Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 1

PT.

KARUNIA ARMADA INDONESIA


SITE PT GANDA ALAM MAKMUR (GAM)
PLANT DEPARTMENT

Location : PT. Karunia Armada Indonesia Unit Type : P360


Report date : 18-May-21 Serial Number : 9BSP6X400J3930662
Accident date : 10-May-21 Engine number : -
Accident place : PIT Utara Simpang stock room Baru Code Number : KDT-033
Hours meter : 85 Grand total cost (A+B+C+D) Rp30,726,600
Cabin Assy Bending, Front Glass windscreen Broken,
Summary damage : Mirror view Lh broken, Door Lh Bending

ANALISA BIAYA PERBAIKAN


A. Evacuation cost
NO UNIT USED PRICE/hour TOTAL HRS TTL COST (IDR) REMARKS
1

TOTAL Rp0

B. Man power cost


NO MAN POWER QTY MCH PRICE/hour TOTAL HRS TTL COST (IDR) REMARKS
1 Mechanic 2 Rp200,000 8 Rp3,200,000

TOTAL Rp3,200,000
C. Spare part cost
NO PART NAME PART NUMBER PRICE/pc (IDR) QTY TTL PRICE (IDR) REMARKS
1 Head Lamp 1732507 Rp 3,754,700 1 Rp 3,754,700
2 MIRROR GLASS 1749684 Rp 860,500 1 Rp 860,500
3 Wind Screen 1406463 Rp 8,740,300 1 Rp 8,740,300
4 MIROR LH ASSY 1484037 Rp 4,171,100 1 Rp 4,171,100
5 SPACING PLATE 1390746
6 SCREW 1768691
7 SCREW M6X30 815875
8 CAB CORNER LH 2165863
9 STEP PLATE LH 1779113
10 VIBRATION INSULATOR 1778532
11 BRACKET 1769417
12 SHOULDER SCREW 1505287
13 SHOULDER SCREW 1518087 BELUM DAPAT
14 SCREW M6X60 815878 HARGA
15 CASING 1484055
16 BRACKET 1819894
17 Mudguard 1485489
18 BUSH 1832298
19 CLASP UPPE-MUD 1390747
20 PROTECTION MESH 1825433
21 COVER SEAL LH 1816881
22 SCREW 805957
TOTAL Rp17,526,600

D. Optional cost
NO PART NAME PART NUMBER PRICE/pc (IDR) QTY TTL PRICE (IDR) REMARKS

1 LABOUR COST REPAIR CABIN - Rp10,000,000 1 Rp10,000,000


& REPAIR DOOR LH

TOTAL Rp10,000,000

PREPARED BY CHECKED BY, APPROVED BY

Machfuzh. A Slamet Purnomo Syahrial


Sr. Maintenance Planner Mtc. Planner Plant Superintendent

You might also like