Unit 345 Install, commission, service and maintain

domestic plumbing and heating systems

Level: 3 Job 2 Task 2


Credit value: 3
Brief description: - PREPARE A BATHROOM SUITE
UAN: K/502/9298
Address: -
Unit aim:

The aim of this unit is to enable learners to demonstrate occupational competence in the
selection of components, the preparation of work sites, to install, commission, diagnose and
rectify faults.

Be able to prepare work sites for the installation of plumbing and


Outcome 2
heating systems and components in the workplace.
Portfolio Candidate Assessor
Criteria
evidence initials initials
use job information to plan the installation
1
work
confirm the position of pipe work and
2 components with other persons before
commencing the installation work
comply with health and safety requirements
3
when carrying out the installation work
prepare a safe and unobstructed access
4 route to the work areas to carry out the
installation work
arrange for all tools, equipment and
5 materials to be available to undertake the
installation work
use job information to identify the location
6 of the building fabric that requires
preparatory work to be carried out
report any pre-existing damage to the
building fabric or customer property to
7
other persons before carrying out the
installation work
provide protection to the building fabric or
8
customer property as the work progresses
carry out preparatory work to the building
9
fabric
Unit 345 Install, Commission, Service and Maintain Domestic
Plumbing and Heating Systems.

Be able to prepare work sites for the installation of plumbing


Outcome 2
and heating systems and components in the workplace.

Criteria 1 How did you use the job information to plan the installation work?

Who did you check with; to ensure the pipe work and components were
Criteria 2
correctly positioned before starting the installation work?

How did you ensure you complied with health and safety requirements
Criteria 3
when carrying out the installation work?

How did you prepare a safe and unobstructed access route to the work
Criteria 4
areas to carry out the installation work?
How did you arrange for all tools, equipment and materials to be
Criteria 5
available to undertake the installation work?

How did you use the job information to identify the location of the
Criteria 6
building fabric that requires preparatory work to be carried out?

Who did you report any pre-existing damage to the building fabric or
Criteria 7
customer property too, before carrying out the installation work?

How did you provide protection to the building fabric and customer
Criteria 8
property as the work progresses?

What preparatory work did you need to carry out to the building fabric before
Criteria 9
the installation work?
Candidate Name:

Candidate Signature: Date:

Workplace Recorder Name:

Workplace Recorder Signature: Date: