Download as pdf or txt
Download as pdf or txt
You are on page 1of 6

SAUDI ARAMCO WORKOVER MANUAL

Drilling Technical Department September 2013

CHAPTER 1 GENERAL INFORMATION


SECTION B WORKOVER MANUAL ORIGINAL ISSUE
AND REVISION GUIDELINES
___________________________________________________________________________________________________________________________

WORKOVER MANUAL ORIGINAL ISSUE & REVISION


GUIDELINES

1.0 ORIGINAL DOCUMENT ISSUE


1.1 Document Format Back

1.2 Media
1.3 Distribution
1.3.1 List
1.3.2 Manual Numbering
1.3.3 Responsibility

2.0 REVISIONS
2.1 Frequency
2.2 Format
2.3 Responsibilities
2.3.1 Manual Modification
2.3.2 Manual Distribution
2.4 Distribution Instructions
SAUDI ARAMCO WORKOVER MANUAL
Drilling Technical Department September 2013

CHAPTER 1 GENERAL INFORMATION


SECTION B WORKOVER MANUAL ORIGINAL ISSUE
AND REVISION GUIDELINES
___________________________________________________________________________________________________________________________

WORKOVER MANUAL ORIGINAL ISSUE & REVISION


GUIDELINES

1.0 ORIGINAL DOCUMENT ISSUE

1.1 Document Format

1.1.1 A common format has been developed to maintain structure


uniformity since the manual has been authored by a number of
individuals. Future revisions should utilize the same structure in order
for the Workover Manual to maintain its organization and appearance.

1.1.2 The Workover Manual has been prepared using Microsoft Word.
Each chapter will consist of an index page, followed by text.
Headings, text fonts, bullets and indentations will vary throughout the
chapter but will conform to the following guidelines:

a) Page Set-up:

i) Margins
Top: 0.5”
Bottom: 0.88”
Left: 1.25”
Right: 1.25”
Header: 0.5”
Footer: 0.19”
ii) Paper Size
Paper Size: Letter
Width: 8.5”
Height: 11”
Orientation: Portrait (checked)
iii) Paper Source
First Page: Default Tray
Other Pages: Default Tray
iv) Layout
Section Start: New Page
Header & Footer: Different Odd & Even (checked)
Different First Page (checked)
Vertical Alignment: Top

1 of 5
SAUDI ARAMCO WORKOVER MANUAL
Drilling Technical Department September 2013

CHAPTER 1 GENERAL INFORMATION


SECTION B WORKOVER MANUAL ORIGINAL ISSUE
AND REVISION GUIDELINES
___________________________________________________________________________________________________________________________

b) Index:

i) Header : ‘As shown above’


ii) Section Heading: Title, Arial 14, Bold, Italic, Centered, Red
iii) First Subheading: Title, Arial 11, Bold, First text indent at
0”, Hanging text indent at 3/8”, Teal
iv) Second Subheading: Title, Arial 11, Bold, First text indent
at 6/8”, Hanging text indent at 1-1/8”, Black
v) Third Subheading: Title, Arial 11, Bold, First text Indent at
1-1/8”, Hanging text indented at 1-5/8”, Black
vi) The subheadings numbering sequence should be as
follows:
1.0 First subheading
1.1 Second subheading
1.1.1 Third subheading
vii) Page Numbering: None

c) Text

i) Section Heading : Title, Arial 14, Bold, Italic, Centered,


Red
ii) First Subheading : Heading 1, Arial 11, Bold, First text
indent at 0”, Hanging text indent at 3/8”, Teal
iii) Second Subheading : Heading 2, Arial 11, Bold, First text
indent at 3/8”, Hanging text indent at 6/8’, Dark Red
iv) Third Subheading : Heading 3, Arial 11, First text indent at
6/8”, Hanging text indent at 1-2/8”, Only number or title
Blue and bolded
v) Forth Subheading : Body text, Arial 11, First text indent at
1-2/8”, Hanging text indent at 1-5/8”, Black
vi) Fifth Subheading : Body text, Arial 11, First text indent at 1-
5/8”, Hanging text indent at 2”
vii) The subheading numbering sequence should be as
follows:
1.0 First Subheading
1.1 Second Subheading
1.1.1 Third Subheading
a) Fourth Subheading
i) Fifth Subheading
The First Subheading numbering sequence cannot be
changed. However, subsequent Subheadings can be
altered to Bullets or Lettering, depending on context and
flow of text.

2 of 5
SAUDI ARAMCO WORKOVER MANUAL
Drilling Technical Department September 2013

CHAPTER 1 GENERAL INFORMATION


SECTION B WORKOVER MANUAL ORIGINAL ISSUE
AND REVISION GUIDELINES
___________________________________________________________________________________________________________________________

viii) Main Text: Body Text, Arial 11, Text alignment Justify.
ix) Page Numbering: 1 of xx, 2 of xx, etc, the page number
location will alternate between the lower right and left hand
corners.

1.2 Media

The Workover Manual will be available on two different media to meet user
requirements. These are:

a) Hard copy (3-ring binder).


b) Electronically, on Drilling & Workover servers.

1.3 Distribution

1.3.1 List

Hard copies of the Workover Manual (and the Drilling Manual) will be
distributed based on need and accessibility to the servers. A copy of
the Workover Manual will be stored in electronic form on the server for
easy access; consequently, hard copy distribution will be minimized.
The hard copy distribution of the Manual will be as follows:

a) Vice President, Drilling & Workover


b) General Manager, Drilling
c) Managers, D&WO
d) Rig Superintendents, WOD and GDD&WD
e) General Supervisors, WOD and GDD&WD
f) Supervisors, WOD and GDD&WD
g) All WO Rigs

Additional copies of the Workover Manual requested by individuals


other than those listed above will be considered on a case-by-case
basis and will be decided by the custodian of the Manual, General
Supervisor of Technical Support Services Division.

1.3.2 Manual Numbering

Each hard copy of the Workover Manual will be numbered to insure


the document is traceable. It will be properly marked, both on the
outside of the binder and on the fist page of the document. A record
will be kept of the Manual numbered and the recipient name.

3 of 5
SAUDI ARAMCO WORKOVER MANUAL
Drilling Technical Department September 2013

CHAPTER 1 GENERAL INFORMATION


SECTION B WORKOVER MANUAL ORIGINAL ISSUE
AND REVISION GUIDELINES
___________________________________________________________________________________________________________________________

1.3.3 Responsibility

a) A designated person will be responsible for distributing all hard


copies of the Workover Manual to the recipients.
b) The responsible person will ask each recipient, prior to delivery,
his preference of the Workover Manual media; hard copy or
none.
c) Copies of the Workover Manual will be hand-delivered to each
recipient and their initials obtained to verify receipt of the
manual.

2.0 REVISIONS

2.1 Frequency

The Workover Manual will be updated no later than once every five years.
The duration of the revision should not exceed two months since majority of
the changes will be minor.

2.2 Format

The same format as the original Workover Manual will be followed. All
changes and addendums will be highlighted on a separate page and inserted
in the inside cover of the manual for quick reference. The updated sections
or paragraphs within the Manual will have a line on the side of the page, as
shown to the right of this paragraph. It is also important to change the date of
the updated section in the upper right hand corner of the document.

2.3 Responsibilities

2.3.1 Manual Modification

The General Supervisor of Technical Support Services Division will


assign a person to undertake the task of modifying the Workover
Manual. The assigned person will work with Workover Department
and Gas Development Drilling & Workover Department in updating
the Manual, evaluate the proposed changes/additions and circulate to
General Supervisor of Technical Support Services Division for
approval. Once approved, he will modify the Manual.

4 of 5
SAUDI ARAMCO WORKOVER MANUAL
Drilling Technical Department September 2013

CHAPTER 1 GENERAL INFORMATION


SECTION B WORKOVER MANUAL ORIGINAL ISSUE
AND REVISION GUIDELINES
___________________________________________________________________________________________________________________________

2.3.2 Manual Distribution

The person designated to modify the Manual will also be responsible


for distribution of copies of the Manual. He may seek the help of a
technician to deliver the Manual to the rig sites if necessary.

2.4 Distribution Instructions

Using the original Workover Manual distribution list either inserts, page
replacements or complete Manual replacements will be hand delivered to the
Manual recipients. Old Manuals that have been replaced with new ones will
be destroyed to avoid inadvertent use. When all Manuals have been
delivered, the issue list will be updated to reflect the up-to-date Manual
recipients.

5 of 5

You might also like