Direct Observation Record

PLG3/07 Install, Commission, Service & Maintain Domestic


Plumbing & Heating Systems On – Site
Learning outcomes 1, 2 and 3

Learner name
Date job activity carried out
Job activity location
Description of job activity

Cold Water Hot Water Central Heating


Sanitation Systems and Sanitation App. Gravity Rainwater

Observed
Criteria
(Tick)
1.1 Obtain details of the customer job requirement:
1.2 Discuss and agree initial system and component options with the customer:
Calculate the size and quantities of components required for systems
1.3
installation:
1.4 Present design calculations and information to the customer:
1.5 Obtain agreement from the customer to progress plumbing and heating work:
Apply changes to customer job requirements and obtain customer agreement to
1.6
those change:
2.1 Use job information to plan the installation work:
Confirm the position of pipe work and components with other persons before
2.2
commencing the installation work:
Comply with health and safety requirements when carrying out the installation
2.3
work:
Prepare a safe and unobstructed access route to the work areas to carry out the
2.4
installation work:
Arrange for all tools, equipment and materials to be available to undertake the
2.5
installation work:
Use job information to identify the location of the building fabric that requires
2.6
preparatory work to be carried out:
Report any pre‐existing damage to the building fabric or customer property to
2.7
other persons before carrying out the installation work:
Provide protection to the building fabric or customer property as the work
2.8
progresses:
2.9 Carry out preparatory work to the building fabric:
Confirm that the incoming or outgoing main supplies meet the requirements of
3.1
the system or component being installed:
3.2 Measure and mark out the position of the components to be installed:
3.3 Make pipe work and component fixings to the building fabric:
3.4 Position and fix pipe work and components to the building fabric:
3.5 Connect pipe work to system controls and main components:
3.6 Connect system pipe work to incoming supplies or outgoing service:
3.7 Carry out installation work minimising the wastage of equipment and materials:
Take precautions to ensure that the system cannot be brought into operation
3.8
before the installation work is fully completed:

Learner Learner
Date:
Name: Signature:
Assesso Assessor
Date:
r Name: Signature: