Download as pdf or txt
Download as pdf or txt
You are on page 1of 87

INSTITUTO NACIONAL DEL CORAZON - INCOR

HVAC Load Analysis


for

ESSALUD

Prepared By:

Lima
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
Elite Software Development INSTITUTO NACIONAL DEL CORAZON - INCOR
College Station, TX 77845 Page 2

General Project Data Input


General Project Information
Project file name: C:\INCOR\CALCULO TERMICO\INCOR CHILLER.CHV
Project title: INSTITUTO NACIONAL DEL CORAZON - INCOR
Designed by: ESSALUD
Project location: LIMA, PERU
Client name: ESSALUD
Company city: Lima

Barometric pressure: 29.876 in.Hg.


Altitude: 42 feet
Latitude: -12 Degrees
Mean daily temperature range: 0 Degrees
Starting & ending time for HVAC load calculations: 1am - 12am
Number of unique zones in this project: 82

Building Default Values


Calculations performed: Both heating and cooling loads
Lighting requirements: 2.80 Watts per square foot
Equipment requirements: 0.00 Watts per square foot
People sensible load multiplier: 250 Btuh per person
People latent load multiplier: 200 Btuh per person
Zone sensible safety factor: 0 %
Zone latent safety factor: 0 %
Zone heating safety factor: 0 %
People diversity factor: 100 %
Lighting profile number: 1
Equipment profile number: 1
People profile number: 1
Building default ceiling height: 8.9 feet
Building default wall height: 8.9 feet

Internal Operating Load Profiles (C = 100)


hr hr hr hr hr hr hr hr hr hr hr hr hr hr hr hr hr hr hr hr hr hr hr hr
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
1 C C C C C C C C C C C C C C C C C C C C C C C C
2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 C C C C 0 0
3 0 0 0 0 0 0 C 0 0 0 0 0 0 0 0 0 0 0 C C C C 0 0
4 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
5 C C C C C C C C C C C C C C C C C C C C C C C C
6 C C C C C C C C C C C C C C C C C C C C C C C C
7 C C C C C C C C C C C C C C C C C C C C C C C C
8 C C C C C C C C C C C C C C C C C C C C C C C C
9 C C C C C C C C C C C C C C C C C C C C C C C C
10 C C C C C C C C C C C C C C C C C C C C C C C C
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
Elite Software Development INSTITUTO NACIONAL DEL CORAZON - INCOR
College Station, TX 77845 Page 3

General Project Data Input (cont'd)


Building-Level Design Conditions
Design Outdoor Outdoor Indoor Indoor Grains In/Outdoor
Month Dry Bulb Wet Bulb Rel.Hum Dry Bulb Diff Correction
January 85 75 50% 75 50.29 3
February 85 75 50% 75 50.29 3
March 85 75 50% 75 50.29 3
Winter 58 68

Master Roofs
Roof ASHRAE Roof Dark Susp.
No. Roof# U-Fac Color Ceil
1 4 0.350 No Sí

Master Walls
Wall ASHRAE Wall Wall
No. Group U-Fac Color
1 A 0.350 M
2 G 0.900 D

Master Partitions
Partition Partition Cool Heat
No. U-Factor T-D T-D
1 0.350 10 10
2 1.000 10 10

Master Glass
Glass Summer Winter Glass Interior Interior
No. U-Factor U-Factor Shd.Coef. Shading Shd.Coef
1 1.000 0.900 0.700 1 0.700
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
Elite Software Development INSTITUTO NACIONAL DEL CORAZON - INCOR
College Station, TX 77845 Page 4

Building Summary Loads


Building peaks in January at 3pm.
Bldg Load Area Sen %Tot Lat Sen Net %Net
Descriptions Quan Loss Loss Gain Gain Gain Gain
Roof 0 0 0.00 0 0 0 0.00
Wall 9,311 32,589 7.72 0 50,306 50,306 1.65
Glass 1,320 11,878 2.81 0 77,029 77,029 2.52
Floor Slab 0 0 0.00 0 0 0 0.00

Skin Loads 44,467 10.53 0 127,335 127,335 4.17

Lighting 84,120 0 0.00 0 287,028 287,028 9.40


Equipment 59,500 0 0.00 0 203,022 203,022 6.65
People 414 0 0.00 82,800 103,500 186,300 6.10
Partition 78,222 273,778 64.82 0 273,778 273,778 8.97
Cool. Pret. 0 0 0.00 0 0 0 0.00
Heat. Pret. 0 0 0.00 0 0 0 0.00
Cool. Vent. 44,177 0 0.00 1,489,089 485,205 1,974,294 64.66
Heat. Vent. 9,656 104,127 24.65 0 0 0 0.00
Cool. Infil. 0 0 0.00 0 0 0 0.00
Heat. Infil. 0 0 0.00 0 0 0 0.00
Draw-Thru Fan 0 0 0.00 0 0 0 0.00
Blow-Thru Fan 0 0 0.00 0 0 0 0.00
Reserve Cap. 0 0 0.00 0 0 0 0.00
Reheat Cap. 0 0 0.00 0 1,615 1,615 0.05
Supply Duct 0 0 0.00 0 0 0 0.00
Return Duct 0 0 0.00 0 0 0 0.00
Misc. Supply 0 0 0.00 0 0 0 0.00
Misc. Return 0 0 0.00 0 0 0 0.00

Building Totals 422,372 100.00 1,571,889 1,481,483 3,053,372 100.00

Building Sen %Tot Lat Sen Net %Net


Summary Loss Loss Gain Gain Gain Gain
Ventilation 104,127 24.65 1,489,089 485,205 1,974,294 64.66
Infiltration 0 0.00 0 0 0 0.00
Pretreated Air 0 0.00 0 0 0 0.00
Zone Loads 318,245 75.35 82,800 996,278 1,079,078 35.34
Plenum Loads 0 0.00 0 0 0 0.00
Fan & Duct Loads 0 0.00 0 0 0 0.00
Building Totals 422,372 100.00 1,571,889 1,481,483 3,053,372 100.00

Check Figures
Total Building Supply Air (based on a 19° TD): 49,586 CFM
Total Building Vent. Air (89.09% of Supply): 44,177 CFM

Total Conditioned Air Space: 30,043 Sq.ft


Supply Air Per Unit Area: 1.6505 CFM/Sq.ft
Area Per Cooling Capacity: 118.0703 Sq.ft/Ton
Cooling Capacity Per Area: 0.0085 Tons/Sq.ft

Total Heating Required With Outside Air: 422,372 Btuh


Total Cooling Required With Outside Air: 254.45 Tons
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
Elite Software Development INSTITUTO NACIONAL DEL CORAZON - INCOR
College Station, TX 77845 Page 5

Air Handler #1 - UMA 1-1 - Summary Loads


Zn Description Area Htg.Loss Sen.Gain Lat.Gain Htg.O.A. Clg.O.A.
No Peak Time People Htg.CFM Clg.CFM S.Exh Req.CFM Req.CFM
Volume CFM/Sqft CFM/Sqft W.Exh Act.CFM Act.CFM
70 P1 - Sala 1 300 4,032 15,564 1,200 None None
12am March 6 138 730 0 0 0
3,450 0.46 2.43 0 0 730

71 P1 - Hall 300 4,330 7,696 400 None None


12am March 2 149 361 0 0 0
2,655 0.50 1.20 0 0 361

72 P1 - Sala 2 360 4,533 16,637 1,200 None None


12am March 6 156 780 0 0 0
4,140 0.43 2.17 0 0 780

Zone Peak Totals: 960 12,895 39,898 2,800


Total Zones: 3 14 443 1,872 0 0 0
Unique Zones: 3 10,245 0.46 1.95 0 0 1,872
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
Elite Software Development INSTITUTO NACIONAL DEL CORAZON - INCOR
College Station, TX 77845 Page 6

Air Handler #1 - UMA 1-1 - Total Load Summary


Air Handler Description: UMA 1-1 Constant Volume - Sum of Peaks
Sensible Heat Ratio: 0.93 --- This system occurs 1 time(s) in the building. ---
Air System Peak Time: 12am in March.
Outdoor Conditions: 85° DB, 75° WB, 115.03 grains

Summer: Ventilation controls outside air, ----- Winter: Exhaust controls outside air.

Zone Space sensible loss: 12,895 Btuh


Infiltration sensible loss: 0 Btuh 0 CFM
Outside Air sensible loss: 0 Btuh 0 CFM
Supply Duct sensible loss: 0 Btuh
Return Duct sensible loss: 0 Btuh
Return Plenum sensible loss: 0 Btuh
Total System sensible loss: 12,895 Btuh

Heating Supply Air: 12,895 / (.998 X 1.08 X 27) = 443 CFM


Winter Vent Outside Air (0.0% of supply) = 0 CFM

Zone space sensible gain: 39,898 Btuh


Infiltration sensible gain: 0 Btuh
Draw-thru fan sensible gain: 0 Btuh
Supply duct sensible gain: 0 Btuh
Reheat sensible gain: 0 Btuh
Total sensible gain on supply side of coil: 39,898 Btuh
Cooling Supply Air: 39,898 / (.998 X 1.1 X 19) = 1,872 CFM
Summer Vent Outside Air (100.0% of supply) = 1,872 CFM

Return duct sensible gain: 0 Btuh


Return plenum sensible gain: 0 Btuh
Outside air sensible gain: 20,556 Btuh 1,872 CFM
Blow-thru fan sensible gain: 0 Btuh
Total sensible gain on return side of coil: 20,556 Btuh
Total sensible gain on air handling system: 60,453 Btuh

Zone space latent gain: 2,800 Btuh


Infiltration latent gain: 0 Btuh
Outside air latent gain: 63,910 Btuh
Total latent gain on air handling system: 66,710 Btuh
Total system sensible and latent gain: 127,163 Btuh

Check Figures
Total Air Handler Supply Air (based on a 19° TD): 1,872 CFM
Total Air Handler Vent. Air (100.00% of Supply): 1,872 CFM

Total Conditioned Air Space: 960 Sq.ft


Supply Air Per Unit Area: 1.9495 CFM/Sq.ft
Area Per Cooling Capacity: 90.5922 Sq.ft/Ton
Cooling Capacity Per Area: 0.0110 Tons/Sq.ft

Total Heating Required With Outside Air: 12,895 Btuh


Total Cooling Required With Outside Air: 10.60 Tons
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
Elite Software Development INSTITUTO NACIONAL DEL CORAZON - INCOR
College Station, TX 77845 Page 7

Air Handler #3 - FC 1-1 - Summary Loads


Zn Description Area Htg.Loss Sen.Gain Lat.Gain Htg.O.A. Clg.O.A.
No Peak Time People Htg.CFM Clg.CFM S.Exh Req.CFM Req.CFM
Volume CFM/Sqft CFM/Sqft W.Exh Act.CFM Act.CFM
73 P1 - Escenario 490 3,173 20,818 1,000 None 7/P
12am January 5 109 979 0 0 35
4,165 0.22 2.00 0 0 58

80 P1 - Estar Expositor 120 1,546 6,169 800 None 10/P


6pm January 4 53 290 0 0 40
1,020 0.44 2.42 0 0 17
Zone Peak Totals: 610 4,719 26,987 1,800
Total Zones: 2 9 162 1,269 0 0 75
Unique Zones: 2 5,185 0.27 2.08 0 0 75
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
Elite Software Development INSTITUTO NACIONAL DEL CORAZON - INCOR
College Station, TX 77845 Page 8

Air Handler #3 - FC 1-1 - Total Load Summary


Air Handler Description: FC 1-1 Constant Volume - Sum of Peaks
Sensible Heat Ratio: 0.94 --- This system occurs 1 time(s) in the building. ---
Air System Peak Time: 6pm in January.
Outdoor Conditions: 85° DB, 75° WB, 115.03 grains

Summer: Ventilation controls outside air, ----- Winter: Exhaust controls outside air.

Zone Space sensible loss: 4,719 Btuh


Infiltration sensible loss: 0 Btuh 0 CFM
Outside Air sensible loss: 0 Btuh 0 CFM
Supply Duct sensible loss: 0 Btuh
Return Duct sensible loss: 0 Btuh
Return Plenum sensible loss: 0 Btuh
Total System sensible loss: 4,719 Btuh

Heating Supply Air: 4,719 / (.998 X 1.08 X 27) = 162 CFM


Winter Vent Outside Air (0.0% of supply) = 0 CFM

Zone space sensible gain: 26,693 Btuh


Infiltration sensible gain: 0 Btuh
Draw-thru fan sensible gain: 0 Btuh
Supply duct sensible gain: 0 Btuh
Reheat sensible gain: 285 Btuh
Total sensible gain on supply side of coil: 26,978 Btuh
Cooling Supply Air: 26,978 / (.998 X 1.1 X 19) = 1,269 CFM
Summer Vent Outside Air (5.9% of supply) = 75 CFM

Return duct sensible gain: 0 Btuh


Return plenum sensible gain: 0 Btuh
Outside air sensible gain: 824 Btuh 75 CFM
Blow-thru fan sensible gain: 0 Btuh
Total sensible gain on return side of coil: 824 Btuh
Total sensible gain on air handling system: 27,802 Btuh

Zone space latent gain: 1,800 Btuh


Infiltration latent gain: 0 Btuh
Outside air latent gain: 2,561 Btuh
Total latent gain on air handling system: 4,361 Btuh
Total system sensible and latent gain: 32,163 Btuh

Check Figures
Total Air Handler Supply Air (based on a 19° TD): 1,269 CFM
Total Air Handler Vent. Air (5.91% of Supply): 75 CFM

Total Conditioned Air Space: 610 Sq.ft


Supply Air Per Unit Area: 2.0799 CFM/Sq.ft
Area Per Cooling Capacity: 227.5891 Sq.ft/Ton
Cooling Capacity Per Area: 0.0044 Tons/Sq.ft

Total Heating Required With Outside Air: 4,719 Btuh


Total Cooling Required With Outside Air: 2.68 Tons
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
Elite Software Development INSTITUTO NACIONAL DEL CORAZON - INCOR
College Station, TX 77845 Page 9

Air Handler #4 - FC 1-2....65% - Summary Loads


Zn Description Area Htg.Loss Sen.Gain Lat.Gain Htg.O.A. Clg.O.A.
No Peak Time People Htg.CFM Clg.CFM S.Exh Req.CFM Req.CFM
Volume CFM/Sqft CFM/Sqft W.Exh Act.CFM Act.CFM
74 P1 - Auditorio/3 665 3,934 28,268 13,800 None 7/P
12am March 69 135 1,670 0 0 483
5,653 0.20 2.51 0 0 483

Zone Peak Totals: 665 3,934 28,268 13,800


Total Zones: 1 69 135 1,670 0 0 483
Unique Zones: 1 5,653 0.20 2.51 0 0 483
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
Elite Software Development INSTITUTO NACIONAL DEL CORAZON - INCOR
College Station, TX 77845 Page 10

Air Handler #4 - FC 1-2....65% - Total Load Summary


Air Handler Description: FC 1-2....65% Constant Volume - Sum of Peaks
Sensible Heat Ratio: 0.67 --- This system occurs 1 time(s) in the building. ---
Air System Peak Time: 12am in March.
Outdoor Conditions: 85° DB, 75° WB, 115.03 grains

Summer: Ventilation controls outside air, ----- Winter: Exhaust controls outside air.

Zone Space sensible loss: 3,934 Btuh


Infiltration sensible loss: 0 Btuh 0 CFM
Outside Air sensible loss: 0 Btuh 0 CFM
Supply Duct sensible loss: 0 Btuh
Return Duct sensible loss: 0 Btuh
Return Plenum sensible loss: 0 Btuh
Total System sensible loss: 3,934 Btuh

Heating Supply Air: 3,934 / (.998 X 1.08 X 27) = 135 CFM


Winter Vent Outside Air (0.0% of supply) = 0 CFM

Zone space sensible gain: 28,268 Btuh


Infiltration sensible gain: 0 Btuh
Draw-thru fan sensible gain: 0 Btuh
Supply duct sensible gain: 0 Btuh
Reheat sensible gain: 0 Btuh
Total sensible gain on supply side of coil: 28,268 Btuh
Cooling Supply Air: 28,268 / (.998 X 1.1 X 15) = 1,670 CFM
Summer Vent Outside Air (28.9% of supply) = 483 CFM

Return duct sensible gain: 0 Btuh


Return plenum sensible gain: 0 Btuh
Outside air sensible gain: 5,305 Btuh 483 CFM
Blow-thru fan sensible gain: 0 Btuh
Total sensible gain on return side of coil: 5,305 Btuh
Total sensible gain on air handling system: 33,573 Btuh

Zone space latent gain: 13,800 Btuh


Infiltration latent gain: 0 Btuh
Outside air latent gain: 10,001 Btuh
Total latent gain on air handling system: 23,801 Btuh
Total system sensible and latent gain: 57,374 Btuh

Check Figures
Total Air Handler Supply Air (based on a 15° TD): 1,670 CFM
Total Air Handler Vent. Air (28.93% of Supply): 483 CFM

Total Conditioned Air Space: 665 Sq.ft


Supply Air Per Unit Area: 2.5106 CFM/Sq.ft
Area Per Cooling Capacity: 139.0885 Sq.ft/Ton
Cooling Capacity Per Area: 0.0072 Tons/Sq.ft

Total Heating Required With Outside Air: 3,934 Btuh


Total Cooling Required With Outside Air: 4.78 Tons
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
Elite Software Development INSTITUTO NACIONAL DEL CORAZON - INCOR
College Station, TX 77845 Page 11

Air Handler #5 - FC 1-3....65% - Summary Loads


Zn Description Area Htg.Loss Sen.Gain Lat.Gain Htg.O.A. Clg.O.A.
No Peak Time People Htg.CFM Clg.CFM S.Exh Req.CFM Req.CFM
Volume CFM/Sqft CFM/Sqft W.Exh Act.CFM Act.CFM
81 P1 - Auditorio/3 665 3,934 28,268 13,800 None 7/P
12am March 69 135 1,670 0 0 483
5,653 0.20 2.51 0 0 483

Zone Peak Totals: 665 3,934 28,268 13,800


Total Zones: 1 69 135 1,670 0 0 483
Unique Zones: 1 5,653 0.20 2.51 0 0 483
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
Elite Software Development INSTITUTO NACIONAL DEL CORAZON - INCOR
College Station, TX 77845 Page 12

Air Handler #5 - FC 1-3....65% - Total Load Summary


Air Handler Description: FC 1-3....65% Constant Volume - Sum of Peaks
Sensible Heat Ratio: 0.67 --- This system occurs 1 time(s) in the building. ---
Air System Peak Time: 12am in March.
Outdoor Conditions: 85° DB, 75° WB, 115.03 grains

Summer: Ventilation controls outside air, ----- Winter: Exhaust controls outside air.

Zone Space sensible loss: 3,934 Btuh


Infiltration sensible loss: 0 Btuh 0 CFM
Outside Air sensible loss: 0 Btuh 0 CFM
Supply Duct sensible loss: 0 Btuh
Return Duct sensible loss: 0 Btuh
Return Plenum sensible loss: 0 Btuh
Total System sensible loss: 3,934 Btuh

Heating Supply Air: 3,934 / (.998 X 1.08 X 27) = 135 CFM


Winter Vent Outside Air (0.0% of supply) = 0 CFM

Zone space sensible gain: 28,268 Btuh


Infiltration sensible gain: 0 Btuh
Draw-thru fan sensible gain: 0 Btuh
Supply duct sensible gain: 0 Btuh
Reheat sensible gain: 0 Btuh
Total sensible gain on supply side of coil: 28,268 Btuh
Cooling Supply Air: 28,268 / (.998 X 1.1 X 15) = 1,670 CFM
Summer Vent Outside Air (28.9% of supply) = 483 CFM

Return duct sensible gain: 0 Btuh


Return plenum sensible gain: 0 Btuh
Outside air sensible gain: 5,305 Btuh 483 CFM
Blow-thru fan sensible gain: 0 Btuh
Total sensible gain on return side of coil: 5,305 Btuh
Total sensible gain on air handling system: 33,573 Btuh

Zone space latent gain: 13,800 Btuh


Infiltration latent gain: 0 Btuh
Outside air latent gain: 10,001 Btuh
Total latent gain on air handling system: 23,801 Btuh
Total system sensible and latent gain: 57,374 Btuh

Check Figures
Total Air Handler Supply Air (based on a 15° TD): 1,670 CFM
Total Air Handler Vent. Air (28.93% of Supply): 483 CFM

Total Conditioned Air Space: 665 Sq.ft


Supply Air Per Unit Area: 2.5106 CFM/Sq.ft
Area Per Cooling Capacity: 139.0885 Sq.ft/Ton
Cooling Capacity Per Area: 0.0072 Tons/Sq.ft

Total Heating Required With Outside Air: 3,934 Btuh


Total Cooling Required With Outside Air: 4.78 Tons
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
Elite Software Development INSTITUTO NACIONAL DEL CORAZON - INCOR
College Station, TX 77845 Page 13

Air Handler #6 - FC 1-4....65% - Summary Loads


Zn Description Area Htg.Loss Sen.Gain Lat.Gain Htg.O.A. Clg.O.A.
No Peak Time People Htg.CFM Clg.CFM S.Exh Req.CFM Req.CFM
Volume CFM/Sqft CFM/Sqft W.Exh Act.CFM Act.CFM
82 P1 - Auditorio/3 665 3,934 28,268 13,800 None 7/P
12am March 69 135 1,670 0 0 483
5,653 0.20 2.51 0 0 483

Zone Peak Totals: 665 3,934 28,268 13,800


Total Zones: 1 69 135 1,670 0 0 483
Unique Zones: 1 5,653 0.20 2.51 0 0 483
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
Elite Software Development INSTITUTO NACIONAL DEL CORAZON - INCOR
College Station, TX 77845 Page 14

Air Handler #6 - FC 1-4....65% - Total Load Summary


Air Handler Description: FC 1-4....65% Constant Volume - Sum of Peaks
Sensible Heat Ratio: 0.67 --- This system occurs 1 time(s) in the building. ---
Air System Peak Time: 12am in March.
Outdoor Conditions: 85° DB, 75° WB, 115.03 grains

Summer: Ventilation controls outside air, ----- Winter: Exhaust controls outside air.

Zone Space sensible loss: 3,934 Btuh


Infiltration sensible loss: 0 Btuh 0 CFM
Outside Air sensible loss: 0 Btuh 0 CFM
Supply Duct sensible loss: 0 Btuh
Return Duct sensible loss: 0 Btuh
Return Plenum sensible loss: 0 Btuh
Total System sensible loss: 3,934 Btuh

Heating Supply Air: 3,934 / (.998 X 1.08 X 27) = 135 CFM


Winter Vent Outside Air (0.0% of supply) = 0 CFM

Zone space sensible gain: 28,268 Btuh


Infiltration sensible gain: 0 Btuh
Draw-thru fan sensible gain: 0 Btuh
Supply duct sensible gain: 0 Btuh
Reheat sensible gain: 0 Btuh
Total sensible gain on supply side of coil: 28,268 Btuh
Cooling Supply Air: 28,268 / (.998 X 1.1 X 15) = 1,670 CFM
Summer Vent Outside Air (28.9% of supply) = 483 CFM

Return duct sensible gain: 0 Btuh


Return plenum sensible gain: 0 Btuh
Outside air sensible gain: 5,305 Btuh 483 CFM
Blow-thru fan sensible gain: 0 Btuh
Total sensible gain on return side of coil: 5,305 Btuh
Total sensible gain on air handling system: 33,573 Btuh

Zone space latent gain: 13,800 Btuh


Infiltration latent gain: 0 Btuh
Outside air latent gain: 10,001 Btuh
Total latent gain on air handling system: 23,801 Btuh
Total system sensible and latent gain: 57,374 Btuh

Check Figures
Total Air Handler Supply Air (based on a 15° TD): 1,670 CFM
Total Air Handler Vent. Air (28.93% of Supply): 483 CFM

Total Conditioned Air Space: 665 Sq.ft


Supply Air Per Unit Area: 2.5106 CFM/Sq.ft
Area Per Cooling Capacity: 139.0885 Sq.ft/Ton
Cooling Capacity Per Area: 0.0072 Tons/Sq.ft

Total Heating Required With Outside Air: 3,934 Btuh


Total Cooling Required With Outside Air: 4.78 Tons
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
Elite Software Development INSTITUTO NACIONAL DEL CORAZON - INCOR
College Station, TX 77845 Page 15

Air Handler #7 - FC 1-5 - Summary Loads


Zn Description Area Htg.Loss Sen.Gain Lat.Gain Htg.O.A. Clg.O.A.
No Peak Time People Htg.CFM Clg.CFM S.Exh Req.CFM Req.CFM
Volume CFM/Sqft CFM/Sqft W.Exh Act.CFM Act.CFM
P1 - Deposito De
616 7,688 15,347 600 None Direct
49 Farmacia
3 264 736 0 0 80
12am March
5,452 0.43 1.20 0 0 80

Zone Peak Totals: 616 7,688 15,347 600


Total Zones: 1 3 264 736 0 0 80
Unique Zones: 1 5,452 0.43 1.20 0 0 80
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
Elite Software Development INSTITUTO NACIONAL DEL CORAZON - INCOR
College Station, TX 77845 Page 16

Air Handler #7 - FC 1-5 - Total Load Summary


Air Handler Description: FC 1-5 Constant Volume - Sum of Peaks
Sensible Heat Ratio: 0.96 --- This system occurs 1 time(s) in the building. ---
Air System Peak Time: 12am in March.
Outdoor Conditions: 85° DB, 75° WB, 115.03 grains

Summer: Ventilation controls outside air, ----- Winter: Exhaust controls outside air.

Zone Space sensible loss: 7,688 Btuh


Infiltration sensible loss: 0 Btuh 0 CFM
Outside Air sensible loss: 0 Btuh 0 CFM
Supply Duct sensible loss: 0 Btuh
Return Duct sensible loss: 0 Btuh
Return Plenum sensible loss: 0 Btuh
Total System sensible loss: 7,688 Btuh

Heating Supply Air: 7,688 / (.998 X 1.08 X 27) = 264 CFM


Winter Vent Outside Air (0.0% of supply) = 0 CFM

Zone space sensible gain: 15,347 Btuh


Infiltration sensible gain: 0 Btuh
Draw-thru fan sensible gain: 0 Btuh
Supply duct sensible gain: 0 Btuh
Reheat sensible gain: 0 Btuh
Total sensible gain on supply side of coil: 15,347 Btuh
Cooling Supply Air: 15,347 / (.998 X 1.1 X 19) = 736 CFM
Summer Vent Outside Air (10.9% of supply) = 80 CFM

Return duct sensible gain: 0 Btuh


Return plenum sensible gain: 0 Btuh
Outside air sensible gain: 879 Btuh 80 CFM
Blow-thru fan sensible gain: 0 Btuh
Total sensible gain on return side of coil: 879 Btuh
Total sensible gain on air handling system: 16,226 Btuh

Zone space latent gain: 600 Btuh


Infiltration latent gain: 0 Btuh
Outside air latent gain: 2,732 Btuh
Total latent gain on air handling system: 3,332 Btuh
Total system sensible and latent gain: 19,558 Btuh

Check Figures
Total Air Handler Supply Air (based on a 19° TD): 736 CFM
Total Air Handler Vent. Air (10.86% of Supply): 80 CFM

Total Conditioned Air Space: 616 Sq.ft


Supply Air Per Unit Area: 1.1955 CFM/Sq.ft
Area Per Cooling Capacity: 377.9579 Sq.ft/Ton
Cooling Capacity Per Area: 0.0026 Tons/Sq.ft

Total Heating Required With Outside Air: 7,688 Btuh


Total Cooling Required With Outside Air: 1.63 Tons
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
Elite Software Development INSTITUTO NACIONAL DEL CORAZON - INCOR
College Station, TX 77845 Page 17

Air Handler #10 - UMA 2-1 - Summary Loads


Zn Description Area Htg.Loss Sen.Gain Lat.Gain Htg.O.A. Clg.O.A.
No Peak Time People Htg.CFM Clg.CFM S.Exh Req.CFM Req.CFM
Volume CFM/Sqft CFM/Sqft W.Exh Act.CFM Act.CFM
40 P2 - Sala1 518 5,822 21,763 1,200 None 10/P
12am January 6 200 1,044 0 0 60
4,580 0.39 2.02 0 200 1,044

41 P2 - Maq1 105 1,045 12,569 0 None 10/P


12am January 0 36 603 0 0 0
929 0.34 5.74 0 36 603

43 P2 - Com1 175 1,612 5,831 400 None 10/P


12am March 2 55 280 0 0 20
1,549 0.32 1.60 0 55 280

P2 - Corredor
468 5,785 11,097 400 None None
59 Hemodinamica A
2 199 533 0 0 0
12am March
4,142 0.42 1.14 0 199 533

Zone Peak Totals: 1,266 14,264 51,261 2,000


Total Zones: 4 10 490 2,460 0 0 80
Unique Zones: 4 11,200 0.39 1.94 0 490 2,460
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
Elite Software Development INSTITUTO NACIONAL DEL CORAZON - INCOR
College Station, TX 77845 Page 18

Air Handler #10 - UMA 2-1 - Total Load Summary


Air Handler Description: UMA 2-1 Constant Volume - Sum of Peaks
Sensible Heat Ratio: 0.96 --- This system occurs 1 time(s) in the building. ---
Air System Peak Time: 12am in January.
Outdoor Conditions: 85° DB, 75° WB, 115.03 grains

Summer: Ventilation controls outside air, ----- Winter: Ventilation controls outside air.

Zone Space sensible loss: 14,264 Btuh


Infiltration sensible loss: 0 Btuh 0 CFM
Outside Air sensible loss: 5,283 Btuh 490 CFM
Supply Duct sensible loss: 0 Btuh
Return Duct sensible loss: 0 Btuh
Return Plenum sensible loss: 0 Btuh
Total System sensible loss: 19,546 Btuh

Heating Supply Air: 14,264 / (.998 X 1.08 X 27) = 490 CFM


Winter Vent Outside Air (100.0% of supply) = 490 CFM

Zone space sensible gain: 51,261 Btuh


Infiltration sensible gain: 0 Btuh
Draw-thru fan sensible gain: 0 Btuh
Supply duct sensible gain: 0 Btuh
Reheat sensible gain: 0 Btuh
Total sensible gain on supply side of coil: 51,261 Btuh
Cooling Supply Air: 51,261 / (.998 X 1.1 X 19) = 2,460 CFM
Summer Vent Outside Air (100.0% of supply) = 2,460 CFM

Return duct sensible gain: 0 Btuh


Return plenum sensible gain: 0 Btuh
Outside air sensible gain: 27,017 Btuh 2,460 CFM
Blow-thru fan sensible gain: 0 Btuh
Total sensible gain on return side of coil: 27,017 Btuh
Total sensible gain on air handling system: 78,278 Btuh

Zone space latent gain: 2,000 Btuh


Infiltration latent gain: 0 Btuh
Outside air latent gain: 83,999 Btuh
Total latent gain on air handling system: 85,999 Btuh
Total system sensible and latent gain: 164,277 Btuh

Check Figures
Total Air Handler Supply Air (based on a 19° TD): 2,460 CFM
Total Air Handler Vent. Air (100.00% of Supply): 2,460 CFM

Total Conditioned Air Space: 1,266 Sq.ft


Supply Air Per Unit Area: 1.9437 CFM/Sq.ft
Area Per Cooling Capacity: 92.4414 Sq.ft/Ton
Cooling Capacity Per Area: 0.0108 Tons/Sq.ft

Total Heating Required With Outside Air: 19,546 Btuh


Total Cooling Required With Outside Air: 13.69 Tons
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
Elite Software Development INSTITUTO NACIONAL DEL CORAZON - INCOR
College Station, TX 77845 Page 19

Air Handler #11 - UMA 2-2 - Summary Loads


Zn Description Area Htg.Loss Sen.Gain Lat.Gain Htg.O.A. Clg.O.A.
No Peak Time People Htg.CFM Clg.CFM S.Exh Req.CFM Req.CFM
Volume CFM/Sqft CFM/Sqft W.Exh Act.CFM Act.CFM
42 P2 - Maq2 105 1,045 12,569 0 None 10/P
12am January 0 36 604 0 0 0
929 0.34 5.75 0 36 604

44 P2 - Com2 175 1,612 5,831 400 None 10/P


12am March 2 55 280 0 0 20
1,549 0.32 1.60 0 55 280

45 P2 - Sala2 529 5,252 21,332 1,200 None 10/P


12am January 6 180 1,025 0 0 60
4,682 0.34 1.94 0 180 1,025

P2 - Corredor
468 5,785 11,097 400 None None
60 Hemodinamica B
2 199 533 0 0 0
12am March
4,142 0.42 1.14 0 199 533

61 P2 - Material Esteril 98 1,770 3,048 0 None None


12am March 0 61 146 0 0 0
867 0.62 1.49 0 61 146

Zone Peak Totals: 1,375 15,464 53,877 2,000


Total Zones: 5 10 531 2,589 0 0 80
Unique Zones: 5 12,169 0.39 1.88 0 531 2,589
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
Elite Software Development INSTITUTO NACIONAL DEL CORAZON - INCOR
College Station, TX 77845 Page 20

Air Handler #11 - UMA 2-2 - Total Load Summary


Air Handler Description: UMA 2-2 Constant Volume - Sum of Peaks
Sensible Heat Ratio: 0.96 --- This system occurs 1 time(s) in the building. ---
Air System Peak Time: 12am in January.
Outdoor Conditions: 85° DB, 75° WB, 115.03 grains

Summer: Ventilation controls outside air, ----- Winter: Ventilation controls outside air.

Zone Space sensible loss: 15,464 Btuh


Infiltration sensible loss: 0 Btuh 0 CFM
Outside Air sensible loss: 5,727 Btuh 531 CFM
Supply Duct sensible loss: 0 Btuh
Return Duct sensible loss: 0 Btuh
Return Plenum sensible loss: 0 Btuh
Total System sensible loss: 21,191 Btuh

Heating Supply Air: 15,464 / (.998 X 1.08 X 27) = 531 CFM


Winter Vent Outside Air (100.0% of supply) = 531 CFM

Zone space sensible gain: 53,877 Btuh


Infiltration sensible gain: 0 Btuh
Draw-thru fan sensible gain: 0 Btuh
Supply duct sensible gain: 0 Btuh
Reheat sensible gain: 0 Btuh
Total sensible gain on supply side of coil: 53,877 Btuh
Cooling Supply Air: 53,877 / (.998 X 1.1 X 19) = 2,589 CFM
Summer Vent Outside Air (100.0% of supply) = 2,589 CFM

Return duct sensible gain: 0 Btuh


Return plenum sensible gain: 0 Btuh
Outside air sensible gain: 28,435 Btuh 2,589 CFM
Blow-thru fan sensible gain: 0 Btuh
Total sensible gain on return side of coil: 28,435 Btuh
Total sensible gain on air handling system: 82,312 Btuh

Zone space latent gain: 2,000 Btuh


Infiltration latent gain: 0 Btuh
Outside air latent gain: 88,408 Btuh
Total latent gain on air handling system: 90,408 Btuh
Total system sensible and latent gain: 172,720 Btuh

Check Figures
Total Air Handler Supply Air (based on a 19° TD): 2,589 CFM
Total Air Handler Vent. Air (100.00% of Supply): 2,589 CFM

Total Conditioned Air Space: 1,375 Sq.ft


Supply Air Per Unit Area: 1.8829 CFM/Sq.ft
Area Per Cooling Capacity: 95.5304 Sq.ft/Ton
Cooling Capacity Per Area: 0.0105 Tons/Sq.ft

Total Heating Required With Outside Air: 21,191 Btuh


Total Cooling Required With Outside Air: 14.39 Tons
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
Elite Software Development INSTITUTO NACIONAL DEL CORAZON - INCOR
College Station, TX 77845 Page 21

Air Handler #12 - UMA 2-3 - Summary Loads


Zn Description Area Htg.Loss Sen.Gain Lat.Gain Htg.O.A. Clg.O.A.
No Peak Time People Htg.CFM Clg.CFM S.Exh Req.CFM Req.CFM
Volume CFM/Sqft CFM/Sqft W.Exh Act.CFM Act.CFM
46 P2 - Sala3 600 6,492 24,360 1,200 None 10/P
2am January 6 223 1,172 0 0 60
5,310 0.37 1.95 0 223 1,172

47 P2 - Maq3 120 1,568 13,673 0 None 10/P


2am March 0 54 658 0 0 0
1,062 0.45 5.48 0 54 658

48 P2 - Com3 185 2,178 6,493 400 None 10/P


12am March 2 75 312 0 0 20
1,637 0.40 1.69 0 75 312

P2 - Corredor
468 5,785 11,097 400 None None
62 Hemodinamica C
2 199 534 0 0 0
12am March
4,142 0.42 1.14 0 199 534

Zone Peak Totals: 1,373 16,023 55,624 2,000


Total Zones: 4 10 550 2,675 0 0 80
Unique Zones: 4 12,151 0.40 1.95 0 550 2,675
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
Elite Software Development INSTITUTO NACIONAL DEL CORAZON - INCOR
College Station, TX 77845 Page 22

Air Handler #12 - UMA 2-3 - Total Load Summary


Air Handler Description: UMA 2-3 Constant Volume - Sum of Peaks
Sensible Heat Ratio: 0.97 --- This system occurs 1 time(s) in the building. ---
Air System Peak Time: 2am in January.
Outdoor Conditions: 85° DB, 75° WB, 115.03 grains

Summer: Ventilation controls outside air, ----- Winter: Ventilation controls outside air.

Zone Space sensible loss: 16,023 Btuh


Infiltration sensible loss: 0 Btuh 0 CFM
Outside Air sensible loss: 5,934 Btuh 550 CFM
Supply Duct sensible loss: 0 Btuh
Return Duct sensible loss: 0 Btuh
Return Plenum sensible loss: 0 Btuh
Total System sensible loss: 21,957 Btuh

Heating Supply Air: 16,023 / (.998 X 1.08 X 27) = 550 CFM


Winter Vent Outside Air (100.0% of supply) = 550 CFM

Zone space sensible gain: 55,603 Btuh


Infiltration sensible gain: 0 Btuh
Draw-thru fan sensible gain: 0 Btuh
Supply duct sensible gain: 0 Btuh
Reheat sensible gain: 0 Btuh
Total sensible gain on supply side of coil: 55,603 Btuh
Cooling Supply Air: 55,603 / (.998 X 1.1 X 19) = 2,674 CFM
Summer Vent Outside Air (100.0% of supply) = 2,674 CFM

Return duct sensible gain: 0 Btuh


Return plenum sensible gain: 0 Btuh
Outside air sensible gain: 29,371 Btuh 2,674 CFM
Blow-thru fan sensible gain: 0 Btuh
Total sensible gain on return side of coil: 29,371 Btuh
Total sensible gain on air handling system: 84,974 Btuh

Zone space latent gain: 2,000 Btuh


Infiltration latent gain: 0 Btuh
Outside air latent gain: 91,317 Btuh
Total latent gain on air handling system: 93,317 Btuh
Total system sensible and latent gain: 178,291 Btuh

Check Figures
Total Air Handler Supply Air (based on a 19° TD): 2,674 CFM
Total Air Handler Vent. Air (100.00% of Supply): 2,674 CFM

Total Conditioned Air Space: 1,373 Sq.ft


Supply Air Per Unit Area: 1.9476 CFM/Sq.ft
Area Per Cooling Capacity: 92.4110 Sq.ft/Ton
Cooling Capacity Per Area: 0.0108 Tons/Sq.ft

Total Heating Required With Outside Air: 21,957 Btuh


Total Cooling Required With Outside Air: 14.86 Tons
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
Elite Software Development INSTITUTO NACIONAL DEL CORAZON - INCOR
College Station, TX 77845 Page 23

Air Handler #30 - UMA 3-1 - Summary Loads


Zn Description Area Htg.Loss Sen.Gain Lat.Gain Htg.O.A. Clg.O.A.
No Peak Time People Htg.CFM Clg.CFM S.Exh Req.CFM Req.CFM
Volume CFM/Sqft CFM/Sqft W.Exh Act.CFM Act.CFM
75 P3 - Infectados1 132 1,362 5,699 200 None None
8am February 1 47 273 0 0 0
1,168 0.35 2.07 0 47 273

76 P3 - Infectados2 132 1,296 3,830 200 None None


12am March 1 45 183 0 0 0
1,168 0.34 1.39 0 45 183

77 P3 - Infectados 279 4,028 9,220 400 None None


12am March 2 138 441 0 0 0
2,469 0.50 1.58 0 138 441

Zone Peak Totals: 543 6,686 18,750 800


Total Zones: 3 4 230 897 0 0 0
Unique Zones: 3 4,806 0.42 1.65 0 230 897
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
Elite Software Development INSTITUTO NACIONAL DEL CORAZON - INCOR
College Station, TX 77845 Page 24

Air Handler #30 - UMA 3-1 - Total Load Summary


Air Handler Description: UMA 3-1 Constant Volume - Sum of Peaks
Sensible Heat Ratio: 0.96 --- This system occurs 1 time(s) in the building. ---
Air System Peak Time: 8am in February.
Outdoor Conditions: 85° DB, 75° WB, 115.03 grains

Summer: Ventilation controls outside air, ----- Winter: Ventilation controls outside air.

Zone Space sensible loss: 6,686 Btuh


Infiltration sensible loss: 0 Btuh 0 CFM
Outside Air sensible loss: 2,476 Btuh 230 CFM
Supply Duct sensible loss: 0 Btuh
Return Duct sensible loss: 0 Btuh
Return Plenum sensible loss: 0 Btuh
Total System sensible loss: 9,162 Btuh

Heating Supply Air: 6,686 / (.998 X 1.08 X 27) = 230 CFM


Winter Vent Outside Air (100.0% of supply) = 230 CFM

Zone space sensible gain: 18,626 Btuh


Infiltration sensible gain: 0 Btuh
Draw-thru fan sensible gain: 0 Btuh
Supply duct sensible gain: 0 Btuh
Reheat sensible gain: 110 Btuh
Total sensible gain on supply side of coil: 18,736 Btuh
Cooling Supply Air: 18,736 / (.998 X 1.1 X 19) = 897 CFM
Summer Vent Outside Air (100.0% of supply) = 897 CFM

Return duct sensible gain: 0 Btuh


Return plenum sensible gain: 0 Btuh
Outside air sensible gain: 9,848 Btuh 897 CFM
Blow-thru fan sensible gain: 0 Btuh
Total sensible gain on return side of coil: 9,848 Btuh
Total sensible gain on air handling system: 28,584 Btuh

Zone space latent gain: 800 Btuh


Infiltration latent gain: 0 Btuh
Outside air latent gain: 30,619 Btuh
Total latent gain on air handling system: 31,419 Btuh
Total system sensible and latent gain: 60,003 Btuh

Check Figures
Total Air Handler Supply Air (based on a 19° TD): 897 CFM
Total Air Handler Vent. Air (100.00% of Supply): 897 CFM

Total Conditioned Air Space: 543 Sq.ft


Supply Air Per Unit Area: 1.6513 CFM/Sq.ft
Area Per Cooling Capacity: 108.5947 Sq.ft/Ton
Cooling Capacity Per Area: 0.0092 Tons/Sq.ft

Total Heating Required With Outside Air: 9,162 Btuh


Total Cooling Required With Outside Air: 5.00 Tons
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
Elite Software Development INSTITUTO NACIONAL DEL CORAZON - INCOR
College Station, TX 77845 Page 25

Air Handler #31 - UMA 3-2 - Summary Loads


Zn Description Area Htg.Loss Sen.Gain Lat.Gain Htg.O.A. Clg.O.A.
No Peak Time People Htg.CFM Clg.CFM S.Exh Req.CFM Req.CFM
Volume CFM/Sqft CFM/Sqft W.Exh Act.CFM Act.CFM
78 P3 - UCI Pediatrica 1,984 21,439 70,313 2,400 None None
4pm January 12 736 3,384 0 0 0
17,558 0.37 1.71 0 736 3,384

79 P3 - Circulacion A 343 5,653 9,430 400 None None


12am March 2 194 454 0 0 0
3,036 0.57 1.32 0 194 454
Zone Peak Totals: 2,327 27,093 79,744 2,800
Total Zones: 2 14 931 3,837 0 0 0
Unique Zones: 2 20,594 0.40 1.65 0 931 3,837
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
Elite Software Development INSTITUTO NACIONAL DEL CORAZON - INCOR
College Station, TX 77845 Page 26

Air Handler #31 - UMA 3-2 - Total Load Summary


Air Handler Description: UMA 3-2 Constant Volume - Sum of Peaks
Sensible Heat Ratio: 0.97 --- This system occurs 1 time(s) in the building. ---
Air System Peak Time: 4pm in January.
Outdoor Conditions: 85° DB, 75° WB, 115.03 grains

Summer: Ventilation controls outside air, ----- Winter: Ventilation controls outside air.

Zone Space sensible loss: 27,093 Btuh


Infiltration sensible loss: 0 Btuh 0 CFM
Outside Air sensible loss: 10,034 Btuh 931 CFM
Supply Duct sensible loss: 0 Btuh
Return Duct sensible loss: 0 Btuh
Return Plenum sensible loss: 0 Btuh
Total System sensible loss: 37,127 Btuh

Heating Supply Air: 27,093 / (.998 X 1.08 X 27) = 931 CFM


Winter Vent Outside Air (100.0% of supply) = 931 CFM

Zone space sensible gain: 79,744 Btuh


Infiltration sensible gain: 0 Btuh
Draw-thru fan sensible gain: 0 Btuh
Supply duct sensible gain: 0 Btuh
Reheat sensible gain: 0 Btuh
Total sensible gain on supply side of coil: 79,744 Btuh
Cooling Supply Air: 79,744 / (.998 X 1.1 X 19) = 3,837 CFM
Summer Vent Outside Air (100.0% of supply) = 3,837 CFM

Return duct sensible gain: 0 Btuh


Return plenum sensible gain: 0 Btuh
Outside air sensible gain: 42,148 Btuh 3,837 CFM
Blow-thru fan sensible gain: 0 Btuh
Total sensible gain on return side of coil: 42,148 Btuh
Total sensible gain on air handling system: 121,892 Btuh

Zone space latent gain: 2,800 Btuh


Infiltration latent gain: 0 Btuh
Outside air latent gain: 131,044 Btuh
Total latent gain on air handling system: 133,844 Btuh
Total system sensible and latent gain: 255,736 Btuh

Check Figures
Total Air Handler Supply Air (based on a 19° TD): 3,837 CFM
Total Air Handler Vent. Air (100.00% of Supply): 3,837 CFM

Total Conditioned Air Space: 2,327 Sq.ft


Supply Air Per Unit Area: 1.6491 CFM/Sq.ft
Area Per Cooling Capacity: 109.1909 Sq.ft/Ton
Cooling Capacity Per Area: 0.0092 Tons/Sq.ft

Total Heating Required With Outside Air: 37,127 Btuh


Total Cooling Required With Outside Air: 21.31 Tons
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
Elite Software Development INSTITUTO NACIONAL DEL CORAZON - INCOR
College Station, TX 77845 Page 27

Air Handler #32 - UMA 3-3 - Summary Loads


Zn Description Area Htg.Loss Sen.Gain Lat.Gain Htg.O.A. Clg.O.A.
No Peak Time People Htg.CFM Clg.CFM S.Exh Req.CFM Req.CFM
Volume CFM/Sqft CFM/Sqft W.Exh Act.CFM Act.CFM
24 P3 - OP.1 572 5,305 19,435 1,200 None None
12am March 6 182 924 0 0 0
5,062 0.32 1.62 0 182 924

P3 - Circulacion+zona
244 3,843 11,978 400 None None
25 rigida A
2 132 570 0 0 0
9am January
2,158 0.54 2.34 0 132 570

Zone Peak Totals: 816 9,147 31,413 1,600


Total Zones: 2 8 314 1,494 0 0 0
Unique Zones: 2 7,220 0.39 1.83 0 314 1,494
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
Elite Software Development INSTITUTO NACIONAL DEL CORAZON - INCOR
College Station, TX 77845 Page 28

Air Handler #32 - UMA 3-3 - Total Load Summary


Air Handler Description: UMA 3-3 Constant Volume - Sum of Peaks
Sensible Heat Ratio: 0.95 --- This system occurs 1 time(s) in the building. ---
Air System Peak Time: 9am in January.
Outdoor Conditions: 85° DB, 75° WB, 115.03 grains

Summer: Ventilation controls outside air, ----- Winter: Ventilation controls outside air.

Zone Space sensible loss: 9,147 Btuh


Infiltration sensible loss: 0 Btuh 0 CFM
Outside Air sensible loss: 3,388 Btuh 314 CFM
Supply Duct sensible loss: 0 Btuh
Return Duct sensible loss: 0 Btuh
Return Plenum sensible loss: 0 Btuh
Total System sensible loss: 12,535 Btuh

Heating Supply Air: 9,147 / (.998 X 1.08 X 27) = 314 CFM


Winter Vent Outside Air (100.0% of supply) = 314 CFM

Zone space sensible gain: 31,413 Btuh


Infiltration sensible gain: 0 Btuh
Draw-thru fan sensible gain: 0 Btuh
Supply duct sensible gain: 0 Btuh
Reheat sensible gain: 0 Btuh
Total sensible gain on supply side of coil: 31,413 Btuh
Cooling Supply Air: 31,413 / (.998 X 1.1 X 19) = 1,494 CFM
Summer Vent Outside Air (100.0% of supply) = 1,494 CFM

Return duct sensible gain: 0 Btuh


Return plenum sensible gain: 0 Btuh
Outside air sensible gain: 16,411 Btuh 1,494 CFM
Blow-thru fan sensible gain: 0 Btuh
Total sensible gain on return side of coil: 16,411 Btuh
Total sensible gain on air handling system: 47,824 Btuh

Zone space latent gain: 1,600 Btuh


Infiltration latent gain: 0 Btuh
Outside air latent gain: 51,024 Btuh
Total latent gain on air handling system: 52,624 Btuh
Total system sensible and latent gain: 100,448 Btuh

Check Figures
Total Air Handler Supply Air (based on a 19° TD): 1,494 CFM
Total Air Handler Vent. Air (100.00% of Supply): 1,494 CFM

Total Conditioned Air Space: 816 Sq.ft


Supply Air Per Unit Area: 1.8316 CFM/Sq.ft
Area Per Cooling Capacity: 97.4591 Sq.ft/Ton
Cooling Capacity Per Area: 0.0103 Tons/Sq.ft

Total Heating Required With Outside Air: 12,535 Btuh


Total Cooling Required With Outside Air: 8.37 Tons
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
Elite Software Development INSTITUTO NACIONAL DEL CORAZON - INCOR
College Station, TX 77845 Page 29

Air Handler #33 - UMA 3-4 - Summary Loads


Zn Description Area Htg.Loss Sen.Gain Lat.Gain Htg.O.A. Clg.O.A.
No Peak Time People Htg.CFM Clg.CFM S.Exh Req.CFM Req.CFM
Volume CFM/Sqft CFM/Sqft W.Exh Act.CFM Act.CFM
26 P3 - OP.2 576 4,032 18,201 1,200 None None
12am March 6 138 864 0 0 0
5,098 0.24 1.50 0 138 864

P3 - Circulacion+zona
244 3,843 11,978 400 None None
50 rigida B
2 132 569 0 0 0
9am January
2,158 0.54 2.33 0 132 569

Zone Peak Totals: 820 7,875 30,178 1,600


Total Zones: 2 8 270 1,433 0 0 0
Unique Zones: 2 7,255 0.33 1.75 0 270 1,433
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
Elite Software Development INSTITUTO NACIONAL DEL CORAZON - INCOR
College Station, TX 77845 Page 30

Air Handler #33 - UMA 3-4 - Total Load Summary


Air Handler Description: UMA 3-4 Constant Volume - Sum of Peaks
Sensible Heat Ratio: 0.95 --- This system occurs 1 time(s) in the building. ---
Air System Peak Time: 9am in January.
Outdoor Conditions: 85° DB, 75° WB, 115.03 grains

Summer: Ventilation controls outside air, ----- Winter: Ventilation controls outside air.

Zone Space sensible loss: 7,875 Btuh


Infiltration sensible loss: 0 Btuh 0 CFM
Outside Air sensible loss: 2,916 Btuh 270 CFM
Supply Duct sensible loss: 0 Btuh
Return Duct sensible loss: 0 Btuh
Return Plenum sensible loss: 0 Btuh
Total System sensible loss: 10,791 Btuh

Heating Supply Air: 7,875 / (.998 X 1.08 X 27) = 270 CFM


Winter Vent Outside Air (100.0% of supply) = 270 CFM

Zone space sensible gain: 30,178 Btuh


Infiltration sensible gain: 0 Btuh
Draw-thru fan sensible gain: 0 Btuh
Supply duct sensible gain: 0 Btuh
Reheat sensible gain: 0 Btuh
Total sensible gain on supply side of coil: 30,178 Btuh
Cooling Supply Air: 30,178 / (.998 X 1.1 X 19) = 1,433 CFM
Summer Vent Outside Air (100.0% of supply) = 1,433 CFM

Return duct sensible gain: 0 Btuh


Return plenum sensible gain: 0 Btuh
Outside air sensible gain: 15,742 Btuh 1,433 CFM
Blow-thru fan sensible gain: 0 Btuh
Total sensible gain on return side of coil: 15,742 Btuh
Total sensible gain on air handling system: 45,920 Btuh

Zone space latent gain: 1,600 Btuh


Infiltration latent gain: 0 Btuh
Outside air latent gain: 48,943 Btuh
Total latent gain on air handling system: 50,543 Btuh
Total system sensible and latent gain: 96,463 Btuh

Check Figures
Total Air Handler Supply Air (based on a 19° TD): 1,433 CFM
Total Air Handler Vent. Air (100.00% of Supply): 1,433 CFM

Total Conditioned Air Space: 820 Sq.ft


Supply Air Per Unit Area: 1.7483 CFM/Sq.ft
Area Per Cooling Capacity: 101.9836 Sq.ft/Ton
Cooling Capacity Per Area: 0.0098 Tons/Sq.ft

Total Heating Required With Outside Air: 10,791 Btuh


Total Cooling Required With Outside Air: 8.04 Tons
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
Elite Software Development INSTITUTO NACIONAL DEL CORAZON - INCOR
College Station, TX 77845 Page 31

Air Handler #34 - UMA 3-5 - Summary Loads


Zn Description Area Htg.Loss Sen.Gain Lat.Gain Htg.O.A. Clg.O.A.
No Peak Time People Htg.CFM Clg.CFM S.Exh Req.CFM Req.CFM
Volume CFM/Sqft CFM/Sqft W.Exh Act.CFM Act.CFM
27 P3 - OP.3 576 5,054 19,223 1,200 None None
12am March 6 174 914 0 0 0
5,098 0.30 1.59 0 174 914

P3 - Circulacion+zona
244 3,843 11,978 400 None None
51 rigida C
2 132 570 0 0 0
9am January
2,158 0.54 2.34 0 132 570

Zone Peak Totals: 820 8,897 31,201 1,600


Total Zones: 2 8 306 1,484 0 0 0
Unique Zones: 2 7,255 0.37 1.81 0 306 1,484
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
Elite Software Development INSTITUTO NACIONAL DEL CORAZON - INCOR
College Station, TX 77845 Page 32

Air Handler #34 - UMA 3-5 - Total Load Summary


Air Handler Description: UMA 3-5 Constant Volume - Sum of Peaks
Sensible Heat Ratio: 0.95 --- This system occurs 1 time(s) in the building. ---
Air System Peak Time: 9am in January.
Outdoor Conditions: 85° DB, 75° WB, 115.03 grains

Summer: Ventilation controls outside air, ----- Winter: Ventilation controls outside air.

Zone Space sensible loss: 8,897 Btuh


Infiltration sensible loss: 0 Btuh 0 CFM
Outside Air sensible loss: 3,295 Btuh 306 CFM
Supply Duct sensible loss: 0 Btuh
Return Duct sensible loss: 0 Btuh
Return Plenum sensible loss: 0 Btuh
Total System sensible loss: 12,192 Btuh

Heating Supply Air: 8,897 / (.998 X 1.08 X 27) = 306 CFM


Winter Vent Outside Air (100.0% of supply) = 306 CFM

Zone space sensible gain: 31,201 Btuh


Infiltration sensible gain: 0 Btuh
Draw-thru fan sensible gain: 0 Btuh
Supply duct sensible gain: 0 Btuh
Reheat sensible gain: 0 Btuh
Total sensible gain on supply side of coil: 31,201 Btuh
Cooling Supply Air: 31,201 / (.998 X 1.1 X 19) = 1,484 CFM
Summer Vent Outside Air (100.0% of supply) = 1,484 CFM

Return duct sensible gain: 0 Btuh


Return plenum sensible gain: 0 Btuh
Outside air sensible gain: 16,296 Btuh 1,484 CFM
Blow-thru fan sensible gain: 0 Btuh
Total sensible gain on return side of coil: 16,296 Btuh
Total sensible gain on air handling system: 47,496 Btuh

Zone space latent gain: 1,600 Btuh


Infiltration latent gain: 0 Btuh
Outside air latent gain: 50,666 Btuh
Total latent gain on air handling system: 52,266 Btuh
Total system sensible and latent gain: 99,762 Btuh

Check Figures
Total Air Handler Supply Air (based on a 19° TD): 1,484 CFM
Total Air Handler Vent. Air (100.00% of Supply): 1,484 CFM

Total Conditioned Air Space: 820 Sq.ft


Supply Air Per Unit Area: 1.8098 CFM/Sq.ft
Area Per Cooling Capacity: 98.6106 Sq.ft/Ton
Cooling Capacity Per Area: 0.0101 Tons/Sq.ft

Total Heating Required With Outside Air: 12,192 Btuh


Total Cooling Required With Outside Air: 8.31 Tons
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
Elite Software Development INSTITUTO NACIONAL DEL CORAZON - INCOR
College Station, TX 77845 Page 33

Air Handler #35 - UMA 3-6 - Summary Loads


Zn Description Area Htg.Loss Sen.Gain Lat.Gain Htg.O.A. Clg.O.A.
No Peak Time People Htg.CFM Clg.CFM S.Exh Req.CFM Req.CFM
Volume CFM/Sqft CFM/Sqft W.Exh Act.CFM Act.CFM
28 P3 - (hall) Antecamara 187 2,176 4,213 200 None None
12am March 1 75 196 0 0 0
1,655 0.40 1.05 0 75 196

29 P3 - Post Operatorio 552 4,174 13,245 1,400 None None


12am March 7 143 617 0 0 0
4,885 0.26 1.12 0 143 617

52 P3 - Zona Semirigida 594 6,760 15,982 1,200 None None


12am March 6 232 744 0 0 0
5,257 0.39 1.25 0 232 744

53 P3 - Informe Medico 119 1,360 5,044 400 None None


12am March 2 47 235 0 0 0
1,053 0.39 1.97 0 47 235

P3 - Ingreso
172 3,372 5,766 600 None None
54 Vestidores (pasillo)
3 116 268 0 0 0
12am March
1,522 0.67 1.56 0 116 268

P3 - Material
126 2,028 3,232 0 None None
63 Esterilizado
0 70 150 0 0 0
12am March
1,115 0.55 1.19 0 70 150

Zone Peak Totals: 1,750 19,870 47,481 3,800


Total Zones: 6 19 682 2,211 0 0 0
Unique Zones: 6 15,488 0.39 1.26 0 682 2,211
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
Elite Software Development INSTITUTO NACIONAL DEL CORAZON - INCOR
College Station, TX 77845 Page 34

Air Handler #35 - UMA 3-6 - Total Load Summary


Air Handler Description: UMA 3-6 Constant Volume - Sum of Peaks
Sensible Heat Ratio: 0.93 --- This system occurs 1 time(s) in the building. ---
Air System Peak Time: 12am in March.
Outdoor Conditions: 85° DB, 75° WB, 115.03 grains

Summer: Ventilation controls outside air, ----- Winter: Ventilation controls outside air.

Zone Space sensible loss: 19,870 Btuh


Infiltration sensible loss: 0 Btuh 0 CFM
Outside Air sensible loss: 7,359 Btuh 682 CFM
Supply Duct sensible loss: 0 Btuh
Return Duct sensible loss: 0 Btuh
Return Plenum sensible loss: 0 Btuh
Total System sensible loss: 27,229 Btuh

Heating Supply Air: 19,870 / (.998 X 1.08 X 27) = 682 CFM


Winter Vent Outside Air (100.0% of supply) = 682 CFM

Zone space sensible gain: 47,481 Btuh


Infiltration sensible gain: 0 Btuh
Draw-thru fan sensible gain: 0 Btuh
Supply duct sensible gain: 0 Btuh
Reheat sensible gain: 0 Btuh
Total sensible gain on supply side of coil: 47,481 Btuh
Cooling Supply Air: 47,481 / (.998 X 1.1 X 20) = 2,211 CFM
Summer Vent Outside Air (100.0% of supply) = 2,211 CFM

Return duct sensible gain: 0 Btuh


Return plenum sensible gain: 0 Btuh
Outside air sensible gain: 24,283 Btuh 2,211 CFM
Blow-thru fan sensible gain: 0 Btuh
Total sensible gain on return side of coil: 24,283 Btuh
Total sensible gain on air handling system: 71,765 Btuh

Zone space latent gain: 3,800 Btuh


Infiltration latent gain: 0 Btuh
Outside air latent gain: 75,500 Btuh
Total latent gain on air handling system: 79,300 Btuh
Total system sensible and latent gain: 151,065 Btuh

Check Figures
Total Air Handler Supply Air (based on a 20° TD): 2,211 CFM
Total Air Handler Vent. Air (100.00% of Supply): 2,211 CFM

Total Conditioned Air Space: 1,750 Sq.ft


Supply Air Per Unit Area: 1.2634 CFM/Sq.ft
Area Per Cooling Capacity: 139.0131 Sq.ft/Ton
Cooling Capacity Per Area: 0.0072 Tons/Sq.ft

Total Heating Required With Outside Air: 27,229 Btuh


Total Cooling Required With Outside Air: 12.59 Tons
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
Elite Software Development INSTITUTO NACIONAL DEL CORAZON - INCOR
College Station, TX 77845 Page 35

Air Handler #36 - UMA 3-7 - Summary Loads


Zn Description Area Htg.Loss Sen.Gain Lat.Gain Htg.O.A. Clg.O.A.
No Peak Time People Htg.CFM Clg.CFM S.Exh Req.CFM Req.CFM
Volume CFM/Sqft CFM/Sqft W.Exh Act.CFM Act.CFM
30 P3 - Dep Mat Esteril 504 4,767 12,130 400 None None
12am March 2 164 584 0 0 0
4,460 0.32 1.16 0 164 584

55 P3 - Descarga 368 3,796 19,082 400 None None


6pm January 2 130 919 0 0 0
3,257 0.35 2.50 0 130 919

56 P3 - Preparacion 418 4,592 27,836 800 None None


4pm January 4 158 1,341 0 0 0
3,699 0.38 3.21 0 158 1,341

57 P3 - Filtro 91 1,133 2,252 200 None None


12am March 1 39 108 0 0 0
805 0.43 1.19 0 39 108

58 P3 - Jefatura 117 1,222 3,863 400 None None


12am March 2 42 186 0 0 0
1,035 0.36 1.59 0 42 186

P3 - Circulacion+zona
244 3,843 11,978 400 None None
64 rigida D
2 132 577 0 0 0
9am January
2,158 0.54 2.37 0 132 577

Zone Peak Totals: 1,742 19,352 77,140 2,600


Total Zones: 6 13 665 3,715 0 0 0
Unique Zones: 6 15,415 0.38 2.13 0 665 3,715
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
Elite Software Development INSTITUTO NACIONAL DEL CORAZON - INCOR
College Station, TX 77845 Page 36

Air Handler #36 - UMA 3-7 - Total Load Summary


Air Handler Description: UMA 3-7 Constant Volume - Sum of Peaks
Sensible Heat Ratio: 0.97 --- This system occurs 1 time(s) in the building. ---
Air System Peak Time: 5pm in January.
Outdoor Conditions: 85° DB, 75° WB, 115.03 grains

Summer: Ventilation controls outside air, ----- Winter: Ventilation controls outside air.

Zone Space sensible loss: 19,352 Btuh


Infiltration sensible loss: 0 Btuh 0 CFM
Outside Air sensible loss: 7,167 Btuh 665 CFM
Supply Duct sensible loss: 0 Btuh
Return Duct sensible loss: 0 Btuh
Return Plenum sensible loss: 0 Btuh
Total System sensible loss: 26,519 Btuh

Heating Supply Air: 19,352 / (.998 X 1.08 X 27) = 665 CFM


Winter Vent Outside Air (100.0% of supply) = 665 CFM

Zone space sensible gain: 75,911 Btuh


Infiltration sensible gain: 0 Btuh
Draw-thru fan sensible gain: 0 Btuh
Supply duct sensible gain: 0 Btuh
Reheat sensible gain: 1,220 Btuh
Total sensible gain on supply side of coil: 77,131 Btuh
Cooling Supply Air: 77,131 / (.998 X 1.1 X 19) = 3,715 CFM
Summer Vent Outside Air (100.0% of supply) = 3,715 CFM

Return duct sensible gain: 0 Btuh


Return plenum sensible gain: 0 Btuh
Outside air sensible gain: 40,799 Btuh 3,715 CFM
Blow-thru fan sensible gain: 0 Btuh
Total sensible gain on return side of coil: 40,799 Btuh
Total sensible gain on air handling system: 117,930 Btuh

Zone space latent gain: 2,600 Btuh


Infiltration latent gain: 0 Btuh
Outside air latent gain: 126,849 Btuh
Total latent gain on air handling system: 129,449 Btuh
Total system sensible and latent gain: 247,379 Btuh

Check Figures
Total Air Handler Supply Air (based on a 19° TD): 3,715 CFM
Total Air Handler Vent. Air (100.00% of Supply): 3,715 CFM

Total Conditioned Air Space: 1,742 Sq.ft


Supply Air Per Unit Area: 2.1326 CFM/Sq.ft
Area Per Cooling Capacity: 84.4922 Sq.ft/Ton
Cooling Capacity Per Area: 0.0118 Tons/Sq.ft

Total Heating Required With Outside Air: 26,519 Btuh


Total Cooling Required With Outside Air: 20.61 Tons
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
Elite Software Development INSTITUTO NACIONAL DEL CORAZON - INCOR
College Station, TX 77845 Page 37

Air Handler #37 - UMA 3-8 - Summary Loads


Zn Description Area Htg.Loss Sen.Gain Lat.Gain Htg.O.A. Clg.O.A.
No Peak Time People Htg.CFM Clg.CFM S.Exh Req.CFM Req.CFM
Volume CFM/Sqft CFM/Sqft W.Exh Act.CFM Act.CFM
P3 - UCI Post
1,876 18,927 57,177 2,400 None None
31 Operatorio
12 650 2,735 0 0 0
6pm January
16,603 0.35 1.46 0 650 2,735

66 P3 - Circulacion A 324 3,941 7,536 400 None None


12am March 2 135 361 0 0 0
2,867 0.42 1.11 0 135 361

Zone Peak Totals: 2,200 22,868 64,713 2,800


Total Zones: 2 14 785 3,096 0 0 0
Unique Zones: 2 19,470 0.36 1.41 0 785 3,096
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
Elite Software Development INSTITUTO NACIONAL DEL CORAZON - INCOR
College Station, TX 77845 Page 38

Air Handler #37 - UMA 3-8 - Total Load Summary


Air Handler Description: UMA 3-8 Constant Volume - Sum of Peaks
Sensible Heat Ratio: 0.96 --- This system occurs 1 time(s) in the building. ---
Air System Peak Time: 6pm in January.
Outdoor Conditions: 85° DB, 75° WB, 115.03 grains

Summer: Ventilation controls outside air, ----- Winter: Ventilation controls outside air.

Zone Space sensible loss: 22,868 Btuh


Infiltration sensible loss: 0 Btuh 0 CFM
Outside Air sensible loss: 8,470 Btuh 785 CFM
Supply Duct sensible loss: 0 Btuh
Return Duct sensible loss: 0 Btuh
Return Plenum sensible loss: 0 Btuh
Total System sensible loss: 31,337 Btuh

Heating Supply Air: 22,868 / (.998 X 1.08 X 27) = 785 CFM


Winter Vent Outside Air (100.0% of supply) = 785 CFM

Zone space sensible gain: 64,713 Btuh


Infiltration sensible gain: 0 Btuh
Draw-thru fan sensible gain: 0 Btuh
Supply duct sensible gain: 0 Btuh
Reheat sensible gain: 0 Btuh
Total sensible gain on supply side of coil: 64,713 Btuh
Cooling Supply Air: 64,713 / (.998 X 1.1 X 19) = 3,096 CFM
Summer Vent Outside Air (100.0% of supply) = 3,096 CFM

Return duct sensible gain: 0 Btuh


Return plenum sensible gain: 0 Btuh
Outside air sensible gain: 34,000 Btuh 3,096 CFM
Blow-thru fan sensible gain: 0 Btuh
Total sensible gain on return side of coil: 34,000 Btuh
Total sensible gain on air handling system: 98,713 Btuh

Zone space latent gain: 2,800 Btuh


Infiltration latent gain: 0 Btuh
Outside air latent gain: 105,712 Btuh
Total latent gain on air handling system: 108,512 Btuh
Total system sensible and latent gain: 207,226 Btuh

Check Figures
Total Air Handler Supply Air (based on a 19° TD): 3,096 CFM
Total Air Handler Vent. Air (100.00% of Supply): 3,096 CFM

Total Conditioned Air Space: 2,200 Sq.ft


Supply Air Per Unit Area: 1.4071 CFM/Sq.ft
Area Per Cooling Capacity: 127.3975 Sq.ft/Ton
Cooling Capacity Per Area: 0.0078 Tons/Sq.ft

Total Heating Required With Outside Air: 31,337 Btuh


Total Cooling Required With Outside Air: 17.27 Tons
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
Elite Software Development INSTITUTO NACIONAL DEL CORAZON - INCOR
College Station, TX 77845 Page 39

Air Handler #38 - UMA 3-9 - Summary Loads


Zn Description Area Htg.Loss Sen.Gain Lat.Gain Htg.O.A. Clg.O.A.
No Peak Time People Htg.CFM Clg.CFM S.Exh Req.CFM Req.CFM
Volume CFM/Sqft CFM/Sqft W.Exh Act.CFM Act.CFM
P3 - UCI Cardiologia
2,268 22,610 66,953 2,400 None None
32 Clinica
12 777 3,216 0 0 0
1pm March
20,072 0.34 1.42 0 777 3,216

67 P3 - Circulacion B 324 3,941 7,536 400 None None


12am March 2 135 362 0 0 0
2,867 0.42 1.12 0 135 362

Zone Peak Totals: 2,592 26,551 74,489 2,800


Total Zones: 2 14 912 3,578 0 0 0
Unique Zones: 2 22,939 0.35 1.38 0 912 3,578
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
Elite Software Development INSTITUTO NACIONAL DEL CORAZON - INCOR
College Station, TX 77845 Page 40

Air Handler #38 - UMA 3-9 - Total Load Summary


Air Handler Description: UMA 3-9 Constant Volume - Sum of Peaks
Sensible Heat Ratio: 0.96 --- This system occurs 1 time(s) in the building. ---
Air System Peak Time: 1pm in March.
Outdoor Conditions: 85° DB, 75° WB, 115.03 grains

Summer: Ventilation controls outside air, ----- Winter: Ventilation controls outside air.

Zone Space sensible loss: 26,551 Btuh


Infiltration sensible loss: 0 Btuh 0 CFM
Outside Air sensible loss: 9,834 Btuh 912 CFM
Supply Duct sensible loss: 0 Btuh
Return Duct sensible loss: 0 Btuh
Return Plenum sensible loss: 0 Btuh
Total System sensible loss: 36,385 Btuh

Heating Supply Air: 26,551 / (.998 X 1.08 X 27) = 912 CFM


Winter Vent Outside Air (100.0% of supply) = 912 CFM

Zone space sensible gain: 74,489 Btuh


Infiltration sensible gain: 0 Btuh
Draw-thru fan sensible gain: 0 Btuh
Supply duct sensible gain: 0 Btuh
Reheat sensible gain: 0 Btuh
Total sensible gain on supply side of coil: 74,489 Btuh
Cooling Supply Air: 74,489 / (.998 X 1.1 X 19) = 3,578 CFM
Summer Vent Outside Air (100.0% of supply) = 3,578 CFM

Return duct sensible gain: 0 Btuh


Return plenum sensible gain: 0 Btuh
Outside air sensible gain: 39,300 Btuh 3,578 CFM
Blow-thru fan sensible gain: 0 Btuh
Total sensible gain on return side of coil: 39,300 Btuh
Total sensible gain on air handling system: 113,789 Btuh

Zone space latent gain: 2,800 Btuh


Infiltration latent gain: 0 Btuh
Outside air latent gain: 122,189 Btuh
Total latent gain on air handling system: 124,989 Btuh
Total system sensible and latent gain: 238,778 Btuh

Check Figures
Total Air Handler Supply Air (based on a 19° TD): 3,578 CFM
Total Air Handler Vent. Air (100.00% of Supply): 3,578 CFM

Total Conditioned Air Space: 2,592 Sq.ft


Supply Air Per Unit Area: 1.3805 CFM/Sq.ft
Area Per Cooling Capacity: 130.2632 Sq.ft/Ton
Cooling Capacity Per Area: 0.0077 Tons/Sq.ft

Total Heating Required With Outside Air: 36,385 Btuh


Total Cooling Required With Outside Air: 19.90 Tons
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
Elite Software Development INSTITUTO NACIONAL DEL CORAZON - INCOR
College Station, TX 77845 Page 41

Air Handler #39 - UMA 3-10 - Summary Loads


Zn Description Area Htg.Loss Sen.Gain Lat.Gain Htg.O.A. Clg.O.A.
No Peak Time People Htg.CFM Clg.CFM S.Exh Req.CFM Req.CFM
Volume CFM/Sqft CFM/Sqft W.Exh Act.CFM Act.CFM
33 P3 - Uci Habitacion 01 156 1,866 4,630 200 None None
12am March 1 64 222 0 0 0
1,381 0.41 1.43 0 64 222

37 P3 - Uci Habitacion 02 156 1,866 4,630 200 None None


12am March 1 64 222 0 0 0
1,381 0.41 1.43 0 64 222

38 P3 - Uci Habitacion 03 156 2,335 6,041 200 None None


1pm March 1 80 290 0 0 0
1,381 0.51 1.86 0 80 290

39 P3 - Uci Infectado 370 4,457 11,395 400 None None


1pm March 2 153 547 0 0 0
3,275 0.41 1.48 0 153 547

Zone Peak Totals: 838 10,525 26,697 1,000


Total Zones: 4 5 362 1,283 0 0 0
Unique Zones: 4 7,416 0.43 1.53 0 362 1,283
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
Elite Software Development INSTITUTO NACIONAL DEL CORAZON - INCOR
College Station, TX 77845 Page 42

Air Handler #39 - UMA 3-10 - Total Load Summary


Air Handler Description: UMA 3-10 Constant Volume - Sum of Peaks
Sensible Heat Ratio: 0.96 --- This system occurs 1 time(s) in the building. ---
Air System Peak Time: 1pm in March.
Outdoor Conditions: 85° DB, 75° WB, 115.03 grains

Summer: Ventilation controls outside air, ----- Winter: Ventilation controls outside air.

Zone Space sensible loss: 10,525 Btuh


Infiltration sensible loss: 0 Btuh 0 CFM
Outside Air sensible loss: 3,898 Btuh 362 CFM
Supply Duct sensible loss: 0 Btuh
Return Duct sensible loss: 0 Btuh
Return Plenum sensible loss: 0 Btuh
Total System sensible loss: 14,424 Btuh

Heating Supply Air: 10,525 / (.998 X 1.08 X 27) = 362 CFM


Winter Vent Outside Air (100.0% of supply) = 362 CFM

Zone space sensible gain: 26,697 Btuh


Infiltration sensible gain: 0 Btuh
Draw-thru fan sensible gain: 0 Btuh
Supply duct sensible gain: 0 Btuh
Reheat sensible gain: 0 Btuh
Total sensible gain on supply side of coil: 26,697 Btuh
Cooling Supply Air: 26,697 / (.998 X 1.1 X 19) = 1,283 CFM
Summer Vent Outside Air (100.0% of supply) = 1,283 CFM

Return duct sensible gain: 0 Btuh


Return plenum sensible gain: 0 Btuh
Outside air sensible gain: 14,087 Btuh 1,283 CFM
Blow-thru fan sensible gain: 0 Btuh
Total sensible gain on return side of coil: 14,087 Btuh
Total sensible gain on air handling system: 40,784 Btuh

Zone space latent gain: 1,000 Btuh


Infiltration latent gain: 0 Btuh
Outside air latent gain: 43,797 Btuh
Total latent gain on air handling system: 44,797 Btuh
Total system sensible and latent gain: 85,581 Btuh

Check Figures
Total Air Handler Supply Air (based on a 19° TD): 1,283 CFM
Total Air Handler Vent. Air (100.00% of Supply): 1,283 CFM

Total Conditioned Air Space: 838 Sq.ft


Supply Air Per Unit Area: 1.5305 CFM/Sq.ft
Area Per Cooling Capacity: 117.5031 Sq.ft/Ton
Cooling Capacity Per Area: 0.0085 Tons/Sq.ft

Total Heating Required With Outside Air: 14,424 Btuh


Total Cooling Required With Outside Air: 7.13 Tons
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
Elite Software Development INSTITUTO NACIONAL DEL CORAZON - INCOR
College Station, TX 77845 Page 43

Air Handler #40 - UMA 3-11 - Summary Loads


Zn Description Area Htg.Loss Sen.Gain Lat.Gain Htg.O.A. Clg.O.A.
No Peak Time People Htg.CFM Clg.CFM S.Exh Req.CFM Req.CFM
Volume CFM/Sqft CFM/Sqft W.Exh Act.CFM Act.CFM
P3 - UCIN
2,485 23,406 67,377 2,800 None None
35 Cardiovascular
14 804 3,224 0 0 0
1pm March
21,992 0.32 1.30 0 804 3,224

68 P3 - Circulacion C 324 3,941 7,536 400 None None


12am March 2 135 361 0 0 0
2,867 0.42 1.11 0 135 361

Zone Peak Totals: 2,809 27,346 74,913 3,200


Total Zones: 2 16 939 3,585 0 0 0
Unique Zones: 2 24,860 0.33 1.28 0 939 3,585
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
Elite Software Development INSTITUTO NACIONAL DEL CORAZON - INCOR
College Station, TX 77845 Page 44

Air Handler #40 - UMA 3-11 - Total Load Summary


Air Handler Description: UMA 3-11 Constant Volume - Sum of Peaks
Sensible Heat Ratio: 0.96 --- This system occurs 1 time(s) in the building. ---
Air System Peak Time: 1pm in March.
Outdoor Conditions: 85° DB, 75° WB, 115.03 grains

Summer: Ventilation controls outside air, ----- Winter: Ventilation controls outside air.

Zone Space sensible loss: 27,346 Btuh


Infiltration sensible loss: 0 Btuh 0 CFM
Outside Air sensible loss: 10,128 Btuh 939 CFM
Supply Duct sensible loss: 0 Btuh
Return Duct sensible loss: 0 Btuh
Return Plenum sensible loss: 0 Btuh
Total System sensible loss: 37,475 Btuh

Heating Supply Air: 27,346 / (.998 X 1.08 X 27) = 939 CFM


Winter Vent Outside Air (100.0% of supply) = 939 CFM

Zone space sensible gain: 74,913 Btuh


Infiltration sensible gain: 0 Btuh
Draw-thru fan sensible gain: 0 Btuh
Supply duct sensible gain: 0 Btuh
Reheat sensible gain: 0 Btuh
Total sensible gain on supply side of coil: 74,913 Btuh
Cooling Supply Air: 74,913 / (.998 X 1.1 X 19) = 3,585 CFM
Summer Vent Outside Air (100.0% of supply) = 3,585 CFM

Return duct sensible gain: 0 Btuh


Return plenum sensible gain: 0 Btuh
Outside air sensible gain: 39,376 Btuh 3,585 CFM
Blow-thru fan sensible gain: 0 Btuh
Total sensible gain on return side of coil: 39,376 Btuh
Total sensible gain on air handling system: 114,289 Btuh

Zone space latent gain: 3,200 Btuh


Infiltration latent gain: 0 Btuh
Outside air latent gain: 122,424 Btuh
Total latent gain on air handling system: 125,624 Btuh
Total system sensible and latent gain: 239,913 Btuh

Check Figures
Total Air Handler Supply Air (based on a 19° TD): 3,585 CFM
Total Air Handler Vent. Air (100.00% of Supply): 3,585 CFM

Total Conditioned Air Space: 2,809 Sq.ft


Supply Air Per Unit Area: 1.2763 CFM/Sq.ft
Area Per Cooling Capacity: 140.5009 Sq.ft/Ton
Cooling Capacity Per Area: 0.0071 Tons/Sq.ft

Total Heating Required With Outside Air: 37,475 Btuh


Total Cooling Required With Outside Air: 19.99 Tons
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
Elite Software Development INSTITUTO NACIONAL DEL CORAZON - INCOR
College Station, TX 77845 Page 45

Air Handler #41 - UMA 3-12 - Summary Loads


Zn Description Area Htg.Loss Sen.Gain Lat.Gain Htg.O.A. Clg.O.A.
No Peak Time People Htg.CFM Clg.CFM S.Exh Req.CFM Req.CFM
Volume CFM/Sqft CFM/Sqft W.Exh Act.CFM Act.CFM
P3 - UCIN Cardiologia
2,485 23,808 68,730 2,800 None None
34 Clinica
14 818 3,291 0 0 0
1pm March
21,992 0.33 1.32 0 818 3,291

69 P3 - Circulacion D 324 3,941 7,536 400 None None


12am March 2 135 361 0 0 0
2,867 0.42 1.11 0 135 361

Zone Peak Totals: 2,809 27,749 76,267 3,200


Total Zones: 2 16 953 3,652 0 0 0
Unique Zones: 2 24,860 0.34 1.30 0 953 3,652
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
Elite Software Development INSTITUTO NACIONAL DEL CORAZON - INCOR
College Station, TX 77845 Page 46

Air Handler #41 - UMA 3-12 - Total Load Summary


Air Handler Description: UMA 3-12 Constant Volume - Sum of Peaks
Sensible Heat Ratio: 0.96 --- This system occurs 1 time(s) in the building. ---
Air System Peak Time: 1pm in March.
Outdoor Conditions: 85° DB, 75° WB, 115.03 grains

Summer: Ventilation controls outside air, ----- Winter: Ventilation controls outside air.

Zone Space sensible loss: 27,749 Btuh


Infiltration sensible loss: 0 Btuh 0 CFM
Outside Air sensible loss: 10,277 Btuh 953 CFM
Supply Duct sensible loss: 0 Btuh
Return Duct sensible loss: 0 Btuh
Return Plenum sensible loss: 0 Btuh
Total System sensible loss: 38,027 Btuh

Heating Supply Air: 27,749 / (.998 X 1.08 X 27) = 953 CFM


Winter Vent Outside Air (100.0% of supply) = 953 CFM

Zone space sensible gain: 76,267 Btuh


Infiltration sensible gain: 0 Btuh
Draw-thru fan sensible gain: 0 Btuh
Supply duct sensible gain: 0 Btuh
Reheat sensible gain: 0 Btuh
Total sensible gain on supply side of coil: 76,267 Btuh
Cooling Supply Air: 76,267 / (.998 X 1.1 X 19) = 3,652 CFM
Summer Vent Outside Air (100.0% of supply) = 3,652 CFM

Return duct sensible gain: 0 Btuh


Return plenum sensible gain: 0 Btuh
Outside air sensible gain: 40,109 Btuh 3,652 CFM
Blow-thru fan sensible gain: 0 Btuh
Total sensible gain on return side of coil: 40,109 Btuh
Total sensible gain on air handling system: 116,376 Btuh

Zone space latent gain: 3,200 Btuh


Infiltration latent gain: 0 Btuh
Outside air latent gain: 124,705 Btuh
Total latent gain on air handling system: 127,905 Btuh
Total system sensible and latent gain: 244,281 Btuh

Check Figures
Total Air Handler Supply Air (based on a 19° TD): 3,652 CFM
Total Air Handler Vent. Air (100.00% of Supply): 3,652 CFM

Total Conditioned Air Space: 2,809 Sq.ft


Supply Air Per Unit Area: 1.3001 CFM/Sq.ft
Area Per Cooling Capacity: 137.9886 Sq.ft/Ton
Cooling Capacity Per Area: 0.0072 Tons/Sq.ft

Total Heating Required With Outside Air: 38,027 Btuh


Total Cooling Required With Outside Air: 20.36 Tons
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
Elite Software Development INSTITUTO NACIONAL DEL CORAZON - INCOR
College Station, TX 77845 Page 47

Air Handler #42 - UMA 3-13 - Summary Loads


Zn Description Area Htg.Loss Sen.Gain Lat.Gain Htg.O.A. Clg.O.A.
No Peak Time People Htg.CFM Clg.CFM S.Exh Req.CFM Req.CFM
Volume CFM/Sqft CFM/Sqft W.Exh Act.CFM Act.CFM
36 P3 - UCIN Pediatrica 1,440 15,779 47,270 2,000 None None
4pm March 10 542 2,263 0 0 0
12,744 0.38 1.57 0 542 2,263

65 P3 - Circulacion B 343 5,653 9,430 400 None None


12am March 2 194 451 0 0 0
3,036 0.57 1.32 0 194 451
Zone Peak Totals: 1,783 21,432 56,700 2,400
Total Zones: 2 12 736 2,714 0 0 0
Unique Zones: 2 15,780 0.41 1.52 0 736 2,714
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
Elite Software Development INSTITUTO NACIONAL DEL CORAZON - INCOR
College Station, TX 77845 Page 48

Air Handler #42 - UMA 3-13 - Total Load Summary


Air Handler Description: UMA 3-13 Constant Volume - Sum of Peaks
Sensible Heat Ratio: 0.96 --- This system occurs 1 time(s) in the building. ---
Air System Peak Time: 4pm in March.
Outdoor Conditions: 85° DB, 75° WB, 115.03 grains

Summer: Ventilation controls outside air, ----- Winter: Ventilation controls outside air.

Zone Space sensible loss: 21,432 Btuh


Infiltration sensible loss: 0 Btuh 0 CFM
Outside Air sensible loss: 7,938 Btuh 736 CFM
Supply Duct sensible loss: 0 Btuh
Return Duct sensible loss: 0 Btuh
Return Plenum sensible loss: 0 Btuh
Total System sensible loss: 29,370 Btuh

Heating Supply Air: 21,432 / (.998 X 1.08 X 27) = 736 CFM


Winter Vent Outside Air (100.0% of supply) = 736 CFM

Zone space sensible gain: 56,700 Btuh


Infiltration sensible gain: 0 Btuh
Draw-thru fan sensible gain: 0 Btuh
Supply duct sensible gain: 0 Btuh
Reheat sensible gain: 0 Btuh
Total sensible gain on supply side of coil: 56,700 Btuh
Cooling Supply Air: 56,700 / (.998 X 1.1 X 19) = 2,714 CFM
Summer Vent Outside Air (100.0% of supply) = 2,714 CFM

Return duct sensible gain: 0 Btuh


Return plenum sensible gain: 0 Btuh
Outside air sensible gain: 29,811 Btuh 2,714 CFM
Blow-thru fan sensible gain: 0 Btuh
Total sensible gain on return side of coil: 29,811 Btuh
Total sensible gain on air handling system: 86,511 Btuh

Zone space latent gain: 2,400 Btuh


Infiltration latent gain: 0 Btuh
Outside air latent gain: 92,687 Btuh
Total latent gain on air handling system: 95,087 Btuh
Total system sensible and latent gain: 181,598 Btuh

Check Figures
Total Air Handler Supply Air (based on a 19° TD): 2,714 CFM
Total Air Handler Vent. Air (100.00% of Supply): 2,714 CFM

Total Conditioned Air Space: 1,783 Sq.ft


Supply Air Per Unit Area: 1.5223 CFM/Sq.ft
Area Per Cooling Capacity: 117.8205 Sq.ft/Ton
Cooling Capacity Per Area: 0.0085 Tons/Sq.ft

Total Heating Required With Outside Air: 29,370 Btuh


Total Cooling Required With Outside Air: 15.13 Tons
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
Elite Software Development INSTITUTO NACIONAL DEL CORAZON - INCOR
College Station, TX 77845 Page 49

Zone Detailed Loads (At Zone Peak Times)


Load Unit -SC- CLTD U.Fac Sen. Lat. Htg. Htg.
Description Quan CFAC SHGF -CLF- Gain Gain Mult. Loss
Zone 24-P3 - OP.1 peaks (sensible) in March at 12am, Air Handler 32 (UMA 3-3), Group 0, 26.0 x
22.0, Construction Type: 1 (Light)
Partition-1-1 572 10/10 0.350 2,002 3.500 2,002
Partition-2-1 572 10/10 0.350 2,002 3.500 2,002
Partition-3-1 371.7 10/10 0.350 1,301 3.500 1,301
Lights-Prof=1 1,602 1.000 5,465
Equipment-Prof=1 2,100 1.000 7,165 0
People-Prof=1 6.0 1.000 1,500 1,200
Sub-total 19,435 1,200 5,305
Safety factors: +0% +0% +0%
--------- --------- ---------
Total w/ safety factors: 19,435 1,200 5,305

Zone 25-P3 - Circulacion+zona rigida A peaks (sensible) in January at 9am, Air Handler 32 (UMA 3-3),
Group 0, 53.0 x 4.6, Construction Type: 1 (Light)
Wall-3-S-A-M 296 0.83 16.7 0.350 1,730 3.500 1,036
Wall-4-E-A-M 112 0.83 17.5 0.350 688 3.500 393
Partition-1-1 243.8 10/10 0.350 853 3.500 853
Partition-2-1 243.8 10/10 0.350 853 3.500 853
Gls-S-1-90-Tran 58.0 1.000 5 1.000 290 9.000 522
0%S-0-WS-Solar 58.0 0.700 69 0.730 2,045
Gls-E-1-90-Tran 20.6 1.000 5 1.000 103 9.000 185
0%S-0-WS-Solar 20.6 0.700 236 0.760 2,586
Lights-Prof=1 683 1.000 2,329
People-Prof=1 2.0 1.000 500 400

Sub-total 11,978 400 3,843


Safety factors: +0% +0% +0%
--------- --------- ---------
Total w/ safety factors: 11,978 400 3,843

Zone 26-P3 - OP.2 peaks (sensible) in March at 12am, Air Handler 33 (UMA 3-4), Group 0, 24.0 x
24.0, Construction Type: 1 (Light)
Partition-1-1 576 10/10 0.350 2,016 3.500 2,016
Partition-2-1 576 10/10 0.350 2,016 3.500 2,016
Lights-Prof=1 1,613 1.000 5,503
Equipment-Prof=1 2,100 1.000 7,165 0
People-Prof=1 6.0 1.000 1,500 1,200

Sub-total 18,201 1,200 4,032


Safety factors: +0% +0% +0%
--------- --------- ---------
Total w/ safety factors: 18,201 1,200 4,032

Zone 27-P3 - OP.3 peaks (sensible) in March at 12am, Air Handler 34 (UMA 3-5), Group 0, 24.0 x
24.0, Construction Type: 1 (Light)
Partition-1-1 576 10/10 0.350 2,016 3.500 2,016
Partition-2-1 576 10/10 0.350 2,016 3.500 2,016
Partition-3-1 212.4 10/10 0.350 743 3.500 743
Partition-4-1 79.65 10/10 0.350 279 3.500 279
Lights-Prof=1 1,613 1.000 5,503
Equipment-Prof=1 2,100 1.000 7,165 0
People-Prof=1 6.0 1.000 1,500 1,200
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
Elite Software Development INSTITUTO NACIONAL DEL CORAZON - INCOR
College Station, TX 77845 Page 50

Zone Detailed Loads (At Zone Peak Times) (cont'd)


Load Unit -SC- CLTD U.Fac Sen. Lat. Htg. Htg.
Description Quan CFAC SHGF -CLF- Gain Gain Mult. Loss
Sub-total 19,223 1,200 5,054
Safety factors: +0% +0% +0%
--------- --------- ---------
Total w/ safety factors: 19,223 1,200 5,054

Zone 28-P3 - (hall) Antecamara peaks (sensible) in March at 12am, Air Handler 35 (UMA 3-6), Group
0, 17.0 x 11.0, Construction Type: 1 (Light)
Partition-1-1 187 10/10 0.350 655 3.500 655
Partition-2-1 187 10/10 0.350 655 3.500 655
Partition-3-1 247.8 10/10 0.350 867 3.500 867
Lights-Prof=1 524 1.000 1,787
People-Prof=1 1.0 1.000 250 200

Sub-total 4,213 200 2,176


Safety factors: +0% +0% +0%
--------- --------- ---------
Total w/ safety factors: 4,213 200 2,176

Zone 29-P3 - Post Operatorio peaks (sensible) in March at 12am, Air Handler 35 (UMA 3-6), Group 0,
24.0 x 23.0, Construction Type: 1 (Light)
Partition-1-1 552 10/10 0.350 1,932 3.500 1,932
Partition-2-1 552 10/10 0.350 1,932 3.500 1,932
Partition-3-1 88.5 10/10 0.350 310 3.500 310
Lights-Prof=1 1,546 1.000 5,274
Equipment-Prof=1 600 1.000 2,047 0
People-Prof=1 7.0 1.000 1,750 1,400

Sub-total 13,245 1,400 4,174


Safety factors: +0% +0% +0%
--------- --------- ---------
Total w/ safety factors: 13,245 1,400 4,174

Zone 30-P3 - Dep Mat Esteril peaks (sensible) in March at 12am, Air Handler 36 (UMA 3-7), Group 0,
42.0 x 12.0, Construction Type: 1 (Light)
Partition-1-1 504 10/10 0.350 1,764 3.500 1,764
Partition-2-1 504 10/10 0.350 1,764 3.500 1,764
Partition-3-1 354 10/10 0.350 1,239 3.500 1,239
Lights-Prof=1 1,411 1.000 4,815
Equipment-Prof=1 600 1.000 2,047 0
People-Prof=1 2.0 1.000 500 400
Sub-total 12,130 400 4,767
Safety factors: +0% +0% +0%
--------- --------- ---------
Total w/ safety factors: 12,130 400 4,767

Zone 31-P3 - UCI Post Operatorio peaks (sensible) in January at 6pm, Air Handler 37 (UMA 3-8),
Group 0, 67.0 x 28.0, Construction Type: 1 (Light)
Wall-3-S-A-M 408 0.83 16.7 0.350 2,386 3.500 1,429
Wall-4-W-A-M 296 0.83 17.5 0.350 1,815 3.500 1,036
Partition-1-1 1876 10/10 0.350 6,566 3.500 6,566
Partition-2-1 1876 10/10 0.350 6,566 3.500 6,566
Partition-5-1 646.05 10/10 0.350 2,261 3.500 2,261
Gls-S-1-90-Tran 105.0 1.000 15 1.000 1,575 9.000 945
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
Elite Software Development INSTITUTO NACIONAL DEL CORAZON - INCOR
College Station, TX 77845 Page 51

Zone Detailed Loads (At Zone Peak Times) (cont'd)


Load Unit -SC- CLTD U.Fac Sen. Lat. Htg. Htg.
Description Quan CFAC SHGF -CLF- Gain Gain Mult. Loss
0%S-0-WS-Solar 105.0 0.700 69 0.910 4,615
Gls-W-1-90-Tran 13.8 1.000 15 1.000 207 9.000 124
0%S-0-WS-Solar 13.8 0.700 236 0.610 1,391
Lights-Prof=1 5,253 1.000 17,923
Equipment-Prof=1 2,600 1.000 8,872 0
People-Prof=1 12.0 1.000 3,000 2,400

Sub-total 57,177 2,400 18,927


Safety factors: +0% +0% +0%
--------- --------- ---------
Total w/ safety factors: 57,177 2,400 18,927

Zone 32-P3 - UCI Cardiologia Clinica peaks (sensible) in March at 1pm, Air Handler 38 (UMA 3-9),
Group 0, 81.0 x 28.0, Construction Type: 1 (Light)
Wall-3-N-A-M 413 0.83 13.0 0.350 1,873 3.500 1,445
Wall-4-W-A-M 340 0.83 17.9 0.350 2,136 3.500 1,191
Partition-1-1 2268 10/10 0.350 7,938 3.500 7,938
Partition-2-1 2268 10/10 0.350 7,938 3.500 7,938
Partition-5-1 672.6 10/10 0.350 2,354 3.500 2,354
Gls-N-1-90-Tran 180.0 1.000 15 1.000 2,700 9.000 1,620
0%S-0-WS-Solar 180.0 0.700 75 0.800 7,560
Gls-W-1-90-Tran 13.8 1.000 15 1.000 207 9.000 124
0%S-0-WS-Solar 13.8 0.700 236 0.310 707
Lights-Prof=1 6,350 1.000 21,668
Equipment-Prof=1 2,600 1.000 8,872 0
People-Prof=1 12.0 1.000 3,000 2,400

Sub-total 66,953 2,400 22,610


Safety factors: +0% +0% +0%
--------- --------- ---------
Total w/ safety factors: 66,953 2,400 22,610

Zone 33-P3 - Uci Habitacion 01 peaks (sensible) in March at 12am, Air Handler 39 (UMA 3-10), Group
0, 12.0 x 13.0, Construction Type: 1 (Light)
Partition-1-1 156 10/10 0.350 546 3.500 546
Partition-2-1 156 10/10 0.350 546 3.500 546
Partition-3-1 221.25 10/10 0.350 774 3.500 774
Lights-Prof=1 437 1.000 1,490
Equipment-Prof=1 300 1.000 1,024 0
People-Prof=1 1.0 1.000 250 200

Sub-total 4,630 200 1,866


Safety factors: +0% +0% +0%
--------- --------- ---------
Total w/ safety factors: 4,630 200 1,866

Zone 34-P3 - UCIN Cardiologia Clinica peaks (sensible) in March at 1pm, Air Handler 41 (UMA 3-12),
Group 0, 71.0 x 35.0, Construction Type: 1 (Light)
Wall-3-N-A-M 513 0.83 13.0 0.350 2,327 3.500 1,796
Wall-5-E-A-M 310 0.83 18.8 0.350 2,035 3.500 1,084
Partition-1-1 2485 10/10 0.350 8,698 3.500 8,698
Partition-2-1 2485 10/10 0.350 8,698 3.500 8,698
Partition-4-1 690.3 10/10 0.350 2,416 3.500 2,416
Gls-N-1-90-Tran 124.2 1.000 15 1.000 1,863 9.000 1,118
0%S-0-WS-Solar 124.2 0.700 75 0.800 5,216
Lights-Prof=1 6,958 1.000 23,742
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
Elite Software Development INSTITUTO NACIONAL DEL CORAZON - INCOR
College Station, TX 77845 Page 52

Zone Detailed Loads (At Zone Peak Times) (cont'd)


Load Unit -SC- CLTD U.Fac Sen. Lat. Htg. Htg.
Description Quan CFAC SHGF -CLF- Gain Gain Mult. Loss
Equipment-Prof=1 3,000 1.000 10,236 0
People-Prof=1 14.0 1.000 3,500 2,800

Sub-total 68,730 2,800 23,808


Safety factors: +0% +0% +0%
--------- --------- ---------
Total w/ safety factors: 68,730 2,800 23,808

Zone 35-P3 - UCIN Cardiovascular peaks (sensible) in March at 1pm, Air Handler 40 (UMA 3-11),
Group 0, 71.0 x 35.0, Construction Type: 1 (Light)
Wall-3-N-A-M 513 0.83 13.0 0.350 2,327 3.500 1,796
Partition-1-1 2485 10/10 0.350 8,698 3.500 8,698
Partition-2-1 2485 10/10 0.350 8,698 3.500 8,698
Partition-4-1 885.0001 10/10 0.350 3,098 3.500 3,098
Gls-N-1-90-Tran 124.2 1.000 15 1.000 1,863 9.000 1,118
0%S-0-WS-Solar 124.2 0.700 75 0.800 5,216
Lights-Prof=1 6,958 1.000 23,742
Equipment-Prof=1 3,000 1.000 10,236 0
People-Prof=1 14.0 1.000 3,500 2,800
Sub-total 67,377 2,800 23,406
Safety factors: +0% +0% +0%
--------- --------- ---------
Total w/ safety factors: 67,377 2,800 23,406

Zone 36-P3 - UCIN Pediatrica peaks (sensible) in March at 4pm, Air Handler 42 (UMA 3-13), Group 0,
48.0 x 30.0, Construction Type: 1 (Light)
Wall-3-W-A-M 270 0.83 17.1 0.350 1,615 3.500 944
Wall-4-N-A-M 360 0.83 13.8 0.350 1,739 3.500 1,261
Wall-5-E-A-M 186 0.83 21.3 0.350 1,383 3.500 650
Partition-1-1 1440 10/10 0.350 5,040 3.500 5,040
Partition-2-1 1440 10/10 0.350 5,040 3.500 5,040
Partition-6-1 566.4 10/10 0.350 1,982 3.500 1,982
Gls-W-1-90-Tran 31.3 1.000 17 1.000 532 9.000 282
0%S-0-WS-Solar 31.3 0.700 236 0.820 4,237
Gls-N-1-90-Tran 64.4 1.000 17 1.000 1,095 9.000 580
0%S-0-WS-Solar 64.4 0.700 75 0.350 1,183
Lights-Prof=1 4,032 1.000 13,758
Equipment-Prof=1 2,100 1.000 7,165 0
People-Prof=1 10.0 1.000 2,500 2,000

Sub-total 47,270 2,000 15,779


Safety factors: +0% +0% +0%
--------- --------- ---------
Total w/ safety factors: 47,270 2,000 15,779

Zone 37-P3 - Uci Habitacion 02 peaks (sensible) in March at 12am, Air Handler 39 (UMA 3-10), Group
0, 12.0 x 13.0, Construction Type: 1 (Light)
Partition-1-1 156 10/10 0.350 546 3.500 546
Partition-2-1 156 10/10 0.350 546 3.500 546
Partition-3-1 221.25 10/10 0.350 774 3.500 774
Lights-Prof=1 437 1.000 1,490
Equipment-Prof=1 300 1.000 1,024 0
People-Prof=1 1.0 1.000 250 200

Sub-total 4,630 200 1,866


Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
Elite Software Development INSTITUTO NACIONAL DEL CORAZON - INCOR
College Station, TX 77845 Page 53

Zone Detailed Loads (At Zone Peak Times) (cont'd)


Load Unit -SC- CLTD U.Fac Sen. Lat. Htg. Htg.
Description Quan CFAC SHGF -CLF- Gain Gain Mult. Loss
Safety factors: +0% +0% +0%
--------- --------- ---------
Total w/ safety factors: 4,630 200 1,866

Zone 38-P3 - Uci Habitacion 03 peaks (sensible) in March at 1pm, Air Handler 39 (UMA 3-10), Group
0, 12.0 x 13.0, Construction Type: 1 (Light)
Wall-4-N-A-M 88 0.83 13.0 0.350 401 3.500 310
Partition-1-1 156 10/10 0.350 546 3.500 546
Partition-2-1 156 10/10 0.350 546 3.500 546
Partition-3-1 221.25 10/10 0.350 774 3.500 774
Gls-N-1-90-Tran 17.7 1.000 15 1.000 266 9.000 159
0%S-0-WS-Solar 17.7 0.700 75 0.800 744
Lights-Prof=1 437 1.000 1,490
Equipment-Prof=1 300 1.000 1,024 0
People-Prof=1 1.0 1.000 250 200
Sub-total 6,041 200 2,335
Safety factors: +0% +0% +0%
--------- --------- ---------
Total w/ safety factors: 6,041 200 2,335

Zone 39-P3 - Uci Infectado peaks (sensible) in March at 1pm, Air Handler 39 (UMA 3-10), Group 0,
37.0 x 10.0, Construction Type: 1 (Light)
Wall-4-N-A-M 48 0.83 13.0 0.350 217 3.500 167
Partition-1-1 370 10/10 0.350 1,295 3.500 1,295
Partition-2-1 370 10/10 0.350 1,295 3.500 1,295
Partition-3-1 442.5 10/10 0.350 1,549 3.500 1,549
Gls-N-1-90-Tran 16.8 1.000 15 1.000 252 9.000 151
0%S-0-WS-Solar 16.8 0.700 75 0.800 705
Lights-Prof=1 1,036 1.000 3,535
Equipment-Prof=1 600 1.000 2,047 0
People-Prof=1 2.0 1.000 500 400
Sub-total 11,395 400 4,457
Safety factors: +0% +0% +0%
--------- --------- ---------
Total w/ safety factors: 11,395 400 4,457

Zone 40-P2 - Sala1 peaks (sensible) in January at 12am, Air Handler 10 (UMA 2-1), Group 0, 22.5 x
23.0, Construction Type: 1 (Light)
Wall-3-S-A-M 195 0.83 19.2 0.350 1,307 3.500 681
Partition-1-1 517.5 10/10 0.350 1,811 3.500 1,811
Partition-2-1 433.65 10/10 0.350 1,518 3.500 1,518
Partition-4-1 517.5 10/10 0.350 1,811 3.500 1,811
Lights-Prof=1 1,449 1.000 4,944
Equipment-Prof=1 2,600 1.000 8,872 0
People-Prof=1 6.0 1.000 1,500 1,200

Sub-total 21,763 1,200 5,822


Safety factors: +0% +0% +0%
--------- --------- ---------
Total w/ safety factors: 21,763 1,200 5,822
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
Elite Software Development INSTITUTO NACIONAL DEL CORAZON - INCOR
College Station, TX 77845 Page 54

Zone Detailed Loads (At Zone Peak Times) (cont'd)


Zone 41-P2 - Maq1 peaks (sensible) in January at 12am, Air Handler 10 (UMA 2-1), Group 0, 10.0 x
10.5, Construction Type: 1 (Light)
Wall-2-S-A-M 89 0.83 19.2 0.350 594 3.500 310
Partition-1-1 105 10/10 0.350 368 3.500 368
Partition-3-1 105 10/10 0.350 368 3.500 368
Lights-Prof=1 294 1.000 1,003
Equipment-Prof=1 3,000 1.000 10,236 0
Sub-total 12,569 0 1,045
Safety factors: +0% +0% +0%
--------- --------- ---------
Total w/ safety factors: 12,569 0 1,045

Zone 42-P2 - Maq2 peaks (sensible) in January at 12am, Air Handler 11 (UMA 2-2), Group 0, 10.0 x
10.5, Construction Type: 1 (Light)
Wall-2-S-A-M 89 0.83 19.2 0.350 594 3.500 310
Partition-1-1 105 10/10 0.350 368 3.500 368
Partition-3-1 105 10/10 0.350 368 3.500 368
Lights-Prof=1 294 1.000 1,003
Equipment-Prof=1 3,000 1.000 10,236 0
Sub-total 12,569 0 1,045
Safety factors: +0% +0% +0%
--------- --------- ---------
Total w/ safety factors: 12,569 0 1,045

Zone 43-P2 - Com1 peaks (sensible) in March at 12am, Air Handler 10 (UMA 2-1), Group 0, 12.5 x
14.0, Construction Type: 1 (Light)
Partition-1-1 175 10/10 0.350 613 3.500 613
Partition-2-1 110.625 10/10 0.350 387 3.500 387
Partition-3-1 175 10/10 0.350 613 3.500 613
Lights-Prof=1 490 1.000 1,672
Equipment-Prof=1 600 1.000 2,047 0
People-Prof=1 2.0 1.000 500 400

Sub-total 5,831 400 1,612


Safety factors: +0% +0% +0%
--------- --------- ---------
Total w/ safety factors: 5,831 400 1,612

Zone 44-P2 - Com2 peaks (sensible) in March at 12am, Air Handler 11 (UMA 2-2), Group 0, 12.5 x
14.0, Construction Type: 1 (Light)
Partition-1-1 175 10/10 0.350 613 3.500 613
Partition-2-1 110.625 10/10 0.350 387 3.500 387
Partition-3-1 175 10/10 0.350 613 3.500 613
Lights-Prof=1 490 1.000 1,672
Equipment-Prof=1 600 1.000 2,047 0
People-Prof=1 2.0 1.000 500 400

Sub-total 5,831 400 1,612


Safety factors: +0% +0% +0%
--------- --------- ---------
Total w/ safety factors: 5,831 400 1,612

Zone 45-P2 - Sala2 peaks (sensible) in January at 12am, Air Handler 11 (UMA 2-2), Group 0, 23.0 x
23.0, Construction Type: 1 (Light)
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
Elite Software Development INSTITUTO NACIONAL DEL CORAZON - INCOR
College Station, TX 77845 Page 55

Zone Detailed Loads (At Zone Peak Times) (cont'd)


Load Unit -SC- CLTD U.Fac Sen. Lat. Htg. Htg.
Description Quan CFAC SHGF -CLF- Gain Gain Mult. Loss
Wall-3-S-A-M 204 0.83 19.2 0.350 1,367 3.500 712
Partition-1-1 529 10/10 0.350 1,852 3.500 1,852
Partition-2-1 238.95 10/10 0.350 836 3.500 836
Partition-4-1 529 10/10 0.350 1,852 3.500 1,852
Lights-Prof=1 1,481 1.000 5,054
Equipment-Prof=1 2,600 1.000 8,872 0
People-Prof=1 6.0 1.000 1,500 1,200

Sub-total 21,332 1,200 5,252


Safety factors: +0% +0% +0%
--------- --------- ---------
Total w/ safety factors: 21,332 1,200 5,252

Zone 46-P2 - Sala3 peaks (sensible) in January at 2am, Air Handler 12 (UMA 2-3), Group 0, 25.0 x
24.0, Construction Type: 1 (Light)
Wall-3-S-A-M 221 0.83 19.2 0.350 1,486 3.500 774
Wall-4-W-A-M 212 0.83 24.2 0.350 1,796 3.500 743
Partition-1-1 600 10/10 0.350 2,100 3.500 2,100
Partition-2-1 221.25 10/10 0.350 774 3.500 774
Partition-5-1 600 10/10 0.350 2,100 3.500 2,100
Lights-Prof=1 1,680 1.000 5,732
Equipment-Prof=1 2,600 1.000 8,872 0
People-Prof=1 6.0 1.000 1,500 1,200

Sub-total 24,360 1,200 6,492


Safety factors: +0% +0% +0%
--------- --------- ---------
Total w/ safety factors: 24,360 1,200 6,492

Zone 47-P2 - Maq3 peaks (sensible) in March at 2am, Air Handler 12 (UMA 2-3), Group 0, 7.5 x 16.0,
Construction Type: 1 (Light)
Wall-3-W-A-M 142 0.83 24.6 0.350 1,218 3.500 496
Partition-1-1 120 10/10 0.350 420 3.500 420
Partition-2-1 66.375 10/10 0.350 232 3.500 232
Partition-4-1 120 10/10 0.350 420 3.500 420
Lights-Prof=1 336 1.000 1,146
Equipment-Prof=1 3,000 1.000 10,236 0
Sub-total 13,673 0 1,568
Safety factors: +0% +0% +0%
--------- --------- ---------
Total w/ safety factors: 13,673 0 1,568

Zone 48-P2 - Com3 peaks (sensible) in March at 12am, Air Handler 12 (UMA 2-3), Group 0, 10.0 x
18.5, Construction Type: 1 (Light)
Partition-1-1 185 10/10 0.350 648 3.500 648
Partition-2-1 252.225 10/10 0.350 883 3.500 883
Partition-3-1 185 10/10 0.350 648 3.500 648
Lights-Prof=1 518 1.000 1,767
Equipment-Prof=1 600 1.000 2,047 0
People-Prof=1 2.0 1.000 500 400

Sub-total 6,493 400 2,178


Safety factors: +0% +0% +0%
--------- --------- ---------
Total w/ safety factors: 6,493 400 2,178
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
Elite Software Development INSTITUTO NACIONAL DEL CORAZON - INCOR
College Station, TX 77845 Page 56

Zone Detailed Loads (At Zone Peak Times) (cont'd)


Load Unit -SC- CLTD U.Fac Sen. Lat. Htg. Htg.
Description Quan CFAC SHGF -CLF- Gain Gain Mult. Loss

Zone 49-P1 - Deposito De Farmacia peaks (sensible) in March at 12am, Air Handler 7 (FC 1-5), Group
0, 38.5 x 16.0, Construction Type: 1 (Light)
Partition-1-1 616 10/10 0.350 2,156 3.500 2,156
Partition-2-1 616 10/10 0.350 2,156 3.500 2,156
Partition-3-1 964.65 10/10 0.350 3,376 3.500 3,376
Lights-Prof=1 1,725 1.000 5,885
Equipment-Prof=1 300 1.000 1,024 0
People-Prof=1 3.0 1.000 750 600

Sub-total 15,347 600 7,688


Safety factors: +0% +0% +0%
--------- --------- ---------
Total w/ safety factors: 15,347 600 7,688

Zone 50-P3 - Circulacion+zona rigida B peaks (sensible) in January at 9am, Air Handler 33 (UMA 3-4),
Group 0, 53.0 x 4.6, Construction Type: 1 (Light)
Wall-3-S-A-M 296 0.83 16.7 0.350 1,730 3.500 1,036
Wall-4-E-A-M 112 0.83 17.5 0.350 688 3.500 393
Partition-1-1 243.8 10/10 0.350 853 3.500 853
Partition-2-1 243.8 10/10 0.350 853 3.500 853
Gls-S-1-90-Tran 58.0 1.000 5 1.000 290 9.000 522
0%S-0-WS-Solar 58.0 0.700 69 0.730 2,045
Gls-E-1-90-Tran 20.6 1.000 5 1.000 103 9.000 185
0%S-0-WS-Solar 20.6 0.700 236 0.760 2,586
Lights-Prof=1 683 1.000 2,329
People-Prof=1 2.0 1.000 500 400
Sub-total 11,978 400 3,843
Safety factors: +0% +0% +0%
--------- --------- ---------
Total w/ safety factors: 11,978 400 3,843

Zone 51-P3 - Circulacion+zona rigida C peaks (sensible) in January at 9am, Air Handler 34 (UMA 3-5),
Group 0, 53.0 x 4.6, Construction Type: 1 (Light)
Wall-3-S-A-M 296 0.83 16.7 0.350 1,730 3.500 1,036
Wall-4-E-A-M 112 0.83 17.5 0.350 688 3.500 393
Partition-1-1 243.8 10/10 0.350 853 3.500 853
Partition-2-1 243.8 10/10 0.350 853 3.500 853
Gls-S-1-90-Tran 58.0 1.000 5 1.000 290 9.000 522
0%S-0-WS-Solar 58.0 0.700 69 0.730 2,045
Gls-E-1-90-Tran 20.6 1.000 5 1.000 103 9.000 185
0%S-0-WS-Solar 20.6 0.700 236 0.760 2,586
Lights-Prof=1 683 1.000 2,329
People-Prof=1 2.0 1.000 500 400
Sub-total 11,978 400 3,843
Safety factors: +0% +0% +0%
--------- --------- ---------
Total w/ safety factors: 11,978 400 3,843

Zone 52-P3 - Zona Semirigida peaks (sensible) in March at 12am, Air Handler 35 (UMA 3-6), Group 0,
54.0 x 11.0, Construction Type: 1 (Light)
Partition-1-1 594 10/10 0.350 2,079 3.500 2,079
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
Elite Software Development INSTITUTO NACIONAL DEL CORAZON - INCOR
College Station, TX 77845 Page 57

Zone Detailed Loads (At Zone Peak Times) (cont'd)


Load Unit -SC- CLTD U.Fac Sen. Lat. Htg. Htg.
Description Quan CFAC SHGF -CLF- Gain Gain Mult. Loss
Partition-2-1 594 10/10 0.350 2,079 3.500 2,079
Partition-3-1 743.4 10/10 0.350 2,602 3.500 2,602
Lights-Prof=1 1,663 1.000 5,675
Equipment-Prof=1 600 1.000 2,047 0
People-Prof=1 6.0 1.000 1,500 1,200

Sub-total 15,982 1,200 6,760


Safety factors: +0% +0% +0%
--------- --------- ---------
Total w/ safety factors: 15,982 1,200 6,760

Zone 53-P3 - Informe Medico peaks (sensible) in March at 12am, Air Handler 35 (UMA 3-6), Group 0,
17.0 x 7.0, Construction Type: 1 (Light)
Partition-1-1 119 10/10 0.350 417 3.500 417
Partition-2-1 119 10/10 0.350 417 3.500 417
Partition-3-1 150.45 10/10 0.350 527 3.500 527
Lights-Prof=1 333 1.000 1,137
Equipment-Prof=1 600 1.000 2,047 0
People-Prof=1 2.0 1.000 500 400
Sub-total 5,044 400 1,360
Safety factors: +0% +0% +0%
--------- --------- ---------
Total w/ safety factors: 5,044 400 1,360

Zone 54-P3 - Ingreso Vestidores (pasillo) peaks (sensible) in March at 12am, Air Handler 35 (UMA 3-
6), Group 0, 43.0 x 4.0, Construction Type: 1 (Light)
Partition-1-1 172 10/10 0.350 602 3.500 602
Partition-2-1 172 10/10 0.350 602 3.500 602
Partition-3-1 619.5 10/10 0.350 2,168 3.500 2,168
Lights-Prof=1 482 1.000 1,643
People-Prof=1 3.0 1.000 750 600

Sub-total 5,766 600 3,372


Safety factors: +0% +0% +0%
--------- --------- ---------
Total w/ safety factors: 5,766 600 3,372

Zone 55-P3 - Descarga peaks (sensible) in January at 6pm, Air Handler 36 (UMA 3-7), Group 0, 23.0 x
16.0, Construction Type: 1 (Light)
Wall-3-S-A-M 256 0.83 16.7 0.350 1,496 3.500 896
Partition-1-1 368 10/10 0.350 1,288 3.500 1,288
Partition-2-1 368 10/10 0.350 1,288 3.500 1,288
Gls-S-1-90-Tran 36.0 1.000 15 1.000 540 9.000 324
0%S-0-WS-Solar 36.0 0.700 69 0.910 1,582
Lights-Prof=1 1,030 1.000 3,516
Equipment-Prof=1 2,600 1.000 8,872 0
People-Prof=1 2.0 1.000 500 400

Sub-total 19,082 400 3,796


Safety factors: +0% +0% +0%
--------- --------- ---------
Total w/ safety factors: 19,082 400 3,796
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
Elite Software Development INSTITUTO NACIONAL DEL CORAZON - INCOR
College Station, TX 77845 Page 58

Zone Detailed Loads (At Zone Peak Times) (cont'd)


Zone 56-P3 - Preparacion peaks (sensible) in January at 4pm, Air Handler 36 (UMA 3-7), Group 0,
19.0 x 22.0, Construction Type: 1 (Light)
Wall-3-S-A-M 152 0.83 15.9 0.350 845 3.500 533
Wall-4-W-A-M 139 0.83 16.7 0.350 810 3.500 485
Partition-1-1 418 10/10 0.350 1,463 3.500 1,463
Partition-2-1 418 10/10 0.350 1,463 3.500 1,463
Gls-S-1-90-Tran 16.0 1.000 17 1.000 272 9.000 144
0%S-0-WS-Solar 16.0 0.700 69 0.750 580
Gls-W-1-90-Tran 56.0 1.000 17 1.000 952 9.000 504
0%S-0-WS-Solar 56.0 0.700 236 0.820 7,586
Lights-Prof=1 1,170 1.000 3,994
Equipment-Prof=1 2,600 1.000 8,872 0
People-Prof=1 4.0 1.000 1,000 800

Sub-total 27,836 800 4,592


Safety factors: +0% +0% +0%
--------- --------- ---------
Total w/ safety factors: 27,836 800 4,592

Zone 57-P3 - Filtro peaks (sensible) in March at 12am, Air Handler 36 (UMA 3-7), Group 0, 13.0 x 7.0,
Construction Type: 1 (Light)
Partition-1-1 91 10/10 0.350 319 3.500 319
Partition-2-1 91 10/10 0.350 319 3.500 319
Partition-3-1 141.6 10/10 0.350 496 3.500 496
Lights-Prof=1 255 1.000 869
People-Prof=1 1.0 1.000 250 200

Sub-total 2,252 200 1,133


Safety factors: +0% +0% +0%
--------- --------- ---------
Total w/ safety factors: 2,252 200 1,133

Zone 58-P3 - Jefatura peaks (sensible) in March at 12am, Air Handler 36 (UMA 3-7), Group 0, 13.0 x
9.0, Construction Type: 1 (Light)
Partition-1-1 117 10/10 0.350 410 3.500 410
Partition-2-1 117 10/10 0.350 410 3.500 410
Partition-3-1 115.05 10/10 0.350 403 3.500 403
Lights-Prof=1 328 1.000 1,118
Equipment-Prof=1 300 1.000 1,024 0
People-Prof=1 2.0 1.000 500 400
Sub-total 3,863 400 1,222
Safety factors: +0% +0% +0%
--------- --------- ---------
Total w/ safety factors: 3,863 400 1,222

Zone 59-P2 - Corredor Hemodinamica A peaks (sensible) in March at 12am, Air Handler 10 (UMA 2-1),
Group 0, 36.0 x 13.0, Construction Type: 1 (Light)
Partition-1-1 468 10/10 0.350 1,638 3.500 1,638
Partition-2-1 468 10/10 0.350 1,638 3.500 1,638
Partition-3-1 716.85 10/10 0.350 2,509 3.500 2,509
Lights-Prof=1 1,310 1.000 4,471
Equipment-Prof=1 100 1.000 341 0
People-Prof=1 2.0 1.000 500 400
Sub-total 11,097 400 5,785
Safety factors: +0% +0% +0%
--------- --------- ---------
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
Elite Software Development INSTITUTO NACIONAL DEL CORAZON - INCOR
College Station, TX 77845 Page 59

Zone Detailed Loads (At Zone Peak Times) (cont'd)


Load Unit -SC- CLTD U.Fac Sen. Lat. Htg. Htg.
Description Quan CFAC SHGF -CLF- Gain Gain Mult. Loss
Total w/ safety factors: 11,097 400 5,785

Zone 60-P2 - Corredor Hemodinamica B peaks (sensible) in March at 12am, Air Handler 11 (UMA 2-2),
Group 0, 36.0 x 13.0, Construction Type: 1 (Light)
Partition-1-1 468 10/10 0.350 1,638 3.500 1,638
Partition-2-1 468 10/10 0.350 1,638 3.500 1,638
Partition-3-1 716.85 10/10 0.350 2,509 3.500 2,509
Lights-Prof=1 1,310 1.000 4,471
Equipment-Prof=1 100 1.000 341 0
People-Prof=1 2.0 1.000 500 400

Sub-total 11,097 400 5,785


Safety factors: +0% +0% +0%
--------- --------- ---------
Total w/ safety factors: 11,097 400 5,785

Zone 61-P2 - Material Esteril peaks (sensible) in March at 12am, Air Handler 11 (UMA 2-2), Group 0,
14.0 x 7.0, Construction Type: 1 (Light)
Partition-1-1 98 10/10 0.350 343 3.500 343
Partition-2-1 98 10/10 0.350 343 3.500 343
Partition-3-1 309.75 10/10 0.350 1,084 3.500 1,084
Lights-Prof=1 274 1.000 936
Equipment-Prof=1 100 1.000 341 0

Sub-total 3,048 0 1,770


Safety factors: +0% +0% +0%
--------- --------- ---------
Total w/ safety factors: 3,048 0 1,770

Zone 62-P2 - Corredor Hemodinamica C peaks (sensible) in March at 12am, Air Handler 12 (UMA 2-3),
Group 0, 36.0 x 13.0, Construction Type: 1 (Light)
Partition-1-1 468 10/10 0.350 1,638 3.500 1,638
Partition-2-1 468 10/10 0.350 1,638 3.500 1,638
Partition-3-1 716.85 10/10 0.350 2,509 3.500 2,509
Lights-Prof=1 1,310 1.000 4,471
Equipment-Prof=1 100 1.000 341 0
People-Prof=1 2.0 1.000 500 400

Sub-total 11,097 400 5,785


Safety factors: +0% +0% +0%
--------- --------- ---------
Total w/ safety factors: 11,097 400 5,785

Zone 63-P3 - Material Esterilizado peaks (sensible) in March at 12am, Air Handler 35 (UMA 3-6), Group
0, 14.0 x 9.0, Construction Type: 1 (Light)
Partition-1-1 126 10/10 0.350 441 3.500 441
Partition-2-1 126 10/10 0.350 441 3.500 441
Partition-3-1 327.45 10/10 0.350 1,146 3.500 1,146
Lights-Prof=1 353 1.000 1,204

Sub-total 3,232 0 2,028


Safety factors: +0% +0% +0%
--------- --------- ---------
Total w/ safety factors: 3,232 0 2,028
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
Elite Software Development INSTITUTO NACIONAL DEL CORAZON - INCOR
College Station, TX 77845 Page 60

Zone Detailed Loads (At Zone Peak Times) (cont'd)


Load Unit -SC- CLTD U.Fac Sen. Lat. Htg. Htg.
Description Quan CFAC SHGF -CLF- Gain Gain Mult. Loss

Zone 64-P3 - Circulacion+zona rigida D peaks (sensible) in January at 9am, Air Handler 36 (UMA 3-7),
Group 0, 53.0 x 4.6, Construction Type: 1 (Light)
Wall-3-S-A-M 296 0.83 16.7 0.350 1,730 3.500 1,036
Wall-4-E-A-M 112 0.83 17.5 0.350 688 3.500 393
Partition-1-1 243.8 10/10 0.350 853 3.500 853
Partition-2-1 243.8 10/10 0.350 853 3.500 853
Gls-S-1-90-Tran 58.0 1.000 5 1.000 290 9.000 522
0%S-0-WS-Solar 58.0 0.700 69 0.730 2,045
Gls-E-1-90-Tran 20.6 1.000 5 1.000 103 9.000 185
0%S-0-WS-Solar 20.6 0.700 236 0.760 2,586
Lights-Prof=1 683 1.000 2,329
People-Prof=1 2.0 1.000 500 400

Sub-total 11,978 400 3,843


Safety factors: +0% +0% +0%
--------- --------- ---------
Total w/ safety factors: 11,978 400 3,843

Zone 65-P3 - Circulacion B peaks (sensible) in March at 12am, Air Handler 42 (UMA 3-13), Group 0,
49.0 x 7.0, Construction Type: 1 (Light)
Partition-1-1 343 10/10 0.350 1,201 3.500 1,201
Partition-2-1 343 10/10 0.350 1,201 3.500 1,201
Partition-3-1 929.2501 10/10 0.350 3,252 3.500 3,252
Lights-Prof=1 960 1.000 3,277
People-Prof=1 2.0 1.000 500 400

Sub-total 9,430 400 5,653


Safety factors: +0% +0% +0%
--------- --------- ---------
Total w/ safety factors: 9,430 400 5,653

Zone 66-P3 - Circulacion A peaks (sensible) in March at 12am, Air Handler 37 (UMA 3-8), Group 0,
36.0 x 9.0, Construction Type: 1 (Light)
Partition-1-1 324 10/10 0.350 1,134 3.500 1,134
Partition-2-1 324 10/10 0.350 1,134 3.500 1,134
Partition-3-1 477.9 10/10 0.350 1,673 3.500 1,673
Lights-Prof=1 907 1.000 3,095
People-Prof=1 2.0 1.000 500 400
Sub-total 7,536 400 3,941
Safety factors: +0% +0% +0%
--------- --------- ---------
Total w/ safety factors: 7,536 400 3,941

Zone 67-P3 - Circulacion B peaks (sensible) in March at 12am, Air Handler 38 (UMA 3-9), Group 0,
36.0 x 9.0, Construction Type: 1 (Light)
Partition-1-1 324 10/10 0.350 1,134 3.500 1,134
Partition-2-1 324 10/10 0.350 1,134 3.500 1,134
Partition-3-1 477.9 10/10 0.350 1,673 3.500 1,673
Lights-Prof=1 907 1.000 3,095
People-Prof=1 2.0 1.000 500 400

Sub-total 7,536 400 3,941


Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
Elite Software Development INSTITUTO NACIONAL DEL CORAZON - INCOR
College Station, TX 77845 Page 61

Zone Detailed Loads (At Zone Peak Times) (cont'd)


Load Unit -SC- CLTD U.Fac Sen. Lat. Htg. Htg.
Description Quan CFAC SHGF -CLF- Gain Gain Mult. Loss
Safety factors: +0% +0% +0%
--------- --------- ---------
Total w/ safety factors: 7,536 400 3,941

Zone 68-P3 - Circulacion C peaks (sensible) in March at 12am, Air Handler 40 (UMA 3-11), Group 0,
36.0 x 9.0, Construction Type: 1 (Light)
Partition-1-1 324 10/10 0.350 1,134 3.500 1,134
Partition-2-1 324 10/10 0.350 1,134 3.500 1,134
Partition-3-1 477.9 10/10 0.350 1,673 3.500 1,673
Lights-Prof=1 907 1.000 3,095
People-Prof=1 2.0 1.000 500 400
Sub-total 7,536 400 3,941
Safety factors: +0% +0% +0%
--------- --------- ---------
Total w/ safety factors: 7,536 400 3,941

Zone 69-P3 - Circulacion D peaks (sensible) in March at 12am, Air Handler 41 (UMA 3-12), Group 0,
36.0 x 9.0, Construction Type: 1 (Light)
Partition-1-1 324 10/10 0.350 1,134 3.500 1,134
Partition-2-1 324 10/10 0.350 1,134 3.500 1,134
Partition-3-1 477.9 10/10 0.350 1,673 3.500 1,673
Lights-Prof=1 907 1.000 3,095
People-Prof=1 2.0 1.000 500 400

Sub-total 7,536 400 3,941


Safety factors: +0% +0% +0%
--------- --------- ---------
Total w/ safety factors: 7,536 400 3,941

Zone 70-P1 - Sala 1 peaks (sensible) in March at 12am, Air Handler 1 (UMA 1-1), Group 0, 20.0 x
15.0, Construction Type: 1 (Light)
Partition-1-1 300 10/10 0.350 1,050 3.500 1,050
Partition-2-1 300 10/10 0.350 1,050 3.500 1,050
Partition-3-1 552 10/10 0.350 1,932 3.500 1,932
Lights-Prof=1 840 1.000 2,866
Equipment-Prof=1 2,100 1.000 7,165 0
People-Prof=1 6.0 1.000 1,500 1,200

Sub-total 15,564 1,200 4,032


Safety factors: +0% +0% +0%
--------- --------- ---------
Total w/ safety factors: 15,564 1,200 4,032

Zone 71-P1 - Hall peaks (sensible) in March at 12am, Air Handler 1 (UMA 1-1), Group 0, 20.0 x 15.0,
Construction Type: 1 (Light)
Partition-1-1 300 10/10 0.350 1,050 3.500 1,050
Partition-2-1 300 10/10 0.350 1,050 3.500 1,050
Partition-3-1 637.2 10/10 0.350 2,230 3.500 2,230
Lights-Prof=1 840 1.000 2,866
People-Prof=1 2.0 1.000 500 400
Sub-total 7,696 400 4,330
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
Elite Software Development INSTITUTO NACIONAL DEL CORAZON - INCOR
College Station, TX 77845 Page 62

Zone Detailed Loads (At Zone Peak Times) (cont'd)


Load Unit -SC- CLTD U.Fac Sen. Lat. Htg. Htg.
Description Quan CFAC SHGF -CLF- Gain Gain Mult. Loss
Safety factors: +0% +0% +0%
--------- --------- ---------
Total w/ safety factors: 7,696 400 4,330

Zone 72-P1 - Sala 2 peaks (sensible) in March at 12am, Air Handler 1 (UMA 1-1), Group 0, 20.0 x
18.0, Construction Type: 1 (Light)
Partition-1-1 360 10/10 0.350 1,260 3.500 1,260
Partition-2-1 360 10/10 0.350 1,260 3.500 1,260
Partition-3-1 575 10/10 0.350 2,013 3.500 2,013
Lights-Prof=1 1,008 1.000 3,439
Equipment-Prof=1 2,100 1.000 7,165 0
People-Prof=1 6.0 1.000 1,500 1,200

Sub-total 16,637 1,200 4,533


Safety factors: +0% +0% +0%
--------- --------- ---------
Total w/ safety factors: 16,637 1,200 4,533

Zone 73-P1 - Escenario peaks (sensible) in January at 12am, Air Handler 3 (FC 1-1), Group 0, 14.0 x
35.0, Construction Type: 1 (Light)
Wall-2-E-A-M 119 0.83 22.5 0.350 937 3.500 417
Wall-3-S-A-M 298 0.83 19.2 0.350 1,998 3.500 1,041
Partition-1-1 490 10/10 0.350 1,715 3.500 1,715
Lights-Prof=1 1,372 1.000 4,681
Equipment-Prof=1 3,000 1.000 10,236 0
People-Prof=1 5.0 1.000 1,250 1,000

Sub-total 20,818 1,000 3,173


Safety factors: +0% +0% +0%
--------- --------- ---------
Total w/ safety factors: 20,818 1,000 3,173

Zone 74-P1 - Auditorio/3 peaks (sensible) in March at 12am, Air Handler 4 (FC 1-2....65%), Group 0,
19.0 x 35.0, Construction Type: 1 (Light)
Wall-2-E-A-M 162 0.83 22.9 0.350 1,296 3.500 565
Partition-1-1 665 10/10 0.350 2,328 3.500 2,328
Partition-3-1 297.5 10/10 0.350 1,041 3.500 1,041
Lights-Prof=1 1,862 1.000 6,353
People-Prof=1 69.0 1.000 17,250 13,800
Sub-total 28,268 13,800 3,934
Safety factors: +0% +0% +0%
--------- --------- ---------
Total w/ safety factors: 28,268 13,800 3,934

Zone 75-P3 - Infectados1 peaks (sensible) in February at 8am, Air Handler 30 (UMA 3-1), Group 0,
11.0 x 12.0, Construction Type: 1 (Light)
Wall-3-E-A-M 94 0.83 17.9 0.350 591 3.500 330
Partition-1-1 132 10/10 0.350 462 3.500 462
Partition-2-1 132 10/10 0.350 462 3.500 462
Gls-E-1-90-Tran 12.0 1.000 3 1.000 36 9.000 108
0%S-0-WS-Solar 12.0 0.700 240 0.800 1,613
Lights-Prof=1 370 1.000 1,261
Equipment-Prof=1 300 1.000 1,024 0
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
Elite Software Development INSTITUTO NACIONAL DEL CORAZON - INCOR
College Station, TX 77845 Page 63

Zone Detailed Loads (At Zone Peak Times) (cont'd)


Load Unit -SC- CLTD U.Fac Sen. Lat. Htg. Htg.
Description Quan CFAC SHGF -CLF- Gain Gain Mult. Loss
People-Prof=1 1.0 1.000 250 200

Sub-total 5,699 200 1,362


Safety factors: +0% +0% +0%
--------- --------- ---------
Total w/ safety factors: 5,699 200 1,362

Zone 76-P3 - Infectados2 peaks (sensible) in March at 12am, Air Handler 30 (UMA 3-1), Group 0, 12.0
x 11.0, Construction Type: 1 (Light)
Partition-1-1 132 10/10 0.350 462 3.500 462
Partition-2-1 132 10/10 0.350 462 3.500 462
Partition-3-1 106.2 10/10 0.350 372 3.500 372
Lights-Prof=1 370 1.000 1,261
Equipment-Prof=1 300 1.000 1,024 0
People-Prof=1 1.0 1.000 250 200

Sub-total 3,830 200 1,296


Safety factors: +0% +0% +0%
--------- --------- ---------
Total w/ safety factors: 3,830 200 1,296

Zone 77-P3 - Infectados peaks (sensible) in March at 12am, Air Handler 30 (UMA 3-1), Group 0, 31.0 x
9.0, Construction Type: 1 (Light)
Wall-3-E-A-M 71 0.83 22.9 0.350 568 3.500 248
Partition-1-1 279 10/10 0.350 977 3.500 977
Partition-2-1 279 10/10 0.350 977 3.500 977
Partition-4-1 522.15 10/10 0.350 1,828 3.500 1,828
Lights-Prof=1 781 1.000 2,666
Equipment-Prof=1 500 1.000 1,706 0
People-Prof=1 2.0 1.000 500 400
Sub-total 9,220 400 4,028
Safety factors: +0% +0% +0%
--------- --------- ---------
Total w/ safety factors: 9,220 400 4,028

Zone 78-P3 - UCI Pediatrica peaks (sensible) in January at 4pm, Air Handler 31 (UMA 3-2), Group 0,
64.0 x 31.0, Construction Type: 1 (Light)
Wall-3-S-A-M 360 0.83 15.9 0.350 1,999 3.500 1,260
Wall-4-E-A-M 238 0.83 20.8 0.350 1,739 3.500 834
Wall-5-W-A-M 405 0.83 16.7 0.350 2,369 3.500 1,419
Partition-1-1 1984 10/10 0.350 6,944 3.500 6,944
Partition-2-1 1984 10/10 0.350 6,944 3.500 6,944
Partition-6-1 708 10/10 0.350 2,478 3.500 2,478
Gls-E-1-90-Tran 36.0 1.000 17 1.000 612 9.000 324
0%S-0-WS-Solar 36.0 0.700 236 0.170 1,011
Gls-W-1-90-Tran 81.4 1.000 17 1.000 1,384 9.000 733
0%S-0-WS-Solar 81.4 0.700 236 0.820 11,027
Gls-S-1-90-Tran 56.0 1.000 17 1.000 952 9.000 504
0%S-0-WS-Solar 56.0 0.700 69 0.750 2,029
Lights-Prof=1 5,555 1.000 18,955
Equipment-Prof=1 2,600 1.000 8,872 0
People-Prof=1 12.0 1.000 3,000 2,400
Sub-total 70,313 2,400 21,439
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
Elite Software Development INSTITUTO NACIONAL DEL CORAZON - INCOR
College Station, TX 77845 Page 64

Zone Detailed Loads (At Zone Peak Times) (cont'd)


Load Unit -SC- CLTD U.Fac Sen. Lat. Htg. Htg.
Description Quan CFAC SHGF -CLF- Gain Gain Mult. Loss
Safety factors: +0% +0% +0%
--------- --------- ---------
Total w/ safety factors: 70,313 2,400 21,439

Zone 79-P3 - Circulacion A peaks (sensible) in March at 12am, Air Handler 31 (UMA 3-2), Group 0,
49.0 x 7.0, Construction Type: 1 (Light)
Partition-1-1 343 10/10 0.350 1,201 3.500 1,201
Partition-2-1 343 10/10 0.350 1,201 3.500 1,201
Partition-3-1 929.2501 10/10 0.350 3,252 3.500 3,252
Lights-Prof=1 960 1.000 3,277
People-Prof=1 2.0 1.000 500 400
Sub-total 9,430 400 5,653
Safety factors: +0% +0% +0%
--------- --------- ---------
Total w/ safety factors: 9,430 400 5,653

Zone 80-P1 - Estar Expositor peaks (sensible) in January at 6pm, Air Handler 3 (FC 1-1), Group 0, 12.0
x 10.0, Construction Type: 1 (Light)
Wall-2-S-A-M 81 0.83 16.7 0.350 474 3.500 284
Wall-3-W-A-M 85 0.83 17.5 0.350 521 3.500 298
Partition-1-1 120 10/10 0.350 420 3.500 420
Partition-4-1 102 10/10 0.350 357 3.500 357
Gls-S-1-90-Tran 20.8 1.000 15 1.000 312 9.000 187
0%S-0-WS-Solar 20.8 0.700 69 0.910 914
Lights-Prof=1 336 1.000 1,146
Equipment-Prof=1 300 1.000 1,024 0
People-Prof=1 4.0 1.000 1,000 800

Sub-total 6,169 800 1,546


Safety factors: +0% +0% +0%
--------- --------- ---------
Total w/ safety factors: 6,169 800 1,546

Zone 81-P1 - Auditorio/3 peaks (sensible) in March at 12am, Air Handler 5 (FC 1-3....65%), Group 0,
19.0 x 35.0, Construction Type: 1 (Light)
Wall-2-E-A-M 162 0.83 22.9 0.350 1,296 3.500 565
Partition-1-1 665 10/10 0.350 2,328 3.500 2,328
Partition-3-1 297.5 10/10 0.350 1,041 3.500 1,041
Lights-Prof=1 1,862 1.000 6,353
People-Prof=1 69.0 1.000 17,250 13,800

Sub-total 28,268 13,800 3,934


Safety factors: +0% +0% +0%
--------- --------- ---------
Total w/ safety factors: 28,268 13,800 3,934

Zone 82-P1 - Auditorio/3 peaks (sensible) in March at 12am, Air Handler 6 (FC 1-4....65%), Group 0,
19.0 x 35.0, Construction Type: 1 (Light)
Wall-2-E-A-M 162 0.83 22.9 0.350 1,296 3.500 565
Partition-1-1 665 10/10 0.350 2,328 3.500 2,328
Partition-3-1 297.5 10/10 0.350 1,041 3.500 1,041
Lights-Prof=1 1,862 1.000 6,353
People-Prof=1 69.0 1.000 17,250 13,800
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
Elite Software Development INSTITUTO NACIONAL DEL CORAZON - INCOR
College Station, TX 77845 Page 65

Zone Detailed Loads (At Zone Peak Times) (cont'd)


Load Unit -SC- CLTD U.Fac Sen. Lat. Htg. Htg.
Description Quan CFAC SHGF -CLF- Gain Gain Mult. Loss
Sub-total 28,268 13,800 3,934
Safety factors: +0% +0% +0%
--------- --------- ---------
Total w/ safety factors: 28,268 13,800 3,934
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
Elite Software Development INSTITUTO NACIONAL DEL CORAZON - INCOR
College Station, TX 77845 Page 66

Air System #1 (UMA 1-1) Psychrometric Analysis


System Load Analysis Latent Grains Sensible Temp CFM
Leaving Coil Condition 62.536 55.590
Draw-Thru Fan 0 0.000 0
Misc Load on Supply Side 0 0.000 0
Supply Air Duct 0 0.000 0
Zone Loads 2,800 2.203 39,898 19.410 1,872
Reheat 0 0.000 0

Zone Condition 2,800 64.740 39,898 75.000 1,872


Return Air Duct 0 0.000
Return Air Plenum 0 0.000
Misc Load on Return Side 0 0.000
Vent Air 1,872 CFM 63,910 50.294 20,556 10.000
Blow-Thru Fan 0 0.000

Entering Coil Condition 66,710 115.034 60,453 85.000 1,872

General Psychrometric Equations Used In Analysis:


PR = (Barometric pressure of site / Standard ASHRAE pressure of 29.921)
TSH = PR x 1.10 x CFM x (DB entering - DB leaving)
TLH = PR x 0.68 x CFM x (Grains entering - Grains leaving)
GTH = PR x 4.50 x CFM x (Enthalpy entering - Enthalpy leaving)

TSH = 0.998 x 1.10 x 1,872 x( 85.000 - 55.590 )= 60,453 Btuh


TLH = 0.998 x 0.68 x 1,872 x( 115.034 - 62.536 )= 66,709 Btuh
----------
SUM = 127,163 Btuh
GTH = 0.998 x 4.50 x 1,872 x( 38.459 - 23.043 )= 129,640 Btuh
Total System Load = 127,163 Btuh

Chilled and Hot Water Flow Rates and Steam Requirement


Cooling GPM = 129,640 / ( 10.00 x 500 ) = 25.9 GPM
Heating GPM = 12,895 / ( 20.00 x 500 ) = 1.3 GPM
Steam Req. = 12,895 / 970 = 13.3 lb./hr

Entering Cooling Coil Conditions Entering Heating Coil Conditions


Dry bulb temperature: 85.00 Dry bulb temperature: 68.00
Wet bulb temperature: 75.00
Relative humidity: 63.34
Enthalpy: 38.46 Btu/lbm

Leaving Cooling Coil Conditions Leaving Heating Coil Conditions


Dry bulb temperature: 55.59 Dry bulb temperature: 95.00
Wet bulb temperature: 54.76
Relative humidity: 95.00
Enthalpy: 23.04 Btu/lbm
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
Elite Software Development INSTITUTO NACIONAL DEL CORAZON - INCOR
College Station, TX 77845 Page 67

Air System #3 (FC 1-1) Psychrometric Analysis


System Load Analysis Latent Grains Sensible Temp CFM
Leaving Coil Condition 62.650 55.640
Draw-Thru Fan 0 0.000 0
Misc Load on Supply Side 0 0.000 0
Supply Air Duct 0 0.000 0
Zone Loads 1,800 2.090 26,693 19.156 1,255
Reheat 285 0.205 13

Zone Condition 1,800 64.739 26,978 75.000 1,269


Return Air Duct 0 0.000
Return Air Plenum 0 0.000
Misc Load on Return Side 0 0.000
Vent Air 75 CFM 2,561 2.973 824 0.591
Blow-Thru Fan 0 0.000

Entering Coil Condition 4,361 67.713 27,802 75.591 1,269

General Psychrometric Equations Used In Analysis:


PR = (Barometric pressure of site / Standard ASHRAE pressure of 29.921)
TSH = PR x 1.10 x CFM x (DB entering - DB leaving)
TLH = PR x 0.68 x CFM x (Grains entering - Grains leaving)
GTH = PR x 4.50 x CFM x (Enthalpy entering - Enthalpy leaving)

TSH = 0.998 x 1.10 x 1,269 x( 75.591 - 55.640 )= 27,802 Btuh


TLH = 0.998 x 0.68 x 1,269 x( 67.713 - 62.650 )= 4,361 Btuh
----------
SUM = 32,163 Btuh
GTH = 0.998 x 4.50 x 1,269 x( 28.732 - 23.072 )= 32,262 Btuh
Total System Load = 32,163 Btuh

Chilled and Hot Water Flow Rates and Steam Requirement


Cooling GPM = 32,262 / ( 10.00 x 500 ) = 6.5 GPM
Heating GPM = 4,719 / ( 20.00 x 500 ) = 0.5 GPM
Steam Req. = 4,719 / 970 = 4.9 lb./hr

Entering Cooling Coil Conditions Entering Heating Coil Conditions


Dry bulb temperature: 75.59 Dry bulb temperature: 68.00
Wet bulb temperature: 63.38
Relative humidity: 51.25
Enthalpy: 28.73 Btu/lbm

Leaving Cooling Coil Conditions Leaving Heating Coil Conditions


Dry bulb temperature: 55.64 Dry bulb temperature: 95.00
Wet bulb temperature: 54.80
Relative humidity: 95.00
Enthalpy: 23.07 Btu/lbm
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
Elite Software Development INSTITUTO NACIONAL DEL CORAZON - INCOR
College Station, TX 77845 Page 68

Air System #4 (FC 1-2....65%) Psychrometric Analysis


System Load Analysis Latent Grains Sensible Temp CFM
Leaving Coil Condition 72.367 59.584
Draw-Thru Fan 0 0.000 0
Misc Load on Supply Side 0 0.000 0
Supply Air Duct 0 0.000 0
Zone Loads 13,800 12.174 28,268 15.416 1,670
Reheat 0 0.000 0

Zone Condition 13,800 84.541 28,268 75.000 1,670


Return Air Duct 0 0.000
Return Air Plenum 0 0.000
Misc Load on Return Side 0 0.000
Vent Air 483 CFM 10,001 8.822 5,305 2.893
Blow-Thru Fan 0 0.000

Entering Coil Condition 23,801 93.362 33,573 77.893 1,670

General Psychrometric Equations Used In Analysis:


PR = (Barometric pressure of site / Standard ASHRAE pressure of 29.921)
TSH = PR x 1.10 x CFM x (DB entering - DB leaving)
TLH = PR x 0.68 x CFM x (Grains entering - Grains leaving)
GTH = PR x 4.50 x CFM x (Enthalpy entering - Enthalpy leaving)

TSH = 0.998 x 1.10 x 1,670 x( 77.893 - 59.584 )= 33,573 Btuh


TLH = 0.998 x 0.68 x 1,670 x( 93.362 - 72.367 )= 23,800 Btuh
----------
SUM = 57,373 Btuh
GTH = 0.998 x 4.50 x 1,670 x( 33.309 - 25.545 )= 58,248 Btuh
Total System Load = 57,374 Btuh

Chilled and Hot Water Flow Rates and Steam Requirement


Cooling GPM = 58,248 / ( 10.00 x 500 ) = 11.6 GPM
Heating GPM = 3,934 / ( 20.00 x 500 ) = 0.4 GPM
Steam Req. = 3,934 / 970 = 4.1 lb./hr

Entering Cooling Coil Conditions Entering Heating Coil Conditions


Dry bulb temperature: 77.89 Dry bulb temperature: 68.00
Wet bulb temperature: 69.21
Relative humidity: 65.08
Enthalpy: 33.31 Btu/lbm

Leaving Cooling Coil Conditions Leaving Heating Coil Conditions


Dry bulb temperature: 59.58 Dry bulb temperature: 95.00
Wet bulb temperature: 58.69
Relative humidity: 95.00
Enthalpy: 25.54 Btu/lbm
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
Elite Software Development INSTITUTO NACIONAL DEL CORAZON - INCOR
College Station, TX 77845 Page 69

Air System #5 (FC 1-3....65%) Psychrometric Analysis


System Load Analysis Latent Grains Sensible Temp CFM
Leaving Coil Condition 72.367 59.584
Draw-Thru Fan 0 0.000 0
Misc Load on Supply Side 0 0.000 0
Supply Air Duct 0 0.000 0
Zone Loads 13,800 12.174 28,268 15.416 1,670
Reheat 0 0.000 0

Zone Condition 13,800 84.541 28,268 75.000 1,670


Return Air Duct 0 0.000
Return Air Plenum 0 0.000
Misc Load on Return Side 0 0.000
Vent Air 483 CFM 10,001 8.822 5,305 2.893
Blow-Thru Fan 0 0.000

Entering Coil Condition 23,801 93.362 33,573 77.893 1,670

General Psychrometric Equations Used In Analysis:


PR = (Barometric pressure of site / Standard ASHRAE pressure of 29.921)
TSH = PR x 1.10 x CFM x (DB entering - DB leaving)
TLH = PR x 0.68 x CFM x (Grains entering - Grains leaving)
GTH = PR x 4.50 x CFM x (Enthalpy entering - Enthalpy leaving)

TSH = 0.998 x 1.10 x 1,670 x( 77.893 - 59.584 )= 33,573 Btuh


TLH = 0.998 x 0.68 x 1,670 x( 93.362 - 72.367 )= 23,800 Btuh
----------
SUM = 57,373 Btuh
GTH = 0.998 x 4.50 x 1,670 x( 33.309 - 25.545 )= 58,248 Btuh
Total System Load = 57,374 Btuh

Chilled and Hot Water Flow Rates and Steam Requirement


Cooling GPM = 58,248 / ( 10.00 x 500 ) = 11.6 GPM
Heating GPM = 3,934 / ( 20.00 x 500 ) = 0.4 GPM
Steam Req. = 3,934 / 970 = 4.1 lb./hr

Entering Cooling Coil Conditions Entering Heating Coil Conditions


Dry bulb temperature: 77.89 Dry bulb temperature: 68.00
Wet bulb temperature: 69.21
Relative humidity: 65.08
Enthalpy: 33.31 Btu/lbm

Leaving Cooling Coil Conditions Leaving Heating Coil Conditions


Dry bulb temperature: 59.58 Dry bulb temperature: 95.00
Wet bulb temperature: 58.69
Relative humidity: 95.00
Enthalpy: 25.54 Btu/lbm
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
Elite Software Development INSTITUTO NACIONAL DEL CORAZON - INCOR
College Station, TX 77845 Page 70

Air System #6 (FC 1-4....65%) Psychrometric Analysis


System Load Analysis Latent Grains Sensible Temp CFM
Leaving Coil Condition 72.367 59.584
Draw-Thru Fan 0 0.000 0
Misc Load on Supply Side 0 0.000 0
Supply Air Duct 0 0.000 0
Zone Loads 13,800 12.174 28,268 15.416 1,670
Reheat 0 0.000 0

Zone Condition 13,800 84.541 28,268 75.000 1,670


Return Air Duct 0 0.000
Return Air Plenum 0 0.000
Misc Load on Return Side 0 0.000
Vent Air 483 CFM 10,001 8.822 5,305 2.893
Blow-Thru Fan 0 0.000

Entering Coil Condition 23,801 93.362 33,573 77.893 1,670

General Psychrometric Equations Used In Analysis:


PR = (Barometric pressure of site / Standard ASHRAE pressure of 29.921)
TSH = PR x 1.10 x CFM x (DB entering - DB leaving)
TLH = PR x 0.68 x CFM x (Grains entering - Grains leaving)
GTH = PR x 4.50 x CFM x (Enthalpy entering - Enthalpy leaving)

TSH = 0.998 x 1.10 x 1,670 x( 77.893 - 59.584 )= 33,573 Btuh


TLH = 0.998 x 0.68 x 1,670 x( 93.362 - 72.367 )= 23,800 Btuh
----------
SUM = 57,373 Btuh
GTH = 0.998 x 4.50 x 1,670 x( 33.309 - 25.545 )= 58,248 Btuh
Total System Load = 57,374 Btuh

Chilled and Hot Water Flow Rates and Steam Requirement


Cooling GPM = 58,248 / ( 10.00 x 500 ) = 11.6 GPM
Heating GPM = 3,934 / ( 20.00 x 500 ) = 0.4 GPM
Steam Req. = 3,934 / 970 = 4.1 lb./hr

Entering Cooling Coil Conditions Entering Heating Coil Conditions


Dry bulb temperature: 77.89 Dry bulb temperature: 68.00
Wet bulb temperature: 69.21
Relative humidity: 65.08
Enthalpy: 33.31 Btu/lbm

Leaving Cooling Coil Conditions Leaving Heating Coil Conditions


Dry bulb temperature: 59.58 Dry bulb temperature: 95.00
Wet bulb temperature: 58.69
Relative humidity: 95.00
Enthalpy: 25.54 Btu/lbm
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
Elite Software Development INSTITUTO NACIONAL DEL CORAZON - INCOR
College Station, TX 77845 Page 71

Air System #7 (FC 1-5) Psychrometric Analysis


System Load Analysis Latent Grains Sensible Temp CFM
Leaving Coil Condition 63.545 56.025
Draw-Thru Fan 0 0.000 0
Misc Load on Supply Side 0 0.000 0
Supply Air Duct 0 0.000 0
Zone Loads 600 1.200 15,347 18.975 736
Reheat 0 0.000 0

Zone Condition 600 64.745 15,347 75.000 736


Return Air Duct 0 0.000
Return Air Plenum 0 0.000
Misc Load on Return Side 0 0.000
Vent Air 80 CFM 2,732 5.463 879 1.086
Blow-Thru Fan 0 0.000

Entering Coil Condition 3,332 70.208 16,226 76.086 736

General Psychrometric Equations Used In Analysis:


PR = (Barometric pressure of site / Standard ASHRAE pressure of 29.921)
TSH = PR x 1.10 x CFM x (DB entering - DB leaving)
TLH = PR x 0.68 x CFM x (Grains entering - Grains leaving)
GTH = PR x 4.50 x CFM x (Enthalpy entering - Enthalpy leaving)

TSH = 0.998 x 1.10 x 736 x( 76.086 - 56.025 )= 16,226 Btuh


TLH = 0.998 x 0.68 x 736 x( 70.208 - 63.545 )= 3,332 Btuh
----------
SUM = 19,557 Btuh
GTH = 0.998 x 4.50 x 736 x( 29.243 - 23.305 )= 19,647 Btuh
Total System Load = 19,558 Btuh

Chilled and Hot Water Flow Rates and Steam Requirement


Cooling GPM = 19,647 / ( 10.00 x 500 ) = 3.9 GPM
Heating GPM = 7,688 / ( 20.00 x 500 ) = 0.8 GPM
Steam Req. = 7,688 / 970 = 7.9 lb./hr

Entering Cooling Coil Conditions Entering Heating Coil Conditions


Dry bulb temperature: 76.09 Dry bulb temperature: 68.00
Wet bulb temperature: 64.07
Relative humidity: 52.23
Enthalpy: 29.24 Btu/lbm

Leaving Cooling Coil Conditions Leaving Heating Coil Conditions


Dry bulb temperature: 56.03 Dry bulb temperature: 95.00
Wet bulb temperature: 55.18
Relative humidity: 95.00
Enthalpy: 23.31 Btu/lbm
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
Elite Software Development INSTITUTO NACIONAL DEL CORAZON - INCOR
College Station, TX 77845 Page 72

Air System #10 (UMA 2-1) Psychrometric Analysis


System Load Analysis Latent Grains Sensible Temp CFM
Leaving Coil Condition 63.548 56.026
Draw-Thru Fan 0 0.000 0
Misc Load on Supply Side 0 0.000 0
Supply Air Duct 0 0.000 0
Zone Loads 2,000 1.198 51,261 18.974 2,460
Reheat 0 0.000 0

Zone Condition 2,000 64.745 51,261 75.000 2,460


Return Air Duct 0 0.000
Return Air Plenum 0 0.000
Misc Load on Return Side 0 0.000
Vent Air 2,460 CFM 83,999 50.289 27,017 10.000
Blow-Thru Fan 0 0.000

Entering Coil Condition 85,999 115.034 78,278 85.000 2,460

General Psychrometric Equations Used In Analysis:


PR = (Barometric pressure of site / Standard ASHRAE pressure of 29.921)
TSH = PR x 1.10 x CFM x (DB entering - DB leaving)
TLH = PR x 0.68 x CFM x (Grains entering - Grains leaving)
GTH = PR x 4.50 x CFM x (Enthalpy entering - Enthalpy leaving)

TSH = 0.998 x 1.10 x 2,460 x( 85.000 - 56.026 )= 78,278 Btuh


TLH = 0.998 x 0.68 x 2,460 x( 115.034 - 63.548 )= 85,989 Btuh
----------
SUM = 164,267 Btuh
GTH = 0.998 x 4.50 x 2,460 x( 38.459 - 23.306 )= 167,481 Btuh
Total System Load = 164,277 Btuh

Chilled and Hot Water Flow Rates and Steam Requirement


Cooling GPM = 167,481 / ( 10.00 x 500 ) = 33.5 GPM
Heating GPM = 19,546 / ( 20.00 x 500 ) = 2.0 GPM
Steam Req. = 19,546 / 970 = 20.2 lb./hr

Entering Cooling Coil Conditions Entering Heating Coil Conditions


Dry bulb temperature: 85.00 Dry bulb temperature: 58.00
Wet bulb temperature: 75.00
Relative humidity: 63.34
Enthalpy: 38.46 Btu/lbm

Leaving Cooling Coil Conditions Leaving Heating Coil Conditions


Dry bulb temperature: 56.03 Dry bulb temperature: 95.00
Wet bulb temperature: 55.18
Relative humidity: 95.00
Enthalpy: 23.31 Btu/lbm
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
Elite Software Development INSTITUTO NACIONAL DEL CORAZON - INCOR
College Station, TX 77845 Page 73

Air System #11 (UMA 2-2) Psychrometric Analysis


System Load Analysis Latent Grains Sensible Temp CFM
Leaving Coil Condition 63.609 56.052
Draw-Thru Fan 0 0.000 0
Misc Load on Supply Side 0 0.000 0
Supply Air Duct 0 0.000 0
Zone Loads 2,000 1.138 53,877 18.948 2,589
Reheat 0 0.000 0

Zone Condition 2,000 64.747 53,877 75.000 2,589


Return Air Duct 0 0.000
Return Air Plenum 0 0.000
Misc Load on Return Side 0 0.000
Vent Air 2,589 CFM 88,408 50.287 28,435 10.000
Blow-Thru Fan 0 0.000

Entering Coil Condition 90,408 115.034 82,312 85.000 2,589

General Psychrometric Equations Used In Analysis:


PR = (Barometric pressure of site / Standard ASHRAE pressure of 29.921)
TSH = PR x 1.10 x CFM x (DB entering - DB leaving)
TLH = PR x 0.68 x CFM x (Grains entering - Grains leaving)
GTH = PR x 4.50 x CFM x (Enthalpy entering - Enthalpy leaving)

TSH = 0.998 x 1.10 x 2,589 x( 85.000 - 56.052 )= 82,312 Btuh


TLH = 0.998 x 0.68 x 2,589 x( 115.034 - 63.609 )= 90,395 Btuh
----------
SUM = 172,707 Btuh
GTH = 0.998 x 4.50 x 2,589 x( 38.459 - 23.322 )= 176,087 Btuh
Total System Load = 172,720 Btuh

Chilled and Hot Water Flow Rates and Steam Requirement


Cooling GPM = 176,087 / ( 10.00 x 500 ) = 35.2 GPM
Heating GPM = 21,191 / ( 20.00 x 500 ) = 2.1 GPM
Steam Req. = 21,191 / 970 = 21.8 lb./hr

Entering Cooling Coil Conditions Entering Heating Coil Conditions


Dry bulb temperature: 85.00 Dry bulb temperature: 58.00
Wet bulb temperature: 75.00
Relative humidity: 63.34
Enthalpy: 38.46 Btu/lbm

Leaving Cooling Coil Conditions Leaving Heating Coil Conditions


Dry bulb temperature: 56.05 Dry bulb temperature: 95.00
Wet bulb temperature: 55.21
Relative humidity: 95.00
Enthalpy: 23.32 Btu/lbm
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
Elite Software Development INSTITUTO NACIONAL DEL CORAZON - INCOR
College Station, TX 77845 Page 74

Air System #12 (UMA 2-3) Psychrometric Analysis


System Load Analysis Latent Grains Sensible Temp CFM
Leaving Coil Condition 63.646 56.068
Draw-Thru Fan 0 0.000 0
Misc Load on Supply Side 0 0.000 0
Supply Air Duct 0 0.000 0
Zone Loads 2,000 1.102 55,603 18.932 2,674
Reheat 0 0.000 0

Zone Condition 2,000 64.747 55,603 75.000 2,674


Return Air Duct 0 0.000
Return Air Plenum 0 0.000
Misc Load on Return Side 0 0.000
Vent Air 2,674 CFM 91,317 50.287 29,371 10.000
Blow-Thru Fan 0 0.000

Entering Coil Condition 93,317 115.034 84,974 85.000 2,674

General Psychrometric Equations Used In Analysis:


PR = (Barometric pressure of site / Standard ASHRAE pressure of 29.921)
TSH = PR x 1.10 x CFM x (DB entering - DB leaving)
TLH = PR x 0.68 x CFM x (Grains entering - Grains leaving)
GTH = PR x 4.50 x CFM x (Enthalpy entering - Enthalpy leaving)

TSH = 0.998 x 1.10 x 2,674 x( 85.000 - 56.068 )= 84,974 Btuh


TLH = 0.998 x 0.68 x 2,674 x( 115.034 - 63.646 )= 93,302 Btuh
----------
SUM = 178,276 Btuh
GTH = 0.998 x 4.50 x 2,674 x( 38.459 - 23.331 )= 181,765 Btuh
Total System Load = 178,291 Btuh

Chilled and Hot Water Flow Rates and Steam Requirement


Cooling GPM = 181,765 / ( 10.00 x 500 ) = 36.4 GPM
Heating GPM = 21,957 / ( 20.00 x 500 ) = 2.2 GPM
Steam Req. = 21,957 / 970 = 22.6 lb./hr

Entering Cooling Coil Conditions Entering Heating Coil Conditions


Dry bulb temperature: 85.00 Dry bulb temperature: 58.00
Wet bulb temperature: 75.00
Relative humidity: 63.34
Enthalpy: 38.46 Btu/lbm

Leaving Cooling Coil Conditions Leaving Heating Coil Conditions


Dry bulb temperature: 56.07 Dry bulb temperature: 95.00
Wet bulb temperature: 55.23
Relative humidity: 95.00
Enthalpy: 23.33 Btu/lbm
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
Elite Software Development INSTITUTO NACIONAL DEL CORAZON - INCOR
College Station, TX 77845 Page 75

Air System #30 (UMA 3-1) Psychrometric Analysis


System Load Analysis Latent Grains Sensible Temp CFM
Leaving Coil Condition 63.428 55.975
Draw-Thru Fan 0 0.000 0
Misc Load on Supply Side 0 0.000 0
Supply Air Duct 0 0.000 0
Zone Loads 800 1.314 18,626 18.914 891
Reheat 110 0.111 5

Zone Condition 800 64.742 18,736 75.000 897


Return Air Duct 0 0.000
Return Air Plenum 0 0.000
Misc Load on Return Side 0 0.000
Vent Air 897 CFM 30,619 50.292 9,848 10.000
Blow-Thru Fan 0 0.000

Entering Coil Condition 31,419 115.034 28,584 85.000 897

General Psychrometric Equations Used In Analysis:


PR = (Barometric pressure of site / Standard ASHRAE pressure of 29.921)
TSH = PR x 1.10 x CFM x (DB entering - DB leaving)
TLH = PR x 0.68 x CFM x (Grains entering - Grains leaving)
GTH = PR x 4.50 x CFM x (Enthalpy entering - Enthalpy leaving)

TSH = 0.998 x 1.10 x 897 x( 85.000 - 55.975 )= 28,584 Btuh


TLH = 0.998 x 0.68 x 897 x( 115.034 - 63.428 )= 31,417 Btuh
----------
SUM = 60,001 Btuh
GTH = 0.998 x 4.50 x 897 x( 38.459 - 23.275 )= 61,175 Btuh
Total System Load = 60,003 Btuh

Chilled and Hot Water Flow Rates and Steam Requirement


Cooling GPM = 61,175 / ( 10.00 x 500 ) = 12.2 GPM
Heating GPM = 9,162 / ( 20.00 x 500 ) = 0.9 GPM
Steam Req. = 9,162 / 970 = 9.4 lb./hr

Entering Cooling Coil Conditions Entering Heating Coil Conditions


Dry bulb temperature: 85.00 Dry bulb temperature: 58.00
Wet bulb temperature: 75.00
Relative humidity: 63.34
Enthalpy: 38.46 Btu/lbm

Leaving Cooling Coil Conditions Leaving Heating Coil Conditions


Dry bulb temperature: 55.98 Dry bulb temperature: 95.00
Wet bulb temperature: 55.13
Relative humidity: 95.00
Enthalpy: 23.27 Btu/lbm
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
Elite Software Development INSTITUTO NACIONAL DEL CORAZON - INCOR
College Station, TX 77845 Page 76

Air System #31 (UMA 3-2) Psychrometric Analysis


System Load Analysis Latent Grains Sensible Temp CFM
Leaving Coil Condition 63.674 56.080
Draw-Thru Fan 0 0.000 0
Misc Load on Supply Side 0 0.000 0
Supply Air Duct 0 0.000 0
Zone Loads 2,800 1.075 79,744 18.920 3,837
Reheat 0 0.000 0

Zone Condition 2,800 64.748 79,744 75.000 3,837


Return Air Duct 0 0.000
Return Air Plenum 0 0.000
Misc Load on Return Side 0 0.000
Vent Air 3,837 CFM 131,044 50.286 42,148 10.000
Blow-Thru Fan 0 0.000

Entering Coil Condition 133,844 115.034 121,892 85.000 3,837

General Psychrometric Equations Used In Analysis:


PR = (Barometric pressure of site / Standard ASHRAE pressure of 29.921)
TSH = PR x 1.10 x CFM x (DB entering - DB leaving)
TLH = PR x 0.68 x CFM x (Grains entering - Grains leaving)
GTH = PR x 4.50 x CFM x (Enthalpy entering - Enthalpy leaving)

TSH = 0.998 x 1.10 x 3,837 x( 85.000 - 56.080 )= 121,892 Btuh


TLH = 0.998 x 0.68 x 3,837 x( 115.034 - 63.674 )= 133,821 Btuh
----------
SUM = 255,712 Btuh
GTH = 0.998 x 4.50 x 3,837 x( 38.459 - 23.339 )= 260,717 Btuh
Total System Load = 255,736 Btuh

Chilled and Hot Water Flow Rates and Steam Requirement


Cooling GPM = 260,717 / ( 10.00 x 500 ) = 52.1 GPM
Heating GPM = 37,127 / ( 20.00 x 500 ) = 3.7 GPM
Steam Req. = 37,127 / 970 = 38.3 lb./hr

Entering Cooling Coil Conditions Entering Heating Coil Conditions


Dry bulb temperature: 85.00 Dry bulb temperature: 58.00
Wet bulb temperature: 75.00
Relative humidity: 63.34
Enthalpy: 38.46 Btu/lbm

Leaving Cooling Coil Conditions Leaving Heating Coil Conditions


Dry bulb temperature: 56.08 Dry bulb temperature: 95.00
Wet bulb temperature: 55.24
Relative humidity: 95.00
Enthalpy: 23.34 Btu/lbm
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
Elite Software Development INSTITUTO NACIONAL DEL CORAZON - INCOR
College Station, TX 77845 Page 77

Air System #32 (UMA 3-3) Psychrometric Analysis


System Load Analysis Latent Grains Sensible Temp CFM
Leaving Coil Condition 63.157 55.859
Draw-Thru Fan 0 0.000 0
Misc Load on Supply Side 0 0.000 0
Supply Air Duct 0 0.000 0
Zone Loads 1,600 1.577 31,413 19.141 1,494
Reheat 0 0.000 0

Zone Condition 1,600 64.734 31,413 75.000 1,494


Return Air Duct 0 0.000
Return Air Plenum 0 0.000
Misc Load on Return Side 0 0.000
Vent Air 1,494 CFM 51,024 50.300 16,411 10.000
Blow-Thru Fan 0 0.000

Entering Coil Condition 52,624 115.034 47,824 85.000 1,494

General Psychrometric Equations Used In Analysis:


PR = (Barometric pressure of site / Standard ASHRAE pressure of 29.921)
TSH = PR x 1.10 x CFM x (DB entering - DB leaving)
TLH = PR x 0.68 x CFM x (Grains entering - Grains leaving)
GTH = PR x 4.50 x CFM x (Enthalpy entering - Enthalpy leaving)

TSH = 0.998 x 1.10 x 1,494 x( 85.000 - 55.859 )= 47,824 Btuh


TLH = 0.998 x 0.68 x 1,494 x( 115.034 - 63.157 )= 52,630 Btuh
----------
SUM = 100,454 Btuh
GTH = 0.998 x 4.50 x 1,494 x( 38.459 - 23.204 )= 102,416 Btuh
Total System Load = 100,448 Btuh

Chilled and Hot Water Flow Rates and Steam Requirement


Cooling GPM = 102,416 / ( 10.00 x 500 ) = 20.5 GPM
Heating GPM = 12,535 / ( 20.00 x 500 ) = 1.3 GPM
Steam Req. = 12,535 / 970 = 12.9 lb./hr

Entering Cooling Coil Conditions Entering Heating Coil Conditions


Dry bulb temperature: 85.00 Dry bulb temperature: 58.00
Wet bulb temperature: 75.00
Relative humidity: 63.34
Enthalpy: 38.46 Btu/lbm

Leaving Cooling Coil Conditions Leaving Heating Coil Conditions


Dry bulb temperature: 55.86 Dry bulb temperature: 95.00
Wet bulb temperature: 55.02
Relative humidity: 95.00
Enthalpy: 23.20 Btu/lbm
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
Elite Software Development INSTITUTO NACIONAL DEL CORAZON - INCOR
College Station, TX 77845 Page 78

Air System #33 (UMA 3-4) Psychrometric Analysis


System Load Analysis Latent Grains Sensible Temp CFM
Leaving Coil Condition 63.088 55.829
Draw-Thru Fan 0 0.000 0
Misc Load on Supply Side 0 0.000 0
Supply Air Duct 0 0.000 0
Zone Loads 1,600 1.644 30,178 19.171 1,433
Reheat 0 0.000 0

Zone Condition 1,600 64.732 30,178 75.000 1,433


Return Air Duct 0 0.000
Return Air Plenum 0 0.000
Misc Load on Return Side 0 0.000
Vent Air 1,433 CFM 48,943 50.302 15,742 10.000
Blow-Thru Fan 0 0.000

Entering Coil Condition 50,543 115.034 45,920 85.000 1,433

General Psychrometric Equations Used In Analysis:


PR = (Barometric pressure of site / Standard ASHRAE pressure of 29.921)
TSH = PR x 1.10 x CFM x (DB entering - DB leaving)
TLH = PR x 0.68 x CFM x (Grains entering - Grains leaving)
GTH = PR x 4.50 x CFM x (Enthalpy entering - Enthalpy leaving)

TSH = 0.998 x 1.10 x 1,433 x( 85.000 - 55.829 )= 45,920 Btuh


TLH = 0.998 x 0.68 x 1,433 x( 115.034 - 63.088 )= 50,550 Btuh
----------
SUM = 96,470 Btuh
GTH = 0.998 x 4.50 x 1,433 x( 38.459 - 23.186 )= 98,354 Btuh
Total System Load = 96,463 Btuh

Chilled and Hot Water Flow Rates and Steam Requirement


Cooling GPM = 98,354 / ( 10.00 x 500 ) = 19.7 GPM
Heating GPM = 10,791 / ( 20.00 x 500 ) = 1.1 GPM
Steam Req. = 10,791 / 970 = 11.1 lb./hr

Entering Cooling Coil Conditions Entering Heating Coil Conditions


Dry bulb temperature: 85.00 Dry bulb temperature: 58.00
Wet bulb temperature: 75.00
Relative humidity: 63.34
Enthalpy: 38.46 Btu/lbm

Leaving Cooling Coil Conditions Leaving Heating Coil Conditions


Dry bulb temperature: 55.83 Dry bulb temperature: 95.00
Wet bulb temperature: 54.99
Relative humidity: 95.00
Enthalpy: 23.19 Btu/lbm
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
Elite Software Development INSTITUTO NACIONAL DEL CORAZON - INCOR
College Station, TX 77845 Page 79

Air System #34 (UMA 3-5) Psychrometric Analysis


System Load Analysis Latent Grains Sensible Temp CFM
Leaving Coil Condition 63.145 55.854
Draw-Thru Fan 0 0.000 0
Misc Load on Supply Side 0 0.000 0
Supply Air Duct 0 0.000 0
Zone Loads 1,600 1.588 31,201 19.146 1,484
Reheat 0 0.000 0

Zone Condition 1,600 64.733 31,201 75.000 1,484


Return Air Duct 0 0.000
Return Air Plenum 0 0.000
Misc Load on Return Side 0 0.000
Vent Air 1,484 CFM 50,666 50.301 16,296 10.000
Blow-Thru Fan 0 0.000

Entering Coil Condition 52,266 115.034 47,496 85.000 1,484

General Psychrometric Equations Used In Analysis:


PR = (Barometric pressure of site / Standard ASHRAE pressure of 29.921)
TSH = PR x 1.10 x CFM x (DB entering - DB leaving)
TLH = PR x 0.68 x CFM x (Grains entering - Grains leaving)
GTH = PR x 4.50 x CFM x (Enthalpy entering - Enthalpy leaving)

TSH = 0.998 x 1.10 x 1,484 x( 85.000 - 55.854 )= 47,496 Btuh


TLH = 0.998 x 0.68 x 1,484 x( 115.034 - 63.145 )= 52,272 Btuh
----------
SUM = 99,768 Btuh
GTH = 0.998 x 4.50 x 1,484 x( 38.459 - 23.201 )= 101,717 Btuh
Total System Load = 99,762 Btuh

Chilled and Hot Water Flow Rates and Steam Requirement


Cooling GPM = 101,717 / ( 10.00 x 500 ) = 20.3 GPM
Heating GPM = 12,192 / ( 20.00 x 500 ) = 1.2 GPM
Steam Req. = 12,192 / 970 = 12.6 lb./hr

Entering Cooling Coil Conditions Entering Heating Coil Conditions


Dry bulb temperature: 85.00 Dry bulb temperature: 58.00
Wet bulb temperature: 75.00
Relative humidity: 63.34
Enthalpy: 38.46 Btu/lbm

Leaving Cooling Coil Conditions Leaving Heating Coil Conditions


Dry bulb temperature: 55.85 Dry bulb temperature: 95.00
Wet bulb temperature: 55.02
Relative humidity: 95.00
Enthalpy: 23.20 Btu/lbm
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
Elite Software Development INSTITUTO NACIONAL DEL CORAZON - INCOR
College Station, TX 77845 Page 80

Air System #35 (UMA 3-6) Psychrometric Analysis


System Load Analysis Latent Grains Sensible Temp CFM
Leaving Coil Condition 62.207 55.447
Draw-Thru Fan 0 0.000 0
Misc Load on Supply Side 0 0.000 0
Supply Air Duct 0 0.000 0
Zone Loads 3,800 2.531 47,481 19.553 2,211
Reheat 0 0.000 0

Zone Condition 3,800 64.738 47,481 75.000 2,211


Return Air Duct 0 0.000
Return Air Plenum 0 0.000
Misc Load on Return Side 0 0.000
Vent Air 2,211 CFM 75,500 50.296 24,283 10.000
Blow-Thru Fan 0 0.000

Entering Coil Condition 79,300 115.034 71,765 85.000 2,211

General Psychrometric Equations Used In Analysis:


PR = (Barometric pressure of site / Standard ASHRAE pressure of 29.921)
TSH = PR x 1.10 x CFM x (DB entering - DB leaving)
TLH = PR x 0.68 x CFM x (Grains entering - Grains leaving)
GTH = PR x 4.50 x CFM x (Enthalpy entering - Enthalpy leaving)

TSH = 0.998 x 1.10 x 2,211 x( 85.000 - 55.447 )= 71,765 Btuh


TLH = 0.998 x 0.68 x 2,211 x( 115.034 - 62.207 )= 79,302 Btuh
----------
SUM = 151,067 Btuh
GTH = 0.998 x 4.50 x 2,211 x( 38.459 - 22.957 )= 154,006 Btuh
Total System Load = 151,065 Btuh

Chilled and Hot Water Flow Rates and Steam Requirement


Cooling GPM = 154,006 / ( 10.00 x 500 ) = 30.8 GPM
Heating GPM = 27,229 / ( 20.00 x 500 ) = 2.7 GPM
Steam Req. = 27,229 / 970 = 28.1 lb./hr

Entering Cooling Coil Conditions Entering Heating Coil Conditions


Dry bulb temperature: 85.00 Dry bulb temperature: 58.00
Wet bulb temperature: 75.00
Relative humidity: 63.34
Enthalpy: 38.46 Btu/lbm

Leaving Cooling Coil Conditions Leaving Heating Coil Conditions


Dry bulb temperature: 55.45 Dry bulb temperature: 95.00
Wet bulb temperature: 54.61
Relative humidity: 95.00
Enthalpy: 22.96 Btu/lbm
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
Elite Software Development INSTITUTO NACIONAL DEL CORAZON - INCOR
College Station, TX 77845 Page 81

Air System #36 (UMA 3-7) Psychrometric Analysis


System Load Analysis Latent Grains Sensible Temp CFM
Leaving Coil Condition 63.708 56.095
Draw-Thru Fan 0 0.000 0
Misc Load on Supply Side 0 0.000 0
Supply Air Duct 0 0.000 0
Zone Loads 2,600 1.031 75,911 18.606 3,656
Reheat 1,220 0.299 59

Zone Condition 2,600 64.739 77,131 75.000 3,715


Return Air Duct 0 0.000
Return Air Plenum 0 0.000
Misc Load on Return Side 0 0.000
Vent Air 3,715 CFM 126,849 50.295 40,799 10.000
Blow-Thru Fan 0 0.000

Entering Coil Condition 129,449 115.034 117,930 85.000 3,715

General Psychrometric Equations Used In Analysis:


PR = (Barometric pressure of site / Standard ASHRAE pressure of 29.921)
TSH = PR x 1.10 x CFM x (DB entering - DB leaving)
TLH = PR x 0.68 x CFM x (Grains entering - Grains leaving)
GTH = PR x 4.50 x CFM x (Enthalpy entering - Enthalpy leaving)

TSH = 0.998 x 1.10 x 3,715 x( 85.000 - 56.095 )= 117,930 Btuh


TLH = 0.998 x 0.68 x 3,715 x( 115.034 - 63.708 )= 129,450 Btuh
----------
SUM = 247,380 Btuh
GTH = 0.998 x 4.50 x 3,715 x( 38.459 - 23.348 )= 252,223 Btuh
Total System Load = 247,379 Btuh

Chilled and Hot Water Flow Rates and Steam Requirement


Cooling GPM = 252,223 / ( 10.00 x 500 ) = 50.4 GPM
Heating GPM = 26,519 / ( 20.00 x 500 ) = 2.7 GPM
Steam Req. = 26,519 / 970 = 27.3 lb./hr

Entering Cooling Coil Conditions Entering Heating Coil Conditions


Dry bulb temperature: 85.00 Dry bulb temperature: 58.00
Wet bulb temperature: 75.00
Relative humidity: 63.34
Enthalpy: 38.46 Btu/lbm

Leaving Cooling Coil Conditions Leaving Heating Coil Conditions


Dry bulb temperature: 56.09 Dry bulb temperature: 95.00
Wet bulb temperature: 55.25
Relative humidity: 95.00
Enthalpy: 23.35 Btu/lbm
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
Elite Software Development INSTITUTO NACIONAL DEL CORAZON - INCOR
College Station, TX 77845 Page 82

Air System #37 (UMA 3-8) Psychrometric Analysis


System Load Analysis Latent Grains Sensible Temp CFM
Leaving Coil Condition 63.409 55.967
Draw-Thru Fan 0 0.000 0
Misc Load on Supply Side 0 0.000 0
Supply Air Duct 0 0.000 0
Zone Loads 2,800 1.332 64,713 19.033 3,096
Reheat 0 0.000 0

Zone Condition 2,800 64.741 64,713 75.000 3,096


Return Air Duct 0 0.000
Return Air Plenum 0 0.000
Misc Load on Return Side 0 0.000
Vent Air 3,096 CFM 105,712 50.293 34,000 10.000
Blow-Thru Fan 0 0.000

Entering Coil Condition 108,512 115.034 98,713 85.000 3,096

General Psychrometric Equations Used In Analysis:


PR = (Barometric pressure of site / Standard ASHRAE pressure of 29.921)
TSH = PR x 1.10 x CFM x (DB entering - DB leaving)
TLH = PR x 0.68 x CFM x (Grains entering - Grains leaving)
GTH = PR x 4.50 x CFM x (Enthalpy entering - Enthalpy leaving)

TSH = 0.998 x 1.10 x 3,096 x( 85.000 - 55.967 )= 98,713 Btuh


TLH = 0.998 x 0.68 x 3,096 x( 115.034 - 63.409 )= 108,508 Btuh
----------
SUM = 207,221 Btuh
GTH = 0.998 x 4.50 x 3,096 x( 38.459 - 23.270 )= 211,273 Btuh
Total System Load = 207,226 Btuh

Chilled and Hot Water Flow Rates and Steam Requirement


Cooling GPM = 211,273 / ( 10.00 x 500 ) = 42.3 GPM
Heating GPM = 31,337 / ( 20.00 x 500 ) = 3.1 GPM
Steam Req. = 31,337 / 970 = 32.3 lb./hr

Entering Cooling Coil Conditions Entering Heating Coil Conditions


Dry bulb temperature: 85.00 Dry bulb temperature: 58.00
Wet bulb temperature: 75.00
Relative humidity: 63.34
Enthalpy: 38.46 Btu/lbm

Leaving Cooling Coil Conditions Leaving Heating Coil Conditions


Dry bulb temperature: 55.97 Dry bulb temperature: 95.00
Wet bulb temperature: 55.13
Relative humidity: 95.00
Enthalpy: 23.27 Btu/lbm
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
Elite Software Development INSTITUTO NACIONAL DEL CORAZON - INCOR
College Station, TX 77845 Page 83

Air System #38 (UMA 3-9) Psychrometric Analysis


System Load Analysis Latent Grains Sensible Temp CFM
Leaving Coil Condition 63.594 56.046
Draw-Thru Fan 0 0.000 0
Misc Load on Supply Side 0 0.000 0
Supply Air Duct 0 0.000 0
Zone Loads 2,800 1.153 74,489 18.954 3,578
Reheat 0 0.000 0

Zone Condition 2,800 64.746 74,489 75.000 3,578


Return Air Duct 0 0.000
Return Air Plenum 0 0.000
Misc Load on Return Side 0 0.000
Vent Air 3,578 CFM 122,189 50.288 39,300 10.000
Blow-Thru Fan 0 0.000

Entering Coil Condition 124,989 115.034 113,789 85.000 3,578

General Psychrometric Equations Used In Analysis:


PR = (Barometric pressure of site / Standard ASHRAE pressure of 29.921)
TSH = PR x 1.10 x CFM x (DB entering - DB leaving)
TLH = PR x 0.68 x CFM x (Grains entering - Grains leaving)
GTH = PR x 4.50 x CFM x (Enthalpy entering - Enthalpy leaving)

TSH = 0.998 x 1.10 x 3,578 x( 85.000 - 56.046 )= 113,789 Btuh


TLH = 0.998 x 0.68 x 3,578 x( 115.034 - 63.594 )= 124,972 Btuh
----------
SUM = 238,761 Btuh
GTH = 0.998 x 4.50 x 3,578 x( 38.459 - 23.318 )= 243,433 Btuh
Total System Load = 238,778 Btuh

Chilled and Hot Water Flow Rates and Steam Requirement


Cooling GPM = 243,433 / ( 10.00 x 500 ) = 48.7 GPM
Heating GPM = 36,385 / ( 20.00 x 500 ) = 3.6 GPM
Steam Req. = 36,385 / 970 = 37.5 lb./hr

Entering Cooling Coil Conditions Entering Heating Coil Conditions


Dry bulb temperature: 85.00 Dry bulb temperature: 58.00
Wet bulb temperature: 75.00
Relative humidity: 63.34
Enthalpy: 38.46 Btu/lbm

Leaving Cooling Coil Conditions Leaving Heating Coil Conditions


Dry bulb temperature: 56.05 Dry bulb temperature: 95.00
Wet bulb temperature: 55.21
Relative humidity: 95.00
Enthalpy: 23.32 Btu/lbm
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
Elite Software Development INSTITUTO NACIONAL DEL CORAZON - INCOR
College Station, TX 77845 Page 84

Air System #39 (UMA 3-10) Psychrometric Analysis


System Load Analysis Latent Grains Sensible Temp CFM
Leaving Coil Condition 63.598 56.048
Draw-Thru Fan 0 0.000 0
Misc Load on Supply Side 0 0.000 0
Supply Air Duct 0 0.000 0
Zone Loads 1,000 1.148 26,697 18.952 1,283
Reheat 0 0.000 0

Zone Condition 1,000 64.746 26,697 75.000 1,283


Return Air Duct 0 0.000
Return Air Plenum 0 0.000
Misc Load on Return Side 0 0.000
Vent Air 1,283 CFM 43,797 50.288 14,087 10.000
Blow-Thru Fan 0 0.000

Entering Coil Condition 44,797 115.034 40,784 85.000 1,283

General Psychrometric Equations Used In Analysis:


PR = (Barometric pressure of site / Standard ASHRAE pressure of 29.921)
TSH = PR x 1.10 x CFM x (DB entering - DB leaving)
TLH = PR x 0.68 x CFM x (Grains entering - Grains leaving)
GTH = PR x 4.50 x CFM x (Enthalpy entering - Enthalpy leaving)

TSH = 0.998 x 1.10 x 1,283 x( 85.000 - 56.048 )= 40,784 Btuh


TLH = 0.998 x 0.68 x 1,283 x( 115.034 - 63.598 )= 44,791 Btuh
----------
SUM = 85,575 Btuh
GTH = 0.998 x 4.50 x 1,283 x( 38.459 - 23.319 )= 87,249 Btuh
Total System Load = 85,581 Btuh

Chilled and Hot Water Flow Rates and Steam Requirement


Cooling GPM = 87,249 / ( 10.00 x 500 ) = 17.4 GPM
Heating GPM = 14,424 / ( 20.00 x 500 ) = 1.4 GPM
Steam Req. = 14,424 / 970 = 14.9 lb./hr

Entering Cooling Coil Conditions Entering Heating Coil Conditions


Dry bulb temperature: 85.00 Dry bulb temperature: 58.00
Wet bulb temperature: 75.00
Relative humidity: 63.34
Enthalpy: 38.46 Btu/lbm

Leaving Cooling Coil Conditions Leaving Heating Coil Conditions


Dry bulb temperature: 56.05 Dry bulb temperature: 95.00
Wet bulb temperature: 55.21
Relative humidity: 95.00
Enthalpy: 23.32 Btu/lbm
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
Elite Software Development INSTITUTO NACIONAL DEL CORAZON - INCOR
College Station, TX 77845 Page 85

Air System #40 (UMA 3-11) Psychrometric Analysis


System Load Analysis Latent Grains Sensible Temp CFM
Leaving Coil Condition 63.427 55.975
Draw-Thru Fan 0 0.000 0
Misc Load on Supply Side 0 0.000 0
Supply Air Duct 0 0.000 0
Zone Loads 3,200 1.315 74,913 19.025 3,585
Reheat 0 0.000 0

Zone Condition 3,200 64.742 74,913 75.000 3,585


Return Air Duct 0 0.000
Return Air Plenum 0 0.000
Misc Load on Return Side 0 0.000
Vent Air 3,585 CFM 122,424 50.292 39,376 10.000
Blow-Thru Fan 0 0.000

Entering Coil Condition 125,624 115.034 114,289 85.000 3,585

General Psychrometric Equations Used In Analysis:


PR = (Barometric pressure of site / Standard ASHRAE pressure of 29.921)
TSH = PR x 1.10 x CFM x (DB entering - DB leaving)
TLH = PR x 0.68 x CFM x (Grains entering - Grains leaving)
GTH = PR x 4.50 x CFM x (Enthalpy entering - Enthalpy leaving)

TSH = 0.998 x 1.10 x 3,585 x( 85.000 - 55.975 )= 114,289 Btuh


TLH = 0.998 x 0.68 x 3,585 x( 115.034 - 63.427 )= 125,618 Btuh
----------
SUM = 239,907 Btuh
GTH = 0.998 x 4.50 x 3,585 x( 38.459 - 23.275 )= 244,598 Btuh
Total System Load = 239,913 Btuh

Chilled and Hot Water Flow Rates and Steam Requirement


Cooling GPM = 244,598 / ( 10.00 x 500 ) = 48.9 GPM
Heating GPM = 37,475 / ( 20.00 x 500 ) = 3.7 GPM
Steam Req. = 37,475 / 970 = 38.6 lb./hr

Entering Cooling Coil Conditions Entering Heating Coil Conditions


Dry bulb temperature: 85.00 Dry bulb temperature: 58.00
Wet bulb temperature: 75.00
Relative humidity: 63.34
Enthalpy: 38.46 Btu/lbm

Leaving Cooling Coil Conditions Leaving Heating Coil Conditions


Dry bulb temperature: 55.97 Dry bulb temperature: 95.00
Wet bulb temperature: 55.13
Relative humidity: 95.00
Enthalpy: 23.27 Btu/lbm
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
Elite Software Development INSTITUTO NACIONAL DEL CORAZON - INCOR
College Station, TX 77845 Page 86

Air System #41 (UMA 3-12) Psychrometric Analysis


System Load Analysis Latent Grains Sensible Temp CFM
Leaving Coil Condition 63.452 55.985
Draw-Thru Fan 0 0.000 0
Misc Load on Supply Side 0 0.000 0
Supply Air Duct 0 0.000 0
Zone Loads 3,200 1.291 76,267 19.015 3,652
Reheat 0 0.000 0

Zone Condition 3,200 64.742 76,267 75.000 3,652


Return Air Duct 0 0.000
Return Air Plenum 0 0.000
Misc Load on Return Side 0 0.000
Vent Air 3,652 CFM 124,705 50.292 40,109 10.000
Blow-Thru Fan 0 0.000

Entering Coil Condition 127,905 115.034 116,376 85.000 3,652

General Psychrometric Equations Used In Analysis:


PR = (Barometric pressure of site / Standard ASHRAE pressure of 29.921)
TSH = PR x 1.10 x CFM x (DB entering - DB leaving)
TLH = PR x 0.68 x CFM x (Grains entering - Grains leaving)
GTH = PR x 4.50 x CFM x (Enthalpy entering - Enthalpy leaving)

TSH = 0.998 x 1.10 x 3,652 x( 85.000 - 55.985 )= 116,376 Btuh


TLH = 0.998 x 0.68 x 3,652 x( 115.034 - 63.452 )= 127,897 Btuh
----------
SUM = 244,273 Btuh
GTH = 0.998 x 4.50 x 3,652 x( 38.459 - 23.281 )= 249,050 Btuh
Total System Load = 244,281 Btuh

Chilled and Hot Water Flow Rates and Steam Requirement


Cooling GPM = 249,050 / ( 10.00 x 500 ) = 49.8 GPM
Heating GPM = 38,027 / ( 20.00 x 500 ) = 3.8 GPM
Steam Req. = 38,027 / 970 = 39.2 lb./hr

Entering Cooling Coil Conditions Entering Heating Coil Conditions


Dry bulb temperature: 85.00 Dry bulb temperature: 58.00
Wet bulb temperature: 75.00
Relative humidity: 63.34
Enthalpy: 38.46 Btu/lbm

Leaving Cooling Coil Conditions Leaving Heating Coil Conditions


Dry bulb temperature: 55.99 Dry bulb temperature: 95.00
Wet bulb temperature: 55.14
Relative humidity: 95.00
Enthalpy: 23.28 Btu/lbm
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
Elite Software Development INSTITUTO NACIONAL DEL CORAZON - INCOR
College Station, TX 77845 Page 87

Air System #42 (UMA 3-13) Psychrometric Analysis


System Load Analysis Latent Grains Sensible Temp CFM
Leaving Coil Condition 63.440 55.980
Draw-Thru Fan 0 0.000 0
Misc Load on Supply Side 0 0.000 0
Supply Air Duct 0 0.000 0
Zone Loads 2,400 1.302 56,700 19.020 2,714
Reheat 0 0.000 0

Zone Condition 2,400 64.742 56,700 75.000 2,714


Return Air Duct 0 0.000
Return Air Plenum 0 0.000
Misc Load on Return Side 0 0.000
Vent Air 2,714 CFM 92,687 50.292 29,811 10.000
Blow-Thru Fan 0 0.000

Entering Coil Condition 95,087 115.034 86,511 85.000 2,714

General Psychrometric Equations Used In Analysis:


PR = (Barometric pressure of site / Standard ASHRAE pressure of 29.921)
TSH = PR x 1.10 x CFM x (DB entering - DB leaving)
TLH = PR x 0.68 x CFM x (Grains entering - Grains leaving)
GTH = PR x 4.50 x CFM x (Enthalpy entering - Enthalpy leaving)

TSH = 0.998 x 1.10 x 2,714 x( 85.000 - 55.980 )= 86,511 Btuh


TLH = 0.998 x 0.68 x 2,714 x( 115.034 - 63.440 )= 95,081 Btuh
----------
SUM = 181,593 Btuh
GTH = 0.998 x 4.50 x 2,714 x( 38.459 - 23.278 )= 185,144 Btuh
Total System Load = 181,598 Btuh

Chilled and Hot Water Flow Rates and Steam Requirement


Cooling GPM = 185,144 / ( 10.00 x 500 ) = 37.0 GPM
Heating GPM = 29,370 / ( 20.00 x 500 ) = 2.9 GPM
Steam Req. = 29,370 / 970 = 30.3 lb./hr

Entering Cooling Coil Conditions Entering Heating Coil Conditions


Dry bulb temperature: 85.00 Dry bulb temperature: 58.00
Wet bulb temperature: 75.00
Relative humidity: 63.34
Enthalpy: 38.46 Btu/lbm

Leaving Cooling Coil Conditions Leaving Heating Coil Conditions


Dry bulb temperature: 55.98 Dry bulb temperature: 95.00
Wet bulb temperature: 55.14
Relative humidity: 95.00
Enthalpy: 23.28 Btu/lbm

You might also like