Professional Documents
Culture Documents
Profile and Project Status Reporting Form - Consultant - Design
Profile and Project Status Reporting Form - Consultant - Design
Reporting Form
For
Consultant: Design
April 2020
Contents
1 Profile of the Consultant...........................................................................................................................1
1.1 Legal Information.............................................................................................................................1
1.2 Technical capability..........................................................................................................................1
1.2.1 Experience of the Consultant....................................................................................................1
1.2.2 Professional Capacity of the Consultant...................................................................................2
1.2.3 Resource Capacity of the Consultant........................................................................................3
1.2.4 Financial Performance..............................................................................................................4
1.2.5 Ongoing Projects......................................................................................................................5
2 Project Status Report................................................................................................................................6
2.1 Executive Summary..........................................................................................................................6
2.2 Project Information...........................................................................................................................6
2.2.1 Manpower assigned for this project by the consultant..............................................................8
2.2.2 List of equipment assigned for this project...............................................................................9
2.2.3 Key Issues.................................................................................................................................9
1 Profile of the Consultant
Consultant’s Legal Name: _____________________________________________________
Nationality: _______________________________________________________________
Address
City:
Street:
Website:
Email:
Fax:
P.O. Box:
Tel No.:
A. In Home Country
Yes: Not Yet No:
1
Name of Percentage Prime Consultant
Value of Period of Client and
project/kind of Works (P) or Sub Final acceptance issued?
Works Contract Place
of works Completed Consultant (S)
B. Abroad
Yes: Not Yet No:
State all permanent technical staff of your company in the Table 1 -2 below.
Table 1-2: Manpower list in the company
1
2
3
4
5
6
7
8
9
NB
2
1.2.3 Resource Capacity of the Consultant
Table 1-3 List of Office Equipment
(Name)
1
2
3
4
5
6
7
8
9
1
2
3
4
5
No Vehicle type Plate No. Production date Capacity
1
2
3
4
5
NB
1) If the above table not sufficient; provide copies or inserting row and provided the information you do not
want to left
3
Table 1-5: Consultant’s financial information
Year Start 1st 2nd 3rd 4th Year 5thYear (last Total
Year Year Year year)
Money in (1)
Money out (2)
Cost of goods
(3)
Overhead cost
(4)
Total money out (5)
3&4
Cash flow
positive/negative
(6= (1)-(5))
Beginning checking
Account Balance (7)
Ending Checking
Account Balance
(8= (7) +(6))
(Birr)
Financial Information
Year 1 Year 2 Year 3 Total Average
Statement of financial position (information from balance sheet)
Total assets (TA)
Total financial liabilities
Total equity/Net worth (NW)
Current assets
Current liabilities
Working capital (WC)
Current Asses/Current
Liabilities
Information from income statement
Total revenue
Earnings before interest,
taxes, depreciation, and
amortization (EBITDA)
Earnings before taxes (EBT)
Cash flow information
Cash flow from operating
activities
4
No Name of the project Client Supervisor
5
2 Project Status Report
2.1 Executive Summary
Summarise the progress of each design project under undertaken by your company separately in not more
than 2 pages. Include a summary of the site visit, study, EIA, public coordination, and progress against the
plan. Highlight major issues and their resolution.
2.2 Project Information
Table 2-7: Project Information
Reporting Period
Project Type: From:
To:
Project Name:
Project Description:
Name of person completing this report: (incl. title
and e-mail address)
Contract Data
Funding
Client
Consultant
Type of Service
Notification of Award
Commencement Date
Contract Amount
6
Advance Payments
Guarantees
Advance Guarantee
Date Received
Expiry Date
7
2.2.1 Manpower assigned for this project by the consultant
8
2.2.2 List of equipment assigned for this project
Identify and summarise key issues that may effect the period of performance or cost of the works contract.
Propose solutions where appropriate. Indicate revised schedule in the following table considering the issues
discussed.
9
Table 2-11: Revised Project Schedule
10