Individual Report: Muhamad Zuhairi Bin Sulaiman FAA18007 02F
Individual Report: Muhamad Zuhairi Bin Sulaiman FAA18007 02F
SESSION/SEMESTE
R : SESSION 2020/2021 SEMESTER II
4 various fields :
a) Civil Engineering
Deals with the design, construction, and maintenance of the physically and naturally built
environment including public works.
b) Chemimcal Engineering
Involve with the factory project.
c) Electrical & Electronic Engineering
Involve with the electrical works like electrical power supply etc.
d) Mechanical Engineering
Involve with the mechanaries and deal with the factory at the most.
GE
PE
PEPC
d) Concrete grade
BEM CIRCULAR NO.003 FOR SUBMISSION OF 1) Sanitary plumbing works shall submitted by
SEWERAGE AND SANITARY PLUMBING registered PEPC in the mechanical or civil
WORKS disciplines.
BEM CIRCULAR NO.004 FOR SUPERVISION 1) Only PEPC submit building plans.
OF CONSTRUCTION WORKS
2) Only submitting person i.e. PEPC or person
authorised by him to supervise. But only
PEPC to certify completion of construction
works.
3) When another engineer PEPC taking over, he
is to ensure all works are properly done
before certify completion.
BEM CIRCULAR NO.006 FOR ENGINEER’S 1) The following SI requirement is evidence
RESPONSIBILITY FOR SUBSURFACE that soil bearing capacity must be drawn
INVESTIGATION from field and laboratory tests.
BEM CIRCULAR NO.007 FOR PEPC 1) Need to complete all the Gs form (G1-G21)
ENDORSEMENTS ON CERTIFICATE OF fully certified by the respective Submitting
COMPLETION AND COMPLIANCE (CCC) AND Persons (SP) or PSP.
FORM Gs
2) UBBL define PSP as the Qualified Person
who can be a Professional Architect,
Professional Engineer with Practising
Certificate (PEPC) or Registered Building
Draughtsman authorized to submit Building
Plan.
BEM CIRCULAR NO.009 FOR SUBMISSION OF 1) All Professional Engineers with Practising
BUILDING PLANS BY PROFESSIONAL Certificate that a Joint Committee had been
ENGINEERS WITH PRACTISING established between the BEM and BAM to
CERTIFICATE AND ARCHITECTS review and update Appendices A, B and C
with regards to submission of building plans
by PE with PC and Architects.