00
-3,776,000.00
1,500.00 1,500.00
100,000.00
100,000.00
60,000.00
1,500.00 1,500.00
285,000.00
-3,776,000.00
3,758,300.00
-3,776,000.00
250,000.00
-3,776,000.00
-4,248,000.00