DESIGN VERIFICATION PLAN REPORT Page : 1 of 10

BAJA SAEINDIA DVP&R TEMPLATE


mBAJA/eBAJA: Team ID: CAR NO.:
Old/New Team: 4WD/AWD: Yes/No Name of the College:
Team Member(s) Responsible:
Sl. No. Level: Vehicle, Performance Target Acceptance Criteria / Target Validation Test Resource/ No. of
Aggregate or part Test & Method Equipments used Tests

10

Note:
1. Each team is expected to perform DVPR for minimum total 10 No's of components/ systems/ vehicle levels compulsorily
2) Performance targets are same as those listed in Design Report for vehicle & aggregates. e.g. Stopping distance after braking.
3) On an average conduce two or three tests/ attemps for each component.

AIR-DVPR_06.03.02
DESIGN VERIFICATION PLAN REPORT Page : 2 of 10

Date:
Team Name:
Faculty Advisor:

Start Dt. Finish Dt. Remarks Report Nos.

AIR-DVPR_06.03.02
Potential
FMEA No.:ASP/AIS/01 __________________
Failure Mode Effects Analysis
( Design FMEA ) Page :_1__________ of 4 ________

BAJA SAEINDIA DFMEA Template Date:


mBAJA/eBAJA: Team ID: CAR NO.: Team Name:
Old/New Team: 4WD/AWD: Yes/No Name of the College: Faculty Advisor:
Team Member(s) Responsible:

MODEL YEAR(s) / VEHICLE(s) : DFMEA date ( Orig. ) _( Rev.) _________


ITEM
O Responsibility &
Potential Failure Mode Potential Effect(s) of Failures s c Potential Cause(s)/Mechanism(s) c Current Design D R Recommended Action(s) Target Completion Action Results
e l of Failures c Control e P Date
v a u t N
s r e
s e c S O D R
Function Action Taken e c e P
v c t N

MQS/APQP/F/04 Rev. : 01 15/06/04


Guidelines:
Section A. For eBAJA Teams: DFMEA has to be performed on Min. 2 out of the below 7 items/subsystems. Also, eBAJA tea
1. Battery
2. Battery Management System (BMS)
3. Motor
5. Controller Minimum 2 No's Items/subsystems are
compulsory for eBAJA Teams
6. Transmission Coupling
7. Wiring Harness

Section B. For mBAJA as well as eBaja Teams, (Teams can choose Minimum "5/3" No's of items/subsystems as per their co
1. Suspension System (Suspension Arms, Links, Ball Joints, Springs, Dampers, Suspension Mountings/Brackets)
2. Steering System (Steering Column, Tie Rod Ends, Rack and Pinion Assembly, Steering Wheel and Column UJ
3. Brake System (Braking Performance, Caliper Mounts, Master Cylinder Mount, Brake Rotor)
4. Roll Cage
5.Transmission System (CVT Belt, Driveshaft, Gearbox, CVT Pulleys, Engine Mounting)
6. Upright
7. Tie Rod Ends
8. Wheel Hub
9. Wheel Bearings
10. Pedal Assembly
11.4WD/AWD

For, 1. eBAJA Teams: DFMEA needs to be performed on the Minimum "5" No's of items/subsystems ("2" No's from Se
2. mBAJA Teams: DFMEA needs to be performed on the Minimum "5" No's of items/subsystems ("5" No's from Sectio
bsystems. Also, eBAJA teams need to perform DFMEA on mBAJA items/subsystems as mentioned below

/subsystems as per their convenience)


nsion Mountings/Brackets)
Minimum 5 No's of subsystems/items are
ring Wheel and Column UJ)
compulsory

systems ("2" No's from Section A & "3" No's from Section B)
ems ("5" No's from Section B)