Download as pdf or txt
Download as pdf or txt
You are on page 1of 3

20 Planning Forms

2.2 SCOPE MANAGEMENT PLAN


The Scope Management Plan is part of the project management plan. It specifies how the project scope will be defined,
developed, monitored, controlled, and validated. Planning how to manage scope should include at least processes for:

• Developing a detailed scope statement


• Decomposing the project into discrete deliverables using a WBS
• Determining what constitutes a scope change versus a revision and how scope changes will be managed
through the formal change control process
• Maintaining the WBS and the scope baseline
• How deliverables will be accepted

In addition, the Scope Management Plan may provide direction on the elements that should be contained in a
WBS Dictionary and how the scope and requirements management plans interact.
The Scope Management Plan can receive information from:

• Project Charter
• Project Management Plan
It is related to:
• Requirements Management Plan
It provides information to:
• Requirements Documentation
• Scope Statement
• WBS
• WBS Dictionary
The Scope Management Plan is an output from the process 5.1 Plan Scope Management in the PMBOK®
Guide—Fifth Edition.
You can use the element descriptions in Table 2.2 to assist you in developing a Scope Management Plan.

TABLE 2.2 Elements of the Scope Management Plan


Document Element Description
Scope Statement Describe how the Scope Statement will be developed including any alternatives analysis, stakeholder
development interviews, or research that will be conducted.
WBS structure Describe the WBS structure and whether it will be arranged using phases, geography, major deliver-
ables, or some other way. The guidelines for establishing control accounts and work packages may
also be documented in this section.
WBS Dictionary Identify the fields that will be used in the WBS Dictionary and the level of detail needed.
Scope baseline Identify the types of scope changes that will need to go through the formal change control process
maintenance and how the scope baseline will be maintained.
Scope change Describe how changes to scope will be managed. This includes articulating the difference between a
scope change and a scope revision.
Deliverable For each deliverable identify how the deliverable will be validated for customer acceptance, including
acceptance any tests or documentation needed for signoff.
Scope and require- Describe how project and product requirements will be addressed in the Project Scope Statement and
ments integration WBS. Identify the integration points and how requirements and scope validation will take place.

c02.indd 20 10/01/13 1:41 PM


SCOPE MANAGEMENT PLAN
Project Title: Date:

Scope Statement Development

WBS Structure

WBS Dictionary

Page 1 of 2

c02.indd 21 10/01/13 1:41 PM


SCOPE MANAGEMENT PLAN
Scope Baseline Maintenance

Scope Change

Deliverable Acceptance

Scope and Requirements Integration

Page 2 of 2

c02.indd 22 10/01/13 1:41 PM

You might also like