Professional Documents
Culture Documents
Back Up Calculation - Station 4
Back Up Calculation - Station 4
Back Up Calculation - Station 4
420.00 m³ 302.40
TOTAL 302.40
210.00 m³ 105.00
15.00 m³ 7.50
320.13 m³ 172.87
71.15 m³ 38.42
142.27 m³ 76.83
639.63 m³ 153.51
TOTAL 554.13 856.53
m³ 257.26
m³ 64.86
TOTAL 322.12
m³ 275.17
m³ 497.18
TOTAL 772.35
RAMP TOWERS
CONCRETE STRUCTURE
DESCRIPTION UNIT QUANTITY
RAMP COLUMN m³ 121.31 121.31
RAMP TIE BEAM m³ 11.34
RAMP GIRDERS m³ 268.95 280.29
RAMP SLAB m³ 203.27
RAMP FOUNDATION m³ 107.93
TOTAL 712.80
REINFORCING STEEL
DESCRIPTION UNIT QUANTITY
RAMP COLUMN kg 24,262.40
RAMP TIE BEAM kg 2,041.05
RAMP GIRDERS kg 48,411.00
RAMP SLAB kg 30,490.10
RAMP FOUNDATION kg 17,269.44
TOTAL 122,473.99
FROM STAAD SOFTWARE
DESCRIPTION UNIT
18,339.00
63,678.00
6,335.00
8,111.61
32,637.00
5,965.00
29,432.00
13,849.00
1,424.00
1,753.00
181,523.61
14,931.25
32,306.63
14,017.86
52,130.02
15,116.52
40,720.00
8,437.74
456.47
890.78
179,007.27
633,354.20
7,176.50
110,958.20
56,544.60
63,588.90
35,652.40
107,389.10
42,820.60
50,963.20
1,108,447.70
REINFORCING STEEL (MAIN BARS GRADE 60) - ROAD LEVEL TO CONCOURSE LEVEL
GC1
ELEVATION
ROAD LEVEL - CONCOURSE LEVEL
GC2
ELEVATION
ROAD LEVEL - CONCOURSE LEVEL
REINFORCING STEEL (LATERAL TIES GRADE 60) - ROAD LEVEL TO CONCOURSE LEVEL
COLUMN L-TIES
COLUMN
GC1
ROAD LEVEL TO CONCOURSE LEVEL
GC2
ROAD LEVEL TO CONCOURSE LEVEL
REINFORCING STEEL (MAIN BARS GRADE 60) - ROAD LEVEL BEAM & PLATFORM LEVEL BEAM
GRID LINE
PLATFORM LEVEL
A.HORIZONTAL GIRDER
GRID C-D*1-15
1
1
1'
B. VERTICAL GIRDER
GRID C-D*1-15
1
1
1
C. HORIZONTAL BEAM
GRID C-D*1-15
1'
1
6
8
8
D. VERTICAL BEAM
GRID C-D*1-15
1'
3
6
REINFORCING STEEL (STIRRUPS GRADE 40) - ROAD LEVEL BEAM & PLATFORM LEVEL BEAM
GRID LINE
PLATFORM LEVEL
A.HORIZONTAL GIRDER
GRID C-D*1-15
1
1
1'
B. VERTICAL GIRDER
GRID C-D*1-15
1
1
1
C. HORIZONTAL BEAM
GRID C-D*1-15
1'
1
1
1
1
D. VERTICAL BEAM
GRID C-D*1-15
1'
3
6
REINFORCING STEEL (GRADE 40) - PLATFORM LEVEL SUSPENDED SLAB, (GRADE 60&GRADE40) - CONCOURSE LEVEL SUS
DISC
DISC
CONT
CONT
CONT
CONT
SUMMARY OF REINFORCEMENTS
DESCRIPTION
REINFORCING STEEL (MAIN BARS GRADE 60) - ROAD LEVEL TO CONCOURSE LEVEL
Concrete, Concrete Column (GC1-1 to GC1-15)
Concrete, Concrete Column (GC2-1 to GC2-60)
SUB-TOTAL
REINFORCING STEEL (LATERAL TIES GRADE 60) - ROAD LEVEL TO CONCOURSE LEVEL
Concrete, Concrete Column (GC1-1 to GC1-15)
Concrete, Concrete Column (GC2-1 to GC2-60)
Concrete, Concrete Corbel (GC1-1 to GC1-15)
Concrete, Concrete Corbel (GC2-1 to GC2-60)
SUB-TOTAL
REINFORCING STEEL (MAIN BARS GRADE 60) - ROAD LEVEL BEAM
Concrete, Footing Tie Beam (FTB-1)
SUB-TOTAL
REINFORCING STEEL (STIRRUPS GRADE 40) - ROAD LEVEL BEAM
Concrete, Footing Tie Beam (FTB-1)
SUB-TOTAL
REINFORCING STEEL (MAIN BARS GRADE 60) - PLATFORM LEVEL BEAM
Concrete, Concrete Girder ( PG-3)
Concrete, Concrete Cantilever Girder ( PCG-1)
Concrete, Concrete Cantilever Girder ( PCG-2)
Concrete, Concrete Cantilever Girder ( PCG-3)
Concrete, Concrete Cantilever Girder ( PCG-4)
Concrete, Concrete Beam ( PB-1)
SUB-TOTAL
15 12.71 0.016
45 12.71 0.016
LEVEL BEAM
2 25 16
2 25 16
1 25 16
15 25 16
15 25 16
15 25 16
1 25
15 25
7 25
9 25
9 25
15' 25
4 25
7 25
VEL BEAM
DISTANCE Grid - grid
2 9
2 9
1 4.5
15 4.015
15 4.015
15 4.015
1 4.5
15 9
7 5.296
9 5.259
9 2.744
15' 3.865
4 1.71
7 2.551
GRID C-D*1'-15'/PLATFORM
1' 1' 0.89
1' 1' 0.89
kg 81,538.08
kg 263,430.72
kg 344,968.80
kg 32,430.78
kg 97,956.12 475,355.70
kg 7,626.05
kg 22,878.14 30,504.19
kg 160,891.09
kg 42,640.08
kg 42,640.08
kg 37,777.40
kg 37,777.40
kg 13,800.99
kg 1,218.29
kg 8,242.91
kg 1,986.75
kg 4,283.47
kg 18,752.69
kg 48,285.10
kg 15,184.90
kg 1,589.59
kg 9,022.65
kg 2,005.03
kg 4,010.07
kg 13,850.67
kg 45,662.91
kg 15,096.86
kg 3,357.49
kg 18,454.35
kg 6,897.24
kg 13,691.30
kg 20,588.55
kg 10,270.81
kg 20,440.19
kg 30,711.01
kg 617,373.62
kg 132,605.67
QTY B HEIGHT LENGTH OF 1B
52 12.71 13.067
1 11.71 1
1 11.71 1
9 7.5 FTB-1
9 7.5 PG-3
4.5 3.75 PCG-1
7.5 FTB-1
7.5 PG-3
3.75 PCG-1
3.265 PCG-2
3.265 PCG-3
3.265 PCG-4
4.2 PB-1
8.4 PB-1
4.796 PB-1
4.759 PB-1
2.244 PB-1
3.415 PB-1
1.31 PB-1
2.101 PB-1
3 2.592 0.4
3 2.6 0.4
3 2.592 0.4
3 2.6 0.4
Column
Corbel
TOTAL LENGTH OF B TOTAL WT OF MB
10192.26 81538.08
TOTAL 344968.8
#PER LAYER
0.6 1.2 12
0.5 1 12
0.5 1 12
0.6 1.2 12
0.6 1.2 12
0.6 1.2 12
0.4 0.6 12
0.4 0.6 12
0.4 0.6 12
0.4 0.6 12
0.4 0.6 12
0.4 0.6 12
0.4 0.6 12
0.4 0.6 12
M Y 9 12 10 8
M Y 9 9 4 5
R Y 5.517125 9 4 9
R Y 5.032125 16 6 16
R Y 5.032125 18 6 18
R Y 5.032125 20 6 20
R Y 5.067125 5 2 3
M Y 9 5 2 3
M N 5.296 5 2 3
M N 5.259 5 2 3
M N 2.744 5 2 3
M N 3.865 5 2 3
M N 1.71 5 2 3
M N 2.551 5 2 3
6 1.42 1.42
6 1.42 1.42
RIGHT SUPPPORT
BOT TOP BOT
10 12 10
6 9 4
4 9 4
6 16 6
6 18 6
6 20 6
4 5 2
4 5 2
4 5 2
4 5 2
4 5 2
4 5 2
4 5 2
4 5 2
0.12 2.68 0
0.12 2.68 0
0.12 2.68 0
0.12 2.68 0
0.12 2.68 0
0.12 2.68 0
0.12 2.68 0
0.12 2.68 0
OP SUPPORT
LEFT SP(pcs) 0.25L LENGTH
17 0.384 14.688
19 0.30025 7.22475
57 0.648 64.296
62 0.65 70.06
57 0.648 64.296
62 0.65 70.06
#PER LAYER
0.16 1 0 0
0.16 1 0 0
4 8 72 10
4 5 45 4
4 9 49.654125 4
5 16 80.514 6
5 18 90.57825 6
5 20 100.6425 6
0 3 15.201375 2
0 3 27 2
0 3 15.888 2
0 3 15.777 2
0 3 8.232 2
0 3 11.595 2
0 3 5.13 2
0 3 7.653 2
12 0 0.05 0.1
12 0 0.05 0.1
12 0 0.05 0.1
12 0 0.05 0.1
12 0 0.05 0.1
12 0 0.05 0.1
12 0 0.05 0.1
12 0 0.05 0.1
0.25 16 1 16
0.25 18 1 18
0.25 56 2 112
0.3 61 2 122
0.25 56 2 112
0.3 61 2 122
D-2 HOOK # OF SET TOTAL LENGT OFLo
Extra Bars
LENGTH LEFT Top (pcs) LEFT Bottom (pcs) 0.25L LENGTH
90 4 0 2.625 10.5
36 4 0 2.625 10.5
22.0685 0 0 0.9375 0
30.19275 0 0 0.81625 0
30.19275 0 0 0.81625 0
30.19275 0 0 0.81625 0
10.13425 2 0 1.05 2.1
18 2 0 2.4 4.8
10.592 2 0 1.399 2.798
10.518 2 0 1.48975 2.9795
5.488 2 0 0.761 1.522
0.15 0.25 1 20 10
0.15 0.25 1 20 10
0.15 0.25 1 20 10
0.15 0.25 1 20 10
0.15 0.25 1 20 10
0.15 0.25 1 20 10
0.15 0.25 1 20 10
0.15 0.25 1 20 10
0.15 0.25 1 20 10
0.15 0.25 1 20 10
0.15 0.25 1 20 10
0.15 0.25 1 20 10
0.15 0.25 1 20 10
0.15 0.25 1 20 10
MID Top (pcs) MID Bottom (pcs) 0.125L LENGTH RIGHT Top (pcs)
0 0 5.625 0 4
0 2 5.625 11.25 4
0 0 2.8125 0 0
0 0 2.44875 0 0
0 0 2.44875 0 0
0 0 2.44875 0 0
0 2 3.15 6.3 2
0 2 6.3 12.6 2
0 2 3.597 7.194 2
0 2 3.56925 7.1385 2
0 2 1.683 3.366 2
0 2 2.56125 5.1225 2
0 2 0.9825 1.965 2
0 2 1.57575 3.1515 2
1.8 2 1 20 10
1.8 2 1 20 10
1 1 1 20 0
1 1 1 20 0
1 1 1 20 0
1 1 1 20 0
1 1 1 20 0
3.6 4 1 20 10
1 1 1 20 2
1 1 1 20 2
1 1 1 20 0
1 1 1 20 0
1 1 1 20 0
1 1 1 20 0
20.5166666666667 11 53.0444444444445
20.5166666666667 11 53.0444444444445
0 2.625 10.5
0 2.625 10.5
0 2.704625 0
0 2.583375 0
0 2.583375 0
0 2.583375 0
0 1.917125 3.83425
0 2.4 4.8
0 1.499 2.998
0 1.38975 2.7795
0 0.861 1.722
0 1.10375 2.2075
0 0.5275 1.055
0 0.77525 1.5505
0 3.75 3.7
0 3.75 3.7
0 1.875 1.825
0 1.6325 1.5825
0 1.6325 1.5825
0 1.6325 1.5825
0 2.1 2.05
2 4.2 4.15
0 2.398 2.348
0 2.3795 2.3295
0 1.122 1.072
0 1.7075 1.6575
0 0.655 0.605
0 1.0505 1.0005
TOTAL WEIGHT
15,096.86
3,357.49
6,897.24
13,691.30
10,270.81
20,440.19
TL Lo TL Lj TL Lv
Web Bars
PCS LENGTH # OF FLOORS
4 36 1
4 36 1
4 18 1
5 20.075 1
5 20.075 1
5 20.075 1
0 0 1
0 0 1
0 0 1
0 0 1
0 0 1
0 0 1
0 0 1
0 0 1
-0.4175 -1.9175 0
-0.4175 -1.9175 0
-0.4175 -1.9175 0
0.05 -1.45 0
2.15 0.65 0.65
0.348 -1.152 0
0.3295 -1.1705 0
-0.928 -2.428 0
-0.3425 -1.8425 0
-1.395 -2.895 0
-0.9995 -2.4995 0
TW Lo TW Lj TW Lv
TOTAL WT
56 10248 2016
28 3171 1008
4 286.8905 72
18 1992.7215 361.35
4 483.084 80.3
8 1046.682 160.6
4 150.2795 0
42 2822.4 0
2 78.94 0
4 156.77 0
2 40.66 0
52 1495.65 0
4 50.5 0
4 75.63 0
56 62 1
28 62 1
4 42 1
18 42 1
4 42 1
8 42 1
4 42 1
42 66 1
2 46 1
4 46 1
2 42 1
52 42 1
4 42 1
4 42 1
GROSS WEIGHT
32430.77586
97956.11539
130386.89125
42640.08 42640.08
13800.99 13800.99
1218.288425 1218.288425
8242.910775 8242.910775
1986.7474 1986.7474
4283.4737 4283.4737
578.576075 578.576075
10866.24 10866.24
303.919 303.919
603.5645 603.5645
156.541 156.541
5758.2525 5758.2525
194.425 194.425
291.1755 291.1755
TOTAL 48285.103875
399.81312 0.888
6596.91648 0.888
218.94528 0.888
437.89056 0.888
199.90656 0.888
5197.57056 0.888
399.81312 0.888
399.81312 0.888
MAIN STRUCTURE
B H
DESCRIPTION
FORMWORKS - ROAD LEVEL BEAM
Footing Tie Beam (FTB-1) 0.60 1.20
RAMP TOWER
DESCRIPTION UNIT QUANTITY
RAMP COLUMN m2 339.81
RAMP TIE BEAM m2 58.25
RAMP GIRDERS m2 1,264.08
RAMP SLAB m2 1,111.65
RAMP FOUNDATION m2 388.35
TOTAL 3,162.14
PASSENGER RAMP
DESCRIPTION UNIT QUANTITY
SUSPENDED SLAB m2 1,065.05
TOTAL 1,065.05
LENGTH
UNIT QUANTITY (PER DESIGN)
420.00 m2 1,260.00
TOTAL 1,260.00
210.00 m2 525.00
15.00 m2 37.50
320.13 m2 768.31
71.15 m2 170.76
142.27 m2 341.45
639.63 m2 1,023.41
TOTAL 2,866.43
190.65 m2 1,143.90
571.95 m2 3,431.70 Column 4,575.60
15.28 m2 122.24
45.85 m2 366.80 Corbel 489.04
TOTAL 5,064.64
m2 1,286.30
m2 324.30
TOTAL 1,610.60
m2 1,375.85
3,314.53
TOTAL 4,690.38
FIRE EXIT STAIRS
CONCRETE STRUCTURE
DESCRIPTION UNIT QUANTITY
STAIR COLUMN m³ 143.54 143.54
STAIR TIE BEAM m³ 21.13
STAIR GIRDER m³ 136.99 158.12
STAIR SLAB m³ 33.435
STAIR FOUNDATION m³ 130.6
TOTAL 465.69
REINFORCING STEEL
DESCRIPTION UNIT QUANTITY
STAIR COLUMN kg 28,708.00
STAIR TIE BEAM kg 3,802.68
STAIR GIRDER kg 24,658.20
STAIR SLAB kg 5,015.25
STAIR FOUNDATION kg 20,896.00
TOTAL 83,080.13
Structural Steel, furnished, fabricated and erected (including Surface Preparation)
Structural Steel, Purlins (LC 200mm x 75mm x 25mm x 2mm) kg
Structural Steel, Passenger Ramp Column (Tube,450x450x25mm) kg
Structural Steel, Passenger Ramp Beams/Girders (W27x84) kg
Structural Steel, Passenger Ramp Roof Rafters (W24X55) kg
Structural Steel, Passenger Ramp Roof Rafters (W18x50) kg
Metal Structure Accessories, Sagrods (12mm diam.) nuts included kg
Metal Structure Accessories, Cross Bracings (16mm diam. with Standard kg
Turnbuckle)
Reinforcing Steel
Reinforcing Steel Bars, Grade 40 (Suspended Slab-Passenger Ramp) kg
Concrete Works (Cast in Place)
Suspended Slab - Passenger Ramp cu.m.
3,350.00
57,350.00
85,620.00
7,550.00
8,020.00
300.00
1,470.00
29,280.00
195.15
MRT 7 STATION 4 BILL OF QUANTITIES
A. STRUCTURAL WORKS
DESCRIPTION Unit Cost
Unit Quantity Material
A.1 FOUNDATION
1.0 Bored Pile-1 2.5meter Diameter l.m. 500
2.0 Bored Pile-2 2.5meter Diameter l.m. 130
A.4 FORMWORKS
1.0 Columns sq.m. 4,575.60
2.0 Beams and Girders sq.m. 4,126.43
3.0 Platform Slab sq.m. 1,610.60
4.0 Concourse Slab sq.m. 4,690.38
5.0 Corbel sq.m. 489.04