Sow System MDP

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

Inside Home Find & Search People Finder

IBU SMO Heavy Oil

Home PORTFOLIO WAP PROCESS PROGRESS REPORTING EQUIPMENT WUR

Work Assignment Form Quotation Log

Work Assignment Create Propose Start Date Propose End Date Duration (Day(s))
Date

20-AUG-2019 02-SEP-2019 31-JAN-2020 152

Rate (IDR) Quantity


Description Unit Non Non Duration Total Price
Remote Remote
Remote Remote
EARTHWORK & CIVIL 0 0 0 0 0 0.00
Earthworks 0 0 0 0 0 0.00
Earthworks Fill from Company Designated Cu. 116,107.00 0.00 15372 0 0 1,784,796,804.00
Location, Haul & Compacted (with hauling Meter
distance from 0.5 KM to 15 KM)
Earthworks Fill, Haul & Compacted, Cu. 15,375.00 0.00 15372 0 0 236,344,500.00
Additional Cost for Contractor Provided Fill Meter
Land Clearing and Grubbing Sq. 11,081.00 0.00 4650 0 0 51,526,650.00
Meter
Manual Excavation Cu. 225,164.00 0.00 312 0 0 70,251,168.00
Meter
Back fill and Compaction for Underground Cu. 82,583.00 0.00 1134 0 0 93,649,122.00
Facility Meter
Earthworks Cut/Excavation Cu. 60,633.00 0.00 282.7 0 0 17,140,949.10
Meter
Road Improvement 0 0 0 0 0 0.00
Supply and Install Soil Cement Bag (Soil Each 148,632.00 0.00 2500 0 0 371,580,000.00
mixed with cement)
Supply and Install Compacted Agregate Cu. 725,596.00 0.00 5652 0 0 4,101,068,592.00
Class C Meter
Structural Steel Works 0 0 0 0 0 0.00
Install Steel Pipe Culvert size >= 24" Meter 1,351,099.00 0.00 60 0 0 81,065,940.00
diameter
Concrete Works for Off Plot 0 0 0 0 0 0.00
Supply and Install Sand Bedding Cu. 262,717.00 0.00 10.17 0 0 2,671,831.89
Meter

GRAND TOTAL: 6,810,095,556.99

SUBMIT QUOTATION