Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 1

Direct Observation Record

PLG2/04 Installation On – Site


Learning outcomes 1, 2 and 3

Learner name
Date job activity carried out
Job activity location
Description of job activity

Cold Water Hot Water Central Heating


Sanitation Gravity Rainwater

Observed
Criteria
(Tick)
Check that all necessary job information is available before commencing
1.1
the installation work:
Liaise with other persons to confirm detail of the installation work to be carried
1.2
out:
1.3 Comply with health and safety requirements when carrying out installation work:
Prepare a safe and unobstructed access route to the work areas to carry out the
1.4
installation work:
Check that all required tools, equipment and materials are available to
1.5
undertake the installation work:
Use job information to identify the location of the building fabric that requires
1.6
preparatory work to be carried out:
Report any pre‐existing damage to the building fabric or customer property to
1.7
the other persons before carrying out the installation work:
Provide protection to the building fabric or customer property as the work
1.8
progresses:
1.9 Carry out preparatory work to the building fabric by:
Confirm that the incoming or outgoing main supplies meet the requirements
2.1
of the system or components being installed:
2.2 Measure and mark out the position of the components to be installed:
2.3 Make pipe work and component fixings to the building fabric:
2.4 Position and fix pipe work and components to the building fabric:
2.5 Connect pipe work to system controls and main components:
2.6 Connect pipe work to incoming supplies or outgoing services:
2.7 Carry out installation work minimising the wastage of equipment and materials:
Take precautions to ensure that the system cannot be brought into operation
2.8
before the installation work is fully completed:
Carry out visual inspection of the system or component to be tested to make sure
3.1
that it is ready to be filled with water:
3.2 Charge the system to normal operating pressure and check for leakage:
Perform a soundness test to industry requirements on the installed system or
3.3
component:
3.4 Flush the system with cold water on completion of soundness testing:
Rectify any leakage from the system or component found during the soundness
3.5
test procedure:

Learner Learner
Date:
Name: Signature:
Assesso Assessor
Date:
r Name: Signature:

You might also like