PROJECT TITLE: ATI MANILA SOUTH HARBOUR EXPANSION PROJECT : EIB RECLAMATION DATE: Friday, March 15, 2019
LOCATION: ATI MANILA SOUTH HARBOUR, MANILA DR. NO. DR-023
whole day near SMC Area On -going operational works of drag flow at SMC Area. Temporary
unloaded sand were suctioned inside the basin.
whole day at inside Felipe 2 Two (2) numbers of RC Sinker (Concrete Block) and MS Plate Bouy
Barge was lifted and placed toward the designated seabed location.
TIPSI Unloading Completion of welding works for the checkered plate installation
on-going 3:45 PM Facility, Pier 3 on the walk-way at Berth Number 1.
arrival of Barge Neo at Site : 7:40 Offshore Barge Neo arrived at the ATI - EIB Reclamation Project site at
A.M around 7:40 A.M.