CONCEPT TO COMMISSIONING OF SOLAR PV POWER

PLANTS

REC
IPM
T
Session:
Best practices in
operation and
maintenance of solar
power plants with a case-
study
Presented by
Ramchander Nirudi
Master Trainer RECIPMT 1
Session title
Best practices in operation and maintenance of solar
power plants with a case-study

RAMCHANDER NIRUDI
Consultant (Solar & EV Projects),
Associate Professor, EEED-BVRIT,
& Guest Faculty at RECIPMT,ESCI, CPTI , CTI , CBIP

Session title
“Our development of Photovoltaic's is something that I feel is a mission, not
just technical or scientific research. I believe it is the only energy source
that can save mankind in the 21st century”
Dr. Yoshihiro Hamakawa , Osaka University

Session title
Solar Photovoltaic Electricity Generation

Session title
Typical Grid-Connected Rooftop Solar PV System 4
Why Maintenance is important for your Solar power plant?

• The number of on-grid / off-grid solar photovoltaic (PV) systems is


expected to increase dramatically over the coming years.
• O&M annual contracts are typically about Rs. 5-6 Lakhs/MW without
trackers and 7-8 Lakhs/MW with trackers, usually escalating annually
at 5%.
• solar plants to perform with maximum possible efficiency and
reliability.
• improving the performance of the plant.
• Types of Maintenance
• Preventive Maintenance :
• Corrective Maintenance:
• Condition-Based Monitoring:

Session title
Top Solar Data Analytics Companies Of 2020 In India

• GreenPowerMonitor:
• AlsoEnergy, Inc.:
• Mahindra TEQO:
• Apollo Energy Analytics:
• TrackSo:
• EnerMAN:
• AirProbe:
• Solargis:
• PV Diagnostics:

Session title
Job
Opportunities

Session title
Major Elements of Photovoltaic Operations and Maintenance

Session title
In-House versus Outsource PV O&M

Session title
Solar PV Plant Maintenance Cost Breakdown

Session title
PV System Failure Areas and Relative Frequencies

Session title
PV Monitoring Options across the PV System

Session title
Operation , Maintenance & Trouble shooting of Solar Plants

 No moving parts in the Solar PV project, thus the maintenance cost is less
compared to other renewable projects.
 Crimping of Cables on DC side.
 Check for any shading due to any object or dust on the modules by visual
inspection.
 Checking the module for hotspots with infrared camera’s.
 Laying of Cables: Check visually and by Meggar for any faults before laying.
 Faults in Jointing Kits.

Session title
Operation , Maintenance & Trouble shooting of Solar Plants

 Checking of string voltage and string current regularly.


 Current checking with respect to current irradiance level.
 Checking input DC power and out put AC power of Inverter.
 Cleaning of Inverters & Fan filters.
 Check for inverter data using inverter software.
 Check for battery charger & battery bank condition(in case stand alone PV System)
 Working out a maintenance schedule and follow the same & keep all records.

Session title
Cleaning & Physical Inspection

• Regular cleaning of the modules


• Online monitoring through mobile
App/SCADA
• Physical inspection at regular intervals

21-Sep-21
Session title 15
Session title
21-Sep-21
Session title 17
21-Sep-21
Session title 18
Auto cleaning of solar PV modules

Session title
21-Sep-21
Session title 20
Solar PV Performance testing equipment

Thermal Imager (Testo-868)

Day star
I-V Curve Tracer

21-Sep-21
Session title 21
21-Sep-21
Session title 22
Session title 23
21-Sep-21
Session title 24
21-Sep-21
Session title 25
21-Sep-21
Session title 26
21-Sep-21
Session title 27
Session title
Performance Analysis of Solar Power Plants
and Case Study of 100kWp SPV Plant

Session title
100kWp Solar PV Power Plant @ BVRIT

Total Project Cost : 130 Lakhs


Subsidy(MNRE) : 39 Lakhs

21-Sep-21
Session title 30
System Specifications
PV Modules Specifications
(SIRIUS Solar Energy Pvt Ltd)
 PV Modules : SIRIUS Solar 250Wp (400 no’s)

Cell Technology : Poly-crystelline (microsol)

Mounting : Fixed Tilt(170 South facing)

Inverters : REFUSol 20kW (5 no’s)

 Number of Arrays : 20 (each 5kW, 20 modules in series)

Number of Strings : 5 (each 20 kW, 4-arrays in parallel)

Array Junction Box : 5 no’s (IP65 protection with MOV’s)

Lightning Arresters : 2 no’s

Earthing : 7 no’s

LT Panel : 1 no’s

21-Sep-21
Session title 31
System Configuration

21-Sep-21
Session title 32
Inverter Specifications

21-Sep-21
Session title 33
Performance Analysis

• The parameters considered in this study are actual performance ratio,


capacity utilization factor:

Session title
Performance Analysis

Session title
Performance Analysis

Session title
Monthly wise PR comparison

Session title
Inverter wise energy comparison

21-Sep-21
Session title 38
Power Generation Profile on 26th Feb14
(590 kWh generated)

21-Sep-21
Session title 39
Irradiance (POA) W/m2

Session title
1000
1200

0
200
400
600
800

21-Sep-21
6:45AM
Feb 26 2014 6:56AM
Feb 26 2014 7:07AM
Feb 26 2014 7:18AM
Feb 26 2014 7:29AM
Feb 26 2014 7:40AM
Feb 26 2014 7:51AM
Feb 26 2014 8:02AM
Feb 26 2014 8:13AM
Feb 26 2014 8:24AM
Feb 26 2014 8:35AM
Feb 26 2014 8:46AM
Feb 26 2014 8:57AM
Feb 26 2014 9:08AM
Feb 26 2014 9:19AM
Feb 26 2014 9:30AM
Feb 26 2014 9:41AM
Feb 26 2014 9:52AM
Feb 26 2014 10:03AM
Feb 26 2014 10:14AM
Feb 26 2014 10:25AM
Feb 26 2014 10:36AM
Feb 26 2014 10:47AM
Feb 26 2014 10:58AM

PSH =5.85
Feb 26 2014 11:09AM
Feb 26 2014 11:20AM
Feb 26 2014 11:31AM
Feb 26 2014 11:42AM
Feb 26 2014 11:53AM
Feb 26 2014 12:04PM
Feb 26 2014 12:15PM

Consider 25% loss


Measured PSH=7.8
Feb 26 2014 12:26PM
Feb 26 2014 12:37PM
Feb 26 2014 12:48PM
Feb 26 2014 12:59PM
Feb 26 2014 1:10PM
Feb 26 2014 1:21PM
Feb 26 2014 1:32PM
Feb 26 2014 1:43PM
Feb 26 2014 1:54PM
Feb 26 2014 2:05PM
Feb 26 2014 2:16PM
Feb 26 2014 2:27PM
Feb 26 2014 2:38PM
Feb 26 2014 2:49PM
Feb 26 2014 3:00PM
Feb 26 2014 3:11PM
Feb 26 2014 3:22PM
Feb 26 2014 3:33PM
Feb 26 2014 3:44PM
Feb 26 2014 3:55PM
Feb 26 2014 4:06PM
Feb 26 2014 4:17PM
Feb 26 2014 4:28PM
Feb 26 2014 4:39PM
Feb 26 2014 4:50PM
Feb 26 2014 5:01PM
Feb 26 2014 5:12PM
Feb 26 2014 5:23PM
Feb 26 2014 5:34PM
Feb 26 2014 5:45PM
Feb 26 2014 5:56PM
Feb 26 2014 6:07PM
40
Power Generation profile on 16th Feb14
(508 kWh generated)

21-Sep-21
Session title 41
Voltage and Current profile on 25th Feb14

21-Sep-21
Session title 42
Performance Ratio
1

0.8

0.6
PR

0.4

0.2

0
Jan Feb Mar Apr May Jun July Aug Sep Oct Nov Dec
Hyderabad 0.9 0.88 0.72 0.73 0.73 0.68 0.9 0.8 0.8 0.9 0.84 0.92
Bhimavaram 0.87 0.82 0.7 0.7 0.72 0.82 0.84 0.84 0.83 0.87 0.71 0.8

2
Calculated nominal yeild  GHI (in kWh/m )
actual energy generated under field conditions
Performance ratio 
Rated module efficiency energy estimated without temperature losses
2
Total PV area (in m )
21-Sep-21
Session title 43
25 Capacity Utilization Factor

20

15
CUF %

10

0
Jan Feb Mar Apr May Jun July Aug Sep Oct Nov Dec
Hyderabad 18.97 21.24 19.09 19.74 19.09 13.72 15.94 13.95 15.11 17.31 16.93 18.18
Bhimavaram 17.25 18.73 18.03 18.67 18.03 16 14.39 14.71 15.16 15.55 13.25 14.83

Annual yield
CUF=  100
100kW×24h×365days
21-Sep-21
Session title 44
280MW Solar Plants-Auditing
Technical due diligence of seven(7) sites in Telangana

Session title
Sol-Bright Technology, Beijing, China, visit in March 2017
Session title
EV’s Manufacturing Industries visit in China, December 2018
Session title
Challenge Areas related to Solar Photovoltaic's Power Generation
Systems

• Design and Development of low cost, low power, high-efficient Inverters.


• Performance Analysis of PV Power Plants and Different PV Technologies.
• Design and Development of Charge Controllers.
• Power Quality Issues on Integration of PV Plants.
• Harmonic Analysis of solar inverters.
• Design and development of Data Acquisition Systems.
• Solar VFD’s for water pumping Application.
• Modeling and simulation of solar PV systems (PVSyst, PVsol, Solar Pro,
PV Professional, PV Planer, String Design Tool)
• Smart Integration of future Grid-Connected Systems.
• PV Performance Reliability and Safety.
• Analyzing micro-cracks on PV modules(snail trails)
• Designing of low cost/low power tracking methods.
21-Sep-21
Session title 48
Session title 49
Thank-You

Ramchander Nirudi
Consultant & Associate Professor
Ramchander.nirudi@gmail.com
+91-9247798832
Session title 50