Maintenance Organization Exposition (Moe) : Prepared By: Faisal Niaz

You might also like

Download as doc, pdf, or txt
Download as doc, pdf, or txt
You are on page 1of 13

Princely Jets (Private) Limited Part 0

(Engineering) INTRODUCTION

MAINTENANCE ORGANIZATION EXPOSITION (MOE)


(PCAA ANO-145)

APPROVAL RECORD

SIGNATURE DATE

Prepared by: Faisal Niaz


Chief Engineer ___________________ _______________
Princely Jets (Pvt) Ltd

Reviewed by: Col (R) Sayed Mukhtar Asif


GM Quality Assurance ___________________ ___________________
Princely Jets (Pvt) Ltd

Approved by: Engr. Imran Ayaz


Additional Director Airworthiness ___________________ ___________________
Pakistan Civil Aviation Authority

PCAA Approval
Revision No: 00No.
PCAA ANO-145, Approval
Originated by: General Ref No.Quality
Manager PCAA.145.009
Assurance

CONTROLLED DOCUMENT # PJ/QA/MOE/


ISSUE-02, REV-00
Dated: 20th November, 2020

Head Office Apron Office Helicopter Wing


No. 10, 2nd Floor, Services Club In front of Hard Stand No. House No: 31 Street No. 77
Extension Building, Merewether 74 Apron Area Jinnah Sector G-13/2, Islamabad
Road, Karachi- 75520 International Airport, Karachi. Tel #: 92-51-2306770
Tel #: 92-21-35674230 Tel #: 92-21-34604933 Fax No. 92-51-5766630
Fax No: 92-21-35674233 Fax No. 92-21-35674233

Issue-02, Rev-00
Maintenance Organization Exposition Page 1 of 13
Dated: 20th November, 2020
Princely Jets (Private) Limited Part 0
(Engineering) INTRODUCTION

0.1 TABLE OF CONTENTS


Part 0 General
0.1 Table of Contents ---------------------------------------------------------------------------------------------------------------- 2
0.2 List of effective pages ----------------------------------------------------------------------------------------------------------- 4
0.3 List of Issues/Amendments-------------------------------------------------------------------------------------------------- 7
0.4 Distribution List --------------------------------------------------------------------------------------------------------------- 11
0.5 MOE Structure-------------------------------------------------------------------------------------------------------------------- 12
0.6 Cross Reference table – PCAA ANO 145------------------------------------------------------------------------------------ 13
0.7 Definitions---------------------------------------------------------------------------------------------------------------------------- 14
0.8 Abbreviations -------------------------------------------------------------------------------------------------------------------- 15

Part 1 MANAGEMENT
1.1 Corporate Commitment by the Accountable Manager-------------------------------------------------------------------------- 2
1.2 Quality & Safety Policy----------------------------------------------------------------------------------------------------------------- 3
1.3 Management Personnel----------------------------------------------------------------------------------------------------------------- 4
1.4 Duties & responsibility of the Management Personnel ------------------------------------------------------------------------ 6
1.5 Management Organization Chart--------------------------------------------------------------------------------------------------- 13
1.6 List of Certifying Staff-------------------------------------------------------------------------------------------------------------------- 14
1.7 Manpower Resources------------------------------------------------------------------------------------------------------------------ 15
1.8 Facilities------------------------------------------------------------------------------------------------------------------------------------ 18
1.9 Scope of work----------------------------------------------------------------------------------------------------------------------------- 22
1.10 Notification Procedure to the PCAA regarding changes to the organization’s-------------------------------------- 24
Activities/approval/location/personnel
1.11 Exposition Amendment Procedures --------------------------------------------------------------------------------------------- 25

Part 2 MAINTENANCE PROCEDURES


2.1 Supplier Evaluation and Subcontract Control Procedures------------------------------------------------------------ 2
2.2 Acceptance/Inspection of aircraft Components and Material from Outside Contractors ---------------------- 4
2.3 Storage, Tagging, and Release of Aircraft Components and Material to Aircraft Maintenance------------------ 8
2.4 Acceptance of Tools and Equipments ----------------------------------------------------------------------------------------- 16
2.5 Calibration of Tools and Equipments----------------------------------------------------------------------------------------- 17
2.6 Use of Tooling and Equipment by Staff (including alternate tools) --------------------------------------------------- 20
2.7 Cleanliness standards of Maintenance Facilities ------------------------------------------------------------------------- 21
2.8 Maintenance Instructions and Relationship to Aircraft/ Aircraft Component Manufacturers’
Instructions Including Updating and Availability to Staff ------------------------------------------------------------------------- 22
2.9 Repair Procedure ----------------------------------------------------------------------------------------------------------------- 24
2.10 Aircraft Maintenance Program Compliance----------------------------------------------------------------------------- 25
2.11 Airworthiness Directives Procedure -------------------------------------------------------------------------------------- 26
2.12 Optional Modification Procedures----------------------------------------------------------------------------------------- 27
2.13 Maintenance Documentation in Use and its Completion------------------------------------------------------------- 28
2.14 Technical Records Control ---------------------------------------------------------------------------------------------------- 33
2.15 Rectification of Defects Arising During Base Maintenance ------------------------------------------------------------ 34
2.16 Release to Service Procedures ----------------------------------------------------------------------------------------------- 35
2.17 Records for the Operator------------------------------------------------------------------------------------------------------- 38
2.18 Reporting of defects to PCAA/Operator/Manufacturer ---------------------------------------------------------------- 39
2.19 Return of Defective Aircraft Components to Store ---------------------------------------------------------------- 40

Issue-02, Rev-00
Maintenance Organization Exposition Page 2 of 13
Dated: 20th November, 2020
Princely Jets (Private) Limited Part 0
(Engineering) INTRODUCTION

2.20 Defective Components to Outside Contractors--------------------------------------------------------------------- 41


2.21 Control of Computer Maintenance Record System -------------------------------------------------------------- 42
2.22 Control of Man-Hour Planning Versus Scheduled Maintenance Work -------------------------------------- 43
2.23 Control of Critical Tasks -------------------------------------------------------------------------------------------------- 44
2.24 Reference to Specific Maintenance Procedures -------------------------------------------------------------------- 47
2.25 Procedures to Detect and Rectify Maintenance Errors------------------------------------------------------------ 48
2.26 Shift / Task Handover Procedures-------------------------------------------------------------------------------------- 50
2.27 Procedures for Notification of Maintenance Data Inaccuracies and Ambiguities--------------------------- 51
2.28 Production Planning Procedures ---------------------------------------------------------------------------------------- 52

Part 3 QUALITY SYSTEM PROCEDURES


3.1 Quality Audit of Organization Procedures ------------------------------------------------------------------------------------- 2
3.2 Quality Audit of Aircraft------------------------------------------------------------------------------------------------------------- 5
3.3 Quality Audit Corrective Action Procedure ---------------------------------------------------------------------------------- 7
3.4 Certifying Staff Qualification and Training Procedure -------------------------------------------------------------------- 9
3.5 Certifying Staff Records ---------------------------------------------------------------------------------------------------------- 15
3.6 Quality Audit Personnel ------------------------------------------------------------------------------------------------------------- 16
3.7 Qualifying Inspectors ------------------------------------------------------------------------------------------------------------- 18
3.8 Qualifying Mechanics-------------------------------------------------------------------------------------------------------------- 19
3.9 Aircraft Maintenance Tasks Exemption Process Control --------------------------------------------------------------- 20
3.10 Concession Control For Deviation from Organization’s Procedures ------------------------------------------------- 21
3.11 Qualification Procedure for Specialized Activities Such as NDT, Welding etc. ----------------------------------- 22
3.12 Control of Manufacturers and Other Maintenance Working Teams ------------------------------------------------ 23
3.13 Human Factors Training Procedure----------------------------------------------------------------------------------------------- 24
3.14 Competence Assessment of Personnel ------------------------------------------------------------------------------------ 28
3.15 Procedure for On-the-Job Training (OJT) ---------------------------------------------------------------------------------------- 29
Intentionally Left Blank -------------------------------------------------------------------------------------------------------------------- 31
Intentionally Left Blank --------------------------------------------------------------------------------------------------------------------- 32
Intentionally Left Blank ------------------------------------------------------------------------------------------------------------------ 33

Part 4 CONTRACTED OPERATOR


4.1 Contracting Operators ---------------------------------------------------------------------------------------------------- 2
4.2 Operator Procedures/Paperwork --------------------------------------------------------------------------------------- 2
4.3 Operator Record Completion --------------------------------------------------------------------------------------------- 2

Part 5 APPENDICES
5.1 Sample of Documents -------------------------------------------------------------------------------------------------------------- 2
5.2 List of Sub-Contractors ----------------------------------------------------------------------------------------------------- 5
5.3 List of Line Maintenance Locations --------------------------------------------------------------------------------------- 6
5.4 List of PCAA Approved Contracted Organizations --------------------------------------------------------------------- 7
5.5 List of Certifying Staff ------------------------------------------------------------------------------------------------------ 8
5.6 Attached Annexures ----------------------------------------------------------------------------------------------------------- 9
5.7 Sample Forms ---------------------------------------------------------------------------------------------------------------- 25

Part 6 RESERVED

Issue-02, Rev-00
Maintenance Organization Exposition Page 3 of 13
Dated: 20th November, 2020
Princely Jets (Private) Limited Part 0
(Engineering) INTRODUCTION

0.2LIST OF EFFECTIVE PAGES PART 2 MAINTENANCE PROCEDURES


MOE Page No Issue Revision Issue Date Revision Date
Chapter
2 1 of 53 02 00 20th Nov, 2020 NIL
PART 1 MANAGEMENT 20th Nov, 2020
MOE Chapter Page No Issue Revision Issue Date Revision Date 2.1 2 of 53 02 00 NIL
th
3 of 53 02 00 20th Nov, 2020 NIL
1 1 of 25 02 00 20 Nov, 2020 NIL
2.2 4 of 53 02 00 20th Nov, 2020 NIL
1.1 2 of 25 02 00 20th Nov, 2020 NIL
1.2 3 of 25 02 00 20th Nov, 2020 NIL 5 of 53 02 00 20th Nov, 2020 NIL
1.3 4 of 25 02 00 20th Nov, 2020 NIL . 6 of 53 02 00 20th Nov, 2020 NIL
5 of 25 02 00 20th Nov, 2020 NIL 7 of 53 02 00 20th Nov, 2020 NIL
1.4 6 of 25 02 00 20th Nov, 2020 NIL 2.3 8 of 53 02 00 20th Nov, 2020 NIL
7 of 25 02 00 20th Nov, 2020 NIL 9 of 53 02 00 20th Nov, 2020 NIL
8 of 25 02 00 20th Nov, 2020 NIL 20th Nov, 2020
10 of53 02 00 NIL
9 of 25 02 00 20th Nov, 2020 NIL
11 of 53 02 00 20th Nov, 2020 NIL
10 of 25 02 00 20th Nov, 2020 NIL
12 of 53 02 00 20th Nov, 2020 NIL
11 of 25 02 00 20th Nov, 2020 NIL
12 of 25 02 00 20th Nov, 2020 NIL 13 of 53 02 00 20th Nov, 2020 NIL
1.5 13 of 25 02 00 20th Nov, 2020 NIL 14 of 53 02 00 20th Nov, 2020 NIL
1.6 14 of 25 02 00 20th Nov, 2020 NIL 15 of 53 02 00 20th Nov, 2020 NIL
1.7 15 of 25 PART 5 APPENDICES
02 00 20th Nov, 2020 NIL 2.4 16 of 53 02 00 20th Nov, 2020 NIL
MOE Chapter Page16 of
No 25 Issue02 Revision
00 Issue20th Date
Nov, 2020 NIL
Revision Date 2.5 17 of 53 02 00 20th Nov, 2020 NIL
th
5 1 of1757of 25 02 02 00 00 20 20
th
Nov, Nov,
20202020 NILNIL 18 of 53 02 00 20th Nov, 2020 NIL
PART 5.1
1.8 4 CONTRACTED
2 of1857of 25OPERATORS
02 02 00 00 20th20
th
Nov, Nov,
20202020 NILNIL 20th Nov, 2020
1957of 25 02 02 00 00 20 th
Nov, 2020
19 of 53 02 00 NIL
MOE Chapter 3 of
Page No Issue Revision 20
Issue
th
Nov,
Date
th
2020 NILNIL Date
Revision 2.6 20 of 53 02 00 20th Nov, 2020 NIL
4 of2057of 25 02 02 00 00 20th20 Nov, Nov,
20202020 NILNIL
21 of 25 02 th 2.7 21 of 53 02 00 20th Nov, 2020 NIL
5.2 5 of 57 02 00 00 20thth20
Nov, Nov,
20202020 NILNIL
4
1.9 1 of of
2 25 02 00 20 th20Nov,Nov,
th
2020 NILNIL 2.8 22 of 53 02 00 20th Nov, 2020 NIL
5.3 6 of2257 02 02 00 00 20th Nov, 20202020 NIL
4.1 2 of 2of 25 02 00 20 th20Nov,
th
2020 NILNIL 20th Nov, 2020
5.4 7 of2357 02 02 00 00 20th Nov, Nov,
20202020 NIL 23 of 53 02 00 NIL
4.1
1.10 2 of 2of 25 02 00 20 th20Nov,
th
2020 NILNIL
5.5 8 of2457 02 02 00 00 20th Nov, Nov,
20202020 NIL 2.9 24 of 53 02 00 20th Nov, 2020 NIL
4.1
1.11 2 25
of 2of 25 02 02 00 20 th20Nov,
th
2020 NILNIL
9 of 57 02 00 00 20 Nov, Nov,
20202020 NIL 2.10 25 of 53 02 00 20th Nov, 2020 NIL
10 of 57 02 00 20th Nov, 2020 NIL 2.11 26 of 53 02 00 20th Nov, 2020
11 of 57 02 00 20th Nov, 2020 NIL 2.12 27 of 53 02 00 20th Nov, 2020
12 of 57 02 00 20th Nov, 2020 NIL 20th Nov, 2020
2.13 28 of 53 02 00
13 of 57 02 00 20th Nov, 2020 NIL
29 of 53 02 00 20th Nov, 2020
14 of 57 02 00 20th Nov, 2020 NIL
30 of 53 02 00 20th Nov, 2020
15 of 57 02 00 20th Nov, 2020 NIL
16 of 57 02 00 20th Nov, 2020 NIL 31 of 53 02 00 20th Nov, 2020
5.6 17 of 57 02 00 20th Nov, 2020 NIL 32 of PART
53 026 RESERVED
00 20th Nov, 2020
18 of 57 02 00 20th Nov, 2020 NIL 2.14 33 of 53 02 00 20th Nov, 2020
19 of 57 02 00 20th Nov, 2020 NIL 2.15 34 of 53 02 00 20th Nov, 2020
20 of 57 02 00 20th Nov, 2020 NIL 2.16 35 of 53 02 00 20th Nov, 2020
21 of 57 02 00 20th Nov, 2020 NIL
36 of 53 02 00 20th Nov, 2020
22 of 57 02 00 20th Nov, 2020 NIL
37 of 53 02 00 20th Nov, 2020
23 of 57 02 00 20th Nov, 2020 NIL
2.17 38 of 53 02 00 20th Nov, 2020
24 of 57 02 00 20th Nov, 2020 NIL
2.18 39 of 53 02 00 20th Nov, 2020
25 of 57 02 00 20th Nov, 2020 NIL
2.19 40 of 53 02 00 20th Nov, 2020
26 of 57 02 00 20th Nov, 2020 NIL
27 of 57 02 00 20th Nov, 2020 NIL 2.20 41 of 53 02 00 20th Nov, 2020
28 of 57 02 00 20th Nov, 2020 NIL 2.21 42 of 53 02 00 20th Nov, 2020
29 of 57 02 00 20th Nov, 2020 NIL 2.22 43 of 53 02 00 20th Nov, 2020
30 of 57 02 00 20th Nov, 2020 NIL 2.23 44 of 53 02 00 20th Nov, 2020
31 of 57 02 00 20th Nov, 2020 NIL 45 of 53 02 00 20th Nov, 2020
32 of 57 02 00 20th Nov, 2020 NIL
46 of 53 02 00 20th Nov, 2020
33 of 57 02 00 20th Nov, 2020 NIL
2.24 47 of 53 02 00 20th Nov, 2020
34 of 57 02 00 20th Nov, 2020 NIL
35 of 57 02 00 20th Nov, 2020 NIL 2.25 48 of 53 02 00 20th Nov, 2020
36 of 57 02 00 20th Nov, 2020 NIL 49 of 53 02 00 20th Nov, 2020
37 of 57 02 00 20th Nov, 2020 NIL 2.26 50 of 53 02 00 20th Nov, 2020
38 of 57 02 00 20th Nov, 2020 NIL 2.27 51 of 53 02 00 20th Nov, 2020
39 of 57 02 00 20th Nov, 2020 NIL 2.28 52 of 53 02 00 20th Nov, 2020
40 of 57 02 00 20th Nov, 2020 NIL 20th Nov, 2020
53 of 53 02 00
41 of 57 02 00 20th Nov, 2020 NIL
5.7
42 of 57 02 00 20th Nov, 2020 NIL MOE Issue-02, Revision-00, dated 20th November, 2020
43 of 57 02 00 20th Nov, 2020 NIL MOE internal Review by the Organization
44 of 57 02 00 20th Nov, 2020 NIL
45 of 57 02 00 20th Nov, 2020 NIL
46 of 57 02 00 20th Nov, 2020 NIL
Reviewed by: Col (r) Sayed Mukhtar Asif (GM QA)
47 of 57 02 00 Date:
20th Nov, 2020 NIL
48 of 57 02 00 20th Nov, 2020 NIL
th
49 of 57 02 00 20 Nov, 2020 NIL
50 of 57 02 00 20th Nov, 2020 NIL
51 of 57 02 00 20th Nov, 2020 NIL
20th Nov, 2020
52 of 57
53 of 57
02
02
00
00 20th Nov, 2020
NIL
NIL
0.3 List of Issues/ Amendments- Record of Revisions
54 of 57 02 00 20th Nov, 2020 NIL Issue-02, Rev-00
Maintenance
55 of 57 Organization
02 00 Exposition
20th Nov, 2020 NIL Page 4 of 13
56 of 57 02 00 20th Nov, 2020 NIL
Dated: 20th November, 2020
57 of 57 02 00 20th Nov, 2020 NIL
Princely Jets (Private) Limited Part 0
(Engineering) INTRODUCTION

Issue Number Issue Date Revision Revision Date Revision Type Reason for change
Number
1 30th September,2015 00 NIL NIL NIL

1 15th March ,2017 00 NIL Initial Updation of procedures

1 15th March ,2017 01 15th September, 2017 Amendments Change in Nominated Personnel

1 15th March ,2017 02 5th September, 2018 Amendments Amendments in procedures

1 15th March ,2017 03 27th August, 2019 Amendments OJT Procedure Amendment

1 15th March ,2017 04 29th October, 2019 Amendments Inclusion of IIAP for maintenance
of EC-130 B4 helicopters

1 15th March ,2017 05 29th July, 2020 Amendments Enhancement of Scope and
upgradation of facility at IIAP

2 20th November, 2020 00 NIL Amendments Procedural Amendments

0.3.1 Highlights of Amendments


MOE Issue & Issue Date List of MOE Paras
Details of Amendments
Rev # /Revision Date Effective Pages Effected
Issue-01, Rev-00 15th March ,2017 N/A N/A

Issue-01, Rev-01 15th March ,2017/ Part 0 (Pg-1,4,5,6) Title Page, Change in Nominated Personnel (MOE Para 1.3)
15th September, 2017 Part 1 (Pg. 2 &4) 0.2,0.3, 1.1,1.3

Issue-01, Rev-02 15th March ,2017/ Part-0 (Pg. 1 to 6) Title Page, 0.2,0.3, 1.2- Quality & Safety Policy & 1.2.8-Addition of TNA
5th September, 2018 Part-1 (Pg. 2 to 14, 1.1, 1.2,1.2.8, 1.3.5,1.3.5.1- Addition of Deputy Mgr QA
&20 to 22) 1.4,1.5,1.6, 1.3.6,1.3.8&1.3.9- Rephrasing and exclusion of foreign MRO
1.7,1.9.2, 1.10.2, 1.4- Removal of Mgr.QA and CAM
1.11.2, 1.4.2- Change in Qualification requirements for GMQA. Also, removal of MCM
2.1,2.5.4,2.5.8, 2.8, & foreign MROs &1.4.3- Exclusion of foreign MRO
2.9,2.11,2.12, 1.5- Mgr. QA deleted from Organizational Chart
2.13.3.1, 2.13.3.5, 1.6- EASA License equivalence deleted.
2.14,2.20,2.21, 1.6.2- Addition of Competence Assessment Form
2.22,2.23,2.24 1.6.3- Change in review duration for management of lists
2.25,2.26,2.28 1.7- Exclusion of foreign MRO, MCM, and aircraft.
3.1,3.2,3.3,3.4, 1.7.3.1- Blank sample of QA Man-hour plan added
3.5,3.6,3.12, 1.9.2- MCM Para references deleted & 1.10.2- Para reference changed to 1.3.9
3.14, 5.6.2, 1.11.2- Document Reference Nos given.
5.6.3,5.6.4, 2.1.1.2- QA Approved suppliers instead of PCAA Approved suppliers.
5.6.5 2.1.1.3- AVL para added & 2.1.1.3.1- EMAIR and EJME removed
2.1.1.4- JSSI and Jet Care removed.
2.1.2-Contracted/Sub-contracted Paras removed. QA Approved suppliers added
2.1.2.3-Purchase Order details given
2.5.4- QA Approved calibration agencies instead of PCAA Approved.
2.5.8- QA Approved calibration agencies instead of PCAA Approved.
2.9- PJ is not performing any repairs & 2.10- Deleted
2.11.1- Continuing Airworthiness Mgr excluded & 2.12- Foreign MRO removed.
2.13.3.5- Task requiring re-inspection Para included
2.14- Period changed to 3 years & 2.16.1.1- Foreign MRO removed
2.20- Qualifying Inspection added
2.21.1&2.21.2 - Personnel access to CAMP/CESCOM changed.

Issue-02, Rev-00
Maintenance Organization Exposition Page 5 of 13
Dated: 20th November, 2020
Princely Jets (Private) Limited Part 0
(Engineering) INTRODUCTION

2.22.1- CAM changed to CEs. Blank sample of Man-Hour Plan added


2.22.2- Foreign MRO para deleted & 2.22.3- Notify GMQA instead of CEO.
2.23.1Duplicate Inspection process redefined & 2.23.3.4- MOE Para ref changed
2.23.3.5(b)- 8 hours’ time defined for Duplicate Insp
2.24.8- Aircraft and Foreign MRO removed
2.25- CAM removed and CEs mentioned &2.25.6- AWNOT reference added
2.26- Amended to include PJ is not working in shifts&2.27.2- CAM removed
2.28.2- Foreign MRO removed & 3.1.1- Monitoring of Stores added
3.1.2.3- Details of audit report and QA Feedback added
3.1.3.1- Assistant to GMQA added, Scope of Audit amended, qualification of
Inspectors removed and foreign MRO para removed.
3.1.4.2- 10th of following month added and record keeping period 3 years
3.1.4.4- CAM removed
3.2.1- Audit of atleast one aircraft of a product line defined and report retention
period changed to 3 years.
3.2.3- Record keeping period changed to 3 years
3.2.4- Levels defined as per User guide & 3.2.5- New para added
3.3.1- Period changed to 3 years & 3.3.2- Feedback period defined
3.3.3- Assistant to GMQA added & 3.3.4- Written as per user guide
3.4- Whole para rephrased
3.5- Contents of List of CS defined and record keeping changed to 3 years
3.6.1- Assistant to GM QA added & 3.6.2- Manager QA removed
3.6.3- Experience requirements changed to 10 years
3.6.6- Approval is granted by GMQA added
3.6.8- Record retention period changed to 3 years &3.8- N/A
3.12- Foreign team details excluded and paragraph shortened.
3.14- AWNOT reference given, Annex-8 &9 added. Record retention period
3 years
5.6.2- Scope of Audit (Annex-2) & 5.6.6 (Sample CRS form Annex-6)
5.6.3- Certification Privileges of CAT’A’ License Holder added as Annex-3
Para 3.15 5.6.4- Checklist-Quality Audit of PJ Aircraft Annex-4 added
5.6.5- Summary of Activities of PJ QA Dept Annex-5 added & PJ/QA/03
“Competence Assessment Form modified.

Issue-01, Rev-03 15th March ,2017/ Part-3 Title Page, 0.2, Part-0 Page 1 of 12 – Organization’s Control Number amended as PJ/QA/MOE
27th August, 2019 Page 28 & 29 of 35 0.3,1.8 & 1.9 0.1- Page numbers of Part 3 changed
Part-3 3.15- Complete OJT Procedures amended
Page 30 to Title Page,
35-‘intentionally 0.1,0.2,0.3,1.6,
Left Blank’ 1.7,1.8 &1.9

Issue-01, Rev-04 15th March ,2017/ Part-0(Pg.1,4,5,6) 1.8.1.3- New Para added for the inclusion of IIAP.
29th October, 2019 Part-1(Pg. 18,19,23) 1.9- Scope of Work amended to include upto & including 100FH/1year
for EC-130B4 helicopter at IIAP station.

Issue-01, Rev-05 15th March ,2017/ Part-0(Pg. 2, 4, 5,6) 1.6.1.2- Limited to line maintenance removed.
29th July, 2020 Part-1 1.7.1- Upto 1200 FH//48M of EC-130B4 helicopters at I.I.A.P and
(Pg.14,15,18,19,22, Uptil 600FH//24M at J.I.A.P included.
23) 1.7.2- Cessna Citation Bravo removed and TNA Note removed.
1.8.1.3.2- New sub-heading ‘Maintenance Data’ added
1.8.6.3- Engineering Facilities layout (HW-IIAP) changed
1.9.1- Cessna Citation Bravo removed & upto & including 1200hrs./4 years
for EC-130 B4 helicopter at IIAP added.
Note: Stores Procedures (MOE Para 2.2 & 2.3) were approved by PCAA
on 27th Feb, 2020 vide mail no: Ref: JIAP/1052/027/AWAS/I

MOE Issue Issue Date List of Effective MOE Paras


Details of Amendments
& Rev # /Revision Date Pages Effected

Issue-02, Rev-00
Maintenance Organization Exposition Page 6 of 13
Dated: 20th November, 2020
Princely Jets (Private) Limited Part 0
(Engineering) INTRODUCTION

Issue-02, Rev-00 20th Nov, 2020 Part 0 (Pg. 7-10) 0.3.1 A separate table formulated showing brief details of paras amended and
para reference numbers.
Part 0 (Pg. 11) 0.4 Table amended to include ‘Reference of Submission’
0.8 Abbreviations amended to include new definitions
Issue-02, Rev-00 20th Nov, 2020 Part 1 (Pg. 5) 1.3.5 GMQA will be nominating Deputy Mgr.QA, process of nomination
defined. PCAA to be informed in case of absence of CE(FW) for a
Part 1 (Pg. 5) 1.3.6 & 1.3.7 period exceeding 7 days.

Part 1 (Pg. 5) 1.3.8 Job Description review period changed to annually.


JD review process defined
Issue-02, Rev-00 20th Nov, 2020 Part 1 (Pg. 7) 1 .4.2.1 Occurrence Reporting process elaborated- Internal Occurrence form made
(Controlled Form) and process defined for occurrence within
the organization. Quality Manager duties made as per AWNOT-088.

Part 1 (Pg. 9 &10) 1.4.3 Duties defined only

1.4.3.14 Fire proof cabinet is not a requirement of PCAA, and it is our choice,
fire proof cabinet excluded.
Part 1 (Pg. 12) 1.4.5 Job Description review period changed to annually.
Issue-02, Rev-00 20th Nov, 2020 Part 1 (Pg. 15) 1.7.2 Only the personnel strength for both wings written excluding experience
details.
Part 1 (Pg. 17) 1.7.4 Amended as per AWNOT-088

Issue-02, Rev-00 20th Nov, 2020 Part 1 (Pg. 23) 1.9.3 ‘specialized maintenance’ heading made, having details that we don’t
perform BSI and NDT.
1.11 Amended to include upload procedure of approved MOE on AMS
Issue-02, Rev-00 20th Nov, 2020 Part 2 (Pg. 12) 2.3.5 Amended to include Traceability details as traceability should start with
Purchase order, incoming stores inspection, quantity issued etc. A new Form
“Part Issuance Form” (Controlled Form) also made.
Release Documentation: Define ‘sufficient evidence’ and ‘acceptable
standards’ in perspective of the user.
Issue-02, Rev-00 20th Nov, 2020 Part 2 (Pg. 16) 2.4.6 Since we procure parts directly from OEM, so supplier monitoring excluded.
We also take loaned tools (subcontractors), amended to include the detail
that we perform desktop audits after every 2 years
of those subcontractors as part of our supplier monitoring process.
Issue-02, Rev-00 20th Nov, 2020 Part 2 (Pg. 18) 2.5.6 Procedure of finding a missing tool elaborated
Issue-02, Rev-00 20th Nov, 2020 Part 2 (Pg. 22&23) 2.8 Amended in entirety in accordance with AWNOT-088
Issue-02, Rev-00 20th Nov, 2020 Part 2 (Pg. 26) 2.11 Amended to reflect the details that how AD is to be evaluated as per
operator’s perspective. Tools, equipment, training requirements to be
evaluated within scope and check whether a specific AD/SB is applicable or
not
Issue-02, Rev-00 20th Nov, 2020 Part 2 (Pg. 27) 2.12 Amended to include that we will ask for approval from operator instead of
PCAA, hence prior approval of PCAA is not required.
Issue-02, Rev-00 20th Nov, 2020 Part 2 (Pg. 28-32) 2.13 Maintenance Documentation defined. Define the contents of all maintenance
documents and procedure of its completion also elaborated.
Issue-02, Rev-00 20th Nov, 2020 Part 2 (Pg. 39) 2.18 Amended as per AWNOT-088
Issue-02, Rev-00 20th Nov, 2020 Part 2 (Pg. 42) 2.21 Amended as CAMP is not computerized maintenance
record system and we maintain maintenance record only in hard copies.
Issue-02, Rev-00 20th Nov, 2020 Part 2 (Pg. 47) 2.24 Engine Running Procedures amended

Issue-02, Rev-00 20th Nov, 2020 Part 2 (Pg. 49) 2.25.4 Amended the procedure to include a system to detect if any AME does error
during maintenance activity.

Issue-02, Rev-00
Maintenance Organization Exposition Page 7 of 13
Dated: 20th November, 2020
Princely Jets (Private) Limited Part 0
(Engineering) INTRODUCTION

Issue-02, Rev-00 20th Nov, 2020 Part 2 (Pg. 51) 2.27 Amended to include the details of how do we find if maintenance data has
any ambiguity,
who will report, how will he report? and how
do we further notify?

Issue-02, Rev-00 20th Nov, 2020 Part 3 (Pg. 14) 3.4.7 Amend for procedure.
Issue-02, Rev-00 20th Nov, 2020 Part 3 (Pg. 14) 3.4.7.5 Amended to define how to set time for the type of training to be imparted.
Issue-02, Rev-00 20th Nov, 2020 Part 5(Pg. 2) 5.1.1 Table amended to include newly formulated PJ Forms
Issue-02, Rev-00 20th Nov, 2020 Part 5(Pg. 19) 5.6.7 PJ Form renamed to ‘Accepted Vendor List’ (AVL)
Issue-02, Rev-00 20th Nov, 2020 Part 5 (Pg-25) 5.6.11 Addition of PJ Form (PJ/Engg/Internal-Worksheet/(year) as Annex-11
Issue-02, Rev-00 20th Nov, 2020 Part 5 (55-56) 5.7 Revision Date and Rev-No inserted into List of CS, also latest revision of AN-
066 mentioned.

Issue-02, Rev-00
Maintenance Organization Exposition Page 8 of 13
Dated: 20th November, 2020
Princely Jets (Private) Limited Part 0
(Engineering) INTRODUCTION

0.4 DISTRIBUTION LIST


MOE Issue MOE HOLDER Reference of Submission
MOE COPY

01 Director Airworthiness (PCAA)

02 Controller Airworthiness (South)

03 Controller Airworthiness (North)


Issue-02, Rev-00
Dated 20th Nov, 2020 04 Accountable Manager (CEO)

05 General Manager Quality Assurance

06 Chief Engineer (Fixed Wing)

07 Chief Engineer (Helicopter Wing)

08 General Manager (Operations)

09 Safety Manager (Maintenance)

0.5 MOE Structure


Issue-02, Rev-00
Maintenance Organization Exposition Page 9 of 13
Dated: 20th November, 2020
Princely Jets (Private) Limited Part 0
(Engineering) INTRODUCTION

ANO 70(a), GM 145. A. 75(a)

The Princely Jets (PJ) Maintenance Exposition Manual (MOE) “Specifies the scope of work, relevant to the extent of
approval granted by CAA and describes in detail how we intend to comply, ensuring all aspects of safety. Compliance
with this MOE will ensure compliance of PCAA ANO-145.
The engineering branch of PJ is responsible for the maintenance /repair, of company’s fixed and rotary wing aircraft,
registered with PCAA.
This manual besides being a reference document also provides practical guidance to all concerned to perform their
duties and discharge their responsibilities in accordance with the terms of approval granted to PJ by Airworthiness
Directorate of Pakistan Civil Aviation Authority (PCAA).
The manual is divided into following parts: -
Part 0- GENERAL
Part 1- MANAGEMENT
Part 2- MAINTENANCE PROCEDURES
Part 3 - QUALITY SYSTEM PROCEDURES
Part 4 - CONTRACTED OPERATORS
Part 5- APPENDICES
Part 6- RESERVED

Right corner of header gives part number of manual (chapter), and its subject. Page number of chapter, issue number,
revision status and date when page was issued/ amended, are given at the footer. Company name appears on upper left
corner of every page.
The historical background of PJ, its organization, list of personnel and their duties and available maintenance facilities
are covered in detail in this manual. The maintenance procedures, training, Quality, Audits and Human Factor are
described for guidance. Safety Management System is covered in a separate SMSM (Safety Management System
Manual). Aspects related to Quality are covered in detail in Part # 3. Quality Assurance falling in preview of operator are
covered in Maintenance Control Manual (MCM). Continuing Airworthiness Management procedure are given in MCM.
Contracted Maintenance from other local and foreign Maintenance Repair Organizations (MROs) is also included in the
MCM.
All PJ employees are bound to ensure compliance of the manual, which is to be kept updated by following laid down
procedures. PJ Engineering personnel are expected to be fully conversant with those parts of the manual that are
relevant to their respective areas of work. No change / amendment, is incorporated in the manual without the approval
of CAA. Procedures for initiating and incorporating changes are given in the manual. General Manager Quality Assurance
is responsible for maintaining the MOE. It will be reviewed at least once a year or wherever there are changes in
organization, procedures or equipment.

0.6 CROSS REFERENCE TABLE –ANO 145

Issue-02, Rev-00
Maintenance Organization Exposition Page 10 of 13
Dated: 20th November, 2020
Princely Jets (Private) Limited Part 0
(Engineering) INTRODUCTION

ANO.145 Requirements MOE, Procedure Remarks


(paragraphs)
A.20 Term of Approval 1.9
A.25 Facility Requirement 1.8, 2.3.4.1, 2.3.4.2
A.30 Personal Requirement 1.7, 1.4, 1.1, 1.3, 2.22
3.4, 3.7, 3.8, 3.13, 3.4.5
A.35 Certifying and Support Staff 1.6, 1.7.2, 3.4.5, 3.7, 3.13
A.40 Equipment, tools and Material 2.4, 2.5
A.42 Acceptance of Components 2.3, 2.19, 2.20, L2.6
A.45 Maintenance Data 2.8, 2.9, 2.10, 2.12, 2.27
A.47 Production Planning 2.26, 2.28, L2.7.4
A.50 Certification of Maintenance 2.16
A.55 Maintenance Record 2.14, 2.17, 2.21
A.60 Occurrence Reporting 2.25, 2.18.1
A.65 Safety & Quality Policy 1.2, 2.4, 2.5, 2.6, 2.7, 2.8, 2.11, 2.12, 2.14, 3.1,
3.2, 3.3, 3.6, 3.9, 3.10, 3.12
A.70 Organization 0.5, 1.1, 1.2, 1.3, 1.4, 1.5, 1.6, 1.7, 1.8, 1.9,
1.10, 1.11, 2.8, 2.10, 2.13, 2.14,2.17,2.25, L2.1,
3, 4.1, 5.2
A.75 Privileges of Organization 2.16.4, L2.1.1, 5.4
A.80 Limitation of Organization 1.9
A.85 Changes to Organization 1.10
A.90 Continued Validating 1.1
A.95 Findings 3.3.4

Issue-02, Rev-00
Maintenance Organization Exposition Page 11 of 13
Dated: 20th November, 2020
Princely Jets (Private) Limited Part 0
(Engineering) INTRODUCTION

0.7 Definitions

Refer to latest revision of ANO-145-AWRG, Para ANO-145. A.1 and latest revision of AWNOT-017-AWRG-3.0 dated 30 th
December 2016.

0.8 ABBREVIATIONS
Issue-02, Rev-00
Maintenance Organization Exposition Page 12 of 13
Dated: 20th November, 2020
ADs Airworthiness Directive
Princely Jets (Private) Limited Part 0
(Engineering) AFM Airplane Flight Manual INTRODUCTION
AME Aircraft Maintenance Engineer
AMEL Aircraft Maintenance License
AMM Aircraft Maintenance Manual
AMP Aircraft Maintenance Program
AMS Airworthiness Management System
ANO Air Navigation Order
A/C Aircraft
AOC Air Operator Certificate
AOG Aircraft on Ground
APU Auxiliary Power Unit
ASSL Aircraft Sales and Services Limited
ATPL Air Transport Pilot License
AVL Accepted Vendor List
AWNOT Airworthiness Notice
AWL Aircraft Wiring List
BSI Boroscopic Inspection
C of A Certificate of Airworthiness
C of FF Certificate of fitness for flight
C of MR Certificate of Maintenance Review
C of R Certificate of Registration
CAR-94 Civil Aviation Rules-94
CAMP Computerized Aircraft Maintenance Program
CAT Category
CC Certificate of Compliance
CDCCL Critical Design Configuration Control Limitation
CE Chief Engineer
CEO Chief Executive Officer
CG Centre of Gravity
CL Check-List
CMM Component Maintenance Manual
CP Chief Pilot
CPL Commercial Pilot License
CRS Certificate of release to Services
CS Certifying Staff
CT Continuation Training
EASA European Union Aviation Safety Agency
ELT Emergency Locator Transmitter
EMM Engine Maintenance Manual
EM Exposition Manual
EWIS Electrical Wiring Interconnection System
EZAP Enhanced Zonal Analysis Procedure
FAA Federal Aviation Administration
FADEC Full Authority Digital Engine Control
FCOM Flight Crew Operational Manual
FCTM Flight Crew Training Manual
FTS Fuel Tank Safety
FMS Flight Management System
FOM Flight Operational Manual
Issue-02, Rev-00
Maintenance OrganizationFSO
Exposition Flight Safety Officer
Page 13 of 13
FW Fixed Wing Dated: 20th November, 2020

You might also like