Professional Documents
Culture Documents
Anexo 3. Calculo Termico
Anexo 3. Calculo Termico
ESSALUD
Prepared By:
Lima
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
Elite Software Development INSTITUTO NACIONAL DEL CORAZON - INCOR
College Station, TX 77845 Page 2
Master Roofs
Roof ASHRAE Roof Dark Susp.
No. Roof# U-Fac Color Ceil
1 4 0.350 No Sí
Master Walls
Wall ASHRAE Wall Wall
No. Group U-Fac Color
1 A 0.350 M
2 G 0.900 D
Master Partitions
Partition Partition Cool Heat
No. U-Factor T-D T-D
1 0.350 10 10
2 1.000 10 10
Master Glass
Glass Summer Winter Glass Interior Interior
No. U-Factor U-Factor Shd.Coef. Shading Shd.Coef
1 1.000 0.900 0.700 1 0.700
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
Elite Software Development INSTITUTO NACIONAL DEL CORAZON - INCOR
College Station, TX 77845 Page 4
Check Figures
Total Building Supply Air (based on a 19° TD): 49,586 CFM
Total Building Vent. Air (89.09% of Supply): 44,177 CFM
Summer: Ventilation controls outside air, ----- Winter: Exhaust controls outside air.
Check Figures
Total Air Handler Supply Air (based on a 19° TD): 1,872 CFM
Total Air Handler Vent. Air (100.00% of Supply): 1,872 CFM
Summer: Ventilation controls outside air, ----- Winter: Exhaust controls outside air.
Check Figures
Total Air Handler Supply Air (based on a 19° TD): 1,269 CFM
Total Air Handler Vent. Air (5.91% of Supply): 75 CFM
Summer: Ventilation controls outside air, ----- Winter: Exhaust controls outside air.
Check Figures
Total Air Handler Supply Air (based on a 15° TD): 1,670 CFM
Total Air Handler Vent. Air (28.93% of Supply): 483 CFM
Summer: Ventilation controls outside air, ----- Winter: Exhaust controls outside air.
Check Figures
Total Air Handler Supply Air (based on a 15° TD): 1,670 CFM
Total Air Handler Vent. Air (28.93% of Supply): 483 CFM
Summer: Ventilation controls outside air, ----- Winter: Exhaust controls outside air.
Check Figures
Total Air Handler Supply Air (based on a 15° TD): 1,670 CFM
Total Air Handler Vent. Air (28.93% of Supply): 483 CFM
Summer: Ventilation controls outside air, ----- Winter: Exhaust controls outside air.
Check Figures
Total Air Handler Supply Air (based on a 19° TD): 736 CFM
Total Air Handler Vent. Air (10.86% of Supply): 80 CFM
P2 - Corredor
468 5,785 11,097 400 None None
59 Hemodinamica A
2 199 533 0 0 0
12am March
4,142 0.42 1.14 0 199 533
Summer: Ventilation controls outside air, ----- Winter: Ventilation controls outside air.
Check Figures
Total Air Handler Supply Air (based on a 19° TD): 2,460 CFM
Total Air Handler Vent. Air (100.00% of Supply): 2,460 CFM
P2 - Corredor
468 5,785 11,097 400 None None
60 Hemodinamica B
2 199 533 0 0 0
12am March
4,142 0.42 1.14 0 199 533
Summer: Ventilation controls outside air, ----- Winter: Ventilation controls outside air.
Check Figures
Total Air Handler Supply Air (based on a 19° TD): 2,589 CFM
Total Air Handler Vent. Air (100.00% of Supply): 2,589 CFM
P2 - Corredor
468 5,785 11,097 400 None None
62 Hemodinamica C
2 199 534 0 0 0
12am March
4,142 0.42 1.14 0 199 534
Summer: Ventilation controls outside air, ----- Winter: Ventilation controls outside air.
Check Figures
Total Air Handler Supply Air (based on a 19° TD): 2,674 CFM
Total Air Handler Vent. Air (100.00% of Supply): 2,674 CFM
Summer: Ventilation controls outside air, ----- Winter: Ventilation controls outside air.
Check Figures
Total Air Handler Supply Air (based on a 19° TD): 897 CFM
Total Air Handler Vent. Air (100.00% of Supply): 897 CFM
Summer: Ventilation controls outside air, ----- Winter: Ventilation controls outside air.
Check Figures
Total Air Handler Supply Air (based on a 19° TD): 3,837 CFM
Total Air Handler Vent. Air (100.00% of Supply): 3,837 CFM
P3 - Circulacion+zona
244 3,843 11,978 400 None None
25 rigida A
2 132 570 0 0 0
9am January
2,158 0.54 2.34 0 132 570
Summer: Ventilation controls outside air, ----- Winter: Ventilation controls outside air.
Check Figures
Total Air Handler Supply Air (based on a 19° TD): 1,494 CFM
Total Air Handler Vent. Air (100.00% of Supply): 1,494 CFM
P3 - Circulacion+zona
244 3,843 11,978 400 None None
50 rigida B
2 132 569 0 0 0
9am January
2,158 0.54 2.33 0 132 569
Summer: Ventilation controls outside air, ----- Winter: Ventilation controls outside air.
Check Figures
Total Air Handler Supply Air (based on a 19° TD): 1,433 CFM
Total Air Handler Vent. Air (100.00% of Supply): 1,433 CFM
P3 - Circulacion+zona
244 3,843 11,978 400 None None
51 rigida C
2 132 570 0 0 0
9am January
2,158 0.54 2.34 0 132 570
Summer: Ventilation controls outside air, ----- Winter: Ventilation controls outside air.
Check Figures
Total Air Handler Supply Air (based on a 19° TD): 1,484 CFM
Total Air Handler Vent. Air (100.00% of Supply): 1,484 CFM
P3 - Ingreso
172 3,372 5,766 600 None None
54 Vestidores (pasillo)
3 116 268 0 0 0
12am March
1,522 0.67 1.56 0 116 268
P3 - Material
126 2,028 3,232 0 None None
63 Esterilizado
0 70 150 0 0 0
12am March
1,115 0.55 1.19 0 70 150
Summer: Ventilation controls outside air, ----- Winter: Ventilation controls outside air.
Check Figures
Total Air Handler Supply Air (based on a 20° TD): 2,211 CFM
Total Air Handler Vent. Air (100.00% of Supply): 2,211 CFM
P3 - Circulacion+zona
244 3,843 11,978 400 None None
64 rigida D
2 132 577 0 0 0
9am January
2,158 0.54 2.37 0 132 577
Summer: Ventilation controls outside air, ----- Winter: Ventilation controls outside air.
Check Figures
Total Air Handler Supply Air (based on a 19° TD): 3,715 CFM
Total Air Handler Vent. Air (100.00% of Supply): 3,715 CFM
Summer: Ventilation controls outside air, ----- Winter: Ventilation controls outside air.
Check Figures
Total Air Handler Supply Air (based on a 19° TD): 3,096 CFM
Total Air Handler Vent. Air (100.00% of Supply): 3,096 CFM
Summer: Ventilation controls outside air, ----- Winter: Ventilation controls outside air.
Check Figures
Total Air Handler Supply Air (based on a 19° TD): 3,578 CFM
Total Air Handler Vent. Air (100.00% of Supply): 3,578 CFM
Summer: Ventilation controls outside air, ----- Winter: Ventilation controls outside air.
Check Figures
Total Air Handler Supply Air (based on a 19° TD): 1,283 CFM
Total Air Handler Vent. Air (100.00% of Supply): 1,283 CFM
Summer: Ventilation controls outside air, ----- Winter: Ventilation controls outside air.
Check Figures
Total Air Handler Supply Air (based on a 19° TD): 3,585 CFM
Total Air Handler Vent. Air (100.00% of Supply): 3,585 CFM
Summer: Ventilation controls outside air, ----- Winter: Ventilation controls outside air.
Check Figures
Total Air Handler Supply Air (based on a 19° TD): 3,652 CFM
Total Air Handler Vent. Air (100.00% of Supply): 3,652 CFM
Summer: Ventilation controls outside air, ----- Winter: Ventilation controls outside air.
Check Figures
Total Air Handler Supply Air (based on a 19° TD): 2,714 CFM
Total Air Handler Vent. Air (100.00% of Supply): 2,714 CFM
Zone 25-P3 - Circulacion+zona rigida A peaks (sensible) in January at 9am, Air Handler 32 (UMA 3-3),
Group 0, 53.0 x 4.6, Construction Type: 1 (Light)
Wall-3-S-A-M 296 0.83 16.7 0.350 1,730 3.500 1,036
Wall-4-E-A-M 112 0.83 17.5 0.350 688 3.500 393
Partition-1-1 243.8 10/10 0.350 853 3.500 853
Partition-2-1 243.8 10/10 0.350 853 3.500 853
Gls-S-1-90-Tran 58.0 1.000 5 1.000 290 9.000 522
0%S-0-WS-Solar 58.0 0.700 69 0.730 2,045
Gls-E-1-90-Tran 20.6 1.000 5 1.000 103 9.000 185
0%S-0-WS-Solar 20.6 0.700 236 0.760 2,586
Lights-Prof=1 683 1.000 2,329
People-Prof=1 2.0 1.000 500 400
Zone 26-P3 - OP.2 peaks (sensible) in March at 12am, Air Handler 33 (UMA 3-4), Group 0, 24.0 x
24.0, Construction Type: 1 (Light)
Partition-1-1 576 10/10 0.350 2,016 3.500 2,016
Partition-2-1 576 10/10 0.350 2,016 3.500 2,016
Lights-Prof=1 1,613 1.000 5,503
Equipment-Prof=1 2,100 1.000 7,165 0
People-Prof=1 6.0 1.000 1,500 1,200
Zone 27-P3 - OP.3 peaks (sensible) in March at 12am, Air Handler 34 (UMA 3-5), Group 0, 24.0 x
24.0, Construction Type: 1 (Light)
Partition-1-1 576 10/10 0.350 2,016 3.500 2,016
Partition-2-1 576 10/10 0.350 2,016 3.500 2,016
Partition-3-1 212.4 10/10 0.350 743 3.500 743
Partition-4-1 79.65 10/10 0.350 279 3.500 279
Lights-Prof=1 1,613 1.000 5,503
Equipment-Prof=1 2,100 1.000 7,165 0
People-Prof=1 6.0 1.000 1,500 1,200
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
Elite Software Development INSTITUTO NACIONAL DEL CORAZON - INCOR
College Station, TX 77845 Page 50
Zone 28-P3 - (hall) Antecamara peaks (sensible) in March at 12am, Air Handler 35 (UMA 3-6), Group
0, 17.0 x 11.0, Construction Type: 1 (Light)
Partition-1-1 187 10/10 0.350 655 3.500 655
Partition-2-1 187 10/10 0.350 655 3.500 655
Partition-3-1 247.8 10/10 0.350 867 3.500 867
Lights-Prof=1 524 1.000 1,787
People-Prof=1 1.0 1.000 250 200
Zone 29-P3 - Post Operatorio peaks (sensible) in March at 12am, Air Handler 35 (UMA 3-6), Group 0,
24.0 x 23.0, Construction Type: 1 (Light)
Partition-1-1 552 10/10 0.350 1,932 3.500 1,932
Partition-2-1 552 10/10 0.350 1,932 3.500 1,932
Partition-3-1 88.5 10/10 0.350 310 3.500 310
Lights-Prof=1 1,546 1.000 5,274
Equipment-Prof=1 600 1.000 2,047 0
People-Prof=1 7.0 1.000 1,750 1,400
Zone 30-P3 - Dep Mat Esteril peaks (sensible) in March at 12am, Air Handler 36 (UMA 3-7), Group 0,
42.0 x 12.0, Construction Type: 1 (Light)
Partition-1-1 504 10/10 0.350 1,764 3.500 1,764
Partition-2-1 504 10/10 0.350 1,764 3.500 1,764
Partition-3-1 354 10/10 0.350 1,239 3.500 1,239
Lights-Prof=1 1,411 1.000 4,815
Equipment-Prof=1 600 1.000 2,047 0
People-Prof=1 2.0 1.000 500 400
Sub-total 12,130 400 4,767
Safety factors: +0% +0% +0%
--------- --------- ---------
Total w/ safety factors: 12,130 400 4,767
Zone 31-P3 - UCI Post Operatorio peaks (sensible) in January at 6pm, Air Handler 37 (UMA 3-8),
Group 0, 67.0 x 28.0, Construction Type: 1 (Light)
Wall-3-S-A-M 408 0.83 16.7 0.350 2,386 3.500 1,429
Wall-4-W-A-M 296 0.83 17.5 0.350 1,815 3.500 1,036
Partition-1-1 1876 10/10 0.350 6,566 3.500 6,566
Partition-2-1 1876 10/10 0.350 6,566 3.500 6,566
Partition-5-1 646.05 10/10 0.350 2,261 3.500 2,261
Gls-S-1-90-Tran 105.0 1.000 15 1.000 1,575 9.000 945
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
Elite Software Development INSTITUTO NACIONAL DEL CORAZON - INCOR
College Station, TX 77845 Page 51
Zone 32-P3 - UCI Cardiologia Clinica peaks (sensible) in March at 1pm, Air Handler 38 (UMA 3-9),
Group 0, 81.0 x 28.0, Construction Type: 1 (Light)
Wall-3-N-A-M 413 0.83 13.0 0.350 1,873 3.500 1,445
Wall-4-W-A-M 340 0.83 17.9 0.350 2,136 3.500 1,191
Partition-1-1 2268 10/10 0.350 7,938 3.500 7,938
Partition-2-1 2268 10/10 0.350 7,938 3.500 7,938
Partition-5-1 672.6 10/10 0.350 2,354 3.500 2,354
Gls-N-1-90-Tran 180.0 1.000 15 1.000 2,700 9.000 1,620
0%S-0-WS-Solar 180.0 0.700 75 0.800 7,560
Gls-W-1-90-Tran 13.8 1.000 15 1.000 207 9.000 124
0%S-0-WS-Solar 13.8 0.700 236 0.310 707
Lights-Prof=1 6,350 1.000 21,668
Equipment-Prof=1 2,600 1.000 8,872 0
People-Prof=1 12.0 1.000 3,000 2,400
Zone 33-P3 - Uci Habitacion 01 peaks (sensible) in March at 12am, Air Handler 39 (UMA 3-10), Group
0, 12.0 x 13.0, Construction Type: 1 (Light)
Partition-1-1 156 10/10 0.350 546 3.500 546
Partition-2-1 156 10/10 0.350 546 3.500 546
Partition-3-1 221.25 10/10 0.350 774 3.500 774
Lights-Prof=1 437 1.000 1,490
Equipment-Prof=1 300 1.000 1,024 0
People-Prof=1 1.0 1.000 250 200
Zone 34-P3 - UCIN Cardiologia Clinica peaks (sensible) in March at 1pm, Air Handler 41 (UMA 3-12),
Group 0, 71.0 x 35.0, Construction Type: 1 (Light)
Wall-3-N-A-M 513 0.83 13.0 0.350 2,327 3.500 1,796
Wall-5-E-A-M 310 0.83 18.8 0.350 2,035 3.500 1,084
Partition-1-1 2485 10/10 0.350 8,698 3.500 8,698
Partition-2-1 2485 10/10 0.350 8,698 3.500 8,698
Partition-4-1 690.3 10/10 0.350 2,416 3.500 2,416
Gls-N-1-90-Tran 124.2 1.000 15 1.000 1,863 9.000 1,118
0%S-0-WS-Solar 124.2 0.700 75 0.800 5,216
Lights-Prof=1 6,958 1.000 23,742
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
Elite Software Development INSTITUTO NACIONAL DEL CORAZON - INCOR
College Station, TX 77845 Page 52
Zone 35-P3 - UCIN Cardiovascular peaks (sensible) in March at 1pm, Air Handler 40 (UMA 3-11),
Group 0, 71.0 x 35.0, Construction Type: 1 (Light)
Wall-3-N-A-M 513 0.83 13.0 0.350 2,327 3.500 1,796
Partition-1-1 2485 10/10 0.350 8,698 3.500 8,698
Partition-2-1 2485 10/10 0.350 8,698 3.500 8,698
Partition-4-1 885.0001 10/10 0.350 3,098 3.500 3,098
Gls-N-1-90-Tran 124.2 1.000 15 1.000 1,863 9.000 1,118
0%S-0-WS-Solar 124.2 0.700 75 0.800 5,216
Lights-Prof=1 6,958 1.000 23,742
Equipment-Prof=1 3,000 1.000 10,236 0
People-Prof=1 14.0 1.000 3,500 2,800
Sub-total 67,377 2,800 23,406
Safety factors: +0% +0% +0%
--------- --------- ---------
Total w/ safety factors: 67,377 2,800 23,406
Zone 36-P3 - UCIN Pediatrica peaks (sensible) in March at 4pm, Air Handler 42 (UMA 3-13), Group 0,
48.0 x 30.0, Construction Type: 1 (Light)
Wall-3-W-A-M 270 0.83 17.1 0.350 1,615 3.500 944
Wall-4-N-A-M 360 0.83 13.8 0.350 1,739 3.500 1,261
Wall-5-E-A-M 186 0.83 21.3 0.350 1,383 3.500 650
Partition-1-1 1440 10/10 0.350 5,040 3.500 5,040
Partition-2-1 1440 10/10 0.350 5,040 3.500 5,040
Partition-6-1 566.4 10/10 0.350 1,982 3.500 1,982
Gls-W-1-90-Tran 31.3 1.000 17 1.000 532 9.000 282
0%S-0-WS-Solar 31.3 0.700 236 0.820 4,237
Gls-N-1-90-Tran 64.4 1.000 17 1.000 1,095 9.000 580
0%S-0-WS-Solar 64.4 0.700 75 0.350 1,183
Lights-Prof=1 4,032 1.000 13,758
Equipment-Prof=1 2,100 1.000 7,165 0
People-Prof=1 10.0 1.000 2,500 2,000
Zone 37-P3 - Uci Habitacion 02 peaks (sensible) in March at 12am, Air Handler 39 (UMA 3-10), Group
0, 12.0 x 13.0, Construction Type: 1 (Light)
Partition-1-1 156 10/10 0.350 546 3.500 546
Partition-2-1 156 10/10 0.350 546 3.500 546
Partition-3-1 221.25 10/10 0.350 774 3.500 774
Lights-Prof=1 437 1.000 1,490
Equipment-Prof=1 300 1.000 1,024 0
People-Prof=1 1.0 1.000 250 200
Zone 38-P3 - Uci Habitacion 03 peaks (sensible) in March at 1pm, Air Handler 39 (UMA 3-10), Group
0, 12.0 x 13.0, Construction Type: 1 (Light)
Wall-4-N-A-M 88 0.83 13.0 0.350 401 3.500 310
Partition-1-1 156 10/10 0.350 546 3.500 546
Partition-2-1 156 10/10 0.350 546 3.500 546
Partition-3-1 221.25 10/10 0.350 774 3.500 774
Gls-N-1-90-Tran 17.7 1.000 15 1.000 266 9.000 159
0%S-0-WS-Solar 17.7 0.700 75 0.800 744
Lights-Prof=1 437 1.000 1,490
Equipment-Prof=1 300 1.000 1,024 0
People-Prof=1 1.0 1.000 250 200
Sub-total 6,041 200 2,335
Safety factors: +0% +0% +0%
--------- --------- ---------
Total w/ safety factors: 6,041 200 2,335
Zone 39-P3 - Uci Infectado peaks (sensible) in March at 1pm, Air Handler 39 (UMA 3-10), Group 0,
37.0 x 10.0, Construction Type: 1 (Light)
Wall-4-N-A-M 48 0.83 13.0 0.350 217 3.500 167
Partition-1-1 370 10/10 0.350 1,295 3.500 1,295
Partition-2-1 370 10/10 0.350 1,295 3.500 1,295
Partition-3-1 442.5 10/10 0.350 1,549 3.500 1,549
Gls-N-1-90-Tran 16.8 1.000 15 1.000 252 9.000 151
0%S-0-WS-Solar 16.8 0.700 75 0.800 705
Lights-Prof=1 1,036 1.000 3,535
Equipment-Prof=1 600 1.000 2,047 0
People-Prof=1 2.0 1.000 500 400
Sub-total 11,395 400 4,457
Safety factors: +0% +0% +0%
--------- --------- ---------
Total w/ safety factors: 11,395 400 4,457
Zone 40-P2 - Sala1 peaks (sensible) in January at 12am, Air Handler 10 (UMA 2-1), Group 0, 22.5 x
23.0, Construction Type: 1 (Light)
Wall-3-S-A-M 195 0.83 19.2 0.350 1,307 3.500 681
Partition-1-1 517.5 10/10 0.350 1,811 3.500 1,811
Partition-2-1 433.65 10/10 0.350 1,518 3.500 1,518
Partition-4-1 517.5 10/10 0.350 1,811 3.500 1,811
Lights-Prof=1 1,449 1.000 4,944
Equipment-Prof=1 2,600 1.000 8,872 0
People-Prof=1 6.0 1.000 1,500 1,200
Zone 42-P2 - Maq2 peaks (sensible) in January at 12am, Air Handler 11 (UMA 2-2), Group 0, 10.0 x
10.5, Construction Type: 1 (Light)
Wall-2-S-A-M 89 0.83 19.2 0.350 594 3.500 310
Partition-1-1 105 10/10 0.350 368 3.500 368
Partition-3-1 105 10/10 0.350 368 3.500 368
Lights-Prof=1 294 1.000 1,003
Equipment-Prof=1 3,000 1.000 10,236 0
Sub-total 12,569 0 1,045
Safety factors: +0% +0% +0%
--------- --------- ---------
Total w/ safety factors: 12,569 0 1,045
Zone 43-P2 - Com1 peaks (sensible) in March at 12am, Air Handler 10 (UMA 2-1), Group 0, 12.5 x
14.0, Construction Type: 1 (Light)
Partition-1-1 175 10/10 0.350 613 3.500 613
Partition-2-1 110.625 10/10 0.350 387 3.500 387
Partition-3-1 175 10/10 0.350 613 3.500 613
Lights-Prof=1 490 1.000 1,672
Equipment-Prof=1 600 1.000 2,047 0
People-Prof=1 2.0 1.000 500 400
Zone 44-P2 - Com2 peaks (sensible) in March at 12am, Air Handler 11 (UMA 2-2), Group 0, 12.5 x
14.0, Construction Type: 1 (Light)
Partition-1-1 175 10/10 0.350 613 3.500 613
Partition-2-1 110.625 10/10 0.350 387 3.500 387
Partition-3-1 175 10/10 0.350 613 3.500 613
Lights-Prof=1 490 1.000 1,672
Equipment-Prof=1 600 1.000 2,047 0
People-Prof=1 2.0 1.000 500 400
Zone 45-P2 - Sala2 peaks (sensible) in January at 12am, Air Handler 11 (UMA 2-2), Group 0, 23.0 x
23.0, Construction Type: 1 (Light)
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
Elite Software Development INSTITUTO NACIONAL DEL CORAZON - INCOR
College Station, TX 77845 Page 55
Zone 46-P2 - Sala3 peaks (sensible) in January at 2am, Air Handler 12 (UMA 2-3), Group 0, 25.0 x
24.0, Construction Type: 1 (Light)
Wall-3-S-A-M 221 0.83 19.2 0.350 1,486 3.500 774
Wall-4-W-A-M 212 0.83 24.2 0.350 1,796 3.500 743
Partition-1-1 600 10/10 0.350 2,100 3.500 2,100
Partition-2-1 221.25 10/10 0.350 774 3.500 774
Partition-5-1 600 10/10 0.350 2,100 3.500 2,100
Lights-Prof=1 1,680 1.000 5,732
Equipment-Prof=1 2,600 1.000 8,872 0
People-Prof=1 6.0 1.000 1,500 1,200
Zone 47-P2 - Maq3 peaks (sensible) in March at 2am, Air Handler 12 (UMA 2-3), Group 0, 7.5 x 16.0,
Construction Type: 1 (Light)
Wall-3-W-A-M 142 0.83 24.6 0.350 1,218 3.500 496
Partition-1-1 120 10/10 0.350 420 3.500 420
Partition-2-1 66.375 10/10 0.350 232 3.500 232
Partition-4-1 120 10/10 0.350 420 3.500 420
Lights-Prof=1 336 1.000 1,146
Equipment-Prof=1 3,000 1.000 10,236 0
Sub-total 13,673 0 1,568
Safety factors: +0% +0% +0%
--------- --------- ---------
Total w/ safety factors: 13,673 0 1,568
Zone 48-P2 - Com3 peaks (sensible) in March at 12am, Air Handler 12 (UMA 2-3), Group 0, 10.0 x
18.5, Construction Type: 1 (Light)
Partition-1-1 185 10/10 0.350 648 3.500 648
Partition-2-1 252.225 10/10 0.350 883 3.500 883
Partition-3-1 185 10/10 0.350 648 3.500 648
Lights-Prof=1 518 1.000 1,767
Equipment-Prof=1 600 1.000 2,047 0
People-Prof=1 2.0 1.000 500 400
Zone 49-P1 - Deposito De Farmacia peaks (sensible) in March at 12am, Air Handler 7 (FC 1-5), Group
0, 38.5 x 16.0, Construction Type: 1 (Light)
Partition-1-1 616 10/10 0.350 2,156 3.500 2,156
Partition-2-1 616 10/10 0.350 2,156 3.500 2,156
Partition-3-1 964.65 10/10 0.350 3,376 3.500 3,376
Lights-Prof=1 1,725 1.000 5,885
Equipment-Prof=1 300 1.000 1,024 0
People-Prof=1 3.0 1.000 750 600
Zone 50-P3 - Circulacion+zona rigida B peaks (sensible) in January at 9am, Air Handler 33 (UMA 3-4),
Group 0, 53.0 x 4.6, Construction Type: 1 (Light)
Wall-3-S-A-M 296 0.83 16.7 0.350 1,730 3.500 1,036
Wall-4-E-A-M 112 0.83 17.5 0.350 688 3.500 393
Partition-1-1 243.8 10/10 0.350 853 3.500 853
Partition-2-1 243.8 10/10 0.350 853 3.500 853
Gls-S-1-90-Tran 58.0 1.000 5 1.000 290 9.000 522
0%S-0-WS-Solar 58.0 0.700 69 0.730 2,045
Gls-E-1-90-Tran 20.6 1.000 5 1.000 103 9.000 185
0%S-0-WS-Solar 20.6 0.700 236 0.760 2,586
Lights-Prof=1 683 1.000 2,329
People-Prof=1 2.0 1.000 500 400
Sub-total 11,978 400 3,843
Safety factors: +0% +0% +0%
--------- --------- ---------
Total w/ safety factors: 11,978 400 3,843
Zone 51-P3 - Circulacion+zona rigida C peaks (sensible) in January at 9am, Air Handler 34 (UMA 3-5),
Group 0, 53.0 x 4.6, Construction Type: 1 (Light)
Wall-3-S-A-M 296 0.83 16.7 0.350 1,730 3.500 1,036
Wall-4-E-A-M 112 0.83 17.5 0.350 688 3.500 393
Partition-1-1 243.8 10/10 0.350 853 3.500 853
Partition-2-1 243.8 10/10 0.350 853 3.500 853
Gls-S-1-90-Tran 58.0 1.000 5 1.000 290 9.000 522
0%S-0-WS-Solar 58.0 0.700 69 0.730 2,045
Gls-E-1-90-Tran 20.6 1.000 5 1.000 103 9.000 185
0%S-0-WS-Solar 20.6 0.700 236 0.760 2,586
Lights-Prof=1 683 1.000 2,329
People-Prof=1 2.0 1.000 500 400
Sub-total 11,978 400 3,843
Safety factors: +0% +0% +0%
--------- --------- ---------
Total w/ safety factors: 11,978 400 3,843
Zone 52-P3 - Zona Semirigida peaks (sensible) in March at 12am, Air Handler 35 (UMA 3-6), Group 0,
54.0 x 11.0, Construction Type: 1 (Light)
Partition-1-1 594 10/10 0.350 2,079 3.500 2,079
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
Elite Software Development INSTITUTO NACIONAL DEL CORAZON - INCOR
College Station, TX 77845 Page 57
Zone 53-P3 - Informe Medico peaks (sensible) in March at 12am, Air Handler 35 (UMA 3-6), Group 0,
17.0 x 7.0, Construction Type: 1 (Light)
Partition-1-1 119 10/10 0.350 417 3.500 417
Partition-2-1 119 10/10 0.350 417 3.500 417
Partition-3-1 150.45 10/10 0.350 527 3.500 527
Lights-Prof=1 333 1.000 1,137
Equipment-Prof=1 600 1.000 2,047 0
People-Prof=1 2.0 1.000 500 400
Sub-total 5,044 400 1,360
Safety factors: +0% +0% +0%
--------- --------- ---------
Total w/ safety factors: 5,044 400 1,360
Zone 54-P3 - Ingreso Vestidores (pasillo) peaks (sensible) in March at 12am, Air Handler 35 (UMA 3-
6), Group 0, 43.0 x 4.0, Construction Type: 1 (Light)
Partition-1-1 172 10/10 0.350 602 3.500 602
Partition-2-1 172 10/10 0.350 602 3.500 602
Partition-3-1 619.5 10/10 0.350 2,168 3.500 2,168
Lights-Prof=1 482 1.000 1,643
People-Prof=1 3.0 1.000 750 600
Zone 55-P3 - Descarga peaks (sensible) in January at 6pm, Air Handler 36 (UMA 3-7), Group 0, 23.0 x
16.0, Construction Type: 1 (Light)
Wall-3-S-A-M 256 0.83 16.7 0.350 1,496 3.500 896
Partition-1-1 368 10/10 0.350 1,288 3.500 1,288
Partition-2-1 368 10/10 0.350 1,288 3.500 1,288
Gls-S-1-90-Tran 36.0 1.000 15 1.000 540 9.000 324
0%S-0-WS-Solar 36.0 0.700 69 0.910 1,582
Lights-Prof=1 1,030 1.000 3,516
Equipment-Prof=1 2,600 1.000 8,872 0
People-Prof=1 2.0 1.000 500 400
Zone 57-P3 - Filtro peaks (sensible) in March at 12am, Air Handler 36 (UMA 3-7), Group 0, 13.0 x 7.0,
Construction Type: 1 (Light)
Partition-1-1 91 10/10 0.350 319 3.500 319
Partition-2-1 91 10/10 0.350 319 3.500 319
Partition-3-1 141.6 10/10 0.350 496 3.500 496
Lights-Prof=1 255 1.000 869
People-Prof=1 1.0 1.000 250 200
Zone 58-P3 - Jefatura peaks (sensible) in March at 12am, Air Handler 36 (UMA 3-7), Group 0, 13.0 x
9.0, Construction Type: 1 (Light)
Partition-1-1 117 10/10 0.350 410 3.500 410
Partition-2-1 117 10/10 0.350 410 3.500 410
Partition-3-1 115.05 10/10 0.350 403 3.500 403
Lights-Prof=1 328 1.000 1,118
Equipment-Prof=1 300 1.000 1,024 0
People-Prof=1 2.0 1.000 500 400
Sub-total 3,863 400 1,222
Safety factors: +0% +0% +0%
--------- --------- ---------
Total w/ safety factors: 3,863 400 1,222
Zone 59-P2 - Corredor Hemodinamica A peaks (sensible) in March at 12am, Air Handler 10 (UMA 2-1),
Group 0, 36.0 x 13.0, Construction Type: 1 (Light)
Partition-1-1 468 10/10 0.350 1,638 3.500 1,638
Partition-2-1 468 10/10 0.350 1,638 3.500 1,638
Partition-3-1 716.85 10/10 0.350 2,509 3.500 2,509
Lights-Prof=1 1,310 1.000 4,471
Equipment-Prof=1 100 1.000 341 0
People-Prof=1 2.0 1.000 500 400
Sub-total 11,097 400 5,785
Safety factors: +0% +0% +0%
--------- --------- ---------
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
Elite Software Development INSTITUTO NACIONAL DEL CORAZON - INCOR
College Station, TX 77845 Page 59
Zone 60-P2 - Corredor Hemodinamica B peaks (sensible) in March at 12am, Air Handler 11 (UMA 2-2),
Group 0, 36.0 x 13.0, Construction Type: 1 (Light)
Partition-1-1 468 10/10 0.350 1,638 3.500 1,638
Partition-2-1 468 10/10 0.350 1,638 3.500 1,638
Partition-3-1 716.85 10/10 0.350 2,509 3.500 2,509
Lights-Prof=1 1,310 1.000 4,471
Equipment-Prof=1 100 1.000 341 0
People-Prof=1 2.0 1.000 500 400
Zone 61-P2 - Material Esteril peaks (sensible) in March at 12am, Air Handler 11 (UMA 2-2), Group 0,
14.0 x 7.0, Construction Type: 1 (Light)
Partition-1-1 98 10/10 0.350 343 3.500 343
Partition-2-1 98 10/10 0.350 343 3.500 343
Partition-3-1 309.75 10/10 0.350 1,084 3.500 1,084
Lights-Prof=1 274 1.000 936
Equipment-Prof=1 100 1.000 341 0
Zone 62-P2 - Corredor Hemodinamica C peaks (sensible) in March at 12am, Air Handler 12 (UMA 2-3),
Group 0, 36.0 x 13.0, Construction Type: 1 (Light)
Partition-1-1 468 10/10 0.350 1,638 3.500 1,638
Partition-2-1 468 10/10 0.350 1,638 3.500 1,638
Partition-3-1 716.85 10/10 0.350 2,509 3.500 2,509
Lights-Prof=1 1,310 1.000 4,471
Equipment-Prof=1 100 1.000 341 0
People-Prof=1 2.0 1.000 500 400
Zone 63-P3 - Material Esterilizado peaks (sensible) in March at 12am, Air Handler 35 (UMA 3-6), Group
0, 14.0 x 9.0, Construction Type: 1 (Light)
Partition-1-1 126 10/10 0.350 441 3.500 441
Partition-2-1 126 10/10 0.350 441 3.500 441
Partition-3-1 327.45 10/10 0.350 1,146 3.500 1,146
Lights-Prof=1 353 1.000 1,204
Zone 64-P3 - Circulacion+zona rigida D peaks (sensible) in January at 9am, Air Handler 36 (UMA 3-7),
Group 0, 53.0 x 4.6, Construction Type: 1 (Light)
Wall-3-S-A-M 296 0.83 16.7 0.350 1,730 3.500 1,036
Wall-4-E-A-M 112 0.83 17.5 0.350 688 3.500 393
Partition-1-1 243.8 10/10 0.350 853 3.500 853
Partition-2-1 243.8 10/10 0.350 853 3.500 853
Gls-S-1-90-Tran 58.0 1.000 5 1.000 290 9.000 522
0%S-0-WS-Solar 58.0 0.700 69 0.730 2,045
Gls-E-1-90-Tran 20.6 1.000 5 1.000 103 9.000 185
0%S-0-WS-Solar 20.6 0.700 236 0.760 2,586
Lights-Prof=1 683 1.000 2,329
People-Prof=1 2.0 1.000 500 400
Zone 65-P3 - Circulacion B peaks (sensible) in March at 12am, Air Handler 42 (UMA 3-13), Group 0,
49.0 x 7.0, Construction Type: 1 (Light)
Partition-1-1 343 10/10 0.350 1,201 3.500 1,201
Partition-2-1 343 10/10 0.350 1,201 3.500 1,201
Partition-3-1 929.2501 10/10 0.350 3,252 3.500 3,252
Lights-Prof=1 960 1.000 3,277
People-Prof=1 2.0 1.000 500 400
Zone 66-P3 - Circulacion A peaks (sensible) in March at 12am, Air Handler 37 (UMA 3-8), Group 0,
36.0 x 9.0, Construction Type: 1 (Light)
Partition-1-1 324 10/10 0.350 1,134 3.500 1,134
Partition-2-1 324 10/10 0.350 1,134 3.500 1,134
Partition-3-1 477.9 10/10 0.350 1,673 3.500 1,673
Lights-Prof=1 907 1.000 3,095
People-Prof=1 2.0 1.000 500 400
Sub-total 7,536 400 3,941
Safety factors: +0% +0% +0%
--------- --------- ---------
Total w/ safety factors: 7,536 400 3,941
Zone 67-P3 - Circulacion B peaks (sensible) in March at 12am, Air Handler 38 (UMA 3-9), Group 0,
36.0 x 9.0, Construction Type: 1 (Light)
Partition-1-1 324 10/10 0.350 1,134 3.500 1,134
Partition-2-1 324 10/10 0.350 1,134 3.500 1,134
Partition-3-1 477.9 10/10 0.350 1,673 3.500 1,673
Lights-Prof=1 907 1.000 3,095
People-Prof=1 2.0 1.000 500 400
Zone 68-P3 - Circulacion C peaks (sensible) in March at 12am, Air Handler 40 (UMA 3-11), Group 0,
36.0 x 9.0, Construction Type: 1 (Light)
Partition-1-1 324 10/10 0.350 1,134 3.500 1,134
Partition-2-1 324 10/10 0.350 1,134 3.500 1,134
Partition-3-1 477.9 10/10 0.350 1,673 3.500 1,673
Lights-Prof=1 907 1.000 3,095
People-Prof=1 2.0 1.000 500 400
Sub-total 7,536 400 3,941
Safety factors: +0% +0% +0%
--------- --------- ---------
Total w/ safety factors: 7,536 400 3,941
Zone 69-P3 - Circulacion D peaks (sensible) in March at 12am, Air Handler 41 (UMA 3-12), Group 0,
36.0 x 9.0, Construction Type: 1 (Light)
Partition-1-1 324 10/10 0.350 1,134 3.500 1,134
Partition-2-1 324 10/10 0.350 1,134 3.500 1,134
Partition-3-1 477.9 10/10 0.350 1,673 3.500 1,673
Lights-Prof=1 907 1.000 3,095
People-Prof=1 2.0 1.000 500 400
Zone 70-P1 - Sala 1 peaks (sensible) in March at 12am, Air Handler 1 (UMA 1-1), Group 0, 20.0 x
15.0, Construction Type: 1 (Light)
Partition-1-1 300 10/10 0.350 1,050 3.500 1,050
Partition-2-1 300 10/10 0.350 1,050 3.500 1,050
Partition-3-1 552 10/10 0.350 1,932 3.500 1,932
Lights-Prof=1 840 1.000 2,866
Equipment-Prof=1 2,100 1.000 7,165 0
People-Prof=1 6.0 1.000 1,500 1,200
Zone 71-P1 - Hall peaks (sensible) in March at 12am, Air Handler 1 (UMA 1-1), Group 0, 20.0 x 15.0,
Construction Type: 1 (Light)
Partition-1-1 300 10/10 0.350 1,050 3.500 1,050
Partition-2-1 300 10/10 0.350 1,050 3.500 1,050
Partition-3-1 637.2 10/10 0.350 2,230 3.500 2,230
Lights-Prof=1 840 1.000 2,866
People-Prof=1 2.0 1.000 500 400
Sub-total 7,696 400 4,330
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
Elite Software Development INSTITUTO NACIONAL DEL CORAZON - INCOR
College Station, TX 77845 Page 62
Zone 72-P1 - Sala 2 peaks (sensible) in March at 12am, Air Handler 1 (UMA 1-1), Group 0, 20.0 x
18.0, Construction Type: 1 (Light)
Partition-1-1 360 10/10 0.350 1,260 3.500 1,260
Partition-2-1 360 10/10 0.350 1,260 3.500 1,260
Partition-3-1 575 10/10 0.350 2,013 3.500 2,013
Lights-Prof=1 1,008 1.000 3,439
Equipment-Prof=1 2,100 1.000 7,165 0
People-Prof=1 6.0 1.000 1,500 1,200
Zone 73-P1 - Escenario peaks (sensible) in January at 12am, Air Handler 3 (FC 1-1), Group 0, 14.0 x
35.0, Construction Type: 1 (Light)
Wall-2-E-A-M 119 0.83 22.5 0.350 937 3.500 417
Wall-3-S-A-M 298 0.83 19.2 0.350 1,998 3.500 1,041
Partition-1-1 490 10/10 0.350 1,715 3.500 1,715
Lights-Prof=1 1,372 1.000 4,681
Equipment-Prof=1 3,000 1.000 10,236 0
People-Prof=1 5.0 1.000 1,250 1,000
Zone 74-P1 - Auditorio/3 peaks (sensible) in March at 12am, Air Handler 4 (FC 1-2....65%), Group 0,
19.0 x 35.0, Construction Type: 1 (Light)
Wall-2-E-A-M 162 0.83 22.9 0.350 1,296 3.500 565
Partition-1-1 665 10/10 0.350 2,328 3.500 2,328
Partition-3-1 297.5 10/10 0.350 1,041 3.500 1,041
Lights-Prof=1 1,862 1.000 6,353
People-Prof=1 69.0 1.000 17,250 13,800
Sub-total 28,268 13,800 3,934
Safety factors: +0% +0% +0%
--------- --------- ---------
Total w/ safety factors: 28,268 13,800 3,934
Zone 75-P3 - Infectados1 peaks (sensible) in February at 8am, Air Handler 30 (UMA 3-1), Group 0,
11.0 x 12.0, Construction Type: 1 (Light)
Wall-3-E-A-M 94 0.83 17.9 0.350 591 3.500 330
Partition-1-1 132 10/10 0.350 462 3.500 462
Partition-2-1 132 10/10 0.350 462 3.500 462
Gls-E-1-90-Tran 12.0 1.000 3 1.000 36 9.000 108
0%S-0-WS-Solar 12.0 0.700 240 0.800 1,613
Lights-Prof=1 370 1.000 1,261
Equipment-Prof=1 300 1.000 1,024 0
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
Elite Software Development INSTITUTO NACIONAL DEL CORAZON - INCOR
College Station, TX 77845 Page 63
Zone 76-P3 - Infectados2 peaks (sensible) in March at 12am, Air Handler 30 (UMA 3-1), Group 0, 12.0
x 11.0, Construction Type: 1 (Light)
Partition-1-1 132 10/10 0.350 462 3.500 462
Partition-2-1 132 10/10 0.350 462 3.500 462
Partition-3-1 106.2 10/10 0.350 372 3.500 372
Lights-Prof=1 370 1.000 1,261
Equipment-Prof=1 300 1.000 1,024 0
People-Prof=1 1.0 1.000 250 200
Zone 77-P3 - Infectados peaks (sensible) in March at 12am, Air Handler 30 (UMA 3-1), Group 0, 31.0 x
9.0, Construction Type: 1 (Light)
Wall-3-E-A-M 71 0.83 22.9 0.350 568 3.500 248
Partition-1-1 279 10/10 0.350 977 3.500 977
Partition-2-1 279 10/10 0.350 977 3.500 977
Partition-4-1 522.15 10/10 0.350 1,828 3.500 1,828
Lights-Prof=1 781 1.000 2,666
Equipment-Prof=1 500 1.000 1,706 0
People-Prof=1 2.0 1.000 500 400
Sub-total 9,220 400 4,028
Safety factors: +0% +0% +0%
--------- --------- ---------
Total w/ safety factors: 9,220 400 4,028
Zone 78-P3 - UCI Pediatrica peaks (sensible) in January at 4pm, Air Handler 31 (UMA 3-2), Group 0,
64.0 x 31.0, Construction Type: 1 (Light)
Wall-3-S-A-M 360 0.83 15.9 0.350 1,999 3.500 1,260
Wall-4-E-A-M 238 0.83 20.8 0.350 1,739 3.500 834
Wall-5-W-A-M 405 0.83 16.7 0.350 2,369 3.500 1,419
Partition-1-1 1984 10/10 0.350 6,944 3.500 6,944
Partition-2-1 1984 10/10 0.350 6,944 3.500 6,944
Partition-6-1 708 10/10 0.350 2,478 3.500 2,478
Gls-E-1-90-Tran 36.0 1.000 17 1.000 612 9.000 324
0%S-0-WS-Solar 36.0 0.700 236 0.170 1,011
Gls-W-1-90-Tran 81.4 1.000 17 1.000 1,384 9.000 733
0%S-0-WS-Solar 81.4 0.700 236 0.820 11,027
Gls-S-1-90-Tran 56.0 1.000 17 1.000 952 9.000 504
0%S-0-WS-Solar 56.0 0.700 69 0.750 2,029
Lights-Prof=1 5,555 1.000 18,955
Equipment-Prof=1 2,600 1.000 8,872 0
People-Prof=1 12.0 1.000 3,000 2,400
Sub-total 70,313 2,400 21,439
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
Elite Software Development INSTITUTO NACIONAL DEL CORAZON - INCOR
College Station, TX 77845 Page 64
Zone 79-P3 - Circulacion A peaks (sensible) in March at 12am, Air Handler 31 (UMA 3-2), Group 0,
49.0 x 7.0, Construction Type: 1 (Light)
Partition-1-1 343 10/10 0.350 1,201 3.500 1,201
Partition-2-1 343 10/10 0.350 1,201 3.500 1,201
Partition-3-1 929.2501 10/10 0.350 3,252 3.500 3,252
Lights-Prof=1 960 1.000 3,277
People-Prof=1 2.0 1.000 500 400
Sub-total 9,430 400 5,653
Safety factors: +0% +0% +0%
--------- --------- ---------
Total w/ safety factors: 9,430 400 5,653
Zone 80-P1 - Estar Expositor peaks (sensible) in January at 6pm, Air Handler 3 (FC 1-1), Group 0, 12.0
x 10.0, Construction Type: 1 (Light)
Wall-2-S-A-M 81 0.83 16.7 0.350 474 3.500 284
Wall-3-W-A-M 85 0.83 17.5 0.350 521 3.500 298
Partition-1-1 120 10/10 0.350 420 3.500 420
Partition-4-1 102 10/10 0.350 357 3.500 357
Gls-S-1-90-Tran 20.8 1.000 15 1.000 312 9.000 187
0%S-0-WS-Solar 20.8 0.700 69 0.910 914
Lights-Prof=1 336 1.000 1,146
Equipment-Prof=1 300 1.000 1,024 0
People-Prof=1 4.0 1.000 1,000 800
Zone 81-P1 - Auditorio/3 peaks (sensible) in March at 12am, Air Handler 5 (FC 1-3....65%), Group 0,
19.0 x 35.0, Construction Type: 1 (Light)
Wall-2-E-A-M 162 0.83 22.9 0.350 1,296 3.500 565
Partition-1-1 665 10/10 0.350 2,328 3.500 2,328
Partition-3-1 297.5 10/10 0.350 1,041 3.500 1,041
Lights-Prof=1 1,862 1.000 6,353
People-Prof=1 69.0 1.000 17,250 13,800
Zone 82-P1 - Auditorio/3 peaks (sensible) in March at 12am, Air Handler 6 (FC 1-4....65%), Group 0,
19.0 x 35.0, Construction Type: 1 (Light)
Wall-2-E-A-M 162 0.83 22.9 0.350 1,296 3.500 565
Partition-1-1 665 10/10 0.350 2,328 3.500 2,328
Partition-3-1 297.5 10/10 0.350 1,041 3.500 1,041
Lights-Prof=1 1,862 1.000 6,353
People-Prof=1 69.0 1.000 17,250 13,800
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
Elite Software Development INSTITUTO NACIONAL DEL CORAZON - INCOR
College Station, TX 77845 Page 65