Terex GmbH

Karl−Funke−Str. 36
44149 Dortmund
Germany
Tel. +49 (0) 231 / 922−3
Fax +49 (0) 231 / 922−5005

Campaign Bulletin No. 2007-010


Subject: Air Charge Lines, Tubes, Fittings

Affected machines: RH 120 E with CAT C18 Diesel Engines

Machine-No: 120073, 120080, 120081, 120083, 120084, 120085, 120086, 120087,


120091, 120094, 120098, 120100, 120101

DATE: Sept. 21st. 2007 GBG

ISSUE
Air tightness of air charge system is not ensured; dust could enter the system.
This could lead to a total damage of the engine.

ACTION
Modification kit needs to be installed.

WARRANTY CLAIM ALLOWANCE


Parts and labour will be accepted until Dec. 31st. 2007.
Cost need to be claimed by warranty with reference of Campaign-Bulletin 2007-010.

Parts parts have to be ordered and will be accepted by


warranty (required parts are shown below) incl. landed
cost dealer place of business
Labour max. 10 hrs.
Travel Cost 1 visit max. 100,-- Euro
Third Party Cost none
Removed Part to be scrapped

RH 120 E, Air Charge Lines, tubes, fittings Page 1 of 6


Campaign-Bulletin 2007-010

Required parts per excavator:

Pos. Qty. Description Part-No.


1 modification kit 3 699 166
containing following parts:
1 4 nozzles ALMG3MN 3 692 957
2 8 silicon hoses 3 692 948
3 32 hose clamps 2 168 076
4 1 tube set 3 692 921
5 1 elbow 3 692 926
6 1 tube set 3 692 931
7 2 tubes 3 698 621
8 1 bracket set 3 698 620
9 1 bracket set 3 698 619
10 2 bracket sets 3 696 987
11 2 plate S355J2G3 2 450 400
12 4 bolts 0 054 431
13 4 washers 3 674 283

Required tools:
• hand tools
• torque wrench for 7,5 Nm

Required torques:
• constant torque hose clamp 7,5 Nm
(Pos. 3 / type teebolt and
spring)

Welding:
• welding of nozzle (Fig. 1, 5, Pos. 1) onto radiator
material: ALMG3MN
• Electrodes: DIN 1732 EL-AlSi5
. DIN EN ISO 18273 AlSi5
. AWS A 5.3 E4043
Ø 2,5 x 250
examples: a) ESAB OK96.40 .
. b) Castolin Eutectic 2103
• Electrodes need to be dried for 1 hour at 80° C prior use
• Preheating for welding not necessary

RH 120 E, Air Charge Lines, tubes, fittings Page 2 of 6


Campaign-Bulletin 2007-010

To ensure tightness of hoses to radiator 2 clamps are necessary. Length of existing


nozzle is not sufficient, therefore it gets increased by welding additional nozzle (Fig.
1, 5, Pos. 1) onto radiator.

Fig. 1

Fig. 2

RH 120 E, Air Charge Lines, tubes, fittings Page 3 of 6


Campaign-Bulletin 2007-010

Fig. 3

Fig. 4

RH 120 E, Air Charge Lines, tubes, fittings Page 4 of 6


Campaign-Bulletin 2007-010

Fig. 5: nozzle of radiator

RH 120 E, Air Charge Lines, tubes, fittings Page 5 of 6


Campaign-Bulletin 2007-010

Fig. 6: frame of engine module (top view)

Fig. 7: Location of plate for bracket Pos. 10/11/12/13 – to be welded onto frame

RH 120 E, Air Charge Lines, tubes, fittings Page 6 of 6