Direct Observation Record

PLG2/04 Installation On – Site


Learning outcomes 4

Learner name
Date job activity carried out
Job activity location
Description of job activity

Cold Water Hot Water Central Heating


Sanitation Gravity Rainwater

Observed
Criteria
(Tick)
Check the necessary job information is available before commencing the
4.1
decommissioning work:
Liaise with other persons to confirm the detail of the decommissioning work to
4.2
be carried out:
Arrange for temporary supplies or services to be available for the duration of the
4.3
decommissioning:
Comply with health and safety requirements when carrying out decommissioning
4.4
work:
Prepare a safe and unobstructed access route to the work areas to carry out
4.5
the decommissioning work:
check that all required tools, equipment and materials are available to undertake
4.6
the decommissioning work:
Report any pre‐existing damage to the building fabric or customer to other
4.7
persons before carrying out decommissioning work:
Provide protection to the building fabric or customer property as the work
4.8
progresses:
4.9 Isolate the system from the supply source or outgoing service:
4.10 Drain and safely dispose of the system contents:
Take precautions to ensure that the system cannot be brought back into
4.11
operation before the decommissioning work is complete:
4.12 Advise other persons that the system has been successfully decommissioned: