PT HASNUR RIUNG SINERGI

DAILY BROKEN INVENTORY JOB SITE PT BRE


PRODUCTION DEPARTEMENT
( DRILL & BLAST )
Hari / Tanggal Release : Wednesday, November 3, 2021

Range Code Number Layar 1


Layar 2 NOTE: HARAP TINGGI FRONT DISESUAIKAN DENGAN KEDALAMAN INVENTORY BLASTING
Progres loading layer terakhir AGAR RECOVERY DAPAT TERLOADING MAKSIMAL

BLASTING GEOMETRI EVALUATION


Blasting Blasting Blasting
No. Of No. Of Dept Depth Actual Volume Elevasi REMAKS
Date Location Burden Spacing Area survey Inventory Recovery Removal
Blast Block Holes Actual Sub Drill 0.3 By Survey Awal BOB Act Cut
meter meter Hole Meter Meter sq meter BCM M M M M BCM % BCM
482 27-Sep-20 Seam OL 16-17 8.00 9.00 16 7.3 6.950 1,162.87 8,081.95 -93.012 -99.96 -97.00 2.96 3444.06 57% 4638 air
541 25-Oct-20 Seam OL 7.00 8.00 35 7.5 7.174 1,930.27 13,906.85 -110.726 -117.90 -114.43 3.47 6726.68 52% 7180 air
553 28-Oct-20 Seam OL 8.00 9.00 30 6.7 6.430 2,219.51 14,419.50 -95.050 -101.48 -98.00 3.48 7804.25 46% 6615 air
555 29-Oct-20 Seam OL 8.00 9.00 34 6.7 6.444 2,531.23 16,424.35 -101.178 -107.62 -104.19 3.43 8748.39 47% 7676 air
0.00
322 17-May-21 Seam O 23 7.00 7.00 27 5.7 5.356 1,130.06 6,140.27 -3.140 -8.50 -5.80 2.70 3090.22 50% 3050 diluar design
341 25-May-21 Seam V1 24-25 7.00 7.00 40 4.0 3.698 1,892.35 6,989.36 35.730 32.03 34.22 2.18 4125.56 41% 2864 diluar design
372 8-Jun-21 Seam UuU 18-19 7.00 7.00 22 5.3 5.009 1,056.27 5,290.95 -1.582 -6.59 -4.45 2.14 2261.38 57% 3030
391 16-Jun-21 Seam F 18-19 8.00 9.00 10 6.8 6.530 744.58 4,862.11 -47.254 -53.78 -52.00 1.78 1328.48 73% 3534
-0.300
446 10-Jul-21 Seam Ru 26 7.00 7.00 29 6.5 6.152 1,416.14 8,324.67 28.624 22.47 24.63 2.16 2924.16 65% 5401 diluar design
447 11-Jul-21 Seam R 25-26 7.00 7.00 42 6.7 6.412 1,796.88 11,520.93 29.358 22.95 26.00 3.05 5486.48 52% 6034 diluar design
478 28-Jul-21 Seam P 17-19 7.00 7.00 88 6.2 5.919 4,224.57 25,151.67 -40.877 -46.80 -43.60 3.20 13581.51 46% 11570 jalan
479 29-Jul-21 Seam L 16 8.00 9.00 43 7.3 7.016 3,093.59 20,848.74 -96.304 -103.32 -101.00 2.32 6894.73 67% 13954 air
482 31-Jul-21 Seam F 17 5.00 9.00 10 5.0 4.660 519.70 2,430.82 -41.197 -45.86 -41.20 4.66 2430.82 0% 0
486 1-Aug-21 Seam UL 20 5.00 7.00 41 4.4 4.107 1,391.16 5,726.37 3.820 -0.29 1.52 1.81 2516.63 56% 3210 diluar design
489 2-Aug-21 Seam UL 19 5.00 7.00 21 4.8 4.519 703.10 3,189.47 4.197 -0.32 2.00 2.32 1638.66 49% 1551 diluar design
497 7-Aug-21 Seam P 16-18 6.00 7.00 57 7.3 6.954 2,150.28 14,953.88 -51.354 -58.31 -55.49 2.82 6059.87 59% 8894
527 19-Aug-21 Floor P 23 7.00 7.00 24 8.5 8.188 1,119.16 9,163.12 18.942 10.75 13.21 2.45 2744.69 70% 6418 jalan
543 26-Aug-21 Seam V 19 7.00 7.00 14 3.5 3.193 652.74 2,071.77 35.159 31.97 35.16 3.19 2071.77 0% 0

575 8-Sep-21 Seam P 18 7.00 7.00 50 7.3 6.968 2,371.99 16,528.03 -58.892 -65.86 -64.20 1.66 3937.65 76% 12590
589 14-Sep-21 Seam U 22-24 7.00 7.00 39 6.5 6.215 1,921.50 11,942.86 8.775 2.56 4.51 1.95 3748.90 69% 8194
605 16-Sep-21 Seam V 23 7.00 7.00 22 6.9 6.614 1,060.36 7,019.74 42.008 35.39 37.60 2.21 2343.34 67% 4676
619 21-Sep-21 Seam F 18 8.00 9.00 28 6.0 5.729 2,018.17 11,615.48 -65.035 -70.76 -69.00 1.76 3576.32 69% 8039

658 05-Okt-21 Seam E 16-18 8.00 9.00 25 5.7 5.380 1,769.07 9,517.60 -31.877 -37.26 -35.20 2.06 3638.98 62% 5879
662 06-Okt-21 Seam U 22-23 7.00 7.00 50 5.0 4.670 2,192.32 10,238.13 -4.622 -9.29 -7.00 2.29 5024.09 51% 5214
674 11-Okt-21 Seam G 17 8.00 9.00 27 6.9 6.630 1,953.31 13,015.34 -77.709 -84.34 -81.50 2.84 5572.82 57% 7443
675 11-Okt-21 Seam U 22-23 7.00 7.00 51 7.2 6.920 2,496.12 17,274.40 -6.082 -13.00 -9.79 3.21 8006.43 54% 9268
684 14-Okt-21 Seam G 23 8.00 9.00 16 6.7 6.440 1,083.21 6,897.09 -77.584 -84.02 -81.50 2.52 2703.21 61% 4194
687 14-Okt-21 Seam Uu 23 7.00 7.00 14 7.0 6.736 761.94 5,132.21 19.679 12.94 16.63 3.69 2808.44 45% 2324
688 16-Okt-21 Seam G 17 8.00 9.00 12 6.5 6.192 837.91 5,232.05 -80.077 -86.27 -81.50 4.77 4029.45 23% 1203
701 19-Okt-21 Seam U 20 7.00 7.00 15 7.1 6.773 610.10 4,145.36 -24.508 -31.28 -29.27 2.01 1229.53 70% 2916
706 20-Okt-21 Seam V 21-22 7.00 7.00 59 5.2 4.900 2,813.70 13,691.81 36.012 31.11 32.78 1.67 4663.06 66% 9029
709 21-Okt-21 Floor E 16-17 58.00 8.00 25 7.1 6.800 926.36 6,277.48 -45.602 -52.40 -45.60 6.80 6277.48 0% 0
711 21-Okt-21 Seam U 25 7.00 7.00 53 4.7 4.389 2,177.59 9,556.74 25.051 20.66 22.77 2.11 4590.17 52% 4967
713 23-Okt-21 Seam G 16 8.00 9.00 31 8.4 8.119 2,031.66 12,759.27 -72.586 -80.71 -76.31 4.39 6902.37 46% 5857
720 25-Okt-21 Seam R 18 7.00 7.00 122 5.9 5.575 6,006.04 33,486.78 -35.671 -41.25 -38.18 3.06 18399.17 45% 15088
721 26-Okt-21 Seam E 20-21 8.00 9.00 47 6.5 6.213 3,154.69 19,546.75 33.548 27.34 30.00 2.66 8382.61 57% 11164
722 26-Okt-21 Seam R 22-23 7.00 7.00 117 7.1 6.754 5,553.09 37,490.67 1.850 -4.90 -0.92 3.98 22100.75 41% 15390
725 28-Okt-21 Seam E 18 7.00 7.00 64 6.7 6.350 4,491.77 28,569.11 -39.147 -45.50 -42.50 3.00 13481.96 53% 15087
732 31-Okt-21 Seam G 18 8.00 9.00 38 7.4 7.111 2,648.06 18,801.07 -76.736 -83.85 -80.38 3.47 9167.92 51% 9633
733 31-Okt-21 Seam R 21 7.00 7.00 81 6.7 6.370 3,958.80 25,207.58 -11.952 -18.32 -14.01 4.31 17053.03 32% 8155
734 1-Nov-21 Seam E 17 8.00 9.00 34 7.1 6.812 2,401.55 16,363.89 -41.213 -48.02 -41.21 6.81 16363.89 0% 0
735 1-Nov-21 Floor P 20 7.00 7.00 51 4.9 4.559 2,297.18 10,483.37 -25.442 -30.00 -25.44 4.56 10483.37 0% 0
736 1-Nov-21 Seam R 23 7.00 7.00 42 7.4 7.090 1,967.47 13,948.29 9.002 1.91 4.39 2.48 4873.19 65% 9075
737 2-Nov-21 Seam R 20 7.00 7.00 89 5.2 4.873 4,257.88 20,714.69 -34.493 -39.37 -36.39 2.97 12641.31 39% 8073
738 2-Nov-21 Seam U 24 7.00 7.00 86 5.9 5.577 4,413.14 24,613.16 10.142 4.56 10.14 5.58 24613.16 0% 0
739 3-Nov-21 Seam F 15 8.00 9.00 20 6.7 6.400 -52.741 -59.14 -52.74 6.40 0.00 0% 0 menunggu data survey
740 3-Nov-21 Seam G 15 8.00 9.00 22 5.7 5.400 -72.714 -78.11 -72.71 5.40 0.00 0% 0 menunggu data survey
741 3-Nov-21 Seam I 15 8.00 9.00 28 6.7 6.430 -72.165 -78.60 -72.17 6.43 0.00 0% 0 menunggu data survey
TOTAL 8 8 1,941 6.27 5.91 97,909 589,566 310,491 47.34% 279,075

Dibuat oleh, Di Ketahui oleh, Disetujui oleh, Inventory Broken Material


Material terendam air 33618.1 BCM
Material di Bench 0.0 BCM
Material di buat jalan 16326.2 BCM
Material diluar design 19781.7 BCM
Material Close 279074.7 BCM
Not Aviable 69726.0 BCM
Available 240,764.91 BCM
GL Drill & Blast Sec. Drill & Blast Mine Plan Engineering Total Broken material 310,491 BCM
Total Recovery 47%