Pipe - Design-Rikhe Bazar WSP

You might also like

Download as xls, pdf, or txt
Download as xls, pdf, or txt
You are on page 1of 20

Spread Sheet Developed By: Softwel (P) Ltd.

Design and Drawing of


Rural Water Supply Scheme

View Pipe Data


Goto
Goto Data
Data Input
Input

Goto
Goto PD-Sample
PD-Sample

Pipe Database Updated as per Nepal Standard For PN100 Pipe Series.
Last Updated : 2019/12/01

Annex - I
DATA INPUT FORM
Spread Sheets Developed by SOFTWEL (P) Ltd.

Consultant Organization Yashaswi Engineering and Reasearch Center,Panchakumari Marg


Scheme Code Gravity System
Project Name Rikhe Bazar Water Supply Project
Name of the Community
Name of the Client Organization Water Supply, Irrigation & Energy Development Office, Salyan
Location : Ward No.: 3
RMP : Tribeni
District : Salyan

SCHEME TYPE Gravity System

SURVEY / DESIGN INFORMATION


District Pop Growth Rate (r) 1.27 % From District Growth Rates
Population per Household 5.20
Construction Period (n1) 3 years
Design Period (n) 20 years
Peak Factor 2.4 Factor
Per Capita Domestic Water Demand 65 l/d
Per Capita Water Demand for Students 10 l/d
Present Year ( Survey Year) BS
Base Year ( Project Completion Year) BS
Design Year BS
Minimum Flow Rate per Tap 0.10 lps
Description of Sources

Discharge Date Yield Remarks


Reservoir Description
Location of source measured of Safe Tapped
S.No. Name of Source Place, RMP/MP-wards Type of Source Lps Measurement Lps Lps RVT No RVT Location

1 Sarada River Luham RMP-06 River 20.00 08-2076 B.S. 18.00 6.00 RVT Kumal Chaur
Near Sarada River Bank

Total 20.00 18.00 6.00


Table C.2 : Reservoir Tank Sizing
Yashaswi Engineering and Reasearch Center,Panchakumari Marg
SCHEME NAME : Rikhe Bazar Water Supply Project
LOCATION : WARD NO : 3 VDC : Tribeni DISTRICT : Salyan

a) Scheme Information
a.1 Reservoir Tank No: 1
a.2 Served Standposts 1 to 8
a.3 Average Design Demand to be Supplied through Reservoir #REF! l/s = #REF! l/day
a.4 Available Minimum flow from the Source (Safe Yield) 0.400 l/s
#REF!
a.5 Adjusted/Optimized supply to Reservoir from Source 0.250 l/s = 21600.0 l/day
a.6 Total Design Flows of all Standposts : #REF! l/s
b) Reservoir sizing assuming Continuous System using Consumption Patterns

Time Period Hours Water Cummu. Cummu. Surplus Deficit


From To Consumption Supply Demand
(%) (lt) (lt) (lt) (lt)
5:00 AM 7:00 AM 2 25.0% 1800 #REF! #REF! #REF!
7:00 AM 12:00 PM 5 35.0% 6300 #REF! #REF! #REF!
12:00 PM 5:00 PM 5 20.0% 10800 #REF! #REF! #REF!
5:00 PM 7:00 PM 2 20.0% 12600 #REF! #REF! #REF!
7:00 PM 5:00 AM 10 0.0% 21600 #REF! #REF! #REF!

Maximum Deficit #REF! lt


Minimum required Reservoir capacity #REF! cum
Provide Reservoir of capacity #REF! cum #REF! of Average Demand
Check if Reservoir gets filled during night (7:00 PM - 5:00 AM)
Volume of water collected during night 9.00 cum

25000

20000

15000

10000

5000

0
04:48 AM

04:48 AM

09:36 AM
12:00 AM

09:36 AM

02:24 PM

07:12 PM

12:00 AM

Supply Demand

c) Reservoir sizing assuming Intermittent System (Optional)

Maximum Required supply hours based on Supply from Source #REF! hours
Maximum Required supply hours based on Demand #REF! hours
Adopted hours of Supply #REF! hours
Recommended Supply Hours and Period
First Shift 5:00 AM To #REF!
Second Shift #REF! To 7:00 PM

Time Period Hours Cum. Inflow Cum. Con- Surplus Deficit


From To In Out (lt) sumption (lt) (lt) (lt)
5:00 AM #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! 7:00 PM #REF! #REF! #REF! #REF! #REF! #REF!
7:00 PM 5:00 AM 10.00 #REF! #REF! #REF! #REF! #REF!

Max Deficit #REF! lt = #REF! cum


Provide Reservoir Capacity of #REF! cum
c) Recommended Reservoir Size

Recommended Size for RVT 01 = #VALUE! cum Time to Fill the RVT #VALUE! Hr
Water Demand and Tap Flow Calculation Sheet
SCHEME NAME : Rikhe Bazar Water Supply Project
SUPPORT ORGANIZATION : Water Supply, Irrigation & Energy Development Office, Salyan
CONSULTANT : Yashaswi Engineering and Reasearch Center,Panchakumari Marg
LOCATION : WARD NO : 3 RMP : Tribeni DISTRICT : Salyan
Name of Community : 0
Required Datas: Base Period (n1) 3 yrs.
Peak Factor: 2.4 Design Period (n) 20 yrs.
Per Capita Demand : 65 lpcd District Growth Rate (r) 1.27 %
Per Capita Demand for Students: 10 lpcd Minimum flow rate 0.10 lps

Description of Tap Population forecast Institutional Water Demand Live Tap Flow Calculation
Cluster Name Ward Nos Present Year Base Year Design Year Total No. of Other Total Stock Grand Average Peak Peak Design Adjusted Sectional
Total Remarks
S.N. Cluster/Section or No. of BS BS BS Domestic Pupil in Institutional Institutional Demand Tap Factor Flow flow Peak Flow
Water
Locality HH (P) (Po) (Pn) Demand School Demand Demand @20% of [11] Demand Flow factor
From To (Nos) (Nos) P(1+r)^n1 P(1+r)^(n1+n) (lpd) (Nos) (lpd) (lpd) (lpd) (lpd) (lps) (Factor) (lps) (lps) (lps)
[1] [2] [3] [4] [5] [6] [8] [9] [10] [11] [9] [10] [11] [12] [15] [16] [17] [18] [16] [17] [18]

RVT-1
1 RVT J1 Cluster- 1 3 1 - 60 600 0 600 0.01 3.00 0.03 0.10 10.00 School
2 J1 J2 Cluster- 2 3 3 16 17 21 1,365 - 273 1,638 0.02 2.40 0.05 0.10 5.00
3 J2 J3 Cluster- 3 3 2 10 10 13 845 - 169 1,014 0.01 2.40 0.02 0.10 10.00
4 J3 J4 Cluster- 4 3 4 21 22 28 1,820 - 364 2,184 0.03 2.40 0.07 0.10 3.33
5 J4 J5 Cluster- 5 3 4 21 22 28 1,820 - 364 2,184 0.03 2.40 0.07 0.10 3.33
6 J5 J6 Cluster- 6 3 6 31 32 41 2,665 - 533 3,198 0.04 2.40 0.10 0.10 2.50
7 J6 J7 Cluster- 7 3 10 52 54 70 4,550 - 910 5,460 0.06 2.40 0.14 0.15 2.50
8 J2 J8 Cluster- 8 5 26 27 35 2,275 - 455 2,730 0.03 2.40 0.07 0.10 3.33
9 J2 J8 Cluster- 9 3 1 - 1,500 1,500 0 1,500 0.02 2.40 0.05 0.10 5.00 Police Station
10 J8 J9 Cluster- 10 3 4 21 22 28 1,820 - 364 2,184 0.03 2.40 0.07 0.10 3.33
11 J9 J10 Cluster- 11 3 6 31 32 41 2,665 - 533 3,198 0.04 2.40 0.10 0.10 2.50
12 J10 J11 Cluster- 12 3 8 42 44 56 3,640 - 728 4,368 0.05 2.40 0.12 0.15 3.00

13 J8 J12 Cluster- 13 3 4 21 22 28 1,820 - 364 2,184 0.03 2.40 0.07 0.10 3.33
14 J13 J14 Cluster- 14 3 12 62 64 83 5,395 - 1079 6,474 0.07 2.40 0.17 0.20 2.86
15 J14 J15 Cluster- 15 3 9 47 49 63 4,095 - 819 4,914 0.06 2.40 0.14 0.15 2.50
16 J15 J16 Cluster- 16 3 14 73 76 98 6,370 - 1274 7,644 0.09 2.40 0.22 0.25 2.78
17 J16 J17 Cluster- 17 3 6 31 32 41 2,665 - 533 3,198 0.04 2.40 0.10 0.10 2.50
18 J17 J18 Cluster- 18 3 4 21 22 28 1,820 - 364 2,184 0.03 2.40 0.07 0.10 3.33
19 J13 J19 Cluster- 19 3 3 16 17 21 1,365 - 273 1,638 0.02 2.40 0.05 0.10 5.00
20 J17 J20 Cluster- 20 3 4 21 22 28 1,820 - 364 2,184 0.03 2.40 0.07 0.10 3.33

5 of 20
Required Datas: Base Period (n1) 3 yrs.
Peak Factor: 2.4 Design Period (n) 20 yrs.
Per Capita Demand : 65 lpcd District Growth Rate (r) 1.27 %
Per Capita Demand for Students: 10 lpcd Minimum flow rate 0.10 lps

Description of Tap Population forecast Institutional Water Demand Live Tap Flow Calculation
Cluster Name Ward Nos Present Year Base Year Design Year Total No. of Other Total Stock Grand Average Peak Peak Design Adjusted Sectional
Total Remarks
S.N. Cluster/Section or No. of BS BS BS Domestic Pupil in Institutional Institutional Demand Tap Factor Flow flow Peak Flow
Water
Locality HH (P) (Po) (Pn) Demand School Demand Demand @20% of [11] Demand Flow factor
From To (Nos) (Nos) P(1+r)^n1 P(1+r)^(n1+n) (lpd) (Nos) (lpd) (lpd) (lpd) (lpd) (lps) (Factor) (lps) (lps) (lps)
[1] [2] [3] [4] [5] [6] [8] [9] [10] [11] [9] [10] [11] [12] [15] [16] [17] [18] [16] [17] [18]

21 J20 J21 Cluster- 21 3 4 21 22 28 1,820 - 364 2,184 0.03 2.40 0.07 0.10 3.33
22 J21 J21' Cluster- 22 3 1 - 300 3,000 0 3,000 0.03 3.00 0.09 0.10 3.33 School

23 J22 J23 Cluster- 23 3 5 26 27 35 2,275 - 455 2,730 0.03 2.40 0.07 0.10 3.33
24 J23 J24 Cluster- 24 5 26 27 35 2,275 - 455 2,730 0.03 2.40 0.07 0.10 3.33
25 J23 J24 Cluster- 25 3 1 - 3,000 3,000 0 3,000 0.03 3.00 0.09 0.10 3.33 Health Post
26 J24 J25 Cluster- 26 3 8 42 44 56 3,640 - 728 4,368 0.05 2.40 0.12 0.15 3.00

27 J26 J27 Cluster- 27 3 8 42 44 56 3,640 - 728 4,368 0.05 2.40 0.12 0.15 3.00
28 J27 J28 Cluster- 28 3 16 83 86 111 7,215 - 1443 8,658 0.10 2.40 0.24 0.25 2.50
29 J28 J29 Cluster- 29 3 13 68 71 91 5,915 - 1183 7,098 0.08 2.40 0.19 0.20 2.50
30 J29 J30 Cluster- 30 3 10 52 54 70 4,550 - 910 5,460 0.06 2.40 0.14 0.15 2.50
31 J30 J31 Cluster- 31 3 11 57 59 76 4,940 - 988 5,928 0.07 2.40 0.17 0.20 2.86
32 J31 J32 Cluster- 32 3 11 57 59 76 4,940 - 988 5,928 0.07 2.40 0.17 0.20 2.86
33 J32 J33 Cluster- 33 3 8 42 44 56 3,640 - 728 4,368 0.05 2.40 0.12 0.15 3.00
34 J33 J34 Cluster- 34 3 7 36 37 48 3,120 - 624 3,744 0.04 2.40 0.10 0.10 2.50
35 J34 J35 Cluster- 35 3 7 36 37 48 3,120 - 624 3,744 0.04 2.40 0.10 0.10 2.50
36 J35 J36 Cluster- 36 3 4 21 22 28 1,820 - 364 2,184 0.03 2.40 0.07 0.10 3.33

37 J26 J37 Cluster- 37 3 9 47 49 63 4,095 - 819 4,914 0.06 2.40 0.14 0.15 2.50
38 J37 J37' Cluster- 38 3 1 - 200 2,000 0 2,000 0.02 3.00 0.06 0.10 5.00 Trebeni School
39 J37 J38 Cluster- 39 3 9 47 49 63 4,095 - 819 4,914 0.06 2.40 0.14 0.15 2.50
40 J38 J41 Cluster- 40 3 8 42 44 56 3,640 - 728 4,368 0.05 2.40 0.12 0.15 3.00
41 J41 J40 Cluster- 41 3 4 21 22 28 1,820 - 364 2,184 0.03 2.40 0.07 0.10 3.33
42 J41 J42 Cluster- 42 3 6 31 32 41 2,665 - 533 3,198 0.04 2.40 0.10 0.10 2.50
43 J42 J43 Cluster- 43 3 7 36 37 48 3,120 - 624 3,744 0.04 2.40 0.10 0.10 2.50

44 RVT J44 Cluster- 44 3 3 16 17 21 1,365 - 273 1,638 0.02 2.40 0.05 0.10 5.00

6 of 20
Required Datas: Base Period (n1) 3 yrs.
Peak Factor: 2.4 Design Period (n) 20 yrs.
Per Capita Demand : 65 lpcd District Growth Rate (r) 1.27 %
Per Capita Demand for Students: 10 lpcd Minimum flow rate 0.10 lps

Description of Tap Population forecast Institutional Water Demand Live Tap Flow Calculation
Cluster Name Ward Nos Present Year Base Year Design Year Total No. of Other Total Stock Grand Average Peak Peak Design Adjusted Sectional
Total Remarks
S.N. Cluster/Section or No. of BS BS BS Domestic Pupil in Institutional Institutional Demand Tap Factor Flow flow Peak Flow
Water
Locality HH (P) (Po) (Pn) Demand School Demand Demand @20% of [11] Demand Flow factor
From To (Nos) (Nos) P(1+r)^n1 P(1+r)^(n1+n) (lpd) (Nos) (lpd) (lpd) (lpd) (lpd) (lps) (Factor) (lps) (lps) (lps)
[1] [2] [3] [4] [5] [6] [8] [9] [10] [11] [9] [10] [11] [12] [15] [16] [17] [18] [16] [17] [18]

45 J44 J44A Cluster- 45 3 7 36 37 48 3,120 - 624 3,744 0.04 2.40 0.10 0.10 2.50

46 J44B J44C Cluster- 46 3 4 21 22 28 1,820 - 364 2,184 0.03 2.40 0.07 0.10 3.33

7 of 20
Required Datas: Base Period (n1) 3 yrs.
Peak Factor: 2.4 Design Period (n) 20 yrs.
Per Capita Demand : 65 lpcd District Growth Rate (r) 1.27 %
Per Capita Demand for Students: 10 lpcd Minimum flow rate 0.10 lps

Description of Tap Population forecast Institutional Water Demand Live Tap Flow Calculation
Cluster Name Ward Nos Present Year Base Year Design Year Total No. of Other Total Stock Grand Average Peak Peak Design Adjusted Sectional
Total Remarks
S.N. Cluster/Section or No. of BS BS BS Domestic Pupil in Institutional Institutional Demand Tap Factor Flow flow Peak Flow
Water
Locality HH (P) (Po) (Pn) Demand School Demand Demand @20% of [11] Demand Flow factor
From To (Nos) (Nos) P(1+r)^n1 P(1+r)^(n1+n) (lpd) (Nos) (lpd) (lpd) (lpd) (lpd) (lps) (Factor) (lps) (lps) (lps)
[1] [2] [3] [4] [5] [6] [8] [9] [10] [11] [9] [10] [11] [12] [15] [16] [17] [18] [16] [17] [18]

47 J45 J46 Cluster- 47 3 4 21 22 28 1,820 - 364 2,184 0.03 2.40 0.07 0.10 3.33
48 J46 J47 Cluster- 48 3 6 31 32 41 2,665 - 533 3,198 0.04 2.40 0.10 0.10 2.50
49 J47 J48 Cluster- 49 3 3 16 17 21 1,365 - 273 1,638 0.02 2.40 0.05 0.10 5.00
50 J49 J50 Cluster- 50 3 3 16 17 21 1,365 - 273 1,638 0.02 2.40 0.05 0.10 5.00
51 J50 J51 Cluster- 51 3 3 16 17 21 1,365 - 273 1,638 0.02 2.40 0.05 0.10 5.00
52 J51 J52 Cluster- 52 3 4 21 22 28 1,820 - 364 2,184 0.03 2.40 0.07 0.10 3.33
53 J52 J53 Cluster- 53 3 2 10 10 13 845 - 169 1,014 0.01 2.40 0.02 0.10 10.00
54 J53 J54 Cluster- 54 3 4 21 22 28 1,820 - 364 2,184 0.03 2.40 0.07 0.10 3.33
55 J54 J55 Cluster- 55 3 3 16 17 21 1,365 - 273 1,638 0.02 2.40 0.05 0.10 5.00
56 J55 J56 Cluster- 56 3 4 21 22 28 1,820 - 364 2,184 0.03 2.40 0.07 0.10 3.33
57 J56 J57 Cluster- 57 3 4 21 22 28 1,820 - 364 2,184 0.03 2.40 0.07 0.10 3.33

58 J59 J60 Cluster- 58 3 2 10 10 13 845 - 169 1,014 0.01 2.40 0.02 0.10 10.00
59 J60 J61 Cluster- 59 3 2 10 10 13 845 - 169 1,014 0.01 2.40 0.02 0.10 10.00
60 J61 J62 Cluster- 60 3 6 31 32 41 2,665 - 533 3,198 0.04 2.40 0.10 0.10 2.50
61 J62 J63 Cluster- 61 3 6 31 32 41 2,665 - 533 3,198 0.04 2.40 0.10 0.10 2.50
62 J49 J64 Cluster- 62 3 4 21 22 28 1,820 - 364 2,184 0.03 2.40 0.07 0.10 3.33
63 J50 J65 Cluster- 63 3 7 36 37 48 3,120 - 624 3,744 0.04 2.40 0.10 0.10 2.50
64 J51 J66 Cluster- 64 3 4 21 22 28 1,820 - 364 2,184 0.03 2.40 0.07 0.10 3.33
65 J52 J67 Cluster- 65 3 3 16 17 21 1,365 - 273 1,638 0.02 2.40 0.05 0.10 5.00
66 J53 J68 Cluster- 66 3 6 31 32 41 2,665 - 533 3,198 0.04 2.40 0.10 0.10 2.50
67 J55 J69 Cluster- 67 3 1 - 3,000 3,000 0 3,000 0.03 3.00 0.09 0.10 3.33 Health Post
68 J55 J69 Cluster- 68 4 21 22 28 1,820 - 364 2,184 0.03 2.40 0.07 0.10 3.33
69 J56 J70 Cluster- 69 3 9 47 49 63 4,095 - 819 4,914 0.06 2.40 0.14 0.15 2.50
70 J57 J71 Cluster- 70 3 5 26 27 35 2,275 - 455 2,730 0.03 2.40 0.07 0.10 3.33
71 J58 J72 Cluster- 71 3 7 36 37 48 3,120 - 624 3,744 0.04 2.40 0.10 0.10 2.50
72 J60 J73 Cluster- 72 3 6 31 32 41 2,665 - 533 3,198 0.04 2.40 0.10 0.10 2.50

Total 399 2,047 2,129 2,728 177,320 560 7,500 13,100 35,464 225,884 2.69 175.80 6.53 8.45 267.18 - -
8 of 20
Required Datas: Base Period (n1) 3 yrs.
Peak Factor: 2.4 Design Period (n) 20 yrs.
Per Capita Demand : 65 lpcd District Growth Rate (r) 1.27 %
Per Capita Demand for Students: 10 lpcd Minimum flow rate 0.10 lps

Description of Tap Population forecast Institutional Water Demand Live Tap Flow Calculation
Cluster Name Ward Nos Present Year Base Year Design Year Total No. of Other Total Stock Grand Average Peak Peak Design Adjusted Sectional
Total Remarks
S.N. Cluster/Section or No. of BS BS BS Domestic Pupil in Institutional Institutional Demand Tap Factor Flow flow Peak Flow
Water
Locality HH (P) (Po) (Pn) Demand School Demand Demand @20% of [11] Demand Flow factor
From To (Nos) (Nos) P(1+r)^n1 P(1+r)^(n1+n) (lpd) (Nos) (lpd) (lpd) (lpd) (lpd) (lps) (Factor) (lps) (lps) (lps)
[1] [2] [3] [4] [5] [6] [8] [9] [10] [11] [9] [10] [11] [12] [15] [16] [17] [18] [16] [17] [18]

NOTE : 1 Peak factor of 2.4 has been adopted


2 Design Tap Flow has been adjusted for the Peak flow by rounding off to nearest 0.1 lps.
3 If flow is less than 0.1 lps then it has been adjusted to 0.1 lps and if flow is greater than 0.25 lps provide additional tapstand.

9 of 20
Reservoir Tank Sizing
SCHEME NAME : Rikhe Bazar Water Supply Project
LOCATION : WARD NO : 3 RMP : Tribeni DISTRICT : Salyan

a) Scheme Information
a.1 Reservoir Tank No: RVT
a.2 Served Clusters 72
a.3 Average Design Demand to be Supplied through Reservoir 2.61 l/s = 225884 l/day
a.4 Available Minimum flow from the Source (Safe Yield) 18.00 l/s

a.5 Adjusted/Optimized supply to Reservoir from Source 6.00 l/s = 248400 l/day
a.6 Total Design Flows of all Standposts : 8.45 l/s
b) Reservoir sizing assuming Continuous System using Consumption Patterns

Time Period Hours Water Cummu. Cummu. Surplus Deficit


From To Consumption Supply Demand
(%) (lt) (lt) (lt) (lt)
5:00 AM 7:00 AM 2 25.0% 43200 56471 13271
7:00 AM 12:00 PM 4.5 35.0% 140400 135530 4870
12:00 PM 5:00 PM 0 20.0% 140400 180707 40307
5:00 PM 7:00 PM 2 20.0% 183600 225884 42284
7:00 PM 5:00 AM 3 0.0% 248400 225884 22516
11.5
Maximum Deficit 42284 lt
Minimum required Reservoir capacity 42.28 cum
Provide Reservoir of capacity 45.00 cum 20% of Average Demand
Check if Reservoir gets filled during night (7:00 PM - 5:00 AM)
Volume of water collected during night 64.80 cum

300000

250000

200000

150000

100000

50000

0
12:00 AM

04:48 AM

09:36 AM

02:24 PM

07:12 PM

12:00 AM

04:48 AM

09:36 AM
Supply Demand

Provide Reservoir Capacity of according to Type Design 75.00 cum


c) Recommended Reservoir Size

Recommended Size for RVT RVT = 75.00 cum Time to Fill the RVT 3.47 Hr

Max. Discharge extracted from Sumpwell 20 lps


Number of Sumpwell 1 no.
Discharge Extracted From each Sumpwell 6 lps
Pump Capacity used
Table C.2 : Reservoir Tank Sizing
Yashaswi Engineering and Reasearch Center,Panchakumari Marg
SCHEME NAME : Rikhe Bazar Water Supply Project
LOCATION : WARD NO : 3 VDC : Tribeni DISTRICT : Salyan

a) Scheme Information
a.1 Reservoir Tank No: 1
a.2 Served Standposts 1 to 8
a.3 Average Design Demand to be Supplied through Reservoir #REF! l/s = #REF! l/day
a.4 Available Minimum flow from the Source (Safe Yield) 0.400 l/s
#REF!
a.5 Adjusted/Optimized supply to Reservoir from Source 0.250 l/s = 21600.0 l/day
a.6 Total Design Flows of all Standposts : #REF! l/s
b) Reservoir sizing assuming Continuous System using Consumption Patterns

Time Period Hours Water Cummu. Cummu. Surplus Deficit


From To Consumption Supply Demand
(%) (lt) (lt) (lt) (lt)
5:00 AM 7:00 AM 2 25.0% 1800 #REF! #REF! #REF!
7:00 AM 12:00 PM 5 35.0% 6300 #REF! #REF! #REF!
12:00 PM 5:00 PM 5 20.0% 10800 #REF! #REF! #REF!
5:00 PM 7:00 PM 2 20.0% 12600 #REF! #REF! #REF!
7:00 PM 5:00 AM 10 0.0% 21600 #REF! #REF! #REF!

Maximum Deficit #REF! lt


Minimum required Reservoir capacity #REF! cum
Provide Reservoir of capacity #REF! cum #REF! of Average Demand
Check if Reservoir gets filled during night (7:00 PM - 5:00 AM)
Volume of water collected during night 9.00 cum

25000

20000

15000

10000

5000

0
12:00 AM

04:48 AM

09:36 AM

02:24 PM

07:12 PM

12:00 AM

04:48 AM

09:36 AM

Supply Demand

c) Reservoir sizing assuming Intermittent System (Optional)

Maximum Required supply hours based on Supply from Source #REF! hours
Maximum Required supply hours based on Demand #REF! hours
Adopted hours of Supply #REF! hours
Recommended Supply Hours and Period
First Shift 5:00 AM To #REF!
Second Shift #REF! To 7:00 PM

Time Period Hours Cum. Inflow Cum. Con- Surplus Deficit


From To In Out (lt) sumption (lt) (lt) (lt)
5:00 AM #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! 7:00 PM #REF! #REF! #REF! #REF! #REF! #REF!
7:00 PM 5:00 AM 10.00 #REF! #REF! #REF! #REF! #REF!

Max Deficit #REF! lt = #REF! cum


Provide Reservoir Capacity of #REF! cum
c) Recommended Reservoir Size

Recommended Size for RVT 01 = #VALUE! cum Time to Fill the RVT #VALUE! Hr
Sheet No. : 12 of 20
Table 4 : PIPELINE DESIGN
(HYDRAULIC CALCULATIONS)
SCHEME TYPE : Gravity System Pipe Class abbreviation HC Soil Code GMS OS
SCHEME NAME : Rikhe Bazar Water Supply Project MC HR BMS
SCHEME NAME : Rikhe Bazar WaterSOURCE
Suppl NAME : Khodepani SAFE YEILD : 0.86 DI SR MR
LOCATION : WARD NO : 3 RMP : Tribeni DISTRICT : Salyan CI HS SS Pipe Line Design from CW
. HS Steel Method

PIPE USED Hydraulic Gradient


S. Pipe Line Length Design Direction Reduced Level Level New Total Max. Friction Head Residual Flow Soil
Line
No. Dis. (UL/UR Diff. Static Head Static HDPE G.I. Factor Loss Head Velocity Type
From To Actual Design Q /DL/DR) From To Level Available Pressure O.D. Class I.D. N.B. Class From To Remarks
(m) (m) (lps) (L/R/U/D) (m) (m) (m) (m) (m) (m) (mm) (kg/cm²) (mm) (mm) (m) (m) (m/s) (m) (m)
[0] [1] [2] [3] 0 [5] (6) (7) (8) (9) (10) (11) (12) (13) (14) (15) (16) (17) (18) (19) (20) (21) (22) (23) (24) (25)

INTAKE TO DC

1 INTAKE 1 50 55 0.85 D 920.00 917.73 2.27 920.00 2.27 2.27 50 6.0 44.90 0.0305 0.56 1.71 0.54 920.00 919.44 BMS

2 1 2 50 55 0.85 D 917.73 915.45 2.27 920.00 3.99 4.55 50 6.0 44.90 0.0305 0.56 3.43 0.54 919.44 918.88 BMS

3 2 3 50 55 0.85 D 915.45 913.18 2.27 920.00 5.70 6.82 50 6.0 44.90 0.0305 0.56 5.14 0.54 918.88 918.32 BMS

4 3 4 50 55 0.85 D 913.18 910.91 2.27 920.00 7.41 9.09 50 6.0 44.90 0.0305 0.56 6.85 0.54 918.32 917.76 BMS

5 4 5 50 55 0.85 D 910.91 908.64 2.27 920.00 9.12 11.36 50 6.0 44.90 0.0305 0.56 8.56 0.54 917.76 917.20 BMS

6 5 6 50 55 0.85 D 908.64 906.36 2.27 920.00 10.84 13.64 50 6.0 44.90 0.0305 0.56 10.28 0.54 917.20 916.64 BMS

7 6 7 50 55 0.85 D 906.36 904.09 2.27 920.00 12.55 15.91 50 6.0 44.90 0.0305 0.56 11.99 0.54 916.64 916.08 BMS

8 7 8 50 55 0.85 D 904.09 901.82 2.27 920.00 14.26 18.18 50 6.0 44.90 0.0305 0.56 13.70 0.54 916.08 915.52 BMS

9 8 9 50 55 0.85 D 901.82 899.55 2.27 920.00 15.97 20.45 40 10.0 33.50 0.0306 2.36 13.61 0.96 915.52 913.16 BMS

10 9 10 50 55 0.85 D 899.55 897.27 2.27 920.00 15.89 22.73 40 10.0 33.50 0.0306 2.36 13.53 0.96 913.16 910.80 BMS

11 10 11 50 55 0.85 D 897.27 895.00 2.27 920.00 15.80 25.00 40 10.0 33.50 0.0306 2.36 13.44 0.96 910.80 908.44 BMS

12 11 12 50 55 0.85 D 895.00 892.73 2.27 920.00 15.71 27.27 40 10.0 33.50 0.0306 2.36 13.35 0.96 908.44 906.08 BMS

13 12 13 40 44 0.85 D 892.73 890.91 1.82 920.00 15.17 29.09 40 10.0 33.50 0.0306 1.89 13.28 0.96 906.08 904.19 BMS

14 13 DC 20 22 0.85 D 890.91 890.00 0.91 920.00 14.19 30.00 40 10.0 33.50 0.0306 0.95 13.24 0.96 904.19 903.24 BMS

DC TO RVT-1

1 DC RVT-1 25 27.5 0.30 DL 890.00 887.00 3.00 890.00 3.00 3.00 40 10.0 33.50 0.0361 0.17 2.83 0.34 890.00 889.83 BMS

DC TO RVT-2

1 DC 1 50 55 0.55 DR 890.00 887.05 2.95 890.00 2.95 2.95 40 10.0 33.50 0.0325 1.05 1.90 0.62 890.00 888.95 BMS

2 1 2 50 55 0.55 DR 887.05 884.09 2.95 890.00 4.86 5.91 40 10.0 33.50 0.0325 1.05 3.81 0.62 888.95 887.90 BMS
Sheet No. : 13 of 20
Table 4 : PIPELINE DESIGN
(HYDRAULIC CALCULATIONS)
SCHEME TYPE : Gravity System Pipe Class abbreviation HC Soil Code GMS OS
SCHEME NAME : Rikhe Bazar Water Supply Project MC HR BMS
SCHEME NAME : Rikhe Bazar WaterSOURCE
Suppl NAME : Khodepani SAFE YEILD : 0.86 DI SR MR
LOCATION : WARD NO : 3 RMP : Tribeni DISTRICT : Salyan CI HS SS Pipe Line Design from CW
. HS Steel Method

PIPE USED Hydraulic Gradient


S. Pipe Line Length Design Direction Reduced Level Level New Total Max. Friction Head Residual Flow Soil
Line
No. Dis. (UL/UR Diff. Static Head Static HDPE G.I. Factor Loss Head Velocity Type
From To Actual Design Q /DL/DR) From To Level Available Pressure O.D. Class I.D. N.B. Class From To Remarks
(m) (m) (lps) (L/R/U/D) (m) (m) (m) (m) (m) (m) (mm) (kg/cm²) (mm) (mm) (m) (m) (m/s) (m) (m)
[0] [1] [2] [3] 0 [5] (6) (7) (8) (9) (10) (11) (12) (13) (14) (15) (16) (17) (18) (19) (20) (21) (22) (23) (24) (25)

3 2 3 50 55 0.55 DR 884.09 881.14 2.95 890.00 6.76 8.86 40 10.0 33.50 0.0325 1.05 5.71 0.62 887.90 886.85 BMS

4 3 4 50 55 0.55 DR 881.14 878.18 2.95 890.00 8.67 11.82 40 10.0 33.50 0.0325 1.05 7.62 0.62 886.85 885.80 BMS

5 4 RVT-2 20 22 0.55 DR 878.18 877.00 1.18 890.00 8.80 13.00 40 10.0 33.50 0.0325 0.42 8.38 0.62 885.80 885.38 BMS

RVT-1 TO P13

1 RVT-1 1 50 55 0.80 D 887.00 881.75 5.25 887.00 5.25 5.25 40 10.0 33.50 0.0308 2.14 3.11 0.91 887.00 884.86 BMS

2 1 2 50 55 0.80 D 881.75 876.50 5.25 887.00 8.36 10.50 40 10.0 33.50 0.0308 2.14 6.22 0.91 884.86 882.72 BMS

3 2 3 50 55 0.80 D 876.50 871.25 5.25 887.00 11.47 15.75 40 10.0 33.50 0.0308 2.14 9.33 0.91 882.72 880.58 BMS

4 3 J1 50 55 0.80 D 871.25 866.00 5.25 887.00 14.58 21.00 40 10.0 33.50 0.0308 2.14 12.44 0.91 880.58 878.44 BMS

5 J1 5 50 55 0.15 D 866.00 864.48 1.52 887.00 13.96 22.52 25 12.5 19.90 0.0397 1.29 12.67 0.48 878.44 877.15 BMS

6 5 6 50 55 0.15 D 864.48 862.97 1.52 887.00 14.18 24.03 25 12.5 19.90 0.0397 1.29 12.89 0.48 877.15 875.86 BMS

7 6 7 40 44 0.15 D 862.97 861.76 1.21 887.00 14.10 25.24 25 12.5 19.90 0.0397 1.03 13.07 0.48 875.86 874.83 BMS

8 7 P13 25 27.5 0.15 D 861.76 861.00 0.76 887.00 13.83 26.00 25 12.5 19.90 0.0397 0.64 13.19 0.48 874.83 874.19 BMS

J1 TO P12

1 J1 1 50 55 0.65 L 866.00 859.64 6.36 887.00 18.80 27.36 32 10.0 26.70 0.0320 4.52 14.28 1.16 878.44 873.92 BMS

2 1 2 40 44 0.65 L 859.64 854.55 5.09 887.00 19.37 32.45 32 10.0 26.70 0.0320 3.62 15.75 1.16 873.92 870.30 BMS

3 2 J2 20 22 0.65 L 854.55 852.00 2.55 887.00 18.30 35.00 32 10.0 26.70 0.0320 1.81 16.49 1.16 870.30 868.49 BMS

4 J2 4 50 55 0.20 L 852.00 851.39 0.61 887.00 17.10 35.61 25 12.5 19.90 0.0378 2.18 14.92 0.64 868.49 866.31 BMS

5 4 5 50 55 0.20 L 851.39 850.79 0.61 887.00 15.52 36.21 25 12.5 19.90 0.0378 2.18 13.34 0.64 866.31 864.13 BMS

6 5 6 40 44 0.20 L 850.79 850.30 0.48 887.00 13.83 36.70 25 12.5 19.90 0.0378 1.75 12.08 0.64 864.13 862.38 BMS

7 6 P12 25 27.5 0.20 L 850.30 850.00 0.30 887.00 12.38 37.00 25 12.5 19.90 0.0378 1.09 11.29 0.64 862.38 861.29 BMS

J2 TO P11

1 J2 1 50 55 0.45 D 852.00 851.09 0.91 887.00 17.40 35.91 32 10.0 26.70 0.0335 2.25 15.15 0.80 868.49 866.24 BMS

2 1 2 40 44 0.45 D 851.09 850.36 0.73 887.00 15.88 36.64 32 10.0 26.70 0.0335 1.80 14.08 0.80 866.24 864.44 BMS

3 2 J3 20 22 0.45 D 850.36 850.00 0.36 887.00 14.44 37.00 32 10.0 26.70 0.0335 0.90 13.54 0.80 864.44 863.54 BMS

4 J3 4 50 55 0.15 D 850.00 849.70 0.30 887.00 13.84 37.30 25 12.5 19.90 0.0397 1.29 12.55 0.48 863.54 862.25 BMS

5 4 5 50 55 0.15 D 849.70 849.39 0.30 887.00 12.86 37.61 25 12.5 19.90 0.0397 1.29 11.57 0.48 862.25 860.96 BMS
Sheet No. : 14 of 20
Table 4 : PIPELINE DESIGN
(HYDRAULIC CALCULATIONS)
SCHEME TYPE : Gravity System Pipe Class abbreviation HC Soil Code GMS OS
SCHEME NAME : Rikhe Bazar Water Supply Project MC HR BMS
SCHEME NAME : Rikhe Bazar WaterSOURCE
Suppl NAME : Khodepani SAFE YEILD : 0.86 DI SR MR
LOCATION : WARD NO : 3 RMP : Tribeni DISTRICT : Salyan CI HS SS Pipe Line Design from CW
. HS Steel Method

PIPE USED Hydraulic Gradient


S. Pipe Line Length Design Direction Reduced Level Level New Total Max. Friction Head Residual Flow Soil
Line
No. Dis. (UL/UR Diff. Static Head Static HDPE G.I. Factor Loss Head Velocity Type
From To Actual Design Q /DL/DR) From To Level Available Pressure O.D. Class I.D. N.B. Class From To Remarks
(m) (m) (lps) (L/R/U/D) (m) (m) (m) (m) (m) (m) (mm) (kg/cm²) (mm) (mm) (m) (m) (m/s) (m) (m)
[0] [1] [2] [3] 0 [5] (6) (7) (8) (9) (10) (11) (12) (13) (14) (15) (16) (17) (18) (19) (20) (21) (22) (23) (24) (25)

6 5 6 40 44 0.15 D 849.39 849.15 0.24 887.00 11.81 37.85 25 12.5 19.90 0.0397 1.03 10.78 0.48 860.96 859.93 BMS

7 6 P11 25 27.5 0.15 D 849.15 849.00 0.15 887.00 10.93 38.00 25 12.5 19.90 0.0397 0.64 10.29 0.48 859.93 859.29 BMS

J3 TO P10

1 J3 1 50 55 0.30 L 850.00 848.64 1.36 887.00 14.90 38.36 32 10.0 26.70 0.0355 1.09 13.81 0.54 863.54 862.45 BMS

2 1 2 40 44 0.30 L 848.64 847.55 1.09 887.00 14.90 39.45 32 10.0 26.70 0.0355 0.87 14.03 0.54 862.45 861.58 BMS

3 2 J4 20 22 0.30 L 847.55 847.00 0.55 887.00 14.58 40.00 32 10.0 26.70 0.0355 0.43 14.15 0.54 861.58 861.15 BMS

4 J4 4 50 55 0.15 L 847.00 846.55 0.45 887.00 14.60 40.45 25 12.5 19.90 0.0397 1.29 13.31 0.48 861.15 859.86 BMS

5 4 5 50 55 0.15 L 846.55 846.09 0.45 887.00 13.77 40.91 25 12.5 19.90 0.0397 1.29 12.48 0.48 859.86 858.57 BMS

6 5 6 50 55 0.15 L 846.09 845.64 0.45 887.00 12.93 41.36 25 12.5 19.90 0.0397 1.29 11.64 0.48 858.57 857.28 BMS

7 6 7 50 55 0.15 L 845.64 845.18 0.45 887.00 12.10 41.82 25 12.5 19.90 0.0397 1.29 10.81 0.48 857.28 855.99 BMS

8 7 P10 20 22 0.15 L 845.18 845.00 0.18 887.00 10.99 42.00 25 12.5 19.90 0.0397 0.51 10.48 0.48 855.99 855.48 BMS

J4 TO P9

1 J4 1 50 55 0.15 DL 847.00 846.09 0.91 887.00 15.06 40.91 25 12.5 19.90 0.0397 1.29 13.77 0.48 861.15 859.86 BMS

2 1 2 40 44 0.15 DL 846.09 845.36 0.73 887.00 14.50 41.64 25 12.5 19.90 0.0397 1.03 13.47 0.48 859.86 858.83 BMS

3 2 P9' 20 22 0.15 DL 845.36 845.00 0.36 887.00 13.83 42.00 25 12.5 19.90 0.0397 0.51 13.32 0.48 858.83 858.32 BMS

4 P9' J5 55 60.5 0.15 DL 845.00 845.00 0.00 887.00 13.32 42.00 25 12.5 19.90 0.0397 1.42 11.90 0.48 858.32 856.90 BMS

5 J5 5 50 55 0.15 DL 845.00 844.09 0.91 887.00 12.81 42.91 25 12.5 19.90 0.0397 1.29 11.52 0.48 856.90 855.61 BMS

6 5 6 40 44 0.15 DL 844.09 843.36 0.73 887.00 12.25 43.64 25 12.5 19.90 0.0397 1.03 11.22 0.48 855.61 854.58 BMS

7 6 P9' 20 22 0.15 DL 843.36 843.00 0.36 887.00 11.58 44.00 25 12.5 19.90 0.0397 0.51 11.07 0.48 854.58 854.07 BMS

RVT-2 TO P2

1 RVT-2 1 50 55 1.50 D 877.00 870.70 6.30 877.00 6.30 6.30 50 6.0 44.90 0.0283 1.59 4.71 0.95 877.00 875.41 BMS

2 1 2 50 55 1.50 D 870.70 864.41 6.30 877.00 11.00 12.59 50 6.0 44.90 0.0283 1.59 9.41 0.95 875.41 873.82 BMS

3 2 J9 35 38.5 1.50 D 864.41 860.00 4.41 877.00 13.82 17.00 50 6.0 44.90 0.0283 1.11 12.71 0.95 873.82 872.71 BMS

4 J9 4 50 55 0.20 D 860.00 858.15 1.85 877.00 14.56 18.85 25 12.5 19.90 0.0378 2.18 12.38 0.64 872.71 870.53 BMS

5 4 5 50 55 0.20 D 858.15 856.30 1.85 877.00 14.23 20.70 25 12.5 19.90 0.0378 2.18 12.05 0.64 870.53 868.35 BMS

6 5 P2 35 38.5 0.20 D 856.30 855.00 1.30 877.00 13.35 22.00 25 12.5 19.90 0.0378 1.53 11.82 0.64 868.35 866.82 BMS
Sheet No. : 15 of 20
Table 4 : PIPELINE DESIGN
(HYDRAULIC CALCULATIONS)
SCHEME TYPE : Gravity System Pipe Class abbreviation HC Soil Code GMS OS
SCHEME NAME : Rikhe Bazar Water Supply Project MC HR BMS
SCHEME NAME : Rikhe Bazar WaterSOURCE
Suppl NAME : Khodepani SAFE YEILD : 0.86 DI SR MR
LOCATION : WARD NO : 3 RMP : Tribeni DISTRICT : Salyan CI HS SS Pipe Line Design from CW
. HS Steel Method

PIPE USED Hydraulic Gradient


S. Pipe Line Length Design Direction Reduced Level Level New Total Max. Friction Head Residual Flow Soil
Line
No. Dis. (UL/UR Diff. Static Head Static HDPE G.I. Factor Loss Head Velocity Type
From To Actual Design Q /DL/DR) From To Level Available Pressure O.D. Class I.D. N.B. Class From To Remarks
(m) (m) (lps) (L/R/U/D) (m) (m) (m) (m) (m) (m) (mm) (kg/cm²) (mm) (mm) (m) (m) (m/s) (m) (m)
[0] [1] [2] [3] 0 [5] (6) (7) (8) (9) (10) (11) (12) (13) (14) (15) (16) (17) (18) (19) (20) (21) (22) (23) (24) (25)

J9 TO P1

1 J9 1 50 55 0.15 R 860.00 861.85 -1.85 877.00 10.86 17.00 32 10.0 26.70 0.0405 0.31 10.55 0.27 872.71 872.40 BMS

2 1 2 50 55 0.15 R 861.85 863.70 -1.85 877.00 8.70 15.15 32 10.0 26.70 0.0405 0.31 8.39 0.27 872.40 872.09 BMS

3 2 P1 35 38.5 0.15 R 863.70 865.00 -1.30 877.00 7.09 13.30 32 10.0 26.70 0.0405 0.22 6.87 0.27 872.09 871.87 BMS

J9 TO P3

1 J9 1 50 55 1.15 DR 860.00 856.82 3.18 877.00 15.89 20.18 50 10.0 42.00 0.0293 1.35 14.54 0.83 872.71 871.36 BMS

2 1 2 40 44 1.15 DR 856.82 854.27 2.55 877.00 17.09 22.73 50 10.0 42.00 0.0293 1.08 16.01 0.83 871.36 870.28 BMS

3 2 J10 20 22 1.15 DR 854.27 853.00 1.27 877.00 17.28 24.00 50 10.0 42.00 0.0293 0.54 16.74 0.83 870.28 869.74 BMS

4 J10 4 50 55 0.15 D 853.00 852.26 0.74 877.00 17.48 24.74 25 12.5 19.90 0.0397 1.29 16.19 0.48 869.74 868.45 BMS

5 4 5 50 55 0.15 D 852.26 851.52 0.74 877.00 16.93 25.48 25 12.5 19.90 0.0397 1.29 15.64 0.48 868.45 867.16 BMS

6 5 P3 35 38.5 0.15 D 851.52 851.00 0.52 877.00 16.16 26.00 25 12.5 19.90 0.0397 0.90 15.26 0.48 867.16 866.26 BMS
Sheet No. : 16 of 20
Table 4 : PIPELINE DESIGN
(HYDRAULIC CALCULATIONS)
SCHEME TYPE : Gravity System Pipe Class abbreviation HC Soil Code GMS OS
SCHEME NAME : Rikhe Bazar Water Supply Project MC HR BMS
SCHEME NAME : Rikhe Bazar WaterSOURCE
Suppl NAME : Khodepani SAFE YEILD : 0.86 DI SR MR
LOCATION : WARD NO : 3 RMP : Tribeni DISTRICT : Salyan CI HS SS Pipe Line Design from CW
. HS Steel Method

PIPE USED Hydraulic Gradient


S. Pipe Line Length Design Direction Reduced Level Level New Total Max. Friction Head Residual Flow Soil
Line
No. Dis. (UL/UR Diff. Static Head Static HDPE G.I. Factor Loss Head Velocity Type
From To Actual Design Q /DL/DR) From To Level Available Pressure O.D. Class I.D. N.B. Class From To Remarks
(m) (m) (lps) (L/R/U/D) (m) (m) (m) (m) (m) (m) (mm) (kg/cm²) (mm) (mm) (m) (m) (m/s) (m) (m)
[0] [1] [2] [3] 0 [5] (6) (7) (8) (9) (10) (11) (12) (13) (14) (15) (16) (17) (18) (19) (20) (21) (22) (23) (24) (25)

J10 TO P7

1 J10 1 50 55 0.80 R 853.00 850.73 2.27 877.00 19.01 26.27 40 10.0 33.50 0.0308 2.14 16.87 0.91 869.74 867.60 BMS

2 1 2 40 44 0.80 R 850.73 848.91 1.82 877.00 18.69 28.09 40 10.0 33.50 0.0308 1.71 16.98 0.91 867.60 865.89 BMS

3 2 J8 20 22 0.80 R 848.91 848.00 0.91 877.00 17.89 29.00 40 10.0 33.50 0.0308 0.85 17.04 0.91 865.89 865.04 BMS

4 J8 4 50 55 0.30 R 848.00 845.88 2.12 877.00 19.16 31.12 32 10.0 26.70 0.0355 1.09 18.07 0.54 865.04 863.95 BMS

5 4 5 50 55 0.30 R 845.88 843.76 2.12 877.00 20.19 33.24 32 10.0 26.70 0.0355 1.09 19.10 0.54 863.95 862.86 BMS

6 5 6 40 44 0.30 R 843.76 842.06 1.70 877.00 20.80 34.94 32 10.0 26.70 0.0355 0.87 19.93 0.54 862.86 861.99 BMS

7 6 J6 25 27.5 0.30 R 842.06 841.00 1.06 877.00 20.99 36.00 32 10.0 26.70 0.0355 0.54 20.45 0.54 861.99 861.45 BMS

8 J6 8 50 55 0.10 R 841.00 840.17 0.83 877.00 21.28 36.83 20 16.0 14.90 0.0423 2.58 18.70 0.57 861.45 858.87 BMS

9 8 9 50 55 0.10 R 840.17 839.33 0.83 877.00 19.54 37.67 20 16.0 14.90 0.0423 2.58 16.96 0.57 858.87 856.29 BMS

10 9 10 50 55 0.10 R 839.33 838.50 0.83 877.00 17.79 38.50 20 16.0 14.90 0.0423 2.58 15.21 0.57 856.29 853.71 BMS

11 10 P7 30 33 0.10 R 838.50 838.00 0.50 877.00 15.71 39.00 20 16.0 14.90 0.0423 1.55 14.16 0.57 853.71 852.16 BMS

J6 TO P6

1 J6 1 50 55 0.10 D 841.00 839.15 1.85 877.00 22.30 37.85 20 16.0 14.90 0.0423 2.58 19.72 0.57 861.45 858.87 BMS

2 1 2 50 55 0.10 D 839.15 837.30 1.85 877.00 21.57 39.70 20 16.0 14.90 0.0423 2.58 18.99 0.57 858.87 856.29 BMS

3 2 P6 35 38.5 0.10 D 837.30 836.00 1.30 877.00 20.29 41.00 20 16.0 14.90 0.0423 1.81 18.48 0.57 856.29 854.48 BMS

J8 TO P5

1 J8 1 50 55 0.50 D 848.00 847.26 0.74 877.00 17.78 29.74 32 10.0 26.70 0.0330 2.75 15.03 0.89 865.04 862.29 BMS

2 1 2 50 55 0.50 D 847.26 846.52 0.74 877.00 15.77 30.48 32 10.0 26.70 0.0330 2.75 13.02 0.89 862.29 859.54 BMS

3 2 J7 35 38.5 0.50 D 846.52 846.00 0.52 877.00 13.54 31.00 32 10.0 26.70 0.0330 1.92 11.62 0.89 859.54 857.62 BMS

4 J7 4 50 55 0.20 D 846.00 844.16 1.84 877.00 13.46 32.84 25 12.5 19.90 0.0378 2.18 11.28 0.64 857.62 855.44 BMS

5 4 5 50 55 0.20 D 844.16 842.32 1.84 877.00 13.12 34.68 25 12.5 19.90 0.0378 2.18 10.94 0.64 855.44 853.26 BMS

6 5 6 50 55 0.20 D 842.32 840.47 1.84 877.00 12.79 36.53 25 12.5 19.90 0.0378 2.18 10.61 0.64 853.26 851.08 BMS

7 6 P5 40 44 0.20 D 840.47 839.00 1.47 877.00 12.08 38.00 25 12.5 19.90 0.0378 1.75 10.33 0.64 851.08 849.33 BMS
Sheet No. : 17 of 20
Table 4 : PIPELINE DESIGN
(HYDRAULIC CALCULATIONS)
SCHEME TYPE : Gravity System Pipe Class abbreviation HC Soil Code GMS OS
SCHEME NAME : Rikhe Bazar Water Supply Project MC HR BMS
SCHEME NAME : Rikhe Bazar WaterSOURCE
Suppl NAME : Khodepani SAFE YEILD : 0.86 DI SR MR
LOCATION : WARD NO : 3 RMP : Tribeni DISTRICT : Salyan CI HS SS Pipe Line Design from CW
. HS Steel Method

PIPE USED Hydraulic Gradient


S. Pipe Line Length Design Direction Reduced Level Level New Total Max. Friction Head Residual Flow Soil
Line
No. Dis. (UL/UR Diff. Static Head Static HDPE G.I. Factor Loss Head Velocity Type
From To Actual Design Q /DL/DR) From To Level Available Pressure O.D. Class I.D. N.B. Class From To Remarks
(m) (m) (lps) (L/R/U/D) (m) (m) (m) (m) (m) (m) (mm) (kg/cm²) (mm) (mm) (m) (m) (m/s) (m) (m)
[0] [1] [2] [3] 0 [5] (6) (7) (8) (9) (10) (11) (12) (13) (14) (15) (16) (17) (18) (19) (20) (21) (22) (23) (24) (25)

J7 TO P4

1 J7 1 50 55 0.20 DR 846.00 842.97 3.03 877.00 14.65 34.03 25 12.5 19.90 0.0378 2.18 12.47 0.64 857.62 855.44 BMS

2 1 2 50 55 0.20 DR 842.97 839.94 3.03 877.00 15.50 37.06 25 12.5 19.90 0.0378 2.18 13.32 0.64 855.44 853.26 BMS

3 2 3 40 44 0.20 DR 839.94 837.52 2.42 877.00 15.74 39.48 25 12.5 19.90 0.0378 1.75 13.99 0.64 853.26 851.51 BMS

4 3 P4 25 27.5 0.20 DR 837.52 836.00 1.52 877.00 15.51 41.00 25 12.5 19.90 0.0378 1.09 14.42 0.64 851.51 850.42 BMS
4155 4570.5
Length
Transmission Distribution
TOTAL LENGTH 905.00 3,250.00
HDP Pipe Length 905.00 3,250.00
GI Pipe Length - -
Total 905.00 3,250.00

Grand Total 4,155.00


Length
PipeCode Transmission Distribution
GPM-15 - -
GPM-20 - -
GPM-25 - -
GPM-32 - -
GPM-40 - -
GPM-50 - -
GPM-65 - -
GPM-80 - -
GPM-100 - -

GPH-15 - -
GPH-20 - -
GPH-25 - -
GPH-32 - -
GPH-40 - -
GPH-50 - -
GPH-63 - -
GPH-80 - -
GPH-100 - -

HP16-20 - 315.00
HP16-25 - -
HP16-32 - -
HP16-40 - -
HP16-50 - -
HP16-63 - -
HP16-75 - -
HP16-90 - -
HP16-110 - -
HP16-125 - -
HP16-140 - -
HP16-160 - -
HP16-180 - -
HP16-200 - -
HP16-225 - -
HP16-250 - -

HP6-50 400.00 135.00


HP6-63 - -
HP6-75 - -
HP6-90 - -
HP6-110 - -
HP6-125 - -
HP6-140 - -
HP6-160 - -
HP6-180 - -
HP6-200 - -
HP6-225 - -
HP6-250 - -

HP10-32 - 765.00
HP10-40 505.00 310.00
HP10-50 - 110.00
HP10-63 - -
HP10-75 - -
HP10-90 - -
HP10-110 - -
HP10-125 - -
HP10-140 - -
HP10-160 - -
HP10-180 - -
HP10-200 - -
HP10-225 - -
HP10-250 - -

HP12.5-25 - 1,615.00
HP12.5-32 - -
HP12.5-40 - -
HP12.5-50 - -
HP12.5-63 - -
HP12.5-75 - -
HP12.5-90 - -
HP12.5-110 - -
HP12.5-125 - -
HP12.5-140 - -
HP12.5-160 - -
HP12.5-180 - -
HP12.5-200 - -
HP12.5-225 - -
HP12.5-250 - -
Length
Transmission Distribution
TOTAL LENGTH 905.00 3,250.00
HDP Pipe Length 905.00 3,250.00
GI Pipe Length - -
Total 905.00 3,250.00
Grand Total 4,155.00
Start Chainage at the branch
SN PipeLength RL Branch Point(1/0) REMARKS Ceiling Length
INTAKE TO DC 1 ###
INTAKE 0 920 1
1 50 918 1
2 50 915 1
3 50 913 1
4 50 911 1
5 50 909 1
6 50 906 1
7 50 904 1
8 50 902 1
9 50 900 1
10 50 897 1
11 50 895 1
12 50 893 1
13 40 891 1
DC 20 890 1
DC TO RVT-1 1
DC 0 890 1
RVT-1 25 887 1
DC TO RVT-2 1
DC 0 890 1
1 50 887 1
2 50 884 1
3 50 881 1
4 50 878 1
RVT-2 20 877 1
RVT-1 TO P13 1
RVT-1 0 887 1
1 50 882 1
2 50 877 1
3 50 871 1
J1 50 866 1
5 50 864 1
6 50 863 1
7 40 862 1
P13 25 861 1
J1 TO P12 1
J1 0 866 1
1 50 860 1
2 40 855 1
J2 20 852 1
4 50 851 1
5 50 851 1
6 40 850 1
P12 25 850 1
J2 TO P11 1
J2 0 852 1
1 50 851 1
2 40 850 1
J3 20 850 1
4 50 850 1
5 50 849 1
6 40 849 1
P11 25 849 1
J3 TO P10 1
J3 0 850 1
1 50 849 1
2 40 848 1
J4 20 847 1
4 50 847 1
5 50 846 1
6 50 846 1
7 50 845 1
P10 20 845 1
J4 TO P9 1
J4 0 847 1
1 50 846 1
2 40 845 1
P9' 20 845 1
J5 55 845 1
5 50 844 1
6 40 843 1
P9' 20 843 1
J5 TO P8 1
J5 0 845 1
1 35 845 1
P8' 35 844 1
3 35 843 1
P8' 35 842 1
RVT-2 TO P2 1
RVT-2 0 877 1
1 50 871 1
2 50 864 1
J9 35 860 1
4 50 858 1
5 50 856 1
P2 35 855 1
J9 TO P1 1
J9 0 860 1
1 50 862 1
2 50 864 1
P1 35 865 1
J9 TO P3 1
J9 0 860 1
1 50 857 1
2 40 854 1
J10 20 853 1
4 50 852 1
5 50 852 1
P3 35 851 1
J10 TO P7 1
J10 0 853 1
1 50 851 1
2 40 849 1
J8 20 848 1
4 50 846 1
5 50 844 1
6 40 842 1
J6 25 841 1
8 50 840 1
9 50 839 1
10 50 839 1
P7 30 838 1
J6 TO P6 1
J6 0 841 1
1 50 839 1
2 50 837 1
P6 35 836 1
J8 TO P5 1
J8 0 848 1
1 50 847 1
2 50 847 1
J7 35 846 1
4 50 844 1
5 50 842 1
6 50 840 1
P5 40 839 1
J7 TO P4 1
J7 0 846 1
1 50 843 1
2 50 840 1
3 40 838 1
P4 25 836 1

4295