Professional Documents
Culture Documents
Smartmate Construction Co., LTD.: V.O Summary 29 R2
Smartmate Construction Co., LTD.: V.O Summary 29 R2
Smartmate Construction Co., LTD.: V.O Summary 29 R2
O Summary 29 R2
添利營造有限公司
Smartmate Construction Co., Ltd.
ISO 9001: 9015
Location : Wall A
1 Provision of the Metal Scaffolding / Hydraulic Scissor Platform for the Works 1 Sum 3,500.00 3,500.00
3 Temporary fix of the conduit before removal of Damaged Fencing Wall 1 Sum 1,000.00 1,000.00
5 Supply and install the new 150mm thk blockwall with C/S screeding Finishing 1 Sum 7,000.00 7,000.00
Remark:
1. Please refer to the attached drawing in the above items, the outside areas of these two
of "Injection and Waterproofing Area" will be calculated separately.
2. 1 year workmanship and material warranty is provided.
3. Material Lead Time : Approx. 1-2 Days subject to availability of stock.
4. Work Period : 1-2 Days.
Total : 18,000.00
________________________
Dicky Lam Authorized Signature with Chop
Date: 2021/10/15 Date:
Address : Flat 8-13, 7/F., Sui Fai Fty. Est., 5-13 Shan Mei Street, Fotan, Sha Tin, N.T. P.1 of 1