5 L
DJ Length of the adjacent building
W
6 DJ Width of the adjacent building
H
7 DJ Height of the adjacent building
STRUCTURE ATTRIBUTES
8 w
m1 Mesh widhts of grid like spatial shield Refer IEC 62305-2 Pg. No. 36 m
9 w
m2 Mesh widhts of grid like spatial shield m
K
10 S3 Factor takes into account the charcteristics of Is internal wiring done with
internal wiring (Power Line) shielded/ unshielded cable?
11 K
S3 Factor takes into account the charcteristics of Is internal wiring done with
internal wiring (Telecommunication Line) shielded/ unshielded cable?
ENVIRONMENTAL INFLUENCES
12 NG Lightning ground flash density Ng of the area where the 1/sq.km x year
structure is located
SERVICE LINES
POWER LINES
21 Probability that a flash to an entering line will cause shock to Protection measures against step
living beings due to dangerous touch volatages voltages, such as notices, physical
P
TU restrictions,etc.
Probability value depending on the resistance of the Line characteristics in terms of
22 P
LD
cable screen and the impulse withstand voltage of the bonding
equipment
TELECOMMUNICATION LINES
Probability value depending on the resistance of the cable Line characteristics in terms of
29 P
LD
screen and the impulse withstand voltage of bonding
the equipment
PROTECTION MEASURES
Probability that a flash to a structure will cause shock Type of additional protection
30 P
TA
to living beings due to dangerous touch and step voltages measures provided
31 PB Probability that a flash will cause physical damage Level of Lightning Protection
32 P
SPD Probability value as a function of LPL for which SPDs Is Surge Protection Design
are designed (Power line) coordinated & Level of LPS?
Probability value depending on theline type and the Line and equipment charateristics
38 P
LI
impulse withstand voltage of the equipment
(Telecommunication line)
VALUE
86
40
42
4.5
86
40
42
0.2
0.2
3.7
0.25
0.5
0.01
0.2
0.5
1
1
0.5
Not Provided
Not Provided
0.001
0.5
0.1
0.2
SR.NO. INPUT DESCRIPTION BRIEF UNIT
Typical mean relative numbers of victims injured by electric Type of structure, industrial, hotel,
39 LT shock due to one dangerous event public, etc.
Typical mean relative numbers of victims injured by physical Type of structure, industrial, hotel,
40 LF damage due to one dangerous event public, etc.
Typical mean relative numbers of victims injured by failure of Type of structure, industrial, hotel,
41 LO internal systems due to one dangerous public, etc.
event
Factor reducing the loss due to physical damage
42 rf depending on the risk of fire or on the risk of explosion of Risk of explosion of structure
structure
43 hz Factor increasing the loss due to physical damage Level of panic
when a special hazard is present
Typical mean relative number of users not served, Type of service, gas, water supply,
47 LF resulting from physical damage due to one dangerous event etc.
Typical mean relative numbers of users not served resulting Type of service, gas, water supply,
48 LO from failure of internal systems due to one etc.
dangerous event
Typical mean relative value of all goods damaged by physical Type of structure, museum, galleries,
49 LF damage due to one dangerous event etc.
Typical mean relative value of all goods damaged by electric Type of structure, industrial, hotel,
52 LT shock due to one dangerous event public, etc.
Typical mean relative value of all goods damaged by physical Type of structure, industrial, hotel,
53 LF damage due to one dangerous event public, etc.
Typical mean relative value of all goods damaged by failure of Type of structure, industrial, hotel,
54 LO internal systems due to one dangerous public, etc.
event
55 ca Valus of animals in the zone
56 cb Value of building relevant to the zone
57 cc Value of content in the zone
58 cs Value of internal systems including their activities in
the zone
VALUE
0.01
0.01
0.01
240
240
8760
0
100000
0.1
0.0001
0
10000
0
0
DESCRIPTION: LIGHTNING RISK ANALYSIS
PREPARED BY: DISHANT KUMAR NAGENDRA CS
CHECKED BY: COLOR INDICATES FACTORS RELEVANT TO THE BUILDING & TO BE ENTERED
L
5 DJ Length of the adjacent building
W
6 DJ Width of the adjacent building
7 H
DJ Height of the adjacent building
STRUCTURE ATTRIBUTES
8 w
m1 Mesh widhts of grid like spatial shield Refer IEC 62305-2 Pg. No. 36 m
w
9 m2 Mesh widhts of grid like spatial shield m
K
10 S3 Factor takes into account the charcteristics of Is internal wiring done with
internal wiring (Power Line) shielded/ unshielded cable?
11 K
S3 Factor takes into account the charcteristics of Is internal wiring done with
internal wiring (Telecommunication Line) shielded/ unshielded cable?
ENVIRONMENTAL INFLUENCES
12 NG Lightning ground flash density Ng of the area where the 1/sq.km x year
structure is located
13 CD Location factor of the structure Surrounding structures / an
exposed location
14 C
DJ Loaction factor of the adjacent structure Surrounding structures / an
exposed location
SERVICE LINES
POWER LINES
20 C
LI Factor depending on shielding, grounding and Is the power/LV line
isolation conditions of the line buried,shielded, etc.?
21 Probability that a flash to an entering line will cause shock to Protection measures against step
living beings due to dangerous touch volatages voltages, such as notices, physical
P
TU restrictions,etc.
TELECOMMUNICATION LINES
28 Probability that a flash to an entering line will cause shock to Protection measures against step
living beings due to dangerous touch volatages voltages, such as notices, physical
P
TU restrictions,etc.
Probability value depending on the resistance of the cable Line characteristics in terms of
29 P
LD
screen and the impulse withstand voltage of bonding
the equipment
PROTECTION MEASURES
Probability that a flash to a structure will cause shock Type of additional protection
30 P
TA
to living beings due to dangerous touch and step voltages measures provided
31 PB Probability that a flash will cause physical damage Level of Lightning Protection
P
32 SPD Probability value as a function of LPL for which SPDs Is Surge Protection Design
are designed (Power line) coordinated & Level of LPS?
33 Coordinated SPD system according to IEC 62305-4 Is coordinated SPD system is
(Power line) provided for the structure?
P
34 SPD Probability value as a function of LPL for which SPDs Is Surge Protection Design
are designed (Telecommunication line) coordinated & Level of LPS?
35 Coordinated SPD system according to IEC 62305-4 Is coordinated SPD system is
(Telecommunication line) provided for the structure?
Probability value depending on theline type and the Line and equipment charateristics
38 P
LI
impulse withstand voltage of the equipment
(Telecommunication line)
Typical mean relative numbers of victims injured by physical Type of structure, industrial, hotel,
40 LF damage due to one dangerous event public, etc.
Typical mean relative numbers of victims injured by Type of structure, industrial, hotel,
41 LO failure of internal systems due to one dangerous event public, etc.
Typical mean relative number of users not served, resulting Type of service, gas, water supply,
47 LF from physical damage due to one etc.
dangerous event
Typical mean relative numbers of users not served Type of service, gas, water supply,
48 LO resulting from failure of internal systems due to one etc.
dangerous event
Typical mean relative value of all goods damaged by physical Type of structure, museum, galleries,
49 LF damage due to one dangerous event etc.
Typical mean relative value of all goods damaged by electric Type of structure, industrial, hotel,
52 LT shock due to one dangerous event public, etc.
Typical mean relative value of all goods damaged by physical Type of structure, industrial, hotel,
53 LF damage due to one dangerous event public, etc.
Typical mean relative value of all goods damaged by Type of structure, industrial, hotel,
54 LO failure of internal systems due to one dangerous event public, etc.
86
40
42
4.5
86
40
42
0.2
0.2
3.7
0.25
0.5
0.01
0.2
0.5
1
1
0.5
Not Provided
Not Provided
0.01
0.5
0.1
0.2
0.01
0.01
0.01
240
240
2920
0
100000
0.1
0.0001
0
10000
0
0
Type of Building Residential
COLOR INDICATES FACTORS RELEVANT TO THE TYPE OF
BUILDING
N = N x A x C x 10-6
D =
N G D D 3.7
G
A = 85614.905
D
C = 0.25
D
ND = 7.92E-02
S EVENTS COMPONENTS
A =
DJ/T 85042.64
C
DJ =
0.5
CT = 1
N = 3.37E+00
M
L =
L/P 1000 Assumed
A =
L/P 40000
NG = 3.7
CI = 0.5
CE = 0.01
CT = 0.2
L
L/T
=
1000 Assumed
A =
L/T 40000
NG = 3.7
CI = 0.5
CE = 0.01
CT = 1
N = 1.48E-02
I/P
N = 7.40E-02
I/T
86
40
1000 Assumed
40000
3.7
0.5
0.01
0.2
1000 Assumed
40000
3.7
0.5
0.01
1
Type of Building Residential
PB = 1
1.00E+00
PA =
P = 1.00E+00
C/P
P =P xC
C/T SPD LD
P =
SPD
1
C = 1
LD
P = 1.00E+00
C/T
wm1 = ###
wm2 = ###
K
S1 = ###
K =
S2 ###
KS3 =
dP SPD
=
1
0.2
UW = 6
K
S4 =
0.166666667
PMS = 0
PM 1 = 0
PM 2 = 0
P =
M/P 0.00E+00
wm1 = 0
w =
m2 0
KS1 = 0
KS2 = 0
KS3 = 0.2
UW = 6
KS4 = 0.166666667
P =
MS 0
PM 1 = 0
PM 2 = 0
P =
M/T 0.00E+00
PTU = 1
PEB = 1
PLD = 1
C =
LD 1
Probability PU that a flash to a line will cause
injury to living beings by electric shock (Telecommunication
Line)
P
U/T = PTU x PEB X PLD x CLD
P = 1
TU
P = 1
EB
P = 1
LD
C = 1
LD
P =
U/T 1.00E+00
Probability PV that a flash to a line will cause physical
damage (Power Line)
P =P xP xC
V/P EB LD LD
P =
V/P 1.00E+00
Probability PV that a flash to a line will cause physical
damage (Telecommunication Line)
P =P xP xC
V/T EB LD LD
P =
V/T
1
Probability PW that a flash to a line will cause failure of
internal systems (Power Line)
P =P xP xC
W/P SPD LD LD
P =
SPD
1
P =
W/P 1.00E+00
Probability PW that a flash to a line will cause
failure of internal systems (Telecommunication Line)
P =P xP xC
W/T SPD LD LD
P =
SPD
1
P =
W/T 1.00E+00
Probability PZ that a flash near an incoming line will cause
failure of internal systems (Power Line)
P =P xP xC
Z/P SPD LI LI
PLI = 0.1
C =
LI 1
P =
Z/P 1.00E-01
PLI = 0.2
C =
LI 1
P =
Z/T 2.00E-01
Type of Building Residential
COLOR INDICATES RISKS RELEVANT TO THE TYPE OF BUILDING
LA = LU = rt x LT x nz/nt x tz/8760
rt = 0.001
LT = 0.01
nz = 240
nt = 240
tz = 8760
rf = 0.01
hz = 1
LF = 0.01
LC = LM = LW = LZ = LO x nz/nt x tz/8760
LO = 1
LC= LM = LW = LZ = 1.00E+00
LB =LV = rp x rf x LF x nz/nt
rp = 0.5
rf = 0.01
LF = 0
nz = 240
nt = 240
LB = LV = 0.00E+00
LOSS DUE TO DAMAGE D3
LC = LM = LW = LZ = LO x nz/nt
LO = 0
LC = LM = LW = LZ = 0.00E+00
rf = 0.01
Lf = 0
cz = 0
ct = 100000
LB = LV = 0.00E+00
LA = LU = rt x LT x ca/ct
rt = 0.001
Lt = 0
ca/ct = 1
La = LU = 0.00E+00
A
s
LOSS DUE TO DAMAGE D2 s
LB = LV = rp x rf x LF x (ca + cb + cc + cs)/ct rp = u
m
e 0.5
d
rf = 0.01
LF = 0.1
(ca + cb + cc + cs)/ct = 1
LB = LV = 5.00E-04
A
s
LOSS DUE TO DAMAGE D3 s
u
LC = LM = LW = LZ = LO x cs/ct m
e
d
LO = 0.0001
c /c = 1 Assumed
s t
L =L =L =L = 1.00E-04
C M W Z
0
0.00E+00
0.5
0.01
0
0
100000
0.00E+00
0.001
0.00E+00
0.5
0.01
0.1
5.00E-04
0.0001
Type of Building Residential
COLOR INDICATES RISKS RELEVANT TO THE TYPE OF BUILDING
LA = LU = rt x LT x nz/nt x tz/8760
rt = 0.01
LT = 0.01
nz = 240
nt = 240
tz = 2920
rf = 0.01
hz = 1
LF = 0.01
LC = LM = LW = LZ = LO x nz/nt x tz/8760
LO = 1
LC= LM = LW = LZ = 3.33E-01
LB =LV = rp x rf x LF x nz/nt
rp = 0.5
rf = 0.01
LF = 0
nz = 240
nt = 240
LB = LV = 0.00E+00
LOSS DUE TO DAMAGE D3
LC = LM = LW = LZ = LO x nz/nt
LO = 0
LC = LM = LW = LZ = 0.00E+00
rf = 0.01
Lf = 0
cz = 0
ct = 100000
LB = LV = 0.00E+00
LA = LU = rt x LT x ca/ct
rt = 0.01
Lt = 0
ca/ct = 1
La = LU = 0.00E+00
A
s
LOSS DUE TO DAMAGE D2 s
LB = LV = rp x rf x LF x (ca + cb + cc + cs)/ct rp = u
m
e 0.5
d
rf = 0.01
LF = 0.1
(ca + cb + cc + cs)/ct = 1
LB = LV = 5.00E-04
A
s
LOSS DUE TO DAMAGE D3 s
u
LC = LM = LW = LZ = LO x cs/ct m
e
d
LO = 0.0001
c /c = 1 Assumed
s t
L =L =L =L = 1.00E-04
C M W Z
0
0.00E+00
0.5
0.01
0
0
100000
0.00E+00
0.01
0.00E+00
0.5
0.01
0.1
5.00E-04
0.0001
Type of Building Residential
RB = ND x PB x LB
ND = 0.079193787
PB = 1
LB = 0.00005
R =N xP xL
C/P D C/P C
ND = 0.079193787
P =
C/P 1
LC = 1
R =
C/P 7.92E-02
R
C/T = ND x PC/T x LC
ND = 0.079193787
P
C/T
=
1
LC = 1
R =
C/T 7.92E-02
RC = 1.58E-01
R =N xP xL
M/P M M/P M
NM = 3.3707
P =
M/P 0
LM = 1
R =
M/P 0.00E+00
R =N xP xL
M/T M M/T M
NM = 3.3707
P =
M/T 0
LM = 1
R
M/T =
0.00E+00
RISK COMPONENETS RELATED TO ZONE 1 (BASEMENT)
RM = ###
R = (N +N )xP xL
U/P L/P DJ/P U/P U
N
L.P
=
###
N =
DJ.P
P
U.P =
LU =
R = (N +N )xP xL
U/T L/T DJ/T U/T U
N =
L/T
N =
DJ/T
P =
U/T
LU =
RU = 1.90E-06
R = (N +N )xP xL
V/P L/P DJ/P V/P V
P =
V/P ###
LV = ###
R = (N +N )xP xL P =
V/T L/T DJ/T V/T V V/T
###
LV = ###
RV = 9.48E-06
R = (N +N )xP xL
W/P L/P DJ/P W/P W
P =
W/P 1
LW = 1
R
W/P
=
3.16E-02
R = (N +N )xP xL P =
W/T L/T DJ/T W/T W W/T
LW = 1
R
W/T
=
1.58E-01
RW = 1.90E-01
R
Z/P = NI/P x PZ x LZ
N =
I/P 0.0148
P =
Z/P 0.1
LZ = 1
R
Z/P =
1.48E-03
R =N xP xL N =
Z/T I/T Z/T Z I/T
0.074
P =
Z/T 0.2
LZ = 1
R =
Z/T 1.48E-02
RZ = 1.63E-02
R1 = RA + RB + RU + RV
R = 3.64E-01
1
0.031465777
1
0.00001
0.00074
0.157328884
1
0.00001
Type of Building Residential
RB = ND x PB x LB
ND = 0.079193787
PB = 1
LB = 1.66667E-05
R =N xP xL
C/P D C/P C
ND = 0.079193787
P =
C/P 1
LC = 0.333333333
R =
C/P 2.64E-02
R
C/T = ND x PC/T x LC
ND = 0.079193787
P
C/T
=
1
LC = 0.333333333
R =
C/T 2.64E-02
RC = 5.28E-02
R =N xP xL
M/P M M/P M
NM = 3.3707
P =
M/P 0
LM = 0.333333333
R =
M/P 0.00E+00
R =N xP xL
M/T M M/T M
NM = 3.3707
P =
M/T 0
LM = 0.333333333
R
M/T =
0.00E+00
RISK COMPONENTS FOR ZONE 2 (ALL FLOORS EXCEPT BASEMENT)
R = 0.00E+00
M
R = (N +N )xP xL
U/P L/P DJ/P U/P U
N = 0.000148
L.P
N = 0.031465777
DJ.P
P =
U.P
1
L = 3.33333E-05
U
R = 1.05E-06
U/P
R
U/T = (NL/T+NDJ/T) x PU/T x LU
N
L/T
=
0.00074
N =
DJ/T 0.157328884
P
U/T =
1
LU = 3.33333E-05
RU = 6.32E-06
R = (N +N )xP xL
V/P L/P DJ/P V/P V
P =
V/P
1
L = 1.66667E-05
V
R = 5.27E-07
V/P
R = (N +N )xP xL
V/T L/T DJ/T V/T V
P =
V/T
1
L = 1.66667E-05
V
R = 2.63E-06
V/T
RV = 3.16E-06
R = (N +N )xP xL
W/P L/P DJ/P W/P W
P =
W/P 1
LW = 0.333333333
R =
W/P 1.05E-02
R = (N +N )xP xL P =
W/T L/T DJ/T W/T W W/T
LW = 0.333333333
R =
W/T 5.27E-02
RW = 6.32E-02
R =N xP xL
Z/P I/P Z Z
N =
I/P 0.0148
P
Z/P =
0.1
LZ = 0.333333333
R =
Z/P 4.93E-04
R =N xP xL
Z/T I/T Z/T Z
N =
I/T 0.074
P =
Z/T 0.2
LZ = 0.333333333
R =
Z/T 4.93E-03
RZ = 5.43E-03
R1 = RA + RB + RU + RV
R1 = 1.34E-05
R1 = RA + RB + RC + RM + RU + RV + RW +RZ
R1 = 1.21E-01
R2 = RB + RC + RM + RV + RW + RZ
R2 = 3.74E-02
R3 = RB + RV
R3 = 1.85E-06
R4 = RB + RC + RM + RV + RW + RZ
R4 = 3.69E-02
R4 = 1.34E-05
LL FLOORS EXCEPT BASEMENT)
RISK COMPONENTS
DESCRIPTION: LIGHTNING RISK ANALYSIS
PREPARED BY: DISHANT KUMAR CHECKED BY: NAGENDRA CS
PA 1.00E+00
PB 1.00E+00
P
C/P 1.00E+00
P
C/T 1.00E+00
P
M/P 0.00E+00
P
M/T 0.00E+00
P
U/P 1.00E+00
P
U/T 1.00E+00
P
V/P 1.00E+00
P
V/T 1.00E+00
P
W/P 1.00E+00
P
W/T 1.00E+00
P
Z/P 1.00E-01
P
Z/T 2.00E-01
Number of Dangerous events per year
ND 7.92E-02
N
DJ/P 3.15E-02
N
DJ/T 1.57E-01
NM 3.37E+00
N
L/P 1.48E-04
N
L/T 7.40E-04
N
I/P 1.48E-02
N
I/T 7.40E-02
R
U/T 1.58E-06 5.27E-06 6.85E-06 RZ 1.63E-02 5.43E-03 2.17E-02
ZONE 1 ZONE 2
LB = LV 0.00E+00 0.00E+00
LC = LM = LW = LZ 0.00E+00 0.00E+00
Loss of Irreplaceable Cultural Heritage (L3)
ZONE 1 ZONE 2
LB = LV 0.00E+00 0.00E+00
Economic Loss (L4)
ZONE 1 ZONE 2
LA = LU 0.00E+00 0.00E+00
LB = LV 5.00E-04 5.00E-04
LC = LM = LW = LZ 1.00E-04 1.00E-04
Total Risk
ZONE 1 ZONE 2 STRUCTURE ZONE 1 ZONE 2 STRUCTURE
R1 1.61E-05 1.34E-05 2.96E-05 R3 5.54E-06 1.85E-06 7.39E-06
R2 1.12E-01 3.74E-02 1.50E-01 R4 1.11E-01 3.69E-02 1.48E-01
O
T
H
E
T
Y
P
E
O
F
B
U
I
L
D
I
N
G
RISK ANALYSIS RESULTS
DESCRIPTION: LIGHTNING RISK ANALYSIS
PREPARED BY: DISHANT KUMAR
CHECKED BY: NAGENDRA CS
NEED OF PROTECTION
YES
YES
NO
YES
LIGHTNING
PROTECTION
H LPS RISK
ANALYSIS
DESCRIPTION: LIGHTNING RISK ANALYSIS
PREPARED BY: DISHANT KUMAR NAGENDRA CS
CHECKED BY: COLOR INDICATES FACTORS RELEVANT TO THE BUILDING & TO BE ENTERED
L
5 DJ Length of the adjacent building
W
6 DJ Width of the adjacent building
7 H
DJ Height of the adjacent building
STRUCTURE ATTRIBUTES
8 w
m1 Mesh widhts of grid like spatial shield Refer IEC 62305-2 Pg. No. 36 m
w
9 m2 Mesh widhts of grid like spatial shield m
K
10 S3 Factor takes into account the charcteristics of Is internal wiring done with
internal wiring (Power Line) shielded/ unshielded cable?
11 K
S3 Factor takes into account the charcteristics of Is internal wiring done with
internal wiring (Telecommunication Line) shielded/ unshielded cable?
ENVIRONMENTAL INFLUENCES
12 NG Lightning ground flash density Ng of the area where the 1/sq.km x year
structure is located
13 CD Location factor of the structure Surrounding structures / an
exposed location
14 C
DJ Loaction factor of the adjacent structure Surrounding structures / an
exposed location
SERVICE LINES
POWER LINES
20 C
LI Factor depending on shielding, grounding and Is the power/LV line
isolation conditions of the line buried,shielded, etc.?
21 Probability that a flash to an entering line will cause shock to Protection measures against step
living beings due to dangerous touch volatages voltages, such as notices, physical
P
TU restrictions,etc.
TELECOMMUNICATION LINES
27 C
LI Factor depending on shielding, grounding and Is the power/LV line
isolation conditions of the line buried,shielded, etc.?
28 Probability that a flash to an entering line will cause shock to Protection measures against step
living beings due to dangerous touch volatages voltages, such as notices, physical
P
TU restrictions,etc.
Probability value depending on the resistance of the cable Line characteristics in terms of
29 P
LD
screen and the impulse withstand voltage of bonding
the equipment
PROTECTION MEASURES
Probability that a flash to a structure will cause shock Type of additional protection
30 P
TA
to living beings due to dangerous touch and step voltages measures provided
31 PB Probability that a flash will cause physical damage Level of Lightning Protection
P
32 SPD Probability value as a function of LPL for which SPDs Is Surge Protection Design
are designed (Power line) coordinated & Level of LPS?
33 Coordinated SPD system according to IEC 62305-4 Is coordinated SPD system is
(Power line) provided for the structure?
P
34 SPD Probability value as a function of LPL for which SPDs Is Surge Protection Design
are designed (Telecommunication line) coordinated & Level of LPS?
Probability value depending on theline type and the impulse Line and equipment charateristics
37 P
LI
withstand voltage of the equipment (Power
line)
Probability value depending on theline type and the Line and equipment charateristics
38 P
LI
impulse withstand voltage of the equipment
(Telecommunication line)
VALUE
86
40
42
4.5
86
40
42
0.2
0.2
3.7
0.25
0.5
0.01
0.2
0.5
1
1
0.5
0.2
Not Provided
Not Provided
0.001
0.5
0.05
0.1
0.2
SR.NO. INPUT DESCRIPTION BRIEF UNIT
Typical mean relative numbers of victims injured by electric Type of structure, industrial, hotel,
39 LT shock due to one dangerous event public, etc.
Typical mean relative numbers of victims injured by physical Type of structure, industrial, hotel,
40 LF damage due to one dangerous event public, etc.
Typical mean relative numbers of victims injured by Type of structure, industrial, hotel,
41 LO failure of internal systems due to one dangerous event public, etc.
Typical mean relative number of users not served, Type of service, gas, water supply,
47 LF resulting from physical damage due to one dangerous event etc.
Typical mean relative numbers of users not served resulting Type of service, gas, water supply,
48 LO from failure of internal systems due to one etc.
dangerous event
Typical mean relative value of all goods damaged by physical Type of structure, museum, galleries,
49 LF damage due to one dangerous event etc.
Typical mean relative value of all goods damaged by electric Type of structure, industrial, hotel,
52 LT shock due to one dangerous event public, etc.
Typical mean relative value of all goods damaged by physical Type of structure, industrial, hotel,
53 LF damage due to one dangerous event public, etc.
Typical mean relative value of all goods damaged by failure of Type of structure, industrial, hotel,
54 LO internal systems due to one dangerous public, etc.
event
55 ca Valus of animals in the zone
56 cb Value of building relevant to the zone
57 cc Value of content in the zone
58 cs Value of internal systems including their activities in
the zone
VALUE
0.01
0.01
0.01
240
240
8760
0
100000
0.1
0.0001
0
10000
0
0
DESCRIPTION: LIGHTNING RISK ANALYSIS
PREPARED BY: DISHANT KUMAR NAGENDRA CS
CHECKED BY: COLOR INDICATES FACTORS RELEVANT TO THE BUILDING & TO BE ENTERED
L
5 DJ Length of the adjacent building
W
6 DJ Width of the adjacent building
7 H
DJ Height of the adjacent building
STRUCTURE ATTRIBUTES
8 w
m1 Mesh widhts of grid like spatial shield Refer IEC 62305-2 Pg. No. 36 m
w
9 m2 Mesh widhts of grid like spatial shield m
K
10 S3 Factor takes into account the charcteristics of Is internal wiring done with
internal wiring (Power Line) shielded/ unshielded cable?
11 K
S3 Factor takes into account the charcteristics of Is internal wiring done with
internal wiring (Telecommunication Line) shielded/ unshielded cable?
ENVIRONMENTAL INFLUENCES
12 NG Lightning ground flash density Ng of the area where the 1/sq.km x year
structure is located
13 CD Location factor of the structure Surrounding structures / an
exposed location
14 C
DJ Loaction factor of the adjacent structure Surrounding structures / an
exposed location
SERVICE LINES
POWER LINES
20 C
LI Factor depending on shielding, grounding and Is the power/LV line
isolation conditions of the line buried,shielded, etc.?
21 Probability that a flash to an entering line will cause shock to Protection measures against step
living beings due to dangerous touch volatages voltages, such as notices, physical
P
TU restrictions,etc.
TELECOMMUNICATION LINES
Probability value depending on the resistance of the cable Line characteristics in terms of
29 P
LD
screen and the impulse withstand voltage of bonding
the equipment
PROTECTION MEASURES
Probability that a flash to a structure will cause shock Type of additional protection
30 P
TA
to living beings due to dangerous touch and step voltages measures provided
31 PB Probability that a flash will cause physical damage Level of Lightning Protection
32 P
SPD Probability value as a function of LPL for which SPDs Is Surge Protection Design
are designed (Power line) coordinated & Level of LPS?
34 P
SPD Probability value as a function of LPL for which SPDs Is Surge Protection Design
are designed (Telecommunication line) coordinated & Level of LPS?
Probability value depending on theline type and the impulse Line and equipment charateristics
37 P
LI
withstand voltage of the equipment (Power
line)
Probability value depending on theline type and the Line and equipment charateristics
38 P
LI
impulse withstand voltage of the equipment
(Telecommunication line)
Typical mean relative numbers of victims injured by physical Type of structure, industrial, hotel,
40 LF damage due to one dangerous event public, etc.
Typical mean relative numbers of victims injured by failure of Type of structure, industrial, hotel,
41 LO internal systems due to one dangerous public, etc.
event
Typical mean relative number of users not served, resulting Type of service, gas, water supply,
47 LF from physical damage due to one etc.
dangerous event
Typical mean relative numbers of users not served Type of service, gas, water supply,
48 LO resulting from failure of internal systems due to one etc.
dangerous event
Typical mean relative value of all goods damaged by physical Type of structure, museum, galleries,
49 LF damage due to one dangerous event etc.
Typical mean relative value of all goods damaged by electric Type of structure, industrial, hotel,
52 LT shock due to one dangerous event public, etc.
Typical mean relative value of all goods damaged by physical Type of structure, industrial, hotel,
53 LF damage due to one dangerous event public, etc.
Typical mean relative value of all goods damaged by Type of structure, industrial, hotel,
54 LO failure of internal systems due to one dangerous event public, etc.
86
40
42
4.5
86
40
42
0.2
0.2
3.7
0.25
0.5
0.01
0.2
0.5
1
1
0.5
0.2
Not Provided
Not Provided
0.01
0.5
0.05
0.1
0.2
0.01
0.01
0.01
240
240
2920
0
100000
0.1
0.0001
0
10000
0
0
Type of Building Residential
COLOR INDICATES FACTORS RELEVANT TO THE TYPE OF
BUILDING
N = N x A x C x 10-6
D =
N G D D 3.7
G
A = 85614.905
D
C = 0.25
D
ND = 7.92E-02
US EVENTS COMPONENTS
A =
DJ/T 85042.64
C
DJ =
0.5
CT = 1
N = 3.37E+00
M
L =
L/P 1000 Assumed
A =
L/P 40000
NG = 3.7
CI = 0.5
CE = 0.01
CT = 0.2
L
L/T
=
1000 Assumed
A =
L/T 40000
NG = 3.7
CI = 0.5
CE = 0.01
CT = 1
N = 1.48E-02
I/P
N = 7.40E-02
I/T
86
40
1000 Assumed
40000
3.7
0.5
0.01
0.2
1000 Assumed
40000
3.7
0.5
0.01
1
Type of Building Residential
PB = 0.2
2.00E-01
PA =
P = 1.00E+00
C/P
P =P xC
C/T SPD LD
P =
SPD
1
C = 1
LD
P = 1.00E+00
C/T
wm1 = ###
wm2 = ###
K
S1 = ###
K =
S2 ###
KS3 =
dP SPD
=
1
0.2
UW = 6
K
S4 =
0.166666667
PMS = 0
PM 1 = 0
PM 2 = 0
P =
M/P 0.00E+00
wm1 = 0
w =
m2 0
KS1 = 0
KS2 = 0
KS3 = 0.2
UW = 6
KS4 = 0.166666667
P =
MS 0
PM 1 = 0
PM 2 = 0
P =
M/T 0.00E+00
PTU = 1
PEB = 0.05
PLD = 1
C =
LD 1
Probability PU that a flash to a line will cause
injury to living beings by electric shock (Telecommunication
Line)
P
U/T = PTU x PEB X PLD x CLD
P = 1
TU
P = 0.05
EB
P = 1
LD
C = 1
LD
P = 5.00E-02
U/T
P =P xP xC
W/T SPD LD LD
P =
SPD
1
P =
W/T 1.00E+00
Probability PZ that a flash near an incoming line will cause
failure of internal systems (Power Line)
P =P xP xC
Z/P SPD LI LI
PLI = 0.1
C =
LI 1
P =
Z/P 1.00E-01
PLI = 0.2
C =
LI 1
P =
Z/T 2.00E-01
Type of Building Residential
COLOR INDICATES RISKS RELEVANT TO THE TYPE OF BUILDING
LA = LU = rt x LT x nz/nt x tz/8760
rt = 0.001
LT = 0.01
nz = 240
nt = 240
tz = 8760
rf = 0.01
hz = 1
LF = 0.01
LC = LM = LW = LZ = LO x nz/nt x tz/8760
LO = 1
LC= LM = LW = LZ = 1.00E+00
LB =LV = rp x rf x LF x nz/nt
rp = 0.5
rf = 0.01
LF = 0
nz = 240
nt = 240
LB = LV = 0.00E+00
LOSS DUE TO DAMAGE D3
LC = LM = LW = LZ = LO x nz/nt
LO = 0
LC = LM = LW = LZ = 0.00E+00
rf = 0.01
Lf = 0
cz = 0
ct = 100000
LB = LV = 0.00E+00
LA = LU = rt x LT x ca/ct
rt = 0.001
Lt = 0
ca/ct = 1
La = LU = 0.00E+00
A
s
LOSS DUE TO DAMAGE D2 s
LB = LV = rp x rf x LF x (ca + cb + cc + cs)/ct rp = u
m
e 0.5
d
rf = 0.01
LF = 0.1
(ca + cb + cc + cs)/ct = 1
LB = LV = 5.00E-04
A
s
LOSS DUE TO DAMAGE D3 s
u
LC = LM = LW = LZ = LO x cs/ct m
e
d
LO = 0.0001
c /c = 1 Assumed
s t
L =L =L =L = 1.00E-04
C M W Z
0
0.00E+00
0.5
0.01
0
0
100000
0.00E+00
0.001
0.00E+00
0.5
0.01
0.1
5.00E-04
0.0001
Type of Building Residential
COLOR INDICATES RISKS RELEVANT TO THE TYPE OF BUILDING
LA = LU = rt x LT x nz/nt x tz/8760
rt = 0.01
LT = 0.01
nz = 240
nt = 240
tz = 2920
rf = 0.01
hz = 1
LF = 0.01
LC = LM = LW = LZ = LO x nz/nt x tz/8760
LO = 1
LC= LM = LW = LZ = 3.33E-01
LB =LV = rp x rf x LF x nz/nt
rp = 0.5
rf = 0.01
LF = 0
nz = 240
nt = 240
LB = LV = 0.00E+00
LOSS DUE TO DAMAGE D3
LC = LM = LW = LZ = LO x nz/nt
LO = 0
LC = LM = LW = LZ = 0.00E+00
rf = 0.01
Lf = 0
cz = 0
ct = 100000
LB = LV = 0.00E+00
LA = LU = rt x LT x ca/ct
rt = 0.01
Lt = 0
ca/ct = 1
La = LU = 0.00E+00
A
s
LOSS DUE TO DAMAGE D2 s
LB = LV = rp x rf x LF x (ca + cb + cc + cs)/ct rp = u
m
e 0.5
d
rf = 0.01
LF = 0.1
(ca + cb + cc + cs)/ct = 1
LB = LV = 5.00E-04
A
s
LOSS DUE TO DAMAGE D3 s
u
LC = LM = LW = LZ = LO x cs/ct m
e
d
LO = 0.0001
c /c = 1 Assumed
s t
L =L =L =L = 1.00E-04
C M W Z
0
0.00E+00
0.5
0.01
0
0
100000
0.00E+00
0.01
0.00E+00
0.5
0.01
0.1
5.00E-04
0.0001
Type of Building Residential
RB = ND x PB x LB
ND = 0.079193787
PB = 0.2
LB = 0.00005
R =N xP xL
C/P D C/P C
ND = 0.079193787
P =
C/P 1
LC = 1
R =
C/P 7.92E-02
R
C/T = ND x PC/T x LC
ND = 0.079193787
P
C/T
=
1
LC = 1
R =
C/T 7.92E-02
RC = 1.58E-01
R =N xP xL
M/P M M/P M
NM = 3.3707
P =
M/P 0
LM = 1
R =
M/P 0.00E+00
R =N xP xL
M/T M M/T M
NM = 3.3707
P =
M/T 0
LM = 1
R
M/T =
0.00E+00
RISK COMPONENETS RELATED TO ZONE 1 (BASEMENT)
RM = ###
R = (N +N )xP xL
U/P L/P DJ/P U/P U
N
L.P
=
###
N =
DJ.P
P
U.P =
LU =
R = (N +N )xP xL
U/T L/T DJ/T U/T U
N =
L/T
N =
DJ/T
P =
U/T
LU =
RU = 9.48E-08
R = (N +N )xP xL
V/P L/P DJ/P V/P V
P =
V/P ###
LV = ###
R = (N +N )xP xL P =
V/T L/T DJ/T V/T V V/T
###
LV = ###
RV = 4.74E-07
R = (N +N )xP xL
W/P L/P DJ/P W/P W
P =
W/P 1
LW = 1
R
W/P
=
3.16E-02
R = (N +N )xP xL P =
W/T L/T DJ/T W/T W W/T
LW = 1
R
W/T
=
1.58E-01
RW = 1.90E-01
R
Z/P = NI/P x PZ x LZ
N =
I/P 0.0148
P
Z/P =
0.1
LZ = 1
R =
Z/P 1.48E-03
R =N xP xL N =
Z/T I/T Z/T Z I/T
0.074
P =
Z/T 0.2
LZ = 1
R
Z/T
=
1.48E-02
RZ = 1.63E-02
R1 = RA + RB + RU + RV
R = 3.64E-01
1
0.031465777
0.05
0.00001
0.00074
0.157328884
0.05
0.00001
Type of Building Residential
RB = ND x PB x LB
ND = 0.079193787
PB = 0.2
LB = 1.66667E-05
R =N xP xL
C/P D C/P C
ND = 0.079193787
P =
C/P 1
LC = 0.333333333
R =
C/P 2.64E-02
R
C/T = ND x PC/T x LC
ND = 0.079193787
P
C/T
=
1
LC = 0.333333333
R =
C/T 2.64E-02
RC = 5.28E-02
R =N xP xL
M/P M M/P M
NM = 3.3707
P =
M/P 0
LM = 0.333333333
R =
M/P 0.00E+00
R =N xP xL
M/T M M/T M
NM = 3.3707
P =
M/T 0
LM = 0.333333333
R
M/T =
0.00E+00
RISK COMPONENTS FOR ZONE 2 (ALL FLOORS EXCEPT BASEMENT)
RM = 0.00E+00
R = (N +N )xP xL N =
U/P L/P DJ/P U/P U L.P
0.000148
N =
DJ.P 0.031465777
P =
U.P 0.05
LU = 3.33333E-05
R = (N +N )xP xL N =
U/T L/T DJ/T U/T U L/T
0.00074
N
DJ/T
=
0.157328884
P =
U/T 0.05
LU = 3.33333E-05
R = (N +N )xP xL P =
V/P L/P DJ/P V/P V V/P
0.05
LV = 1.66667E-05
R = (N +N )xP xL P =
V/T L/T DJ/T V/T V V/T
0.05
LV = 1.66667E-05
R = (N +N )xP xL P =
W/P L/P DJ/P W/P W W/P
LW = 0.333333333
R =
W/P 1.05E-02
R = (N +N )xP xL P =
W/T L/T DJ/T W/T W W/T
LW = 0.333333333
R =
W/T 5.27E-02
RW = 6.32E-02
R =N xP xL
Z/P I/P Z Z
ALL FLOORS EXCEPT BASEMENT)
N =
I/P 0.0148
P
Z/P =
0.1
LZ = 0.333333333
R =
Z/P 4.93E-04
R =N xP xL
Z/T I/T Z/T Z
N =
I/T 0.074
P =
Z/T 0.2
LZ = 0.333333333
R =
Z/T 4.93E-03
RZ = 5.43E-03
R1 = RA + RB + RU + RV
R1 = 1.27E-06
R1 = RA + RB + RC + RM + RU + RV + RW +RZ
R1 = 1.21E-01
R2 = RB + RC + RM + RV + RW + RZ
R2 = 3.74E-02
R3 = RB + RV
R3 = 2.90E-07
R4 = RB + RC + RM + RV + RW + RZ
R4 = 3.69E-02
R4 = 1.27E-06
RISK COMPONENTS
DESCRIPTION: LIGHTNING RISK ANALYSIS
PREPARED BY: DISHANT KUMAR CHECKED BY: NAGENDRA CS
PA 2.00E-01
PB 2.00E-01
P
C/P 1.00E+00
P
C/T 1.00E+00
P
M/P 0.00E+00
P
M/T 0.00E+00
P
U/P 5.00E-02
P
U/T 5.00E-02
P
V/P 5.00E-02
P
V/T 5.00E-02
P
W/P 1.00E+00
P
W/T 1.00E+00
P
Z/P 1.00E-01
P
Z/T 2.00E-01
Number of Dangerous events per year
ND 7.92E-02
N
DJ/P 3.15E-02
N
DJ/T 1.57E-01
NM 3.37E+00
N
L/P 1.48E-04
N
L/T 7.40E-04
N
I/P 1.48E-02
N
I/T 7.40E-02
R
U/T 7.90E-08 2.63E-07 3.42E-07 RZ 1.63E-02 5.43E-03 2.17E-02
ZONE 1 ZONE 2
LB = LV 0.00E+00 0.00E+00
LC = LM = LW = LZ 0.00E+00 0.00E+00
Loss of Irreplaceable Cultural Heritage (L3)
ZONE 1 ZONE 2
LB = LV 0.00E+00 0.00E+00
Economic Loss (L4)
ZONE 1 ZONE 2
LA = LU 0.00E+00 0.00E+00
LB = LV 5.00E-04 5.00E-04
LC = LM = LW = LZ 1.00E-04 1.00E-04
Total Risk
ZONE 1 ZONE 2 STRUCTURE ZONE 1 ZONE 2 STRUCTURE
R1 1.52E-06 1.27E-06 2.79E-06 R3 8.71E-07 2.90E-07 1.16E-06
R2 1.12E-01 3.74E-02 1.50E-01 R4 1.11E-01 3.69E-02 1.48E-01
O
T
H
E
T
Y
P
E
O
F
B
U
I
L
D
I
N
G
RISK ANALYSIS RESULTS
DESCRIPTION: LIGHTNING RISK ANALYSIS
PREPARED BY: DISHANT KUMAR
CHECKED BY: NAGENDRA CS
NEED OF PROTECTION
NO
YES
NO
YES