Best Practices in Operation and Maintenance of SPV plant-RECIPMT-by-Ramchander (17-09-2021) PDF
Best Practices in Operation and Maintenance of SPV plant-RECIPMT-by-Ramchander (17-09-2021) PDF
PLANTS
REC
IPM
T
Session:
Best practices in
operation and
maintenance of solar
power plants with a case-
study
Presented by
Ramchander Nirudi
Master Trainer RECIPMT 1
Session title
Best practices in operation and maintenance of solar
power plants with a case-study
RAMCHANDER NIRUDI
Consultant (Solar & EV Projects),
Associate Professor, EEED-BVRIT,
& Guest Faculty at RECIPMT,ESCI, CPTI , CTI , CBIP
Session title
“Our development of Photovoltaic's is something that I feel is a mission, not
just technical or scientific research. I believe it is the only energy source
that can save mankind in the 21st century”
Dr. Yoshihiro Hamakawa , Osaka University
Session title
Solar Photovoltaic Electricity Generation
Session title
Typical Grid-Connected Rooftop Solar PV System 4
Why Maintenance is important for your Solar power plant?
Session title
Top Solar Data Analytics Companies Of 2020 In India
• GreenPowerMonitor:
• AlsoEnergy, Inc.:
• Mahindra TEQO:
• Apollo Energy Analytics:
• TrackSo:
• EnerMAN:
• AirProbe:
• Solargis:
• PV Diagnostics:
Session title
Job
Opportunities
Session title
Major Elements of Photovoltaic Operations and Maintenance
Session title
In-House versus Outsource PV O&M
Session title
Solar PV Plant Maintenance Cost Breakdown
Session title
PV System Failure Areas and Relative Frequencies
Session title
PV Monitoring Options across the PV System
Session title
Operation , Maintenance & Trouble shooting of Solar Plants
No moving parts in the Solar PV project, thus the maintenance cost is less
compared to other renewable projects.
Crimping of Cables on DC side.
Check for any shading due to any object or dust on the modules by visual
inspection.
Checking the module for hotspots with infrared camera’s.
Laying of Cables: Check visually and by Meggar for any faults before laying.
Faults in Jointing Kits.
Session title
Operation , Maintenance & Trouble shooting of Solar Plants
Session title
Cleaning & Physical Inspection
21-Sep-21
Session title 15
Session title
21-Sep-21
Session title 17
21-Sep-21
Session title 18
Auto cleaning of solar PV modules
Session title
21-Sep-21
Session title 20
Solar PV Performance testing equipment
Day star
I-V Curve Tracer
21-Sep-21
Session title 21
21-Sep-21
Session title 22
Session title 23
21-Sep-21
Session title 24
21-Sep-21
Session title 25
21-Sep-21
Session title 26
21-Sep-21
Session title 27
Session title
Performance Analysis of Solar Power Plants
and Case Study of 100kWp SPV Plant
Session title
100kWp Solar PV Power Plant @ BVRIT
21-Sep-21
Session title 30
System Specifications
PV Modules Specifications
(SIRIUS Solar Energy Pvt Ltd)
PV Modules : SIRIUS Solar 250Wp (400 no’s)
Earthing : 7 no’s
21-Sep-21
Session title 31
System Configuration
21-Sep-21
Session title 32
Inverter Specifications
21-Sep-21
Session title 33
Performance Analysis
Session title
Performance Analysis
Session title
Performance Analysis
Session title
Monthly wise PR comparison
Session title
Inverter wise energy comparison
21-Sep-21
Session title 38
Power Generation Profile on 26th Feb14
(590 kWh generated)
21-Sep-21
Session title 39
Irradiance (POA) W/m2
Session title
1000
1200
0
200
400
600
800
21-Sep-21
6:45AM
Feb 26 2014 6:56AM
Feb 26 2014 7:07AM
Feb 26 2014 7:18AM
Feb 26 2014 7:29AM
Feb 26 2014 7:40AM
Feb 26 2014 7:51AM
Feb 26 2014 8:02AM
Feb 26 2014 8:13AM
Feb 26 2014 8:24AM
Feb 26 2014 8:35AM
Feb 26 2014 8:46AM
Feb 26 2014 8:57AM
Feb 26 2014 9:08AM
Feb 26 2014 9:19AM
Feb 26 2014 9:30AM
Feb 26 2014 9:41AM
Feb 26 2014 9:52AM
Feb 26 2014 10:03AM
Feb 26 2014 10:14AM
Feb 26 2014 10:25AM
Feb 26 2014 10:36AM
Feb 26 2014 10:47AM
Feb 26 2014 10:58AM
PSH =5.85
Feb 26 2014 11:09AM
Feb 26 2014 11:20AM
Feb 26 2014 11:31AM
Feb 26 2014 11:42AM
Feb 26 2014 11:53AM
Feb 26 2014 12:04PM
Feb 26 2014 12:15PM
21-Sep-21
Session title 41
Voltage and Current profile on 25th Feb14
21-Sep-21
Session title 42
Performance Ratio
1
0.8
0.6
PR
0.4
0.2
0
Jan Feb Mar Apr May Jun July Aug Sep Oct Nov Dec
Hyderabad 0.9 0.88 0.72 0.73 0.73 0.68 0.9 0.8 0.8 0.9 0.84 0.92
Bhimavaram 0.87 0.82 0.7 0.7 0.72 0.82 0.84 0.84 0.83 0.87 0.71 0.8
2
Calculated nominal yeild GHI (in kWh/m )
actual energy generated under field conditions
Performance ratio
Rated module efficiency energy estimated without temperature losses
2
Total PV area (in m )
21-Sep-21
Session title 43
25 Capacity Utilization Factor
20
15
CUF %
10
0
Jan Feb Mar Apr May Jun July Aug Sep Oct Nov Dec
Hyderabad 18.97 21.24 19.09 19.74 19.09 13.72 15.94 13.95 15.11 17.31 16.93 18.18
Bhimavaram 17.25 18.73 18.03 18.67 18.03 16 14.39 14.71 15.16 15.55 13.25 14.83
Annual yield
CUF= 100
100kW×24h×365days
21-Sep-21
Session title 44
280MW Solar Plants-Auditing
Technical due diligence of seven(7) sites in Telangana
Session title
Sol-Bright Technology, Beijing, China, visit in March 2017
Session title
EV’s Manufacturing Industries visit in China, December 2018
Session title
Challenge Areas related to Solar Photovoltaic's Power Generation
Systems
Ramchander Nirudi
Consultant & Associate Professor
Ramchander.nirudi@gmail.com
+91-9247798832
Session title 50