Department of Civil Engineering

DCA20072 – ENGINEERING
SURVEY

Field Book-Levelling

PROGRAMME : DIPLOMA IN CIVIL ENGINEEERING


PRACTICAL NO. :
TITLE :
GROUP :
CLASS :
LECTURER’S NAME :
PROGRESS REPORT PER WEEK

WEEK/
PROGRESS
DATE

DAY 1
DATE:

DAY 2
DATE:

DAY 3
DATE:

DAY 4
DATE:

DAY 5
DATE:
DCC20063 ENG. SURVEY

Levelling Booking Form


Contour

Civil Engineering Department


PORT DICKSON POLYTECHNIC

a1 b1 c1 d1 e1

b2 c2 d2 e2
a2

b3 c3 d3 e3
a3

b4 c4 d4 e4
a4

b5 c5 d5 e5
a5

CH 0m CH 5m CH 10m CH 15m CH 20m

b6 c6 d6 e6
a6

TBM
b7 c7 d7 e7
a7

b8 c8 d8 e8
a8

b9 c9 d9 e9
a9

5 metre
b10 c10 d10 e10
a10 v{"A?":"B","a":5,"d":"B","h":"www.canva.com","c":"

5 metre

Task 1 :
Plot grid contour using scale 1 metre = 1 cm on a size A3 paper. Indicate value of spot height each
point from data of longitudinal and cros sectional using Height Of Collimation Method.

Task 2 :
Based on your data, generate contour with suitable interval using Interpolation Method.

3
DCC20063 ENG. SURVEY
APPENDIX 2
Levelling Booking Form
(Height of Collimation
Method) Bac
Inter Fo H R
k m re ei e A d R
sigh e si g d d j e
Civil Engineering Department
t d gh h u j u m
PORT DICKSON
i t c u s a
POLYTECHNIC a o e s t r
t t m k
e C L m e s
si ol e e n
g li v n t
h m e t R
t a l e
ti d
o u
n c
e
H L
O e
C v
e
l
DCC20063 ENG. SURVEY
DCA20072 ENG. SURVEY

ENGINEERING SURVEY
CIVIL ENGINEERING DEPARTMENT
POLYTECHNIC OF PORT DICKSON

PRACTICAL : PRACTICAL 1

TITLE : Contour

Introduction

Instrument
DCA20072 ENG. SURVEY

Field work procedure


Result
Conclusion
DATA
GRID CONTOUR

GROUP 1

REDUCE
BS IS FS RISE FALL REMAKS
LEVEL.
0.89           TBM (10.00 m)
  1.64         ch 0m
  1.45         a1
  1.32         a2
  1.45         a3
  1.39         a4
  1.46         a5
  1.5         a6
  1.42         a7
  1.32         a8
  1.38         a9
1.295   1.3       a10
  1.505         ch 5 m
  1.4         b1
  1.32         b2
  1.5         b3
  1.456         b4
  1.47         b5
  1.44         b6
  1.564         b7
  1.4         b8
  1.399         b9
1.569   1.005       b10
  1.47         ch 10 m
  1.32         c1
  1.224         c2
  1.059         c3
  1.551         c4
  1.532         c5
  1.265         c6
  1.332         c7
  1.23         c8
  1.226         c9
  1.264         c10
1.456   1.554       ch 15 m
  0.894         d1
  0.578         d2
  1.001         d3
  1.056         d4
  1.558         d5
  0.869         d6
  0.558         d7
  0.887         d8
  0.894         d9
  1.112         d10
0.987   1.054       ch 20 m
  1.226         e1
  0.99         e2
  1.564         e3
  1.112         e4
  0.98         e5
  1.487         e6
  1.87         e7
  0.98         e8
  1.63         e9
  1.55         e10
0.54   0.89       A
    1.899       TBM (10.00 m)

Point a1-e10 = Point


Grid
A = unknown point
TBM = Temporary Bench Mark

GROUP 2
REDUCE
BS IS FS RISE FALL REMAKS
LEVEL
0.918           TBM (10.00 m)

  1.64         ch 0m
  1.45         a1
  1.32         a2
  1.45         a3
  1.39         a4
  1.46         a5
  1.5         a6
  1.42         a7
  1.32         a8
  1.38         a9
1.334   1.45       a10
  0.687         ch 5 m
  0.888         b1
  0.879         b2
  0.56         b3
  0.49         b4
  0.44         b5
  1.235         b6
  1.225         b7
  1.059         b8
  1.056         b9
1.058   1.665       b10
  1.47         ch 10 m
  1.32         c1
  1.224         c2
  1.059         c3
  1.551         c4
  1.532         c5
  1.265         c6
  1.332         c7
  1.23         c8
  1.226         c9
  1.264         c10
1.445   1.564       ch 15 m
  0.894         d1
  0.578         d2
  1.001         d3
  1.056         d4
  1.558         d5
  0.869         d6
  0.558         d7
  0.887         d8
  0.894         d9
  1.112         d10
1.555   1.45       ch 20 m
  1.226         e1
  1.645         e2
  1.455         e3
  0.921         e4
  0.945         e5
  1.487         e6
  1.87         e7
  1.555         e8
  1.63         e9
  0.89         e10
0.881   0.918       A
    1.78       TBM

Point a1-e10 = Point Grid


A = unknown point
TBM = Temporary Bench Mark

GROUP 3
REDUCE
BS IS FS RISE FALL REMAKS
LEVEL
TBM (10.00
1.11          
m)
  1.64         ch 0m
  1.45         a1
  1.32         a2
  1.45         a3
  1.39         a4
  1.46         a5
  1.5         a6
  1.42         a7
  1.32         a8
  1.38         a9
1.334   1.45       a10
  1.505         ch 5 m
  1.4         b1
  1.32         b2
  1.5         b3
  1.456         b4
  1.47         b5
  1.44         b6
  1.564         b7
  1.4         b8
  1.399         b9
1.058   1.665       b10
  1.47         ch 10 m
  1.32         c1
  1.224         c2
  1.059         c3
  1.551         c4
  1.532         c5
  1.265         c6
  1.332         c7
  1.23         c8
  1.226         c9
  1.264         c10
1.445   1.564       ch 15 m
  0.894         d1
  0.578         d2
  1.001         d3
  1.056         d4
  1.558         d5
  0.869         d6
  0.558         d7
  0.887         d8
  0.894         d9
  1.112         d10
1.23   1.45       ch 20 m
  1.226         e1
  1.897         e2
  1.564         e3
  1.112         e4
  1.664         e5
  1.487         e6
  1.234         e7
  1.555         e8
  1.63         e9
  1.55         e10
0.64   0.812       A

    1.54       TBM

Point a1-e10 = Point Grid


A = unknown point
TBM = Temporary Bench Mark

GROUP 4

REDUCE
BS IS FS RISE FALL REMAKS
LEVEL

1.02           TBM (10.00 m)

  1.64         ch 0m
  1.45         a1
  1.32         a2
  1.45         a3
  1.39         a4
  1.46         a5
  1.5         a6
  1.42         a7
  1.32         a8
  1.38         a9
1.025   1.02       a10
  0.687         ch 5 m
  0.888         b1
  0.879         b2
  0.56         b3
  0.49         b4
  0.44         b5
  1.235         b6
  1.225         b7
  1.059         b8
  1.056         b9
1.245   1.52       b10
  1.47         ch 10 m
  1.32         c1
  1.224         c2
  1.059         c3
  1.551         c4
  1.532         c5
  1.265         c6
  1.332         c7
  1.23         c8
  1.226         c9
  1.264         c10
1.65   0.898       ch 15 m
  0.894         d1
  0.578         d2
  1.001         d3
  1.056         d4
  1.01         d5
  0.869         d6
  0.558         d7
  0.887         d8
  0.894         d9
  1.112         d10
1.012   1.13       ch 20 m
  1.226         e1
  0.781         e2
  1.455         e3
  0.921         e4
  0.945         e5
  1.012         e6
  1.106         e7
  1.032         e8
  1.63         e9
  0.89         e10

0.56   1.67       A

    1.79       TBM (10.00 m)


             

Point a1-e10 = Point Grid


A = unknown point
TBM = Temporary Bench Mark

GROUP 5

FALL REDUCE
BS IS FS RISE REMAKS
LEVEL

1.021         TBM (10.00 m)

  1.25       ch 0m
  1.08       a1
  1.32       a2
  1.45       a3
  1.39       a4
  1.46       a5
  1.081       a6
  1.42       a7
  1.32       a8
  1.38       a9
1.35   1.25     a10
  0.687       ch 5 m
  0.888       b1
  0.879       b2
  0.56       b3
  0.49       b4
  0.44       b5
  1.235       b6
  1.225       b7
  1.059       b8
  1.056       b9
1.058   1.665     b10
  1.47       ch 10 m
  1.32       c1
  1.224       c2
  1.059       c3
  1.551       c4
  1.532       c5
  1.265       c6
  1.332       c7
  1.23       c8
  1.226       c9
  1.264       c10
1.445   1.564     ch 15 m
  0.894       d1
  0.578       d2
  1.001       d3
  1.056       d4
  1.558       d5
  0.869       d6
  0.558       d7
  0.887       d8
  0.894       d9
  1.112       d10
1.07   1.26     ch 20 m
  0.877       e1
  0.86       e2
  1.2       e3
  0.921       e4
  0.98       e5
  1.487       e6
  1.66       e7
  1.56       e8
  1.36       e9
  0.891       e10
0.561   1.021     A

    1.399     TBM
           

GROUP 6

REDUC
BS IS FS RISE FALL REMAKS
E LEVEL

1.115           TBM (10.00 m)

  0.55         ch 0m
  0.68         a1
  1.32         a2
  1.112         a3
  1.05         a4
  1.12         a5
  1.5         a6
  1.45         a7
  1.15         a8
  1.25         a9
1.334   1.45       a10
  0.687         ch 5 m
  0.888         b1
  0.879         b2
  0.56         b3
  0.49         b4
  0.44         b5
  1.235         b6
  1.225         b7
  1.059         b8
  1.056         b9
0.891   0.899       b10
  1.256         ch 10 m
  1.056         c1
  1.222         c2
  0.589         c3
  0.85         c4
  1.532         c5
  1.265         c6
  1.335         c7
  1.23         c8
  1.226         c9
  1.25         c10
1.025   1.052       ch 15 m
  0.894         d1
  0.578         d2
  1.001         d3
  1.056         d4
  1.558         d5
  0.869         d6
  0.558         d7
  0.887         d8
  0.894         d9
  1.112         d10
1.25   1.355       ch 20 m
  1.226         e1
  1.645         e2
  1.455         e3
  0.921         e4
  0.945         e5
  1.487         e6
  1.65         e7
  1.25         e8
  1.55         e9
  0.89         e10

0.773   1.115       A
    1.48       TBM (10.00 m)
             
Point a1-e10 = Point Grid
A = unknown point