Submittal Item

Submittal Item

Project [BP-1A-02] - Msheireb Downtown Doha Project - Phase 1A View Date  6/5/2012


Sub&Super Structure

Hyundai Engineering & Construction Co.

Submittal Item No.  BP-1A-


02-3863

General Information

Item No. BP-1A-02-3863 Revision 3


Package No. Rev. BP-1A-02-4004.3
Description WMS-A-041 R.3 and ITP-A-041 R.3 for Field Installation of STO VENTEC System in DA and AG
CSI Code 07 24 13 - Polymer-Based Exterior Insulation and Finish Submitting Company Hyundai Engineering & Construction
System  Co.
Doc. Spec. Or BOQ Page 072413-Part 3 Copies Required
Status Requested Item Type Method Of Statement
Responsible Team Member Sang-Lak Chung  (Hyundai Engineering & Construction Co.)
Item Notes

Diwan Annex and Amiri Guard Building

Subcontractor: QE

Primary Response
Submission Notes
Review Notes

Dates

Required On Site (E1) 24/6/2011 Required Lead Time (days) 46


Approved Submittal Required By 9/5/2011 Required Review Time 14
(E1) (days)
Submission Due (E1) 25/4/2011  

EI No.
Activity Code E10650
Micro Schedule Activity ID
BLDG DA/AG
AREA
LEVEL
Submitted Date 2/5/2012
Discipline Architectural
Sub Contractor Qatar EIFS
Compliance: Specification Division 07, Specification Section 072413 Polymer-Based Exterior Insulation and Finish System Part 3
Requirement
Compliance: Contractor Complete WMS/ITP issued with submission
Proposal
Compliance: Remarks Work Method Statement and Inspection & Test Plan are in full compliance with the specifications. 

Also refer to attached Responded RFI-0966 for the BMD’s Confirmation regarding to the Proposed STO System

Please be informed that this WMS&ITP R.2 was previously approved on 22 Oct 2011.  Accordingly, we have just instructed to
resubmit the aforesaid document on the basis to incorporate the insulation fixing; in which was reflected to Approved As Noted
MAR-A-432 R.0 for STO Insulation Fixing DH-T8 dated 30 January 2012 under Sub. Item # 0304527 R.0. 

Given above, please find installation process and our proposal in fixing the thermal insulation at Atrium Area (Please refer to Sheet
No. 13 of 20 in this submittal for the Installation of Approved Thermal Insulation and Accessories for your perusal).

Reflected are as follows:

A. STO Insulation Fixing DH-T8: to secure insulation on place with average of five pieces per m2 on concrete wall or ceiling (i.e.
concrete and block work surface) with a minimum of 20mm anchoring depth.

B. The insulation fixing on parapet sub-framing wall (i.e. Atrium Skylight) will be fixed comprising of L Profile Aluminium
40X50X75mm length installed with facade screw 5.5x19 on T Profile Aluminium or by FP/GP – GP Wall Bracket every 0.6 x 1.0 m
(Please see small mock-up sample based on the aforesaid).

In addition, we intend/propose to use the Approved MAR of L Profile for fixing the insulation in Atrium Area in order to avoid any
penetration to the waterproofing membrane and mechanical fixing is not advisable for use in cementitious board. 

In summary, approved STO Insulation Fixing DH-T8 will be used in concrete and block work substrate and approved L Profile
Aluminum will be used in Atrium Area, i.e to fix the thermal insulation in place.

Acknowledged (E2)
Estimated Quantity (E2)
Unit (E2)

https://secure.constructware.com/Common/View/Document_Display.asp?DocumentType=95&ItemID=42559828[5/6/2012 2:50:45 AM]


Submittal Item

Ordered Quantity (E2)


Reqd. Order Date (E2)
Date Purchase Order Issued
(E2)
Purchase Order No. (E2)
Supplier (E2)
Method Of Shipping (E2)
Shipping Date (E2)
E.D.A. To Site (E2)
A.D.A. To Site (E2)
Lead Time (E2)

Supporting Documents

Document Document Open Description Date Size


Type (KB)
File 01 May 2012_WMS-A-041and ITP-A-041 R.3_for_Field_Installation_of_STO_VENTEC_System_in_DA_and_AG_Building.pdf       01 May 1/5/2012 15969
2012_WMS-
A-041and
ITP-A-041
R.3_for_Fiel...

https://secure.constructware.com/Common/View/Document_Display.asp?DocumentType=95&ItemID=42559828[5/6/2012 2:50:45 AM]


Msheireb Downtown Doha, BP-1A-02, Doc. No. WMS-A-041
Substructure & Superstructure
Works-Phase 1A Rev. No 3

HYUNDAI-HBK Consortium Sheet Sheet : 4 of 20

TITLE : Work Method Statement for Field Installation of Sto Ventec System

1. PURPOSE
To ensure in meeting the target schedule to complete our scope of work on time with extensive quality of
installation for Sto Ventec system on Wall and Ceiling based on the approved detail, plan and specification
stipulated in the contract. QATAR EIFS will be using highly skilled manpower, equipped tools & technical
support complying with the contract’s specification and LEED’s requirements as this to enable client’s utmost
expectation and satisfaction on delivering Quality Performance.

2. SCOPE
Exterior wall and Soffits installation materials:
1) Vapour Barrier Application
2) STO Starter Track Universal
3) Aluminum Bracket with Facade dowel anchor Ejot-SDF-KB-10Vx50-E on Wall and
STO Long Shaft Anchor (Fischer SXS-F US A4 10 x 60) on Ceiling
4) Zinc-Tin Alloy Stainless Steel Type 304 Flashing
5) Thermal Insulation with Accessories (DH-T8 as Insulation Fixing on Wall and Ceiling;
L-Profile Aluminum 75mm on Sub-frame Wall at Atrium Area
6) T-Profile and L Profile with screw dowel-19x55mm
7) Aluminum Ventilation profile
8) Carrier Board -12mm with self drilling facade screw - 5.5x19mm
9) Sto edge and PVC mesh corner bead
10) STO Roof Vent Profile VE with applied STO Color Top – Black for Ceiling
11) STO Armat Classic / Level Reno with embedment of Sto glass Fibre mesh
12) Stolit K1.5 – Final Finish Coat

Detail of Works:
1. After receiving all approval on documentations, submittals, and coordinated shop
drawings, secure an approval for inspection of available structure.
2. Check surface condition with allowable tolerance on plumbness and alignment.
3. Initiate finding report – QA/QC.
4. After securing checklist approval and coordination with interfacing of work to other
trade – Application of Vapor Barrier on entire available area will be done.
5. Layout drilling of holes for anchor bolt installation.
6. Installation of STO Starter Track Universal and fixing Aluminum bracket with
required spacing (as per approved detail drawing).
7. Installation of Zinc-Tin Alloy coated Stainless Steel Type 304 Flashing (as required
for walls)
8. Install approved Thermal Insulation with Accessories.
9. Installation of T-Brackets,L Brackets and framing accessories.
10. Installation of STO Carrier Board with self drilling screws.
11. Installation of STO Roof Vent Profile VE with applied STO ColorTop (i.e. Black) for
Ceiling/Soffit.
12. Installation of STO Armat classic/ level Reno base coat with embedment of STO
Glass fibre mesh.
13. Application of final finish – Stolit K 1.5 (As per MP and BMD’s Confirmation and
Approval)
Msheireb Downtown Doha, BP-1A-02, Doc. No. WMS-A-041
Substructure & Superstructure
Works-Phase 1A Rev. No 3

HYUNDAI-HBK Consortium Sheet Sheet : 13 of 20

TITLE : Work Method Statement for Field Installation of Sto Ventec System

V. In process (Installation)
EIFS QA/QC initial checking and follow up before installation.
 After the substrate examination and has approval from consultant- QA/QC, an
approved vapour barrier (Nitro Proof 10) will be applied by means of rollers and/or
paint brush.
 Angle clip with anchor bolt (i.e. Sto-Ejot SDF-KB-10VX50-E on Wall and STO Long
Shaft Anchor ‘’Fischer SXS-F US A4 10X60mm’’on Ceiling)
 Installation of Framings (i.e. STO Starter Track Universal, T-profile, L-profile and
Aluminum Ventilation profile) should comply on its spacing requirements and must be
true, plumb and align position prior to receive STO – Carrier Board Installation with
self taping screw with required/specified spacing.
 EIFS-QA/QC will ensure the drilling of holes on the concrete to receive the Facade
screw dowel anchor is complying on the approved shop drawings and the required
Vapor Barrier approved sealing restoration procedure.
 Installation of Zinc-Tin Alloy Stainless Steel Type 304 Flashing (as required and
indicated in the approved coordinated shop drawings)
 Installation of Approved Thermal Insulation and Accessories:
STO Insulation Fixing DH-T8: to secure insulation on place with average of five
pieces per m2 on concrete wall or ceiling (i.e. solid surface) with a minimum of 20mm
anchoring depth.
The insulation fixing on parapet sub-framing wall (i.e. Atrium Skylight) will be fixed
comprising of L Profile Aluminium 40X50X75mm length installed with facade screw
5.5x19 on T Profile Aluminium or by FP/GP – GP Wall Bracket every 0.6 x 1.0 m
(please refer to the attached photograph on the next page).
 Installation of STO – Carrier Board with self taping screw with the required/specified
spacing (i.e. indicated in the approved coordinated shop drawings).
 Installation of corner bead and edge bead as per required shop drawing.
 Installation of expansion joint (as required)
 Installation of STO Roof Vent Profile VE with applied STO Color Top (i.e. BLACK)
for ceiling soffit ONLY.
 Application of Base coat with embedment of fibre mesh to cover entire surfaces of
carrier board.
 QA/QC Inspection shall be performed prior to application of EIFS final finish coat
(i.e. Stolit - K 1.5); to check and verify if there is any irregularities.
 Application of EIFS Finish Coat - Stolit K 1.5
 Application of caulking with backer rod on joint (as required and indicated in the
approved coordinated shop drawings).
Msheireb Downtown Doha, BP-1A-02, Doc. No. ITP-A-041
Substructure & Superstructure Works-
Phase 1A Rev. No. 3

HYUNDAI-HBK Consortium Sheet No. Sht. 11 of 15

TITLE : Inspection & Test Plan for Installation of Sto Ventec System

Check List for Installation of Thermal Insulation

REPORT NO.:___________________________ DATE:_________________

DISCIPLINE:_____________________ SUBCON:______________

LOCATION DESCRIPTION:______________________________

REF.DWG.NO.:__________________________________
ACCEPTED BY
NO. DESCRIPTION OF INSPECTION / TEST REMARKS
SUB HHC OWN
1.0 Concrete Substrate Installation

1.1 Drilling of Holes for Anchor bolts.

Secure Installation with DH-T8


1.2 (Insulation Fixing) on solid wall and
ceiling.

1.3 Installation of Thermal Insulation

2.0 Atrium Area Installation

2.1 Fixing of clip angle

Secure Installation with L-Profile


2.2 (40x50x75mm) Length as Insulation
Fixing on Sub-Frame Wall.

2.3 Installation of Thermal Insulation

NOTE:

Form No. QSP-010/3-2