Standalone PAT

for Jazz IPRAN

Site ID:
Standalone PAT for Jazz IPRAN

1 Introduction
This document defines all the standalone test items in details for Jazz IPRAN test.

1.1 Equipment Details

Table 1 – Device under test


Model Version Role
CX600-X2-M8A V800R100 V800R010

2 Installation Quality Test

2.1 Installation Quality

Test Item Installation Quality


Sub-Item Installation Quality
Test Objective Check the node installation quality by visual inspection.
Check the hardware installation is to check the installation of the
Test cabinet, sub rack, and the distribution of optical fiber, and power
Procedure lines, to confirm that the hardware installation quality meet the
design requirements. For the check items, see the following table
Test Record
Serial Item Requirements Passed Failed
No.
1 Cabinet (1) Location for installing cabinets meets
requirement.

(2) Cabinets are installed stably.

(3) Cabinets are neatly arranged.

(4) Labels are pasted according to standard

2 Fiber and (1) Routing and binding of internal optical fibers


wiring meet requirement.

(2) Labels are pasted according to standard.

3 Earth wire (1) Connection of earth wire complies with


standards.

(2) Routing and binding of earth wire meet

2
Standalone PAT for Jazz IPRAN

requirement.

(3) Labels are pasted well.

4 Power (1) There is no short circuit.


supply
(2) The power cables are routed neatly and
color coding is according to standard.

(3) The connector of DC power cable meets


requirement.

4) Labels are pasted according to standard.

5 Hardware (1) Boards can be inserted and removed


check smoothly.

(2) Retainer of plug board is complete and


reliable.

(3) Laying of fiber are according to the standard.

(4) Load the program and make sure the


hardware is normal.

Actual Result Passed  Failed  N/A 


Remarks
Signed by
Signed by
Huawei
Customer
representativ
representative
e

3 Power Supply Environment Test

3.1 Power Supply and installation

Test Item Power Supply


Sub-Item Power Voltage
Confirm the hardware installation, the power cables are connected

Test Objective correctly. -48V1, -48V2 to the correct terminals. Messure the power

supply voltage within range.


Test 1. Check power cable connection is firmed.
2. Check the power cable connect to correct terminals.
Procedure 3. Measure the voltage value from NE master and standby power
1. Voltage of power supply is between -38.4V and -57.6V
Expected 2. The power cables are connected correctly. -48V1, -48V2, PGND
Result and BGND to the correct terminals
3. The GND cable is well connected with Grounding bar

3
Standalone PAT for Jazz IPRAN

Power connection firmly Yes  No 

Power cable connect to correct terminals Yes  No 


Test Record
Master power voltage:

Standby power voltage:


Actual Result Passed  Failed  N/A 
Remarks
Signed by
Signed by
Huawei
Customer
representativ
representative
e

4
Standalone PAT for Jazz IPRAN

4 Optical Power Test

4.1 Mean Launch Power Test

Test Item NE optical power test


Sub-Item Mean Launch Power Test
Test Objective To check the mean launch power of optical module

Optical
Equipment
power
Test to be tested
meter
Procedure
1. Undo shutdown the interface to be test.
2. Connect the optical power meter to the port and red the value
100G,10km QSFP28 : 1.7 dbm ~ 10.5dbm

100G,40km QSFP28 : 3.1dbm ~ 8.9dbm

100G,80km QSFP28 : 8.0 dbm ~ 12.5dbm

50G,40km QSFP28 : 1.5dbm ~ 8dbm


Expected
10G,0.3km SFP+: -7.3dbm~-1dbm
Result
10G,10km SFP+: -8.2dbm~0.5dbm

10G,40km SFP+: -4.7dbm~4dbm

10G,80km SFP+: 0dbm~4dbm

10km GE eSFP : -9dbm ~ -3dbm


Slot/Port Power(dbm) Slot/Port Power(dbm)

Test Record

Actual Result Passed  Failed  N/A 


Remarks
Signed by
Signed by
Huawei
Customer
representativ
representative
e

5
Standalone PAT for Jazz IPRAN

4.2 Receiver Sensitivity Test

Test Item NE optical power test


Sub-Item Receiver Sensitivity Test
Test Objective To check the receiver sensitivity of optical module
OTU

TX Variable
Optical
Transp attenuator1
onder/
Line
Board
R
RX
Test
Procedure Optical
power
meter

1. Connect the patch cord as above diagram


2. Increase the variable optical attenuator until the link down alarm
appear.
3. Decrease the variable optical attenuator until link down alarm
disappear.
4. Disconnect the patch cord and measure the optical power on power
meter.
100G,10km QSFP28 : -2.6dbm

100G,40km QSFP28 : -14.9dbm

100G,80km QSFP28 : -22dbm

50G,40km QSFP28 : -15dbm


Expected
10G,0.3km SFP+: -9.9dbm
Result
10G,10km SFP+: -12.6dbm

10G,40km SFP+: -14.1dbm

10G,80km SFP+: -24dbm

10km GE eSFP: -20dbm


Test Record Slot/Port Power(dbm) Slot/Port Power(dbm)

6
Standalone PAT for Jazz IPRAN

Actual Result Passed  Failed  N/A 


Remarks
Signed by
Signed by
Huawei
Customer
representativ
representative
e

5 Redundancy Test

5.1 Power Card Redundancy Test

Test Item Redundancy test


Sub-Item Power Card Redundancy Test
Test Objective To check the redundancy of power card
1. Connect the analyzer to the 10G port.
2. Physical loop at another 10G port.
3. Configure same vlan to the step 1 and step 2 port.
Test 4. Remove power card of slot 11, read the service disruption time on
analyzer.
Procedure 5. Insert power card of slot 11 back.
6. After 5min, remover power card of slot 12, read the service
disruption time on analyzer.
7. Insert power card of slot 12 back.
Expected 1. In step 4, the service disruption is less than 50ms
2. In step 6, the service disruption is less than 50ms
Result
Service disruption time in step 4:
Test Record
Service disruption time in step 6:
Actual Result Passed  Failed  N/A 
Remarks
Signed by
Signed by
Huawei
Customer
representativ
representative
e

5.2 IPU Card Redundancy Test

Test Item Redundancy test


Sub-Item MPU Card Redundancy Test
Test Objective To check the redundancy of MPU card

7
Standalone PAT for Jazz IPRAN

1. Connect the analyzer to the 10G port.


2. Physical loop at another 10G port.
3. Configure same vlan to the step 1 and step 2 port.
Test 4. Remove IPU card of slot 9, read the service disruption time on
analyzer.
Procedure 5. Insert IPU card of slot 9 back.
6. After 5min, remover MPU card of slot 10, read the service disruption
time on analyzer.
7. Insert MPU card of slot 10 back.
Expected In step 4, the service disruption is less than 50ms
Result In step 6, the service disruption is less than 50ms
Service disruption time in step 4:
Test Record
Service disruption time in step 6:
Actual Result Passed  Failed  N/A 
Remarks
Signed by
Signed by
Huawei
Customer
representativ
representative
e

6 External Alarm Testing

6.1 External alarm testing

Test Item External alarm testing


Sub-Item External alarm testing
Test Objective Check the external alarm can be reported on NE8000-M8
1. Connect RJ45 connector the Ethernet cable to NE8000-M8 IPU
Test board ALMI port
2. Open the other end of Ethernet cable(remove the connector) and
Procedure make the 6 pair cable bear
3. Loop the wire one pair by one air
Expected Check the alarm on NCE, external alarm should appear.
Result
Test Record Alarm reporting as plan
Actual Result Passed  Failed  N/A 
Remarks
Signed by
Signed by
Huawei
Customer
representativ
representative
e
Remark: During ATP only testing by loop, patching will done after traffic shifting and cisco got

free, will reuse the sensor.

8
Standalone PAT for Jazz IPRAN

7 Platform

7.1 Basic information and NE Health

Test Item NE basic information


Sub-Item NE version test
Test Objective Check the software version of the router.
Test 1. Login NE by CLI
2. Execute the display version command
Procedure
Expected The version is V8R12
Result
Test Record NE version is V800R012
Actual Result Passed  Failed  N/A 
Remarks
Signed by
Signed by
Huawei
Customer
representativ
representative
e

Test Item NE basic information


Sub-Item Check NE card status
Test Objective Display and check each module status

Test 1. Login NE by CLI


3. Execute the display device, display device pic-status
Procedure
Expected All cards work normally.
Result
Test Record All cards work normally.
Actual Result Passed  Failed  N/A 
Remarks
Signed by
Signed by
Huawei
Customer
representativ
representative
e

Test Item NE Health


Sub-Item Verify device health status
Test Objective To Verify device health status

9
Standalone PAT for Jazz IPRAN

1. Login NE by CLI.
Test 2. Execute the command display health, display cpu-usage, display
memory
Procedure 3. Check the state from result of executing command.

Expected CPU usage, Memory are normal, under 50%


Result
Test Record CPU usage and memory usage is normal
Actual Result Passed  Failed  N/A 
Remarks
Signed by
Signed by
Huawei
Customer
representativ
representative
e

8 Network Protocols

8.1 IGP

Test Item Network Protocols


Sub-Item IGP
Test Objective To test the function of IGP ISIS

Test Topology

1. Login NE by CLI
Test 2. Run display ip routing-table command
Procedure 3. Run display isis peer
4. Run display isis bfd session all
Expected 1. IPRAN network interface ip and lookback ip shows in routing table and

10
Standalone PAT for Jazz IPRAN

type is ISIS
Result 2. Isis peer establish with adjacent NE in the topology
3. Isis bfd session is up.
1. IPRAN network interface ip and lookback ip shows in routing table and
type is ISIS
Test Record 2. Isis peer establish with adjacent NE in the topology
3. Isis bfd session is up.
Actual Result Passed  Failed  N/A 
Remarks
Signed by
Signed by
Huawei
Customer
representativ
representative
e

8.2 BGP

Test Item Network Protocols


Sub-Item BGP
Test Objective To test the function of BGP

Test Topology

Test 1. Login NE by CLI


2. Execute display bgp all summary
Procedure
Expected 1. At Non-RR site, vpnv4 peer established with the RR of the ring
2. At RR site, the vpnv4 peer established with the Non-RR node of the
Result ring

Test Record

11
Standalone PAT for Jazz IPRAN

Actual Result Passed  Failed  N/A 


Remarks
Signed by
Signed by
Huawei
Customer
representativ
representative
e

8.3 MPLS for TE/RSVP-TE

Test Item Network Protocols


Sub-Item MPLS
Test Objective To test the function of MPLS

Test Setup

1. Login NE by CLI
2. Execute display ip interface brief
Test
3. Execute display mpls te tunnel-interface tunnelid
Procedure

1. The TE tunnels are all up.


Expected 2. There is backup LSP for primary LSP, tunnel state of primary and hot
Result standby both are up.

1. The TE tunnels are all up.


2. There is backup LSP for primary LSP, tunnel state of primary and hot
Test Record standby both are up.

Actual Result Passed  Failed  N/A 

Remarks

Signed by Signed by

12
Standalone PAT for Jazz IPRAN

Huawei
Customer
representativ
representative
e

9 Services

9.1 L3VPN Service

Test Item Service


Sub-Item L3VPN service
Test Objective To test the function of L3VPN

Test Setup

1. Login NE by CLI
Test 2. Execute display ip routing-table all-vpn-instance
Procedure

Expected 1. VRF IPRAN,LTE_DATA,RAN_OAM,SIGNALING,TXN_OAM


Result showing route entry.

Test Record

Actual Result Passed  Failed  N/A 


Remarks
Signed by
Signed by
Huawei
Customer
representativ
representative
e

13