Download as pdf or txt
Download as pdf or txt
You are on page 1of 31

Maintenance Manual for C2000 Series Semi-Automatic Coagulation Analyzers

 
C2000‐1/2/4 
Semi‐Automatic Coagulation 
Analyzers 
 

Maintenance 
Manual 
Beijing Precil Instrument Co., Ltd. 

                                 
Maintenance Manual for C2000 Series Semi-Automatic Coagulation Analyzers

Preface 

Intellectual Property 
Beijing Precil Instrument Co., Ltd. (Precil for short) owns the copyright of this 
non‐public manual and has the rights to keep this manual confidential. This manual 
provides reference only for maintaining Precil products. 
 
Precil owns all intellectual property rights (including the copyright) of this manual. 
It is prohibited to use, disclose, or spread the information in this manual in any 
manner without the prior written approval of Precil. It is prohibited to photograph, 
copy, print, or translate (or conduct any other similar activities) the information in 
this manual in any manner without the prior written approval of Precil. 
 
Precil reserves the right of final interpretation for this manual. 
Precil reserves the right to modify the content in this manual without prior notice. 
Precil reserves the right to modify relevant technologies without prior notice. 
Precil reserves the right to modify relevant product specifications without prior notice. 
 

Disclaimer 
Precil is not liable for this manual in any manner, including (but not limited to) the 
warranty of merchantability or fitness implied in this manual for any particular purpose. 
 
Precil is responsible for the safety, reliability, and performance of this product, 
only if: 
 all installation operations, expansions, changes, modifications, and repairs of this 
product are conducted by Precil authorized personnel; 
 the relevant electrical devices comply with national standards; 
 the product is used in accordance with instructions. 
 
Precil is not responsible for safety, reliability, and performance of this product, if: 
 components of this product are disassembled, stretched, or re‐commissioned;   
the product is not used in accordance with instructions. 

                                 
Maintenance Manual for C2000 Series Semi-Automatic Coagulation Analyzers

● Application Scope 
This manual applies to the product maintenance conducted by Precil customer 
service engineers or Precil authorized personnel. 
 
 
● Use of This Manual
Content in the preface is informative. And content of Warnings must be observed 
during operations. Ignorance of the precautions or misoperation may cause failures 
of the product or even endanger personal safety. 
 

This manual contains four chapters, which are described as follows: 

Chapter 1: Structure and Function. This chapter describes the instrument structure. 

Chapter 2: Troubleshooting. This chapter describes common troubleshooting methods. 

Chapter 3: Commissioning. This chapter describes common commissioning methods 
and relevant precautions. 

Chapter 4: Maintenance Diagrams. This chapter describes the system principle 
diagram and cable layout diagram. These diagrams may not cover all 
details about the instrument but provide reference for maintenance 
engineers who are familiar with the instrument. 
 
 
● Warnings
 
Warning 1 
Before maintenance, carefully read the operation and safety instructions in this 
manual to ensure proper operations. 
 
Warning 2 
When the operating environment of the instrument does not comply with the 
Operation Manual for C2000 Series Semi‐Automatic Coagulation Analyzers, the 
instrument may not operate properly or even become faulty. 

                                    
Maintenance Manual for C2000 Series Semi-Automatic Coagulation Analyzers

Warning 3 
Sudden power failure: 
When a transient voltage drop occurs due to power failures or lightning strikes, 
the instrument may become faulty. In addition, the basic software, application 
software, data, as well as memory data and software may be damaged. 
 
 
● Commitment
Warranty Period: 
Precil provides a one‐year warranty and lifelong maintenance for the product. 
Maintenance services and accessories are free of charge during the warranty period. 
After the warranty period expires, customers are charged for replaced accessories 
and maintenance services. 

Warranty Particulars: 
During the warranty period, Precil provides free‐of‐charge maintenance against 
faults relevant to the product design and manufacturing. Maintenance methods are 
determined by the manufacturer based on the faults. 

Exemptions: 
(1)  The operating environment does not meet the requirements of this manual. 
(2)  The customer misuses, misoperates, or operates the product in a rough 
manner. 
(3)  The product is not moved, transported, or installed in accordance with the 
procedures and methods recognized by the manufacturer. 
(4)  The product is disassembled without permission. 
(5)  The product is damaged in natural disasters (including fire accidents, 
earthquakes, floods, wind disasters, and thunderstorms), terrorist activities, 
wars, or other acts of God. 
(6)  The customer uses parts that are not provided by the manufacturer. 
(7)  Consumable parts become faulty, or the service life of the components 
expires. 
(8)  The customer does not maintain the product in accordance with the 
manufacturer's requirements. 
(9)  The customer buys a second‐hand product without contacting the 
manufacturer. 
(10)  The system crashes or the hardware is damaged due to computer viruses.

                                    
Maintenance Manual for C2000 Series Semi-Automatic Coagulation Analyzers

● After‐Sales Service
Service Particulars: 
Installation and commissioning: 
Precil customer service department and local dealers 
Application training: 
Precil customer service department and local dealers, providing free‐of‐charge 
training on installation and on‐site applications 
Maintenance: 
Precil customer service department and local dealers 
Supply of accessories: 
Precil customer service department and local dealers 

Direct service 
Precil customer service engineers provide direct services for customers. 
 
 
● Contact Information
Address: East 2F, Building No. 5, Qunying Technology and Science Park, No. 8 
Chuangye Road, Shangdi IT Industry Base, Haidian District, Beijing, China 
Telephone: +86‐10‐62987758 / 62963063 / 62971023 / 62964796 
Postcode: 100085 
Fax: +86‐10‐62987761 
Customer Service Department: +86‐10‐62963237 extension 21 
Email: plslhy@163.com 
Website: www.precil.com.cn

                                 
Maintenance Manual for C2000 Series Semi-Automatic Coagulation Analyzers

Contents 
Chapter 1 Structure and Function.......................................................................... 1
1.1 Structure ...............................................................................................................1
1.1.1 Structural Diagram of C2000‐1 ..........................................................................1
1.1.2 Structural Diagram of C2000‐2 ..........................................................................4
1.1.3 Structural Diagram of C2000‐4 ..........................................................................7
1.2 Parts and Functions............................................................................................ 10
1.2.1 Power Switch Board........................................................................................ 10
1.2.2 Heating Board ................................................................................................. 11
1.2.3 LCD .................................................................................................................. 13
1.2.4 Main Board...................................................................................................... 14
1.2.5 Network Access Board .................................................................................... 15
1.2.6 Test Strip ......................................................................................................... 16
1.2.7 Mixer Motor.................................................................................................... 16
Chapter 2 Troubleshooting.................................................................................. 17
Chapter 3 Commissioning.................................................................................... 19
3.1 Checks to Be Performed Before Commissioning and Maintenance.................. 19
3.1.1 Check whether all parts are installed properly and whether lines are   
intact with good connectivity. ........................................................................ 19
3.1.2 Check whether the pre‐warming hole and test hole are blocked or   
damaged. ........................................................................................................ 19
3.1.3 Check whether the power voltage output is normal...................................... 19
3.2 Circuit Board Installation ................................................................................... 19
3.2.1 Add loads on the power supply to enable discharge before   
the installation. ............................................................................................... 19
3.2.2 Install circuit boards in the specified positions and connect   
the corresponding signal cables. .................................................................... 19
3.3 Self‐Check and Version Check............................................................................ 19
3.4 Temperature Calibration.................................................................................... 20
3.5 Channel Calibration............................................................................................ 21
Chapter 4 Maintenance Diagrams ....................................................................... 22
4.1 System Principle Diagram .................................................................................. 22
4.2 Cable Layout Diagrams ...................................................................................... 23
4.2.1 Cable Layout Diagram of C2000‐1 .................................................................. 23
4.2.2 Cable Layout Diagram of C2000‐2 .................................................................. 24
4.2.3 Cable Layout Diagram of C2000‐4 .................................................................. 25

                                 
Maintenance Manual for C2000 Series Semi-Automatic Coagulation Analyzers

Chapter 1  Structure and Function 

1.1  Structure 
1.1.1  Structural Diagram of C2000‐1 

Pipette

Ball dispenser 
Display

Membrane keypad

Reagent pre‐warming area
Sample 
Top case  pre‐warming 
area 

Test area
Bottom case

Figure 1.1  Front view of C2000‐1 

                                    
Maintenance Manual for C2000 Series Semi-Automatic Coagulation Analyzers

External printer 
connector

Pipette connector 
 

Figure 1.2  Rear view of C2000‐1 

Heating 
board

LCD

Main 
board

Figure 1.3  Internal components in the top case of C2000‐1 

                                    
Maintenance Manual for C2000 Series Semi-Automatic Coagulation Analyzers

Power switch board

Figure 1.4  Internal components in the bottom case of C2000‐1 

                                    
Maintenance Manual for C2000 Series Semi-Automatic Coagulation Analyzers

1.1.2  Structural Diagram of C2000‐2 

Position of the 
ball dispenser 
Built‐in micro printer

Reagent 
pre‐warming area 

Test area 
Sample 
pre‐warming area 

LCD 
Membrane 
keypad 

Top case Bottom case
 

Figure 1.5  Front view of C2000‐2 

                                    
Maintenance Manual for C2000 Series Semi-Automatic Coagulation Analyzers

Figure 1.6  Rear view of C2000‐2 

Pipette connector

Heating board Printer 
drive board 

Mixer motor 
drive board 
Main 

LCD
Top case 

Figure 1.7  Components in the top case of C2000‐2 

                                    
Maintenance Manual for C2000 Series Semi-Automatic Coagulation Analyzers

Network 
access board 

Power 
switch board

Bottom case 

Figure 1.8  Components in the bottom case of C2000‐2 

                                    
Maintenance Manual for C2000 Series Semi-Automatic Coagulation Analyzers

1.1.3  Structural Diagram of C2000‐4 

Position of the 
ball dispenser 
Built‐in micro printer

Position of the pipette
Top case  LCD
Reagent pre‐warming 
position 

Test area 
Pre‐warming area 

Membrane 
keypad

Figure 1.9  Front view of C2000‐4 

                                    
Maintenance Manual for C2000 Series Semi-Automatic Coagulation Analyzers

Figure 1.10  Rear view of C2000‐4 

Mixer motor 
drive board 

Heating  Printer drive board
board (small)

LCD 

Pipette connector 

Heating 
board (large)

Test strip 

Main board 

Top case 

Figure 1.11  Components in the top case of C2000‐4 

                                    
Maintenance Manual for C2000 Series Semi-Automatic Coagulation Analyzers

Power switch board

Figure 1.12  Components in the bottom case of C2000‐4 
 

                                    
Maintenance Manual for C2000 Series Semi-Automatic Coagulation Analyzers

1.2  Parts and Functions 
1.2.1  Power Switch Board 
24 V/12 V power switch board: The 24 V power is supplied to the heating board and main 
board. The 12 V power is supplied to the test head. 

 
Figure 1.13  24 V/12 V power switch board 

                                    
Maintenance Manual for C2000 Series Semi-Automatic Coagulation Analyzers

1.2.2  Heating Board 
The heating board provides precise temperature control to ensure the accuracy of test data. 

 
Figure 1.14  Heating board of C2000‐1 

Figure 1.15  Heating board of C2000‐2 

                                    
Maintenance Manual for C2000 Series Semi-Automatic Coagulation Analyzers

Figure 1.16  Heating board (large) of C2000‐4 

 
Figure 1.17  Heating board (small) of C2000‐4 

                                    
Maintenance Manual for C2000 Series Semi-Automatic Coagulation Analyzers

1.2.3  LCD 

Figure 1.18  LCD of C2000‐2 

Figure 1.19  LCD of C2000‐4 

                                    
Maintenance Manual for C2000 Series Semi-Automatic Coagulation Analyzers

1.2.4  Main Board 
The main board consists of the power supply, CPU, and test parts. 

 
Figure 1.20  Main board of C2000‐1 

 
Figure 1.21  Main board of C2000‐2 
 

                                    
Maintenance Manual for C2000 Series Semi-Automatic Coagulation Analyzers

 
Figure 1.22  Main board of C2000‐4 
 
 
1.2.5  Network Access Board 
The network access board exchanges data between the instrument and the computer. 

 
Figure 1.23  Network access board 
 

                                    
Maintenance Manual for C2000 Series Semi-Automatic Coagulation Analyzers

1.2.6  Test Strip 
The test strip consists of four groups of coils in two pairs, including two groups of drive 
coils and two groups of test coils. 

 
Figure 1.24  Test strip 

1.2.7  Mixer Motor 
C2000‐2 and C2000‐4 provide reagent mixing positions. Figure 1.25 shows the DC motor 
and control board components, which are driven by a 5 V DC power supply. 

 
Figure 1.25  Mixer motor assembly 

                                    
Maintenance Manual for C2000 Series Semi-Automatic Coagulation Analyzers

Chapter 2  Troubleshooting 
Corrective 
No.  Fault  Possible Cause  Check 
Action 
Some of the four  Check the operation procedure  Standardize 
a. Operation problem 
coagulation  according to the instructions.  operations. 

parameters are  Replace the 
b. Reagent problem  Check the reagent quality. 
abnormal.  reagent. 
The test results 
are inconsistent,  Improve the 
Improve the precision of 
2  and precision  Sample loading problem  operation 
sample loading. 
does not meet  proficiency. 
requirements. 
The FIB curve  a. Inaccurate dilution of 
Create a new 
and R value do  calibration plasma  Check whether the R value is less 
3  standard 
not meet  b. Improper operations and  than 0.98. 
curve. 
requirements.  inaccurate sample loading 
a. The room temperature is 
displayed on the instrument, 
The temperature 
indicating no heating.  Check the power supply or  Replace the 
4  display is 
b. The temperature displayed  triode (540).  faulty part. 
abnormal. 
on the instrument is higher 
than 40°C. 
The temperature 
display is normal,  Adjust the 
The temperature coefficient is  Check the temperature according 
5  but the actual  temperature 
not set properly.  to the temperature indicator. 
temperature is  coefficient. 
higher than 37°C.
The membrane keypad 
The keys do not  Replace the 
6  connection is poor or the keys   
respond.  membrane. 
are faulty. 
The pipette does  Check whether the connection 
Rectify the 
7  not respond when  of the pipette is normal and   
open circuits.
you press it.  whether open circuits occur. 
The mixer motor makes a loud  Adjust the 
There is a loud 
noise. The position of the mixer  position of 
8  noise during   
motor magnet support is  the mixing 
reagent mixing. 
incorrect.  rod. 
The power cable is not 
The system does  connected properly, or the fuse 
Check whether the voltage at the  Replace the 
9  not respond after  or rectifier bridge is burned out.
GP point is 5 V.  faulty part. 
power‐on.  The power chip (2596) is 
burned out. 
The measured FIB  Create a new 
The standard curve is 
10  values are too    standard 
abnormal. 
high or too low.  curve. 
No steel ball is  Use the 
a. The cup and steel ball are not  Check whether the "NO BALL" 
11  detected.    original steel 
manufactured by Precil.  prompt is displayed. 
(NO BALL)  ball and cup.
Check whether the amplitude 
b. The amplitude of the steel  becomes smaller as the R15 (10 Ω)  Replace the 
ball is too small or too large.  increases and becomes larger as  resistor. 
the R15 (10 Ω) decreases. 

                                    
Maintenance Manual for C2000 Series Semi-Automatic Coagulation Analyzers

Corrective 
No.  Fault  Possible Cause  Check 
Action 
The null value does not meet 
requirements: 1. short circuit of the 
test strip (the null value is about  Replace the 
400 or 500); 2. open circuit of the  test strip or 
test strip (the null value is 0);    capacitor. 
3. breakdown or capacity decrease 
of the 12 V filter capacitor (C5). 
The plasma calibration is incorrect. 
Test the 
The calibration value is more than or 
capacitance 
less than 20 times of the null value. 
of the 
c. Calibration problem  Check the capacitors corresponding 
channels by 
to channels 1, 2, 3, and 4. Channels 
using a 
1, 2, 4, and 5 correspond to 
capacitance 
capacitors C52/C53, C54/C55, 
meter and 
C56/C57, and C58/C59 respectively. 
replace the 
If the calibration value is more than 
capacitors 
20 times of the null value, use 
based on the 
capacitors with a smaller capacity. If 
plasma 
the calibration value is less than 20 
calibration 
times of the null value, use 
value. 
capacitors with a larger capacity. 
Check the resistance of the test 
The plasma 
strip (50 Ω for two groups of coils,  Replace the 
solidifies, and the  a. The test strip is faulty. 
and 180 Ω for another two groups  faulty part. 
12  ball stops moving, 
of coils). 
but the counting 
Check the 8th pin of U10  Replace the 
continues.  b. No –5 V voltage is available.
(7660 chip).  faulty part. 

                                    
Maintenance Manual for C2000 Series Semi-Automatic Coagulation Analyzers

Chapter 3  Commissioning 
This chapter describes the methods for commissioning the instrument, including the 
pre‐commissioning checks, circuit board installation, dual needle installation, pipeline connection, 
dual needle and mechanical gripper coordinates, magnetic ball channel calibration, luminous flux 
values, and other system parameters. 
Maintenance engineers must learn the following precautions before commissioning: 
(1) Disconnect the power supply before replacing a component or inserting/removing 
a conductor. 
(2) Do not pull or twist the cable when removing a plug. 
(3) Prepare a multimeter and other common tools. 

3.1  Checks to Be Performed Before Commissioning and Maintenance 
3.1.1  Check whether all parts are installed properly and whether lines are intact with good 
connectivity. 
3.1.2  Check whether the pre‐warming hole and test hole are blocked or damaged. 
3.1.3  Check whether the power voltage output is normal. 

3.2  Circuit Board Installation 
3.2.1  Add loads on the power supply to enable discharge before the installation. 
3.2.2  Install circuit boards in the specified positions and connect the corresponding signal 
cables. 

3.3  Self‐Check and Version Check 
Power on the instrument. The self‐check menu is displayed on the instrument, as shown in 
Figure 3.1. Check whether the version is the latest. 
Four‐channel coagulation analyzer V x.x 
Beijing Precil Instrument Co., Ltd. 
Precil 
TEL: (010) 62987758 

Figure 3.1  Start menu of C2000‐4 
 
Menu Description: 
Precil:  English name of the manufacturer 
TEL:  after‐sales service telephone of the manufacturer 
V x.x:  version of the instrument 
 
Main menu: After the start menu is displayed, the instrument automatically enters the main 
menu, as shown in Figure 3.2. 
‐ Precil    C2000 ‐        T=x.xx     
 
Test      Calibration      Parameter      System 

Figure 3.2  Main menu of C2000‐4 

                                    
Maintenance Manual for C2000 Series Semi-Automatic Coagulation Analyzers

3.4  Temperature Calibration 
The instrument temperature is detected and controlled by the built‐in temperature sensor 
and may be inaccurate. Therefore, it must be calibrated by using a standard thermometer certified 
by the national metrology department. 
(1) After the instrument starts, wait until the temperature displayed on the instrument reaches 
37°C. Add 150 µl distilled water to a test cup, place the test cup into any pre‐warming hole, 
insert a standard thermometer certified by the national metrology department into the test 
cup, wait 3 to 5 minutes, and read the temperature on the standard thermometer. 
(2) Temperature Calibration Setup 
On the main menu, move the cursor by using the left and right arrow keys. Select System and 
press OK. The system menu is displayed, as shown in Figure 3.3. 
 
System Parameter      T=x.xx 
Printer=xxx      Buzzer=xxx      Mixer=xx 
Temperature Coefficient 1=x.xxx    Temperature Coefficient 2=x.xxx 
xxxx    xx‐xx    xx:xx:xx 

Figure 3.3  System menu of C2000‐4 
 
Menu Description: 
Printer=xxx: Four options are available for this parameter. 
=On1: instant print; =Ons: batch print; =Prt: to start batch print; =Off: to stop print. 
Buzzer=xxx: Three options are available for this parameter. 
=All: to enable the buzzer during sample loading and pre‐warming; =Tst: to 
enable the buzzer only during sample loading; =Off: to disable the buzzer. 
Mixer=xxx: Two options are available for this parameter. 
=On: to enable the mixer switch; =Off: to disable the mixer switch. 
Temperature Coefficient 1 and Temperature Coefficient 2: Temperature coefficients of 
the test area and the reagent pre‐warming area. 
Temperature Coefficient 1: Temperature coefficient of the test area; Temperature 
Coefficient 2: temperature coefficient of the reagent pre‐warming area. 
xxxx    xx‐xx    xx:xx:xx: Current time in the format yyyy    mm‐dd    hh:mm:ss. You can set 
the time as required. 
T=xx.x: Current temperature displayed on the instrument. 
① You can set the printer, buzzer, and time as required. 
② Temperature coefficient: The instrument displays the temperature of the test area. 
The  temperature  is  commissioned  at  room  temperature  before  delivery.  However, 
the  temperature  sensor  is  highly  sensitive  to  the  ambient  temperature.  If  the 
deviation of the instrument temperature exceeds ±0.5°C during installation, you can 
adjust  the  temperature  coefficient.  Adjustment  method:  Move  the  cursor  to 
Temperature Coefficient and press OK. Adjust the temperature coefficient by using 
the  left  and  right  arrow  keys,  press  OK,  and  exit  the  menu.  The  setting  is  saved. 
Adjustment  rule:  The  temperature  displayed  on  the  instrument  changes  by  0.4°C 
when  the  temperature  coefficient  changes  by  0.01.  Example:  The  temperature 
coefficient is 1.000, the actual temperature is 36.4°C, and the temperature displayed 
on the instrument is 37.0°C. In this case, you can adjust the temperature coefficient 
to  0.990.  The  temperature  coefficient  of  the  test  head  is  set  by  the  manufacturer 
before  delivery.  If  the  temperature  accuracy  meets  the  requirement,  do  not  modify 
the temperature coefficient. 

                                    
Maintenance Manual for C2000 Series Semi-Automatic Coagulation Analyzers

3.5  Channel Calibration 

(1) Null test: Set the test channel to null and temperature to 37°C. Enter the system menu, set 
the year to 88, and save the setting. Enter the test menu, select any test item, and enable the 
test item for all test channels. The instrument counts and obtains the calibration data, which 
should be less than 50. 

(2) Media test: Add 150 µl PVP (or plasma in a hospital) to a test cup with a steel ball, pre‐warm it 
for 3 minutes, place it in a test channel, observe the movement of the steel ball, and enable 
tests for all test channels. The instrument counts and obtains the calibration data, which 
ranges from 100 to 1023 and is equal to or greater than 10 times the corresponding null data. 

When the values in the null test and media test meet requirements, enter the system menu 
and set the system time to the current time. The calibration is completed. 
 

                                    
Maintenance Manual for C2000 Series Semi-Automatic Coagulation Analyzers

Chapter 4  Maintenance Diagrams 
4.1  System Principle Diagram 
The following figure shows the system principle diagram of C2000‐4. The number of channels 
on C2000‐1 and C2000‐2 is different from that on C2000‐4. 
 
 

 
 
 

                                    
Maintenance Manual for C2000 Series Semi-Automatic Coagulation Analyzers

4.2  Cable Layout Diagrams 
4.2.1  Cable Layout Diagram of C2000‐1 

board 
Heating 

Pipette base 

connector 

Keypad 
Printer 

LCD 
Power switch board

Main board 

Cable layout diagram of 
Fuse

April 14, 2010 
C2000‐1 
resistor 
Voltage‐dependent 

                                    
 
Cable layout diagram of 
Maintenance Manual for C2000 Series Semi-Automatic Coagulation Analyzers

Pipette base 
Keypad  C2000‐2 
April 14, 2010 
Mixer motor 
Network  board
access board 
Printer board 
(small) 
Fuse
LCD 
Main board 
Main printer 
board
Cable Layout Diagram of C2000‐2 

                                    
Voltage‐dependent 
Heating 
resistor 
board 
Printer 
connector
Power switch board
4.2.2 

 
 
Maintenance Manual for C2000 Series Semi-Automatic Coagulation Analyzers

Keypad  Pipette base 
Cable layout diagram of 
C2000‐4 
April 14, 2010 
Mixer motor 
Network  board
access board 
Printer board 
(small) 
Fuse
LCD  Main board 
Main printer 
board
Cable Layout Diagram of C2000‐4 

                                    
Heating 
Voltage‐dependent 
board (large)  resistor 
Printer 
connector
Power switch board
Heating board 
4.2.3
(small) 

You might also like