General English Yagie Alfayed UTS 19.55.4018

You might also like

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 1

1. A. the vessel owned by PT.

ALP carring the bus and truck cargo was sailing to lampung

B. with whom you must report if have a passanger without entry ticket in the vessel

2 -RO/RO : RO/RO vessel is designed for the carriage of wheeled cargo, are always
distinguished by large doors in the hull and often by external ramps that fold down to
allow rolling between pier and ship
-Container Ship: container ships are characterized by the absence of cargo handling gear,
in their case reflecting the usual practice of locating the container-handling cranes at
shore terminals rather than aboard ship
- Reefer Vessel : A vessel designed to carry goods requiring specific climatic
conditions during transport, such as meat, fruit and fish. A reefer ship has special
insulated holds into which cold air is forced at the temperature appropriate for the goods
being carried
-Cruise Ship : large passenger ships used mainly for vacationing. Unlike ocean liners,
which are used for transport, they typically embark on round-trip voyages to various
ports-of-call, where passengers may go on tours known as "shore excursions
-Bulk Carrier : a type of ship which transports cargoes in bulk quantities. The cargo
transported in such ships is loose cargo i.e. without any specific packaging to it and
generally contains items like food grains, ores and coals and even cement
3 a. to Papua have been sent a container of wheat was sent this morning.
b. the general agent has been handled The in-ship clearance document a few days ago.
c. at the New Orleans port was unloaded The iron ore cargo on the bulk carrier port last
night.
d what a technician Was being repaired the container crane yesterday ?
e. Where the Management Team of PT. Pelindo 3 being trained the Lecturers?

4 a. A container of wheat have sent to Papua this morning.


b. The in-ship clearance document has handled by the general agent a few days ago.
c. The iron ore cargo on the bulk carrier have unloaded at the New Orleans port last
night.
d. Was the container crane being repaired by a technician yesterday afternoon?
e. Where the Lecturers are being trained by the Management Team of PT. Pelindo 3?

You might also like