BLK 8 LOT 5 CHRYSANTHEMUM ST. CAMELLA HOMES B.L.S BRGY. DON BOSCO, PARANAQUE CITY
MATERIAL
PARTICULAR QTY UNIT LABOR COST UNIT COST TOTAL COST
COST
I General Requirements
a) Mobilization 1.00 lot 20,000.00 20,000.00 20,000.00
b) Power and Water Consumption 1.00 lot 15,000.00 15,000.00 15,000.00
d) Temporary Facilities 1.00 lot 15,000.00 15,000.00 15,000.00
e) Safety 1.00 lot 15,000.00 15,000.00 15,000.00
f) Demobilization 1.00 lot 20,000.00 20,000.00 20,000.00
Total "I" 85,000.00