MOH Drivers: Connecting It To The Number of Units Produced

You might also like

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 9

Direct Materials Units BDT/unit Total Comment

Laminated Super Board 2.5 1500 3750


- Canadian oak/garjan 2.5 3200 0
Polish(canadian oak) 1 6000 0
- Lacor polish(premium) 1 8000 0
Chinese Mirror 10.8 80 864 Mirror size is Length-3ft,Width-3ft 6inch. Total Sq fee
3 watt bulbs 15 75 1125
Drawer channel/sliders 10 125 1250 5 drawers: 5 pairs each BDT 250
Drawer Knobs- silver 5 45 225
- Drawer Knobs- crystal 5 120 0
3mm plywood-PVC board 1 1500 1500 PVC white & waterproof. Length-8ft, Width 4ft. Some
Electric workbox 1 1500 1500
Srews & nails 32 0.5 16
10230

Direct Labor Units BDT/unit Total Comment


Workers 12 40 480 Daily 15 hrs work & paid BDT 600 per day

Example Connecting it to the number of units


MOH Drivers per unit cost units Total
Rent expense-facility per square feet 20.833333333 2400 50000
Storage cost- warehouse no of units/Per sq feet 28.571428571 1400 40000
Utility Expenses ??
Wires-coils no of units
Inspection & Processing no of inspection/no of units/inspec hrs

Supervison direct labour hrs


Order costs no of orders
Maintainence of equip machine hours
Dep machine hours
Polish materials no of units
Equipments machine hours
Circular Saw
Jigsaw
Sander
Hammers,Mallet
Extra nails & screws
Saw
Drill
Tape 2
MISC pencil/markers 5
MISC
Glue no of units 40 10 400
Width-3ft 6inch. Total Sq feet 10.8

Length-8ft, Width 4ft. Some are wasted in cutting process.

40

BDT 600 per day

ng it to the number of units produced


Depatments
Support driver Support
Admin salary DL hrs HR dept
R&D and Design cost allocated basis FIXED IT dept
Dep-office equip admin hrs R&D dept
Office Supplies admin hrs
Website maintainenno of orders
Website hositing fixed
Internet fixed
Selling
Mkt % of rev
Distribution no of units sold
Survey % of mkt cost
customer support working hrs
Dep-vans miles driven
Depatments
Ops
no of employees/hrs Production Dept
processing time Sales Dept
no of hrs Procurement Dept
Capex Machines

Equipments (cost per piece)


Circular Saw 3,300৳
Jigsaw 900৳
Cordless Drills 1,600৳
Stud funder 600৳
Sanders 2,400৳

Furniture
Work stations 10,000৳
Tables 3,000৳
Chairs 1,000৳
Vans
Truck 26 lakhs

Taxes?