SAUDI ARAMCO WORKOVER MANUAL

Drilling Technical Department September 2013

CHAPTER 4 COMPLETION PRACTICES


SECTION C PACKER AND PBR SELECTION
___________________________________________________________________________________________________________________________

PACKER AND PBR SELECTION

1.0 SELECTION CRITERIA


1.1 Cost Back
1.2 Well Conditions
1.3 Running and Setting Considerations
1.4 Retrieving Considerations
1.5 Production & Treating Considerations
1.6 Compatibility with Downhole Equipment
1.7 Maximum Packer Bore

2.0 TYPICAL COMPLETION DIAGRAMS


2.1 Onshore Arab-D Horizontal
2.2 Offshore Ratawi Horizontal
2.3 Offshore Hadriya Horizontal
2.4 Dual Lateral Arab-C Horizontal
2.5 Shaybah Horizontal
2.6 Dual Lateral Arab-D Completion
2.7 Offshore Oil Dual Completion
2.8 Shaybah 7” Tri-Lateral Smart Completion
2.9 Khuff 9⅝” DAB Packer/PBR Completion
2.10 Khuff 7” Liner PBR Completion
2.11 Khuff 7” Packer/PBR Completion
SAUDI ARAMCO WORKOVER MANUAL
Drilling Technical Department September 2013

CHAPTER 4 COMPLETION PRACTICES


SECTION C PACKER AND PBR SELECTION
___________________________________________________________________________________________________________________________

PACKER AND PBR SELECTION

1.0 SELECTION CRITERIA

The best approach for selecting a packer is to first examine well conditions and
desired operational capabilities and then determine which packer features meet
those well conditions and best fulfill those operational requirements. Some of the
factors that should be considered in selecting a packer are:

1.1 Cost

The packer of minimum cost that will accomplish the objective should be
selected. Initial packer price should not be used as the only criterion. Rig time
cost for running and retrieving the packer should also be taken into
consideration.

1.2 Well Conditions

a) Packer should be selected to withstand the pressure differentials


between the tubing-casing annulus and wellbore below packer during
producing and acidizing.

b) Packer should be made of alloys that will withstand the corrosive


environment of well fluids.

1.3 Running and Setting Considerations

Packer setting mechanisms are tubing-set, electric-line-set or hydraulic-set.


Tubing-set packers should not be used in deep wells because of increased
possibility of tubing manipulation problems with increased depth. Electric line
set packers should not be used in highly deviated holes (greater than 50-
55O) because it is not possible to run the packer to the required depth. In high
deviated wells, hydraulic set packers should be considered.

1.4 Retrieving Considerations

Retrievable packers can be retrieved by a rotational release mechanism or


straight pickup release mechanism. A rotation release packer should be
avoided in deviated wells because of difficulty in transmitting rotation
downhole. However the straight pull release mechanism packers are used in
Saudi ARAMCO.

1 of 14
SAUDI ARAMCO WORKOVER MANUAL
Drilling Technical Department September 2013

CHAPTER 4 COMPLETION PRACTICES


SECTION C PACKER AND PBR SELECTION
___________________________________________________________________________________________________________________________

1.5 Production & Treating Considerations

Packers must be able to accommodate tubing movements (elongation and


contraction) as a result of changes in temperatures and pressures. Packers
set in tension allow for tubing movement due to expansion whereas packers
set in compression accommodate tubing contraction. Tubing movement due
to both expansion and contraction can be accommodated using a floating
seal assembly with sealbore extension or Polish Bore Receptacle.

1.6 Compatibility with other Downhole Equipment

If wireline equipment or perforating guns are to be run in the tubing, it is


desirable to use packers that do not require weight to keep them set. Wireline
operations can be more successfully completed if tubing is kept straight by
landing it in tension or neutral. Furthermore, the bore of the packer or the seal
assembly should be large enough to allow for running through-tubing,
perforating guns, production logs and tubing plugs.

1.7 Maximum Packer Bore

In deep gas wells or other situations where casing or liner diameter is limited
and maximum packer bore is required, the PBR Completion may have
application.

2.0 TYPICAL COMPLETION PROGRAM

The best approach for selecting completion types is based on production


requirements, well monitoring capabilities, and well conditions. Additionally, the
desired well operational constraints need to be considered too. The desired
completion types should be able to meet these well conditions and best fulfill these
operational requirements.

2 of 14
SAUDI ARAMCO WORKOVER MANUAL
Drilling Technical Department September 2013

CHAPTER 4 COMPLETION PRACTICES


SECTION C PACKER AND PBR SELECTION
___________________________________________________________________________________________________________________________

2.1 Typical Onshore Vertical Arab-D Completion with 7” Halliburton two trip
TWB packer:

3 of 14
SAUDI ARAMCO WORKOVER MANUAL
Drilling Technical Department September 2013

CHAPTER 4 COMPLETION PRACTICES


SECTION C PACKER AND PBR SELECTION
___________________________________________________________________________________________________________________________

2.2 Typical Offshore Ratawi Horizontal Completion with Halliburton two trip
Packer, Downhole gauge and SSV at +280 ft:

4 of 14
SAUDI ARAMCO WORKOVER MANUAL
Drilling Technical Department September 2013

CHAPTER 4 COMPLETION PRACTICES


SECTION C PACKER AND PBR SELECTION
___________________________________________________________________________________________________________________________

2.3 Typical Offshore Hadriya Horizontal oil well Completion with


Schlumberger 7” QHSP hydraulic retrievable Packer and SSV at ± 253 ft:

5 of 14
SAUDI ARAMCO WORKOVER MANUAL
Drilling Technical Department September 2013

CHAPTER 4 COMPLETION PRACTICES


SECTION C PACKER AND PBR SELECTION
___________________________________________________________________________________________________________________________

2.4 Offshore Dual lateral Arab-C Horizontal Producer:

6 of 14
SAUDI ARAMCO WORKOVER MANUAL
Drilling Technical Department September 2013

CHAPTER 4 COMPLETION PRACTICES


SECTION C PACKER AND PBR SELECTION
___________________________________________________________________________________________________________________________

2.5 Typical Shaybah Horizontal Completion with Smith Retrievable Packer:

7 of 14
SAUDI ARAMCO WORKOVER MANUAL
Drilling Technical Department September 2013

CHAPTER 4 COMPLETION PRACTICES


SECTION C PACKER AND PBR SELECTION
___________________________________________________________________________________________________________________________

2.6 Typical Dual lateral Arab-D Completion with Halliburton 4½” TWR
Packer and Ratch-Latch Assembly and ICDs:

8 of 14
SAUDI ARAMCO WORKOVER MANUAL
Drilling Technical Department September 2013

CHAPTER 4 COMPLETION PRACTICES


SECTION C PACKER AND PBR SELECTION
___________________________________________________________________________________________________________________________

2.7 Typical Dual lateral Arab-D Completion with Halliburton 4½” TWR Packer ICDs
(continued):

9 of 14
SAUDI ARAMCO WORKOVER MANUAL
Drilling Technical Department September 2013

CHAPTER 4 COMPLETION PRACTICES


SECTION C PACKER AND PBR SELECTION
___________________________________________________________________________________________________________________________

2.8 Typical offshore top dual completion with Halliburton 9⅝” RHD dual
packer:

10 of 14
SAUDI ARAMCO WORKOVER MANUAL
Drilling Technical Department September 2013

CHAPTER 4 COMPLETION PRACTICES


SECTION C PACKER AND PBR SELECTION
___________________________________________________________________________________________________________________________

2.9 Typical SHYB Schlumberger 7” Trilateral Smart completion:

11 of 14
SAUDI ARAMCO WORKOVER MANUAL
Drilling Technical Department September 2013

CHAPTER 4 COMPLETION PRACTICES


SECTION C PACKER AND PBR SELECTION
___________________________________________________________________________________________________________________________

2.10 Typical Khuff Completion with Baker 9⅝” DAB Permanent Packer and
Ratch-Latch/PBR Assembly
PROPOSED WELL SCHEMATIC EQUIPMENT AND SERVICES LOCATION SALES LOCATION

Baker Oil Tools Baker Oil Tools c/o Al Rushaid


1 Trading Company P.O. Box
Cased Hole Completion Systems 31952 Al Khobar 31952 KSA

OPERATOR FAX # BHP BHT Baker Oil Tools


ARAMCO 880-7607 280
FOREMAN PHONE # MAX DEV. ZONE DEV.

HARM MULDER 880-7600 Page : 1


FIELD WELL NO. SCREEN SIZE STARTING WELL

HRDH HRDH-972 N-A


SAND SIZE COMPLETION FLUID (weight and ty pe) COATING (ty pe)

9 5/8" DAB PACKER WITH PBR


LOADING DOCK PHONE # PERFORATIONS

Onshore N-A
SIZE WEIGHT GRADE THREAD
RIG NAME PHONE #

2 PA-860 880-7600 CASING 9-5/8 53.5 + 58.4 P-110 NK-3SB


PREPARED BY PHONE #

NAZIM FADAI LINER 7.000 32.00 VM-95 HCS VAM TOP HC


DATE SUBMITTED J OB # (v ers ion #)

13-Oct-09 TUBING 4-1/2 13.50 VM-95 HCS VAM TOP HC


J OB REPORT # WELL TYPE

Gas WRKSTR.
SUPERINTENDENT PHONE #

KHAMEES, SHAKER ABDUL MAJEED WRKSTR.


No. DEPTH LENGTH OD ID AMS No COMMODITY DESCRIPTION

0.00 32.20 Elevation


1 32.20 1.00 11.000 3.920 4-1/2" Tubing Hanger
33.20 3.40 4.500 3.920 Tubing Hanger Sub 4-1/2" 13.5# New Vam Pin X V. Top HC Pin
36.60 5.44 4.500 3.920 X-over Vam Top Hc 13.5# Pin X New Vam 12.6#,L-80 Box
42.04 78.25 4.500 3.920 ( 2 ) Jt's. 4-1/2" 13.5# Vam Top HC VM-95 HCS Tbg.
120.29 14.13 4.500 3.920 ( 2 ) Pup jnt Spacers 4.5" 13.5# Vam Top HC Box x Pin
134.42 2,335.90 4.500 3.920 ( 60 ) Jt's. 4-1/2" 13.5# Vam Top HC VM-95 HCS Tbg.
2,470.32 8.16 4.500 3.920 ( 1 ) Pup Jt 4-1/2" 13.5# Vam Top.HC
3 2,478.48 4.70 5.040 3.751 HALCO 4-1/2" Flow Coupling VTHC
4 2 2,483.18 1.19 5.030 3.688 HALCO 4-1/2" "R" Nipple VTHC
2,484.37 4.70 5.030 3.751 HALCO 4-1/2" Flow Coupling VTHC
2,489.07 6.09 4.500 3.920 ( 1 ) Pup Jt 4-1/2" 13.5# Vam Top.HC
5 2,495.16 8,154.60 4.500 3.920 ( 209 ) Jt's. 4-1/2" 13.5# Vam Top HC VM-95 HCS Tbg.
10,649.76 10.75 4.500 3.920 Pup Jt 4-1/2" 13.5# Vam Top.HC
3 10,660.51 2.41 4.875 3.938 Baker Locator Seal Assembly
4 10,667.66 0.00 4.750 3.762 Baker PBR Seal Assembly Consist of
6 10,667.66 0.83 Debris Barriers
10,668.49 24.92 Baker PBR Seal Spacer
10,693.41 3.32 4 x Baker PBR Seal Units
10,696.73 0.83 Debris Barriers
7 10,697.56 0.59 Baker Half Mule Shoe
End Of Seal Assembly
8

5 10,667.61 31.98 5.875 4.750 1000025604 H683-19-4781 Size 80-47 PBR w/ 5 1/2'' 17 # VamTop HC Pin Down
9 6 10,699.59 1.02 5.875 3.920 X-O 5 1/2'' 17 # Vam Top HC Box x 4 1/2'' 13.5 # Pin
7 10,700.61 2.50 5.500 3.720 H443-82-3545 Size 81-47 "KC-22" Anchor Seal Assy.
10 10,703.11 w/ 4 1/2'' 13.5 # VTHC Box Up
10,703.11 1.00 4.750 3.720 Seal Unit
10,704.11 End of Seal Unit

8 10,703.11 5.04 8.125 4.750 1000025006 H415-26-9700 Baker 9-5/8" Mod." DAB" Packer
3.720 ( lower bore)
11 9 10,708.15 5.21 5.040 4.276 H02-06517-2X Baker Millout Extension
10 10,713.36 0.81 5.620 3.920 H299-69-2992 X-over, 5" 20# N.V. Box X 4-1/2" 13.5# VTHC Pin
10,714.17 6.15 4.500 3.920 ( 1 ) Pup Jt. 4-1/2" 13.5# Vam Top HC
10,720.32 39.07 4.500 3.920 ( 1 ) Jt. 4-1/2" 13.5# Vam Top HC
10,759.39 4.10 4.500 3.920 ( 1 ) Pup Jt. 4-1/2" 13.5# Vam Top HC
11 10,763.49 1.20 5.030 3.688 HALCO 4-1/2" "R" Nipple VTHC
10,764.69 4.10 4.500 3.920 ( 1 ) Pup Jt. 4-1/2" 13.5# Vam Top HC
12 10,768.79 117.30 4.500 3.920 ( 3 ) Jt. 4-1/2" 13.5# Vam Top HC
10,886.09 6.34 6.120 3.920 X-Over 5.5" V. Top 20 # Pin x 4.5" V.Top 13.5 # Box
10,892.43 5.07 5.600 4.778 X-Over 5.5" V. Top x NK35 20 #
12 10,897.50 1.50 8.280 4.778 TIW LINER TOP LOCATOR
10,899.00 10.50 5.600 4.778 X-Over 5.5" V. Top x NK35 20 #
13 10,909.50 6.84 6.120 4.778 ( 1 ) Pup Jt w/ mule shoe. 5-1/2" 20# Vam Top HC
10,916.34 End Of Tailpipe

12 of 14
SAUDI ARAMCO WORKOVER MANUAL
Drilling Technical Department September 2013

CHAPTER 4 COMPLETION PRACTICES


SECTION C PACKER AND PBR SELECTION
___________________________________________________________________________________________________________________________

2.11 Typical Khuff 7” Liner/PBR Gas Completion:


PROPOSED WELL SCHEMATIC EQUIPMENT AND SERVICES LOCATION SALES LOCATION

Baker Oil Tools Baker Oil Tools c/o Al


Rushaid Trading Company P.O.
1 Open Hole - Liner Hanger Box 31952 Al Khobar 31952 G
KSA
Systems Info
OPERATOR FAX # BHP BHT Baker Oil Tools
ARAMCO 8807327 280
FOREMAN PHONE # MAX DEV. ZONE DEV.

GHAZI ALI 880-7320 Page : 1


FIELD WELL NO. SCREEN SIZE STARTING WELL

UTMN UTMN-1807 N-A Info


SAND SIZE COMPLETION FLUID (weight and ty pe) COATING (ty pe)

LINER TOP COMPLETION I


LOADING DOCK PHONE # PERFORATIONS

2 Onshore N-A D
SIZE WEIGHT GRADE THREAD
RIG NAME PHONE #

ADC-14 880-7323 CASING 7.000 32.00 VM-95TS VAM TOP HC Ins


PREPARED BY PHONE #
LINER 4.500 13.50 VM-95TS VAM TOP HC p
JASIM AL ULAIW 055-433-0057
DATE SUBMITTED J OB # (v ers ion #)

11-Mar-09 TUBING 4-1/2 13.50 VM-95TS VAM TOP HC


J OB REPORT # WELL TYPE

Gas WRKSTR.
SUPERINTENDENT PHONE #

KHAMEES, SHAKER ABDUL MAJEED WRKSTR.


DEPTH LENGTH OD ID AMS No COMMODITY DESCRIPTION

3 0.00 30.53 Elevation


1 30.53 0.46 11.000 4.778 5-1/2" Tubing Hanger
30.99 5.35 5.500 4.778 Tubing Hanger Sub 5-1/2" 20# New Vam Pin X V. Top HC Pin
4 36.34 78.23 5.500 4.778 ( 2 ) Jt's. 5-1/2" 20# Vam Top HC VM-95 HCS Tbg.
114.57 1.20 5.500 3.920 4-1/2" VTHC Pin X 5-1/2" VTHC Box CrossOver
115.77 26.45 4.500 3.920 Spacers 4.5" 13.5# VTHC VM-95HCS Box x Pin
142.22 2,346.26 4.500 3.920 ( 60 ) Jt's. 4-1/2" 13.5# VTHC VM-95HCS Tbg.
2,488.48 7.92 4.500 3.920 ( 1 ) Pup Jt 4-1/2" 13.5# VTHC VM-95HCS.
2,496.40 4.69 5.040 3.751 HALCO 4-1/2" Flow Coupling VTHC
2 2,501.09 1.22 5.030 3.688 HALCO 4-1/2" "R" Nipple VTHC
2,502.31 4.70 5.030 3.751 HALCO 4-1/2" Flow Coupling VTHC
2,507.01 5.15 4.500 3.920 ( 1 ) Pup Jt 4-1/2" 13.5# VTHC VM-95HCS.
2,512.16 8,831.45 4.500 3.920 ( 224 ) Jt's. 4-1/2" 13.5# VTHC VM-95HCS Tbg.
11,343.61 5.91 4.500 3.920 ( 1 ) Pup Jt 4-1/2" 13.5# VTHC VM-95HCS.
3 11,349.52 1.48 5.813 3.828 1000644370 H297510320 Baker Locator Seal Assembly 4.5" 13.5# VTHC B x B
4 11,351.00 24.60 5.250 3.847 H297501336 Baker PBR Seal Assembly 4.5" 13.5# V.T.HC Pin
11,375.60 End of Seals

Top Of 7" liner at 8979 ft


** Depths to be confirmed **
FOR ANY QUENST ION RELAT ED T O ORDER T HIS EQUIPMENT ,PLEASE CONT ACT OUR OPERAT IONS COORDINAT OR
AT 3-868-1660 Ext 253

Baker Rep: Date:

13 of 14
SAUDI ARAMCO WORKOVER MANUAL
Drilling Technical Department September 2013

CHAPTER 4 COMPLETION PRACTICES


SECTION C PACKER AND PBR SELECTION
___________________________________________________________________________________________________________________________

2.12 Typical Khuff Baker 7” S-3 Packer / PBR Completion:


PROPOSED WELL SCHEMATIC EQUIPMENT AND SERVICES LOCATION SALES LOCATION

Baker Oil Tools Baker Oil Tools c/o Al Rushaid I


Trading Company P.O. Box
Ge
Cased Hole Completion Systems 31952 Al Khobar 31952 KSA
Info
OPERATOR FAX # BHP BHT Baker Oil Tools
ARAMCO 800-7147 280 I
FOREMAN PHONE # MAX DEV. ZONE DEV.

E. ANDREWS/M. BADRA800-7140 Page : 1 W


FIELD WELL NO. SCREEN SIZE STARTING WELL

HRDH HRDH-637 N-A Info


SAND SIZE COMPLETION FLUID (weight and ty pe) COATING (ty pe)
2 Duple S-3 PACKER WITH PBR ONE TRIP SYSTEM
LOADING DOCK PHONE # PERFORATIONS
Im
Ons hore N-A Dr
SIZE WEIGHT GRADE THREAD
RIG NAME PHONE #

PA-859 880-7142 CASING 9-5/8 58.4-53.5 P-110 NK-3SB Inse


PREPARED BY PHONE #
LINER 7.000 32.00 VM-95 HCS VAM TOP HC pa
JASIM AL ULAIW 055-433-0057
DATE SUBMITTED J OB # (v ers ion #)

25-Mar-08 TUBING 4-1/2 13.50 VM-95 HCS VAM TOP HC


J OB REPORT # WELL TYPE

Gas WRKSTR.
SUPERINTENDENT PHONE #

KHAMEES, SHAKER ABDUL MAJEED WRKSTR.


No. DEPTH LENGTH OD ID AMS No COMMODITY DESCRIPTION
0.00 25.40 Elevation
25.40 0.60 11.000 4.778 Tubing Hanger
1
26.00 3.99 5.500 4.778 Tubing Hanger Sub 5-1/2" VTHC Pin Down
29.99 78.07 5.500 4.778 ( 2 ) Joints 5.5" 20# Vam Top HC Box x Pin
108.06 5.95 5.500 3.920 Cros s Over Sub 5.5" 20# VTHC Box x 4.5 13.5# VTHC Pin
3 114.01 27.78 4.500 3.920 Spacers 4.5" 13.5# Vam Top HC Box x Pin
141.79 2,348.10 4.500 3.920 ( 59 ) Jt's . 4-1/2" 13.5# Vam Top HC VM-95 HCS Tbg.
2,489.89 5.92 4.500 3.920 ( 1 ) Pup Jt 4-1/2" 13.5# Vam Top.HC
4 2,495.81 5.93 5.040 3.751 HALCO 4-1/2" Flow Coupling VTHC
2 2,501.74 1.22 5.030 3.688 HALCO 4-1/2" "R" Nipple VTHC
2,502.96 5.92 5.040 3.751 HALCO 4-1/2" Flow Coupling VTHC
2,508.88 3.92 4.500 3.920 ( 1 ) Pup Jt 4-1/2" 13.5# Vam Top.HC
2,512.80 8,305.05 4.500 3.920 ( 207 ) Jt's . 4-1/2" 13.5# Vam Top HC VM-95 HCS Tbg.
10,817.85 3.92 4.500 3.920 ( 1 ) Pup Jt 4-1/2" 13.5# Vam Top.HC
5 3 10,821.77 3.10 4.875 3.938 H683-19-4781 Baker Locator Seal Assembly
10,824.87 0.00 4.750 3.762 H683-19-4781 Baker PBR Seal Assembly Consist of
10,824.87 0.83 Debris Barriers
10,825.70 24.92 Baker PBR Seal Spacer
10,850.62 0.83 Debris Barriers
10,851.45 3.32 4 x Baker PBR Seal Units
10,854.77 0.83 Debris Barriers
10,855.60 0.52 Baker Half Mule Shoe
End Of Seal As s em bly

4 10,824.87 31.03 5.890 4.750 H683-19-4781 Baker PBR w/ 25' Seal Bore Receptacle
10,855.90 1.03 4.500 3.826 with X-Over in , 5-1/2" Vam Top x 4-1/2" 15.1 #
6 Vam Top HC
10,856.93 7.90 4.500 3.920 ( 1 ) Pup Jt 4-1/2" 13.5# C-95 Vam Top.
10,864.83 3.92 4.500 3.920 ( 1 ) Pup Jt 4-1/2" 13.5# C-95 Vam Top.
5 10,868.75 10.90 5.875 3.720 1000025107 H409-24-0700 Baker 7" " S - 3 " Permanent Packer
10,879.65 3.70 4.500 3.920 ( 1 ) Pup Jt 4-1/2" 13.5# C-95 Vam Top.
7 10,883.35 0.00 4.500 3.920 ( 1 ) Jt 4-1/2" 13.5# C-95 Vam Top.
10,883.35 5.92 4.500 3.920 ( 1 ) Pup Jt 4-1/2" 13.5# C-95 Vam Top.
6 10,889.27 1.22 5.030 3.688 HALCO 4-1/2" "R" Nipple VTHC
10,890.49 3.92 4.500 3.920 ( 1 ) Pup Jt 4-1/2" 13.5# C-95 Vam Top.
8 10,894.41 40.04 4.500 3.920 ( 1 ) Jt 4-1/2" 13.5# C-95 Vam Top.
10,934.45 7.93 4.500 3.920 ( 1 ) Pup Jt 4-1/2" 13.5# Vam Top.HC
7 10,942.38 3.10 4.875 3.938 H683-19-4781 Baker Locator Seal Assembly
10,945.48 0.00 4.750 3.762 H683-19-4781 Baker PBR Seal Assembly Consist of
10,945.48 0.83 Debris Barriers
9 10,946.31 24.92 Baker PBR Seal Spacer
10,971.23 0.83 Debris Barriers
10,972.06 3.32 4 x Baker PBR Seal Units
10,975.38 0.83 Debris Barriers
10,976.21 0.52 Baker Half Mule Shoe
End Of Seal As s em bly

8 10,961.48 30.82 5.890 4.750 H683-19-4781 Baker PBR w/ 25' Seal Bore Receptacle
10,992.30 1.03 4.500 3.826 with X-Over in , 5-1/2" Vam Top x 4-1/2" 15.1 #
Vam Top HC
10,993.33 7.91 4.500 3.920 ( 1 ) Pup Jt 4-1/2" 13.5# C-95 Vam Top.
11,001.24 7.88 4.500 3.920 ( 1 ) Pup Jt 4-1/2" 13.5# C-95 Vam Top.
10 9 11,009.12 10.88 5.875 3.720 1000025107 H409-24-0700 Baker 7" " S - 3 " Permanent Packer
11,020.00 7.88 4.500 3.920 ( 1 ) Pup Jt 4-1/2" 13.5# C-95 Vam Top.
11,027.88 40.29 4.500 3.920 ( 1 ) Jt 4-1/2" 13.5# C-95 Vam Top.
11,068.17 5.93 4.500 3.920 ( 1 ) Pup Jt 4-1/2" 13.5# C-95 Vam Top.
10 11,074.10 1.22 5.030 3.688 HALCO 4-1/2" "R" Nipple VTHC
11,075.32 3.92 4.500 3.920 ( 1 ) Pup Jt 4-1/2" 13.5# C-95 Vam Top.
11,079.24 40.43 4.500 3.920 ( 1 ) Jt 4-1/2" 13.5# C-95 Vam Top.
11,119.67 7.93 4.860 3.920 ( 1 ) Pup Jt 4-1/2" 13.5# C-95 Vam Top.
11 11 11,127.60 0.71 4.860 3.920 H469-21-452Z Wireline Re-Entry;4-1/2" Half mule shoe
11,128.31 End Of Tail pipe Assembly
7" Top Of Liner at 8,628 ft. 7" Liner shoe at 12,582 ft

NOTE:
H 683-19-4781 (S H E A R R IN G: 70 Klb s )
Baker Rep: Date:

14 of 14

You might also like