SUBJECT: PROFESSIONAL PRACTICE 1- BUILDING LAWS

Due : June 25, 2021


Items: 100 points

FINAL EXAM IN PROF PRAC 1


Instructions: Read the given problems given carefully. Answer the
questions by encircling or highlighting your answer based on the
gathered data. In the occasion that there is conflict with the
numerical value and written word, the written word prevails.

Intended to serve common needs and for the benefit of the community
and multi-purpose center.

a. Park c. Parks & Play grounds

b. Community Facilities d. Open space

For Apartment construction drawings, a rule of thumb on drawing


elevators?

a. 1:150 c. 1:50

b. 1:120 d. 1:20

A court bounded on three sides by building lines with one (1) side
by another open space whether public or private.

a.Inner court c. Open court

b. Court d. Courtyard

It is a dwelling for one family which is completely surrounded by


permanent open spaces, with independent access, services, and use of
land.

a. R1 c. Single attached

b. Single detached d. Residential

As per code what is the minimum size of parallel parking slot? (Part
of design)

a.2.50 x 5.00 mts. c. 3.00 x 6.00 mts

b. 2.05 x 6.00 mts. d. None of the above

As per code what is the standard size of truck?

a. 3.00 x 9.00 mts. c. 3.60 x 18.00 mts.


b. 3.60 x 12.00 mts. d. None of the above

It is the circulation of fresh air through open windows, door, or


other openings on opposite sides of a room

a. Active cooling c. Passive cooling

b. Cross ventilation d. Air circulation

How many hours does the Firewall have?

a. 1 Hour c. 1.5 Hours

b. 2 Hours d. 3 Hours

As per code Foundation may be permitted to encroach into public


sidewalk areas to a width not exceeding.

a. 1000mm c. 500 mm.

b. 300mm d. 530mm

Height for electrical Device for PWD.

a. .50-1.30mts. c. 1.00mts-1.30mts.

b.0.90-1.10mts. d. 1.20mts.-1.50mts.

What is the minimum length of a rectangular table good for 8


persons?

a. 1.30mts. c. 1.40mts,

b.1.10mts. d. 1.20mts.
A stage wherein the architect must prepare schematic design studies
and conceptual analysis of the project:

Design Development Phase


Schematic Design Phase
Contract Document Phase
Construction Phase
Any person, entity, public or private, Filipino or foreigner, who
shall force an architect to perform any service under the general
practice of architecture, without executing a written contract
agreement is guilty of misdemeanor and is sentenced to a fine of not
less than:

P 100,000.00
P 200,000.00
P 1,000,000.00
P 2,000,000.00
What will be the role of a Filipino counterpart should a foreign
national gain entry to the Philippines to perform professional
services as an architect or consultant?

Architect-of-Record
Consulting Architect
Architect in Charge of Construction
Design Consultant
When the Owner fails to implement the plans and documents for
construction as prepared by the Architect, the Architect is entitled
to receive as compensation the sum corresponding to ___ (%) percent
of the Architect’s fee.

70%
80%
90%
95 %
Generally, who is responsible in applying building permit?

Architect
Owner
Contractor
Subcontractor
Standards and technical requirements for economic and socialized
housing projects in rural and urban areas?

PD 957
PD 1185
BP 220
BP 344
It is the systematic dismantling or destruction of a building.

a.Repair c. Destruction

b. Demolition d. None of the choices

19. How much will you get if the client decides to include
architectural interiors in your service?
a. 10% c. 12%
b. 15% d. 10% plus reimbursable
expenses

20. Under BP 344, what is the inside dimensions of an elevator car?


1.10m W x 1.20m D
1.20m W x 1.40m D
1.10m W x 1.40m D
1.20m W x 1.20m D

21. Under PD 1096, minimum dimension for a habitable area?


1.5m
2.0m
3.0m
6.0m

You recently passed the board, and you’ve gotten your licensed as an
architect, which of the following is unethical for you to do?
Steal fellow architect’s intellectual properties
Take a project from fellow architect who was already commissioned to
do the work
Punch the boastful architect
All of the above
How much is the Minimum basic fee from the PCC for Monumental
Buildings?
a.12%
b. 10%
c. 15%
d. 25%

What law protects the Architect form the reproduction of copies of


the contract?
a. Intellectual Property c. All rights reserved
b. Copy Rights d. Trade Mark

24. Who is responsible for the fee of an additional Full-time


Supervisor at the Project?
a. Architect c. Constructor
b. Owner d. Sub-constructor

Situation (76-78) Mr. Brendon wants to build a rest house in his lot
at Talisay City, Cebu. He talked with his friend, Mr. Canton about the
project. His daughter, Jhemmy, also recommended an Interior Designer,
Mr. Desu Aigo. However, while browsing a magazine, Mr. Brendon learned
about Architect Jan, who also happens to be an Interior Designer at
the same time.

25. What is the best method for Mr. Brendon to select the designers?
a. Open Design Competition c. Comparative Selection
b. Closed Design Competition d. None of the above
27. Why is it best to select Architect Jan?
a. He can get a discount on ID services
b. It’s not best to choose Architect Jan since Brendon doesn’t
know this guy.
c. Architect Jan can best interpret the architectural drawings
for the interior design.
d. Select both architects so that it would be fair for both.
28. If architect Jan is hired, how will he be compensated?
a. MDPE
b. 10% architect’s regular rate + 12% ID’s discounted rate
c. 10% architect’s regular rate + 15% for ID’s regular rate
d. 10% architect’s regular rate + 10% for ID’s regular rate

29. In the following list, which does not constitute the post-
construction services of the architect?
a. building/equipment maintenance
b. real property evaluation
c. building administration
d. post-construction evaluation
30. What is the standard width of a standard-size bed?
a. 0.90m c. 0.60m
b. 1.10m d. 1.20m
31. It refers to person, firm, or corporation providing guarantee for
contractor’s bonds?

a. Proposal c. Bidder
b. Guarantor d. Surety

Situation A(32-44): An architect administered apprentice A & B to be


working for a 3-storey residence, apprentice A being the site
supervisor and apprentice B in-charge of doing the production of
working drawings, as the project for a design-build project. The
architect was so busy with his other projects and that he trusted
everything to both apprentice A & B. Upon the progress of the project,
work went well until the architect found out that there was part of
the house that was not followed as per plan because of some
discrepancies that were present in the construction drawings.
32. Whose fault is it?
a. Apprentice A for not informing that there were discrepancies in
the drawings.
b. Apprentice B for producing drawings with discrepancies.
c. The architect for not giving time to check the works of his
apprentice.
d. The client, for not inspecting the project.
33. What would be the architect’s action on the initial stage of this
scenario?
a. The architect should have looked over the works of his
apprentices before implementing any action in the site.
b. The architect should have placed more apprentices to look over
the project.
c. The architect should have left the other project and concentrate
on this one.
d. The apprentices should have told the architect ahead of time that
they can’t handle the scope of work given to them.
34. To whom are apprentices A & B civilly liable?
a. To the architect
b. To the client
c. To the contractor
d. Not among the choices
35. In this project, who is responsible for obtaining a Certificate of
Occupancy upon completion of the project?
a. architect
b. engineer
c. book keeper
d. owner
36. On this project, how many percent should the architect charge?
a. 10% of PCC
b. 10% plus the charge for design-build services
c. 10% plus the contract amount
d. 10% plus the supervision fee and contract amount
37. Who gives the directive to start the project?
a. engineer
b. architect
c. owner
d. contractor
38. For this design-build project, who keeps the record on site?
a. owner
b. architect
c. contractor
d. book keeper
Situation: (94-95) A family of architects and engineers plans to set-
up and architectural company to cater architectural services.
39. What percentage of share should the architect have?
a. 75%
b. 85%
c. 70%
d. 90%
40. For whom they would register their business first?
a. SEC
b. DTI
c. Mayor’s office
d. PRC
Situation (96-99) An Architect drew up plans for a family... the
owners went abroad after a year, the owner returned but instructed the
architect to help them find a new lot, the task would entail the
architect's personal time.
96. What stage in the Architect's services will the Architect perform?
a. Pre-design Services c. Regular Design Services
b. Comprehensive Archt'l Services d. Specialized Allied
Services
41. What will be the ideal method of compensation that the Architect
should
use if he is to find a new site for the project?
a. Percentage of Construction Cost c. MDPE
b. Per diem plus reimbursable expenses d. Lump sum inclusive of
arch fee
42. What can the Architect suggest to the owners to minimize spending?
a. Buy a New House b. Buy Existing House & Lot
c. Buy a New Lot then repair
d. Buy Existing House
43. How much is the Architect compensated after he completed all plans
and documents for construction?
a. 65%
b. 75%
c. 90%
d. 80%
Situation: Mr. A wants to build a rest house in his lot at
Minglanilla. He talked with his friend, Mr. B about the project. Jem's
daughter also recommended Interior Designer B to her mom. However,
while browsing a magazine, he learned about Architect C, who also
happens to be an Interior Designer at the same time.

44. What is the best method for him to select the designers?
a. Select Ron, a friend b. Comparative Selection
c. Design Competition d. None

45-74. For 30 points explain the different practice of Architects in


Construction.

75-94. For 20 points explain the role of a Civil Engineer in the


construction projects.