GN 110 - Guidelines for Web Lifting Slings End Termination on Bundle for
Anglo Arabian Container Loading
Rev 00 Date: 15.02.2021
1. Ensure Reinforced eyes of both ends of Web Lifting slings to be inserted in the load bar gap properly to a
minimum of 150mm Deep
2. Flat end of Web Lifting Slings to be Tied with Cable 3. Hold the Cable Tie in one Hand and Pull out the
Tie along with nearby Crossbar Web Lifting Slings for Lifting Purspose