Surigao del Norte Electric Cooperative, Inc.

Surigao City

March 4, 2020

TO : ENGR. VIRBUEN U. LADAGA


Manager, Technical Services Department

THRU : ENGR. ALEX A. DIAZ


Supervisor, Engineering Services Division

SUBJECT : NGCP ANNUAL METER TESTING RESULT

Last march 3-4, 2020, NGCP conducted its “ANNUAL PRIMARY METERING/ ACCURACY TESTING OF
REVENUE METERS” on all substation covered by SURNECO.

Attached herein are the copies of the said test result.

For your information.

NOEL GEORGE T. PAQUEO


Industrial load inspector