Pipe Database Updated as per Nepal Standard For PN100 Pipe Series.
Last Updated : 2019/12/01
Annex - I
DATA INPUT FORM
Spread Sheets Developed by SOFTWEL (P) Ltd.
1 Sarada River Luham RMP-06 River 20.00 08-2076 B.S. 18.00 6.00 RVT Kumal Chaur
Near Sarada River Bank
a) Scheme Information
a.1 Reservoir Tank No: 1
a.2 Served Standposts 1 to 8
a.3 Average Design Demand to be Supplied through Reservoir #REF! l/s = #REF! l/day
a.4 Available Minimum flow from the Source (Safe Yield) 0.400 l/s
#REF!
a.5 Adjusted/Optimized supply to Reservoir from Source 0.250 l/s = 21600.0 l/day
a.6 Total Design Flows of all Standposts : #REF! l/s
b) Reservoir sizing assuming Continuous System using Consumption Patterns
25000
20000
15000
10000
5000
0
04:48 AM
04:48 AM
09:36 AM
12:00 AM
09:36 AM
02:24 PM
07:12 PM
12:00 AM
Supply Demand
Maximum Required supply hours based on Supply from Source #REF! hours
Maximum Required supply hours based on Demand #REF! hours
Adopted hours of Supply #REF! hours
Recommended Supply Hours and Period
First Shift 5:00 AM To #REF!
Second Shift #REF! To 7:00 PM
Recommended Size for RVT 01 = #VALUE! cum Time to Fill the RVT #VALUE! Hr
Water Demand and Tap Flow Calculation Sheet
SCHEME NAME : Rikhe Bazar Water Supply Project
SUPPORT ORGANIZATION : Water Supply, Irrigation & Energy Development Office, Salyan
CONSULTANT : Yashaswi Engineering and Reasearch Center,Panchakumari Marg
LOCATION : WARD NO : 3 RMP : Tribeni DISTRICT : Salyan
Name of Community : 0
Required Datas: Base Period (n1) 3 yrs.
Peak Factor: 2.4 Design Period (n) 20 yrs.
Per Capita Demand : 65 lpcd District Growth Rate (r) 1.27 %
Per Capita Demand for Students: 10 lpcd Minimum flow rate 0.10 lps
Description of Tap Population forecast Institutional Water Demand Live Tap Flow Calculation
Cluster Name Ward Nos Present Year Base Year Design Year Total No. of Other Total Stock Grand Average Peak Peak Design Adjusted Sectional
Total Remarks
S.N. Cluster/Section or No. of BS BS BS Domestic Pupil in Institutional Institutional Demand Tap Factor Flow flow Peak Flow
Water
Locality HH (P) (Po) (Pn) Demand School Demand Demand @20% of [11] Demand Flow factor
From To (Nos) (Nos) P(1+r)^n1 P(1+r)^(n1+n) (lpd) (Nos) (lpd) (lpd) (lpd) (lpd) (lps) (Factor) (lps) (lps) (lps)
[1] [2] [3] [4] [5] [6] [8] [9] [10] [11] [9] [10] [11] [12] [15] [16] [17] [18] [16] [17] [18]
RVT-1
1 RVT J1 Cluster- 1 3 1 - 60 600 0 600 0.01 3.00 0.03 0.10 10.00 School
2 J1 J2 Cluster- 2 3 3 16 17 21 1,365 - 273 1,638 0.02 2.40 0.05 0.10 5.00
3 J2 J3 Cluster- 3 3 2 10 10 13 845 - 169 1,014 0.01 2.40 0.02 0.10 10.00
4 J3 J4 Cluster- 4 3 4 21 22 28 1,820 - 364 2,184 0.03 2.40 0.07 0.10 3.33
5 J4 J5 Cluster- 5 3 4 21 22 28 1,820 - 364 2,184 0.03 2.40 0.07 0.10 3.33
6 J5 J6 Cluster- 6 3 6 31 32 41 2,665 - 533 3,198 0.04 2.40 0.10 0.10 2.50
7 J6 J7 Cluster- 7 3 10 52 54 70 4,550 - 910 5,460 0.06 2.40 0.14 0.15 2.50
8 J2 J8 Cluster- 8 5 26 27 35 2,275 - 455 2,730 0.03 2.40 0.07 0.10 3.33
9 J2 J8 Cluster- 9 3 1 - 1,500 1,500 0 1,500 0.02 2.40 0.05 0.10 5.00 Police Station
10 J8 J9 Cluster- 10 3 4 21 22 28 1,820 - 364 2,184 0.03 2.40 0.07 0.10 3.33
11 J9 J10 Cluster- 11 3 6 31 32 41 2,665 - 533 3,198 0.04 2.40 0.10 0.10 2.50
12 J10 J11 Cluster- 12 3 8 42 44 56 3,640 - 728 4,368 0.05 2.40 0.12 0.15 3.00
13 J8 J12 Cluster- 13 3 4 21 22 28 1,820 - 364 2,184 0.03 2.40 0.07 0.10 3.33
14 J13 J14 Cluster- 14 3 12 62 64 83 5,395 - 1079 6,474 0.07 2.40 0.17 0.20 2.86
15 J14 J15 Cluster- 15 3 9 47 49 63 4,095 - 819 4,914 0.06 2.40 0.14 0.15 2.50
16 J15 J16 Cluster- 16 3 14 73 76 98 6,370 - 1274 7,644 0.09 2.40 0.22 0.25 2.78
17 J16 J17 Cluster- 17 3 6 31 32 41 2,665 - 533 3,198 0.04 2.40 0.10 0.10 2.50
18 J17 J18 Cluster- 18 3 4 21 22 28 1,820 - 364 2,184 0.03 2.40 0.07 0.10 3.33
19 J13 J19 Cluster- 19 3 3 16 17 21 1,365 - 273 1,638 0.02 2.40 0.05 0.10 5.00
20 J17 J20 Cluster- 20 3 4 21 22 28 1,820 - 364 2,184 0.03 2.40 0.07 0.10 3.33
5 of 20
Required Datas: Base Period (n1) 3 yrs.
Peak Factor: 2.4 Design Period (n) 20 yrs.
Per Capita Demand : 65 lpcd District Growth Rate (r) 1.27 %
Per Capita Demand for Students: 10 lpcd Minimum flow rate 0.10 lps
Description of Tap Population forecast Institutional Water Demand Live Tap Flow Calculation
Cluster Name Ward Nos Present Year Base Year Design Year Total No. of Other Total Stock Grand Average Peak Peak Design Adjusted Sectional
Total Remarks
S.N. Cluster/Section or No. of BS BS BS Domestic Pupil in Institutional Institutional Demand Tap Factor Flow flow Peak Flow
Water
Locality HH (P) (Po) (Pn) Demand School Demand Demand @20% of [11] Demand Flow factor
From To (Nos) (Nos) P(1+r)^n1 P(1+r)^(n1+n) (lpd) (Nos) (lpd) (lpd) (lpd) (lpd) (lps) (Factor) (lps) (lps) (lps)
[1] [2] [3] [4] [5] [6] [8] [9] [10] [11] [9] [10] [11] [12] [15] [16] [17] [18] [16] [17] [18]
21 J20 J21 Cluster- 21 3 4 21 22 28 1,820 - 364 2,184 0.03 2.40 0.07 0.10 3.33
22 J21 J21' Cluster- 22 3 1 - 300 3,000 0 3,000 0.03 3.00 0.09 0.10 3.33 School
23 J22 J23 Cluster- 23 3 5 26 27 35 2,275 - 455 2,730 0.03 2.40 0.07 0.10 3.33
24 J23 J24 Cluster- 24 5 26 27 35 2,275 - 455 2,730 0.03 2.40 0.07 0.10 3.33
25 J23 J24 Cluster- 25 3 1 - 3,000 3,000 0 3,000 0.03 3.00 0.09 0.10 3.33 Health Post
26 J24 J25 Cluster- 26 3 8 42 44 56 3,640 - 728 4,368 0.05 2.40 0.12 0.15 3.00
27 J26 J27 Cluster- 27 3 8 42 44 56 3,640 - 728 4,368 0.05 2.40 0.12 0.15 3.00
28 J27 J28 Cluster- 28 3 16 83 86 111 7,215 - 1443 8,658 0.10 2.40 0.24 0.25 2.50
29 J28 J29 Cluster- 29 3 13 68 71 91 5,915 - 1183 7,098 0.08 2.40 0.19 0.20 2.50
30 J29 J30 Cluster- 30 3 10 52 54 70 4,550 - 910 5,460 0.06 2.40 0.14 0.15 2.50
31 J30 J31 Cluster- 31 3 11 57 59 76 4,940 - 988 5,928 0.07 2.40 0.17 0.20 2.86
32 J31 J32 Cluster- 32 3 11 57 59 76 4,940 - 988 5,928 0.07 2.40 0.17 0.20 2.86
33 J32 J33 Cluster- 33 3 8 42 44 56 3,640 - 728 4,368 0.05 2.40 0.12 0.15 3.00
34 J33 J34 Cluster- 34 3 7 36 37 48 3,120 - 624 3,744 0.04 2.40 0.10 0.10 2.50
35 J34 J35 Cluster- 35 3 7 36 37 48 3,120 - 624 3,744 0.04 2.40 0.10 0.10 2.50
36 J35 J36 Cluster- 36 3 4 21 22 28 1,820 - 364 2,184 0.03 2.40 0.07 0.10 3.33
37 J26 J37 Cluster- 37 3 9 47 49 63 4,095 - 819 4,914 0.06 2.40 0.14 0.15 2.50
38 J37 J37' Cluster- 38 3 1 - 200 2,000 0 2,000 0.02 3.00 0.06 0.10 5.00 Trebeni School
39 J37 J38 Cluster- 39 3 9 47 49 63 4,095 - 819 4,914 0.06 2.40 0.14 0.15 2.50
40 J38 J41 Cluster- 40 3 8 42 44 56 3,640 - 728 4,368 0.05 2.40 0.12 0.15 3.00
41 J41 J40 Cluster- 41 3 4 21 22 28 1,820 - 364 2,184 0.03 2.40 0.07 0.10 3.33
42 J41 J42 Cluster- 42 3 6 31 32 41 2,665 - 533 3,198 0.04 2.40 0.10 0.10 2.50
43 J42 J43 Cluster- 43 3 7 36 37 48 3,120 - 624 3,744 0.04 2.40 0.10 0.10 2.50
44 RVT J44 Cluster- 44 3 3 16 17 21 1,365 - 273 1,638 0.02 2.40 0.05 0.10 5.00
6 of 20
Required Datas: Base Period (n1) 3 yrs.
Peak Factor: 2.4 Design Period (n) 20 yrs.
Per Capita Demand : 65 lpcd District Growth Rate (r) 1.27 %
Per Capita Demand for Students: 10 lpcd Minimum flow rate 0.10 lps
Description of Tap Population forecast Institutional Water Demand Live Tap Flow Calculation
Cluster Name Ward Nos Present Year Base Year Design Year Total No. of Other Total Stock Grand Average Peak Peak Design Adjusted Sectional
Total Remarks
S.N. Cluster/Section or No. of BS BS BS Domestic Pupil in Institutional Institutional Demand Tap Factor Flow flow Peak Flow
Water
Locality HH (P) (Po) (Pn) Demand School Demand Demand @20% of [11] Demand Flow factor
From To (Nos) (Nos) P(1+r)^n1 P(1+r)^(n1+n) (lpd) (Nos) (lpd) (lpd) (lpd) (lpd) (lps) (Factor) (lps) (lps) (lps)
[1] [2] [3] [4] [5] [6] [8] [9] [10] [11] [9] [10] [11] [12] [15] [16] [17] [18] [16] [17] [18]
45 J44 J44A Cluster- 45 3 7 36 37 48 3,120 - 624 3,744 0.04 2.40 0.10 0.10 2.50
46 J44B J44C Cluster- 46 3 4 21 22 28 1,820 - 364 2,184 0.03 2.40 0.07 0.10 3.33
7 of 20
Required Datas: Base Period (n1) 3 yrs.
Peak Factor: 2.4 Design Period (n) 20 yrs.
Per Capita Demand : 65 lpcd District Growth Rate (r) 1.27 %
Per Capita Demand for Students: 10 lpcd Minimum flow rate 0.10 lps
Description of Tap Population forecast Institutional Water Demand Live Tap Flow Calculation
Cluster Name Ward Nos Present Year Base Year Design Year Total No. of Other Total Stock Grand Average Peak Peak Design Adjusted Sectional
Total Remarks
S.N. Cluster/Section or No. of BS BS BS Domestic Pupil in Institutional Institutional Demand Tap Factor Flow flow Peak Flow
Water
Locality HH (P) (Po) (Pn) Demand School Demand Demand @20% of [11] Demand Flow factor
From To (Nos) (Nos) P(1+r)^n1 P(1+r)^(n1+n) (lpd) (Nos) (lpd) (lpd) (lpd) (lpd) (lps) (Factor) (lps) (lps) (lps)
[1] [2] [3] [4] [5] [6] [8] [9] [10] [11] [9] [10] [11] [12] [15] [16] [17] [18] [16] [17] [18]
47 J45 J46 Cluster- 47 3 4 21 22 28 1,820 - 364 2,184 0.03 2.40 0.07 0.10 3.33
48 J46 J47 Cluster- 48 3 6 31 32 41 2,665 - 533 3,198 0.04 2.40 0.10 0.10 2.50
49 J47 J48 Cluster- 49 3 3 16 17 21 1,365 - 273 1,638 0.02 2.40 0.05 0.10 5.00
50 J49 J50 Cluster- 50 3 3 16 17 21 1,365 - 273 1,638 0.02 2.40 0.05 0.10 5.00
51 J50 J51 Cluster- 51 3 3 16 17 21 1,365 - 273 1,638 0.02 2.40 0.05 0.10 5.00
52 J51 J52 Cluster- 52 3 4 21 22 28 1,820 - 364 2,184 0.03 2.40 0.07 0.10 3.33
53 J52 J53 Cluster- 53 3 2 10 10 13 845 - 169 1,014 0.01 2.40 0.02 0.10 10.00
54 J53 J54 Cluster- 54 3 4 21 22 28 1,820 - 364 2,184 0.03 2.40 0.07 0.10 3.33
55 J54 J55 Cluster- 55 3 3 16 17 21 1,365 - 273 1,638 0.02 2.40 0.05 0.10 5.00
56 J55 J56 Cluster- 56 3 4 21 22 28 1,820 - 364 2,184 0.03 2.40 0.07 0.10 3.33
57 J56 J57 Cluster- 57 3 4 21 22 28 1,820 - 364 2,184 0.03 2.40 0.07 0.10 3.33
58 J59 J60 Cluster- 58 3 2 10 10 13 845 - 169 1,014 0.01 2.40 0.02 0.10 10.00
59 J60 J61 Cluster- 59 3 2 10 10 13 845 - 169 1,014 0.01 2.40 0.02 0.10 10.00
60 J61 J62 Cluster- 60 3 6 31 32 41 2,665 - 533 3,198 0.04 2.40 0.10 0.10 2.50
61 J62 J63 Cluster- 61 3 6 31 32 41 2,665 - 533 3,198 0.04 2.40 0.10 0.10 2.50
62 J49 J64 Cluster- 62 3 4 21 22 28 1,820 - 364 2,184 0.03 2.40 0.07 0.10 3.33
63 J50 J65 Cluster- 63 3 7 36 37 48 3,120 - 624 3,744 0.04 2.40 0.10 0.10 2.50
64 J51 J66 Cluster- 64 3 4 21 22 28 1,820 - 364 2,184 0.03 2.40 0.07 0.10 3.33
65 J52 J67 Cluster- 65 3 3 16 17 21 1,365 - 273 1,638 0.02 2.40 0.05 0.10 5.00
66 J53 J68 Cluster- 66 3 6 31 32 41 2,665 - 533 3,198 0.04 2.40 0.10 0.10 2.50
67 J55 J69 Cluster- 67 3 1 - 3,000 3,000 0 3,000 0.03 3.00 0.09 0.10 3.33 Health Post
68 J55 J69 Cluster- 68 4 21 22 28 1,820 - 364 2,184 0.03 2.40 0.07 0.10 3.33
69 J56 J70 Cluster- 69 3 9 47 49 63 4,095 - 819 4,914 0.06 2.40 0.14 0.15 2.50
70 J57 J71 Cluster- 70 3 5 26 27 35 2,275 - 455 2,730 0.03 2.40 0.07 0.10 3.33
71 J58 J72 Cluster- 71 3 7 36 37 48 3,120 - 624 3,744 0.04 2.40 0.10 0.10 2.50
72 J60 J73 Cluster- 72 3 6 31 32 41 2,665 - 533 3,198 0.04 2.40 0.10 0.10 2.50
Total 399 2,047 2,129 2,728 177,320 560 7,500 13,100 35,464 225,884 2.69 175.80 6.53 8.45 267.18 - -
8 of 20
Required Datas: Base Period (n1) 3 yrs.
Peak Factor: 2.4 Design Period (n) 20 yrs.
Per Capita Demand : 65 lpcd District Growth Rate (r) 1.27 %
Per Capita Demand for Students: 10 lpcd Minimum flow rate 0.10 lps
Description of Tap Population forecast Institutional Water Demand Live Tap Flow Calculation
Cluster Name Ward Nos Present Year Base Year Design Year Total No. of Other Total Stock Grand Average Peak Peak Design Adjusted Sectional
Total Remarks
S.N. Cluster/Section or No. of BS BS BS Domestic Pupil in Institutional Institutional Demand Tap Factor Flow flow Peak Flow
Water
Locality HH (P) (Po) (Pn) Demand School Demand Demand @20% of [11] Demand Flow factor
From To (Nos) (Nos) P(1+r)^n1 P(1+r)^(n1+n) (lpd) (Nos) (lpd) (lpd) (lpd) (lpd) (lps) (Factor) (lps) (lps) (lps)
[1] [2] [3] [4] [5] [6] [8] [9] [10] [11] [9] [10] [11] [12] [15] [16] [17] [18] [16] [17] [18]
9 of 20
Reservoir Tank Sizing
SCHEME NAME : Rikhe Bazar Water Supply Project
LOCATION : WARD NO : 3 RMP : Tribeni DISTRICT : Salyan
a) Scheme Information
a.1 Reservoir Tank No: RVT
a.2 Served Clusters 72
a.3 Average Design Demand to be Supplied through Reservoir 2.61 l/s = 225884 l/day
a.4 Available Minimum flow from the Source (Safe Yield) 18.00 l/s
a.5 Adjusted/Optimized supply to Reservoir from Source 6.00 l/s = 248400 l/day
a.6 Total Design Flows of all Standposts : 8.45 l/s
b) Reservoir sizing assuming Continuous System using Consumption Patterns
300000
250000
200000
150000
100000
50000
0
12:00 AM
04:48 AM
09:36 AM
02:24 PM
07:12 PM
12:00 AM
04:48 AM
09:36 AM
Supply Demand
Recommended Size for RVT RVT = 75.00 cum Time to Fill the RVT 3.47 Hr
a) Scheme Information
a.1 Reservoir Tank No: 1
a.2 Served Standposts 1 to 8
a.3 Average Design Demand to be Supplied through Reservoir #REF! l/s = #REF! l/day
a.4 Available Minimum flow from the Source (Safe Yield) 0.400 l/s
#REF!
a.5 Adjusted/Optimized supply to Reservoir from Source 0.250 l/s = 21600.0 l/day
a.6 Total Design Flows of all Standposts : #REF! l/s
b) Reservoir sizing assuming Continuous System using Consumption Patterns
25000
20000
15000
10000
5000
0
12:00 AM
04:48 AM
09:36 AM
02:24 PM
07:12 PM
12:00 AM
04:48 AM
09:36 AM
Supply Demand
Maximum Required supply hours based on Supply from Source #REF! hours
Maximum Required supply hours based on Demand #REF! hours
Adopted hours of Supply #REF! hours
Recommended Supply Hours and Period
First Shift 5:00 AM To #REF!
Second Shift #REF! To 7:00 PM
Recommended Size for RVT 01 = #VALUE! cum Time to Fill the RVT #VALUE! Hr
Sheet No. : 12 of 20
Table 4 : PIPELINE DESIGN
(HYDRAULIC CALCULATIONS)
SCHEME TYPE : Gravity System Pipe Class abbreviation HC Soil Code GMS OS
SCHEME NAME : Rikhe Bazar Water Supply Project MC HR BMS
SCHEME NAME : Rikhe Bazar WaterSOURCE
Suppl NAME : Khodepani SAFE YEILD : 0.86 DI SR MR
LOCATION : WARD NO : 3 RMP : Tribeni DISTRICT : Salyan CI HS SS Pipe Line Design from CW
. HS Steel Method
INTAKE TO DC
1 INTAKE 1 50 55 0.85 D 920.00 917.73 2.27 920.00 2.27 2.27 50 6.0 44.90 0.0305 0.56 1.71 0.54 920.00 919.44 BMS
2 1 2 50 55 0.85 D 917.73 915.45 2.27 920.00 3.99 4.55 50 6.0 44.90 0.0305 0.56 3.43 0.54 919.44 918.88 BMS
3 2 3 50 55 0.85 D 915.45 913.18 2.27 920.00 5.70 6.82 50 6.0 44.90 0.0305 0.56 5.14 0.54 918.88 918.32 BMS
4 3 4 50 55 0.85 D 913.18 910.91 2.27 920.00 7.41 9.09 50 6.0 44.90 0.0305 0.56 6.85 0.54 918.32 917.76 BMS
5 4 5 50 55 0.85 D 910.91 908.64 2.27 920.00 9.12 11.36 50 6.0 44.90 0.0305 0.56 8.56 0.54 917.76 917.20 BMS
6 5 6 50 55 0.85 D 908.64 906.36 2.27 920.00 10.84 13.64 50 6.0 44.90 0.0305 0.56 10.28 0.54 917.20 916.64 BMS
7 6 7 50 55 0.85 D 906.36 904.09 2.27 920.00 12.55 15.91 50 6.0 44.90 0.0305 0.56 11.99 0.54 916.64 916.08 BMS
8 7 8 50 55 0.85 D 904.09 901.82 2.27 920.00 14.26 18.18 50 6.0 44.90 0.0305 0.56 13.70 0.54 916.08 915.52 BMS
9 8 9 50 55 0.85 D 901.82 899.55 2.27 920.00 15.97 20.45 40 10.0 33.50 0.0306 2.36 13.61 0.96 915.52 913.16 BMS
10 9 10 50 55 0.85 D 899.55 897.27 2.27 920.00 15.89 22.73 40 10.0 33.50 0.0306 2.36 13.53 0.96 913.16 910.80 BMS
11 10 11 50 55 0.85 D 897.27 895.00 2.27 920.00 15.80 25.00 40 10.0 33.50 0.0306 2.36 13.44 0.96 910.80 908.44 BMS
12 11 12 50 55 0.85 D 895.00 892.73 2.27 920.00 15.71 27.27 40 10.0 33.50 0.0306 2.36 13.35 0.96 908.44 906.08 BMS
13 12 13 40 44 0.85 D 892.73 890.91 1.82 920.00 15.17 29.09 40 10.0 33.50 0.0306 1.89 13.28 0.96 906.08 904.19 BMS
14 13 DC 20 22 0.85 D 890.91 890.00 0.91 920.00 14.19 30.00 40 10.0 33.50 0.0306 0.95 13.24 0.96 904.19 903.24 BMS
DC TO RVT-1
1 DC RVT-1 25 27.5 0.30 DL 890.00 887.00 3.00 890.00 3.00 3.00 40 10.0 33.50 0.0361 0.17 2.83 0.34 890.00 889.83 BMS
DC TO RVT-2
1 DC 1 50 55 0.55 DR 890.00 887.05 2.95 890.00 2.95 2.95 40 10.0 33.50 0.0325 1.05 1.90 0.62 890.00 888.95 BMS
2 1 2 50 55 0.55 DR 887.05 884.09 2.95 890.00 4.86 5.91 40 10.0 33.50 0.0325 1.05 3.81 0.62 888.95 887.90 BMS
Sheet No. : 13 of 20
Table 4 : PIPELINE DESIGN
(HYDRAULIC CALCULATIONS)
SCHEME TYPE : Gravity System Pipe Class abbreviation HC Soil Code GMS OS
SCHEME NAME : Rikhe Bazar Water Supply Project MC HR BMS
SCHEME NAME : Rikhe Bazar WaterSOURCE
Suppl NAME : Khodepani SAFE YEILD : 0.86 DI SR MR
LOCATION : WARD NO : 3 RMP : Tribeni DISTRICT : Salyan CI HS SS Pipe Line Design from CW
. HS Steel Method
3 2 3 50 55 0.55 DR 884.09 881.14 2.95 890.00 6.76 8.86 40 10.0 33.50 0.0325 1.05 5.71 0.62 887.90 886.85 BMS
4 3 4 50 55 0.55 DR 881.14 878.18 2.95 890.00 8.67 11.82 40 10.0 33.50 0.0325 1.05 7.62 0.62 886.85 885.80 BMS
5 4 RVT-2 20 22 0.55 DR 878.18 877.00 1.18 890.00 8.80 13.00 40 10.0 33.50 0.0325 0.42 8.38 0.62 885.80 885.38 BMS
RVT-1 TO P13
1 RVT-1 1 50 55 0.80 D 887.00 881.75 5.25 887.00 5.25 5.25 40 10.0 33.50 0.0308 2.14 3.11 0.91 887.00 884.86 BMS
2 1 2 50 55 0.80 D 881.75 876.50 5.25 887.00 8.36 10.50 40 10.0 33.50 0.0308 2.14 6.22 0.91 884.86 882.72 BMS
3 2 3 50 55 0.80 D 876.50 871.25 5.25 887.00 11.47 15.75 40 10.0 33.50 0.0308 2.14 9.33 0.91 882.72 880.58 BMS
4 3 J1 50 55 0.80 D 871.25 866.00 5.25 887.00 14.58 21.00 40 10.0 33.50 0.0308 2.14 12.44 0.91 880.58 878.44 BMS
5 J1 5 50 55 0.15 D 866.00 864.48 1.52 887.00 13.96 22.52 25 12.5 19.90 0.0397 1.29 12.67 0.48 878.44 877.15 BMS
6 5 6 50 55 0.15 D 864.48 862.97 1.52 887.00 14.18 24.03 25 12.5 19.90 0.0397 1.29 12.89 0.48 877.15 875.86 BMS
7 6 7 40 44 0.15 D 862.97 861.76 1.21 887.00 14.10 25.24 25 12.5 19.90 0.0397 1.03 13.07 0.48 875.86 874.83 BMS
8 7 P13 25 27.5 0.15 D 861.76 861.00 0.76 887.00 13.83 26.00 25 12.5 19.90 0.0397 0.64 13.19 0.48 874.83 874.19 BMS
J1 TO P12
1 J1 1 50 55 0.65 L 866.00 859.64 6.36 887.00 18.80 27.36 32 10.0 26.70 0.0320 4.52 14.28 1.16 878.44 873.92 BMS
2 1 2 40 44 0.65 L 859.64 854.55 5.09 887.00 19.37 32.45 32 10.0 26.70 0.0320 3.62 15.75 1.16 873.92 870.30 BMS
3 2 J2 20 22 0.65 L 854.55 852.00 2.55 887.00 18.30 35.00 32 10.0 26.70 0.0320 1.81 16.49 1.16 870.30 868.49 BMS
4 J2 4 50 55 0.20 L 852.00 851.39 0.61 887.00 17.10 35.61 25 12.5 19.90 0.0378 2.18 14.92 0.64 868.49 866.31 BMS
5 4 5 50 55 0.20 L 851.39 850.79 0.61 887.00 15.52 36.21 25 12.5 19.90 0.0378 2.18 13.34 0.64 866.31 864.13 BMS
6 5 6 40 44 0.20 L 850.79 850.30 0.48 887.00 13.83 36.70 25 12.5 19.90 0.0378 1.75 12.08 0.64 864.13 862.38 BMS
7 6 P12 25 27.5 0.20 L 850.30 850.00 0.30 887.00 12.38 37.00 25 12.5 19.90 0.0378 1.09 11.29 0.64 862.38 861.29 BMS
J2 TO P11
1 J2 1 50 55 0.45 D 852.00 851.09 0.91 887.00 17.40 35.91 32 10.0 26.70 0.0335 2.25 15.15 0.80 868.49 866.24 BMS
2 1 2 40 44 0.45 D 851.09 850.36 0.73 887.00 15.88 36.64 32 10.0 26.70 0.0335 1.80 14.08 0.80 866.24 864.44 BMS
3 2 J3 20 22 0.45 D 850.36 850.00 0.36 887.00 14.44 37.00 32 10.0 26.70 0.0335 0.90 13.54 0.80 864.44 863.54 BMS
4 J3 4 50 55 0.15 D 850.00 849.70 0.30 887.00 13.84 37.30 25 12.5 19.90 0.0397 1.29 12.55 0.48 863.54 862.25 BMS
5 4 5 50 55 0.15 D 849.70 849.39 0.30 887.00 12.86 37.61 25 12.5 19.90 0.0397 1.29 11.57 0.48 862.25 860.96 BMS
Sheet No. : 14 of 20
Table 4 : PIPELINE DESIGN
(HYDRAULIC CALCULATIONS)
SCHEME TYPE : Gravity System Pipe Class abbreviation HC Soil Code GMS OS
SCHEME NAME : Rikhe Bazar Water Supply Project MC HR BMS
SCHEME NAME : Rikhe Bazar WaterSOURCE
Suppl NAME : Khodepani SAFE YEILD : 0.86 DI SR MR
LOCATION : WARD NO : 3 RMP : Tribeni DISTRICT : Salyan CI HS SS Pipe Line Design from CW
. HS Steel Method
6 5 6 40 44 0.15 D 849.39 849.15 0.24 887.00 11.81 37.85 25 12.5 19.90 0.0397 1.03 10.78 0.48 860.96 859.93 BMS
7 6 P11 25 27.5 0.15 D 849.15 849.00 0.15 887.00 10.93 38.00 25 12.5 19.90 0.0397 0.64 10.29 0.48 859.93 859.29 BMS
J3 TO P10
1 J3 1 50 55 0.30 L 850.00 848.64 1.36 887.00 14.90 38.36 32 10.0 26.70 0.0355 1.09 13.81 0.54 863.54 862.45 BMS
2 1 2 40 44 0.30 L 848.64 847.55 1.09 887.00 14.90 39.45 32 10.0 26.70 0.0355 0.87 14.03 0.54 862.45 861.58 BMS
3 2 J4 20 22 0.30 L 847.55 847.00 0.55 887.00 14.58 40.00 32 10.0 26.70 0.0355 0.43 14.15 0.54 861.58 861.15 BMS
4 J4 4 50 55 0.15 L 847.00 846.55 0.45 887.00 14.60 40.45 25 12.5 19.90 0.0397 1.29 13.31 0.48 861.15 859.86 BMS
5 4 5 50 55 0.15 L 846.55 846.09 0.45 887.00 13.77 40.91 25 12.5 19.90 0.0397 1.29 12.48 0.48 859.86 858.57 BMS
6 5 6 50 55 0.15 L 846.09 845.64 0.45 887.00 12.93 41.36 25 12.5 19.90 0.0397 1.29 11.64 0.48 858.57 857.28 BMS
7 6 7 50 55 0.15 L 845.64 845.18 0.45 887.00 12.10 41.82 25 12.5 19.90 0.0397 1.29 10.81 0.48 857.28 855.99 BMS
8 7 P10 20 22 0.15 L 845.18 845.00 0.18 887.00 10.99 42.00 25 12.5 19.90 0.0397 0.51 10.48 0.48 855.99 855.48 BMS
J4 TO P9
1 J4 1 50 55 0.15 DL 847.00 846.09 0.91 887.00 15.06 40.91 25 12.5 19.90 0.0397 1.29 13.77 0.48 861.15 859.86 BMS
2 1 2 40 44 0.15 DL 846.09 845.36 0.73 887.00 14.50 41.64 25 12.5 19.90 0.0397 1.03 13.47 0.48 859.86 858.83 BMS
3 2 P9' 20 22 0.15 DL 845.36 845.00 0.36 887.00 13.83 42.00 25 12.5 19.90 0.0397 0.51 13.32 0.48 858.83 858.32 BMS
4 P9' J5 55 60.5 0.15 DL 845.00 845.00 0.00 887.00 13.32 42.00 25 12.5 19.90 0.0397 1.42 11.90 0.48 858.32 856.90 BMS
5 J5 5 50 55 0.15 DL 845.00 844.09 0.91 887.00 12.81 42.91 25 12.5 19.90 0.0397 1.29 11.52 0.48 856.90 855.61 BMS
6 5 6 40 44 0.15 DL 844.09 843.36 0.73 887.00 12.25 43.64 25 12.5 19.90 0.0397 1.03 11.22 0.48 855.61 854.58 BMS
7 6 P9' 20 22 0.15 DL 843.36 843.00 0.36 887.00 11.58 44.00 25 12.5 19.90 0.0397 0.51 11.07 0.48 854.58 854.07 BMS
RVT-2 TO P2
1 RVT-2 1 50 55 1.50 D 877.00 870.70 6.30 877.00 6.30 6.30 50 6.0 44.90 0.0283 1.59 4.71 0.95 877.00 875.41 BMS
2 1 2 50 55 1.50 D 870.70 864.41 6.30 877.00 11.00 12.59 50 6.0 44.90 0.0283 1.59 9.41 0.95 875.41 873.82 BMS
3 2 J9 35 38.5 1.50 D 864.41 860.00 4.41 877.00 13.82 17.00 50 6.0 44.90 0.0283 1.11 12.71 0.95 873.82 872.71 BMS
4 J9 4 50 55 0.20 D 860.00 858.15 1.85 877.00 14.56 18.85 25 12.5 19.90 0.0378 2.18 12.38 0.64 872.71 870.53 BMS
5 4 5 50 55 0.20 D 858.15 856.30 1.85 877.00 14.23 20.70 25 12.5 19.90 0.0378 2.18 12.05 0.64 870.53 868.35 BMS
6 5 P2 35 38.5 0.20 D 856.30 855.00 1.30 877.00 13.35 22.00 25 12.5 19.90 0.0378 1.53 11.82 0.64 868.35 866.82 BMS
Sheet No. : 15 of 20
Table 4 : PIPELINE DESIGN
(HYDRAULIC CALCULATIONS)
SCHEME TYPE : Gravity System Pipe Class abbreviation HC Soil Code GMS OS
SCHEME NAME : Rikhe Bazar Water Supply Project MC HR BMS
SCHEME NAME : Rikhe Bazar WaterSOURCE
Suppl NAME : Khodepani SAFE YEILD : 0.86 DI SR MR
LOCATION : WARD NO : 3 RMP : Tribeni DISTRICT : Salyan CI HS SS Pipe Line Design from CW
. HS Steel Method
J9 TO P1
1 J9 1 50 55 0.15 R 860.00 861.85 -1.85 877.00 10.86 17.00 32 10.0 26.70 0.0405 0.31 10.55 0.27 872.71 872.40 BMS
2 1 2 50 55 0.15 R 861.85 863.70 -1.85 877.00 8.70 15.15 32 10.0 26.70 0.0405 0.31 8.39 0.27 872.40 872.09 BMS
3 2 P1 35 38.5 0.15 R 863.70 865.00 -1.30 877.00 7.09 13.30 32 10.0 26.70 0.0405 0.22 6.87 0.27 872.09 871.87 BMS
J9 TO P3
1 J9 1 50 55 1.15 DR 860.00 856.82 3.18 877.00 15.89 20.18 50 10.0 42.00 0.0293 1.35 14.54 0.83 872.71 871.36 BMS
2 1 2 40 44 1.15 DR 856.82 854.27 2.55 877.00 17.09 22.73 50 10.0 42.00 0.0293 1.08 16.01 0.83 871.36 870.28 BMS
3 2 J10 20 22 1.15 DR 854.27 853.00 1.27 877.00 17.28 24.00 50 10.0 42.00 0.0293 0.54 16.74 0.83 870.28 869.74 BMS
4 J10 4 50 55 0.15 D 853.00 852.26 0.74 877.00 17.48 24.74 25 12.5 19.90 0.0397 1.29 16.19 0.48 869.74 868.45 BMS
5 4 5 50 55 0.15 D 852.26 851.52 0.74 877.00 16.93 25.48 25 12.5 19.90 0.0397 1.29 15.64 0.48 868.45 867.16 BMS
6 5 P3 35 38.5 0.15 D 851.52 851.00 0.52 877.00 16.16 26.00 25 12.5 19.90 0.0397 0.90 15.26 0.48 867.16 866.26 BMS
Sheet No. : 16 of 20
Table 4 : PIPELINE DESIGN
(HYDRAULIC CALCULATIONS)
SCHEME TYPE : Gravity System Pipe Class abbreviation HC Soil Code GMS OS
SCHEME NAME : Rikhe Bazar Water Supply Project MC HR BMS
SCHEME NAME : Rikhe Bazar WaterSOURCE
Suppl NAME : Khodepani SAFE YEILD : 0.86 DI SR MR
LOCATION : WARD NO : 3 RMP : Tribeni DISTRICT : Salyan CI HS SS Pipe Line Design from CW
. HS Steel Method
J10 TO P7
1 J10 1 50 55 0.80 R 853.00 850.73 2.27 877.00 19.01 26.27 40 10.0 33.50 0.0308 2.14 16.87 0.91 869.74 867.60 BMS
2 1 2 40 44 0.80 R 850.73 848.91 1.82 877.00 18.69 28.09 40 10.0 33.50 0.0308 1.71 16.98 0.91 867.60 865.89 BMS
3 2 J8 20 22 0.80 R 848.91 848.00 0.91 877.00 17.89 29.00 40 10.0 33.50 0.0308 0.85 17.04 0.91 865.89 865.04 BMS
4 J8 4 50 55 0.30 R 848.00 845.88 2.12 877.00 19.16 31.12 32 10.0 26.70 0.0355 1.09 18.07 0.54 865.04 863.95 BMS
5 4 5 50 55 0.30 R 845.88 843.76 2.12 877.00 20.19 33.24 32 10.0 26.70 0.0355 1.09 19.10 0.54 863.95 862.86 BMS
6 5 6 40 44 0.30 R 843.76 842.06 1.70 877.00 20.80 34.94 32 10.0 26.70 0.0355 0.87 19.93 0.54 862.86 861.99 BMS
7 6 J6 25 27.5 0.30 R 842.06 841.00 1.06 877.00 20.99 36.00 32 10.0 26.70 0.0355 0.54 20.45 0.54 861.99 861.45 BMS
8 J6 8 50 55 0.10 R 841.00 840.17 0.83 877.00 21.28 36.83 20 16.0 14.90 0.0423 2.58 18.70 0.57 861.45 858.87 BMS
9 8 9 50 55 0.10 R 840.17 839.33 0.83 877.00 19.54 37.67 20 16.0 14.90 0.0423 2.58 16.96 0.57 858.87 856.29 BMS
10 9 10 50 55 0.10 R 839.33 838.50 0.83 877.00 17.79 38.50 20 16.0 14.90 0.0423 2.58 15.21 0.57 856.29 853.71 BMS
11 10 P7 30 33 0.10 R 838.50 838.00 0.50 877.00 15.71 39.00 20 16.0 14.90 0.0423 1.55 14.16 0.57 853.71 852.16 BMS
J6 TO P6
1 J6 1 50 55 0.10 D 841.00 839.15 1.85 877.00 22.30 37.85 20 16.0 14.90 0.0423 2.58 19.72 0.57 861.45 858.87 BMS
2 1 2 50 55 0.10 D 839.15 837.30 1.85 877.00 21.57 39.70 20 16.0 14.90 0.0423 2.58 18.99 0.57 858.87 856.29 BMS
3 2 P6 35 38.5 0.10 D 837.30 836.00 1.30 877.00 20.29 41.00 20 16.0 14.90 0.0423 1.81 18.48 0.57 856.29 854.48 BMS
J8 TO P5
1 J8 1 50 55 0.50 D 848.00 847.26 0.74 877.00 17.78 29.74 32 10.0 26.70 0.0330 2.75 15.03 0.89 865.04 862.29 BMS
2 1 2 50 55 0.50 D 847.26 846.52 0.74 877.00 15.77 30.48 32 10.0 26.70 0.0330 2.75 13.02 0.89 862.29 859.54 BMS
3 2 J7 35 38.5 0.50 D 846.52 846.00 0.52 877.00 13.54 31.00 32 10.0 26.70 0.0330 1.92 11.62 0.89 859.54 857.62 BMS
4 J7 4 50 55 0.20 D 846.00 844.16 1.84 877.00 13.46 32.84 25 12.5 19.90 0.0378 2.18 11.28 0.64 857.62 855.44 BMS
5 4 5 50 55 0.20 D 844.16 842.32 1.84 877.00 13.12 34.68 25 12.5 19.90 0.0378 2.18 10.94 0.64 855.44 853.26 BMS
6 5 6 50 55 0.20 D 842.32 840.47 1.84 877.00 12.79 36.53 25 12.5 19.90 0.0378 2.18 10.61 0.64 853.26 851.08 BMS
7 6 P5 40 44 0.20 D 840.47 839.00 1.47 877.00 12.08 38.00 25 12.5 19.90 0.0378 1.75 10.33 0.64 851.08 849.33 BMS
Sheet No. : 17 of 20
Table 4 : PIPELINE DESIGN
(HYDRAULIC CALCULATIONS)
SCHEME TYPE : Gravity System Pipe Class abbreviation HC Soil Code GMS OS
SCHEME NAME : Rikhe Bazar Water Supply Project MC HR BMS
SCHEME NAME : Rikhe Bazar WaterSOURCE
Suppl NAME : Khodepani SAFE YEILD : 0.86 DI SR MR
LOCATION : WARD NO : 3 RMP : Tribeni DISTRICT : Salyan CI HS SS Pipe Line Design from CW
. HS Steel Method
J7 TO P4
1 J7 1 50 55 0.20 DR 846.00 842.97 3.03 877.00 14.65 34.03 25 12.5 19.90 0.0378 2.18 12.47 0.64 857.62 855.44 BMS
2 1 2 50 55 0.20 DR 842.97 839.94 3.03 877.00 15.50 37.06 25 12.5 19.90 0.0378 2.18 13.32 0.64 855.44 853.26 BMS
3 2 3 40 44 0.20 DR 839.94 837.52 2.42 877.00 15.74 39.48 25 12.5 19.90 0.0378 1.75 13.99 0.64 853.26 851.51 BMS
4 3 P4 25 27.5 0.20 DR 837.52 836.00 1.52 877.00 15.51 41.00 25 12.5 19.90 0.0378 1.09 14.42 0.64 851.51 850.42 BMS
4155 4570.5
Length
Transmission Distribution
TOTAL LENGTH 905.00 3,250.00
HDP Pipe Length 905.00 3,250.00
GI Pipe Length - -
Total 905.00 3,250.00
GPH-15 - -
GPH-20 - -
GPH-25 - -
GPH-32 - -
GPH-40 - -
GPH-50 - -
GPH-63 - -
GPH-80 - -
GPH-100 - -
HP16-20 - 315.00
HP16-25 - -
HP16-32 - -
HP16-40 - -
HP16-50 - -
HP16-63 - -
HP16-75 - -
HP16-90 - -
HP16-110 - -
HP16-125 - -
HP16-140 - -
HP16-160 - -
HP16-180 - -
HP16-200 - -
HP16-225 - -
HP16-250 - -
HP10-32 - 765.00
HP10-40 505.00 310.00
HP10-50 - 110.00
HP10-63 - -
HP10-75 - -
HP10-90 - -
HP10-110 - -
HP10-125 - -
HP10-140 - -
HP10-160 - -
HP10-180 - -
HP10-200 - -
HP10-225 - -
HP10-250 - -
HP12.5-25 - 1,615.00
HP12.5-32 - -
HP12.5-40 - -
HP12.5-50 - -
HP12.5-63 - -
HP12.5-75 - -
HP12.5-90 - -
HP12.5-110 - -
HP12.5-125 - -
HP12.5-140 - -
HP12.5-160 - -
HP12.5-180 - -
HP12.5-200 - -
HP12.5-225 - -
HP12.5-250 - -
Length
Transmission Distribution
TOTAL LENGTH 905.00 3,250.00
HDP Pipe Length 905.00 3,250.00
GI Pipe Length - -
Total 905.00 3,250.00
Grand Total 4,155.00
Start Chainage at the branch
SN PipeLength RL Branch Point(1/0) REMARKS Ceiling Length
INTAKE TO DC 1 ###
INTAKE 0 920 1
1 50 918 1
2 50 915 1
3 50 913 1
4 50 911 1
5 50 909 1
6 50 906 1
7 50 904 1
8 50 902 1
9 50 900 1
10 50 897 1
11 50 895 1
12 50 893 1
13 40 891 1
DC 20 890 1
DC TO RVT-1 1
DC 0 890 1
RVT-1 25 887 1
DC TO RVT-2 1
DC 0 890 1
1 50 887 1
2 50 884 1
3 50 881 1
4 50 878 1
RVT-2 20 877 1
RVT-1 TO P13 1
RVT-1 0 887 1
1 50 882 1
2 50 877 1
3 50 871 1
J1 50 866 1
5 50 864 1
6 50 863 1
7 40 862 1
P13 25 861 1
J1 TO P12 1
J1 0 866 1
1 50 860 1
2 40 855 1
J2 20 852 1
4 50 851 1
5 50 851 1
6 40 850 1
P12 25 850 1
J2 TO P11 1
J2 0 852 1
1 50 851 1
2 40 850 1
J3 20 850 1
4 50 850 1
5 50 849 1
6 40 849 1
P11 25 849 1
J3 TO P10 1
J3 0 850 1
1 50 849 1
2 40 848 1
J4 20 847 1
4 50 847 1
5 50 846 1
6 50 846 1
7 50 845 1
P10 20 845 1
J4 TO P9 1
J4 0 847 1
1 50 846 1
2 40 845 1
P9' 20 845 1
J5 55 845 1
5 50 844 1
6 40 843 1
P9' 20 843 1
J5 TO P8 1
J5 0 845 1
1 35 845 1
P8' 35 844 1
3 35 843 1
P8' 35 842 1
RVT-2 TO P2 1
RVT-2 0 877 1
1 50 871 1
2 50 864 1
J9 35 860 1
4 50 858 1
5 50 856 1
P2 35 855 1
J9 TO P1 1
J9 0 860 1
1 50 862 1
2 50 864 1
P1 35 865 1
J9 TO P3 1
J9 0 860 1
1 50 857 1
2 40 854 1
J10 20 853 1
4 50 852 1
5 50 852 1
P3 35 851 1
J10 TO P7 1
J10 0 853 1
1 50 851 1
2 40 849 1
J8 20 848 1
4 50 846 1
5 50 844 1
6 40 842 1
J6 25 841 1
8 50 840 1
9 50 839 1
10 50 839 1
P7 30 838 1
J6 TO P6 1
J6 0 841 1
1 50 839 1
2 50 837 1
P6 35 836 1
J8 TO P5 1
J8 0 848 1
1 50 847 1
2 50 847 1
J7 35 846 1
4 50 844 1
5 50 842 1
6 50 840 1
P5 40 839 1
J7 TO P4 1
J7 0 846 1
1 50 843 1
2 50 840 1
3 40 838 1
P4 25 836 1
4295