The best approach for selecting a packer is to first examine well conditions and
desired operational capabilities and then determine which packer features meet
those well conditions and best fulfill those operational requirements. Some of the
factors that should be considered in selecting a packer are:
1.1 Cost
The packer of minimum cost that will accomplish the objective should be
selected. Initial packer price should not be used as the only criterion. Rig time
cost for running and retrieving the packer should also be taken into
consideration.
1 of 14
SAUDI ARAMCO WORKOVER MANUAL
Drilling Technical Department September 2013
In deep gas wells or other situations where casing or liner diameter is limited
and maximum packer bore is required, the PBR Completion may have
application.
2 of 14
SAUDI ARAMCO WORKOVER MANUAL
Drilling Technical Department September 2013
2.1 Typical Onshore Vertical Arab-D Completion with 7” Halliburton two trip
TWB packer:
3 of 14
SAUDI ARAMCO WORKOVER MANUAL
Drilling Technical Department September 2013
2.2 Typical Offshore Ratawi Horizontal Completion with Halliburton two trip
Packer, Downhole gauge and SSV at +280 ft:
4 of 14
SAUDI ARAMCO WORKOVER MANUAL
Drilling Technical Department September 2013
5 of 14
SAUDI ARAMCO WORKOVER MANUAL
Drilling Technical Department September 2013
6 of 14
SAUDI ARAMCO WORKOVER MANUAL
Drilling Technical Department September 2013
7 of 14
SAUDI ARAMCO WORKOVER MANUAL
Drilling Technical Department September 2013
2.6 Typical Dual lateral Arab-D Completion with Halliburton 4½” TWR
Packer and Ratch-Latch Assembly and ICDs:
8 of 14
SAUDI ARAMCO WORKOVER MANUAL
Drilling Technical Department September 2013
2.7 Typical Dual lateral Arab-D Completion with Halliburton 4½” TWR Packer ICDs
(continued):
9 of 14
SAUDI ARAMCO WORKOVER MANUAL
Drilling Technical Department September 2013
2.8 Typical offshore top dual completion with Halliburton 9⅝” RHD dual
packer:
10 of 14
SAUDI ARAMCO WORKOVER MANUAL
Drilling Technical Department September 2013
11 of 14
SAUDI ARAMCO WORKOVER MANUAL
Drilling Technical Department September 2013
2.10 Typical Khuff Completion with Baker 9⅝” DAB Permanent Packer and
Ratch-Latch/PBR Assembly
PROPOSED WELL SCHEMATIC EQUIPMENT AND SERVICES LOCATION SALES LOCATION
Onshore N-A
SIZE WEIGHT GRADE THREAD
RIG NAME PHONE #
Gas WRKSTR.
SUPERINTENDENT PHONE #
5 10,667.61 31.98 5.875 4.750 1000025604 H683-19-4781 Size 80-47 PBR w/ 5 1/2'' 17 # VamTop HC Pin Down
9 6 10,699.59 1.02 5.875 3.920 X-O 5 1/2'' 17 # Vam Top HC Box x 4 1/2'' 13.5 # Pin
7 10,700.61 2.50 5.500 3.720 H443-82-3545 Size 81-47 "KC-22" Anchor Seal Assy.
10 10,703.11 w/ 4 1/2'' 13.5 # VTHC Box Up
10,703.11 1.00 4.750 3.720 Seal Unit
10,704.11 End of Seal Unit
8 10,703.11 5.04 8.125 4.750 1000025006 H415-26-9700 Baker 9-5/8" Mod." DAB" Packer
3.720 ( lower bore)
11 9 10,708.15 5.21 5.040 4.276 H02-06517-2X Baker Millout Extension
10 10,713.36 0.81 5.620 3.920 H299-69-2992 X-over, 5" 20# N.V. Box X 4-1/2" 13.5# VTHC Pin
10,714.17 6.15 4.500 3.920 ( 1 ) Pup Jt. 4-1/2" 13.5# Vam Top HC
10,720.32 39.07 4.500 3.920 ( 1 ) Jt. 4-1/2" 13.5# Vam Top HC
10,759.39 4.10 4.500 3.920 ( 1 ) Pup Jt. 4-1/2" 13.5# Vam Top HC
11 10,763.49 1.20 5.030 3.688 HALCO 4-1/2" "R" Nipple VTHC
10,764.69 4.10 4.500 3.920 ( 1 ) Pup Jt. 4-1/2" 13.5# Vam Top HC
12 10,768.79 117.30 4.500 3.920 ( 3 ) Jt. 4-1/2" 13.5# Vam Top HC
10,886.09 6.34 6.120 3.920 X-Over 5.5" V. Top 20 # Pin x 4.5" V.Top 13.5 # Box
10,892.43 5.07 5.600 4.778 X-Over 5.5" V. Top x NK35 20 #
12 10,897.50 1.50 8.280 4.778 TIW LINER TOP LOCATOR
10,899.00 10.50 5.600 4.778 X-Over 5.5" V. Top x NK35 20 #
13 10,909.50 6.84 6.120 4.778 ( 1 ) Pup Jt w/ mule shoe. 5-1/2" 20# Vam Top HC
10,916.34 End Of Tailpipe
12 of 14
SAUDI ARAMCO WORKOVER MANUAL
Drilling Technical Department September 2013
2 Onshore N-A D
SIZE WEIGHT GRADE THREAD
RIG NAME PHONE #
Gas WRKSTR.
SUPERINTENDENT PHONE #
13 of 14
SAUDI ARAMCO WORKOVER MANUAL
Drilling Technical Department September 2013
Gas WRKSTR.
SUPERINTENDENT PHONE #
4 10,824.87 31.03 5.890 4.750 H683-19-4781 Baker PBR w/ 25' Seal Bore Receptacle
10,855.90 1.03 4.500 3.826 with X-Over in , 5-1/2" Vam Top x 4-1/2" 15.1 #
6 Vam Top HC
10,856.93 7.90 4.500 3.920 ( 1 ) Pup Jt 4-1/2" 13.5# C-95 Vam Top.
10,864.83 3.92 4.500 3.920 ( 1 ) Pup Jt 4-1/2" 13.5# C-95 Vam Top.
5 10,868.75 10.90 5.875 3.720 1000025107 H409-24-0700 Baker 7" " S - 3 " Permanent Packer
10,879.65 3.70 4.500 3.920 ( 1 ) Pup Jt 4-1/2" 13.5# C-95 Vam Top.
7 10,883.35 0.00 4.500 3.920 ( 1 ) Jt 4-1/2" 13.5# C-95 Vam Top.
10,883.35 5.92 4.500 3.920 ( 1 ) Pup Jt 4-1/2" 13.5# C-95 Vam Top.
6 10,889.27 1.22 5.030 3.688 HALCO 4-1/2" "R" Nipple VTHC
10,890.49 3.92 4.500 3.920 ( 1 ) Pup Jt 4-1/2" 13.5# C-95 Vam Top.
8 10,894.41 40.04 4.500 3.920 ( 1 ) Jt 4-1/2" 13.5# C-95 Vam Top.
10,934.45 7.93 4.500 3.920 ( 1 ) Pup Jt 4-1/2" 13.5# Vam Top.HC
7 10,942.38 3.10 4.875 3.938 H683-19-4781 Baker Locator Seal Assembly
10,945.48 0.00 4.750 3.762 H683-19-4781 Baker PBR Seal Assembly Consist of
10,945.48 0.83 Debris Barriers
9 10,946.31 24.92 Baker PBR Seal Spacer
10,971.23 0.83 Debris Barriers
10,972.06 3.32 4 x Baker PBR Seal Units
10,975.38 0.83 Debris Barriers
10,976.21 0.52 Baker Half Mule Shoe
End Of Seal As s em bly
8 10,961.48 30.82 5.890 4.750 H683-19-4781 Baker PBR w/ 25' Seal Bore Receptacle
10,992.30 1.03 4.500 3.826 with X-Over in , 5-1/2" Vam Top x 4-1/2" 15.1 #
Vam Top HC
10,993.33 7.91 4.500 3.920 ( 1 ) Pup Jt 4-1/2" 13.5# C-95 Vam Top.
11,001.24 7.88 4.500 3.920 ( 1 ) Pup Jt 4-1/2" 13.5# C-95 Vam Top.
10 9 11,009.12 10.88 5.875 3.720 1000025107 H409-24-0700 Baker 7" " S - 3 " Permanent Packer
11,020.00 7.88 4.500 3.920 ( 1 ) Pup Jt 4-1/2" 13.5# C-95 Vam Top.
11,027.88 40.29 4.500 3.920 ( 1 ) Jt 4-1/2" 13.5# C-95 Vam Top.
11,068.17 5.93 4.500 3.920 ( 1 ) Pup Jt 4-1/2" 13.5# C-95 Vam Top.
10 11,074.10 1.22 5.030 3.688 HALCO 4-1/2" "R" Nipple VTHC
11,075.32 3.92 4.500 3.920 ( 1 ) Pup Jt 4-1/2" 13.5# C-95 Vam Top.
11,079.24 40.43 4.500 3.920 ( 1 ) Jt 4-1/2" 13.5# C-95 Vam Top.
11,119.67 7.93 4.860 3.920 ( 1 ) Pup Jt 4-1/2" 13.5# C-95 Vam Top.
11 11 11,127.60 0.71 4.860 3.920 H469-21-452Z Wireline Re-Entry;4-1/2" Half mule shoe
11,128.31 End Of Tail pipe Assembly
7" Top Of Liner at 8,628 ft. 7" Liner shoe at 12,582 ft
NOTE:
H 683-19-4781 (S H E A R R IN G: 70 Klb s )
Baker Rep: Date:
14 of 14