Professional Documents
Culture Documents
Annexes-Rikhe Bazar
Annexes-Rikhe Bazar
Karnali Province
Ministry of Physical Infrastructure Development
Infrastructure Development Directorate
Water Supply, Irrigation & Energy Development Office
Khalanga, Salyan
A FINAL REPORT ON
Submitted By:
Yashaswi Engineering and Reasearch
Center,Panchakumari
Marg,Kathmandu
FY : 2076-77
प्रदेश सरकार
कर्ााली प्रदेश
पुर्ााधार वर्कास विदेशिालय
खािेपािी, वसचिं ाई तथा उर्ाा वर्कास कायाालय
खलगािं, सल्याि
cfof]hgfsf] l8hfOg tyf nfut cg'dfg l:js[lt kmf/d
!= cfof]hgfsf] ;+lIfKt ljj/0f M—
-s_ cfof]hgfsf] gfd M— ररखे बर्ार खा. पा. आयोर्िा
-v_ lhNnf / न. पा./ गा. पा. / j8f g=M— विर्ेर्ी गाउँपावलका - ३
-u_ cfwf/ aif{sf] hg;+Vof= M— ५७६
८,७०३,५७५।५४
@= cfof]hgfsf] s"n cg'dflgt nfut ?=M—
#= ;j]{If0f ;DjlGw ljj/0f M—
-s_ ;j]{If0f/;h{ldg stf{sf] gfd, kb, b:tvt / ldlt M—
-!_
-@_
-v_ ;j]{If0f / ;h{ldg ul/Psf] cjlw÷ldlt M—
$= k|dfl0ft ul/Psf]
-s_ = k|:tljt sfdsf] gSzf ;h{dLgdf lnPsf] sfdsf] cfwf/df ul/Psf] 5 .
-v_ = l8hfOg tyf Oli6d]6 ul/Psf] c+s u0fgfx? l7s 5 .
l8hfOg tyf n=O{= k|ltj]bg tof/ ug]{ kbflwsf/Lsf]
gfd, kb, b:tvt / ldlt M—
-u_ = k|:tfljt l8hfOg Oli6d]6sf] k|fljlws kIf ;fdfGo OlGhlgol/8 l;WbfGt, ljefluo gd{; tyf
sfoljlw/lbUb{g cg';f/ l7s 5 .
-3_ = k|:tfljt l8hfOgdf gS;fx? k|fljlws b[li6sf]0fjf6 hf'Rbf dgfl;j / l7s 5 .
-ª_ = k|:tfljt Oli6d]6 sfd x'g ;Sg] Go"gtd b//]6df cfwfl/t 5 .
l8hfOg tyf n=O{= k|ltj]bg hf+r ug]{ kbflwsf/Lsf]
gfd, kb, b:tvt / ldlt M—
%= l;kmfl/z ul/Psf] M— o; cfof]hgfsf] ?= ८,७०३,५७५।५४
sf] nfut cg'dfg :jLs[t ug{ dgfl;j b]lvG5 .
l;kmfl/; ug]{ kbflwsf/Lsf]
gfd, kb, b:tvt / ldlt M—
Water supply and sanitation is a basic need of the people. Periodic plans and policy documents
of the government have therefore advocated for improving the access to the basic but safe water
supply services adopting a policy of all-inclusive ethnic groups, economic strata, gender,
religion, disability and geographical location, on the principle of cost sharing and full operation
and maintenance by the beneficiary group in the community.
The sustainable access to safe drinking water supply and appropriate sanitation facilities, in
addition to lessening the drudgery of the people in fetching water, especially of women and
girls children, will improve the health of the people. It helps to reduce medical expenses and
provides an opportunity to additional economic activity and ultimately to improve the living
standards.
The Final Report of Detailed Engineering Survey, Design and Estimate of Rikhe Bazar
Water Supply Project, Tribeni Rural Municipality, Ward – 03, Salyan is prepared under
an agreement signed between Water Supply, Irrigation & Energy Development Office,
Salyan and Yashaswi Engineering and Reasearch Center, Panchakumari Marg
,Kathmandu. It includes detailed cost and quantity estimates of the components.
We would also like to express our thanks to all staff of the Water Supply, Irrigation &
Energy Development Office, Salyan for providing us their kind support and help in some way
or other during field study as well as during design and preparation of the report.
I
Salient Features of Project
District: Salyan
1 Name of Project Rikhe Bazar Water Supply Project
2 Name of Rural Municipality Tribeni
3 Wards Covered 3
4 Number of scheme 1
Rikhe Bazar Water
5 Name of Scheme
Supply Project
Sn Parameters Unit Total
A. Household/Population
1 Households(Survey year:2077) No. 104 104
2 Population(Survey year:2077) No. 548 548
3 Households(Base year:2080) No. 108 108
4 Population(Base year:2080) No. 576 576
5 Households(Design year:2100) No. 139 139
6 Population(Design year:2100) No. 751 751
7 Design Period Yrs. 20 20
8 Annual growth rate % 1.27 1.27
B. Source Information -
1. INTRODUCTION............................................................................................................ 1
1.1. Background ................................................................................................................. 1
1.2. Objective of the Assignment ....................................................................................... 2
1.3. Scope of the Assignment ............................................................................................. 2
1.4. Methodology ............................................................................................................... 3
2. PROJECT AREA............................................................................................................. 5
2.1 Location and Accessibility .......................................................................................... 5
2.2 Topography, Climate and Vegetation ......................................................................... 5
2.3 Population and Educational Institutions ...................................................................... 6
2.4 Economic Characteristics ............................................................................................ 6
3. TECHNICAL ASPECTS ................................................................................................ 7
3.1. Existing Water Supply and Sanitary Situation ............................................................ 7
3.2. Proposed Project .......................................................................................................... 7
3.3. Water Quality .............................................................................................................. 7
3.4. Design Criteria ............................................................................................................ 8
3.4.1. Coverage and Population ..................................................................................... 8
3.4.2. Service Level ....................................................................................................... 8
3.4.3. Water Demand ..................................................................................................... 9
3.4.4. Peak Factor........................................................................................................... 9
3.4.5. Domestic Demand ................................................................................................ 9
3.4.6. Wastage and Leakage .......................................................................................... 9
3.4.7. Total Water Demand ............................................................................................ 9
3.4.8. Consumption Pattern.......................................................................................... 10
3.4.9. Pipe Materials .................................................................................................... 10
3.4.10. Pressure and Velocity ..................................................................................... 10
3.5. Components of the Project ........................................................................................ 11
3.6. Sanitation................................................................................................................... 12
3.7. Environmental Consideration .................................................................................... 12
Final Report of Rikhe Bazar Water Supply Project
Annexes
Annex-A : Quantity & Cost Estimate
Annex-C : Design
Total 87 03 575.54 6 50 418.44 23 31 801.43 29 82 219.87 53 03 222.99 60.93 23 31 801.43 10 68 551.12 34 00 352.55 39.07 Greater than 20%, OK
Notes :
1. The distribution line should always be contributed by people and it ( Village contribution ) should always be more than 20% of total cost.
2. If it is less than 20%, some part, or whole as whatever the case be, the transmission line should also be considered for village contribution.
3. Here about Private Tap connection work should be done by village contribution (as shown in Table).
1. INTRODUCTION
1.1. Background
Poverty alleviation is the overriding objective of development efforts in Nepal. The tenth Plan
(2002-2007) document of the Government of Nepal has renewed in commitment towards this
objective. Equitable access to social and economic infrastructure for the poor and marginalized
groups is regarded as one of the four pillars towards achieving this overriding goal of poverty
alleviation. The government has acknowledged that development of water supply and
sanitation is an important link towards achieving this social equity. Periodic plans and policy
documents of the government have therefore advocated for improving the access to safe water
supply and sanitation facilities in order to improve the quality of life and productivity,
especially in rural areas, which will ultimately lead to poverty reduction.
The water supply and sanitation sector has received a well-deserved priority from both the
governmental and non-governmental sector and several international funding / aid agencies
have supported this endeavor. The vision of this sub-sector is to provide safe drinking water
and adequate sanitation services to the entire population in a sustainable manner and at an
affordable cost by mobilizing resources and communities and applying appropriate technology.
The development of this sector, in addition to saving time in fetching water, will improve the
health of the people and therefore create a healthy manpower that will contribute to productive
economy of the country. The 10th plan aims to develop healthy manpower with additional
economic productivity, reduce medical expenses, and ultimately achieve the target of poverty
alleviation through development of the water supply and sanitation sector which is expected to
play a critical role in this process.
Department of Water Supply & Sewerage is the lead agency in the water and sanitation sector
under the Ministry of Water Supply and Sanitation. The department facilitates and executes
water supply and sanitation projects through users committees under the supervision of its
district based division and sub-division offices to achieve the sector goals set by the
government.
Detailed Engineering Study and Design (DESD) of a project is to be carried out after the project
is selected for implementation. The study will be conducted for all new projects, and for all
existing projects to be selected for rehabilitation. The detailed study reports are produced as
the outcome of the detail survey and design of the projects so that immediate actions could be
undertaken for their implementation
Now, Water Supply, Irrigation & Energy Development Office, Khalanga, Salyan has a
goal to carry out detailed survey and estimate of water supply projects in Salyan district of
1|Page
Final Report of Rikhe Bazar Water Supply Project
Karnali Province as per 2076/77 annual program. Due to the limited appropriate technical
manpower, the office seeks for consultancy service (consultant) to conduct following job.
The main objective of this project is to support interested potential and qualified user
associations/ communities for improvement in the living standard of the people by providing
safe, reliable, adequate and sustainable water supply and sanitation services. The overall
objective of the study is to formulate technically sound and cost-effective water supply and
sanitation projects. Specific objectives are:
The detailed scope of the work mostly includes, but not necessarily limited to the following:
To assess existing situation of water supply and sanitation in the project area;
To carry out detailed engineering and socio-economic survey, prepare checklist for
environment parameters of the project area. The survey will determine existing
levels of services and coverage, income and other poverty indicators, vulnerable
groups and willingness to pay.
To verify the source yield, water quality, intake/deep tube well boring site, reservoir
site, pipe alignment and number and location of public taps and other major
structures;
2|Page
Final Report of Rikhe Bazar Water Supply Project
To clarify the community enthusiasm on the execution of the project and willingness
to contribute for construction and undertake operation and maintenance
responsibility upon commissioning;
To identify appropriate interventions required to promote sanitation at personal,
household and community level, within the project area.
Assessment of electro-mechanical component in order to calculate capital cost as
well as estimated annual power cost & its operation and Maintenance cost.
Prepare detailed Layout Plan and Flow Diagram, name of remarkable places, major
civil components, hydraulic parameter, working drawing and cost estimate etc.
1.4. Methodology
A survey team consisting of Water Supply Engineer and an Overseer with necessary supporting
professionals were assigned for the field study. This team in close consultation with WSIEDO
personal and users thoroughly studied the project area and carried out detailed survey of the
proposed project.
The new DWSS standardization is used for the adoption of design criteria and design of all the
system components. Cost estimation is carried out according to GON Norms adopting
approved district rate and prevailing market rate of materials. Available secondary information
and relevant data from the Central Bureau of Statistics has been used where found necessary.
Final report has been prepared and presented compiling the drawings and quantity estimates
on the basis of designs, and cost estimates based on the detailed analysis of DWSS and
incorporated accordingly in the Final Report.
The consulting services mainly consist of detailed engineering design for Water Supply
components. On the basis of the scope of work, gathering additional information during the
desk study phase, field visit and reconnaissance survey of the sites and the task to be carried
out in the consulting services are identified and listed below in brief.
The following activities have been carried-out necessary during detailed engineering phase:
Field visit, field verification, preparation and submission of detail design Draft
report
3|Page
Final Report of Rikhe Bazar Water Supply Project
Intake design
4|Page
Final Report of Rikhe Bazar Water Supply Project
2. PROJECT AREA
Salyan District (Nepali: स यान िज ला), a part of Karnali province, is one of the seventy-seven
districts of Nepal. Salyan covers an area of 1,462 km2 (564 sq mi) with a population of 213,500
in 2001 and 241,716 in 2011. The district's administrative center is named Salyan or Salyan
Khalanga, today it is part of Shaarda Municipality.
The district is known for its Hindu temples including Shiva temples in Chhayachhetra and
Laxmipur, and the Devi temple at Khairabang in Sarda municipality, one of nine in Nepal.
Tribeni is a rural municipality in Salyan District in the Rapti Zone of western-central Nepal.
At the time of the 1991 Nepal census it had a population of 3789 people living in 710 individual
households.
1. General Information
Name of Project : Rikhe Bazar Water Supply Project
District : Salyan
RMP/MP : Tribeni Rural Municipality
Ward : 03
Community : Rikhe Bazar
2. Accessibility
Distance from district headquarter to project area (Avg.) : 25 km
Name of the nearest market for construction materials : Luham Bazar
Distance from project area to nearest market (Avg.) : 5 km
Name of the place of nearest all weather roadhead from the project area : Luham- Rikhe Site
Although Salyan is considered a hilly district, its southwest salient is actually outside the
Pahari-inhabited hill region, in the lower Siwalik Hills that are more an extension of the Terai.
The Babai River flows through the southwestern Siwaliks section after draining Dang Valley.
A tributary Sharad Khola drains the eastern half of Salyan's hill region—including the district
center, then exits these hills by cutting through the Mahabharat Range to its confluence with
the Babai. The western half of Salyan's hill region is drained by the Bheri.
The soil in the project area is gravel and boulder mixed type. The area has moderate vegetation
with sub-tropical forest species. Main crops are maize, wheat and paddy, potato, sugarcane etc.
5|Page
Final Report of Rikhe Bazar Water Supply Project
The project area includes ward-03 of the Tribeni Rural Municipality of which the population
in 2077 B.S. according to the survey is 548 distributed in 104 households with 5.2 people in
average per household.
The sample survey results show that the Business, Government officers, Abroad, agriculture
and farming are the dominant occupation in all of the households. Some of the residents are
engaged in local trade and business and service. Farming and livestock are closely linked as
livestock provides manure for fertilizer, milk and meat.
6|Page
Final Report of Rikhe Bazar Water Supply Project
3. TECHNICAL ASPECTS
Water Supply, Irrigation & Energy Development Office, Khalanga, Salyan had decided to
provide water supply facilities in the village because the existing systems are quite insufficient
and miss-functional to meet the present demand of the area due to increase as well as migration
of the population. As the area is located in the hill, scattered settlement and based on demand
of local people, a new setup of system, we had to propose separate pipe supply for different
location system. Comparatively, the sanitary condition of the area is quite good.
In the Project area, gravity water supply schemes are proposed to the newly implementation
for providing water supply facilities in the identified area. The schemes include intakes,
distribution chamber, water storage tanks, and transmission and distribution pipelines with
necessary appurtenances in the system. The consumers in the village area will be served
through private tab connection.
Water quality of selected sources is good with pleasant taste with no visual turbidity was found.
Chemical tests of the water samples were not done however, physically the selected sources
are acceptable.
7|Page
Final Report of Rikhe Bazar Water Supply Project
The water supply systems are designed based on criteria of the DWSS Design Guidelines unless
specific site conditions demand otherwise. Design Guidelines are adopted for design period of
the project is taken as
For Gravity System: - 20 years from base year and 23 years from survey year assuming
3 years as construction period.
For Lift System: - 15 years from base year and 18 years from survey year assuming 3
years as construction period
N
R
PN P 1
100
Where,
P = Present Population
N = Number of years
8|Page
Final Report of Rikhe Bazar Water Supply Project
Other demands to be considered are Livestock demand i.e. 20 % of domestic demand, leakage
and wastage from the system by 10 %.
Each type of tap connection has different rate of water consumption. The percentage of the
population served by each category has been estimated through socio-economic survey. Rate
of consumption per person is based on the design guidelines and discussion with Rural
Municipal Officers & Water Supply, Irrigation & Energy Development Office, Khalanga,
Salyan. However, domestic water demand is determined considering optimum water use i.e.
65 lpcd. and also, water yield capacity of sources.
Water demand has been based also on the living standard of the people. The change in the types
of connection from community connection to yard connection to fully plumbed connection will
reflect the increase in their living standard of the beneficiaries. The percentage of different
types of tap connection is based on the present situation of the community.
9|Page
Final Report of Rikhe Bazar Water Supply Project
Water Demand and Tap Flow Calculation Sheet shows the total water demand in different
uses.
Based upon the above consumption pattern, the peak factor has been calculated and found as
2.4 and is applied for the design of distribution system.
10 | P a g e
Final Report of Rikhe Bazar Water Supply Project
DWSS guidelines, a minimum residual head of 5-10 meters has been maintained at all service
nodes as far as possible.
Similarly, there should be minimum cleansing velocity in the pipe sections. An attempt had
been made to have at least 0.3 m/sec velocity in all pipe sections. However, the pipe size
governs the velocity at dead end in few stretches of pipe length. Slightly, higher residual heads
are provided in the design for better service in most of the places. In a few places the residual
head is below 5m but can be managed to flow water by repositioning of structure.
The minimum self-cleaning velocity has been maintained in distribution system wherever
possible. The velocities are non-scoring and are enough for self-cleaning. In some cases, the
size of the pipe governs the nominal velocity.
a. Intakes
DWSS approved standard type of Sump well, Spring intake & Stream intake are proposed to
tap water from selected sources for distribution. Safety of intake structures as well as protection
of sources from pollution is taken into consideration in selecting the intake location.
i) Design demand;
ii) Supply from source; and
iii) Water consumption pattern.
Location of the proposed reservoirs is selected at geographically stable, centrally located and
easily accessible sites.
The average 10m length of 15mm dia. medium class GI pipe has been estimated up to meter
for each public connection. The meter shall be kept near and adjoining the compound of the
public Tap. The necessary fittings have been designed.
11 | P a g e
Final Report of Rikhe Bazar Water Supply Project
e. System Appurtenances
Necessary appurtenances such as collection and distribution chambers, brake pressure
chambers required along the pipelines are provided for proper functioning of the system as
needed. Control valves are provided in each private tap to regulate and control the flow. Some
other components have been proposed for the project in addition to components explained
above. Appurtenances such as wash out, air valve, control valve etc. are provided as needed.
Control valves/ pipe valve box have been designed in suitable distribution junction having more
than two mains or in required place to regulate the design flow in the main. The design flow is
based on design population, non-domestic demand. The future demand in the main may vary
from the demand envisaged during design phase. The control valve is necessary to regulate the
flow in the distribution system and is useful to deliver the required flow in pipeline.
The guard/pump house is also included in the design and project cost estimate.
f. Flow Chart
Schematic flow diagram of the schemes showing intakes, storage tanks, tap stands and designed
pipe sizes and lengths with designed flow in the pipelines is submitted.
3.6. Sanitation
The survey shows that about 90 percent of households have proper latrines in their houses.
Sanitation and domestic latrines in the remaining households shall be promoted as per the
principle of School Led Total Sanitation (SLTS) approved by the DWSS. Provision has been
made in the cost of the project to cover all households of the project area during implementation
of the systems.
No major adverse effects on agriculture land, forest, vegetation, ground water will be caused
due to the implementation of the proposed system. It will not create the problem of wastewater
disposal and drainage. No potential threat could be anticipated even in the long-term
perspective. There would not be any major threat to the agricultural land and other
infrastructure because of excavation.
Appropriate training to the VMWs, WUSC members, teachers, rural municipal officers and
female CHVs are necessary for the sustainability of the water supply systems. Several
12 | P a g e
Final Report of Rikhe Bazar Water Supply Project
categories of training area routinely held at district, regional and national levels. Training of
VMWs and WUSCs are regular activities of the WSS district-based offices. Provisions of
necessary training are made in the project cost estimate.
13 | P a g e
Final Report of Rikhe Bazar Water Supply Project
4. FINANCIAL ASPECTS
4.1 General
For estimation of the project cost, unit rates of relevant work items have been developed. The
cost of proposed components such as civil structures, pipe laying and jointing, trench
excavation and backfilling, etc. were estimated using the worked-out unit rates.
All the construction materials, except those available locally, are to be procured and transported
from outside district. Rates of all construction materials have been worked out adopting
approved district rates for materials and labors summing up the procurement cost and
transportation cost. HDPE pipes required are to be procured and transported directly from the
factory.
Unit rates of civil works are developed as per GoN norms. Unit rates of the items are worked
out adding 15% contractor’s overhead in the material and labor cost. 13% VAT is added
separately in the total of component costs.
The project cost comprises of the cost of civil works of water supply and sanitation components
including the cost of detail survey and design work and cost of materials and equipment like
pipe, fittings, and tools. The total cost of the project is worked out adding up 4% for the
contingencies required for the miscellaneous minor expenses and 10% price contingencies and
10% physical contingencies on the total project costs.
The total cost of the project is estimated at Rs. 8,703,575.54. The communities’ contribution
of this project is of greater than 20 percent of total cost with providing labor for excavation and
refiling of trench in distribution and/or transmission pipelines.
The ownership of the schemes is transferred to the local user committees after completion,
which takes over the responsibility of regular operation and maintenance of the system.
The operation and maintenance cost include the remuneration of VMW (personnel) and the
maintenance cost. The remuneration of VMW is left to decide by the WUSC and maintenance
cost may be taken as 0.4% of total investment cost. The operation and maintenance cost are
escalated at the rate of 10% per annum.
14 | P a g e
Final Report of Rikhe Bazar Water Supply Project
Water tariff should be adequate to pay the salaries to the operation and maintenance staff, pay
for small repairs and replacement of parts and build reserve fund to finance minor
improvements in the system. The WUSC should make decisions on water tariff taking into
consideration the regular and sustainable operation and maintenance of the project.
15 | P a g e
Final Report of Rikhe Bazar Water Supply Project
5. IMPLEMENTATION OF PROJECT
The overall schedule shall include three major activities, which are tendering, procurement and
transportation of materials, and construction. The planning of the schedule should be based on
the nature and scope of work, availability of local manpower during slack seasons of
agricultural works, beneficiary’s preferences, budget allocations, and inter-relation of different
activities.
The proposed project area is far away from the district headquarters, which lies relatively in
the remote area. The present supply of drinking water in the area is highly unreliable and
inadequate. To improve the health and sanitary condition of the people and to enhance the
development, it is necessary to provide reliable and adequate water supply service in the
identified area. Beneficiaries are quite enthusiastic about the project and have agreed to
participate in the implementation of the project. If any, and make the land available free of cost
necessary for water supply components. WUSC has also assured to provide full co-operation
during implementation.
16 | P a g e
Annex-A
Quantity & Cost Estimate
Procurement of Pipes
Rikhe Bazar Water Supply Project
S.No. Pipe size and series Unit Quantity Rate Amount
1 HDPE pipes
Subtotal 0 0.00
A Transmission line
1 E/W in excavation in BM soil 905.00 0.45 0.90 366.53 m3 1,130.01 4 14 182.57
3
2 E/W in backfilling with BM soil 905.00 0.45 0.90 366.53 m 426.42 1 56 295.72
6 Steel reinforcement
8mm f bars @ 150c/c both ways
for cover slab 12 1.75 @ 0.395 kg/m 8.30
12 1.75 @ 0.395 kg/m 8.30
Deduction for Manhole Opening 8 0.60 @ 0.395 kg/m -1.90
Total 14.70 kg 125.06 1 838.38
S.N. Description No. Length Breadth Height Quantity Unit Rate Amount
7 Steel reinforcement
8 mm ø @ 175 mm c/c bothways 18 1.70 @ 0.395 kg/m 12.09
12 2.90 @ 0.395 kg/m 13.75
Deduct for man hole 16 0.60 @ 0.395 kg/m -3.79
Net reinforcement 22.05 kg 125.06 2 757.57
Subtotal 76 972.61
Add Value Added Tax @ 13.00% 10 006.44
Total Amount 86 979.05
8 Steel reinforcement
for VC slab cover 8 mmf bars @ 15 cm c/c both ways
Longer span 11 1.70 @ 0.395 kg/m 7.39
Shorter span 12 1.50 @ 0.395 kg/m 7.11
Deduction for manhole opening 8 0.60 @ 0.395 kg/m -1.90
Total 12.60 kg 125.06 1 575.76
9 Shuttering works for RCC
- Cover slab bottom 1.00 0.80 0.80
Side 6.40 - 0.10 0.64
Deduction for manhole opening π 0.30 0.30 -0.283
Total 1.16 m² 725.14 841.16
10 HDPE formwork for ferrocement
- Wall portion (Q = 2 x p x r x h, r = d/2+.025) 2π 1.78 - 1.70 19.01
- Roof portion 2π 2.93 0.60 11.05
Q = 2 x p x R x h, R = ((d+.05)² +4h²)/8h,h=dome height
- Deduction for manhole opening Q=pxr², r=0.30 π 0.30 0.30 -0.28
Total form work 29.78 m² 4562.91 1 35 883.46
RT size: 14.00 m³
S.N. Description No. Radius Length Breadth Height Quantity Unit Rate Amount
18 600 mmf circular metal manhole cover for ferrocement 2 set 2748.44 5 496.88
10 Steel reinforcement
-Base slab
Bottom main bars 10 @ 125 mm C/C -2 directions 2 5.1 42 no 0.617 kg/m 264.32
top main bars 12 @ 100 mm C/C -2 directions 2 5.10 52 no 0.888 kg/m 471.00
total reinforcement in base slab 735.32
Vertical walls
vertical bars- inner :10 mmØ @ 150 c/c 115 3.30 @ 0.617 kg/m 234.15
vertical bars- outer :10 mmØ @ 150 c/c 115 3.30 @ 0.617 kg/m 234.15
Inner hor. bars of 12 mmØ bars 110 mm c/c upto 1 m height 10 25.20 @ 0.888 kg/m 223.78
Inner hr. bars of 12 mmØ bars 140 mm c/c for next 1.3 m height 10 25.200 @ 0.888 kg/m 223.78
Outer hor. bars of 12 mmØ bars 150 mm c/c upto 1 m height 8 17.800 @ 0.888 kg/m 126.45
Outer hor.bars of 12 mmØ bars 180 mm c/c for next 1.3 m height 8 17.800 @ 0.888 kg/m 126.45
QUANTITY ESTIMATES OF RECTANGULAR RCC RESERVOIR TANK
3
30 m capacity
3
MS angle post(40*40*6mm
size and 2.1m long) 17 2.10 @ 3.50 kg/m 124.95 kg 139.09 17 379.30
4 Barbed wire fencing
- horizontal ( 7 layers) 7 24.00 168.00
- Diagonals 32 1.82 58.24
Total 226.24 m 74.52 16 859.40
Entrance Gate
For barbed wire fencing Type-A
S.N. Description No. Length Breadth Height Quantity Unit Rates Amount
S.N. Description No. Length Breadth Height Quantity Unit Rate Amount
A. Pipe Protection by RCC Pillar 1 nos
1 Site Clearance 1 1 1 1 m² 110.40 110.40
2 Earthwork excavation in BMS 1 0.45 0.45 0.30 0.06 m³ 1130.01 67.80
3 Boulder soling without sand 1 0.45 0.45 0.10 0.02 m³ 3135.36 62.71
S.N. Description No. Length Breadth Height Quantity Unit Rate Amount
SN Description ItemCode Units DiC-0 RCT-30 RVT-Ferro-14 SINT-01 TotalQty UnitWt(kg) TotalWt(Kg) Rate(Rs) TotalAmount(Rs)
1 Brass Flange Set 40 mm dia BFS-40 no 1 1 1 1 1671 1671
2 Brass Union (32x40 mmØ) BU-32 no 3 1 2 6 0.37 2.22 1086 6516
3 Brass Union (40x50 mmØ) BU-40 no 1 1 2 0.5 1 1658 3316
4 GI Elbow (15 mmØ) GEL-15 no 1 1 2 1 5 0.1 0.5 45 225
5 GI Elbow (32 mmØ) GEL-32 no 7 3 5 15 0.3 4.5 173 2595
6 GI Elbow (40 mmØ) GEL-40 no 2 3 5 0.4 2 249 1245
7 GI Elbow (50 mmØ) GEL-50 no 1 1 2 0.68 1.36 368 736
8 GI Equal Tee (15 mmØ) GET-15 no 1 1 0.13 0.13 70 70
9 GI Equal Tee (32 mmØ) GET-32 no 1 1 0.4 0.4 234 234
10 GI Equal Tee(40 mmØ) GET-40 no 1 1 0.5 0.5 280 280
11 GI Nipple (15 mmØ) GNI-15 no 1 1 0.13 0.13 47 47
12 GI Nipple (32 mmØ) GNI-32 no 8 1 4 13 0.28 3.64 109 1417
13 GI Nipple (40 mmØ) GNI-40 no 3 5 3 11 0.3 3.3 137 1507
14 GI Pipe (15mm)-MC GPM-15 m 3 3 2.76 1.5 10.26 1.28 13.17 180 1846.8
15 GI Pipe (32mm)-MC GPM-32 m 7.55 4.5 4.21 16.26 3.28 53.32 440 7154.4
16 GI Pipe (40mm)-MC GPM-40 m 3.5 1.7 4.76 1.5 11.46 3.79 43.41 500 5730
17 GI Pipe (50mm)-MC GPM-50 m 2.75 1.75 4.5 5.32 23.94 680 3060
18 GI Plug (40 mmØ) GIP-40 no 2 2 1 2 96 192
19 GI Plug (50 mmØ) GIP-50 no 1 1 2 1 2 121 242
20 GI Reducer Socket (40x32 mmØ) GRS-40x32 no 2 1 3 0.65 1.95 302 906
21 GI Reducer Socket (50x40 mmØ) GRS-50x40 no 1 1 2 0.65 1.3 447 894
22 GI Socket 15 mmØ GS-15 no 1 1 0.08 0.08 40 40
23 GI Socket 32 mmØ GS-32 no 1 1 0.2 0.2 125 125
24 GI Socket 40 mmØ GS-40 no 2 1 3 0.25 0.75 168 504
25 GI Socket 50 mmØ GS-50 no 1 1 2 0.5 1 216 432
26 GI Strainer (40 mmØ) GST-40 no 2 1 3 2.27 6.81 1050 3150
27 GI Strainer (50 mmØ) GST-50 no 1 1 2 3.19 6.38 1418 2836
28 GI Unequal Tee (32x15 mmØ) GUT-32x15 no 2 1 3 0.23 0.69 250 750
29 GI Unequal Tee (40x15 mmØ) GUT-40x15 no 1 1 2 0.4 0.8 324 648
30 GI Union (15 mmØ) GUN-15 no 1 1 0.22 0.22 121 121
Summary of structurewise fittings
SN Description ItemCode Units DiC-0 RCT-30 RVT-Ferro-14 SINT-01 TotalQty UnitWt(kg) TotalWt(Kg) Rate(Rs) TotalAmount(Rs)
31 GI Union (32 mmØ) GUN-32 no 4 2 6 0.5 3 352 2112
32 GI Union (40 mmØ) GUN-40 no 2 2 2 6 0.65 3.9 429 2574
33 GM Gate Valve (32 mmØ) GMGAV-32 no 4 1 1 6 0.95 5.7 2515 15090
34 GM Gate Valve (40 mmØ) GMGAV-40 no 1 1 1 3 1.25 3.75 3349 10047
35 HDPE Pipe(63mm)-6Kg/cm2 HP6-63 m 5 5 5 5 20 0.58 11.7 142 2840
Total Total 206.75 81153.2
Miscel. Fittings @ 10% 20.68 8115.32
Total 227.43 89268.52
VAT@13% 11604.91
Grand Total 227.43 100873.43
Annex-B
Rate Analysis
Item Rates for Estimating
Rikhe Bazar Water Supply Project
Rate Per Unit
Sn. Norms no Items Unit
( without VAT
)
Earth Works
1 1-8 Site clearance m2 110.40
2 2-9 Earthwork in Excavation in ordinary soil m3 710.70
3
3 2-12 Earthwork in Excavation in hard soil m 888.38
3
4 2-14 Earthwork in Excavation in boulder mixed soil m 1,130.01
3
5 2-15a Earthwork in Excavation in soft rock m 2,132.10
6 2-15b Earthwork in Excavation in medium rock m3 3,198.15
7 2-16b Earthwork in Excavation in hard rock with chiselling m3 17,909.64
8 2-25a Earthwork in backfilling in ordinary soil m3 355.35
3
9 2-39c Earthwork in backfilling with hard soil m 447.74
3
10 2-39d Earthwork in backfilling with boulder mixed soil m 426.42
11 2-39e Earthwork in backfilling with soft rock m3 781.77
Stone Works
12 6-5 Stone soling work m3 3,135.36
3
13 11-16 Stone Pitching with sand m 7,067.12
3
14 6-2.1 Dry stone masonry work m 4,340.33
15 6-2.2 Stone masonry in mud mortar m3 4,947.53
16 6-3.1 R.R. masonry in 1:3 cement mortar m3 11,649.91
17 6-3.2 R.R. masonry in 1:4cement mortar m3 11,050.03
3
18 6-3.3 R.R. masonry in 1:6cement mortar m 10,081.04
Brick Work
19 Brick bat filling m3 11,919.75
20 Flat Brick soling with sand (m2) m2 1,204.25
21 Dry Brick masonry work m3 14,605.92
22 Brick masonry in mud mortar m3 14,833.62
3
23 (5-1Ka1) Brick masonry in 1:3 cement mortar m 18,398.44
3
24 (5-1Ka2) Brick masonry in 1:4cement mortar m 17,846.80
25 (5-1Ka3) Brick masonry in 1:6cement mortar m3 17,319.00
Concrete Works
26 7-2c Plain cement concrete (1:3:6) in sub Structure m3 12,367.17
3
27 7-2d Plain cement concrete (1:2:4) sub Structure m 14,259.66
3
28 7-4 b Plain cement concrete (1:1:5:3) sub Structure m 16,070.56
29 7-2 d Plain cement concrete (1:2:4) in super structure m3 16,122.66
30 7-4 b Plain cement concrete (1:1.5:3) in super structure m3 17,933.56
31 7-2d Plain cement concrete (1:2:4) substructure with 2% WPC m3 14,669.46
3
32 7-4 b Plain cement concrete (1:1:5:3) substructure with 2% WPC m 16,582.82
Miscelleneous Works
33 7-5 Mild steel reinforcement kg 125.06
34 8-2a Form work for concrete work in simple slab and structure m2 725.14
Form work for concrete work in arch,dome,etc ( Assuming form work
canbe used 4 times) m2 1,393.31
2
35 DWSS HDPE pipe formwork for ferro-cement works m 4,562.91
36 DWSS Bar binding works including chicken wire, MS rods, GI plain wires etc m2 1,043.04
37 24-6 Barbed wire fencing m 74.52
Barbed wire fencing on wooden posts (2 diagonals & 5 horizontals) @
38 24-7 3m c\c m 561.03
Item Rates for Estimating
Rikhe Bazar Water Supply Project
Rate Per Unit
Sn. Norms no Items Unit
( without VAT
)
39 10-17 Wood works for door window frame m3 77,848.16
40 38 mm thick wooden shutter with 24 SWG plain sheet on one side m2 5,318.24
2
38 mm thick panelled wooden shutter m 7,005.86
2
38 mm thick Salwood framed glazed shutter for windows- m 9,650.90
2
41 9-1 CGI sheet roofing m 1,059.52
42 Laying of one layer of 500 G of Polythene sheet m2 170.78
43 16-2a+14-5a ds no 4,150.59
44 16-11 Filling of Gabion box with stone m3 2,270.33
3
45 Gravel packing 20,25 mm dia m 7,263.29
3
46 10-17 Wood work for beams, rafters,etc. m 55,776.18
47 10-19 25 mm thick eavesboard m² 1,133.92
Plastering, Punning and Pointing works
48 12-1a 12.5 mm thick 1:2 c-s plaster m2 436.31
2
49 12-1b 12.5 mm thick 1:3 c-s plaster m 384.99
2
50 12-1c 12.5 mm thick 1:4 c-s plaster m 372.59
51 12-4a 20 mm thick 1:3 c-s plaster m2 506.61
52 12-4b 20 mm thick 1:4 c-s plaster m2 483.79
53 12-4c 20 mm thick 1:6 c-s plaster m2 441.34
2
12-1a 12.5 mm thick 1:2 c-s plaster with 2% WPC m 447.83
2
12-1b 12.5 mm thick 1:3 c-s plaster with 2% WPC m 393.31
2
12-4a 20 mm thick 1:3 c-s plaster with 2% WPC m 518.78
54 13-10 3 mm thick 1:1 c-s punning m2 242.43
55 14-2c 1:3 c-s Flush ruled pointing work m2 273.80
Painting Works
56 13-5 Two coats of enamel painting with one coat of primer m2 304.20
2
57 13-12b Two coats snowcem painting m 152.77
58 13-10 Two coats of bitumen painting m2 77.54
Pipe Jointing Works
HDPE Pipes
59 17-2 Laying and joining of 20,25 mmØ HDPE pipe with butt-weld joints m 4.16
60 17-2 Laying and joining of 32 mmØ HDPE pipe with butt-weld joints m 4.87
61 17-2 Laying and joining of 40,50 mmØ HDPE pipe with butt-weld joints m 5.65
62 17-2 Laying and joining of 63-90 mmØ HDPE pipe with butt-weld joints m 83.80
17-2 Laying and joining of 110,125 mmØ HDPE pipe with butt-weld joints m 113.57
17-2 Laying and joining of 140-180 mmØ HDPE pipe with butt-weld joints m 167.61
63 DWSS Laying and joining of 200-250 mmØ HDPE pipe with butt-weld joints m 228.41
GI Pipes
64 17-4a Laying and joining of 15,20 mmØ GI pipe with socket joints m 68.46
65 17-4a Laying and joining of 25,32 mmØ GI pipe with socket joints m 95.41
66 17-4a Laying and joining of 40,50 mmØ GI pipe with socket joints m 129.65
67 17-4a Laying and joining of 65,80 mmØ GI pipe with socket joints m 170.07
17-4a Laying and joining of 100 mmØ GI pipe with socket joints m 210.50
Item Rates for Estimating
Rikhe Bazar Water Supply Project
Rate Per Unit
Sn. Norms no Items Unit
( without VAT
)
68 17-4a Laying and joining of 125 mmØ GI pipe with socket joints m 257.67
Standard mild steel angle ( 25×25×3 mm size ) framed grill gate 4,174.85
Supply and fixing of standard manhole cover ( 45×45 cm) 1,821.20
Supply and fixing of standard manhole cover of 60cm diameter 2,389.95
Supply and fixing of standard manhole cover ( 60×60 cm) 3,026.77
Fly proof net fixing 278.14
Transportation work
69 Convenient load from store to site kg 0.78
70 Transportation of pipes and fittings from store to project site kg 1.28
Analysis of Rates
Name of Project/Scheme : Rikhe Bazar Water Supply Project
Assumptions
Density of sand = 1600.00 kg/m³
Density of rubble stone = 2200.00 kg/m³
Density of aggregate = 1600.00 kg/m³
Density of Sal Wood = 860.00 kg/m³
Density of 1st class brick (1cum=500nos) 1600.00 kg/m³
Name of market : Luham
Name of roadhead : Luham-Rikhe Bazar Site
Distance of project site from market on :
- Foot = 0.05 kosh
-Earthen road = 0.00 km
- Gravel road = 0.00 km
-Metalled road = 5.00 km
Sand is available in Luham
Distance of river from project site for sand collection
for head load = 0.20 km
If there is tractor/ truck road distance of haulage for sand transportation on :
-Earthen road = 0.00 km
- Gravel road = 0.00 km
-Metalled road = 5.00 km
Stone is available in Locally Available
Distance of quary site from project site for stone collection
for head load = 0.20 km
If there is tractor/ truck road distance of haulage for sand transportation on :
-Earthen road = 0.00 km
- Gravel road = 0.00 km
-Metalled road = 1.00 km
Aggregate is available in Locally Available
Distance of quary site from project site for stone collection
for head load = 0.20 km
If there is tractor/ truck road distance of haulage for sand transportation on :
-Earthen road = 0.00 km
- Gravel road = 0.00 km
-Metalled road = 1.00 km
Cost of sand per m³ for purchase 0.00 Rs.
District Rates :
District rate of transportation by head load for :
-convenient load = 7.24 Rs./kg.kosh
-inconvenient load as bars, ms angle, etc. = 12.31 Rs./kg.kosh
- GI & HDPE pipes 14.48 Rs./kg.kosh
District rate of transportation by truck for convenient load on : Truck
-Earthen road = 6.75 Rs./km.quintal
- Gravel road = 3.40 Rs./km.quintal
-Metalled road = 2.00 Rs./km.quintal
District rate of transportation by truck for inconvenient load on : Truck
-Earthen road = 11.48 Rs./km.quintal
- Gravel road = 5.78 Rs./km.quintal
-Metalled road = 3.40 Rs./km.quintal
Estimated by Checked by Approved by
Analysis of Rates
Name of Project/Scheme : Rikhe Bazar Water Supply Project
Rate of load / unload = 10.85 Rs./quintal
District rate of Skilled labour = 900.00 Rs./d
District rate of unskilled labour = 600.00 Rs./d
District rate of plumber = 675.00 Rs./d
2 Stone for 1 m³
i Cost of stone per m³ for purchase 950.00 Rs.
ii Distance from site to Road head = 0.20 km
Labour required for collection, screening and stacking of Stone/m3 0.00 nos
Labour required for transportation upto 13 km by headload 60.00 nos
Hence,Labour required for transportation upto site 0.20 km = 0.92 nos
Total labour required to collect and transport 1 m³ of stone upto site = 0.92 nos
Cost of labour for collection and transportation 552.00
iii Cost of transportation by truck -Earthen road 0.00 km = 0.00
- Gravel road 0.00 km = 0.00
-Metalled road 1.00 km = 20.00
Rate 1 m³ of stone at site ( transporation cost +collection or purchase cost) = 1 522.00 Rs.
5 Rate of Transportation :
Road type Distance Convenient Inconvenient GI & HDPE pipe
-Earthen road 0.00 0.00 0.00 0.00 Rs/kg
- Gravel road 0.00 0.00 0.00 0.00 Rs/kg
-Metalled road 5.00 0.10 0.17 0.17 Rs/kg
-For head load 0.05 0.36 0.62 0.72 Rs/kg
Loading - unloading 0.22 0.22 0.22 Rs/kg
Rate of transportation per kg : 0.68 1.01 Rs/kg 1.11 Rs/kg
Rate of transportation of inconvenient load with CO ( Without VAT ) 1.28 Rs/kg
7 Salwood per 1 m³
District rate of salwood, per m³ = 176678.45
Transportation rate per m³ upto site (from nearest market) = 584.80
District rate of salwood, per m³ = 1 77 263.25 Rs/m³
Local materials
3
1 Block Stone m 1,522.00
3
2 Bond Stone m 1,522.00
3
3 10 - 20 mm Aggregate m 3,630.00
3
4 20 - 40 mm Aggregate m 3,158.00
3
5 Sand m 2,072.00
3
6 Mud ( 1.5md of coolie) m 900.00
3
7 Sal Wood m 177,263.25
3
8 Local Wood m 30,052.41
9 Bamboo no 300.00
Labours
Rate
Hard soil Boulder/Gravel mixedsoil Ordinary Soil Soft rock Medium rock
Materials and labours Unit (Norms No 2-12) (Norms No 2-14) (Norms No 2-9) (Norms No 2-15a) (Norms No 2-15b)
Rs/unit
Quantity Cost Rs. Quantity Cost Rs. Quantity Cost Rs. Quantity Cost Rs. Quantity Cost Rs.
Unskilled Rs/day 600.00 1.25 750.00 1.59 954.00 1.00 600.00 3.00 1800.00 4.50 2700.00
Tools and plants % 3.00% 22.50 3.00% 28.62 3.00% 18.00 3.00% 54.00 3.00% 81.00
Subtotal 772.50 982.62 618.00 1854.00 2781.00
Contracror's Overhead % 15.00% 115.88 147.39 92.70 278.10 417.15
Rate/m³ ( Without VAT ) 888.38 1130.01 710.7 2132.1 3198.15
Earthwork in excavation with 10m lead and 1.5 m lift in pipeline trench in :
Rate
Hard rock
Materials and labours Unit (Norms No. 2-16b)
Rs/unit
Quantity Cost Rs.
Unskilled Rs/day 600.00 25.20 15 120.00
Tools and plants % 3.00% 453.60
Subtotal 15 573.60
Contracror's Overhead % 15.00% 2 336.04
Rate/m³ ( Without VAT ) 17 909.64
Earthwork in back filling for pipe line trench with compaction in layers of 20cm with water sprinkling and site clearance
Hard soil Boulder/Gravel mixed soil Ordinary Soil Soft rock (Norms Site clearance per m²
Rate
Materials and labours Unit (Norms No 2-39c) (Norms No 2-39d) (Norms No ) No 2-39e) N(1-8)
Rs/unit
Quantity Cost Rs. Quantity Cost Rs. Quantity Cost Rs. Quantity Cost Rs. Quantity Cost Rs.
Unskilled Rs/day 600.00 0.63 378.00 0.6 360.00 0.5 300.00 1.1 660.00 0.16 96.00
Tools and plants % 3.00% 11.34 3.00% 10.80 3.00% 9.00 3.00% 19.80 0.00
Subtotal 389.34 370.80 309.00 679.80 96.00
Contracror's Overhead % 15.00% 58.40 55.62 46.35 101.97 14.40
Rate/m³ ( Without VAT ) 447.74 426.42 355.35 781.77 110.4
Quantity Cost Rs. Quantity Cost Rs. Quantity Cost Rs. Quantity Cost Rs. Quantity Cost Rs.
Steel bar kg 85.51 1.05 89.79 - 2.593 221.73
Binding wire kg 95.68 0.01 0.96 - 0.083 7.94 0.111 10.62
GI Plain wire kg 100.68 - - 2.083 209.72
Chicken wire m 105.27 - - 1.806 190.12
Nail kg 100.68 - 0.25 25.17 0.014 1.41
Hold fast no 19.68 92 1810.56
Screw no 1.01 184 185.84
Wood m³ 30052.41 - 0.0526/4x0.75 296.39 1.1 33057.65
Bamboo no 300.00 - - 0.333 99.9
32mmf HDP pipe m 91.04 40.00 3641.6
Skiled labour no 900.00 0.012 10.8 0.172 154.8 0.167 150.3 0.25 225 34 30600
Unskilled no 600.00 0.012 7.2 0.257 154.2 0.111 66.6 0.083 49.8 3.4 2040
Subtotal 108.75 630.56 3967.75 906.99 67694.05
Contracror's Overhead % 15.00% 16.31 94.58 595.16 136.05 10154.11
Rate / Unit ( Without VAT ) 125.06 725.14 4562.91 1043.04 77848.16
12.5mm thick 1:2 c-s 12.5mm thick 1:3 c-s plaster 12.5mm thick 1:4 c-s plaster 20mm 1:3 c-s plaster 20mm 1:4 c-s plaster
Rate
Materials and labours Unit plaster( N12-1a) (N12-1b) (N12-1c) (N12-4a) (N12-4b)
Rs/unit
Quantity Cost Rs. Quantity Cost Rs. Quantity Cost Rs. Quantity Cost Rs. Quantity Cost Rs.
Cement kg 16.68 9.00 150.12 6.25 104.25 5.38 89.74 9.60 160.13 8.10 135.11
Sand m3 2072.00 0.0122 25.28 0.0128 26.52 0.0146 30.25 0.0195 40.40 0.022 45.58
W.P.C. kg 55.68
Skilled labour no 900.00 0.12 108.00 0.12 108.00 0.12 108.00 0.14 126.00 0.14 126.00
Unskilled no 600.00 0.16 96.00 0.16 96.00 0.16 96.00 0.19 114.00 0.19 114.00
Subtotal 379.40 334.77 323.99 440.53 420.69
Contracror's Overhead % 15.00% 56.91 50.22 48.60 66.08 63.10
Rate/m² ( Without VAT ) 436.31 384.99 372.59 506.61 483.79
Quantity Cost Rs. Quantity Cost Rs. Quantity Cost Rs. Quantity Cost Rs. Quantity Cost Rs.
Cement kg 16.68 3.36 56.04 3.06 51.04
Sand m3 2072.00 0.0023 4.77 0.0063 13.05
GI Barbed wire m 18.87 - 1.1 20.76 8.333 157.24
Local wood m3 30052.41 0.006 180.31
CGI sheet-26G m2 541.32 - 1.20 649.58
Nuts & bolts no 11.63 - 3.00 34.89
J - hook no 25.14 - 2.50 62.85
U - hook no 31.32 LS 2.08 2.567 80.40
Skilled labours no 900.00 0.10 90.00 0.1 90.00 0.01076 9.68 0.033 29.70 0.11 99.00
Collies no 600.00 0.10 60.00 0.14 84.00 0.0538 32.28 0.067 40.20 0.125 75.00
Subtotal 210.81 238.09 64.80 487.85 921.32
Contracror's Overhead % 15.00% 31.62 35.71 9.72 73.18 138.20
Rate / Unit ( Without VAT ) 242.43 273.80 74.52 561.03 1 059.52
38 mm thick wooden shutter 38 mm thick panelled Wood work for beams, 25 mm thick eavesboard.
3 2 2 rafters,etc. per m³ per m² N10-
Rate Gravel packing for 1 m with GI plain sheet for 1 m wooden shutter for 1 m [
Materials and labours Unit
Rs/unit [ Norms no 10-9) Norms no 10-2) N10-I7 I9
Quantity Cost Rs. Quantity Cost Rs. Quantity Cost Rs. Quantity Cost Rs. Quantity Cost Rs.
3
Aggregate - 40mm m 3158.00 1.05 3315.90 - - - -
3
Local wood m 30,052.41 0.017 510.89 0.040 1202.10 1.050 31555.03 0.0275 826.44
Nails kg 100.68 - LS 5.00 LS 5.00 LS 50.00 LS 25.00
Hinges no 55.14 - 1.34 73.89 2.84 156.60 0.00 0.00
Locking set no 200.2 - 0.45 90.09 0.47 94.09 0.00 0.00
Tower bolt 150mm no 65.14 - 0.89 57.97 0.95 61.88 0.00 0.00
Handle no 35.14 - 0.45 15.81 0.95 33.38 0.00 0.00
GI plain sheet no 423.63 2.07 876.91 0.00 0.00 0.00
Skilled labour no 900.00 1 900.00 3.12 2808.00 4.73 4257.00 17.60 15840.00 0.14 126.00
Unskilled no 600.00 3.5 2100.00 0.31 186.00 0.47 282.00 1.76 1056.00 0.0143 8.58
Total 6315.9 4624.56 6092.05 48501.03 986.02
C.P&VAT 15.00% 947.39 693.68 913.81 7275.15 147.90
Rate /Unit 7263.29 5318.24 7005.86 55776.18 1133.92
3
C.1 Concrete work in substructure with 2% WPC(for 1m )
(With a lead of 30 m and all materials supplied )
P.C.C (1:2:4) work in sub P.C.C(1:1.5:3) work in sub
Rate structure with 2% W.P.C(N structure with 2% W.P.C (
Materials and labours Unit
Rs/unit 7-2d) N7-2d +N7-4b)
Quantity Cost Rs. Quantity Cost Rs.
Cement kg 16.68 320.00 5337.60 400.00 6672.00
Sand m3 2072.00 0.445 922.04 0.425 880.60
Aggregate-10-20mm m3 3630.00 0.33 1197.90 0.86 3121.80
Aggregate-20-40mm m3 3158.00 0.52 1642.16
W.P.C @2% Kg 55.68 6.40 356.35 8.00 445.44
Skiled Labour no 900.00 1.00 900.00 1.00 900.00
Unskilled no 600.00 4.00 2400.00 4.00 2400.00
Subtotal 12756.05 14419.84
Contracror's Overhead % 15.00% 1913.41 2162.98
Rate/m ³ ( Without VAT ) 14669.46 16582.82
38 x 75 mm size Salwood
Shuttering work for staging work for culvert, Wood work for beams,
frame using 4 mm thick
Materials and labours Unit
Rate arch,dome,etc(per m2) bridge, dome, etc.(per m³) rafters,etc. per m³
glass for glazed shutter for
Rs/unit N8-2a N15-31a N10-I7
1
Quantity Cost Rs. Quantity Cost Rs. Quantity Cost Rs. Quantity Cost Rs.
Nail kg 100.68 0.25 25.17 0.00 0.00 0.00
Wood for formwork m3 30052.41 0.0526/4x0.75 296.39 1.05 1.05
Wood for scaffolding m3 30052.41 0.075/4x0.75 422.61
Skiled labour no 900.00 0.26 234.00 0.5 450.00 0.5 450.00 0.5 450.00
Unskilled no 600.00 0.389 233.40 0.5 300.00 0.5 300.00 0.5 300.00
2
E.1 Plastering Work with 2% WPC (for 1m )
12.5mm thick 1:2 c-s 12.5mm thick 1:3 c-s 20mm 1:3 c-s plaster 20mm 1:6 c-s plaster
plasterwith 2% W.P.C ( plaster with 2% with 2% W.P.C (N12- (N12-4c)
Rate
Materials and labours Unit N12-1a) W.P.C(N12-1b) 4a)
Rs/unit
Quantity Cost Rs. Quantity Cost Rs. Quantity Cost Rs. Quantity Cost Rs.
Cement kg 16.68 9.00 150.12 6.25 104.25 9.60 160.13 5.70 95.08
Sand m3 2072.00 0.0122 25.28 0.0128 26.52 0.0195 40.40 0.0235 48.69
W.P.C. kg 55.68 0.18 10.02 0.13 7.24 0.19 10.58 0.00
Skilled labour no 900.00 0.12 108.00 0.12 108.00 0.14 126.00 0.14 126.00
Unskilled no 600.00 0.16 96.00 0.16 96.00 0.19 114.00 0.19 114.00
Subtotal 389.42 342.01 451.11 383.77
Contracror's Overhead % 15.00% 58.41 51.30 67.67 57.57
Rate/m² ( Without VAT ) 447.83 393.31 518.78 441.34
2 IRON WORKS
Preparation including sand
papering, painting with aluminium
paint and fixing inclusive of labour
cost of iron grills for 1m2
RVT-1 -
1 J1 P13 Cluster-1 3 6 32 34 44 2,860 - 572 3,432 343 3,775 0.05 2.40 0.12 0.15 3.00
2 J2 P12 Cluster-2 3 9 47 49 64 4,160 - 832 4,992 499 5,491 0.07 2.40 0.17 0.20 2.86
3 J3 P11 Cluster-3 3 7 37 39 51 3,315 - 663 3,978 398 4,376 0.06 2.40 0.14 0.15 2.50
4 J4 P10 Cluster-4 3 6 32 34 44 2,860 - 572 3,432 343 3,775 0.05 2.40 0.12 0.15 3.00
5 J5 P9 Cluster-5 3 7 37 39 51 3,315 - 663 3,978 398 4,376 0.06 2.40 0.14 0.15 2.50
Total 35 185 195 254 16,510 - - - 3,302 19,812 1,981 21,793 0.29 12.00 0.69 0.80 13.86
1 of 2
Table: 2 Water Demand and Tap Flow Calculation Sheet
SCHEME NAME : Rikhe Bazar Water Supply Project
SUPPORT ORGANIZATION : Water Supply, Irrigation & Energy Development Office, Salyan
CONSULTANT : Yashaswi Engineering and Reasearch Center,Panchakumari Marg
LOCATION : WARD NO : 3 RMP : Tribeni DISTRICT : Salyan
Name of Community : 0
Required Datas: Base Period (n1) 3 yrs.
Peak Factor: 2.4 Design Period (n) 20 yrs.
Per Capita Demand : 65 lpcd District Pop Growth Rate (r) 1.27 %
Per Capita Demand for Students: 10 lpcd Minimum flow rate 0.10 lps
Population per Household 5.2
Description of Tap Population forecast Institutional Water Demand Live Total Wastage Tap Flow Calculation
Grand
Cluster Name Ward Nos Present Year Base Year Design Year Total No. of Other Total Stock Water @10% Average Peak Peak Design Adjusted
Total Remarks
S.N. Cluster/Section or No. of 2077 BS 2080 BS 2100 BS Domestic Pupil in Institutional Institutional Demand Demand of Tap Factor Flow flow Peak
Water
Locality HH (P) (Po) (Pn) Demand School Demand Demand @20% of [11] [13] Demand Flow factor
From To (Nos) (Nos) P(1+r)^n1 P(1+r)^(n1+n) (lpd) (Nos) (lpd) (lpd) (lpd) (lpd) (lpd) (lpd) (lps) (Factor) (lps) (lps) (lps)
[1] [2] [3] [4] [5] [6] [8] [9] [10] [11] [9] [10] [11] [12] [13] [14] [15] [16] [17] [18] [16] [17] [18]
RVT-2
6 J9 P2 Cluster-6 3 11 58 61 79 5,135 - 1,027 6,162 616 6,778 0.08 2.40 0.19 0.20 2.50
7 J9 P1 Cluster-7 3 7 37 39 51 3,315 - 663 3,978 398 4,376 0.06 2.40 0.14 0.15 2.50
8 J9 J10 Cluster-8 3 9 47 49 64 4,160 - 832 4,992 499 5,491 0.07 2.40 0.17 0.20 2.86
9 J10 P3 Cluster-9 3 8 42 44 57 3,705 - 741 4,446 445 4,891 0.06 2.40 0.14 0.15 2.50
J10 TO P7 3 - - - - - - - - - - - - - - -
10 J8 J6 Cluster-10 3 4 21 22 29 1,885 - 377 2,262 226 2,488 0.03 2.40 0.07 0.10 3.33
11 J6 P7 Cluster-11 3 4 21 22 29 1,885 - 377 2,262 226 2,488 0.03 2.40 0.07 0.10 3.33
12 J6 P6 Cluster-12 3 2 11 12 16 1,040 - 208 1,248 125 1,373 0.02 2.40 0.05 0.10 5.00
13 J8 J7 Cluster-13 3 4 21 22 29 1,885 - 377 2,262 226 2,488 0.03 2.40 0.07 0.10 3.33
14 J7 P5 Cluster-14 3 11 58 61 79 5,135 - 1,027 6,162 616 6,778 0.08 2.40 0.19 0.20 2.50
15 J7 P4 Cluster-15 3 9 47 49 64 4,160 - 832 4,992 499 5,491 0.07 2.40 0.17 0.20 2.86
Total 69 363 381 497 32,305 - - - 6,461 38,766 3,877 42,643 0.53 24.00 1.26 1.50 30.71
Grand Total 104 548 576 751 48,815 - - - 9,763 58,578 5,858 64,436 0.82 36.00 1.95 2.30 44.57
2 of 2
Table: 3.1 Reservoir Tank Sizing
a) Scheme Information
a.1 Reservoir Tank No: RVT-1_FRT 0
a.2 Served Clusters 1 to 5
a.3 Average Design Demand to be Supplied through Reservoir 0.25 l/s = 21793 l/day
a.4 Available Minimum flow from the Source (Safe Yield) 0.86 l/s
a.5 Adjusted/Optimized supply to Reservoir from Source 0.30 l/s = 25920 l/day
a.6 Total Design Flows of all Standposts : 0.80 l/s
b) Reservoir sizing assuming Continuous System using Consumption Patterns
30000
25000
20000
15000
10000
5000
0
12:00 AM
04:48 AM
09:36 AM
02:24 PM
07:12 PM
12:00 AM
04:48 AM
09:36 AM
Supply Demand
Recommended Size for RVT RVT-1_FRT = 14.00 cum Time to Fill the RVT 12.96 Hr
Table: 3.2 Reservoir Tank Sizing
a) Scheme Information
a.1 Reservoir Tank No: RVT-2_RCT_REC
a.2 Served Clusters 5 to 15
a.3 Average Design Demand to be Supplied through Reservoir 0.49 l/s = 42643 l/day
a.4 Available Minimum flow from the Source (Safe Yield) 0.86 l/s
a.5 Adjusted/Optimized supply to Reservoir from Source 0.55 l/s = 47520 l/day
a.6 Total Design Flows of all Standposts : 1.50 l/s
b) Reservoir sizing assuming Continuous System using Consumption Patterns
50000
45000
40000
35000
30000
25000
20000
15000
10000
5000
0
12:00 AM
04:48 AM
09:36 AM
02:24 PM
07:12 PM
12:00 AM
04:48 AM
09:36 AM
Supply Demand
Recommended Size for RVT RVT-2_RCT_REC = 30.00 cum Time to Fill the RVT 15.15 Hr
Table 4 : PIPELINE DESIGN
(HYDRAULIC CALCULATIONS)
SCHEME TYPE : Gravity System Pipe Class abbreviation HC Soil CodesGMS OS
SCHEME NAME : Rikhe Bazar Water Supply Project MC HR BMS Sheet No. : 1 of 5
SCHEME NAME : Rikhe Bazar WaterSOURCE
Supply Project
NAME : Khodepani SAFE YEILD : 0.86 DI SR MR
LOCATION : WARD NO : 3 RMP : Tribeni DISTRICT : Salyan CI HS SS Pipe Line Design from CW
. HS Steel Method
PIPE USED Hydraulic Gradient
S. Pipe Line Length Design Direction Reduced Level Level New Total Max. Friction Head Residual Flow Soil
Line
No. Dis. (UL/UR Diff. Static Head Static HDPE G.I. Factor Loss Head Velocity Type
From To Actual Design Q /DL/DR) From To Level Available Pressure O.D. Class I.D. N.B. Class From To Remarks
(m) (m) (lps) (L/R/U/D) (m) (m) (m) (m) (m) (m) (mm) (kg/cm²) (mm) (mm) (m) (m) (m/s) (m) (m)
[0] [1] [2] [3] 0 [5] (6) (7) (8) (9) (10) (11) (12) (13) (14) (15) (16) (17) (18) (19) (20) (21) (22) (23) (24) (25)
INTAKE TO DC
1 INTAKE 1 50 55 0.85 D 920.00 917.73 2.27 920.00 2.27 2.27 50 6.0 44.90 0.0305 0.56 1.71 0.54 920.00 919.44 BMS
2 1 2 50 55 0.85 D 917.73 915.45 2.27 920.00 3.99 4.55 50 6.0 44.90 0.0305 0.56 3.43 0.54 919.44 918.88 BMS
3 2 3 50 55 0.85 D 915.45 913.18 2.27 920.00 5.70 6.82 50 6.0 44.90 0.0305 0.56 5.14 0.54 918.88 918.32 BMS
4 3 4 50 55 0.85 D 913.18 910.91 2.27 920.00 7.41 9.09 50 6.0 44.90 0.0305 0.56 6.85 0.54 918.32 917.76 BMS
5 4 5 50 55 0.85 D 910.91 908.64 2.27 920.00 9.12 11.36 50 6.0 44.90 0.0305 0.56 8.56 0.54 917.76 917.20 BMS
6 5 6 50 55 0.85 D 908.64 906.36 2.27 920.00 10.84 13.64 50 6.0 44.90 0.0305 0.56 10.28 0.54 917.20 916.64 BMS
7 6 7 50 55 0.85 D 906.36 904.09 2.27 920.00 12.55 15.91 50 6.0 44.90 0.0305 0.56 11.99 0.54 916.64 916.08 BMS
8 7 8 50 55 0.85 D 904.09 901.82 2.27 920.00 14.26 18.18 50 6.0 44.90 0.0305 0.56 13.70 0.54 916.08 915.52 BMS
9 8 9 50 55 0.85 D 901.82 899.55 2.27 920.00 15.97 20.45 40 10.0 33.50 0.0306 2.36 13.61 0.96 915.52 913.16 BMS
10 9 10 50 55 0.85 D 899.55 897.27 2.27 920.00 15.89 22.73 40 10.0 33.50 0.0306 2.36 13.53 0.96 913.16 910.80 BMS
11 10 11 50 55 0.85 D 897.27 895.00 2.27 920.00 15.80 25.00 40 10.0 33.50 0.0306 2.36 13.44 0.96 910.80 908.44 BMS
12 11 12 50 55 0.85 D 895.00 892.73 2.27 920.00 15.71 27.27 40 10.0 33.50 0.0306 2.36 13.35 0.96 908.44 906.08 BMS
13 12 13 40 44 0.85 D 892.73 890.91 1.82 920.00 15.17 29.09 40 10.0 33.50 0.0306 1.89 13.28 0.96 906.08 904.19 BMS
14 13 DC 20 22 0.85 D 890.91 890.00 0.91 920.00 14.19 30.00 40 10.0 33.50 0.0306 0.95 13.24 0.96 904.19 903.24 BMS
DC TO RVT-1
1 DC RVT-1 25 27.5 0.30 DL 890.00 887.00 3.00 890.00 3.00 3.00 40 10.0 33.50 0.0361 0.17 2.83 0.34 890.00 889.83 BMS
DC TO RVT-2
1 DC 1 50 55 0.55 DR 890.00 887.05 2.95 890.00 2.95 2.95 40 10.0 33.50 0.0325 1.05 1.90 0.62 890.00 888.95 BMS
2 1 2 50 55 0.55 DR 887.05 884.09 2.95 890.00 4.86 5.91 40 10.0 33.50 0.0325 1.05 3.81 0.62 888.95 887.90 BMS
3 2 3 50 55 0.55 DR 884.09 881.14 2.95 890.00 6.76 8.86 40 10.0 33.50 0.0325 1.05 5.71 0.62 887.90 886.85 BMS
4 3 4 50 55 0.55 DR 881.14 878.18 2.95 890.00 8.67 11.82 40 10.0 33.50 0.0325 1.05 7.62 0.62 886.85 885.80 BMS
5 4 RVT-2 20 22 0.55 DR 878.18 877.00 1.18 890.00 8.80 13.00 40 10.0 33.50 0.0325 0.42 8.38 0.62 885.80 885.38 BMS
RVT-1 TO P13
1 RVT-1 1 50 55 0.80 D 887.00 881.75 5.25 887.00 5.25 5.25 40 10.0 33.50 0.0308 2.14 3.11 0.91 887.00 884.86 BMS
2 1 2 50 55 0.80 D 881.75 876.50 5.25 887.00 8.36 10.50 40 10.0 33.50 0.0308 2.14 6.22 0.91 884.86 882.72 BMS
3 2 3 50 55 0.80 D 876.50 871.25 5.25 887.00 11.47 15.75 40 10.0 33.50 0.0308 2.14 9.33 0.91 882.72 880.58 BMS
4 3 J1 50 55 0.80 D 871.25 866.00 5.25 887.00 14.58 21.00 40 10.0 33.50 0.0308 2.14 12.44 0.91 880.58 878.44 BMS
5 J1 5 50 55 0.15 D 866.00 864.48 1.52 887.00 13.96 22.52 25 12.5 19.90 0.0397 1.29 12.67 0.48 878.44 877.15 BMS
6 5 6 50 55 0.15 D 864.48 862.97 1.52 887.00 14.18 24.03 25 12.5 19.90 0.0397 1.29 12.89 0.48 877.15 875.86 BMS
Table 4 : PIPELINE DESIGN
(HYDRAULIC CALCULATIONS)
SCHEME TYPE : Gravity System Pipe Class abbreviation HC Soil CodesGMS OS
SCHEME NAME : Rikhe Bazar Water Supply Project MC HR BMS Sheet No. : 2 of 5
SCHEME NAME : Rikhe Bazar WaterSOURCE
Supply Project
NAME : Khodepani SAFE YEILD : 0.86 DI SR MR
LOCATION : WARD NO : 3 RMP : Tribeni DISTRICT : Salyan CI HS SS Pipe Line Design from CW
. HS Steel Method
PIPE USED Hydraulic Gradient
S. Pipe Line Length Design Direction Reduced Level Level New Total Max. Friction Head Residual Flow Soil
Line
No. Dis. (UL/UR Diff. Static Head Static HDPE G.I. Factor Loss Head Velocity Type
From To Actual Design Q /DL/DR) From To Level Available Pressure O.D. Class I.D. N.B. Class From To Remarks
(m) (m) (lps) (L/R/U/D) (m) (m) (m) (m) (m) (m) (mm) (kg/cm²) (mm) (mm) (m) (m) (m/s) (m) (m)
[0] [1] [2] [3] 0 [5] (6) (7) (8) (9) (10) (11) (12) (13) (14) (15) (16) (17) (18) (19) (20) (21) (22) (23) (24) (25)
7 6 7 40 44 0.15 D 862.97 861.76 1.21 887.00 14.10 25.24 25 12.5 19.90 0.0397 1.03 13.07 0.48 875.86 874.83 BMS
8 7 P13 25 27.5 0.15 D 861.76 861.00 0.76 887.00 13.83 26.00 25 12.5 19.90 0.0397 0.64 13.19 0.48 874.83 874.19 BMS
J1 TO P12
1 J1 1 50 55 0.65 L 866.00 859.64 6.36 887.00 18.80 27.36 32 10.0 26.70 0.0320 4.52 14.28 1.16 878.44 873.92 BMS
2 1 2 40 44 0.65 L 859.64 854.55 5.09 887.00 19.37 32.45 32 10.0 26.70 0.0320 3.62 15.75 1.16 873.92 870.30 BMS
3 2 J2 20 22 0.65 L 854.55 852.00 2.55 887.00 18.30 35.00 32 10.0 26.70 0.0320 1.81 16.49 1.16 870.30 868.49 BMS
4 J2 4 50 55 0.20 L 852.00 851.39 0.61 887.00 17.10 35.61 25 12.5 19.90 0.0378 2.18 14.92 0.64 868.49 866.31 BMS
5 4 5 50 55 0.20 L 851.39 850.79 0.61 887.00 15.52 36.21 25 12.5 19.90 0.0378 2.18 13.34 0.64 866.31 864.13 BMS
6 5 6 40 44 0.20 L 850.79 850.30 0.48 887.00 13.83 36.70 25 12.5 19.90 0.0378 1.75 12.08 0.64 864.13 862.38 BMS
7 6 P12 25 27.5 0.20 L 850.30 850.00 0.30 887.00 12.38 37.00 25 12.5 19.90 0.0378 1.09 11.29 0.64 862.38 861.29 BMS
J2 TO P11
1 J2 1 50 55 0.45 D 852.00 851.09 0.91 887.00 17.40 35.91 32 10.0 26.70 0.0335 2.25 15.15 0.80 868.49 866.24 BMS
2 1 2 40 44 0.45 D 851.09 850.36 0.73 887.00 15.88 36.64 32 10.0 26.70 0.0335 1.80 14.08 0.80 866.24 864.44 BMS
3 2 J3 20 22 0.45 D 850.36 850.00 0.36 887.00 14.44 37.00 32 10.0 26.70 0.0335 0.90 13.54 0.80 864.44 863.54 BMS
4 J3 4 50 55 0.15 D 850.00 849.70 0.30 887.00 13.84 37.30 25 12.5 19.90 0.0397 1.29 12.55 0.48 863.54 862.25 BMS
5 4 5 50 55 0.15 D 849.70 849.39 0.30 887.00 12.86 37.61 25 12.5 19.90 0.0397 1.29 11.57 0.48 862.25 860.96 BMS
6 5 6 40 44 0.15 D 849.39 849.15 0.24 887.00 11.81 37.85 25 12.5 19.90 0.0397 1.03 10.78 0.48 860.96 859.93 BMS
7 6 P11 25 27.5 0.15 D 849.15 849.00 0.15 887.00 10.93 38.00 25 12.5 19.90 0.0397 0.64 10.29 0.48 859.93 859.29 BMS
J3 TO P10
1 J3 1 50 55 0.30 L 850.00 848.64 1.36 887.00 14.90 38.36 32 10.0 26.70 0.0355 1.09 13.81 0.54 863.54 862.45 BMS
2 1 2 40 44 0.30 L 848.64 847.55 1.09 887.00 14.90 39.45 32 10.0 26.70 0.0355 0.87 14.03 0.54 862.45 861.58 BMS
3 2 J4 20 22 0.30 L 847.55 847.00 0.55 887.00 14.58 40.00 32 10.0 26.70 0.0355 0.43 14.15 0.54 861.58 861.15 BMS
4 J4 4 50 55 0.15 L 847.00 846.55 0.45 887.00 14.60 40.45 25 12.5 19.90 0.0397 1.29 13.31 0.48 861.15 859.86 BMS
5 4 5 50 55 0.15 L 846.55 846.09 0.45 887.00 13.77 40.91 25 12.5 19.90 0.0397 1.29 12.48 0.48 859.86 858.57 BMS
6 5 6 50 55 0.15 L 846.09 845.64 0.45 887.00 12.93 41.36 25 12.5 19.90 0.0397 1.29 11.64 0.48 858.57 857.28 BMS
7 6 7 50 55 0.15 L 845.64 845.18 0.45 887.00 12.10 41.82 25 12.5 19.90 0.0397 1.29 10.81 0.48 857.28 855.99 BMS
8 7 P10 20 22 0.15 L 845.18 845.00 0.18 887.00 10.99 42.00 25 12.5 19.90 0.0397 0.51 10.48 0.48 855.99 855.48 BMS
J4 TO P9
1 J4 1 50 55 0.15 DL 847.00 846.09 0.91 887.00 15.06 40.91 25 12.5 19.90 0.0397 1.29 13.77 0.48 861.15 859.86 BMS
Table 4 : PIPELINE DESIGN
(HYDRAULIC CALCULATIONS)
SCHEME TYPE : Gravity System Pipe Class abbreviation HC Soil CodesGMS OS
SCHEME NAME : Rikhe Bazar Water Supply Project MC HR BMS Sheet No. : 3 of 5
SCHEME NAME : Rikhe Bazar WaterSOURCE
Supply Project
NAME : Khodepani SAFE YEILD : 0.86 DI SR MR
LOCATION : WARD NO : 3 RMP : Tribeni DISTRICT : Salyan CI HS SS Pipe Line Design from CW
. HS Steel Method
PIPE USED Hydraulic Gradient
S. Pipe Line Length Design Direction Reduced Level Level New Total Max. Friction Head Residual Flow Soil
Line
No. Dis. (UL/UR Diff. Static Head Static HDPE G.I. Factor Loss Head Velocity Type
From To Actual Design Q /DL/DR) From To Level Available Pressure O.D. Class I.D. N.B. Class From To Remarks
(m) (m) (lps) (L/R/U/D) (m) (m) (m) (m) (m) (m) (mm) (kg/cm²) (mm) (mm) (m) (m) (m/s) (m) (m)
[0] [1] [2] [3] 0 [5] (6) (7) (8) (9) (10) (11) (12) (13) (14) (15) (16) (17) (18) (19) (20) (21) (22) (23) (24) (25)
2 1 2 40 44 0.15 DL 846.09 845.36 0.73 887.00 14.50 41.64 25 12.5 19.90 0.0397 1.03 13.47 0.48 859.86 858.83 BMS
3 2 P9' 20 22 0.15 DL 845.36 845.00 0.36 887.00 13.83 42.00 25 12.5 19.90 0.0397 0.51 13.32 0.48 858.83 858.32 BMS
4 P9' J5 55 60.5 0.15 DL 845.00 845.00 0.00 887.00 13.32 42.00 25 12.5 19.90 0.0397 1.42 11.90 0.48 858.32 856.90 BMS
5 J5 5 50 55 0.15 DL 845.00 844.09 0.91 887.00 12.81 42.91 25 12.5 19.90 0.0397 1.29 11.52 0.48 856.90 855.61 BMS
6 5 6 40 44 0.15 DL 844.09 843.36 0.73 887.00 12.25 43.64 25 12.5 19.90 0.0397 1.03 11.22 0.48 855.61 854.58 BMS
7 6 P9' 20 22 0.15 DL 843.36 843.00 0.36 887.00 11.58 44.00 25 12.5 19.90 0.0397 0.51 11.07 0.48 854.58 854.07 BMS
RVT-2 TO P2
1 RVT-2 1 50 55 1.50 D 877.00 870.70 6.30 877.00 6.30 6.30 50 6.0 44.90 0.0283 1.59 4.71 0.95 877.00 875.41 BMS
2 1 2 50 55 1.50 D 870.70 864.41 6.30 877.00 11.00 12.59 50 6.0 44.90 0.0283 1.59 9.41 0.95 875.41 873.82 BMS
3 2 J9 35 38.5 1.50 D 864.41 860.00 4.41 877.00 13.82 17.00 50 6.0 44.90 0.0283 1.11 12.71 0.95 873.82 872.71 BMS
4 J9 4 50 55 0.20 D 860.00 858.15 1.85 877.00 14.56 18.85 25 12.5 19.90 0.0378 2.18 12.38 0.64 872.71 870.53 BMS
5 4 5 50 55 0.20 D 858.15 856.30 1.85 877.00 14.23 20.70 25 12.5 19.90 0.0378 2.18 12.05 0.64 870.53 868.35 BMS
6 5 P2 35 38.5 0.20 D 856.30 855.00 1.30 877.00 13.35 22.00 25 12.5 19.90 0.0378 1.53 11.82 0.64 868.35 866.82 BMS
J9 TO P1
1 J9 1 50 55 0.15 R 860.00 861.85 -1.85 877.00 10.86 17.00 32 10.0 26.70 0.0405 0.31 10.55 0.27 872.71 872.40 BMS
2 1 2 50 55 0.15 R 861.85 863.70 -1.85 877.00 8.70 15.15 32 10.0 26.70 0.0405 0.31 8.39 0.27 872.40 872.09 BMS
3 2 P1 35 38.5 0.15 R 863.70 865.00 -1.30 877.00 7.09 13.30 32 10.0 26.70 0.0405 0.22 6.87 0.27 872.09 871.87 BMS
J9 TO P3
1 J9 1 50 55 1.15 DR 860.00 856.82 3.18 877.00 15.89 20.18 50 10.0 42.00 0.0293 1.35 14.54 0.83 872.71 871.36 BMS
2 1 2 40 44 1.15 DR 856.82 854.27 2.55 877.00 17.09 22.73 50 10.0 42.00 0.0293 1.08 16.01 0.83 871.36 870.28 BMS
3 2 J10 20 22 1.15 DR 854.27 853.00 1.27 877.00 17.28 24.00 50 10.0 42.00 0.0293 0.54 16.74 0.83 870.28 869.74 BMS
4 J10 4 50 55 0.15 D 853.00 852.26 0.74 877.00 17.48 24.74 25 12.5 19.90 0.0397 1.29 16.19 0.48 869.74 868.45 BMS
5 4 5 50 55 0.15 D 852.26 851.52 0.74 877.00 16.93 25.48 25 12.5 19.90 0.0397 1.29 15.64 0.48 868.45 867.16 BMS
6 5 P3 35 38.5 0.15 D 851.52 851.00 0.52 877.00 16.16 26.00 25 12.5 19.90 0.0397 0.90 15.26 0.48 867.16 866.26 BMS
Table 4 : PIPELINE DESIGN
(HYDRAULIC CALCULATIONS)
SCHEME TYPE : Gravity System Pipe Class abbreviation HC Soil CodesGMS OS
SCHEME NAME : Rikhe Bazar Water Supply Project MC HR BMS Sheet No. : 4 of 5
SCHEME NAME : Rikhe Bazar WaterSOURCE
Supply Project
NAME : Khodepani SAFE YEILD : 0.86 DI SR MR
LOCATION : WARD NO : 3 RMP : Tribeni DISTRICT : Salyan CI HS SS Pipe Line Design from CW
. HS Steel Method
PIPE USED Hydraulic Gradient
S. Pipe Line Length Design Direction Reduced Level Level New Total Max. Friction Head Residual Flow Soil
Line
No. Dis. (UL/UR Diff. Static Head Static HDPE G.I. Factor Loss Head Velocity Type
From To Actual Design Q /DL/DR) From To Level Available Pressure O.D. Class I.D. N.B. Class From To Remarks
(m) (m) (lps) (L/R/U/D) (m) (m) (m) (m) (m) (m) (mm) (kg/cm²) (mm) (mm) (m) (m) (m/s) (m) (m)
[0] [1] [2] [3] 0 [5] (6) (7) (8) (9) (10) (11) (12) (13) (14) (15) (16) (17) (18) (19) (20) (21) (22) (23) (24) (25)
J10 TO P7
1 J10 1 50 55 0.80 R 853.00 850.73 2.27 877.00 19.01 26.27 40 10.0 33.50 0.0308 2.14 16.87 0.91 869.74 867.60 BMS
2 1 2 40 44 0.80 R 850.73 848.91 1.82 877.00 18.69 28.09 40 10.0 33.50 0.0308 1.71 16.98 0.91 867.60 865.89 BMS
3 2 J8 20 22 0.80 R 848.91 848.00 0.91 877.00 17.89 29.00 40 10.0 33.50 0.0308 0.85 17.04 0.91 865.89 865.04 BMS
4 J8 4 50 55 0.30 R 848.00 845.88 2.12 877.00 19.16 31.12 32 10.0 26.70 0.0355 1.09 18.07 0.54 865.04 863.95 BMS
5 4 5 50 55 0.30 R 845.88 843.76 2.12 877.00 20.19 33.24 32 10.0 26.70 0.0355 1.09 19.10 0.54 863.95 862.86 BMS
6 5 6 40 44 0.30 R 843.76 842.06 1.70 877.00 20.80 34.94 32 10.0 26.70 0.0355 0.87 19.93 0.54 862.86 861.99 BMS
7 6 J6 25 27.5 0.30 R 842.06 841.00 1.06 877.00 20.99 36.00 32 10.0 26.70 0.0355 0.54 20.45 0.54 861.99 861.45 BMS
8 J6 8 50 55 0.10 R 841.00 840.17 0.83 877.00 21.28 36.83 20 16.0 14.90 0.0423 2.58 18.70 0.57 861.45 858.87 BMS
9 8 9 50 55 0.10 R 840.17 839.33 0.83 877.00 19.54 37.67 20 16.0 14.90 0.0423 2.58 16.96 0.57 858.87 856.29 BMS
10 9 10 50 55 0.10 R 839.33 838.50 0.83 877.00 17.79 38.50 20 16.0 14.90 0.0423 2.58 15.21 0.57 856.29 853.71 BMS
11 10 P7 30 33 0.10 R 838.50 838.00 0.50 877.00 15.71 39.00 20 16.0 14.90 0.0423 1.55 14.16 0.57 853.71 852.16 BMS
J6 TO P6
1 J6 1 50 55 0.10 D 841.00 839.15 1.85 877.00 22.30 37.85 20 16.0 14.90 0.0423 2.58 19.72 0.57 861.45 858.87 BMS
2 1 2 50 55 0.10 D 839.15 837.30 1.85 877.00 21.57 39.70 20 16.0 14.90 0.0423 2.58 18.99 0.57 858.87 856.29 BMS
3 2 P6 35 38.5 0.10 D 837.30 836.00 1.30 877.00 20.29 41.00 20 16.0 14.90 0.0423 1.81 18.48 0.57 856.29 854.48 BMS
J8 TO P5
1 J8 1 50 55 0.50 D 848.00 847.26 0.74 877.00 17.78 29.74 32 10.0 26.70 0.0330 2.75 15.03 0.89 865.04 862.29 BMS
2 1 2 50 55 0.50 D 847.26 846.52 0.74 877.00 15.77 30.48 32 10.0 26.70 0.0330 2.75 13.02 0.89 862.29 859.54 BMS
3 2 J7 35 38.5 0.50 D 846.52 846.00 0.52 877.00 13.54 31.00 32 10.0 26.70 0.0330 1.92 11.62 0.89 859.54 857.62 BMS
4 J7 4 50 55 0.20 D 846.00 844.16 1.84 877.00 13.46 32.84 25 12.5 19.90 0.0378 2.18 11.28 0.64 857.62 855.44 BMS
5 4 5 50 55 0.20 D 844.16 842.32 1.84 877.00 13.12 34.68 25 12.5 19.90 0.0378 2.18 10.94 0.64 855.44 853.26 BMS
6 5 6 50 55 0.20 D 842.32 840.47 1.84 877.00 12.79 36.53 25 12.5 19.90 0.0378 2.18 10.61 0.64 853.26 851.08 BMS
7 6 P5 40 44 0.20 D 840.47 839.00 1.47 877.00 12.08 38.00 25 12.5 19.90 0.0378 1.75 10.33 0.64 851.08 849.33 BMS
Table 4 : PIPELINE DESIGN
(HYDRAULIC CALCULATIONS)
SCHEME TYPE : Gravity System Pipe Class abbreviation HC Soil CodesGMS OS
SCHEME NAME : Rikhe Bazar Water Supply Project MC HR BMS Sheet No. : 5 of 5
SCHEME NAME : Rikhe Bazar WaterSOURCE
Supply Project
NAME : Khodepani SAFE YEILD : 0.86 DI SR MR
LOCATION : WARD NO : 3 RMP : Tribeni DISTRICT : Salyan CI HS SS Pipe Line Design from CW
. HS Steel Method
PIPE USED Hydraulic Gradient
S. Pipe Line Length Design Direction Reduced Level Level New Total Max. Friction Head Residual Flow Soil
Line
No. Dis. (UL/UR Diff. Static Head Static HDPE G.I. Factor Loss Head Velocity Type
From To Actual Design Q /DL/DR) From To Level Available Pressure O.D. Class I.D. N.B. Class From To Remarks
(m) (m) (lps) (L/R/U/D) (m) (m) (m) (m) (m) (m) (mm) (kg/cm²) (mm) (mm) (m) (m) (m/s) (m) (m)
[0] [1] [2] [3] 0 [5] (6) (7) (8) (9) (10) (11) (12) (13) (14) (15) (16) (17) (18) (19) (20) (21) (22) (23) (24) (25)
J7 TO P4
1 J7 1 50 55 0.20 DR 846.00 842.97 3.03 877.00 14.65 34.03 25 12.5 19.90 0.0378 2.18 12.47 0.64 857.62 855.44 BMS
2 1 2 50 55 0.20 DR 842.97 839.94 3.03 877.00 15.50 37.06 25 12.5 19.90 0.0378 2.18 13.32 0.64 855.44 853.26 BMS
3 2 3 40 44 0.20 DR 839.94 837.52 2.42 877.00 15.74 39.48 25 12.5 19.90 0.0378 1.75 13.99 0.64 853.26 851.51 BMS
4 3 P4 25 27.5 0.20 DR 837.52 836.00 1.52 877.00 15.51 41.00 25 12.5 19.90 0.0378 1.09 14.42 0.64 851.51 850.42 BMS
4155 4571
Length
Transmission Distribution
TOTAL LENGTH 905.00 3,250.00
HDP Pipe Length 905.00 3,250.00
GI Pipe Length - -
Total 905.00 3,250.00
Grand Total 4,155.00
Annex-D1
Layout, Schematic Diagrams &
Pipeline Profiles
Annex-D2
Typical Drawings of Structures