Mnhs Be Narrative 2021
Mnhs Be Narrative 2021
Narrative Report
INTRODUCTION
Attendance of
Stakeholders
APPENDIX B
Community Recorida,
Posting of Flyers &
Giving of Leaflets
APPENDIX C
School Clean-Up
Drive participated
with the Teachers &
Stakeholders
APPENDIX D
CONSTRUCTION OF MNHS
SIGNAGE, INSTALLATION OF
STAIRWAY RAILINGS, ROOFING OF
HANDWASHING AREA &
RE-PAINTING
CONSTRUCTION OF THE SCHOOL SIGNAGE
“I<3 MALAGANA NHS”
INSTALLATION OF STAIRWAY RAILINGS
ROOFING & REPAIR OF HAND WASHING
AREA
LIST OF MATERIALS USED IN CONSTRUCTING
MNHS SIGNAGE, RAILINGS OF STAIRWAYS,
ROOFING & REPAIR OF HANDWASHING AREA &
RE-PAINTING
QTY./UNIT ITEMS
20 BAG/S CEMENT
4 LOAD/S
33 MTRS. G.I. PIPE
10 KLS. TIE WIRE
5 SHEET/S ROOF (12 FT.)
1 BOX WELDING ROD
1 PC. CUTTING DISK
LABOR:
12,000.00 1 PC. GRINDING DISK
(Advance Payment) 5 GAL. PAINT
5 CAN/S PAINT (TINTING COLORS)
6 PCS. FAUCET
2 ROLL/S TIPLON
1 KL. CONCRETE NAILS #2
¼ KL. CONCRETE NAILS #3
5 PCS. PLYWOODS
5 PCS. PAINT BRUSH
5 BTLS. THINNER
2 BDLS. 1X2X8 GEMELINA CUTS
APPENDIX E
Receiving
of
Donations
DONOR:
DELMONTE PHILIPPINES
CASH DONATIONS:
STAKEHOLDERS
TOTAL
ACCUMULATED
CASH DONATIONS:
55,000 Php