The document is a correspondence between a lead bidder and Torkham CMC regarding clarifications on technical drawings. It includes 7 requests for clarification from Torkham CMC on details in structure drawings and the lead bidder's responses providing explanations and clarifying the drawings. The lead bidder confirms details in some places and asks for civil structure engineering assistance in other cases where site dynamics require specialized solutions.
The document is a correspondence between a lead bidder and Torkham CMC regarding clarifications on technical drawings. It includes 7 requests for clarification from Torkham CMC on details in structure drawings and the lead bidder's responses providing explanations and clarifying the drawings. The lead bidder confirms details in some places and asks for civil structure engineering assistance in other cases where site dynamics require specialized solutions.
The document is a correspondence between a lead bidder and Torkham CMC regarding clarifications on technical drawings. It includes 7 requests for clarification from Torkham CMC on details in structure drawings and the lead bidder's responses providing explanations and clarifying the drawings. The lead bidder confirms details in some places and asks for civil structure engineering assistance in other cases where site dynamics require specialized solutions.
The document is a correspondence between a lead bidder and Torkham CMC regarding clarifications on technical drawings. It includes 7 requests for clarification from Torkham CMC on details in structure drawings and the lead bidder's responses providing explanations and clarifying the drawings. The lead bidder confirms details in some places and asks for civil structure engineering assistance in other cases where site dynamics require specialized solutions.
No Drawing No Drawing Title Sec New Comments from Torkham CMC Response from Lead Bidder Drawing Reference
Refer to Project manager's email shared with you on 6th
October 2021, we believe that this issue was address. We In the structure drawings of the gantry scanner the have confirmed the manhole section as 600mm L x 600mm proposed trench size is 800mm wide while in the manhole Width x 600mm Depth. Further conduit size is 200mm dia section you have mentioned that manhole sizes are and 100 mm dia which is also mentioned in the diagram. 600mm from each side. (GS-IMP/EXP-D3). Recommended depth of trench below FF should be 250mm.
Although the detail of each drawing along with drawing
Needs to add drawings register in merged pdf file. number are given in the main drawing legend, however we will submit a register of drawings for reference.
Please understand that we are equipment provider and our
OEM has standard policy for intimating its requirement. OEM has stamped the drawing stating that each drawing should be vetted by structure engineer as well therefore if any change is require due to structure or civil work You have routed conduits through columns. You need to assistance, please provide us the solution and we will vet it use an alternative route, if there are no special rather than asking assistance in civil work which is not in our requirements. If it is your requirement then please provide scope. the details. (GS-IMP/EXP-D3). We have already provided detail of equipments which will be installed at designated places further if you need clarity please read Technical Document of Smiths and Building Infrastructure Design documents submitted in the approved technical submittal of BOQ 01 respectively.
Some of the poles are outside the walls. Do we need any
base for poles to cater the air pressure if so kindly its We have already maked the equipment on designated foundation (RCC/PCC) details need to be incorporated in areas. Please ask your civil strucutre engineer to provide drawings. A section needs to be added in drawings specilized solution incase if require as per site dynamics. describing how you will enter your conduits from depth into the base/foundation of the pole.(GS-IMP/EXP-D3).
1: For the complete building earthing and lightning arrestors
to be executed by electrical contractor. Some of the earthing cable routes are not clear. From ECP to equipment. (GS-IMP/EXP-D3). Please clarify. 2: For Smiths equipment electrical contractor will provide an earthing point in the server room at DB placement point which is already marked in the drawing.
Civil scope is to provide the exact conduit in trench where
For cameras you have mentioned that it will be mounted they are marked, nothing more or nothing less you have to 2 GS-IMP/EXP-D3 on the pole, is there any height, thickness, provide in this. We believe the whole finish floor is CONDUITS PLACEMENT foundation details or base plates requirements of these concreted and does contain iron bars for strenght in that poles. Do we need to embed its foundation in therefore no special foundation required, baseplates will be concrete?. (GS-IMP/EXP-D3) provided by Smiths Detection and Smiths Detection will mount these plates on floor
You are requested to include legend in drawing with the
exact symbol used in drawings, in most of your drawings Noted. A separate drawing of legend and symbols will be you have added a table with name legend details but no submit to you in this regard. symbols are used against these names. (GS-IMP/EXP-D3). Please review the drawing again, section details are For section AA and section BB you have not mentioned the mentioned in drawing. AA is marked in the conduit going depth and width; only conduit requirements are from gantry building to operator room whereas section BB mentioned without any specifications. (GS-IMP/EXP-D3). is marked in conduit trench in gantry building
Provide height at which you need an opening in the
wall better is to add a section with cable entry inside the Please provide the crossing at floor level. building. (GS-IMP/EXP-D3).
For genset cable it is requested to provide the depth of
cable crossings and at which depth you need an opening in Please provide the crossing at floor level. situ wall of the operator room. (GS-IMP/EXP-D3).
Please use the name of room as designated for clear
In operator room cables are entering from power room to understanding. It is electrical room. operator room please provide the details at which height you need to cross these cables. Please provide the crossing at floor level
Operator training room is not in our scope. There is no
In the operator training room no cable requirements are equipment going to be install or place in operator training mentioned. (GS-IMP/EXP-D10). room by Smiths Detection.
Reference details are added inside the operator room and
need to provide the exact info as per the BCP Already provided. Please review the drawing again. requirements and placements. (GS-IMP/EXP-D10).