Product: INDUSTRIAL ENGINE
Model: C18 INDUSTRIAL ENGINE WJH01852
Configuration: C18 Industrial Engine WJH00001-UP
i02155142
Installation Procedure
Table 1
Required Tools
Tool Part Number Part Description Qty
A 1U-6396 O-Ring Assembly Compound -
NOTICE
file:///C:/Users/ASUS/AppData/Local/Temp/Low/N6B9X03K.htm 22/04/2021
C18 Industrial Engine WJH00001-UP(SEBP3816 - 73) - Systems & Components Page 2 of 2
Illustration 1 g01092920
2. Install the O-ring seals on pipe (3). Apply Tooling (A) to the O-ring seals. Install the pipe in
the water temperature regulator housing.
3. Position water pump cover (4) on water pump (5) and install bolts (7).
4. Install O-ring seal (9) on oil cooler bonnet (10). Apply Tooling (A) to the O-ring seal.
Install the oil cooler bonnet in the engine oil cooler.
5. Install integral seal (8) on oil cooler bonnet (10). Position the oil cooler bonnet on the water
pump and install bolts (11).
7. Fill the cooling system. Refer to Operation and Maintenance Manual, "Cooling System
Coolant - Change".