LABORATORIUM ENTERPRISE SYSTEM ENGINEERING

FAKULTAS REKAYASA INDUSTRI


UNIVERSITAS TELKOM
Gedung C-207 Jl. Telekomunikasi No. 1, Terusan Buah Batu
Bandung 40257 Indonesia

FORMAT EXERCISE OF SAP SCM 100

 Name : Fayi Firzatullah Achmad


 SID (NIM) : 1201174447
 Class : TI-41-03
 Day/Shift : Tuesday/Shift-1
 Assistant Code : MAJ
 Username : 26SCMIC-34
 Password : 11februari
 Client : 936
 Material Master : R-FC134

Example:
1. Data Flow Diagram Level 0
(Fullscreenshoot/Printscreen)
LABORATORIUM ENTERPRISE SYSTEM ENGINEERING
FAKULTAS REKAYASA INDUSTRI
UNIVERSITAS TELKOM
Gedung C-207 Jl. Telekomunikasi No. 1, Terusan Buah Batu
Bandung 40257 Indonesia

EXERCISE RESULT WORKSPACE

UNIT 4
Exercise 5: Planning with Final Assembly
Task 1 : Change the Material Master
1. Screenshot your transaction to change material master
(Full Screenshoot/Print Screen)

2. Confirm that MRP type is “PD” and lot size is “EX” at MRP 1 tab
(Full Screenshoot/Print Screen)

3. Check that Strategy group 40, consumption mode 2, and backward and forward consumption
periods of 30 days each
(Full Screenshoot/Print Screen)

4. Save your work. Make sure the Material change


(Full Screenshoot/Print Screen)

Task 2 : Enter Planned Independent Requirement


1. Create Planned Ind. Requirement for Material R-F*1## at current month +2 until +6
(Full Screenshoot/Print Screen)

2. Display Stock/Requirement list for Material Pump


(Full Screenshoot/Print Screen)

Task 3 : Execute Single-Item, Multi-Level Planning


1. Display the Single-Item, Multi-Level Planning result.
(Full Screenshoot/Print Screen)

2. Record that the Available Quantity at the end of the list is 0 PC


(Full Screenshoot/Print Screen)

Task 4 : Create sales order in the form of corresponding customer Requirement


1. Create Independent requirement, make sure that the Requirement type is “KSV”
(Full Screenshoot/Print Screen)

2. Show steps to evaluate Stock/Requirement List


LABORATORIUM ENTERPRISE SYSTEM ENGINEERING
FAKULTAS REKAYASA INDUSTRI
UNIVERSITAS TELKOM
Gedung C-207 Jl. Telekomunikasi No. 1, Terusan Buah Batu
Bandung 40257 Indonesia

(Full Screenshoot/Print Screen)

3. Record that the available quantity at the end of the list is 0 PC


(Full Screenshoot/Print Screen)

UNIT 5
Exercise 6 : Creating a Planning Scenario
Task 1 :
1. Create a Planning Scenario transaction.
(Full Screenshoot/Print Screen)

2. Configure the scenario to simulate planned independent requirement version ## of plant 1000
(Full Screenshoot/Print Screen)

3. Release and save function in the scenario.


(Full Screenshoot/Print Screen)
Task 2 :
1. Show stock/requirement list on the evaluations on Long-Term Planning.
(Full Screenshoot/Print Screen)

2. Show stock/requirement list on the evaluations on MRP.


(Full Screenshoot/Print Screen)

Exercise 7 : Executing Long-Term Planning


Task 1 :
1. Show Single-Item, Multi-Level Planning on Long-Term Planning.
(Full Screenshoot/Print Screen)

Task 2 :
1. Show the Procurement element on Stock/Requirements List on Long-Term Planning.
(Full Screenshoot/Print Screen)