Materials System Specification

45-SAMSS-005 31 December 2012


Valves and Wellhead Equipment Requirements per API SPEC 6A
Document Responsibility: Drilling Workover Wellhead & Valves Stds. Committee

Saudi Aramco DeskTop Standards


Table of Contents

I Scope.............................................................. 2
II Conflicts and Deviations................................. 2
III References...................................................... 2
IV Definitions....................................................... 3
V Qualifications of Equipment/Manufacturers… 3
VI Modifications to API SPEC 6A........................ 3
VII Coating Specifications and Requirement….... 6

Appendix A.............................................................. 7
Appendix B............................................................ 29
Appendix C........................................................... 34
Appendix D........................................................... 43
Saudi Aramco Manufacturer's Deviation
Review Procedure (AMDR)........................... 44

Previous Issue: 29 January 2011 Next Planned Update: 29 January 2016


Revised paragraphs are indicated in the right margin Page 1 of 45
Primary contact: Al-Taweel, Gamal Aref on 966-3-8628595

Copyright©Saudi Aramco 2012. All rights reserved.


Document Responsibility: Drilling Workover Wellhead & Valves Standards Committee 45-SAMSS-005
Issue Date: 31 December 2012
Next Planned Update: 29 January 2016 Valves and Wellhead Equipment Requirements per API SPEC 6A

I Scope

API SPEC 6A, in conjunction with this specification, and the Purchase Order, defines the
minimum requirements for Saudi Aramco oil and gas production trees, wellheads, valves
and miscellaneous equipment relating to the wellhead as covered by API SPEC 6A.

II Conflicts and Deviations

A. Any conflicts between this specification and other applicable Saudi Aramco
Materials System Specifications (SAMSSs), Engineering Standards (SAESs),
Standard Drawings (SASDs), or industry standards, codes, and forms shall be
resolved in writing by the Company or Buyer Representative through the
Manager, Drilling Technical Department of Saudi Aramco, Dhahran.

B. Direct all requests to deviate from this specification in writing to the Company or
Buyer Representative, who shall follow internal company procedure SAEP-302
and forward such requests to the Manager, Drilling Technical Department of
Saudi Aramco, Dhahran.

C. Conflicting requirements between the specification and drawings, the


manufacturer's specifications and drawings, and data sheets or specification sheets
not specifically covered as an exception by the purchase order shall be resolved
using Appendix D “Saudi Aramco Manufacturer's Deviation Review Procedure
(AMDR)”.

III References

The selection of material and equipment, and the design, construction, maintenance, and
repair of equipment and facilities covered by this specification shall comply with the
latest edition of the references listed below, unless otherwise noted.

A. Saudi Aramco References

Saudi Aramco Engineering Procedure


SAEP-302 Instructions for Obtaining a Waiver of a Mandatory
Saudi Aramco Engineering Requirement

B. Industry Codes and Standards

American Petroleum Institute


API SPEC 6A Wellhead and Christmas Tree Equipment

Page 2 of 45
Document Responsibility: Drilling Workover Wellhead & Valves Standards Committee 45-SAMSS-005
Issue Date: 31 December 2012
Next Planned Update: 29 January 2016 Valves and Wellhead Equipment Requirements per API SPEC 6A

Commentary Note:

This Specification also includes by reference, either in total or in part, other


standards listed in Table 104.1 of API SPEC 6A.

IV Definitions

Buyer or Purchaser: The Company (Saudi Aramco, ASC, or AOC) actually placing
the order for the material.

Vendor: The other party to the order for the material who is supplying may or may not
be the manufacturer of the equipment.

Buyer's Representative: The person acting on behalf of the Buyer or Purchasing, who
may be from the Drilling Technical Department, Vendor Inspection (or his agent).

Responsible Standardization Agent (RSA): A Saudi Aramco organization responsible


for the technical aspects of the material/order in question. RSA duties for the material
covered by this SAMSS have been assigned to Drilling Technical Department.

V Qualifications of Equipment/Manufacturers

A. The vendor's plant shall be API-approved for the Product Specification Level
specified in the P.O.

B. The RSA may require that the vendor's product be tested and approved via the
RSA's Trial Test Program before it is considered acceptable.

VI Modifications to API SPEC 6A

The following paragraph numbers Refer to API SPEC 6A, “Wellhead and Christmas
Tree Equipment,” which is part of this specification. The text in each paragraph below
is an addition, exception, modification, or deletion to API SPEC 6A as noted.

Paragraph numbers not appearing in API SPEC 6A are new paragraphs to be inserted in
numerical order.

SECTION 600

601 (ADDITION) PSL 1-4 The items manufactured to this specification are
subject to the verification by the Buyer's Inspection Representative per
Saudi Aramco Inspection Requirements Form 175 (either 175-453800 or
175-453900) attached to the Purchase Order.

(ADDITION) PSL 4 A Pre-inspection meeting between the primary


manufacturer and Buyer's Inspection Representative is required for all

Page 3 of 45
Document Responsibility: Drilling Workover Wellhead & Valves Standards Committee 45-SAMSS-005
Issue Date: 31 December 2012
Next Planned Update: 29 January 2016 Valves and Wellhead Equipment Requirements per API SPEC 6A

PSL-4 equipment. The meeting must be held before any action against
the order is taken by the manufacturer as soon as possible after receipt
date of the order.

As a minimum, the meeting shall include the manufacturer's


representatives of Production, Engineering and Quality Assurance
Departments and the Buyer's Inspection Representative. The meeting's
objective will be to discuss the assigned specification, identify, clarify
and document any technical areas or question of difficulty. The Buyer's
Inspection Representative shall be acting for the RSA, but the RSA shall
have the final approval of any deviation from the assigned specification
or procedures.

In the event material ordered is “stock” material, an exception to this


specification can be approved by the RSA. Request for this exception
must be submitted to the Buyer in writing in no more than thirty (30)
calendar days after initial contact between the Manufacturer and Saudi
Aramco. The initial contact date is determined and documented (and the
Manufacturer advised of that set date) by the assigned Buyer's Inspection
Representative.

605.2a(3) (ADDITION) PSL 1-4 Each piece of 10M psi rated equipment listed in
the drawing of Appendix A shall have its hardness tests performed in the
locations so marked on the appropriate manufacturer's representative or
generic drawings located in Appendix A.

If equipment being manufactured is not included in Appendix A,


hardness tests are to be per the manufacturer's normal procedures.

605.2b(9) (ADDITION) PSL 2-4 For non-ferromagnetic materials, all liquid


penetrant inspections shall be performed using fluorescent penetrant.

605.2c(10) (ADDITION) PSL-3 only All equipment rated at 10M psi working
pressure or above must have prior approval (via Saudi Aramco
Manufacturer's Deviation Review Procedure (AMDR) (see Appendix D
for details) before any weld repairs may be made.

605.2c(14) (ADDITION) PSL 3-4 Volumetric testing of cast materials shall be


done by radiography. Forgings shall be ultrasonically tested. In the
event the prescribed test method is impractical, the Buyer's Inspection
Representative shall approve an alternative method of testing during the
Pre-Inspection meeting. In the event there is no pre-inspection meeting
required, approval of alternate method must be made before production
of the equipment begins.

Page 4 of 45
Document Responsibility: Drilling Workover Wellhead & Valves Standards Committee 45-SAMSS-005
Issue Date: 31 December 2012
Next Planned Update: 29 January 2016 Valves and Wellhead Equipment Requirements per API SPEC 6A

(MODIFICATION) PSL 3-4 Hot Worked Parts - Ultrasonic


examination of hot worked parts shall be performed in accordance with
both the flat bottom hole procedures (straight beam examination) and
applicable angle beam examinations specified in ASTM A388 (except
immersion method may be used) and ASTM E428.

(ADDITION) PSL 3-4 Castings - Angle beam examination in


accordance with ASTM A609 shall be applied when any area of the
casting cannot be effectively examined using a longitudinal beam due to
casting design or possible discontinuity orientation.

(ADDITION) PSL 3-4 Acceptance Criteria, Castings - Castings


examined in accordance with ASTM A609 shall meet Quality Level 1
(Table 2 “Rejection Level”) requirements.

605.2d(3) (ADDITION) PSL 4 Please include ADDITION to 605.2a(3) in this


specification.

605.9c(3) (ADDITION) PSL 1-4 All cast body equipment - Prior to hydrostatic
test of cast body equipment, an acid bath of 15% unihibited HCL is
required. An immersion time of 15 minutes is required. In addition, all
cast body equipment (of all pressure ratings) require both hydrostatic and
gas tests to working pressure after acid bath.

605.9c(5) (ADDITION) PSL 1-4 Functional tests of all valves shall be conducted
at full differential pressure between 1st and 2nd seat tests. Valves
ordered with actuators shall be tested with actuator installed.

605.9e(4) (ADDITION For Body Tests On 10M psi Or Above Equipment)

PSL 1-4 100% of the equipment shall also be nitrogen gas tested as per
PSL-4 requirements. Should each flange of the equipment carry a
different working pressure, only the 10M flange is to be gas tested.
See Appendix B drawings.

605.9e(5) (ADDITION) PSL 1-4 Same as 605.9e(4).

606.1c (ADDITION) PSL 1-4 Additional records may be required by assigned


Saudi Aramco Inspection Requirement Form 175 or Purchase Order
description. If so noted by assigned A175 form, Manufacturer will
furnish a complete set of inspection documents to the Saudi Aramco
Vendor/Inspection (or his agent) representative.

Page 5 of 45
Document Responsibility: Drilling Workover Wellhead & Valves Standards Committee 45-SAMSS-005
Issue Date: 31 December 2012
Next Planned Update: 29 January 2016 Valves and Wellhead Equipment Requirements per API SPEC 6A

SECTION 900

913.4 (ADDITION) PSL 1-4 Production trees and side outlet valves on spools
shall be assembled as per drawings in Appendix C.

VII Coating Specifications and Requirement

This section covers the minimum mandatory coating requirements for the external
protection of any equipment manufactured under this materials specification.
The specifications of the coating system to be applied are:
- The applied coating system composes of three layers coating system.
- Each layer has identified thickness for each manufacturer approved coating system as
per Table 1 of Appendix D.
- The coating system layers are zinc rich epoxy or inorganic zinc as primer, polyamide
epoxy as a middle coat and aliphatic polyurethane as a top coat.

The approved coating system specification which meets Saudi Aramco technical
requirement per wellhead manufacturer is listed below:
1. Cameron coating specification is X-197777-04 Rev-09 dated 3/3/2010.
2. FMC coating specification is C81601 Rev-E dated 22/6/2006.
3. GE Oil and Gas coating specification VGS 19.1.25 Rev.1 dated 14/7/2004.

The equipment manufactured to this specification are subject to the verification by the
Buyer's Inspection Representative per Saudi Aramco Inspection Requirements Form
175-091450 for proper coating application.

Revision Summary
29 January 2011 Revised the "Next Planned Update". Reaffirmed the contents of the document, and
reissued with editorial revision removing the committee members' list.
31 December 2012 Minor revision to add Coating Specification and Requirement.

Page 6 of 45
Document Responsibility: Drilling Workover Wellhead & Valves Standards Committee 45-SAMSS-005
Issue Date: 31 December 2012
Next Planned Update: 29 January 2016 Valves and Wellhead Equipment Requirements per API SPEC 6A

Appendix A

Lower Master Valve/Bonnet

HARDNESS
PART # DESCRIPTION QTY. OF CHECKS RANGE

1. BODY 4
2. BONNET 3
3. VALVE STEM 1
4. SEAT 1
5. GATE 1
6. BONNET SEAL RING 1
7. DRIVE BUSHING 2
8. BEARING RET. UNIT 1
9. EXPANDER 1
10. PACKING CARTRIDGE 1
11. BONNET STUD 1
12. STUD 1
13. NUTS 1
14. INJECTION FITTING See Page of this Appendix

Page 7 of 45
Document Responsibility: Drilling Workover Wellhead & Valves Standards Committee 45-SAMSS-005
Issue Date: 31 December 2012
Next Planned Update: 29 January 2016 Valves and Wellhead Equipment Requirements per API SPEC 6A

Appendix A (Continued)

Lower Master Valve/Bonnet

8
10

TWO REQUIRED

7 13

14

6 9

13 11

12

Page 8 of 45
Document Responsibility: Drilling Workover Wellhead & Valves Standards Committee 45-SAMSS-005
Issue Date: 31 December 2012
Next Planned Update: 29 January 2016 Valves and Wellhead Equipment Requirements per API SPEC 6A

Appendix A (Continued)

Composite Valve

HARDNESS
PART # DESCRIPTION QTY. OF CHECKS RANGE

1. BODY 5
2. BONNET 3
3. VALVE STEM 1
4. SEAT 1
5. GATE 1
6. BONNET SEAL RING 1
7. DRIVE BUSHING 2
8. BEARING RET. UNIT 1
9. EXPANDER 1
10. PACKING CARTRIDGE 1
11. BONNET STUD 1
12. NUT 1
13. STUD 1
14. INJECTION FITTING See Page of this Appendix

Page 9 of 45
Document Responsibility: Drilling Workover Wellhead & Valves Standards Committee 45-SAMSS-005
Issue Date: 31 December 2012
Next Planned Update: 29 January 2016 Valves and Wellhead Equipment Requirements per API SPEC 6A

Appendix A (Continued)

Composite Valves

10
TW O REQUIRED

12

14

11

12

13

PUNCH OUTLET FACE

Page 10 of 45
Document Responsibility: Drilling Workover Wellhead & Valves Standards Committee 45-SAMSS-005
Issue Date: 31 December 2012
Next Planned Update: 29 January 2016 Valves and Wellhead Equipment Requirements per API SPEC 6A

Appendix A (Continued)

Lower Master Valve/Bonnet

HARDNESS
PART # DESCRIPTION QTY. OF CHECKS RANGE

1. BODY 4
2. BONNET 3
3. VALVE STEM 1
4. SEAT 1
5. GATE 1
6. BONNET SEAL RING 1
7. DRIVE BUSHING 2
8. EXPANDER 1
9. BONNET STUD 1
10. BEARING RET. NUT 1
11. PACKING CARTRIDGE 1
12. NUT 1
13. INJECTION FITTING See Page of this Appendix

Page 11 of 45
Document Responsibility: Drilling Workover Wellhead & Valves Standards Committee 45-SAMSS-005
Issue Date: 31 December 2012
Next Planned Update: 29 January 2016 Valves and Wellhead Equipment Requirements per API SPEC 6A

Appendix A (Continued)

Flanged Valve

10
11

TW O REQUIRED

2
12

13 6

8 5

Page 12 of 45
Document Responsibility: Drilling Workover Wellhead & Valves Standards Committee 45-SAMSS-005
Issue Date: 31 July 2012
Next Planned Update: 29 January 2016 Valves and Wellhead Equipment Requirements per API SPEC 6A

Appendix A (Continued)

Studded Tee W/45 Outlet

HARDNESS

PART # DESCRIPT ION QTY OF


RANGE
CHECKS

1. BODY 3
2. STUDS 1
3. NUTS 1
HARDNESS TEST LOCATION

Page 13 of 45
Document Responsibility: Drilling Workover Wellhead & Valves Standards Committee 45-SAMSS-005
Issue Date: 31 July 2012
Next Planned Update: 29 January 2016 Valves and Wellhead Equipment Requirements per API SPEC 6A

Appendix A (Continued)

Tubing Hanger

HARDNESS

PART # DESCRIPTION
QTY OF RANGE
CHECKS

1. TUBING HANGER 2

HARDNESS TEST LOCATION

Page 14 of 45
Document Responsibility: Drilling Workover Wellhead & Valves Standards Committee 45-SAMSS-005
Issue Date: 31 July 2012
Next Planned Update: 29 January 2016 Valves and Wellhead Equipment Requirements per API SPEC 6A

Appendix A (Continued)

Casing Hanger W & W-D15

HARDNESS

PART # DESCRIPTION
QTY OF
RANGE
CHECKS

1. BODY 2*
2. STUDS 2*
* ONE PUNCH PER SEGMENT
HARDNESS TEST LOCATION

Page 15 of 45
Document Responsibility: Drilling Workover Wellhead & Valves Standards Committee 45-SAMSS-005
Issue Date: 31 July 2012
Next Planned Update: 29 January 2016 Valves and Wellhead Equipment Requirements per API SPEC 6A

Appendix A (Continued)

Casing Spool Less Screws

HARDNESS
PART# DESCRIPTION QTY OF RANGE
CHECKS

1. BODY
2. STUD
3. NUT
4. INJECTION FITTING
5. BLEEDER PLUG

HARDNESS TEST LOCATION

2
3

5
1

Page 16 of 45
Document Responsibility: Drilling Workover Wellhead & Valves Standards Committee 45-SAMSS-005
Issue Date: 31 July 2012
Next Planned Update: 29 January 2016 Valves and Wellhead Equipment Requirements per API SPEC 6A

Appendix A (Continued)

Casing Head & Tubing Head Spool W / Set Screws

HARDNESS

PART # DESCRIPTION QTY OF RANGE


CHECKS

1. BODY 6
2. SET SCREW 1
3. SET SCREW GLAND 1
4. STUD 1
5. NUT 1
6. INJECTION FITTING SEE PAGE OF THIS APPENDIX
7. BLEEDER PLUG SEE PAGE OF THIS APPENDIX
HARDNESS TEST LOCATION

6
1

Page 17 of 45
Document Responsibility: Drilling Workover Wellhead & Valves Standards Committee 45-SAMSS-005
Issue Date: 31 July 2012
Next Planned Update: 29 January 2016 Valves and Wellhead Equipment Requirements per API SPEC 6A

Appendix A (Continued)

Adapter-Double Studded Pack-off

HARDNESS
PART # DESCRIPTION QTY OF RANGE
CHECKS

1. BODY 6
2. STUD 1
3. NUT 1
4. INJECTION FITTING (K) SEE PAGE OF THIS APPENDIX
5. BLEEDER LPUG (K) SEE PAGE OF THIS APPENDIX

HARDNESS TEST LOCATION

2 3
1
4

Page 18 of 45
Document Responsibility: Drilling Workover Wellhead & Valves Standards Committee 45-SAMSS-005
Issue Date: 31 July 2012
Next Planned Update: 29 January 2016 Valves and Wellhead Equipment Requirements per API SPEC 6A

Appendix A (Continued)

Blind Flange

HARDNESS

PART # DESCRIPTION QTY. OF


RANGE
CHECKS

1. BODY 3

HARDNESS TEST LOCATION

Page 19 of 45
Document Responsibility: Drilling Workover Wellhead & Valves Standards Committee 45-SAMSS-005
Issue Date: 31 July 2012
Next Planned Update: 29 January 2016 Valves and Wellhead Equipment Requirements per API SPEC 6A

Appendix A (Continued)

API Seal Ring

HARDNESS

PART # DESCRIPTION QTY. OF


RANGE
CHECKS

1. API RING GASKET 1

HARDNESS TEST LOCATION

Page 20 of 45
Document Responsibility: Drilling Workover Wellhead & Valves Standards Committee 45-SAMSS-005
Issue Date: 31 July 2012
Next Planned Update: 29 January 2016 Valves and Wellhead Equipment Requirements per API SPEC 6A

Appendix A (Continued)

Bleeder Plug

HARDNESS

PART # DESCRIPTION QTY. OF


RANGE
CHECKS

1. BODY 1

2. CAP 1

HARDNESS TEST LOCATION

1
2

Page 21 of 45
Document Responsibility: Drilling Workover Wellhead & Valves Standards Committee 45-SAMSS-005
Issue Date: 31 July 2012
Next Planned Update: 29 January 2016 Valves and Wellhead Equipment Requirements per API SPEC 6A

Appendix A (Continued)

VR Plug

HARDNESS
PART # DESCRIPTION QTY. OF
RANGE
CHECKS

1. BODY 1
2. STEM NUT 1
3. STEM 1

HARDNESS TEST LOCATION

Page 22 of 45
Document Responsibility: Drilling Workover Wellhead & Valves Standards Committee 45-SAMSS-005
Issue Date: 31 July 2012
Next Planned Update: 29 January 2016 Valves and Wellhead Equipment Requirements per API SPEC 6A

Appendix A (Continued)

Bolting

HARDNESS

PART # DESCRIPTION QTY. OF


RANGE
CHECKS

1. STUD 1

2. NUT 1

HARDNESS TEST LOCATION

2
1

Page 23 of 45
Document Responsibility: Drilling Workover Wellhead & Valves Standards Committee 45-SAMSS-005
Issue Date: 31 December 2012
Next Planned Update: 29 January 2016 Valves and Wellhead Equipment Requirements per API SPEC 6A

Appendix A (Continued)

Injection Fitting

HARDNESS

PART # DESCRIPTION QTY. OF


RANGE
CHECKS

1. BODY 1

2. CAP 1

HARDNESS TEST LOCATION

1
2

Page 24 of 45
Document Responsibility: Drilling Workover Wellhead & Valves Standards Committee 45-SAMSS-005
Issue Date: 31 December 2012
Next Planned Update: 29 January 2016 Valves and Wellhead Equipment Requirements per API SPEC 6A

Appendix A (Continued)

Model D Injection Fitting

HARDNESS
PART # DESCRIPTION QTY. OF
RANGE
CHECKS

1. BODY 1

HARDNESS TEST LOCATION

Page 25 of 45
Document Responsibility: Drilling Workover Wellhead & Valves Standards Committee 45-SAMSS-005
Issue Date: 31 December 2012
Next Planned Update: 29 January 2016 Valves and Wellhead Equipment Requirements per API SPEC 6A

Appendix A (Continued)

Model C Injection Fitting

HARDNESS

PART # DESCRIPTION QTY. OF


RANGE
CHECKS

1. BODY 1

2. STEM 1

HARDNESS TEST LOCATION

2 1

Page 26 of 45
Document Responsibility: Drilling Workover Wellhead & Valves Standards Committee 45-SAMSS-005
Issue Date: 31 July 2012
Next Planned Update: 29 January 2016 Valves and Wellhead Equipment Requirements per API SPEC 6A

Appendix A (Continued)

Type K Injection Fitting

HARDNESS
PART # DESCRIPTION QTY. OF
RANGE
CHECKS

1. BODY 1
2. BLIND PLUG 1

HARDNESS TEST LOCATION

Page 27 of 45
Document Responsibility: Drilling Workover Wellhead & Valves Standards Committee 45-SAMSS-005
Issue Date: 31 December 2012
Next Planned Update: 29 January 2016 Valves and Wellhead Equipment Requirements per API SPEC 6A

Appendix A (Continued)

Type K Injection Fitting

HARDNESS

PART # DESCRIPTION QTY. OF


RANGE
CHECKS

1. BODY 1

2. BLIND PLUG 1

HARDNESS TEST LOCATION

Page 28 of 45
Document Responsibility: Drilling Workover Wellhead & Valves Standards Committee 45-SAMSS-005
Issue Date: 31 December 2012
Next Planned Update: 29 January 2016 Valves and Wellhead Equipment Requirements per API SPEC 6A

Appendix B

Test Procedure for Single Completion Tubing Bonnet with or without Control Lines

M2

M1

STEP 1 STEP 2

M3

STEP 3

SHADED PORTION IS THE AREA TO BE TESTED PER API 6A AND THIS SAMSS. AFTER
EACH AREA HAS BEEN TESTED SATISFACTORILY, PLACE APPROVAL STAMP IN LOCATION
SHOWN ABOVE. IF TUBING BONNET HAS NO CONTROL LINE, ELIMINATE STEP 3. IF
TUBING BONNET HAS MORE THAN ONE CONTROL LINE, EACH ONE MUST BE TESTED
SEPARATELY.

Page 29 of 45
Document Responsibility: Drilling Workover Wellhead & Valves Standards Committee 45-SAMSS-005
Issue Date: 31 December 2012
Next Planned Update: 29 January 2016 Valves and Wellhead Equipment Requirements per API SPEC 6A

Appendix B (Continued)

Test Procedure for Tubing and Casing Spools with Different PSI Rated Flanges

M1 M2

FIGURE 1 FIGURE 3

M2

FIGURE 2

SHADED PORTIONS ARE THE AREAS TO BE TESTED PER API 6A AND THIS SAMSS IF THE TOP,
BOTTOM, AND OUTLETS ARE NOT THE SAME PRESSURE RATINGS. AFTER EACH CONNECTION
HAS BEEN TESTED SATISFACTORILY, PLACE APPROVAL STAMP IN LOCATION SHOWN ABOVE.

Page 30 of 45
Document Responsibility: Drilling Workover Wellhead & Valves Standards Committee 45-SAMSS-005
Issue Date: 31 July 2012
Next Planned Update: 29 January 2016 Valves and Wellhead Equipment Requirements per API SPEC 6A

Appendix B (Continued)

Test Procedure Tee or Cross

SHADED PORTION IS THE AREA TO BE TESTED PER API 6A AND THIS SAMSS. AFTER EACH AREA HAS
BEEN TESTED SATISFACTORILY, PLACE APPROVAL STAMP IN LOCATION SHOWN ABOVE.

Page 31 of 45
Document Responsibility: Drilling Workover Wellhead & Valves Standards Committee 45-SAMSS-005
Issue Date: 31 December 2012
Next Planned Update: 29 January 2016 Valves and Wellhead Equipment Requirements per API SPEC 6A

Appendix B (Continued)

Test Procedure for Tubing and Casing Spools

M1

FIGURE 1

SHADED PORTION IS THE AREA TO BE TESTED PER API 6A AND THIS SAMSS, IF ALL CONNECTION
ARE THE SAME PRESSURE RATING. AFTER THIS AREA HAS BEEN TESTED SATISFACTORILY, PLACE
APPROVAL STAMP IN LOCATION SHOWN ABOVE.

Page 32 of 45
Document Responsibility: Drilling Workover Wellhead & Valves Standards Committee 45-SAMSS-005
Issue Date: 31 December 2012
Next Planned Update: 29 January 2016 Valves and Wellhead Equipment Requirements per API SPEC 6A

Appendix B (Continued)

Test Procedure for Casing Head

SHADED PORTION IS THE AREA TO BE TESTED PER API 6A AND THIS SAMSS IF ALL CONNECTION
ARE THE SAME PRESSURE RATING. AFTER THIS AREA HAS BEEN TESTED SATISFACTORILY,
PLACE APPROVAL STAMP IN LOCATION SHOWN ABOVE.

M2

SHADED PORTION IS THE AREA TO BE TESTED PER API 6A AND THIS SAMSS IF ALL CONNECTION
ARE NOT THE SAME PRESSURE RATING. AFTER THIS AREA HAS BEEN TESTED SATISFACTORILY,
PLACE APPROVAL STAMP IN LOCATION SHOWN ABOVE.

Page 33 of 45
Document Responsibility: Drilling Workover Wellhead & Valves Standards Committee 45-SAMSS-005
Issue Date: 31 December 2012
Next Planned Update: 29 January 2016 Valves and Wellhead Equipment Requirements per API SPEC 6A

Appendix C

Figure 1: 2” 3M Tree

2-1/16” 3M PSI Onshore Production Tree

2” 3M GATE VALVE

14-5/8”

2” 3M FLANGE

9”
38-1/4

2” 3M CROSS
14-5/8”

2” 3M GATE VALVE

21-1/8”

SAUDI ARAMCO
3M PSI WP WOG
6M PSI TP
2-1/16” TREE ASSEMBLY

Page 34 of 45
Document Responsibility: Drilling Workover Wellhead & Valves Standards Committee 45-SAMSS-005
Issue Date: 31 July 2012
Next Planned Update: 29 January 2016 Valves and Wellhead Equipment Requirements per API SPEC 6A

Appendix C (Continued)

Figure 2: 3” 3M Tree

3-1/8” 3M PSI Onshore Production Tree

3” 3M PSI GATE VALVE

17-1/8”

3-1/8” FLANGE

10”

44-1/4”

17-1/8”

3” 3M PSI GATE VALVE

25-3/16”

SAUDI ARAMCO
3M PSI WP WOG
6M PSI TP
3-1/8” TREE ASSEMBLY

Page 35 of 45
Document Responsibility: Drilling Workover Wellhead & Valves Standards Committee 45-SAMSS-005
Issue Date: 31 July 2012
Next Planned Update: 29 January 2016 Valves and Wellhead Equipment Requirements per API SPEC 6A

Appendix C (Continued)
Figure 3: 4” 3M Tree
4-1/16” 3M PSI Onshore Production Tree

4-1/16” 3M GATE VALVE

20-1/8”

4-1/16” 3M FLANGE

52-1/4”

12”

4-1/16” 3M TEE

20-1/8”

4-1/16” 3M GATE VALVE

29-3/4”
SAUDI ARAMCO
3M PSI WP WOG
6M PSI TP
4-1/16” TREE ASSEMBLY

Page 36 of 45
Document Responsibility: Drilling Workover Wellhead & Valves Standards Committee 45-SAMSS-005
Issue Date: 31 July 2012
Next Planned Update: 29 January 2016 Valves and Wellhead Equipment Requirements per API SPEC 6A

Appendix C (Continued)

Figure 4: 4” 3M Offshore Tree


4-1/16” 3M PSI Onshore Production Tree

4” 3M QUICK UNION TREE CAP

13-1/2”

4” 3M MANUAL GATE VALVE

20-1/8”
4” 3M FLANGE

12”

4' 3M TEE

20-1/8”

4” 3M HYDRAULIC ACTUATED SSV

4” 3M QUICK UNION TREE CAP

20-1/8”

29-3/4”
SAUDI ARAMCO
3M PSI WP WOG
6M PSI TP
4-1/16” TREE ASSEMBLY

Page 37 of 45
Document Responsibility: Drilling Workover Wellhead & Valves Standards Committee 45-SAMSS-005
Issue Date: 31 July 2012
Next Planned Update: 29 January 2016 Valves and Wellhead Equipment Requirements per API SPEC 6A

Appendix C (Continued)

Figure 5: 7” 3M Tree
7-1/16” 3M PSI Onshore Production Tree

7” 3M GATE VALVE

24-1/8”
7” 3M FLANGE

16”

7” 3M TEE

24-1/8”

7” 3M GATE VALVE

32-1/4”

SAUDI ARAMCO
3M PSI WP WOG
6M PSI TP
7-1/16” TREE ASSEMBLY

Page 38 of 45
Document Responsibility: Drilling Workover Wellhead & Valves Standards Committee 45-SAMSS-005
Issue Date: 31 July 2012
Next Planned Update: 29 January 2016 Valves and Wellhead Equipment Requirements per API SPEC 6A

Appendix C (Continued)
Figure 6: 7” 3M Offshore Tree
7-1/16” 3M PSI Onshore Production Tree

7” 3M QUICK UNION TREE CAP


14-7/8”

24-1/8”
7” 3M GATE VALVE

7” 3M FLANGE
16”

7” 3M TEE
24-1/8”

7” 3M HYDRAULIC ACTUATED SSV

7” 3M GATE VALVE 24-1/8”

32-1/4”

SAUDI ARAMCO
3M PSI WP WOG
6M PSI TP

Page 39 of 45
Document Responsibility: Drilling Workover Wellhead & Valves Standards Committee 45-SAMSS-005
Issue Date: 31 July 2012
Next Planned Update: 29 January 2016 Valves and Wellhead Equipment Requirements per API SPEC 6A

Appendix C (Continued)

Figure 7: 3” 10M Tree

3” 10M TREE CAP

15”

3” 10M GATE VALVE

3” 10M SSV 24-3/8”

FLANGE 17-3/4”

3” 10M TEE OR CROSS


3” 10M SSV 24-3/8”

3” 10M TEE OR CROSS


133-1/4”

3” 10M GATE VALVE 17-3/4”

3” 10M SSV
24-3/8”

3” 10M GATE VALVE

24-3/8”

SAUDI ARAMCO
10M PSI WP WOG
15M PSI TP

Page 40 of 45
Document Responsibility: Drilling Workover Wellhead & Valves Standards Committee 45-SAMSS-005
Issue Date: 31 July 2012
Next Planned Update: 29 January 2016 Valves and Wellhead Equipment Requirements per API SPEC 6A

Appendix C (Continued)

Figure 8: 4” 10M Tree

4-1/16” QUICK UNION TREE CAP


16”

4-1/16” MANUAL GATE VALVE

26-3/8”

4-1/16” TAPPED FLANGE


23”
4-1/16” SSV

4-1/16” 45 DEGREE TEE

38”
4-1/16” DUAL SSV BLOCK

103”
4-1/16” MANUAL GATE VALVE

Page 41 of 45
Document Responsibility: Drilling Workover Wellhead & Valves Standards Committee 45-SAMSS-005
Issue Date: 31 July 2012
Next Planned Update: 29 January 2016 Valves and Wellhead Equipment Requirements per API SPEC 6A

Appendix C (Continued)

Figure 9: 7-1/16” 10M Tree

7-1/16” QUICK UNION TREE CAP


16-3/4”

7-1/16” MANUAL GATE VALVE

26-3/8”

7-1/16” TAPPED FLANGE

23”

7-1/16” SSV

7-1/16” 45 DEGREE TEE

38”
7-1/16” DUAL SSV BLOCK

103-3/8”
7-1/16” MANUAL GATE VALVE

Page 42 of 45
Document Responsibility: Drilling Workover Wellhead & Valves Standards Committee 45-SAMSS-005
Issue Date: 31 December 2012
Next Planned Update: 29 January 2016 Valves and Wellhead Equipment Requirements per API SPEC 6A

Appendix D

Table 1 – Wellhead Manufacturers Coating Systems

Coating Total
Manufacturer Date Primer Middle Top Coat
Specification Thickness
High build
X-197777-04 Zinc rich Aliphatic 200-325
Cameron Rev-09
3/3/2010
epoxy
Polyamide
Polyurethane microns
Epoxy
C81601 Inorganic Polyamide Aliphatic 250-375
FMC Rev-E
22/6/2006
Zinc Epoxy Polyurethane microns
VGS 19.1.25 Inorganic Polyamide Aliphatic 325-500
GE OIL & Gas Rev 1
14/7/2004
Zinc Epoxy Polyurethane microns

Page 43 of 45
Document Responsibility: Drilling Workover Wellhead & Valves Standards Committee 45-SAMSS-005
Issue Date: 31 December 2012
Next Planned Update: 29 January 2016 Valves and Wellhead Equipment Requirements per API SPEC 6A

Saudi Aramco Manufacturer's Deviation Review Procedure (AMDR)

This procedure is to be used when any deviation from the assigned Specification, Procedure or
Purchase Order description is noted by Buyer's Inspection Representative or the Manufacturer's
Inspection Department.

I. This section is the “formal” AMDR process and will only pertain to all equipment
produced under API SPEC 6A PSL-4 service level rating.

A. Buyer's Inspection Representative (BIR) is advised of the deviation by the

Manufacturer (or finds the deviation in their inspection process).

B. Saudi Aramco Vendor Inspection (SAVI) evaluates the problem and determines if
the situation constitutes the use of the balance of this section of the AMDR
Procedure. If this formal section is not required by SAVI, use procedure in section
2 (informal) to obtain deviation approvals.

C. If the procedure is required, SAVI advises the Manufacturer to submit a full report
and advises the RSA and Buyer of the deviation. If applicable, the Manufacturer
should notify the Vendor.

The Manufacturer's full report shall consist of a complete explanation of the


problem and their proposal to repair or correct the deviation. The report shall
contain drawings if there is any doubt as to a text explanation giving a complete
picture of the nature and/or location of the problem. In addition, it will state the
length of delay (if any) the proposed repairs or corrections will have on the delivery
of the complete order. The report shall be reviewed by the manufacturer's Chief
Quality Engineer (or the Manufacturer's titled equivalent). He/she shall then draft a
cover letter for the report on his letterhead concurring with the proposed repair
and/or corrections.

D. Upon receipt of the report, SAVI will:

1. Log the report using the following format:

a. XMDR-AOC(or ASC)-87-YYY-000-ZZ

b. The “X” is the first letter in the Manufacturer's name.

c. The “87” is the current year.

d. The “YYY” is the sequentially numbered report for the subject order
number.

Page 44 of 45
Document Responsibility: Drilling Workover Wellhead & Valves Standards Committee 45-SAMSS-005
Issue Date: 31 December 2012
Next Planned Update: 29 January 2016 Valves and Wellhead Equipment Requirements per API SPEC 6A

e. The “0000” is the last 4 digits of the subject order number.

f. The “ZZZ” is the first letters of the location of the Manufacturer's plant.
For example, AOC would use “SIN” to identify Gray's Singapore plant.

g. An example number would be: CMDR-AOC-91-003-8926-SIN.

This number would indicate AOC 1991 report number 003 concerning
order 8926 being made in Gray's Singapore plant.

E. The RSA shall review the report and consult with any appropriate organizations for
information and approvals (if required) resulting in the resolution of the matter.

F. The RSA shall advise the SAVI and the Buyer of its findings and recommended
actions. The disposition shall be reported to the Manufacturer by SAVI.

G. If the disposition from the RSA has a commercial impact against the Manufacturer
and/or the Vendor, the matter is resolved between said parties and the Buyer.

H. If the Vendor and/or Manufacturer is not satisfied and wishes to appeal the case, he
can submit another report or clarification to the original report. This can be done
through the channels of communications described above. The appeal must be made
within thirty (30) days of the date of the RSA's issue of the disposition. This set time
limit shall also pertain to any and all additional appeals to the deviation disposition.

II. This section pertains to equipment made under PSL ratings 1-3.

A. Buyer's Inspection Representative (BIR) is advised of the deviation by the

Manufacturer (or finds the deviation in their inspection process).

B. BIR advises SAVI of deviation and Manufacturer advises his Vendor and the Buyer.

C. A full informal report is submitted to the RSA by SAVI. This informal shall be in
writing (telex or fax); but does not require an assigned log number or formal review
and documentation from the Manufacturer's executive quality assurance management.

D. The RSA findings will be issued per paragraph F in Section I.

E. Paragraph G of Section I shall also apply to this informal process.

F. The Vendor and/or the Manufacturer will retain the ability to appeal the RSA's
findings in this informal process. They may appeal using the same process
described in this section within a thirty (30) day period from the date of the RSA's
issue of the disposition.

Page 45 of 45