SITE HSE INSPECTION REPORT

SECB Supervision Projects

Note: Contractors are hereby reminded that they must comply with health, safety and environmental legislation of the
country and / or Client Requirements as specified. The contractor should take appropriate action and submit a
closeout report to SECB on or before the close out date. All actions shall be tracked by SECB.

1) INSPECTION OVERVIEW
Project: Villa Khalifa Ahmed Saif Al Suwaidi SECB Project No: 1922

Location Plot 46, Sector W42 Date / Time: 16.12.2020


Who attended inspection? Engr. Shadi – Rama Real-estate Report No. SECB/HSE/1922/08

2) ACTION PRIORITY DEFINITION


HIGH (H) = Immediate Immediate same day action is required to avoid the high risk of an accident or incident
MEDIUM (M) = Within 24 Hrs Urgent action is required within the next 24 hours of the finding
LOW (L) = Within 3 Days Action is required within the next 3 days of the finding
IMPROVEMENT (I) = As agreed Improvement action required to meet best practice and continually improve standards
POSITIVE (POS) = As agreed Well done - good practice or good behaviours have been observed.
3) INSPECTION FINDINGS
PRIO ACTION
OBSERVATION ACTIONS REQUIRED RITY
REF PHOTO BY
(Hazard / Location / Requirement) (What must be done & recommendations) (H / M
/ L) (Name)

Health & Safety


Corrective action
Workers have been observed
 All the workers working at height must PM
working at height without
comply with full body safety harness Rama
01
wearing safety harness , Safe
 Industrial ladders should be provided HIGH Real-
access /egress and edge
for safe access and egress. estate
protection has not provided
 Edge protection should be provided
Contractor is required to comply
with OSHAD SF Cop-23.0 work
at height

Health & Safety

De-shuttering material is PM
Corrective action
MEDIUM

scattered here and there. Rama


 Shuttering material should be
02 Eloping tripping hazard. Real-
organised.
Contractor is required to comply estate
with OSHAD SF Cop-08.0
general work amenities

Page 1 of 2
SITE HSE INSPECTION REPORT
SECB Supervision Projects

Designation Name (PRINT) Date Signature


SECB HSE Engineer / 16.12.2020
Specialist / Rep.
Rakesh Kumar
SECB Resident Engineer / 16.12.2020
Project Manager:
Makin Alhadid
Reports issued to Contractor 16.12.2020
PM :
Mr. Hassan

Page 2 of 2