Kage 1 150 KV AS Nsulatedsubsta N G S and Undergroundcable UG FOR A DWE AVA
Kage 1 150 KV AS Nsulatedsubsta N G S and Undergroundcable UG FOR A DWE AVA
PACKAGE 1 : 150 KV GAS INSULATEDSUBSTATION(GIS)AND UNDERGROUNDCABLE (UGC) FOR JAKARTA AND WEST JAVA
h
9,488.67
D
3 phase busbar disconnec:tor 1600 A, 40 kA, 1 sec. W~
3 phase driving mecI1anlsm.
France I SwftzeIIand 4 sets 23.980.07 0.00 23,980.07 1,236.14
t:" ~~
4,944.55
France I Switze<land
2 sets 38,690.56
3 phase GIS current transformer comprising : France I SwftzeIIand 2 sets Included in 1.7.
Class X ratio 2000 11A for main bus zone protection
/-
Class X ratio 2000 11A lor check bus zone protection
~-
3 phase GIS rnagnetlc Voltage Transformer
ratio 150000 ;V311oo ;V3IlOO; V3 Volt
France I SwiIzef1and 2 sets 32,465.54 0.00 32,465.54 1.618.38
~::Z vD
e
100 VA burden for each secondary ratio, class 0.5 and ciass 3P
cable and box suitable to tenninate 3 single core 1xlooo sqmm Cu France I Switzerland 2 sets 8,333.33 0.00 8,333.33 468.10
150 kV XLPE cables ~
Local Cantrol Panel at GIS room. each comprising : 2 sets
I·_diagram
1 • Local I remote switch
7 • Discrepancy swftch
1 • Gas Monitoring equipment
, • Cable Marshalling board
ProIecIion & Cantrol Cubicle 10( UGC ComprIsIng : U.K. 0( France 2 sets 10,248.03 0.00 10,248.03 1,293.75 20,496.06 2,587.50 7
· lEO MUI Una Protection (Current differential, synchmcheck. etc.)
· lED Backup Protection (OC, DEF, Break fail, Fau~ Locator, etc)
~ lEO Bay Cantrol, mete~ng, etc.
Ethernet SWitch for Inter-bay system-I
· Ethernet SWitch foe Inter-bay system-2
Including miscellaneous equipment. local mImIe and material, rack cabine~
cables, cIamp$, connectrxs, eompnesslon terminal, connection to individual
Items at equipment. test terminal, auxiiary neIay, intel10r1am9, heater •.. etc. to
completethe scope at -u.
LV paw ... and control cable. power cable and necessaIY equipment to France I Switzerland 2 sets 5,208.53 0.00 5,208.53 259.64 10,417.06 519.28
complete the specifled scape at WO<k
,.,.:::-
TOTAL PRICE ITEM1 535.174.32 29.249:2.1
~
\
SIGNATURE OF BIOOER :
1 0319
PACKAGE 1 : 150 KV GAS INSULATED SUBSTATION (GIS) AND UNDERGROUND CABLE (UGC) FOR JAKARTA AND WEST JAVA
SCHEDULE NO.1: PLANT AND EQUIPMENT (INCLUDING MANDATORY SPARE PARTS) SUPPLIED FROM ABROAD
e
150 kV GIS TRAHSFORMER BAYS, comprising: (3 sets)
......
I 3 phase busba< c:onductor 2000 A, 40 kA, 1 sec - double busba< Ff'IW1Ce I SWiIz.er1and 3 sets 12,313.38 0.00 12,313.38 613.81
(refer to slogle Ine dagram). ~
r<:
3 phase c:IrI:ulI bteaket, 1250 A, 40 kA symmetrical, FranceIS_ 3 sets 95,173.65 0.00 95,173.65 4,744.33 14,233.00
short c:trcu~ C>lrrent for 1 sec, with 3 phase drivfng mechanism. ~
~
3 phase busbar disconneetor 1250 A, 40 kA, 1 sec. With
3 phase dIMng mechanism.
NA sets
33,883.54 0.00 33.883.54 1,689.07
616 ~
<,
3 phase GIS cutrenl transfonner comprising : France I SWiIu<Iand 3 sets _In 2.6
-
19 e
Class X ratio 2000 11Ato< main bus zone protection
Class X ratio 2000 11A for check bus zone protection
t/
Cable and box suitable for terminatV>g 3 single c:o<e 400 sqmm France I SwttufIand 3 sets 9,390.41 0.00 9,390.41 468.10
(
Cu 150 kV XlPE cable
Protection & Control Cubicle to< 150/20 kV Transformer CompnsIng : UK or France 3 sets 4,442.42 0.00 4,442.42 560.83 13,327.25 1,682.48
lED Maln Transformer Protection (Differential, REF HVILV side, DFR, etc.)
)
lED Backup Protection (OC, EF, SEF, OV, UV, AVR, FR, etc.)
lED Bay Control AVR, metering, etc.
Ethernet SWItch for Int ....oay system-l
- -
Ethernet SWItch for Int ....oay syste~2
Indudlng mlscelaneous equ~t local mimic and material, rack cabinet
cables, clamps, connectors, c:ompresslon tenninal, connection to lndMduai
items of equipment test tenmal, awcIia<y ntIay,lntenorlamp, heater ... etc, to
completethe scope of WOfI<s.
LV _ and control-. _ cable and necessaty equipment to FraneelS_d 3.00 sets 5,208.53 0.00 5,208.53 259.84 15,625.59 778.92
completethe specified scope of_
r-
TOTAL PRICE ITEM 2 -.M5.17 \1oYk13
~
SIGNATURE OF BIDDER:
1 0320
PACKAGE 1 : 150 KV GAS INSULATED SUBSTATION (GIS) AND UNDERGROUND CABLE (UGC) FOR JAKARTA AND WEST JAVA
SCHEDULE NO.1: PLANT AND EQUIPMENT (INCWDING MANDATORY SPARE PARTS) SUPPLIE.D FROM ABROAD
CIF
TOTAl PRICE
lJU
short c:lrcuft currenl for 1 sec, willl 3 phase driving mechanism.
I 3 phase busbar disconnector 2000 A, 40 kA, 1 sec. With France / Switzerland 2 sets 35.195.49 0.00 35,195.49 1.754.47 70,390.97
3 phase dtMng mechanism.
3 phase high speed earthing switch France / Switzel1and 2 sets included In3.3
Pn>IadIon & CcnInlI Cubicle for Bus Coupler Compftsing : UK or Frana! 1 set 6,564.20 0.00 6,564.20 631.22 6,564.20 631.22
lEO Main Bus Proteetlon
lEO Backup ProteetIon
lED BayCcntrol
Elhemet SwItch for Int ... -bay system-l
Elhemel Switch for Inter-bay system-2
" IndudIng mlsc:elaneous equipmenL local mimic and material, rack cabineL
cables. clamps, connedDn, compression tennlnal, conneetlon to lndMduai
Items of equJpmen~ test tennlnal, awOllary relay, Inteflor lamp, heater ... etc, to
) complete lIle scope of wor1<s.
c::
Mar.;hatllng kiosk for 150 kV bus coupler bay.
"----- I
for 20 kVIn<:ofM1g 2 sets (complete with 4 set metering per~ as required)
SIGNATURE OF BIOOER:
1 0321
PACKAGE 1 : 150 KV GAS INSULATED SUBSTAT10N (GIS) AND UNDERGROUND CABLE (UGC) FOR JAKARTA AND WEST JAVA
SCHEDULE NO.1: PlAHT AND EQUIPMENT (INCLUDING MAHOATORY SPARE PARTS) SUPPLIED FROM ABROAD
.
I UTP cable to connect lED for ethemet switches In the same cubicle 1 sel
! Rack for _. Gate Way and Ethernet SwItch 1 sel
Fumiture 1 set
..
I Engin-'ng Toots and Test Equipmenl (laptop)
Fiber optic cable to support Interbay L/>Jol
MsceIaneous equipment and material includingcables. UTP cable. telephone
1
1
1
sel
Lot
set
sc SUPPLY EQUlPMEHT
IIM!IIer 1 set
AC 0IsltIbu1I0n Boan! 1 sel
20 kV Stainless steel Neutral Earttmg ResIstor 12 oIvn. 10 sec. SpaIn or oIheIs 2 sets 2,226.17 0.00 2.226.17 281.04 4.452.34 562.08
SIGNATURE OF BIDDER:
1 0322
PACKAGE 1 : 150 KV GAS INSULATEDSUBSTATION(GIS)AND UNDERGROUNDCABLE (UGC) FORJAKARTA AND weST JAVA
20 kV single phase neutral CT Class X ratio 2000-1000 I 5A Spain or cMhers 2 seIs Included
fO( reslricted elf protection suitable for mounting outdoor on
tr3nsformer tank 0( on separate steel slructure support.
20 kV single phase neu1ral CT Class 10P20 ratio 1000 I SA, SpaIn or o!heIs 2 sets Included
30 VA for standby earth fauft pn>Iection suftabIe for mounting outdoor
on transformer tank or on separate steel slructure support.
, Transformer blast and fire prevention equipment France or India 2 sets 12.010.n 0.00 1~.010.72 1.516.28 24,021.45 3.032.56
DC EQUIPMENT, comprising :
! 110 V DC BaII8ry minimum 240 AH, 8 hours rate (for cubicle 2OkV) 1 set
I 48 V DC Battery minimum 120 AH, 8 hours rate for remote substation NA set
I.VAC cistribution board for "",lmum 9 bays including 20% spare 1 lot
for each type of MC8(S~ fuses, 3 Anvneter, 1 Voltmeter with
setec:tor swi1I;h, 1 single rate 3 phase kWH meter, 4 wire, 3 phase
CT suitable for the load, wiring, damp, connector and aMnec:essa<y
material to ccmpIete the scope of work.
SIGNATURE
OF BIDDER:
1 0323
PACKAGE 1 : 150 KV GAS INSULATED SUBSTATION (GIS) AND UNDERGROUND CABLE (UGC) FOR JAKARTA AND WEST JAVA
SCHEDULE NO.1: PLANT AND EQUIPMENT (INCLUDING MANDATORY SPARE PARTS) SUPPUED FROM ABROAD
CIF
TOTALPRlCE
2 Supply and Inslalation of LV auxiliary power and control cables for : 1 lot
'3 Clamps, connectors and 04her necessary matef1aIsfor ~ern 14.2 1 101
~
TOTAL PRICE ITEM 14 0.00 0.00
150 kV single core XlPE cable 400 sqmm III conductor for 2 sets
3 phase connection between GIS cable end box and Ir.Insformer
cable end box. 1 core perphase.
The cable length is approJdmately 150 m
2 c- end box/Cable seaIng end. cable support. damps. a>nneetors SwfIz.e<tand or 04hers 2 sets 8.806.97 0.00 6.806.97 859.34 13.613.94 1.718.68
and accessories for i!em 15.1 at the GIS for proper connection
between GIS and 150 kV XlPE cables. 3 phase set
3 cable _ationIcabie end box. cable support. clamps. connectc<s SwitzeI1and or 04hflfS 2 sets 6.981.66 0.00 6.981.66 681.42 13.963.72 1,762.83
ar.d accessories for Kern 15.1 a1the power transformer for proper
connection between power transformer and 150 kV XlPE cables.
3 phase set.
~
\
SIGNATURE OF BIDDER:
1 0324
PACKAGE 1 : 150 KV GAS INSULA TEO SUBSTATION (GIS) AND UNDERGROUND CABLE (UGC) FOR JAKARTA AND WEST JAVA
SCHEDULE NO.1: PLANT AND EQUIPMENT (INCLUDING MANDATORY SPARE PARTS) SUPPLIED FROM ABROAD
1
Ethernet Interface
M)F Maln DIstribution Frame
2
1
1
Port
set
lot
Included
Included
Included
Rad<lCabinet
i DIgital Teleprotectlon 4 ·sels Included
I PAX Telephone 0 lot
4 Hand set Telephone 2 sels Included
S _eou$ equipment and matefiaI including cables, path c:on1, pig tail, 1 lot Included
telephone cable, connectors, compression terminal, connection 10 indiVIdual
Items 01 equipment ... eIc, to complete the scope of WOf1<s•
In,
T ..... program apf>hd for 1 (one) pac:I<age con_ I lot
SUbstation Automation Engineer (2 trainee, 15 _) 30 M)
: Substation Automation Operation and Malnternlnce (2 Trainee, 15 duration) 30 M)
Optical TeIecommunicalion I NMS eng.. _(2 trainee, 15 dufaIion) 30 M)
SUbstation TeieCO<MKJnlcatlon Opetation and MaIntenance Stall' 30 M)
(2 Trainee, 15 Duration)
IIISCEl.I.AHEOUS
, --
~ equlpment and material requlnld for completion the scope 01
0.00 0.00
SIGNATURE OF BIDDER: