Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 68

ANNEX G-2

Attachment 3-B: Capacity Development Requirements for Barangays

CAPACITY DEVELOPMENT REQUIREMENTS FOR BARANGAYS

Region: ___________________________
Province: ___________________________
City/Municipality: ___________________________

POBLACION
(BARANGAY)

Implementation Details
Priority Capacity Target Barangay
Functions/ Funding Requirements Source of
Development Official/Personn Expected Output
Services Timeframe Technical Funding Source
Intervention el
Year 1 Year 2 Year 3 Support
[1] [2] [3] [4] [5] [6] [7] [8]

Agricultural support
services which
include planting Training on
materials, creating
Barangay Official Trained Barangay
distribution system sustainable 2023-2024 10,000.00 10,000.00 CAO/PB 20%
and operation of and constituents Constituents
Agricultural
farm produce
collection and Program
buying stations
Expanded
Provide reading
Information and Barangay Vocabulary of
reading center. materials & 2024 50,000.00 CAO/PB MOOE
Constituents Barangay
reading center
Constituents
Services and
facilities related to
beautification, and
solid waste
collection.

Construction of
Sattelite or Public Barangay availability of agro
Market were viable Barangay Sattelite Constituents and fishery products
2024 200,000.00 CAO/PB MOOE
market
Maintenance of
Katarungang
Pambarangay

Maintenance of
Barangay Roads and
Bridges , and water
Supply System

Infrastructure
Facilities such as
Multi-Purpose
Pavement , Plaza ,
Sports Center , and
other similar
Facilities

Services and Healthier


facilities related to Handwashing Barangay
community/Illness 2023-2024 10,000.00 10,000.00 CAO/PB 20% BDF
general hygiene and Facilities constituents
sanitation. prevention
Social welfare
Services such as
Maintenance of Day
Care Centers

Prepared by: Reviewed by: Approved by:

______________________________ ______________________________ ______________________________


Barangay Secretary Barangay Treasurer Punong Barangay
Date Date Date

Capacity Development Requirements Content:


[1] Refers to functions and services devolved to barangays under Section 17 of the LGC and other relevant laws.
[2] Strategies mapped out to enhance the ability of the LGU to achieve its desired performance/state/condition.
[3] Beneficiaries of the intervention.
[4] Refers to a plan, program, system, process, or people trained.
[5] Refers to the duration of the capacity development intervention within the three-year time frame of the current leadership.
[6] Refers to the estimated cost/budget required for capacity development interventions per year if applicable.
Refers to internal or external stakeholders who can provide the necessary coaching/mentoring/technical assistance in the delivery of the capacity
[7]
development intervention.
[8] Refers to the source of financing for the capacity development intervention.
CAPACITY DEVELOPMENT REQUIREMENTS FOR BA

Region: ___________________________
Province: ___________________________
City/Municipality: ___________________________

LINANGKAYAN
(BARANGAY)

Priority Capacity Target Barangay


Functions/
Development Official/Personn Expected Output
Services Timeframe
Intervention el

[1] [2] [3] [4] [5]

Agricultural support
services which
include planting
materials,
distribution system
and operation of
farm produce
collection and
buying stations

Information and
reading center.

Services and
facilities related to
beautification, and
solid waste
collection.

Sattelite or Public
Market were viable

Maintenance of
Katarungang
Pambarangay
Maintenance of
Barangay Roads and
Bridges , and water
Supply System

Infrastructure
Facilities such as
Multi-Purpose
Pavement , Plaza ,
Sports Center , and
other similar
Facilities

Services and
facilities related to
general hygiene and
sanitation.

Social welfare
Services such as
Maintenance of Day
Care Centers

Prepared by: Reviewed by: Approved by:

______________________________ ______________________________ ________________


Barangay Secretary Barangay Treasurer Punong Barangay
Date Date Date

Capacity Development Requirements Content:


[1] Refers to functions and services devolved to barangays under Section 17 of the LGC an
[2] Strategies mapped out to enhance the ability of the LGU to achieve its desired performa
[3] Beneficiaries of the intervention.
[4] Refers to a plan, program, system, process, or people trained.
[5] Refers to the duration of the capacity development intervention within the three-year time
[6] Refers to the estimated cost/budget required for capacity development interventions per
Refers to internal or external stakeholders who can provide the necessary coaching/men
[7]
development intervention.
[8] Refers to the source of financing for the capacity development intervention.
ANNEX G-2
Attachment 3-B: Capacity Development Requirements for Barangays

EQUIREMENTS FOR BARANGAYS

NGKAYAN
RANGAY)

Implementation Details
Funding Requirements Source of
Technical Funding Source
Year 1 Year 2 Year 3 Support
[6] [7] [8]
______________________________
arangay

Section 17 of the LGC and other relevant laws.


hieve its desired performance/state/condition.
within the three-year time frame of the current leadership.
opment interventions per year if applicable.
necessary coaching/mentoring/technical assistance in the delivery of the capacity
intervention.
CAPACITY DEVELOPMENT REQUIREMENTS FOR BA

Region: ___________________________
Province: ___________________________
City/Municipality: ___________________________

MAPUTI
(BARANGAY)

Priority Capacity Target Barangay


Functions/
Development Official/Personn Expected Output
Services Timeframe
Intervention el

[1] [2] [3] [4] [5]

Agricultural support
services which
include planting
materials,
distribution system
and operation of
farm produce
collection and
buying stations

Information and
reading center.

Services and
facilities related to
beautification, and
solid waste
collection.

Sattelite or Public
Market were viable

Maintenance of
Katarungang
Pambarangay
Maintenance of
Barangay Roads and
Bridges , and water
Supply System

Infrastructure
Facilities such as
Multi-Purpose
Pavement , Plaza ,
Sports Center , and
other similar
Facilities

Services and
facilities related to
general hygiene and
sanitation.

Social welfare
Services such as
Maintenance of Day
Care Centers

Prepared by: Reviewed by: Approved by:

______________________________ ______________________________ ________________


Barangay Secretary Barangay Treasurer Punong Barangay
Date Date Date

Capacity Development Requirements Content:


[1] Refers to functions and services devolved to barangays under Section 17 of the LGC an
[2] Strategies mapped out to enhance the ability of the LGU to achieve its desired performa
[3] Beneficiaries of the intervention.
[4] Refers to a plan, program, system, process, or people trained.
[5] Refers to the duration of the capacity development intervention within the three-year time
[6] Refers to the estimated cost/budget required for capacity development interventions per
Refers to internal or external stakeholders who can provide the necessary coaching/men
[7]
development intervention.
[8] Refers to the source of financing for the capacity development intervention.
ANNEX G-2
Attachment 3-B: Capacity Development Requirements for Barangays

EQUIREMENTS FOR BARANGAYS

MAPUTI
RANGAY)

Implementation Details
Funding Requirements Source of
Technical Funding Source
Year 1 Year 2 Year 3 Support
[6] [7] [8]
______________________________
arangay

Section 17 of the LGC and other relevant laws.


hieve its desired performance/state/condition.
within the three-year time frame of the current leadership.
opment interventions per year if applicable.
necessary coaching/mentoring/technical assistance in the delivery of the capacity
intervention.
CAPACITY DEVELOPMENT REQUIREMENTS FOR BA

Region: ___________________________
Province: ___________________________
City/Municipality: ___________________________

DON PEDRO
(BARANGAY)

Priority Capacity Target Barangay


Functions/
Development Official/Personn Expected Output
Services Timeframe
Intervention el

[1] [2] [3] [4] [5]

Agricultural support
services which
include planting
materials,
distribution system
and operation of
farm produce
collection and
buying stations

Information and
reading center.

Services and
facilities related to
beautification, and
solid waste
collection.

Sattelite or Public
Market were viable

Maintenance of
Katarungang
Pambarangay
Maintenance of
Barangay Roads and
Bridges , and water
Supply System

Infrastructure
Facilities such as
Multi-Purpose
Pavement , Plaza ,
Sports Center , and
other similar
Facilities

Services and
facilities related to
general hygiene and
sanitation.

Social welfare
Services such as
Maintenance of Day
Care Centers

Prepared by: Reviewed by: Approved by:

______________________________ ______________________________ ________________


Barangay Secretary Barangay Treasurer Punong Barangay
Date Date Date

Capacity Development Requirements Content:


[1] Refers to functions and services devolved to barangays under Section 17 of the LGC an
[2] Strategies mapped out to enhance the ability of the LGU to achieve its desired performa
[3] Beneficiaries of the intervention.
[4] Refers to a plan, program, system, process, or people trained.
[5] Refers to the duration of the capacity development intervention within the three-year time
[6] Refers to the estimated cost/budget required for capacity development interventions per
Refers to internal or external stakeholders who can provide the necessary coaching/men
[7]
development intervention.
[8] Refers to the source of financing for the capacity development intervention.
ANNEX G-2
Attachment 3-B: Capacity Development Requirements for Barangays

EQUIREMENTS FOR BARANGAYS

N PEDRO
RANGAY)

Implementation Details
Funding Requirements Source of
Technical Funding Source
Year 1 Year 2 Year 3 Support
[6] [7] [8]
______________________________
arangay

Section 17 of the LGC and other relevant laws.


hieve its desired performance/state/condition.
within the three-year time frame of the current leadership.
opment interventions per year if applicable.
necessary coaching/mentoring/technical assistance in the delivery of the capacity
intervention.
CAPACITY DEVELOPMENT REQUIREMENTS FOR BA

Region: ___________________________
Province: ___________________________
City/Municipality: ___________________________

PATAG
(BARANGAY)

Priority Capacity Target Barangay


Functions/
Development Official/Personn Expected Output
Services Timeframe
Intervention el

[1] [2] [3] [4] [5]

Agricultural support
services which
include planting
materials,
distribution system
and operation of
farm produce
collection and
buying stations

Information and
reading center.

Services and
facilities related to
beautification, and
solid waste
collection.

Sattelite or Public
Market were viable

Maintenance of
Katarungang
Pambarangay
Maintenance of
Barangay Roads and
Bridges , and water
Supply System

Infrastructure
Facilities such as
Multi-Purpose
Pavement , Plaza ,
Sports Center , and
other similar
Facilities

Services and
facilities related to
general hygiene and
sanitation.

Social welfare
Services such as
Maintenance of Day
Care Centers

Prepared by: Reviewed by: Approved by:

______________________________ ______________________________ ________________


Barangay Secretary Barangay Treasurer Punong Barangay
Date Date Date

Capacity Development Requirements Content:


[1] Refers to functions and services devolved to barangays under Section 17 of the LGC an
[2] Strategies mapped out to enhance the ability of the LGU to achieve its desired performa
[3] Beneficiaries of the intervention.
[4] Refers to a plan, program, system, process, or people trained.
[5] Refers to the duration of the capacity development intervention within the three-year time
[6] Refers to the estimated cost/budget required for capacity development interventions per
Refers to internal or external stakeholders who can provide the necessary coaching/men
[7]
development intervention.
[8] Refers to the source of financing for the capacity development intervention.
ANNEX G-2
Attachment 3-B: Capacity Development Requirements for Barangays

EQUIREMENTS FOR BARANGAYS

PATAG
RANGAY)

Implementation Details
Funding Requirements Source of
Technical Funding Source
Year 1 Year 2 Year 3 Support
[6] [7] [8]
______________________________
arangay

Section 17 of the LGC and other relevant laws.


hieve its desired performance/state/condition.
within the three-year time frame of the current leadership.
opment interventions per year if applicable.
necessary coaching/mentoring/technical assistance in the delivery of the capacity
intervention.
CAPACITY DEVELOPMENT REQUIREMENTS FOR BA

Region: ___________________________
Province: ___________________________
City/Municipality: ___________________________

MAPULOG
(BARANGAY)

Priority Capacity Target Barangay


Functions/
Development Official/Personn Expected Output
Services Timeframe
Intervention el

[1] [2] [3] [4] [5]

Agricultural support
services which
include planting
materials,
distribution system
and operation of
farm produce
collection and
buying stations

Information and
reading center.

Services and
facilities related to
beautification, and
solid waste
collection.

Sattelite or Public
Market were viable

Maintenance of
Katarungang
Pambarangay
Maintenance of
Barangay Roads and
Bridges , and water
Supply System

Infrastructure
Facilities such as
Multi-Purpose
Pavement , Plaza ,
Sports Center , and
other similar
Facilities

Services and
facilities related to
general hygiene and
sanitation.

Social welfare
Services such as
Maintenance of Day
Care Centers

Prepared by: Reviewed by: Approved by:

______________________________ ______________________________ ________________


Barangay Secretary Barangay Treasurer Punong Barangay
Date Date Date

Capacity Development Requirements Content:


[1] Refers to functions and services devolved to barangays under Section 17 of the LGC an
[2] Strategies mapped out to enhance the ability of the LGU to achieve its desired performa
[3] Beneficiaries of the intervention.
[4] Refers to a plan, program, system, process, or people trained.
[5] Refers to the duration of the capacity development intervention within the three-year time
[6] Refers to the estimated cost/budget required for capacity development interventions per
Refers to internal or external stakeholders who can provide the necessary coaching/men
[7]
development intervention.
[8] Refers to the source of financing for the capacity development intervention.
ANNEX G-2
Attachment 3-B: Capacity Development Requirements for Barangays

EQUIREMENTS FOR BARANGAYS

APULOG
RANGAY)

Implementation Details
Funding Requirements Source of
Technical Funding Source
Year 1 Year 2 Year 3 Support
[6] [7] [8]
______________________________
arangay

Section 17 of the LGC and other relevant laws.


hieve its desired performance/state/condition.
within the three-year time frame of the current leadership.
opment interventions per year if applicable.
necessary coaching/mentoring/technical assistance in the delivery of the capacity
intervention.
CAPACITY DEVELOPMENT REQUIREMENTS FOR BA

Region: ___________________________
Province: ___________________________
City/Municipality: ___________________________

MAT - I
(BARANGAY)

Priority Capacity Target Barangay


Functions/
Development Official/Personn Expected Output
Services Timeframe
Intervention el

[1] [2] [3] [4] [5]

Agricultural support
services which
include planting
materials,
distribution system
and operation of
farm produce
collection and
buying stations

Information and
reading center.

Services and
facilities related to
beautification, and
solid waste
collection.

Sattelite or Public
Market were viable

Maintenance of
Katarungang
Pambarangay
Maintenance of
Barangay Roads and
Bridges , and water
Supply System

Infrastructure
Facilities such as
Multi-Purpose
Pavement , Plaza ,
Sports Center , and
other similar
Facilities

Services and
facilities related to
general hygiene and
sanitation.

Social welfare
Services such as
Maintenance of Day
Care Centers

Prepared by: Reviewed by: Approved by:

______________________________ ______________________________ ________________


Barangay Secretary Barangay Treasurer Punong Barangay
Date Date Date

Capacity Development Requirements Content:


[1] Refers to functions and services devolved to barangays under Section 17 of the LGC an
[2] Strategies mapped out to enhance the ability of the LGU to achieve its desired performa
[3] Beneficiaries of the intervention.
[4] Refers to a plan, program, system, process, or people trained.
[5] Refers to the duration of the capacity development intervention within the three-year time
[6] Refers to the estimated cost/budget required for capacity development interventions per
Refers to internal or external stakeholders who can provide the necessary coaching/men
[7]
development intervention.
[8] Refers to the source of financing for the capacity development intervention.
ANNEX G-2
Attachment 3-B: Capacity Development Requirements for Barangays

EQUIREMENTS FOR BARANGAYS

MAT - I
RANGAY)

Implementation Details
Funding Requirements Source of
Technical Funding Source
Year 1 Year 2 Year 3 Support
[6] [7] [8]
______________________________
arangay

Section 17 of the LGC and other relevant laws.


hieve its desired performance/state/condition.
within the three-year time frame of the current leadership.
opment interventions per year if applicable.
necessary coaching/mentoring/technical assistance in the delivery of the capacity
intervention.
CAPACITY DEVELOPMENT REQUIREMENTS FOR BA

Region: ___________________________
Province: ___________________________
City/Municipality: ___________________________

TAGBALOGO
(BARANGAY)

Priority Capacity Target Barangay


Functions/
Development Official/Personn Expected Output
Services Timeframe
Intervention el

[1] [2] [3] [4] [5]

Agricultural support
services which
include planting
materials,
distribution system
and operation of
farm produce
collection and
buying stations

Information and
reading center.

Services and
facilities related to
beautification, and
solid waste
collection.

Sattelite or Public
Market were viable

Maintenance of
Katarungang
Pambarangay
Maintenance of
Barangay Roads and
Bridges , and water
Supply System

Infrastructure
Facilities such as
Multi-Purpose
Pavement , Plaza ,
Sports Center , and
other similar
Facilities

Services and
facilities related to
general hygiene and
sanitation.

Social welfare
Services such as
Maintenance of Day
Care Centers

Prepared by: Reviewed by: Approved by:

______________________________ ______________________________ ________________


Barangay Secretary Barangay Treasurer Punong Barangay
Date Date Date

Capacity Development Requirements Content:


[1] Refers to functions and services devolved to barangays under Section 17 of the LGC an
[2] Strategies mapped out to enhance the ability of the LGU to achieve its desired performa
[3] Beneficiaries of the intervention.
[4] Refers to a plan, program, system, process, or people trained.
[5] Refers to the duration of the capacity development intervention within the three-year time
[6] Refers to the estimated cost/budget required for capacity development interventions per
Refers to internal or external stakeholders who can provide the necessary coaching/men
[7]
development intervention.
[8] Refers to the source of financing for the capacity development intervention.
ANNEX G-2
Attachment 3-B: Capacity Development Requirements for Barangays

EQUIREMENTS FOR BARANGAYS

BALOGO
RANGAY)

Implementation Details
Funding Requirements Source of
Technical Funding Source
Year 1 Year 2 Year 3 Support
[6] [7] [8]
______________________________
arangay

Section 17 of the LGC and other relevant laws.


hieve its desired performance/state/condition.
within the three-year time frame of the current leadership.
opment interventions per year if applicable.
necessary coaching/mentoring/technical assistance in the delivery of the capacity
intervention.
CAPACITY DEVELOPMENT REQUIREMENTS FOR BA

Region: ___________________________
Province: ___________________________
City/Municipality: ___________________________

TUBORAN
(BARANGAY)

Priority Capacity Target Barangay


Functions/
Development Official/Personn Expected Output
Services Timeframe
Intervention el

[1] [2] [3] [4] [5]

Agricultural support
services which
include planting
materials,
distribution system
and operation of
farm produce
collection and
buying stations

Information and
reading center.

Services and
facilities related to
beautification, and
solid waste
collection.

Sattelite or Public
Market were viable

Maintenance of
Katarungang
Pambarangay
Maintenance of
Barangay Roads and
Bridges , and water
Supply System

Infrastructure
Facilities such as
Multi-Purpose
Pavement , Plaza ,
Sports Center , and
other similar
Facilities

Services and
facilities related to
general hygiene and
sanitation.

Social welfare
Services such as
Maintenance of Day
Care Centers

Prepared by: Reviewed by: Approved by:

______________________________ ______________________________ ________________


Barangay Secretary Barangay Treasurer Punong Barangay
Date Date Date

Capacity Development Requirements Content:


[1] Refers to functions and services devolved to barangays under Section 17 of the LGC an
[2] Strategies mapped out to enhance the ability of the LGU to achieve its desired performa
[3] Beneficiaries of the intervention.
[4] Refers to a plan, program, system, process, or people trained.
[5] Refers to the duration of the capacity development intervention within the three-year time
[6] Refers to the estimated cost/budget required for capacity development interventions per
Refers to internal or external stakeholders who can provide the necessary coaching/men
[7]
development intervention.
[8] Refers to the source of financing for the capacity development intervention.
ANNEX G-2
Attachment 3-B: Capacity Development Requirements for Barangays

EQUIREMENTS FOR BARANGAYS

BORAN
RANGAY)

Implementation Details
Funding Requirements Source of
Technical Funding Source
Year 1 Year 2 Year 3 Support
[6] [7] [8]
______________________________
arangay

Section 17 of the LGC and other relevant laws.


hieve its desired performance/state/condition.
within the three-year time frame of the current leadership.
opment interventions per year if applicable.
necessary coaching/mentoring/technical assistance in the delivery of the capacity
intervention.
CAPACITY DEVELOPMENT REQUIREMENTS FOR BA

Region: ___________________________
Province: ___________________________
City/Municipality: ___________________________

LUBILAN
(BARANGAY)

Priority Capacity Target Barangay


Functions/
Development Official/Personn Expected Output
Services Timeframe
Intervention el

[1] [2] [3] [4] [5]

Agricultural support
services which
include planting
materials,
distribution system
and operation of
farm produce
collection and
buying stations

Information and
reading center.

Services and
facilities related to
beautification, and
solid waste
collection.

Sattelite or Public
Market were viable

Maintenance of
Katarungang
Pambarangay
Maintenance of
Barangay Roads and
Bridges , and water
Supply System

Infrastructure
Facilities such as
Multi-Purpose
Pavement , Plaza ,
Sports Center , and
other similar
Facilities

Services and
facilities related to
general hygiene and
sanitation.

Social welfare
Services such as
Maintenance of Day
Care Centers

Prepared by: Reviewed by: Approved by:

______________________________ ______________________________ ________________


Barangay Secretary Barangay Treasurer Punong Barangay
Date Date Date

Capacity Development Requirements Content:


[1] Refers to functions and services devolved to barangays under Section 17 of the LGC an
[2] Strategies mapped out to enhance the ability of the LGU to achieve its desired performa
[3] Beneficiaries of the intervention.
[4] Refers to a plan, program, system, process, or people trained.
[5] Refers to the duration of the capacity development intervention within the three-year time
[6] Refers to the estimated cost/budget required for capacity development interventions per
Refers to internal or external stakeholders who can provide the necessary coaching/men
[7]
development intervention.
[8] Refers to the source of financing for the capacity development intervention.
ANNEX G-2
Attachment 3-B: Capacity Development Requirements for Barangays

EQUIREMENTS FOR BARANGAYS

UBILAN
RANGAY)

Implementation Details
Funding Requirements Source of
Technical Funding Source
Year 1 Year 2 Year 3 Support
[6] [7] [8]
______________________________
arangay

Section 17 of the LGC and other relevant laws.


hieve its desired performance/state/condition.
within the three-year time frame of the current leadership.
opment interventions per year if applicable.
necessary coaching/mentoring/technical assistance in the delivery of the capacity
intervention.

You might also like