Professional Documents
Culture Documents
Analisis Struktur
Analisis Struktur
Data :
Mutu Beton(fc') = 24 Mpa
Mutu Baja (fy) = 240 Mpa
Lx = 4.2 m
Ly = 2.9 m
WL = 250 kg/m3
WD = 406 kg/m3
WU = 887.2 kg/m3
Tebal selimut P = 20 mm
Ln = 4.2 m
= 420 cm
= 4200 mm
β= Ly/Lx
0.69 cm
(𝐿𝑛 (0,8+(𝑓𝑦/1500)))/(36+(9𝑥β))
h min =
= 9.6 cm
(𝐿𝑛 (0,8+(𝑓𝑦/1500)))/36
h max =
= 11.2 cm
ꙮ Karena hmin (9,6 cm) <h< h max (11,2cm) maka tebal pelat lantai yang digunakan adalah 11 cm
d efektif x = h – p – 0,5 D
= 85 mm
d efektif y = h – p – 0,5D – D
= 75 mm
PERHITUNGAN BEBAN LAYAN
Beban Mati
Berat sendiri pelat 2400 kg/m 0.11 = 264 Kg/m
Spesi 21 kg/m 2 = 42 Kg/m
Pasir urug 1600 kg/m 0.03 = 48 Kg/m
penutup lantai 24 kg/m 1 = 24 Kg/m
Plafond dan penggantung 18 Kg/m
Mechanical Electrical 10 Kg/m
+
Beban Total Mati ( WD ) 406 Kg/m
C = ( Ly/Lx )
= 1.45
Ly/Lx
Clx Cly Ctx Cty
25 34 42 49
25 22 18 15
51 63 72 78
51 54 55 54
Tabel Gideon
Data h = 110 mm
s = 20 mm
D tulangan Ø = 8 mm
Øx = 10 mm
fy = 240 Mpa
fc' = 24 Mpa
b = 1000
Mlx = 1.87
𝑀𝑙𝑥/Ø
K= = 0.233
m =𝑓𝑦/(0,85 𝑥 𝑓𝑐′)
= 11.765
ρmin =1,4/𝑓𝑦
= 0.00583
(0,85 . 𝑓𝑐′)/𝑓𝑦
ρb = = 0.085
As Rencana = ρmin x b x d
= 379.17 mm2
Menggunakan tulangan D10-200 (As = 393 mm2)
Data h = 110 mm
s = 30 mm
D tulangan Ø = 8 mm
Øx = 10 mm
fy = 240 Mpa
fc' = 24 Mpa
b = 2400
Mly = 2.54
Tinggi efektif balok (d) = h-s-(Ø/2) = 76 mm
𝑀𝑙𝑥/Ø
K= = 0.317
m =𝑓𝑦/(0,85 𝑥 𝑓𝑐′)
= 11.765
ρmin =1,4/𝑓𝑦
= 0.00583
(0,85 . 𝑓𝑐′)/𝑓𝑦
ρb = = 0.085
As Rencana = ρmin x b x d
= 379.17 mm2
Menggunakan tulangan D10-200 (As = 393 mm2)
Data h = 110 mm
s = 30 mm
D tulangan Ø = 8 mm
Øx = 10 mm
fy = 240 Mpa
fc' = 24 Mpa
b = 2400
Mtx = 3.13
𝑀𝑙𝑥/Ø
K= = 0.392
m =𝑓𝑦/(0,85 𝑥 𝑓𝑐′)
= 11.765
ρmin =1,4/𝑓𝑦
= 0.00583
(0,85 . 𝑓𝑐′)/𝑓𝑦
ρb = = 0.085
ρmax = 0,75 x ρb = 0.0638
Karena ρ < ρmax ρ < ρmin , maka digunakan ρmin
As Rencana = ρmin x b x d
= 379.17 mm2
Menggunakan tulangan D10-200 (As = 393 mm2)
Data h = 110 mm
s = 30 mm
D tulangan Ø = 8 mm
Øx = 10 mm
fy = 240 Mpa
fc' = 24 Mpa
b = 2400
Mty = 3.66
𝑀𝑙𝑥/Ø
K= = 0.457
m =𝑓𝑦/(0,85 𝑥 𝑓𝑐′)
= 11.765
ρmin =1,4/𝑓𝑦
= 0.00583
(0,85 . 𝑓𝑐′)/𝑓𝑦
ρb = = 0.085
As Rencana = ρmin x b x d
= 379.17 mm2
Menggunakan tulangan D10-200 (As = 393 mm2)
PERENCANAAN BALOK
Tinjauan pelat yang terbesar
Data Balok Induk Balok Anak
Ly = 2.9 m Ly = 2.9
Lx = 4.2 m Lx = 4.2
WD = 4.325 KN/m2 WD = 4.325 KN/m2
WL = 2.500 KN/m2 WL = 2.500 KN/m2
WU = 9.19 KN/m2 WU = 9.19 KN/m2
b = 200 mm b = m
h = 350 mm h = m
BJ Beton = 2400 Kg/m BJ Beton = 2400 Kg/m
selimut beton = 30 mm
D = 19 mm
P = 10 mm
Deff = 300.50 m
0.3005 mm
Balok Induk
Luas Trapesium Leq 1.28 m
1/24. 𝑞𝑈.𝐿^2
M Lapangan = 9.7 KN.m
1/2. 𝑞𝑈.𝐿
Wu 1 = 27.6 KN.m
1/4. 𝑞𝑈.𝐿
Wu2 = 13.8 KN.m
(𝑀K𝑙𝑎𝑝𝑎𝑛𝑔𝑎𝑛)/(0,8𝑥𝑏𝑥𝑑^2
= ) = 0.669 Mpa
Dari tabel A-10 (Buku Istimawan) untuk nilai K=0,267 Mpa, didapat nilai ρ >
ρmin, maka digunakan nilai ρmin = 0,0058
〖𝐴𝑆〗 _1 = ρ x b x d x 10^6
= 3485.8 mm2
1/4 𝑥 𝜋 𝑥 𝐷^2
A =
= 283.385 mm2
= 20.504705882
= 242.819 KN/m
= 60.70 KN/m
〖𝐴𝑆〗 _2 (𝑀𝑛2
= 𝑥 〖 10 〗 ^′ 6)/(𝑓𝑦 𝑥 𝑑)
= 842 mm2
= 4328
= 12.30 ≈ 12 Tulangan
= 2.97 ≈ 3 Tulangan
(𝑀K𝑇𝑢𝑚𝑝𝑢𝑎𝑛)/(0,8𝑥𝑏𝑥𝑑^2
= ) = 1.337 Mpa
Dari tabel A-10 (Buku Istimawan) untuk nilai K=0,267 Mpa, didapat nilai ρ >
ρmin, maka digunakan nilai ρmin = 0,0058
〖𝐴𝑆〗 _1 = ρ x b x d x 10^6
= 3486 mm2
1/4 𝑥 𝜋 𝑥 𝐷^2
A =
= 283.385 mm2
= 20.505
= 242.819 KN/m
= 60.70 KN/m
〖𝐴𝑆〗 _2 (𝑀𝑛2
= 𝑥 〖 10 〗 ^′ 6)/(𝑓𝑦 𝑥 𝑑)
= 842 mm2
= 4328
= 12.30 ≈ 12 Tulangan
= 2.97 ≈ 3 Tulangan
ØVc = ØVc x b x d
= 30.05 KN
y = ( Vu - ØVc) / Wu
= 309.6 mm
(𝑏 𝑥 𝑦)/(3 𝑓𝑦)
As sengkang =
= 86.01
Untuk As = 86,01 m2 dengan diameter tulangan sengkang D10 ,
maka dicari luas yang mendekati yaitu : D 10 - 350
PERENCANAAN KOLOM
0,7225 x b x c x fc' = AS x fy
0,7225 x 350 x c x 24 = 8038 x 240
6069 c 1929216
c 317.88038 mm
Jadi, e . 〖 10 〗 ^3 )/𝑃𝑢
= (𝑀𝑢
= (252,9601
900 . 〖 10 〗 ^3 )/𝑃𝑢
PU = 281.1 KN
28660.379 Kg
Lebar Penampang b = 30 cm
Tinggi Penampang ht = 30 cm
M 25,794.34
eo1 = = = 0.90 = 90.00 cm
P 28,660.38
1 30
eo2 = ht = = 1 cm
30 30
eo 91.00
= = 3.0333332053983 cm
ht 30
C2 = 8
e1 = C1 C2 ( lk / 100.ht )2 . ht
e2 = 0.15 ht = 4.50 cm
eu = eo + e1 + e2
= 91.00 + 3.706 + 4.5 = 99.21 cm
eau = eu + ( 1/2 ht )
= 99.21 + 15.0
= 114.21 cm
Pembesian kolom :
- lebar kolom (b) = 300 mm
- beton decking (ds) = 30 mm
- tebal efektif d = 270 mm
- Mutu beton fc' = 24 MPa
- Mutu baja fy = 240 MPa
m = fc / (0,85 .fy)
= 240 / (0.85 . 24)
= 11.76
Rn = M / ( f b d2)
= 327.319.478/(0.85.300.270,270)
= 17.608
= 0.14670
Dipasang tulangan 8 d - 19 (A
15act = D 32 ( Aact = 12057.6 mm2) Ok
Pembesian begel :
Dsengkang D9 - 300 mm