PT. MADHANI TALATAH NUSANTARA Unit Update tanggal Material Ritasi % HM 0.64 4.18
Construction and Mining Contractors EX-5037 1-Sep-21 Liquid Mud 186 100% 11.00 0.30 1.86 57.80 5.30
ACP Project #051C Night OB 0 0% - 0.39 2.54 63.10
OB Ripping 0 0% - 832,239.74

Trip
Production OB
Date Shift No Unit Start Finish HM Activity NIK Operator jam6 jam7 jam8 jam9 jam10 jam11 jam12 jam1 jam2 jam3 jam4 jam5
Total Material Inpit/Outp Loading Lokasi Front Lokasi Dumping Seam/Ore Truck (BCM)/Production Distance Trip (Inpit) Truck Factor Production OB
Trip it Unit Block Factor Coal (Tons) OB (Inpit)

1-Sep-21 Day EX-2037 22,043.5 22,044.0 0.50 Moving - pindah lokasi kerja 15617 ZAENAL - PIT 5 - - -
1-Sep-21 Day EX-2037 22,044.0 22,049.6 5.60 Setting pompa 15617 ZAENAL - PIT 11 - - -
1-Sep-21 Day EX-2037 22,049.6 22,054.6 5.00 Side casting 15567 ARIF WAHYUDI - PIT 5 EXT - - -
1-Sep-21 Day EX-2058 17,317.0 17,323.0 6.00 Setting pompa 15504 SLAMET WIDODO - PIT 11 - 1,013 -
1-Sep-21 Day EX-2058 17,323.0 17,323.5 0.50 Moving - pindah lokasi kerja 15504 SLAMET WIDODO - PIT 11 - 1,013 -
1-Sep-21 Day EX-2058 17,323.5 17,327.3 3.80 Loading Solid mud 12534 PUJIYANTO - Solid Mud Outpit PIT 5 EXT IPD 10 - - 1,013 - -
1-Sep-21 Day EX-4006 35,177.0 35,177.0 - Unscheduled - PARKIRAN SCANIA - 1,176 -
1-Sep-21 Day EX-5014 38,581.0 38,586.0 5.00 Unit Rental 15616 JOKO SUDIRO - KCP - - -
1-Sep-21 Day EX-5022 11,208.0 11,218.0 10.00 Loading Waste 15604 AHMAD SYAFI'I - OB Outpit PIT 5 EXT IPD 10 - 1,185 -
1-Sep-21 Day EX-5037 18,960.0 18,965.8 5.80 Loading Waste 10914 SETYO BUDI UTOMO - OB Outpit PIT 5 IPD 10 - 1,168 -
1-Sep-21 Day EX-5037 18,965.8 18,971.0 5.20 Loading Liquid Mud 10914 SETYO BUDI UTOMO - Liquid Mud Outpit PIT 5 IPD 10 - 1,168 -
1-Sep-21 Day EX-6014 57,514.0 57,514.0 - Unscheduled - PIT 5 - - -
1-Sep-21 Day EX-6016 44,088.0 44,097.0 9.00 Loading Waste 9136 AHMAD YANI - OB Outpit PIT 5 EXT IPD 10 - 752 -
1-Sep-21 Day EX-6022 18,402.9 18,411.4 8.50 Loading Waste 9864 UJANG FERNANDES GUCIANO - OB Outpit PIT 5 IPD 10 - - -
1-Sep-21 Day TR-3080 42,551.5 42,552.1 0.56 Hauling OB 10881 BURHANUDDIN 2 2 OB Outpit EX-5037 PIT 5 IPD 10 42 84 - 42 -
1-Sep-21 Day TR-3080 42,552.1 42,555.7 3.64 Hauling OB 10881 BURHANUDDIN 3 4 3 3 13 OB Outpit EX-6016 PIT 5 EXT IPD 10 42 546 - 42 -
1-Sep-21 Day TR-3080 42,555.7 42,559.9 4.20 Hauling OB 10881 BURHANUDDIN 2 3 3 3 4 15 OB Ripping Outpit EX-6016 PIT 5 EXT IPD 10 42 630 - 42 -
1-Sep-21 Day TR-3174 41,281.9 41,289.7 7.80 Hauling OB 15229 ARDIANSYAH 4 3 2 4 5 6 5 1 5 35 OB Outpit EX-6022 PIT 5 IPD 10 42 1,470 - 1 42 42
1-Sep-21 Day TR-3175 38,671.0 38,674.0 3.00 Hauling OB 1330 SUTRISNO 4 3 5 3 15 OB Outpit EX-6022 PIT 5 IPD 10 42 630 - 42 -
1-Sep-21 Day TR-3175 38,674.0 38,678.6 4.60 Hauling OB 1330 SUTRISNO 6 5 6 1 5 23 OB Outpit EX-6022 PIT 5 IPD 10 42 966 - 42 -
1-Sep-21 Day TR-3195 24,534.5 24,536.3 1.75 Hauling OB 10762 SYAMSUDDIN 2 4 1 7 OB Outpit EX-5037 PIT 5 IPD 10 42 294 - 42 -
1-Sep-21 Day TR-3195 24,536.3 24,537.0 0.75 Hauling OB 10762 SYAMSUDDIN 2 1 3 OB Outpit EX-6022 PIT 5 IPD 10 42 126 - 42 -
1-Sep-21 Day TR-3195 24,537.0 24,541.5 4.50 Hauling Liquid Mud 10762 SYAMSUDDIN 4 5 3 2 4 18 Liquid Mud Outpit EX-5037 PIT 5 IPD 10 21 378 - 21 -
1-Sep-21 Day TR-3202 26,672.6 26,679.9 7.30 Hauling OB 10882 SABIRIN 4 2 5 4 6 5 4 1 5 36 OB Outpit EX-6022 PIT 5 IPD 10 42 1,512 - 42 -
1-Sep-21 Day TR-3203 26,773.5 26,776.7 3.19 Hauling OB 8892 BAGUS PURWONO 4 2 2 2 10 OB Outpit EX-6016 PIT 5 EXT IPD 10 42 420 - 42 -
1-Sep-21 Day TR-3203 26,776.7 26,781.8 5.11 Hauling OB 8892 BAGUS PURWONO 2 4 3 3 4 16 OB Ripping Outpit EX-6016 PIT 5 EXT IPD 10 42 672 - 42 -
1-Sep-21 Day TR-3204 26,090.5 26,091.2 0.73 Hauling OB 9043 SAMSUL ARIF 1 1 1 3 OB Outpit EX-6016 PIT 5 EXT IPD 10 42 126 - 42 -
1-Sep-21 Day TR-3204 26,091.2 26,092.9 1.70 Hauling OB 9043 SAMSUL ARIF 1 5 1 7 OB Outpit EX-6022 PIT 5 IPD 10 42 294 - 42 -
1-Sep-21 Day TR-3204 26,092.9 26,093.7 0.73 Hauling OB 9043 SAMSUL ARIF 3 3 OB Outpit EX-5037 PIT 5 IPD 10 42 126 - 42 -
1-Sep-21 Day TR-3204 26,093.7 26,098.5 4.85 Hauling Liquid Mud 9043 SAMSUL ARIF 4 4 4 4 4 20 Liquid Mud Outpit EX-5037 PIT 5 IPD 10 21 420 - 21 -
1-Sep-21 Day TR-3205 25,638.4 25,642.2 3.76 Hauling OB 10695 SUPIYANDI 3 3 4 3 13 OB Outpit EX-6016 PIT 5 EXT IPD 10 42 546 - 42 -
1-Sep-21 Day TR-3205 25,642.2 25,646.5 4.34 Hauling OB 10695 SUPIYANDI 3 3 3 3 3 15 OB Ripping Outpit EX-6016 PIT 5 EXT IPD 10 42 630 - 42 -
1-Sep-21 Day TR-3206 24,890.5 24,894.2 3.70 Hauling OB 10969 JOKO PRIONO 3 4 2 2 11 OB Outpit EX-6016 PIT 5 EXT IPD 10 42 462 - 6 42 252
1-Sep-21 Day TR-3206 24,894.2 24,898.9 4.70 Hauling OB 10969 JOKO PRIONO 1 3 4 2 4 14 OB Ripping Outpit EX-6016 PIT 5 EXT IPD 10 42 588 - 42 -
1-Sep-21 Day TR-3220 25,829.3 25,836.8 7.50 Hauling OB 10968 SUKIRNO 4 1 5 4 5 5 5 1 5 35 OB Outpit EX-6022 PIT 5 IPD 10 42 1,470 - 42 -
1-Sep-21 Day TR-1024 31,325.7 31,326.5 0.79 Hauling OB 15636 AKHMAD NOOR 1 1 1 3 OB Outpit EX-5037 PIT 5 IPD 10 24 72 - 24 -
1-Sep-21 Day TR-1024 31,326.5 31,334.1 7.65 Hauling OB 15636 AKHMAD NOOR 3 4 2 4 4 4 2 3 3 29 OB Outpit EX-5022 PIT 5 EXT IPD 10 24 696 - 1 24 24
1-Sep-21 Day TR-1024 31,334.1 31,334.4 0.26 Hauling Liquid Mud 15636 AKHMAD NOOR 1 1 Liquid Mud Outpit EX-5037 PIT 5 IPD 10 12 12 - 12 -
1-Sep-21 Day TR-1025 47,063.3 47,064.1 0.80 Hauling OB 15466 SUPRIYANTO 2 1 3 OB Outpit EX-5037 PIT 5 IPD 10 24 72 - 24 -
1-Sep-21 Day TR-1025 47,064.1 47,064.9 0.80 Hauling OB 15466 SUPRIYANTO 2 2 OB Outpit EX-5022 PIT 5 EXT IPD 10 24 48 - 24 -
1-Sep-21 Day TR-1031 49,341.4 49,342.4 1.04 Hauling OB 15485 ROBY TM 1 3 4 OB Outpit EX-5037 PIT 5 IPD 10 24 96 - 24 -
1-Sep-21 Day TR-1031 49,342.4 49,351.0 8.56 Hauling OB 15485 ROBY TM 3 4 5 3 4 4 3 3 4 33 OB Outpit EX-5022 PIT 5 EXT IPD 10 24 792 - 24 -
1-Sep-21 Day TR-1032 51,046.6 51,050.4 3.77 Hauling OB 15468 PADLIANSYAH 4 5 4 3 16 OB Outpit EX-5037 PIT 5 IPD 10 24 384 - 24 -
1-Sep-21 Day TR-1032 51,050.4 51,053.9 3.53 Hauling Liquid Mud 15468 PADLIANSYAH 5 3 3 4 15 Liquid Mud Outpit EX-5037 PIT 5 IPD 10 12 180 - 12 -
1-Sep-21 Day TR-1033 51,500.5 51,502.4 1.85 Hauling OB 15421 AGUS A 1 3 3 4 11 OB Outpit EX-5037 PIT 5 IPD 10 24 264 - 24 -
1-Sep-21 Day TR-1033 51,502.4 51,502.5 0.17 Hauling OB 15421 AGUS A 1 1 OB Outpit EX-6016 PIT 5 EXT IPD 10 24 24 - 24 -
1-Sep-21 Day TR-1033 51,502.4 51,502.5 0.17 Hauling Liquid Mud 15421 AGUS A 1 1 Liquid Mud Outpit EX-5037 PIT 5 IPD 10 12 12 - 12 -
1-Sep-21 Day TR-1033 51,502.5 51,507.2 4.67 Hauling Liquid Mud 15815 MUHAMMAD 3 4 4 4 4 19 Liquid Mud Outpit EX-5037 PIT 5 IPD 10 12 228 - 12 -
1-Sep-21 Day TR-1034 49,276.3 49,277.6 1.33 Hauling OB 15350 HERMAN 1 3 1 5 OB Outpit EX-5037 PIT 5 IPD 10 24 120 - 24 -
1-Sep-21 Day TR-1034 49,277.6 49,285.6 7.97 Hauling OB 15350 HERMAN 3 4 4 3 4 2 3 4 3 30 OB Outpit EX-5022 PIT 5 EXT IPD 10 24 720 - 1 24 24
1-Sep-21 Day TR-1036 50,526.1 50,526.6 0.48 Hauling OB 15398 SIGIT SUSANTO 1 1 2 OB Outpit EX-6016 PIT 5 EXT IPD 10 24 48 - 24 -
1-Sep-21 Day TR-1036 50,526.6 50,530.4 3.81 Hauling OB 15398 SIGIT SUSANTO 4 5 3 4 16 OB Outpit EX-5037 PIT 5 IPD 10 24 384 - 24 -
1-Sep-21 Day TR-1036 50,530.4 50,530.9 0.48 Hauling Liquid Mud 15398 SIGIT SUSANTO 2 2 Liquid Mud Outpit EX-5037 PIT 5 IPD 10 12 24 - 12 -
1-Sep-21 Day TR-1036 50,530.9 50,534.9 4.04 Hauling OB 15398 SIGIT SUSANTO 2 4 4 4 3 17 OB Outpit EX-5022 PIT 5 EXT IPD 10 24 408 - 1 24 24
1-Sep-21 Day TR-1048 52,134.2 52,135.5 1.25 Hauling OB 15420 M ABD MADI 3 2 5 OB Outpit EX-5037 PIT 5 IPD 10 24 120 - 24 -
1-Sep-21 Day TR-1048 52,135.5 52,143.2 7.75 Hauling OB 15420 M ABD MADI 1 3 5 3 5 4 3 4 3 31 OB Outpit EX-5022 PIT 5 EXT IPD 10 24 744 - 1 24 24
1-Sep-21 Day TR-1049 45,942.0 45,949.5 7.51 Hauling OB 15576 JOKO SANTOSO 4 4 1 3 4 4 2 2 3 27 OB Outpit EX-5022 PIT 5 EXT IPD 10 24 648 - 24 -
1-Sep-21 Day TR-1049 45,949.5 45,950.1 0.56 Hauling OB 15576 JOKO SANTOSO 2 2 OB Outpit EX-5037 PIT 5 IPD 10 24 48 - 24 -
1-Sep-21 Day TR-1049 45,950.1 45,950.9 0.83 Hauling Liquid Mud 15576 JOKO SANTOSO 2 1 3 Liquid Mud Outpit EX-5037 PIT 5 IPD 10 12 36 - 12 -
1-Sep-21 Day TR-1050 45,811.5 45,811.5 - Unscheduled - WORKSHOP - - -
1-Sep-21 Day TA-7009 27,737.8 27,738.1 0.30 Hauling Solid Mud 15862 RUDY AMRIYADI 1 1 Solid Mud Outpit EX-2058 PIT 5 EXT IPD 10 11 11 - 11 -
1-Sep-21 Day TA-7009 27,738.1 27,739.3 1.20 Hauling OB 15862 RUDY AMRIYADI 2 1 1 4 OB Outpit EX-5037 PIT 5 IPD 10 14 56 - 14 -
1-Sep-21 Day TA-7009 27,739.3 27,739.6 0.30 Hauling OB 15862 RUDY AMRIYADI 1 1 OB Outpit EX-5022 PIT 5 EXT IPD 10 14 14 - 14 -
1-Sep-21 Day TA-7009 27,739.6 27,743.2 3.60 Hauling Solid Mud 15862 RUDY AMRIYADI 3 5 2 2 12 Solid Mud Outpit EX-2058 PIT 5 EXT IPD 10 11 134 - 11 -
1-Sep-21 Day TA-7010 25,063.4 25,064.8 1.40 Hauling OB 15863 HENDRA M 1 2 1 4 OB Outpit EX-5037 PIT 5 IPD 10 14 56 - 14 -
1-Sep-21 Day TA-7010 25,064.8 25,069.0 4.20 Hauling Solid Mud 15863 HENDRA M 4 4 3 1 12 Solid Mud Outpit EX-2058 PIT 5 EXT IPD 10 11 134 - 11 -
1-Sep-21 Day TA-7022 - - - Unscheduled - WORKSHOP - - -
1-Sep-21 Day TA-7029 28,491.9 28,491.9 - Unscheduled - PIT 5 - - -
1-Sep-21 Day TA-7030 28,200.9 28,201.9 0.97 Hauling OB 15817 YUSANDI 1 1 1 3 OB Outpit EX-5037 PIT 5 IPD 10 14 42 - 14 -
1-Sep-21 Day TA-7030 28,201.9 28,202.8 0.97 Hauling OB 15817 YUSANDI 3 3 OB Outpit EX-5022 PIT 5 EXT IPD 10 14 42 - 14 -
1-Sep-21 Day TA-7030 28,202.8 28,206.4 3.56 Hauling Solid Mud 15817 YUSANDI 3 4 3 1 11 Solid Mud Outpit EX-2058 PIT 5 EXT IPD 10 11 123 - 11 -
1-Sep-21 Day BD-4005 13,770.7 13,770.7 - Unscheduled - WORKSHOP - - -
k 1-Sep-21 Day BD-5035 3,306.6 3,317.4 10.80 Road Maintenance Support 15747 MUSTAQIM D6 - PIT 5 - - -
1-Sep-21 Day BD-6025 2,690.8 2,690.8 - Standby - KCP - - -
1-Sep-21 Day BD-6026 30,198.7 30,198.7 - Standby - WORKSHOP - - -
1-Sep-21 Day BD-6028 4,109.2 4,109.2 - Standby - KCP - - -
1-Sep-21 Day BD-6036 34,025.1 34,034.7 9.60 Unit Rental 14964 JOKO P (Dozer) - KCP - - -
1-Sep-21 Day BD-6038 33,811.7 33,821.8 10.10 Unit Rental 15570 HENDRY S - KCP - - -
1-Sep-21 Day BD-6069 10,279.0 10,290.3 11.30 Disposal maintenance 9339F ANTON WIBOWO - IPD 10 - - -
1-Sep-21 Day BD-7013 39,735.6 39,745.7 10.10 Front maintenance 15639 A. BUDIMAN - PIT 5 - - -
1-Sep-21 Day BD-7026 26,396.3 26,406.4 10.10 Ripping 14709 A. FATHONI - PIT 5 - - -
1-Sep-21 Day BD-7034 9,798.8 9,804.7 5.90 Disposal maintenance 9492 MAHFUDI - IPD 10 - - -
1-Sep-21 Day GR-2012 22,215.8 22,215.8 - Unscheduled - - - -
1-Sep-21 Day GR-3007 39,057.2 39,067.4 10.20 Road Maintenance Support 8925 AGUS SUNARWAN - PIT 5 - - -
1-Sep-21 Day GR-3008 46,779.4 46,788.0 8.60 Road Maintenance Support 8958 MUKHROMIN - PIT 5 - - -
1-Sep-21 Day TW-3001 8,476.0 8,480.0 4.00 Road Maintenance Support 15743 LANA - PIT 5 - - -
1-Sep-21 Day TW-4001 18,756.0 18,756.0 - Standby - PIT 5 - - -
1-Sep-21 Day PU-4002 19,056.0 19,056.00 - Unscheduled - PIT 11 - - -
1-Sep-21 Day PU-2026 6,185.3 6,186.0 0.70 Dewatering 10847 FAUZI AHMAD - PIT 11 - - -
1-Sep-21 Day PU-3026 12,307.0 12,307.00 - Standby - ROM TEMPORARY - - -
1-Sep-21 Day PU-3015 1,696.0 1,696.00 - Standby - PIT 11 - - -
1-Sep-21 Day PU-3014 27,240.4 27,240.40 - Standby - ROM TEMPORARY - - -
1-Sep-21 Day LP-2165 13,410.0 13,410.00 - Standby - KCP - - -
1-Sep-21 Day LP-2166 12,906.0 12,906.00 - Standby - KCP - - -
1-Sep-21 Day LP-2167 13,912.0 13,912.00 - Standby - KCP - - -
1-Sep-21 Day LP-2168 12,712.0 12,712.00 - Standby - KCP - - -
1-Sep-21 Day LP-2169 12,445.0 12,445.00 - Standby - KCP - - -
1-Sep-21 Day TS-4007 - - - Standby - KCP - - -
1-Sep-21 Day TS-4017 16,015.0 16,024.0 9.00 Unit Rental 15472 RIZKA M - KCP - - -
1-Sep-21 Day TF-4013 20,281.0 20,286.0 5.00 Unit Rental 15310 ALDI ALFI SAPUTRA - KCP - - -
1-Sep-21 Day TF-4014 34,550.0 34,550.0 - Standby - KCP - - -
1-Sep-21 Night EX-2037 22,054.6 22,056.9 2.30 Side casting 15309 SURATNO - PIT 5 EXT - - -
1-Sep-21 Night EX-2037 22,056.9 22,063.2 6.30 Loading Solid Mud 15309 SURATNO - Solid Mud Outpit PIT 5 EXT IPD 10 - - - - -
1-Sep-21 Night EX-2058 17,327.3 17,333.1 5.80 Road Maintenance Support 15503 ASHARI SETIYO NUGROHO - PIT 5 EXT - 1,013 -
1-Sep-21 Night EX-2058 17,333.1 17,334.8 1.70 Loading Solid Mud 15503 ASHARI SETIYO NUGROHO - Solid Mud Outpit PIT 5 EXT IPD 10 - - 1,013 - -
1-Sep-21 Night EX-2058 17,334.8 17,336.8 2.00 Setting pompa 15503 ASHARI SETIYO NUGROHO - PIT 5 - 1,013 -
1-Sep-21 Night EX-4006 35,177.0 35,177.0 - Unscheduled - PARKIRAN SCANIA - 1,176 -
1-Sep-21 Night EX-5014 38,586.0 38,587.0 1.00 Unit Rental 15375 A JEFRI M - KCP - - -
1-Sep-21 Night EX-5022 11,218.0 11,228.0 10.00 Loading Waste 15568 FUAD EFENDI - OB Outpit PIT 5 EXT IPD 10 - 1,185 -
1-Sep-21 Night EX-5037 18,971.0 18,982.0 11.00 Loading Liquid Mud 9590F SIRATAL RAYYAN - Liquid Mud Outpit PIT 5 IPD 10 - 1,168 -
1-Sep-21 Night EX-6014 57,514.0 57,514.0 - Unscheduled - PIT 5 - - -
1-Sep-21 Night EX-6016 44,097.0 44,107.0 10.00 Loading Waste 8952 DIDI SETIAWAN - OB Outpit PIT 5 EXT IPD 10 - 752 -
1-Sep-21 Night EX-6022 18,411.4 18,419.3 7.90 Loading Waste 11146 PURWANTO - OB Outpit PIT 5 IPD 10 - - -
1-Sep-21 Night TR-3080 42,559.9 42,569.9 10.00 Hauling OB 11619 DWI WARDOYO 3 3 3 3 3 3 3 4 4 3 3 35 OB Outpit EX-6016 PIT 5 EXT IPD 10 42 1,470 - 42 -
1-Sep-21 Night TR-3174 41,289.7 41,296.2 6.50 Hauling OB 11328 JUSESLAF BANJAR NAHOR 2 5 3 4 4 5 4 3 30 OB Outpit EX-6022 PIT 5 IPD 10 42 1,260 - 1 42 42
1-Sep-21 Night TR-3175 38,678.6 38,685.6 7.00 Hauling OB 9354 JIDIN 3 5 4 5 4 5 4 2 32 OB Outpit EX-6022 PIT 5 IPD 10 42 1,344 - 42 -
1-Sep-21 Night TR-3195 24,541.5 24,551.4 9.90 Hauling Liquid Mud 15349 ARDIANSYAH 2 5 3 3 4 4 4 4 4 4 3 40 Liquid Mud Outpit EX-5037 PIT 5 IPD 10 21 840 - 21 -
1-Sep-21 Night TR-3202 26,679.9 26,686.8 6.90 Hauling OB 11474 SARINDI 3 5 4 4 4 4 4 2 30 OB Outpit EX-6022 PIT 5 IPD 10 42 1,260 - 42 -
1-Sep-21 Night TR-3203 26,781.8 26,791.5 9.70 Hauling OB 8920 VERRY EKO SETIAWAN 3 3 2 4 3 3 3 3 3 4 2 33 OB Outpit EX-6016 PIT 5 EXT IPD 10 42 1,386 - 42 -
1-Sep-21 Night TR-3204 26,098.5 26,098.8 0.29 Hauling Liquid Mud 1303 EFENDI 1 1 Liquid Mud Outpit EX-5037 PIT 5 IPD 10 21 21 - 21 -
1-Sep-21 Night TR-3204 26,098.8 26,108.0 9.20 Hauling OB 1303 EFENDI 3 3 3 4 3 3 3 4 3 3 32 OB Outpit EX-5022 PIT 5 EXT IPD 10 42 1,344 - 1 42 42
1-Sep-21 Night TR-3205 25,646.5 25,656.4 9.90 Hauling OB 7170F TRI PRASETIYO 3 4 2 3 3 3 4 3 4 3 3 35 OB Outpit EX-6016 PIT 5 EXT IPD 10 42 1,470 - 42 -
1-Sep-21 Night TR-3206 24,898.9 24,904.5 5.62 Hauling OB 1354 SUDIYANTO 3 3 4 3 3 2 18 OB Outpit EX-6016 PIT 5 EXT IPD 10 42 756 - 42 -
1-Sep-21 Night TR-3206 24,904.5 24,909.2 4.68 Hauling OB 1354 SUDIYANTO 2 1 3 3 4 2 15 OB Outpit EX-5022 PIT 5 EXT IPD 10 42 630 - 42 -
1-Sep-21 Night TR-3220 25,836.8 25,843.7 6.90 Hauling OB 8965 HADI SUTIKNO 3 4 5 4 4 5 4 2 31 OB Outpit EX-6022 PIT 5 IPD 10 42 1,302 - 42 -
1-Sep-21 Night TR-1024 31,334.4 31,335.8 1.40 Hauling OB 15395 ANDRI SUSANTO 2 3 5 OB Outpit EX-5022 PIT 5 EXT IPD 10 24 120 - 24 -
1-Sep-21 Night TR-1025 47,064.9 47,064.9 - Unscheduled - PIT 5 EXT - - -
1-Sep-21 Night TR-1031 49,351.0 49,360.7 9.70 Hauling OB 15744 MARYANTO 1 5 2 4 4 5 4 3 4 4 3 39 OB Outpit EX-5022 PIT 5 EXT IPD 10 24 936 - 24 -
1-Sep-21 Night TR-1032 51,053.9 51,061.7 7.76 Hauling Liquid Mud 15377 RIZALI RAHMAN 2 4 1 1 5 5 4 4 4 2 32 Liquid Mud Outpit EX-5037 PIT 5 IPD 10 12 384 - 12 -
1-Sep-21 Night TR-1032 51,061.7 51,063.6 1.94 Hauling OB 15377 RIZALI RAHMAN 2 4 2 8 OB Outpit EX-5022 PIT 5 EXT IPD 10 24 192 - 24 -
1-Sep-21 Night TR-1033 51,507.2 51,512.9 5.70 Hauling Liquid Mud 15470 IJAI 3 4 3 4 4 4 1 23 Liquid Mud Outpit EX-5037 PIT 5 IPD 10 12 276 - 12 -
1-Sep-21 Night TR-1033 51,512.9 51,517.0 4.10 Hauling Liquid Mud 15395 ANDRI SUSANTO 2 4 4 4 3 17 Liquid Mud Outpit EX-5037 PIT 5 IPD 10 12 204 - 12 -
1-Sep-21 Night TR-1034 49,285.6 49,295.3 9.70 Hauling OB 15397 YUSUF 2 4 3 3 3 4 3 4 3 4 3 36 OB Outpit EX-5022 PIT 5 EXT IPD 10 24 864 - 24 -
1-Sep-21 Night TR-1036 50,534.9 50,535.2 0.25 Hauling OB 15346 MUSA 1 1 OB Outpit EX-5022 PIT 5 EXT IPD 10 24 24 - 24 -
1-Sep-21 Night TR-1036 50,535.2 50,544.8 9.64 Hauling Liquid Mud 15346 MUSA 1 4 2 4 4 4 5 4 4 4 3 39 Liquid Mud Outpit EX-5037 PIT 5 IPD 10 12 468 - 12 -
1-Sep-21 Night TR-1048 52,143.2 52,148.7 5.50 Hauling OB 15471 MULYADI 1 4 4 3 4 3 3 22 OB Outpit EX-5022 PIT 5 EXT IPD 10 24 528 - 24 -
1-Sep-21 Night TR-1049 45,950.9 45,951.1 0.16 Hauling OB 15376 EKO FAJAR S 1 1 OB Outpit EX-5022 PIT 5 EXT IPD 10 24 24 - 24 -
1-Sep-21 Night TR-1049 45,951.1 45,959.6 8.54 Hauling Liquid Mud 15376 EKO FAJAR S 1 3 4 4 4 4 4 4 4 2 34 Liquid Mud Outpit EX-5037 PIT 5 IPD 10 12 408 - 12 -
1-Sep-21 Night TR-1050 45,811.5 45,811.5 - Unscheduled - WORKSHOP - - -
1-Sep-21 Night TA-7009 27,743.2 27,745.2 2.01 Hauling Solid Mud 15818 AGUS SUGIANTO 1 4 3 8 Solid Mud Outpit EX-2058 PIT 5 EXT IPD 10 11 90 - 11 -
1-Sep-21 Night TA-7009 27,745.2 27,751.8 6.59 Hauling Solid Mud 15818 AGUS SUGIANTO 3 3 3 3 4 4 2 22 Solid Mud Outpit EX-2037 PIT 5 EXT IPD 10 11 246 - 11 -
1-Sep-21 Night TA-7010 25,069.0 25,072.1 3.05 Hauling Solid Mud 15653 M. ILIAS 1 4 3 8 Solid Mud Outpit EX-2058 PIT 5 EXT IPD 10 11 90 - 11 -
1-Sep-21 Night TA-7010 25,072.1 25,077.6 5.55 Hauling Solid Mud 15653 M. ILIAS 1 3 4 4 3 4 2 21 Solid Mud Outpit EX-2037 PIT 5 EXT IPD 10 11 235 - 11 -
1-Sep-21 Night TA-7022 - - - Unscheduled - WORKSHOP - - -
1-Sep-21 Night TA-7029 28,491.9 28,491.9 - Unscheduled - PIT 5 EXT - - -
1-Sep-21 Night TA-7030 28,206.4 28,206.7 0.31 Hauling Solid Mud 15819 AHNIANSYAH 1 1 Solid Mud Outpit EX-2058 PIT 5 EXT IPD 10 11 11 - 11 -
1-Sep-21 Night TA-7030 28,206.7 28,211.4 4.69 Hauling Solid Mud 15819 AHNIANSYAH 2 3 4 4 2 15 Solid Mud Outpit EX-2037 PIT 5 EXT IPD 10 11 168 - 11 -
1-Sep-21 Night BD-4005 13,770.7 13,770.7 - Scheduled - WORKSHOP - - -
1-Sep-21 Night BD-5035 3,317.4 3,326.5 9.10 Disposal maintenance 14963 MAULANA ISHAK - IPD 10 - - -
1-Sep-21 Night BD-6025 2,691.6 2,698.9 7.30 Unit Rental 14708 ADEFI P - KCP - - -
1-Sep-21 Night BD-6026 30,198.7 30,198.7 - Standby - WORKSHOP - - -
1-Sep-21 Night BD-6028 4,109.2 4,109.2 - Standby - KCP - - -
1-Sep-21 Night BD-6036 34,034.8 34,044.9 10.10 Unit Rental 11169 ANNAS - KCP - - -
1-Sep-21 Night BD-6038 33,821.9 33,831.8 9.90 Unit Rental 15464 MARJUKI - KCP - - -
1-Sep-21 Night BD-6069 10,290.3 10,299.7 9.40 Front maintenance 14744 NOORDIANTO - PIT 5 - - -
1-Sep-21 Night BD-7013 39,745.7 39,756.8 11.10 Front maintenance 11676 SUDARSONO - PIT 5 - - -
1-Sep-21 Night BD-7026 26,406.4 26,416.9 10.50 Ripping 15606 FATHUR - PIT 5 - - -
1-Sep-21 Night BD-7034 9,804.7 9,815.1 10.40 Disposal maintenance 8157 SAMIDI - IPD 10 - - -
1-Sep-21 Night GR-2012 22,215.8 22,215.8 - Unscheduled - WORKSHOP - - -
1-Sep-21 Night GR-3007 39,067.4 39,077.4 10.00 Road Maintenance Support 9103 WAWAN WIDODO - PIT 5 - - -
1-Sep-21 Night GR-3008 46,788.0 46,796.5 8.50 Road Maintenance Support 15571 YOHANIS L - PIT 5 - - -
1-Sep-21 Night TW-3001 8,480.0 8,483.0 3.00 Road Maintenance Support 15106 AHMAD NURANI - PIT 5 - - -
1-Sep-21 Night TW-4001 18,756.0 18,756.00 - Standby - PIT 5 - - -
1-Sep-21 Night PU-4002 19,056.0 19,056.0 - Unscheduled - - - -
1-Sep-21 Night PU-2026 6,186.0 6,186.0 - Standby 10914 SETYO BUDI UTOMO - - - -
1-Sep-21 Night PU-3026 12,307.0 12,307.0 - Standby - - - -
1-Sep-21 Night PU-3015 1,696.0 1,696.0 - Standby - - - -
1-Sep-21 Night PU-3014 27,240.4 27,240.4 - Standby - - - -
1-Sep-21 Night LP-2165 13,410.0 13,422.0 12.00 Unit Rental 4671 NURUDIN - KCP - - -
1-Sep-21 Night LP-2166 12,906.0 12,917.0 11.00 Unit Rental 4671 NURUDIN - KCP - - -
1-Sep-21 Night LP-2167 13,910.0 13,921.0 11.00 Unit Rental 4671 NURUDIN - KCP - - -
1-Sep-21 Night LP-2168 12,712.0 12,723.0 11.00 Unit Rental 4671 NURUDIN - KCP - - -
1-Sep-21 Night LP-2169 12,445.0 12,457.0 12.00 Unit Rental 4671 NURUDIN - KCP - - -
1-Sep-21 Night TS-4007 - - - Standby - KCP - - -
1-Sep-21 Night TS-4017 16,024.0 16,032.0 8.00 Unit Rental 15473 ISMAIL SAIDI - KCP - - -
1-Sep-21 Night TF-4013 20,286.0 20,293.0 7.00 Unit Rental 15746 SYARIFUDDI - KCP - - -
1-Sep-21 Night TF-4014 34,550.0 34,550.0 - Standby - KCP - - -
2-Sep-21 Day EX-2037 22,063.2 22,067.2 4.00 Drainage 15617 ZAENAL - PIT 11 - - -
2-Sep-21 Day EX-2037 22,067.2 22,068.2 1.00 Moving - pindah lokasi kerja 15617 ZAENAL - PIT 11 - - -
2-Sep-21 Day EX-2037 22,068.2 22,070.6 2.40 Side casting 15617 ZAENAL - WORKSHOP - - -
2-Sep-21 Day EX-2058 17,336.8 17,344.1 7.25 Loading Solid Mud 11330 EKO PURWANTO - Solid Mud Outpit PIT 5 EXT IPD 10 - - 1,223 - -
2-Sep-21 Day EX-2058 17,344.1 17,346.7 2.65 Sloping 11330 EKO PURWANTO - PIT 5 EXT - 1,223 -
2-Sep-21 Day EX-4006 35,177.0 35,177.0 - Unscheduled - PARKIRAN SCANIA - 1,286 -
2-Sep-21 Day EX-5014 38,587.0 38,590.0 3.00 Unit Rental 15616 JOKO SUDIRO - KCP - - -
2-Sep-21 Day EX-5022 11,228.0 11,238.0 10.00 Loading Waste 15604 AHMAD SYAFI'I - OB Outpit PIT 5 EXT IPD 10 - 1,288 -
2-Sep-21 Day EX-5037 18,982.0 18,993.0 11.00 Loading Waste 15567 ARIF WAHYUDI - OB Outpit PIT 5 IPD 10 - 1,284 -
2-Sep-21 Day EX-6014 57,514.0 57,514.0 - Unscheduled - PIT 5 - - -
2-Sep-21 Day EX-6016 44,107.0 44,111.0 4.00 Loading Waste 10917 SETA VERDY KARYA - OB Outpit PIT 5 EXT IPD 10 - 752 -
2-Sep-21 Day EX-6022 18,419.3 18,429.0 9.70 Loading Waste 9423 BILMAR SIMANJUNTAK - OB Outpit PIT 5 EXT IPD 10 - - -
2-Sep-21 Day TR-3080 42,569.9 42,572.7 2.75 Hauling OB 10881 BURHANUDDIN 1 3 4 4 12 OB Outpit EX-6016 PIT 5 EXT IPD 10 42 504 - 42 -
2-Sep-21 Day TR-3080 42,572.7 42,573.0 0.31 Hauling Liquid Mud 10881 BURHANUDDIN 1 1 Liquid Mud Outpit EX-5037 PIT 5 IPD 10 21 21 - 21 -
2-Sep-21 Day TR-3080 42,573.0 42,574.5 1.53 Hauling OB 10881 BURHANUDDIN 3 2 5 OB Outpit EX-5022 PIT 5 EXT IPD 10 42 210 - 42 -
2-Sep-21 Day TR-3080 42,574.5 42,575.7 1.22 Hauling OB 10881 BURHANUDDIN 2 2 4 OB Outpit EX-5037 PIT 5 IPD 10 42 168 - 42 -
2-Sep-21 Day TR-3174 41,296.2 41,296.5 0.30 Hauling OB 10882 SABIRIN 1 1 OB Outpit EX-5022 PIT 5 EXT IPD 10 42 42 - 42 -
2-Sep-21 Day TR-3174 41,296.5 41,304.1 7.60 Hauling OB 10882 SABIRIN 5 4 5 4 4 4 3 4 33 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 1,386 - 42 -
2-Sep-21 Day TR-3175 38,685.6 38,695.5 9.90 Hauling OB 1330 SUTRISNO 4 4 4 4 4 4 4 4 3 3 4 42 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 1,764 - 42 -
2-Sep-21 Day TR-3195 24,551.4 24,554.2 2.82 Hauling OB 10762 SYAMSUDDIN 1 3 4 4 12 OB Outpit EX-6016 PIT 5 EXT IPD 10 42 504 - 42 -
2-Sep-21 Day TR-3195 24,554.2 24,554.7 0.51 Hauling OB 10762 SYAMSUDDIN 2 2 OB Outpit EX-5022 PIT 5 EXT IPD 10 42 84 - 42 -
2-Sep-21 Day TR-3195 24,554.7 24,559.1 4.36 Hauling OB 10762 SYAMSUDDIN 1 4 4 4 4 17 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 714 - 42 -
2-Sep-21 Day TR-3202 26,686.8 26,696.7 9.90 Hauling OB 10969 JOKO PRIONO 3 4 5 4 5 4 4 3 4 4 3 43 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 1,806 - 42 -
2-Sep-21 Day TR-3203 26,791.5 26,794.0 2.49 Hauling OB 8892 BAGUS PURWONO 1 3 3 3 10 OB Outpit EX-6016 PIT 5 EXT IPD 10 42 420 - 2 42 84
2-Sep-21 Day TR-3203 26,794.0 26,795.9 1.86 Hauling OB 8892 BAGUS PURWONO 2 4 6 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 252 - 42 -
2-Sep-21 Day TR-3203 26,795.9 26,799.0 3.11 Hauling OB 8892 BAGUS PURWONO 3 3 4 10 OB Outpit EX-5022 PIT 5 EXT IPD 10 42 420 - 42 -
2-Sep-21 Day TR-3203 26,799.0 26,800.2 1.24 Hauling OB 8892 BAGUS PURWONO 2 2 4 OB Outpit EX-5037 PIT 5 IPD 10 42 168 - 42 -
2-Sep-21 Day TR-3204 26,108.0 26,109.0 1.01 Hauling OB 15350 HERMAN 1 2 3 OB Outpit EX-5022 PIT 5 EXT IPD 10 42 126 - 42 -
2-Sep-21 Day TR-3204 26,109.0 26,112.0 3.02 Hauling OB 15350 HERMAN 2 3 4 4 13 OB Outpit EX-6016 PIT 5 EXT IPD 10 42 546 - 42 -
2-Sep-21 Day TR-3204 26,112.0 26,113.7 1.68 Hauling OB 15350 HERMAN 3 2 5 OB Outpit EX-5037 PIT 5 IPD 10 42 210 - 42 -
2-Sep-21 Day TR-3205 25,656.4 25,666.7 10.30 Hauling OB 10695 SUPIYANDI 4 3 4 3 4 4 5 4 3 4 4 42 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 1,764 - 42 -
2-Sep-21 Day TR-3206 24,909.2 24,909.2 - Standby - PIT 5 EXT - - -
2-Sep-21 Day TR-3220 25,843.7 25,847.5 3.81 Hauling OB 10968 SUKIRNO 4 3 4 3 14 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 588 - 42 -
2-Sep-21 Day TR-3220 25,847.5 25,852.4 4.89 Hauling OB 10968 SUKIRNO 3 5 3 2 3 2 18 OB Outpit EX-5022 PIT 5 EXT IPD 10 42 756 - 1 42 42
2-Sep-21 Day TR-1024 31,335.8 31,335.8 - Unscheduled - WORKSHOP - - -
2-Sep-21 Day TR-1025 47,064.9 47,069.8 4.87 Hauling Liquid Mud 15466 SUPRIYANTO 3 3 4 4 5 19 Liquid Mud Outpit EX-5037 PIT 5 IPD 10 12 228 - 12 -
2-Sep-21 Day TR-1025 47,069.8 47,073.1 3.33 Hauling OB 15466 SUPRIYANTO 4 4 5 13 OB Outpit EX-5037 PIT 5 IPD 10 24 312 - 24 -
2-Sep-21 Day TR-1031 49,360.7 49,366.2 5.46 Hauling OB 15485 ROBY TM 2 2 2 3 3 1 4 4 21 OB Outpit EX-5022 PIT 5 EXT IPD 10 24 504 - 24 -
2-Sep-21 Day TR-1031 49,366.2 49,367.7 1.56 Hauling Liquid Mud 15485 ROBY TM 2 3 2 7 Liquid Mud Outpit EX-5037 PIT 5 IPD 10 12 84 - 12 -
2-Sep-21 Day TR-1031 49,367.7 49,368.5 0.78 Hauling OB 15485 ROBY TM 3 3 OB Outpit EX-5037 PIT 5 IPD 10 24 72 - 24 -
2-Sep-21 Day TR-1032 51,063.6 51,068.7 5.12 Hauling Liquid Mud 15468 PADLIANSYAH 3 3 4 4 4 4 22 Liquid Mud Outpit EX-5037 PIT 5 IPD 10 12 264 - 12 -
2-Sep-21 Day TR-1032 51,068.7 51,071.3 2.56 Hauling OB 15468 PADLIANSYAH 3 4 4 11 OB Outpit EX-5037 PIT 5 IPD 10 24 264 - 24 -
2-Sep-21 Day TR-1032 51,071.3 51,073.6 2.33 Hauling OB 15468 PADLIANSYAH 1 1 4 4 10 OB Outpit EX-5022 PIT 5 EXT IPD 10 24 240 - 24 -
2-Sep-21 Day TR-1033 51,517.0 51,522.4 5.40 Hauling Liquid Mud 15636 AKHMAD NOOR 3 4 3 4 4 4 22 Liquid Mud Outpit EX-5037 PIT 5 IPD 10 12 264 - 12 -
2-Sep-21 Day TR-1033 51,522.4 51,525.9 3.50 Hauling OB 15421 AGUS A 4 3 5 2 14 OB Outpit EX-5037 PIT 5 IPD 10 24 336 - 24 -
2-Sep-21 Day TR-1034 49,295.3 49,303.6 8.30 Hauling OB 15815 MUHAMMAD 2 2 3 2 2 4 4 3 3 3 4 32 OB Outpit EX-5022 PIT 5 EXT IPD 10 24 768 - 24 -
2-Sep-21 Day TR-1036 50,544.8 50,546.6 1.79 Hauling OB 15398 SIGIT SUSANTO 3 2 2 7 OB Outpit EX-5022 PIT 5 EXT IPD 10 24 168 - 24 -
2-Sep-21 Day TR-1036 50,546.6 50,549.9 3.33 Hauling Liquid Mud 15398 SIGIT SUSANTO 1 4 4 4 13 Liquid Mud Outpit EX-5037 PIT 5 IPD 10 12 156 - 12 -
2-Sep-21 Day TR-1036 50,549.9 50,553.0 3.08 Hauling OB 15398 SIGIT SUSANTO 4 5 3 12 OB Outpit EX-5037 PIT 5 IPD 10 24 288 - 24 -
2-Sep-21 Day TR-1048 52,148.7 52,152.4 3.72 Hauling OB 15420 M ABD MADI 3 2 3 3 11 OB Outpit EX-5022 PIT 5 EXT IPD 10 24 264 - 24 -
2-Sep-21 Day TR-1048 52,152.4 52,153.1 0.68 Hauling Liquid Mud 15420 M ABD MADI 2 2 Liquid Mud Outpit EX-5037 PIT 5 IPD 10 12 24 - 12 -
2-Sep-21 Day TR-1049 45,959.6 45,961.2 1.59 Hauling Liquid Mud 15576 JOKO SANTOSO 3 3 6 Liquid Mud Outpit EX-5037 PIT 5 IPD 10 12 72 - 12 -
2-Sep-21 Day TR-1049 45,961.2 45,967.8 6.61 Hauling OB 15576 JOKO SANTOSO 3 2 3 3 4 2 1 4 3 25 OB Outpit EX-5022 PIT 5 EXT IPD 10 24 600 - 24 -
2-Sep-21 Day TR-1050 45,811.5 45,811.5 - Unscheduled - WORKSHOP - - -
2-Sep-21 Day TA-7009 27,751.8 27,759.5 7.70 Hauling Solid Mud 15862 RUDY AMRIYADI 2 4 5 6 5 6 6 6 40 Solid Mud Outpit EX-2058 PIT 5 EXT IPD 10 11 448 - 11 -
2-Sep-21 Day TA-7009 27,759.5 27,759.8 0.30 Hauling OB 15862 RUDY AMRIYADI 1 1 OB Outpit EX-5037 PIT 5 IPD 10 14 14 - 14 -
2-Sep-21 Day TA-7010 25,077.6 25,084.7 7.10 Hauling Solid Mud 15861 AGUSTIAN 2 5 4 5 6 6 7 35 Solid Mud Outpit EX-2058 PIT 5 EXT IPD 10 11 392 - 11 -
2-Sep-21 Day TA-7010 25,084.7 25,085.0 0.30 Hauling OB 15861 AGUSTIAN 2 2 OB Outpit EX-5022 PIT 5 EXT IPD 10 14 28 - 14 -
2-Sep-21 Day TA-7010 25,085.0 25,085.2 0.20 Hauling OB 15861 AGUSTIAN 1 1 OB Outpit EX-5037 PIT 5 IPD 10 14 14 - 14 -
2-Sep-21 Day TA-7022 - - - Unscheduled - WORKSHOP - - -
2-Sep-21 Day TA-7029 28,491.9 28,491.9 - Unscheduled - PIT 5 EXT - - -
2-Sep-21 Day TA-7030 28,211.4 28,219.1 7.70 Hauling Solid Mud 15863 HENDRA M 2 5 5 6 5 5 5 6 39 Solid Mud Outpit EX-2058 PIT 5 EXT IPD 10 11 437 - 11 -
2-Sep-21 Day TA-7030 28,219.1 28,219.4 0.30 Hauling OB 15863 HENDRA M 1 1 OB Outpit EX-5037 PIT 5 IPD 10 14 14 - 14 -
2-Sep-21 Day BD-4005 13,770.7 13,770.7 - Scheduled - WORKSHOP - - -
k 2-Sep-21 Day BD-5035 3,326.5 3,329.4 2.90 Disposal maintenance - IPD 10 - - -
2-Sep-21 Day BD-6025 2,698.9 2,698.9 - Standby - KCP - - -
2-Sep-21 Day BD-6026 30,198.7 30,198.7 - Standby - WORKSHOP - - -
2-Sep-21 Day BD-6028 4,109.2 4,109.2 - Standby - KCP - - -
2-Sep-21 Day BD-6036 34,044.9 34,051.1 6.20 Unit Rental 14710 AGUS S - KCP - - -
2-Sep-21 Day BD-6038 33,831.8 33,838.3 6.50 Unit Rental 15570 HENDRY S - KCP - - -
2-Sep-21 Day BD-6069 10,299.7 10,309.8 10.10 Front maintenance 15747 MUSTAQIM D6 - PIT 5 - - -
2-Sep-21 Day BD-7013 39,756.8 39,765.3 8.50 Ripping 15639 A. BUDIMAN - PIT 5 - - -
2-Sep-21 Day BD-7026 26,416.9 26,426.8 9.90 Front maintenance 15579 ISMADI - PIT 5 - - -
2-Sep-21 Day BD-7034 9,815.1 9,826.1 11.00 Disposal maintenance 9492 MAHFUDI - IPD 10 - - -
2-Sep-21 Day GR-2012 22,215.8 22,215.8 - Unscheduled - WORKSHOP - - -
2-Sep-21 Day GR-3007 39,077.4 39,087.1 9.70 Road Maintenance Support 8925 AGUS SUNARWAN - PIT 5 - - -
2-Sep-21 Day GR-3008 46,796.5 46,806.5 10.00 Road Maintenance Support 8958 MUKHROMIN - PIT 5 - - -
2-Sep-21 Day TW-3001 8,483.0 8,484.0 1.00 Road Maintenance Support 15743 LANA - PIT 5 - - -
2-Sep-21 Day TW-4001 18,756.0 18,756.00 - Standby - PIT 5 - - -
2-Sep-21 Day PU-4002 19,056.0 19,056.00 - Unscheduled - PIT 11 - - -
2-Sep-21 Day PU-2026 6,186.0 6,186.2 0.20 Dewatering 10847 FAUZI AHMAD - PIT 11 - - -
2-Sep-21 Day PU-3026 12,307.0 12,307.00 - Standby - ROM TEMPORARY - - -
2-Sep-21 Day PU-3015 1,696.0 1,696.00 - Standby - PIT 11 - - -
2-Sep-21 Day PU-3014 27,240.4 27,240.40 - Standby - ROM TEMPORARY - - -
2-Sep-21 Day LP-2165 13,422.0 13,422.00 - Standby - KCP - - -
2-Sep-21 Day LP-2166 12,917.0 12,917.00 - Standby - KCP - - -
2-Sep-21 Day LP-2167 13,921.0 13,921.00 - Standby - KCP - - -
2-Sep-21 Day LP-2168 12,723.0 12,723.00 - Standby - KCP - - -
2-Sep-21 Day LP-2169 12,457.0 12,457.00 - Standby - KCP - - -
2-Sep-21 Day TS-4007 - - - Standby - KCP - - -
2-Sep-21 Day TS-4017 16,032.0 16,035.0 3.00 Unit Rental 15472 RIZKA M - KCP - - -
2-Sep-21 Day TF-4013 20,293.0 20,296.0 3.00 Unit Rental 15745 SURYANATA - KCP - - -
2-Sep-21 Day TF-4014 34,550.0 34,550.0 - Standby - KCP - - -
2-Sep-21 Night EX-2037 22,070.6 22,070.6 - Standby - WORKSHOP - - -
2-Sep-21 Night EX-2058 17,346.7 17,348.7 2.00 Sloping 15503 ASHARI SETIYO NUGROHO - PIT 5 EXT - 1,223 -
2-Sep-21 Night EX-2058 17,348.7 17,356.7 8.00 Loading Solid Mud 15503 ASHARI SETIYO NUGROHO - Solid Mud Outpit PIT 5 EXT IPD 10 - - 1,223 - -
2-Sep-21 Night EX-4006 35,177.0 35,177.0 - Unscheduled - PARKIRAN SCANIA - 1,286 -
2-Sep-21 Night EX-5014 38,590.0 38,597.0 7.00 Unit Rental 15375 A JEFRI M - KCP - - -
2-Sep-21 Night EX-5022 11,238.0 11,248.0 10.00 Loading Waste 9136 AHMAD YANI - OB Outpit PIT 5 EXT IPD 10 - 1,288 -
2-Sep-21 Night EX-5037 18,993.0 19,003.0 10.00 Loading Waste 9590F SIRATAL RAYYAN - OB Outpit PIT 5 IPD 10 - 1,284 -
2-Sep-21 Night EX-6014 57,514.0 57,514.0 - Unscheduled - PIT 5 - - -
2-Sep-21 Night EX-6016 44,111.0 44,112.0 1.00 Loading Waste 11146 PURWANTO - OB Outpit PIT 5 EXT IPD 10 - 752 -
2-Sep-21 Night EX-6022 18,429.0 18,438.5 9.50 Loading Waste 8952 DIDI SETIAWAN - OB Outpit PIT 5 EXT IPD 10 - - -
2-Sep-21 Night TR-3080 42,575.7 42,581.1 5.39 Hauling OB 11619 DWI WARDOYO 2 3 2 2 2 3 14 OB Outpit EX-5037 PIT 5 IPD 10 42 588 - 42 -
2-Sep-21 Night TR-3080 42,581.1 42,585.5 4.40 Hauling OB 15349 ARDIANSYAH 2 4 3 3 3 15 OB Outpit EX-5037 PIT 5 IPD 10 42 630 - 42 -
2-Sep-21 Night TR-3174 41,304.1 41,307.5 3.38 Hauling OB 11328 JUSESLAF BANJAR NAHOR 3 4 3 3 13 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 546 - 42 -
2-Sep-21 Night TR-3174 41,307.5 41,309.3 1.82 Hauling OB 11328 JUSESLAF BANJAR NAHOR 3 3 1 7 OB Outpit EX-5037 PIT 5 IPD 10 42 294 - 42 -
2-Sep-21 Night TR-3175 38,695.5 38,697.6 2.10 Hauling OB 15349 ARDIANSYAH 3 3 6 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 252 - 42 -
2-Sep-21 Night TR-3195 24,559.1 24,567.1 8.01 Hauling OB 15229 ARDIANSYAH 2 4 3 3 3 4 4 5 3 31 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 1,302 - 42 -
2-Sep-21 Night TR-3202 26,696.7 26,704.2 7.50 Hauling OB 11474 SARINDI 2 4 3 3 4 4 4 5 3 32 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 1,344 - 1 42 42
2-Sep-21 Night TR-3203 26,800.2 26,807.0 6.80 Hauling OB 8920 VERRY EKO SETIAWAN 2 2 2 3 3 2 1 2 3 2 22 OB Outpit EX-5037 PIT 5 IPD 10 42 924 - 42 -
2-Sep-21 Night TR-3203 26,807.0 26,807.2 0.20 Hauling OB 8920 VERRY EKO SETIAWAN 2 2 OB Outpit EX-6016 PIT 5 EXT IPD 10 42 84 - 42 -
2-Sep-21 Night TR-3204 26,113.7 26,122.0 8.29 Hauling OB 1303 EFENDI 2 2 2 3 3 3 3 3 3 3 2 29 OB Outpit EX-5037 PIT 5 IPD 10 42 1,218 - 42 -
2-Sep-21 Night TR-3205 25,666.7 25,674.3 7.60 Hauling OB 7170F TRI PRASETIYO 3 4 3 3 3 5 5 4 3 33 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 1,386 - 42 -
2-Sep-21 Night TR-3206 24,909.2 24,917.0 7.80 Hauling OB 1354 SUDIYANTO 2 3 3 3 3 5 4 5 4 32 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 1,344 - 42 -
2-Sep-21 Night TR-3220 25,852.4 25,861.7 9.30 Hauling OB 8965 HADI SUTIKNO 1 3 2 3 2 3 3 3 3 4 3 30 OB Outpit EX-5037 PIT 5 IPD 10 42 1,260 - 42 -
2-Sep-21 Night TR-1024 31,335.8 31,335.8 - Unscheduled - WORKSHOP - - -
2-Sep-21 Night TR-1025 47,073.1 47,073.9 0.80 Hauling OB 15471 MULYADI 1 1 OB Outpit EX-5037 PIT 5 IPD 10 24 24 - 24 -
2-Sep-21 Night TR-1031 49,368.5 49,376.5 8.00 Hauling OB 15744 MARYANTO 3 4 4 4 2 4 3 4 3 4 3 38 OB Outpit EX-5022 PIT 5 EXT IPD 10 24 912 - 24 -
2-Sep-21 Night TR-1032 51,073.6 51,082.1 8.49 Hauling OB 15377 RIZALI RAHMAN 3 4 4 4 3 3 4 3 4 3 3 38 OB Outpit EX-5022 PIT 5 EXT IPD 10 24 912 - 24 -
2-Sep-21 Night TR-1033 51,525.9 51,526.7 0.80 Hauling OB 15377 RIZALI RAHMAN 1 1 OB Outpit EX-5037 PIT 5 IPD 10 24 24 - 24 -
2-Sep-21 Night TR-1034 49,303.6 49,313.2 9.60 Hauling OB 15397 YUSUF 2 5 3 4 3 4 3 3 4 3 3 37 OB Outpit EX-5022 PIT 5 EXT IPD 10 24 888 - 24 -
2-Sep-21 Night TR-1036 50,553.0 50,553.6 0.60 Hauling OB 15346 MUSA 1 1 OB Outpit EX-6022 PIT 5 EXT IPD 10 24 24 - 24 -
2-Sep-21 Night TR-1048 52,153.1 52,153.1 - Unscheduled - PIT 5 EXT - - -
2-Sep-21 Night TR-1049 45,967.8 45,976.2 8.40 Hauling OB 15376 EKO FAJAR S 2 5 3 5 2 4 3 4 3 4 3 38 OB Outpit EX-5022 PIT 5 EXT IPD 10 24 912 - 24 -
2-Sep-21 Night TR-1050 45,811.5 45,811.5 - Unscheduled - WORKSHOP - - -
2-Sep-21 Night TA-7009 27,759.8 27,765.2 5.40 Hauling Solid Mud 15818 AGUS SUGIANTO 1 3 2 4 3 2 3 18 Solid Mud Outpit EX-2058 PIT 5 EXT IPD 10 11 202 - 11 -
2-Sep-21 Night TA-7010 25,085.2 25,089.1 3.92 Hauling Solid Mud 15653 M. ILIAS 1 2 4 4 3 14 Solid Mud Outpit EX-2058 PIT 5 EXT IPD 10 11 157 - 11 -
2-Sep-21 Night TA-7010 25,089.1 25,093.6 4.48 Hauling Solid Mud 15819 AHNIANSYAH 4 4 3 1 4 16 Solid Mud Outpit EX-2058 PIT 5 EXT IPD 10 11 179 - 11 -
2-Sep-21 Night TA-7022 - - - Unscheduled - WORKSHOP - - -
2-Sep-21 Night TA-7029 28,491.9 28,491.9 - Unscheduled - PIT 5 EXT - - -
2-Sep-21 Night TA-7030 28,219.4 28,223.6 4.20 Hauling Solid Mud 15817 YUSANDI 2 2 3 3 3 13 Solid Mud Outpit EX-2058 PIT 5 EXT IPD 10 11 146 - 11 -
2-Sep-21 Night BD-4005 13,770.7 13,770.7 - Scheduled - WORKSHOP - - -
2-Sep-21 Night BD-5035 3,329.4 3,339.8 10.40 Road Maintenance Support 14963 MAULANA ISHAK - IPD 10 - - -
2-Sep-21 Night BD-6025 2,698.9 2,698.9 - Standby - KCP - - -
2-Sep-21 Night BD-6026 30,198.7 30,198.7 - Standby - WORKSHOP - - -
2-Sep-21 Night BD-6028 4,109.2 4,109.2 - Standby - KCP - - -
2-Sep-21 Night BD-6036 34,051.1 34,060.7 9.60 Unit Rental 15569 SUJIONO - KCP - - -
2-Sep-21 Night BD-6038 33,838.3 33,847.4 9.10 Unit Rental 14708 ADEFI P - KCP - - -
2-Sep-21 Night BD-6069 10,309.8 10,319.8 10.00 Front maintenance 14744 NOORDIANTO - PIT 5 - - -
2-Sep-21 Night BD-7013 39,765.3 39,775.1 9.80 Ripping 11676 SUDARSONO - PIT 5 - - -
2-Sep-21 Night BD-7026 26,426.8 26,431.9 5.10 Front maintenance 11367 RULLYANTO - PIT 5 - - -
2-Sep-21 Night BD-7034 9,826.1 9,836.0 9.90 Disposal maintenance 8157 SAMIDI - IPD 10 - - -
2-Sep-21 Night GR-2012 22,215.8 22,215.8 - Unscheduled - WORKSHOP - - -
2-Sep-21 Night GR-3007 39,087.1 39,097.4 10.30 Road Maintenance Support 15571 YOHANIS L - PIT 5 - - -
2-Sep-21 Night GR-3008 46,806.5 46,806.5 - Standby - PIT 5 - - -
2-Sep-21 Night TW-3001 8,484.0 8,486.0 2.00 Road Maintenance Support 15106 AHMAD NURANI - PIT 5 - - -
2-Sep-21 Night TW-4001 18,756.0 18,756.00 - Standby - PIT 5 - - -
2-Sep-21 Night PU-4002 19,056.0 19,056.0 - Unscheduled - PIT 11 - - -
2-Sep-21 Night PU-2026 6,186.2 6,186.2 - Standby 10914 SETYO BUDI UTOMO - PIT 11 - - -
2-Sep-21 Night PU-3026 12,307.0 12,307.0 - Standby - ROM TEMPORARY - - -
2-Sep-21 Night PU-3015 1,696.0 1,696.0 - Standby - PIT 11 - - -
2-Sep-21 Night PU-3014 27,240.4 27,240.4 - Standby - ROM TEMPORARY - - -
2-Sep-21 Night LP-2165 13,422.0 13,434.0 12.00 Unit Rental 4671 NURUDIN - KCP - - -
2-Sep-21 Night LP-2166 12,917.0 12,929.0 12.00 Unit Rental 4671 NURUDIN - KCP - - -
2-Sep-21 Night LP-2167 13,921.0 13,933.0 12.00 Unit Rental 4671 NURUDIN - KCP - - -
2-Sep-21 Night LP-2168 12,723.0 12,734.0 11.00 Unit Rental 4671 NURUDIN - KCP - - -
2-Sep-21 Night LP-2169 12,457.0 12,469.0 12.00 Unit Rental 4671 NURUDIN - KCP - - -
2-Sep-21 Night TS-4007 - - - Standby - KCP - - -
2-Sep-21 Night TS-4017 16,035.0 16,041.0 6.00 Unit Rental 15473 ISMAIL SAIDI - KCP - - -
2-Sep-21 Night TF-4013 20,297.0 20,303.0 6.00 Unit Rental 15746 SYARIFUDDI - KCP - - -
2-Sep-21 Night TF-4014 34,550.0 34,550.0 - Standby - KCP - - -
3-Sep-21 Day EX-2037 22,070.6 22,076.5 5.90 Side casting 15617 ZAENAL - WORKSHOP - - -
3-Sep-21 Day EX-2058 17,356.7 17,362.9 6.20 Side casting 15504 SLAMET WIDODO - PIT 5 EXT - 1,066 -
3-Sep-21 Day EX-2058 17,362.9 17,365.4 2.50 Loading Solid Mud 15504 SLAMET WIDODO - Solid Mud Outpit PIT 5 EXT IPD 10 - - 1,066 - -
3-Sep-21 Day EX-4006 35,177.0 35,177.0 - Unscheduled - PARKIRAN SCANIA - 1,121 -
3-Sep-21 Day EX-5014 38,597.0 38,598.0 1.00 Unit Rental 15345 SUTONO - KCP - - -
3-Sep-21 Day EX-5022 11,248.0 11,251.0 3.00 Loading Waste 10917 SETA VERDY KARYA - OB Outpit PIT 5 EXT IPD 10 - 1,117 -
3-Sep-21 Day EX-5037 19,003.0 19,006.0 3.00 Loading Waste 12534 PUJIYANTO - OB Outpit PIT 5 EXT IPD 10 - 1,131 -
3-Sep-21 Day EX-6014 57,514.0 57,514.0 - Unscheduled - PIT 5 EXT - - -
3-Sep-21 Day EX-6016 44,112.0 44,116.0 4.00 Loading Waste 15567 ARIF WAHYUDI - OB Outpit PIT 5 EXT IPD 10 - 697 -
3-Sep-21 Day EX-6022 18,438.5 18,443.1 4.60 Loading Waste 15486 SUGENG PRAYETNO - OB Outpit PIT 5 EXT IPD 10 - - -
3-Sep-21 Day TR-3080 42,585.5 42,587.5 2.00 Hauling OB 9214 MUSTOFA ADI PRAYITNO 2 2 4 OB Outpit EX-6016 PIT 5 EXT IPD 10 42 168 - 42 -
3-Sep-21 Day TR-3174 41,309.3 41,311.8 2.50 Hauling OB 8958 MUKHROMIN 1 4 4 9 OB Outpit EX-6016 PIT 5 EXT IPD 10 42 378 - 42 -
3-Sep-21 Day TR-3175 38,697.6 38,698.1 0.48 Hauling OB 10881 BURHANUDDIN 1 1 2 OB Outpit EX-5037 PIT 5 EXT IPD 10 42 84 - 42 -
3-Sep-21 Day TR-3175 38,698.1 38,700.7 2.62 Hauling OB 10881 BURHANUDDIN 3 6 1 1 11 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 462 - 42 -
3-Sep-21 Day TR-3195 24,567.1 24,570.2 3.10 Hauling OB 10762 SYAMSUDDIN 1 5 5 1 1 13 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 546 - 42 -
3-Sep-21 Day TR-3202 26,704.2 26,707.3 3.10 Hauling OB 10882 SABIRIN 2 4 6 2 14 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 588 - 42 -
3-Sep-21 Day TR-3203 26,807.2 26,809.7 2.50 Hauling OB 8892 BAGUS PURWONO 2 3 4 9 OB Outpit EX-6016 PIT 5 EXT IPD 10 42 378 - 42 -
3-Sep-21 Day TR-3204 26,122.0 26,125.1 3.06 Hauling OB 15350 HERMAN 2 3 4 9 OB Outpit EX-6016 PIT 5 EXT IPD 10 42 378 - 42 -
3-Sep-21 Day TR-3204 26,125.1 26,125.4 0.34 Hauling OB 10969 JOKO PRIONO 1 1 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 42 - 42 -
3-Sep-21 Day TR-3205 25,674.3 25,675.8 1.50 Hauling OB 10695 SUPIYANDI 2 3 5 OB Outpit EX-5037 PIT 5 EXT IPD 10 42 210 - 42 -
3-Sep-21 Day TR-3205 25,675.8 25,677.0 1.20 Hauling OB 10695 SUPIYANDI 4 4 OB Outpit EX-6016 PIT 5 EXT IPD 10 42 168 - 42 -
3-Sep-21 Day TR-3206 24,917.0 24,918.2 1.20 Hauling OB 10969 JOKO PRIONO 1 2 3 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 126 - 42 -
3-Sep-21 Day TR-3220 25,861.7 25,864.0 2.30 Hauling OB 10968 SUKIRNO 2 5 3 1 11 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 462 - 42 -
3-Sep-21 Day TR-1024 31,335.8 31,335.8 - Unscheduled - WORKSHOP - - -
3-Sep-21 Day TR-1025 47,073.9 47,076.6 2.70 Hauling OB 15466 SUPRIYANTO 3 4 7 OB Outpit EX-5037 PIT 5 EXT IPD 10 24 168 - 24 -
3-Sep-21 Day TR-1031 49,376.5 49,378.8 2.30 Hauling OB 15485 ROBY TM 1 5 6 12 OB Outpit EX-5022 PIT 5 EXT IPD 10 24 288 - 24 -
3-Sep-21 Day TR-1032 51,082.1 51,084.7 2.60 Hauling OB 15468 PADLIANSYAH 1 6 5 12 OB Outpit EX-5022 PIT 5 EXT IPD 10 24 288 - 24 -
3-Sep-21 Day TR-1033 51,526.7 51,529.0 2.30 Hauling OB 15470 IJAI 1 4 4 9 OB Outpit EX-5037 PIT 5 EXT IPD 10 24 216 - 24 -
3-Sep-21 Day TR-1034 49,313.2 49,315.6 2.40 Hauling OB 15395 ANDRI SUSANTO 1 5 6 12 OB Outpit EX-5022 PIT 5 EXT IPD 10 24 288 - 24 -
3-Sep-21 Day TR-1036 50,553.6 50,555.7 2.10 Hauling OB 15420 M ABD MADI 1 4 3 8 OB Outpit EX-5037 PIT 5 EXT IPD 10 24 192 - 24 -
3-Sep-21 Day TR-1048 52,153.1 52,154.2 1.10 Hauling OB 15350 HERMAN 1 1 OB Outpit EX-5037 PIT 5 EXT IPD 10 24 24 - 24 -
3-Sep-21 Day TR-1049 45,976.2 45,978.5 2.30 Hauling OB 15576 JOKO SANTOSO 1 5 6 12 OB Outpit EX-5022 PIT 5 EXT IPD 10 24 288 - 24 -
3-Sep-21 Day TR-1050 45,811.5 45,811.5 - Unscheduled - WORKSHOP - - -
3-Sep-21 Day TA-7009 27,765.2 27,767.7 2.50 Hauling Solid Mud 15862 RUDY AMRIYADI 4 4 Solid Mud Outpit EX-2058 PIT 5 EXT IPD 10 11 45 - 6 11 67
3-Sep-21 Day TA-7010 25,093.6 25,096.4 2.80 Hauling Solid Mud 15816 M. YUSUF 4 4 Solid Mud Outpit EX-2058 PIT 5 EXT IPD 10 11 45 - 6 11 67
3-Sep-21 Day TA-7022 - - - Unscheduled - WORKSHOP - - -
3-Sep-21 Day TA-7029 28,491.9 28,491.9 - Unscheduled - PIT 5 EXT - - -
3-Sep-21 Day TA-7030 28,223.6 28,223.6 - Unscheduled - PIT 5 EXT - - -
3-Sep-21 Day BD-4005 13,770.7 13,770.7 - Unscheduled - WORKSHOP - - -
k 3-Sep-21 Day BD-5035 3,339.8 3,340.2 0.40 Road Maintenance Support 5535 ISMADI - PIT 5 EXT - - -
3-Sep-21 Day BD-6025 2,698.9 2,701.6 2.70 Unit Rental 14750 MUSTAKIM - KCP - - -
3-Sep-21 Day BD-6026 30,198.7 30,198.7 - Standby - WORKSHOP - - -
3-Sep-21 Day BD-6028 4,109.2 4,109.2 - Standby - KCP - - -
3-Sep-21 Day BD-6036 34,060.7 34,064.2 3.50 Unit Rental 14710 AGUS S - KCP - - -
3-Sep-21 Day BD-6038 33,847.4 33,850.0 2.60 Unit Rental 11169 ANNAS - KCP - - -
3-Sep-21 Day BD-6069 10,319.8 10,325.0 5.20 Disposal maintenance 9339f ANTON WIBOWO - IPD 10 - - -
3-Sep-21 Day BD-7013 39,775.1 39,777.0 1.90 Front maintenance 9339f ANTON WIBOWO - PIT 5 EXT - - -
3-Sep-21 Day BD-7026 26,431.9 26,437.0 5.10 Front maintenance 15606 FATHUR - PIT 5 EXT - - -
3-Sep-21 Day BD-7034 9,836.0 9,842.3 6.30 Disposal maintenance 9492 MAHFUDI - IPD 10 - - -
3-Sep-21 Day GR-2012 22,215.8 22,215.8 - Unscheduled - WORKSHOP - - -
3-Sep-21 Day GR-3007 39,097.4 39,101.4 4.00 Road Maintenance Support 8925 AGUS SUNARWAN - PIT 5 EXT - - -
3-Sep-21 Day GR-3008 46,806.5 46,810.1 3.60 Road Maintenance Support 9426 ADE SUPIANA - PIT 5 EXT - - -
3-Sep-21 Day TW-3001 8,486.0 8,486.0 - Standby - PIT 5 EXT - - -
3-Sep-21 Day TW-4001 18,756.0 18,756.00 - Standby - PIT 5 EXT - - -
3-Sep-21 Day PU-4002 19,056.0 19,056.00 - Standby - PIT 11 - - -
3-Sep-21 Day PU-2026 6,186.2 6,186.2 - Standby - PIT 11 - - -
3-Sep-21 Day PU-3026 12,307.0 12,307.00 - Standby - ROM TEMPORARY - - -
3-Sep-21 Day PU-3015 1,696.0 1,696.00 - Standby - PIT 11 - - -
3-Sep-21 Day PU-3014 27,240.4 27,240.40 - Standby - ROM TEMPORARY - - -
3-Sep-21 Day LP-2165 13,434.0 13,434.00 - Standby - KCP - - -
3-Sep-21 Day LP-2166 12,929.0 12,931.00 2.00 Unit Rental - KCP - - -
3-Sep-21 Day LP-2167 13,933.0 13,933.00 - Standby - KCP - - -
3-Sep-21 Day LP-2168 12,734.0 12,734.00 - Standby - KCP - - -
3-Sep-21 Day LP-2169 12,469.0 12,469.00 - Standby - KCP - - -
3-Sep-21 Day TS-4007 - - - Standby - KCP - - -
3-Sep-21 Day TS-4017 16,041.0 16,047.0 6.00 Unit Rental 15310 ALDI ALFI SAPUTRA - KCP - - -
3-Sep-21 Day TF-4013 20,303.0 20,304.0 1.00 Unit Rental 15745 SURYANATA - KCP - - -
3-Sep-21 Day TF-4014 34,550.0 34,550.0 - Standby - KCP - - -
3-Sep-21 Night EX-2037 22,076.5 22,076.5 - Standby - WORKSHOP - - -
3-Sep-21 Night EX-2058 17,365.4 17,374.1 8.70 Drainage - PIT 5 EXT - 1,066 -
3-Sep-21 Night EX-4006 35,177.0 35,177.0 - Unscheduled - PARKIRAN SCANIA - 1,121 -
3-Sep-21 Night EX-5014 38,598.0 38,598.0 - Standby 15375 A JEFRI M - KCP - - -
3-Sep-21 Night EX-5022 11,251.0 11,251.0 - Standby - PIT 5 EXT - 1,117 -
3-Sep-21 Night EX-5037 19,006.0 19,008.0 2.00 Sloping 9590F SIRATAL RAYYAN - PIT 5 - 1,131 -
3-Sep-21 Night EX-6014 57,514.0 57,519.0 5.00 Loading Waste 10916 DANI NOVI KUSYANTO - OB Outpit PIT 5 EXT IPD 10 - - -
3-Sep-21 Night EX-6016 44,116.0 44,116.0 - Standby - OB Outpit PIT 5 EXT IPD 10 - 697 -
3-Sep-21 Night EX-6022 18,443.1 18,445.0 1.90 Loading Waste 9136 AHMAD YANI - OB Outpit PIT 5 IPD 10 - - -
3-Sep-21 Night TR-3080 42,587.5 42,587.5 - Unscheduled - WORKSHOP - - -
3-Sep-21 Night TR-3174 41,311.8 41,311.8 - Standby - PIT 5 EXT - - -
3-Sep-21 Night TR-3175 38,700.7 38,702.4 1.70 Hauling OB 9354 JIDIN 3 2 5 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 210 - 42 -
3-Sep-21 Night TR-3195 24,570.2 24,571.4 1.20 Hauling OB 15229 ARDIANSYAH 2 4 6 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 252 - 42 -
3-Sep-21 Night TR-3202 26,707.3 26,708.6 1.30 Hauling OB 2 4 6 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 252 - 42 -
3-Sep-21 Night TR-3203 26,809.7 26,810.5 0.80 Hauling OB 11619 DWI WARDOYO 4 4 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 168 - 42 -
3-Sep-21 Night TR-3203 26,810.5 26,811.3 0.80 Hauling OB 11619 DWI WARDOYO 4 4 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 168 - 42 -
3-Sep-21 Night TR-3204 26,125.4 26,125.4 - Standby - PIT 5 EXT - - -
3-Sep-21 Night TR-3205 25,677.0 25,677.4 0.43 Hauling OB 7170f TRI PRASETIYO 2 2 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 84 - 42 -
3-Sep-21 Night TR-3205 25,677.4 25,678.3 0.87 Hauling OB 7170f TRI PRASETIYO 1 3 4 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 168 - 42 -
3-Sep-21 Night TR-3206 24,918.2 24,918.2 - Scheduled - WORKSHOP - - -
3-Sep-21 Night TR-3220 25,864.0 25,866.2 2.20 Hauling OB 8965 HADI SUTIKNO 3 3 6 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 252 - 42 -
3-Sep-21 Night TR-1024 31,335.8 31,335.8 - Unscheduled - WORKSHOP - - -
3-Sep-21 Night TR-1025 47,076.6 47,077.8 1.20 Hauling OB 15636 AKHMAD NOOR 2 2 4 OB Outpit EX-6014 PIT 5 EXT IPD 10 24 96 - 1 24 24
3-Sep-21 Night TR-1031 49,378.8 49,378.8 - Standby - PIT 5 EXT - - -
3-Sep-21 Night TR-1032 51,084.7 51,085.2 0.50 Moving - pindah lokasi kerja 15377 RIZALI RAHMAN - PIT 5 EXT - - -
3-Sep-21 Night TR-1033 51,529.0 51,529.0 - Standby - PIT 5 EXT - - -
3-Sep-21 Night TR-1034 49,315.6 49,316.1 0.50 Hauling OB 15397 YUSUF 1 1 OB Outpit EX-6014 PIT 5 EXT IPD 10 24 24 - 24 -
3-Sep-21 Night TR-1036 50,555.7 50,556.7 1.00 Hauling OB 15346 MUSA 1 3 4 OB Outpit EX-6014 PIT 5 EXT IPD 10 24 96 - 24 -
3-Sep-21 Night TR-1048 52,154.2 52,155.4 1.20 Hauling OB 1 3 4 OB Outpit EX-6014 PIT 5 EXT IPD 10 24 96 - 24 -
3-Sep-21 Night TR-1049 45,978.5 45,978.5 - Standby - PIT 5 EXT - - -
3-Sep-21 Night TR-1050 45,811.5 45,811.5 - Unscheduled - WORKSHOP - - -
3-Sep-21 Night TA-7009 27,767.7 27,767.7 - Standby - PIT 5 EXT - - -
3-Sep-21 Night TA-7010 25,096.4 25,096.4 - Standby - PIT 5 EXT - - -
3-Sep-21 Night TA-7022 - - - Unscheduled - WORKSHOP - - -
3-Sep-21 Night TA-7029 28,491.9 28,491.9 - Standby - PIT 5 EXT - - -
3-Sep-21 Night TA-7030 28,223.6 28,223.6 - Unscheduled - PIT 5 EXT - - -
3-Sep-21 Night BD-4005 13,770.7 13,770.7 - Unscheduled - WORKSHOP - - -
3-Sep-21 Night BD-5035 3,340.2 3,340.5 0.30 Road Maintenance Support 14963 MAULANA ISHAK - PIT 5 EXT - - -
3-Sep-21 Night BD-6025 2,701.6 2,701.6 - Standby - KCP - - -
3-Sep-21 Night BD-6026 30,198.7 30,198.7 - Standby - WORKSHOP - - -
3-Sep-21 Night BD-6028 4,109.2 4,109.2 - Standby - KCP - - -
3-Sep-21 Night BD-6036 34,064.2 34,065.2 1.00 Unit Rental 14964 JOKO P (Dozer) - KCP - - -
3-Sep-21 Night BD-6038 33,850.0 33,852.0 2.00 Unit Rental 15464 MARJUKI - KCP - - -
3-Sep-21 Night BD-6069 10,325.0 10,333.8 8.80 Disposal maintenance 11367 RULLYANTO - IPD 10 - - -
3-Sep-21 Night BD-7013 39,777.0 39,783.1 6.10 Front maintenance 11676 SUDARSONO - PIT 5 EXT - - -
3-Sep-21 Night BD-7026 26,437.0 26,442.5 5.50 Front maintenance 14709 A. FATHONI - PIT 5 EXT - - -
3-Sep-21 Night BD-7034 9,842.3 9,849.5 7.20 Disposal maintenance 15639 A. BUDIMAN - IPD 10 - - -
3-Sep-21 Night GR-2012 22,215.8 22,215.8 - Unscheduled - WORKSHOP - - -
3-Sep-21 Night GR-3007 39,101.4 39,107.5 6.10 Road Maintenance Support 15571 YOHANIS L - PIT 5 EXT - - -
3-Sep-21 Night GR-3008 46,810.1 46,810.1 - Standby - PIT 5 EXT - - -
3-Sep-21 Night TW-3001 8,486.0 8,486.0 - Standby - PIT 5 EXT - - -
3-Sep-21 Night TW-4001 18,756.0 18,756.00 - Standby - PIT 5 EXT - - -
3-Sep-21 Night PU-4002 19,056.0 19,056.0 - Standby - PIT 11 - - -
3-Sep-21 Night PU-2026 6,186.2 6,186.2 - Standby - PIT 11 - - -
3-Sep-21 Night PU-3026 12,307.0 12,307.0 - Standby - ROM TEMPORARY - - -
3-Sep-21 Night PU-3015 1,696.0 1,696.0 - Standby - PIT 11 - - -
3-Sep-21 Night PU-3014 27,240.4 27,240.4 - Standby - ROM TEMPORARY - - -
3-Sep-21 Night LP-2165 13,434.0 13,446.0 12.00 Unit Rental 4671 NURUDIN - KCP - - -
3-Sep-21 Night LP-2166 12,931.0 12,943.0 12.00 Unit Rental 4671 NURUDIN - KCP - - -
3-Sep-21 Night LP-2167 13,933.0 13,933.0 - Unit Rental 4671 NURUDIN - KCP - - -
3-Sep-21 Night LP-2168 12,734.0 12,739.0 5.00 Unit Rental 4671 NURUDIN - KCP - - -
3-Sep-21 Night LP-2169 12,469.0 12,481.0 12.00 Unit Rental 4671 NURUDIN - KCP - - -
3-Sep-21 Night TS-4007 - - - Standby - KCP - - -
3-Sep-21 Night TS-4017 16,047.0 16,049.0 2.00 Unit Rental 15472 RIZKA M - KCP - - -
3-Sep-21 Night TF-4013 20,304.0 20,304.0 - Standby 15746 SYARIFUDDI - KCP - - -
3-Sep-21 Night TF-4014 34,550.0 34,550.0 - Standby - KCP - - -
4-Sep-21 Day EX-2037 22,076.5 22,086.2 9.70 Road Maintenance Support 15617 ZAENAL - JALAN SAKA - - -
4-Sep-21 Day EX-2058 17,374.1 17,377.1 3.00 Side casting 11330 EKO PURWANTO - PIT 5 - 1,084 -
4-Sep-21 Day EX-2058 17,377.1 17,381.8 4.70 Drainage 11330 EKO PURWANTO - PIT 5 - 1,084 -
4-Sep-21 Day EX-4006 35,177.0 35,177.0 - Unscheduled - PARKIRAN SCANIA - 1,201 -
4-Sep-21 Day EX-5014 38,598.0 38,601.0 3.00 Unit Rental 15345 SUTONO - KCP - - -
4-Sep-21 Day EX-5022 11,251.0 11,254.0 3.00 Side casting 15568 FUAD EFENDI - PIT 5 EXT - 1,091 -
4-Sep-21 Day EX-5037 19,008.0 19,012.0 4.00 Side casting 12534 PUJIYANTO - PIT 5 EXT - 1,212 -
4-Sep-21 Day EX-6014 57,519.0 57,520.0 1.00 Loading Waste 10917 SETA VERDY KARYA - OB Outpit PIT 5 EXT IPD 10 - - -
4-Sep-21 Day EX-6016 44,116.0 44,116.0 - Standby 15567 ARIF WAHYUDI - PIT 5 EXT - - -
4-Sep-21 Day EX-6022 18,445.0 18,447.7 2.70 Loading Waste 15486 SUGENG PRAYETNO - OB Outpit PIT 5 EXT IPD 10 - - -
4-Sep-21 Day TR-3080 42,587.5 42,587.5 - Standby - PIT 5 - - -
4-Sep-21 Day TR-3174 41,311.8 41,311.8 - Standby 8958 MUKHROMIN - PIT 5 - - -
4-Sep-21 Day TR-3175 38,702.4 38,704.3 1.90 Hauling OB 15349 ARDIANSYAH 4 1 2 7 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 294 - 42 -
4-Sep-21 Day TR-3195 24,571.4 24,573.4 2.00 Hauling OB 10762 SYAMSUDDIN 3 1 3 7 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 294 - 42 -
4-Sep-21 Day TR-3202 26,708.6 26,710.3 1.70 Hauling OB 15230 MARGONO 4 1 1 6 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 252 - 42 -
4-Sep-21 Day TR-3203 26,811.3 26,813.3 2.00 Hauling OB 8892 BAGUS PURWONO 4 1 1 2 8 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 336 - 42 -
4-Sep-21 Day TR-3204 26,125.4 26,126.4 1.00 Hauling OB 10969 JOKO PRIONO 1 1 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 42 - 42 -
4-Sep-21 Day TR-3205 25,678.3 25,680.1 1.80 Hauling OB 10695 SUPIYANDI 4 1 2 7 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 294 - 42 -
4-Sep-21 Day TR-3206 24,918.2 24,918.2 - Scheduled - PIT 5 EXT IPD 10 - - -
4-Sep-21 Day TR-3220 25,866.2 25,866.5 0.30 Hauling OB 15350 HERMAN 1 1 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 42 - 42 -
4-Sep-21 Day TR-3220 25,866.5 25,866.7 0.20 Hauling OB 15350 HERMAN 1 1 2 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 84 - 42 -
4-Sep-21 Day TR-1024 31,335.8 31,335.8 - Unscheduled - PIT 5 - - -
4-Sep-21 Day TR-1025 47,077.8 47,077.8 - Standby - PIT 5 - - -
4-Sep-21 Day TR-1031 49,378.8 49,379.4 0.60 Hauling OB 15485 ROBY TM 1 1 OB Outpit EX-6014 PIT 5 EXT IPD 10 24 24 - 24 -
4-Sep-21 Day TR-1032 51,085.2 51,085.2 - Standby - PIT 5 - - -
4-Sep-21 Day TR-1033 51,529.0 51,529.0 - Standby 15470 IJAI - PIT 5 - - -
4-Sep-21 Day TR-1034 49,316.1 49,316.1 - Standby 15395 ANDRI SUSANTO - PIT 5 - - -
4-Sep-21 Day TR-1036 50,556.7 50,556.7 - Standby 15471 MULYADI - PIT 5 - - -
4-Sep-21 Day TR-1048 52,155.4 52,155.4 - Standby - PIT 5 - - -
4-Sep-21 Day TR-1049 45,978.5 45,978.5 - Standby 15576 JOKO SANTOSO - PIT 5 - - -
4-Sep-21 Day TR-1050 45,811.5 45,811.5 - Unscheduled - PIT 5 - - -
4-Sep-21 Day TA-7009 27,767.7 27,767.7 - Standby 15862 RUDY AMRIYADI - PIT 5 - - -
4-Sep-21 Day TA-7010 25,096.4 25,096.4 - Standby 15861 AGUSTIAN - PIT 5 - - -
4-Sep-21 Day TA-7022 - - - Unscheduled - WORKSHOP - - -
4-Sep-21 Day TA-7029 28,493.0 28,493.0 - Standby 15816 M. YUSUF - PIT 5 - - -
4-Sep-21 Day TA-7030 28,223.6 28,223.6 - Unscheduled 15863 HENDRA M - PIT 5 - - -
4-Sep-21 Day BD-4005 13,770.7 13,770.7 - Scheduled - WORKSHOP - - -
4-Sep-21 Day BD-5035 3,340.5 3,340.5 - Standby - PIT 5 - - -
4-Sep-21 Day BD-6025 2,701.6 2,701.6 - Standby - KCP - - -
4-Sep-21 Day BD-6026 30,198.7 30,198.7 - Standby - WORKSHOP - - -
4-Sep-21 Day BD-6028 4,109.2 4,109.2 - Standby - KCP - - -
4-Sep-21 Day BD-6036 34,065.2 34,070.3 5.10 Unit Rental 14750 MUSTAKIM - KCP - - -
4-Sep-21 Day BD-6038 33,852.0 33,857.1 5.10 Unit Rental 15570 HENDRY S - KCP - - -
4-Sep-21 Day BD-6069 10,333.8 10,343.0 9.20 Disposal maintenance 14744 NOORDIANTO - IPD 10 - - -
4-Sep-21 Day BD-7013 39,783.1 39,787.7 4.60 Front maintenance 15606 FATHUR - PIT 5 - - -
4-Sep-21 Day BD-7026 26,442.5 26,445.0 2.50 Front maintenance 15606 FATHUR - PIT 5 - - -
4-Sep-21 Day BD-7034 9,849.5 9,858.3 8.80 Disposal maintenance 9492 MAHFUDI - IPD 10 - - -
4-Sep-21 Day GR-2012 22,215.8 22,215.8 - Unscheduled - WORKSHOP - - -
4-Sep-21 Day GR-3007 39,107.5 39,112.1 4.60 Road Maintenance Support 9103 WAWAN WIDODO - PIT 5 - - -
4-Sep-21 Day GR-3008 46,810.1 46,814.6 4.50 Road Maintenance Support 9426 ADE SUPIANA - PIT 5 - - -
4-Sep-21 Day TW-3001 8,486.0 8,486.0 - Standby 15743 LANA - PIT 5 - - -
4-Sep-21 Day TW-4001 18,756.0 18,756.00 - Standby - PIT 5 - - -
4-Sep-21 Day PU-4002 19,056.0 19,056.00 - Standby - PIT 11 - - -
4-Sep-21 Day PU-2026 6,186.2 6,186.2 - Standby - PIT 11 - - -
4-Sep-21 Day PU-3026 12,307.0 12,307.00 - Standby - ROM TEMPORARY - - -
4-Sep-21 Day PU-3015 1,696.0 1,696.00 - Standby - PIT 11 - - -
4-Sep-21 Day PU-3014 27,240.4 27,240.40 - Standby - ROM TEMPORARY - - -
4-Sep-21 Day LP-2165 13,446.0 13,446.00 - Standby - KCP - - -
4-Sep-21 Day LP-2166 12,943.0 12,943.00 - Standby - KCP - - -
4-Sep-21 Day LP-2167 13,933.0 13,933.00 - Standby - KCP - - -
4-Sep-21 Day LP-2168 12,739.0 12,739.00 - Standby - KCP - - -
4-Sep-21 Day LP-2169 12,481.0 12,481.00 - Standby - KCP - - -
4-Sep-21 Day TS-4007 - - - Standby - KCP - - -
4-Sep-21 Day TS-4017 16,049.0 16,054.0 5.00 Unit Rental 15310 ALDI ALFI SAPUTRA - KCP - - -
4-Sep-21 Day TF-4013 20,304.0 20,308.0 4.00 Unit Rental 15745 SURYANATA - KCP - - -
4-Sep-21 Day TF-4014 34,550.0 34,550.0 - Standby - KCP - - -
4-Sep-21 Night EX-2037 22,086.2 22,086.2 - Standby - JALAN SAKA - - -
4-Sep-21 Night EX-2058 17,381.8 17,382.8 1.00 Drainage - PIT 5 - 1,084 -
4-Sep-21 Night EX-2058 17,382.8 17,385.8 3.00 Side casting - PIT 5 - 1,084 -
4-Sep-21 Night EX-2058 17,385.8 17,388.3 2.50 Sloping - PIT 5 - 1,084 -
4-Sep-21 Night EX-2058 17,388.3 17,389.0 0.70 Loading Solid Mud - Solid Mud Outpit PIT 5 IPD 10 - - 1,084 - -
4-Sep-21 Night EX-4006 35,177.0 35,177.0 - Unscheduled - PARKIRAN SCANIA - 1,201 -
4-Sep-21 Night EX-5014 38,601.0 38,602.0 1.00 Unit Rental 15616 JOKO SUDIRO - KCP - - -
4-Sep-21 Night EX-5022 11,254.0 11,258.0 4.00 Side casting 15604 AHMAD SYAFI'I - OB Outpit PIT 5 EXT IPD 10 - 1,091 -
4-Sep-21 Night EX-5037 19,012.0 19,012.5 0.50 Rehandling Coal 9590F SIRATAL RAYYAN - OB Outpit PIT 5 EXT IPD 10 - 1,212 -
4-Sep-21 Night EX-5037 19,012.5 19,019.0 6.50 Loading Waste 9590F SIRATAL RAYYAN - OB Outpit PIT 5 EXT IPD 10 - 1,212 -
4-Sep-21 Night EX-6014 57,520.0 57,529.0 9.00 Loading Waste 9136 AHMAD YANI - OB Outpit PIT 5 EXT IPD 10 - - -
4-Sep-21 Night EX-6016 44,116.0 44,121.0 5.00 Loading Waste 10916 DANI NOVI KUSYANTO - OB Outpit PIT 5 EXT IPD 10 - - -
4-Sep-21 Night EX-6022 18,447.7 18,456.6 8.90 Loading Waste 11146 PURWANTO - OB Outpit PIT 5 EXT IPD 10 - - -
4-Sep-21 Night TR-3080 42,587.5 42,593.4 5.90 Hauling OB 10881 BURHANUDDIN 2 3 3 3 4 3 3 21 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 882 - 42 -
4-Sep-21 Night TR-3174 41,311.8 41,318.8 7.00 Hauling OB 11328 JUSESLAF BANJAR NAHOR 2 3 3 2 4 3 3 2 22 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 924 - 1 42 42
4-Sep-21 Night TR-3174 41,318.8 41,319.3 0.50 Hauling OB 11328 JUSESLAF BANJAR NAHOR 2 2 OB Outpit EX-5037 PIT 5 EXT IPD 10 42 84 - 42 -
4-Sep-21 Night TR-3175 38,704.3 38,706.4 2.05 Hauling OB 9354 JIDIN 3 4 7 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 294 - 42 -
4-Sep-21 Night TR-3175 38,706.4 38,712.5 6.15 Hauling OB 9354 JIDIN 3 3 3 3 4 3 2 21 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 882 - 42 -
4-Sep-21 Night TR-3195 24,573.4 24,580.4 7.00 Hauling OB 2 4 3 2 2 3 2 2 20 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 840 - 42 -
4-Sep-21 Night TR-3202 26,710.3 26,718.4 8.10 Hauling OB 10882 SABIRIN 3 2 5 4 3 5 5 4 3 34 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 1,428 - 2 42 84
4-Sep-21 Night TR-3202 26,718.4 26,718.7 0.30 Hauling OB 10882 SABIRIN 1 1 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 42 - 42 -
4-Sep-21 Night TR-3203 26,813.3 26,819.9 6.60 Hauling OB 1354 SUDIYANTO 2 2 3 2 4 3 4 2 22 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 924 - 42 -
4-Sep-21 Night TR-3203 26,819.9 26,820.8 0.90 Hauling OB 1354 SUDIYANTO 1 2 3 OB Outpit EX-5037 PIT 5 EXT IPD 10 42 126 - 42 -
4-Sep-21 Night TR-3204 26,126.4 26,135.0 8.60 Hauling OB 1303 EFENDI 3 5 5 4 3 5 5 4 4 38 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 1,596 - 42 -
4-Sep-21 Night TR-3205 25,680.1 25,688.3 8.20 Hauling OB 7170F TRI PRASETIYO 4 4 4 5 3 5 4 4 3 36 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 1,512 - 42 -
4-Sep-21 Night TR-3206 24,918.2 24,918.2 - Unscheduled - PIT 5 EXT - - -
4-Sep-21 Night TR-3220 25,866.7 25,875.0 8.30 Hauling OB 8965 HADI SUTIKNO 3 4 5 3 3 4 5 4 3 34 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 1,428 - 42 -
4-Sep-21 Night TR-1024 31,335.8 31,335.8 - Unscheduled - WORKSHOP - - -
4-Sep-21 Night TR-1025 47,077.8 47,079.8 1.95 Hauling OB 15636 AKHMAD NOOR 4 1 2 7 OB Outpit EX-5037 PIT 5 EXT IPD 10 24 168 - 24 -
4-Sep-21 Night TR-1025 47,079.8 47,081.2 1.40 Hauling OB 15636 AKHMAD NOOR 3 2 5 OB Outpit EX-5022 PIT 5 EXT IPD 10 24 120 - 24 -
4-Sep-21 Night TR-1025 47,081.2 47,084.5 3.35 Hauling OB 15636 AKHMAD NOOR 2 3 2 3 2 12 OB Outpit EX-6016 PIT 5 EXT IPD 10 24 288 - 24 -
4-Sep-21 Night TR-1031 49,379.4 49,379.4 - Standby - PIT 5 - - -
4-Sep-21 Night TR-1032 51,085.2 51,089.2 3.95 Hauling OB 15468 PADLIANSYAH 2 4 3 1 3 13 OB Outpit EX-5037 PIT 5 EXT IPD 10 24 312 - 2 24 48
4-Sep-21 Night TR-1032 51,089.2 51,089.5 0.30 Hauling OB 15468 PADLIANSYAH 1 1 OB Outpit EX-5022 PIT 5 EXT IPD 10 24 24 - 24 -
4-Sep-21 Night TR-1032 51,089.5 51,092.8 3.34 Hauling OB 15468 PADLIANSYAH 2 3 2 1 3 11 OB Outpit EX-6016 PIT 5 EXT IPD 10 24 264 - 24 -
4-Sep-21 Night TR-1033 51,529.0 51,532.5 3.53 Hauling OB 15421 AGUS A 3 4 3 1 11 OB Outpit EX-5037 PIT 5 EXT IPD 10 24 264 - 24 -
4-Sep-21 Night TR-1033 51,532.5 51,532.9 0.32 Hauling OB 15421 AGUS A 1 1 OB Outpit EX-5022 PIT 5 EXT IPD 10 24 24 - 24 -
4-Sep-21 Night TR-1033 51,532.9 51,536.7 3.85 Hauling OB 15421 AGUS A 2 3 1 3 3 12 OB Outpit EX-6016 PIT 5 EXT IPD 10 24 288 - 24 -
4-Sep-21 Night TR-1034 49,316.1 49,318.5 2.43 Hauling OB 15397 YUSUF 4 4 8 OB Outpit EX-6014 PIT 5 EXT IPD 10 24 192 - 24 -
4-Sep-21 Night TR-1034 49,318.5 49,319.8 1.22 Hauling OB 15397 YUSUF 4 4 OB Outpit EX-5037 PIT 5 EXT IPD 10 24 96 - 24 -
4-Sep-21 Night TR-1034 49,319.8 49,323.4 3.65 Hauling OB 15397 YUSUF 1 3 2 4 2 12 OB Outpit EX-6016 PIT 5 EXT IPD 10 24 288 - 1 24 24
4-Sep-21 Night TR-1036 50,556.7 50,557.0 0.27 Hauling OB 15420 M ABD MADI 1 1 OB Outpit EX-6014 PIT 5 EXT IPD 10 24 24 - 24 -
4-Sep-21 Night TR-1036 50,557.0 50,557.5 0.53 Hauling OB 15420 M ABD MADI 2 2 OB Outpit EX-5037 PIT 5 EXT IPD 10 24 48 - 24 -
4-Sep-21 Night TR-1036 50,557.5 50,559.9 2.39 Hauling OB 15420 M ABD MADI 2 4 3 9 OB Outpit EX-5022 PIT 5 EXT IPD 10 24 216 - 24 -
4-Sep-21 Night TR-1036 50,559.9 50,563.6 3.72 Hauling OB 15420 M ABD MADI 2 3 2 4 3 14 OB Outpit EX-6016 PIT 5 EXT IPD 10 24 336 - 24 -
4-Sep-21 Night TR-1048 52,155.4 52,155.4 - Standby - PIT 5 - - -
4-Sep-21 Night TR-1049 45,978.5 45,983.3 4.80 Hauling OB 15376 EKO FAJAR S 1 1 3 4 4 3 16 OB Outpit EX-5037 PIT 5 EXT IPD 10 24 384 - 24 -
4-Sep-21 Night TR-1049 45,983.3 45,985.4 2.10 Hauling OB 15376 EKO FAJAR S 1 3 3 7 OB Outpit EX-5022 PIT 5 EXT IPD 10 24 168 - 24 -
4-Sep-21 Night TR-1049 45,985.4 45,985.7 0.30 Hauling OB 15376 EKO FAJAR S 1 1 OB Outpit EX-6014 PIT 5 EXT IPD 10 24 24 - 24 -
4-Sep-21 Night TR-1049 45,985.7 45,986.6 0.90 Hauling OB 15376 EKO FAJAR S 1 2 3 OB Outpit EX-6016 PIT 5 EXT IPD 10 24 72 - 24 -
4-Sep-21 Night TR-1050 45,811.5 45,811.5 - Unscheduled - WORKSHOP - - -
4-Sep-21 Night TA-7009 27,767.7 27,772.7 4.96 Hauling OB 15818 AGUS SUGIANTO 1 3 4 3 4 2 17 OB Outpit EX-5037 PIT 5 EXT IPD 10 14 238 - 14 -
4-Sep-21 Night TA-7009 27,772.7 27,775.0 2.34 Hauling OB 15818 AGUS SUGIANTO 4 4 8 OB Outpit EX-5022 PIT 5 EXT IPD 10 14 112 - 14 -
4-Sep-21 Night TA-7010 25,096.4 25,097.2 0.80 Rehandling Coal 15653 M. ILIAS 3 3 COAL EX-5037 PIT 5 EXT 11 - - 11 -
4-Sep-21 Night TA-7010 25,097.2 25,101.7 4.52 Hauling OB 15653 M. ILIAS 3 4 3 4 3 17 OB Outpit EX-5037 PIT 5 EXT IPD 10 14 238 - 14 -
4-Sep-21 Night TA-7010 25,101.7 25,104.9 3.19 Hauling OB 15653 M. ILIAS 5 4 3 12 OB Outpit EX-5022 PIT 5 EXT IPD 10 14 168 - 14 -
4-Sep-21 Night TA-7022 - - - Unscheduled - WORKSHOP - - -
4-Sep-21 Night TA-7029 28,493.0 28,493.8 0.77 Rehandling Coal 15819 AHNIANSYAH 3 3 COAL EX-5037 PIT 5 EXT 11 - - 11 -
4-Sep-21 Night TA-7029 28,493.8 28,497.9 4.13 Hauling OB 15819 AHNIANSYAH 2 3 4 4 3 16 OB Outpit EX-5037 PIT 5 EXT IPD 10 14 224 - 14 -
4-Sep-21 Night TA-7029 28,497.9 28,499.7 1.81 Hauling OB 15819 AHNIANSYAH 2 3 2 7 OB Outpit EX-5022 PIT 5 EXT IPD 10 14 98 - 14 -
4-Sep-21 Night TA-7029 28,499.7 28,500.5 0.77 Hauling OB 15819 AHNIANSYAH 3 3 Solid Mud Outpit EX-5022 PIT 5 EXT IPD 10 11 34 - 11 -
4-Sep-21 Night TA-7029 28,500.5 28,501.0 0.52 Hauling OB 15819 AHNIANSYAH 2 2 COAL EX-2058 PIT 5 EXT 11 - - 11 -
4-Sep-21 Night TA-7030 28,223.6 28,223.6 - Unscheduled 15817 YUSANDI - PIT 5 - - -
4-Sep-21 Night BD-4005 13,770.7 13,770.7 - Unscheduled - WORKSHOP - - -
4-Sep-21 Night BD-5035 3,340.5 3,346.0 5.50 Front maintenance 14963 MAULANA ISHAK - PIT 5 - - -
4-Sep-21 Night BD-6025 2,701.9 2,711.8 9.90 Unit Rental 15464 MARJUKI - KCP - - -
4-Sep-21 Night BD-6026 30,198.7 30,198.7 - Standby - WORKSHOP - - -
4-Sep-21 Night BD-6028 4,109.2 4,109.2 - Standby - KCP - - -
4-Sep-21 Night BD-6036 34,070.3 34,078.8 8.50 Unit Rental 14964 JOKO P (Dozer) - KCP - - -
4-Sep-21 Night BD-6038 33,857.1 33,865.4 8.30 Unit Rental 14708 ADEFI P - KCP - - -
4-Sep-21 Night BD-6069 10,343.0 10,351.4 8.40 Disposal maintenance - - - -
4-Sep-21 Night BD-7013 39,787.7 39,796.1 8.40 Front maintenance 11678 HARI BOWO - PIT 5 - - -
4-Sep-21 Night BD-7026 26,445.0 26,455.7 10.70 Front maintenance 14709 A. FATHONI - PIT 5 - - -
4-Sep-21 Night BD-7034 9,858.3 9,868.8 10.50 Disposal maintenance 15639 A. BUDIMAN - - - -
4-Sep-21 Night GR-2012 22,215.8 22,215.8 - Unscheduled - WORKSHOP - - -
4-Sep-21 Night GR-3007 39,112.1 39,122.3 10.20 Road Maintenance Support 8925 AGUS SUNARWAN - PIT 5 - - -
4-Sep-21 Night GR-3008 46,814.6 46,825.2 10.60 Road Maintenance Support 15571 YOHANIS L - PIT 5 - - -
4-Sep-21 Night TW-3001 8,486.0 8,486.0 - Standby - PIT 5 - - -
4-Sep-21 Night TW-4001 18,756.0 18,756.00 - Standby - PIT 5 - - -
4-Sep-21 Night PU-4002 19,056.0 19,056.0 - Standby - PIT 11 - - -
4-Sep-21 Night PU-2026 6,186.2 6,186.4 0.20 Dewatering 10914 SETYO BUDI UTOMO - PIT 11 - - -
4-Sep-21 Night PU-3026 12,307.0 12,307.0 - Standby - ROM TEMPORARY - - -
4-Sep-21 Night PU-3015 1,696.0 1,696.0 - Standby - PIT 11 - - -
4-Sep-21 Night PU-3014 27,240.4 27,240.4 - Standby - ROM TEMPORARY - - -
4-Sep-21 Night LP-2165 13,446.0 13,457.0 11.00 Unit Rental 4671 NURUDIN - KCP - - -
4-Sep-21 Night LP-2166 12,943.0 12,954.0 11.00 Unit Rental 4671 NURUDIN - KCP - - -
4-Sep-21 Night LP-2167 13,933.0 13,945.0 12.00 Unit Rental 4671 NURUDIN - KCP - - -
4-Sep-21 Night LP-2168 12,739.0 12,751.0 12.00 Unit Rental 4671 NURUDIN - KCP - - -
4-Sep-21 Night LP-2169 12,481.0 12,493.0 12.00 Unit Rental 4671 NURUDIN - KCP - - -
4-Sep-21 Night TS-4007 - - - Standby - KCP - - -
4-Sep-21 Night TS-4017 16,054.0 16,060.0 6.00 Unit Rental 15472 RIZKA M - KCP - - -
4-Sep-21 Night TF-4013 20,308.0 20,313.0 5.00 Unit Rental 15746 SYARIFUDDI - KCP - - -
4-Sep-21 Night TF-4014 34,550.0 34,550.0 - Standby - KCP - - -
5-Sep-21 Day EX-2037 22,086.2 22,094.5 8.30 Road Maintenance Support 15503 ASHARI SETIYO NUGROHO - JALAN SAKA - - -
5-Sep-21 Day EX-2058 17,389.0 17,393.0 4.00 Side casting 11330 EKO PURWANTO - PIT 5 EXT - 1,147 -
5-Sep-21 Day EX-2058 17,393.0 17,396.7 3.70 Setting pompa 11330 EKO PURWANTO - PIT 5 EXT - 1,147 -
5-Sep-21 Day EX-2058 17,396.7 17,397.9 1.20 Loading Solid Mud 11330 EKO PURWANTO - Solid Mud Outpit PIT 5 EXT IPD 10 - - 1,147 - -
5-Sep-21 Day EX-4006 35,177.0 35,177.0 - Unscheduled - PARKIRAN SCANIA - 1,332 -
5-Sep-21 Day EX-5014 38,602.0 38,602.0 - Unscheduled - KCP - - -
5-Sep-21 Day EX-5022 11,258.0 11,264.0 6.00 Loading Waste 15567 ARIF WAHYUDI - OB Outpit PIT 5 EXT IPD 10 - 1,297 -
5-Sep-21 Day EX-5037 19,019.0 19,025.0 6.00 Loading Waste 12534 PUJIYANTO - OB Outpit PIT 5 IPD 10 - 1,369 -
5-Sep-21 Day EX-5037 19,025.0 19,030.0 5.00 Loading Waste 12534 PUJIYANTO - OB Ripping Outpit PIT 5 IPD 10 - 1,369 -
5-Sep-21 Day EX-6014 57,529.0 57,535.0 6.00 Loading Waste 10917 SETA VERDY KARYA - OB Outpit PIT 5 EXT IPD 10 - - -
5-Sep-21 Day EX-6016 44,121.0 44,129.0 8.00 Loading Waste 15567 ARIF WAHYUDI - OB Outpit PIT 5 EXT IPD 10 - 1,554 -
5-Sep-21 Day EX-6022 18,456.6 18,467.5 10.90 Loading Waste 15568 FUAD EFENDI - OB Outpit PIT 5 EXT IPD 10 - - -
5-Sep-21 Day TR-3080 42,593.4 42,593.7 0.25 Hauling OB 9214 MUSTOFA ADI PRAYITNO 1 1 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 42 - 2 42 84
5-Sep-21 Day TR-3080 42,593.7 42,594.2 0.50 Hauling OB 9214 MUSTOFA ADI PRAYITNO 2 2 OB Outpit EX-6016 PIT 5 EXT IPD 10 42 84 - 42 -
5-Sep-21 Day TR-3080 42,594.2 42,603.9 9.75 Hauling OB 9214 MUSTOFA ADI PRAYITNO 2 4 4 4 4 4 4 5 4 4 39 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 1,638 - 2 42 84
5-Sep-21 Day TR-3174 41,319.3 41,325.4 6.06 Hauling OB 15350 HERMAN 3 3 3 3 4 4 2 22 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 924 - 2 42 84
5-Sep-21 Day TR-3174 41,325.4 41,326.2 0.83 Hauling OB 15350 HERMAN 1 2 3 OB Ripping Outpit EX-5037 PIT 5 IPD 10 42 126 - 42 -
5-Sep-21 Day TR-3174 41,326.2 41,329.5 3.31 Hauling OB 15350 HERMAN 2 4 3 3 12 OB Outpit EX-6016 PIT 5 EXT IPD 10 42 504 - 42 -
5-Sep-21 Day TR-3175 38,712.5 38,718.4 5.92 Hauling OB 10968 SUKIRNO 1 2 4 3 3 4 2 19 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 798 - 5 42 210
5-Sep-21 Day TR-3175 38,718.4 38,723.1 4.68 Hauling OB 10968 SUKIRNO 4 4 3 4 15 OB Outpit EX-6016 PIT 5 EXT IPD 10 42 630 - 42 -
5-Sep-21 Day TR-3195 24,580.4 24,583.9 3.48 Hauling OB 10762 SYAMSUDDIN 1 3 4 4 2 14 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 588 - 42 -
5-Sep-21 Day TR-3195 24,583.9 24,584.1 0.25 Hauling OB 10762 SYAMSUDDIN 1 1 OB Ripping Outpit EX-5037 PIT 5 IPD 10 42 42 - 42 -
5-Sep-21 Day TR-3195 24,584.1 24,587.6 3.48 Hauling OB 10762 SYAMSUDDIN 4 3 4 3 14 OB Outpit EX-6016 PIT 5 EXT IPD 10 42 588 - 42 -
5-Sep-21 Day TR-3202 26,718.7 26,729.5 10.80 Hauling OB 15230 MARGONO 4 4 5 3 4 5 5 4 4 4 4 46 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 1,932 - 42 -
5-Sep-21 Day TR-3203 26,820.8 26,826.3 5.46 Hauling OB 8920 VERRY EKO SETIAWAN 1 3 1 3 3 4 3 18 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 756 - 4 42 168
5-Sep-21 Day TR-3203 26,826.3 26,830.2 3.94 Hauling OB 8920 VERRY EKO SETIAWAN 4 3 3 3 13 OB Outpit EX-6016 PIT 5 EXT IPD 10 42 546 - 42 -
5-Sep-21 Day TR-3204 26,135.0 26,145.2 10.20 Hauling OB 10969 JOKO PRIONO 3 4 4 4 5 4 4 5 4 4 4 45 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 1,890 - 42 -
5-Sep-21 Day TR-3205 25,688.3 25,694.1 5.81 Hauling OB 10695 SUPIYANDI 4 4 4 4 5 5 26 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 1,092 - 42 -
5-Sep-21 Day TR-3205 25,694.1 25,698.8 4.69 Hauling OB 15349 ARDIANSYAH 4 4 5 4 4 21 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 882 - 42 -
5-Sep-21 Day TR-3206 24,918.2 24,918.2 - Scheduled - WORKSHOP - - -
5-Sep-21 Day TR-3220 25,875.0 25,876.5 1.50 Hauling OB 10968 SUKIRNO 3 2 5 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 210 - 1 42 42
5-Sep-21 Day TR-1024 31,335.8 31,335.8 - Unscheduled - WORKSHOP - - -
5-Sep-21 Day TR-1025 47,084.5 47,087.3 2.78 Hauling OB 15471 MULYADI 2 4 2 3 11 OB Outpit EX-6016 PIT 5 EXT IPD 10 24 264 - 24 -
5-Sep-21 Day TR-1025 47,087.3 47,087.8 0.51 Hauling OB 15471 MULYADI 2 2 OB Outpit EX-6014 PIT 5 EXT IPD 10 24 48 - 24 -
5-Sep-21 Day TR-1025 47,087.8 47,092.1 4.29 Hauling OB 15471 MULYADI 2 4 3 2 1 3 2 17 OB Outpit EX-5022 PIT 5 EXT IPD 10 24 408 - 24 -
5-Sep-21 Day TR-1025 47,092.1 47,094.6 2.53 Hauling OB 15471 MULYADI 2 3 3 2 10 OB Ripping Outpit EX-5037 PIT 5 IPD 10 24 240 - 24 -
5-Sep-21 Day TR-1031 49,379.4 49,382.3 2.87 Hauling OB 15485 ROBY TM 2 3 4 2 11 OB Outpit EX-6016 PIT 5 EXT IPD 10 24 264 - 24 -
5-Sep-21 Day TR-1031 49,382.3 49,382.8 0.52 Hauling OB 15485 ROBY TM 2 2 OB Outpit EX-6014 PIT 5 EXT IPD 10 24 48 - 24 -
5-Sep-21 Day TR-1031 49,382.8 49,388.3 5.47 Hauling OB 15485 ROBY TM 2 4 4 2 4 3 2 21 OB Outpit EX-5022 PIT 5 EXT IPD 10 24 504 - 24 -
5-Sep-21 Day TR-1031 49,388.3 49,389.3 1.04 Hauling OB 15485 ROBY TM 2 2 4 OB Ripping Outpit EX-5037 PIT 5 IPD 10 24 96 - 24 -
5-Sep-21 Day TR-1032 51,092.8 51,098.0 5.25 Hauling OB 15377 RIZALI RAHMAN 3 4 4 4 4 4 23 OB Outpit EX-5037 PIT 5 IPD 10 24 552 - 24 -
5-Sep-21 Day TR-1032 51,098.0 51,101.7 3.65 Hauling OB 15377 RIZALI RAHMAN 5 2 3 2 4 16 OB Ripping Outpit EX-5037 PIT 5 IPD 10 24 384 - 24 -
5-Sep-21 Day TR-1032 51,101.7 51,102.6 0.91 Hauling OB 15377 RIZALI RAHMAN 1 2 1 4 OB Outpit EX-6016 PIT 5 EXT IPD 10 24 96 - 24 -
5-Sep-21 Day TR-1033 51,536.7 51,538.6 1.86 Hauling OB 15470 IJAI 3 3 1 7 OB Outpit EX-6016 PIT 5 EXT IPD 10 24 168 - 24 -
5-Sep-21 Day TR-1033 51,538.6 51,538.8 0.27 Hauling OB 15470 IJAI 1 1 OB Outpit EX-6014 PIT 5 EXT IPD 10 24 24 - 24 -
5-Sep-21 Day TR-1033 51,538.8 51,540.4 1.59 Hauling OB 15470 IJAI 2 1 3 6 OB Outpit EX-5037 PIT 5 IPD 10 24 144 - 24 -
5-Sep-21 Day TR-1033 51,540.4 51,541.8 1.33 Hauling OB 15470 IJAI 1 3 1 5 OB Ripping Outpit EX-5037 PIT 5 IPD 10 24 120 - 24 -
5-Sep-21 Day TR-1033 51,541.8 51,543.6 1.86 Hauling OB 15470 IJAI 2 3 2 7 OB Outpit EX-5022 PIT 5 EXT IPD 10 24 168 - 24 -
5-Sep-21 Day TR-1034 49,323.4 49,326.4 2.98 Hauling OB 15395 ANDRI SUSANTO 3 3 1 4 11 OB Outpit EX-6016 PIT 5 EXT IPD 10 24 264 - 24 -
5-Sep-21 Day TR-1034 49,326.4 49,326.9 0.54 Hauling OB 15395 ANDRI SUSANTO 2 2 OB Outpit EX-6014 PIT 5 EXT IPD 10 24 48 - 24 -
5-Sep-21 Day TR-1034 49,326.9 49,332.3 5.42 Hauling OB 15395 ANDRI SUSANTO 3 4 3 2 1 3 4 20 OB Outpit EX-5022 PIT 5 EXT IPD 10 24 480 - 1 24 24
5-Sep-21 Day TR-1034 49,332.3 49,333.7 1.36 Hauling OB 15395 ANDRI SUSANTO 2 3 5 OB Ripping Outpit EX-5037 PIT 5 IPD 10 24 120 - 24 -
5-Sep-21 Day TR-1036 50,563.6 50,567.0 3.38 Hauling OB 15346 MUSA 2 3 2 4 1 12 OB Outpit EX-6016 PIT 5 EXT IPD 10 24 288 - 24 -
5-Sep-21 Day TR-1036 50,567.0 50,567.6 0.56 Hauling OB 15346 MUSA 2 2 OB Outpit EX-6014 PIT 5 EXT IPD 10 24 48 - 24 -
5-Sep-21 Day TR-1036 50,567.6 50,568.1 0.56 Hauling OB 15346 MUSA 2 2 OB Outpit EX-5022 PIT 5 EXT IPD 10 24 48 - 24 -
5-Sep-21 Day TR-1036 50,568.1 50,569.2 1.13 Hauling OB 15346 MUSA 4 4 OB Outpit EX-5037 PIT 5 IPD 10 24 96 - 24 -
5-Sep-21 Day TR-1036 50,569.2 50,569.5 0.28 Hauling Solid Mud 15346 MUSA 1 1 Solid Mud Outpit EX-2058 PIT 5 EXT IPD 10 19 19 - 19 -
5-Sep-21 Day TR-1036 50,569.5 50,572.9 3.38 Hauling OB 15346 MUSA 4 2 1 2 3 12 OB Ripping Outpit EX-5037 PIT 5 IPD 10 24 288 - 24 -
5-Sep-21 Day TR-1048 52,155.4 52,156.9 1.50 Hauling OB 15349 ARDIANSYAH 1 2 3 OB Outpit EX-5037 PIT 5 IPD 10 24 72 - 24 -
5-Sep-21 Day TR-1048 52,156.9 52,157.4 0.50 Hauling OB 15349 ARDIANSYAH 1 1 OB Ripping Outpit EX-5037 PIT 5 IPD 10 24 24 - 24 -
5-Sep-21 Day TR-1049 45,986.6 45,990.0 3.39 Hauling OB 15744 MARYANTO 2 4 2 4 12 OB Outpit EX-6016 PIT 5 EXT IPD 10 24 288 - 24 -
5-Sep-21 Day TR-1049 45,990.0 45,990.8 0.85 Hauling OB 15744 MARYANTO 1 2 3 OB Outpit EX-5037 PIT 5 IPD 10 24 72 - 24 -
5-Sep-21 Day TR-1049 45,990.8 45,995.9 5.08 Hauling OB 15744 MARYANTO 2 4 3 2 2 2 3 18 OB Outpit EX-5022 PIT 5 EXT IPD 10 24 432 - 1 24 24
5-Sep-21 Day TR-1049 45,995.9 45,996.2 0.28 Hauling OB 15744 MARYANTO 1 1 OB Ripping Outpit EX-5037 PIT 5 IPD 10 24 24 - 24 -
5-Sep-21 Day TR-1050 45,811.5 45,811.5 - Unscheduled - WORKSHOP - - -
5-Sep-21 Day TA-7009 27,775.0 27,780.5 5.54 Hauling OB 15862 RUDY AMRIYADI 3 4 4 1 4 4 20 OB Outpit EX-5037 PIT 5 IPD 10 14 280 - 14 -
5-Sep-21 Day TA-7009 27,780.5 27,781.1 0.55 Hauling OB 15862 RUDY AMRIYADI 2 2 OB Outpit EX-6014 PIT 5 EXT IPD 10 14 28 - 14 -
5-Sep-21 Day TA-7009 27,781.1 27,785.0 3.88 Hauling OB 15863 HENDRA M 5 2 2 1 4 14 OB Ripping Outpit EX-5037 PIT 5 IPD 10 14 196 - 14 -
5-Sep-21 Day TA-7009 27,785.0 27,785.8 0.83 Hauling Solid Mud 15863 HENDRA M 1 2 3 Solid Mud Outpit EX-2058 PIT 5 EXT IPD 10 11 34 - 1 11 11
5-Sep-21 Day TA-7010 25,104.9 25,110.9 5.94 Hauling OB 15861 AGUSTIAN 3 3 4 4 3 4 21 OB Outpit EX-5037 PIT 5 IPD 10 14 294 - 14 -
5-Sep-21 Day TA-7010 25,110.9 25,114.0 3.11 Hauling OB 15861 AGUSTIAN 4 2 1 2 2 11 OB Ripping Outpit EX-5037 PIT 5 IPD 10 14 154 - 14 -
5-Sep-21 Day TA-7010 25,114.0 25,115.1 1.13 Hauling Solid Mud 15861 AGUSTIAN 1 3 4 Solid Mud Outpit EX-2058 PIT 5 EXT IPD 10 11 45 - 11 -
5-Sep-21 Day TA-7022 - - - Unscheduled - WORKSHOP - - -
5-Sep-21 Day TA-7029 28,501.0 28,505.5 4.50 Hauling OB 15816 M. YUSUF 3 4 3 4 2 16 OB Outpit EX-5037 PIT 5 IPD 10 14 224 - 14 -
5-Sep-21 Day TA-7030 28,223.6 28,223.6 - Unscheduled - PIT 5 - - -
5-Sep-21 Day BD-4005 13,770.7 13,770.7 - Scheduled - WORKSHOP - - -
k 5-Sep-21 Day BD-5035 3,346.0 3,351.1 5.10 Disposal maintenance 9978 KARSIANTO - IPD 10 - - -
5-Sep-21 Day BD-6025 2,711.8 2,717.1 5.30 Unit Rental 11169 ANNAS - KCP - - -
5-Sep-21 Day BD-6026 30,198.7 30,198.7 - Standby - WORKSHOP - - -
5-Sep-21 Day BD-6028 4,109.2 4,109.2 - Standby - KCP - - -
5-Sep-21 Day BD-6036 34,078.8 34,088.6 9.80 Unit Rental 14710 AGUS S - KCP - - -
5-Sep-21 Day BD-6038 33,865.4 33,875.6 10.20 Unit Rental 15570 HENDRY S - KCP - - -
5-Sep-21 Day BD-6069 10,351.4 10,362.8 11.40 Disposal maintenance 14744 NOORDIANTO - IPD 10 - - -
5-Sep-21 Day BD-7013 39,796.1 39,807.5 11.40 Ripping - PIT 5 - - -
5-Sep-21 Day BD-7026 26,455.7 26,466.4 10.70 Front maintenance 8157 SAMIDI - PIT 5 EXT - - -
5-Sep-21 Day BD-7034 9,868.8 9,879.9 11.10 Disposal maintenance 9492 MAHFUDI - IPD 10 - - -
5-Sep-21 Day GR-2012 22,215.8 22,215.8 - Unscheduled 9103 WAWAN WIDODO - WORKSHOP - - -
5-Sep-21 Day GR-3007 39,122.3 39,130.4 8.10 Road Maintenance Support 9426 ADE SUPIANA - PIT 5 - - -
5-Sep-21 Day GR-3008 46,825.2 46,833.3 8.10 Road Maintenance Support 12344 M FAJRI - PIT 5 - - -
5-Sep-21 Day TW-3001 8,486.0 8,492.0 6.00 Road Maintenance Support 15743 LANA - PIT 5 - - -
5-Sep-21 Day TW-4001 18,756.0 18,756.00 - Standby - WORKSHOP - - -
5-Sep-21 Day PU-4002 19,056.0 19,056.00 - Standby Z7354 M. ALMA DENNY - PIT 11 - - -
5-Sep-21 Day PU-2026 6,186.4 6,187.2 0.80 Dewatering Z7354 M. ALMA DENNY - PIT 11 - - -
5-Sep-21 Day PU-3026 12,307.0 12,307.00 - Standby - ROM TEMPORARY - - -
5-Sep-21 Day PU-3015 1,696.0 1,696.00 - Standby - PIT 11 - - -
5-Sep-21 Day PU-3014 27,240.4 27,240.40 - Standby - ROM TEMPORARY - - -
5-Sep-21 Day LP-2165 13,457.0 13,458.00 1.00 Unit Rental 4671 NURUDIN - KCP - - -
5-Sep-21 Day LP-2166 12,954.0 12,955.00 1.00 Unit Rental 4671 NURUDIN - KCP - - -
5-Sep-21 Day LP-2167 13,945.0 13,945.00 - Standby - KCP - - -
5-Sep-21 Day LP-2168 12,751.0 12,751.00 - Standby - KCP - - -
5-Sep-21 Day LP-2169 12,493.0 12,493.00 - Standby - KCP - - -
5-Sep-21 Day TS-4007 - - - Standby - KCP - - -
5-Sep-21 Day TS-4017 16,060.0 16,066.0 6.00 Unit Rental 15310 ALDI ALFI SAPUTRA - KCP - - -
5-Sep-21 Day TF-4013 20,313.0 20,320.0 7.00 Unit Rental 15745 SURYANATA - KCP - - -
5-Sep-21 Day TF-4014 34,550.0 34,550.0 - Standby - KCP - - -
5-Sep-21 Night EX-2037 22,094.5 22,104.9 10.40 Road Maintenance Support 15617 ZAENAL - JALAN SAKA - - -
5-Sep-21 Night EX-2058 17,397.9 17,400.9 3.00 Side casting 15504 SLAMET WIDODO - PIT 5 EXT - 1,147 -
5-Sep-21 Night EX-2058 17,400.9 17,402.3 1.38 Evakuasi unit 15504 SLAMET WIDODO - Solid Mud Outpit PIT 5 EXT IPD 10 - - 1,147 - -
5-Sep-21 Night EX-2058 17,402.3 17,403.0 0.75 Moving - pindah lokasi kerja 15504 SLAMET WIDODO - Solid Mud Outpit PIT 5 EXT IPD 10 - - 1,147 - -
5-Sep-21 Night EX-2058 17,403.0 17,407.8 4.77 Loading Solid Mud 15504 SLAMET WIDODO - Solid Mud Outpit PIT 5 EXT IPD 10 - - 1,147 - -
5-Sep-21 Night EX-4006 35,177.0 35,177.0 - Unscheduled - PARKIRAN SCANIA - 1,332 -
5-Sep-21 Night EX-5014 38,602.0 38,602.0 - Unscheduled - KCP - - -
5-Sep-21 Night EX-5022 11,264.0 11,274.0 10.00 Loading Waste 15604 AHMAD SYAFI'I - OB Outpit PIT 5 EXT IPD 10 - 1,297 -
5-Sep-21 Night EX-5037 19,030.0 19,035.0 5.00 Loading Waste 9590F SIRATAL RAYYAN - OB Ripping Outpit PIT 5 IPD 10 - 1,369 -
5-Sep-21 Night EX-6014 57,536.0 57,537.0 1.00 Loading Waste 8952 DIDI SETIAWAN - OB Outpit PIT 5 EXT IPD 10 - - -
5-Sep-21 Night EX-6016 44,129.0 44,139.0 10.00 Loading Waste 9136 AHMAD YANI - OB Outpit PIT 5 EXT IPD 10 - 1,554 -
5-Sep-21 Night EX-6022 18,467.5 18,478.1 10.60 Loading Waste 11146 PURWANTO - OB Outpit PIT 5 EXT IPD 10 - - -
5-Sep-21 Night TR-3080 42,603.9 42,613.6 9.70 Hauling OB 10881 BURHANUDDIN 3 5 3 4 4 4 4 4 4 3 2 40 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 1,680 - 1 42 42
5-Sep-21 Night TR-3174 41,329.5 41,338.9 9.40 Hauling OB 11328 JUSESLAF BANJAR NAHOR 3 3 1 3 3 3 3 4 2 3 2 30 OB Outpit EX-6016 PIT 5 EXT IPD 10 42 1,260 - 42 -
5-Sep-21 Night TR-3175 38,723.1 38,728.6 5.48 Hauling OB 1354 SUDIYANTO 2 3 2 4 3 3 17 OB Outpit EX-6016 PIT 5 EXT IPD 10 42 714 - 42 -
5-Sep-21 Night TR-3175 38,728.6 38,732.5 3.87 Hauling OB 8958 MUKHROMIN 3 3 3 3 12 OB Outpit EX-6016 PIT 5 EXT IPD 10 42 504 - 42 -
5-Sep-21 Night TR-3175 38,732.5 38,733.1 0.65 Hauling OB 8958 MUKHROMIN 2 2 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 84 - 42 -
5-Sep-21 Night TR-3195 24,587.6 24,595.5 7.89 Hauling OB 15229 ARDIANSYAH 2 4 2 3 4 3 3 3 4 2 2 32 OB Outpit EX-6016 PIT 5 EXT IPD 10 42 1,344 - 42 -
5-Sep-21 Night TR-3202 26,729.5 26,739.1 9.60 Hauling OB 11474 SARINDI 3 5 3 4 4 4 3 4 3 4 2 39 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 1,638 - 2 42 84
5-Sep-21 Night TR-3203 26,830.2 26,830.5 0.30 Hauling OB 8892 BAGUS PURWONO 1 1 OB Outpit EX-6016 PIT 5 EXT IPD 10 42 42 - 42 -
5-Sep-21 Night TR-3203 26,830.5 26,840.3 9.80 Hauling OB 8892 BAGUS PURWONO 2 4 3 4 4 5 3 5 4 3 2 39 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 1,638 - 42 -
5-Sep-21 Night TR-3204 26,145.2 26,155.0 9.80 Hauling OB 1303 EFENDI 3 4 3 4 4 4 4 4 4 4 2 40 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 1,680 - 42 -
5-Sep-21 Night TR-3205 25,698.8 25,702.8 4.00 Hauling OB 7170F TRI PRASETIYO 1 3 3 3 3 13 OB Outpit EX-6016 PIT 5 EXT IPD 10 42 546 - 42 -
5-Sep-21 Night TR-3205 25,702.8 25,707.2 4.40 Hauling OB 10882 SABIRIN 3 4 3 3 2 15 OB Outpit EX-6016 PIT 5 EXT IPD 10 42 630 - 42 -
5-Sep-21 Night TR-3206 24,918.2 24,918.2 - Scheduled - WORKSHOP - - -
5-Sep-21 Night TR-3220 25,876.5 25,879.6 3.14 Hauling OB 8965 HADI SUTIKNO 2 1 2 3 8 OB Outpit EX-6016 PIT 5 EXT IPD 10 42 336 - 42 -
5-Sep-21 Night TR-3220 25,879.6 25,882.0 2.36 Hauling OB 8965 HADI SUTIKNO 1 3 2 6 OB Outpit EX-5037 PIT 5 IPD 10 42 252 - 42 -
5-Sep-21 Night TR-1024 31,335.8 31,335.8 - Unscheduled - WORKSHOP - - -
5-Sep-21 Night TR-1025 47,094.6 47,105.0 10.39 Hauling OB 15576 JOKO SANTOSO 1 3 3 4 4 3 4 4 4 3 2 35 OB Outpit EX-5022 PIT 5 EXT IPD 10 24 840 - 24 -
5-Sep-21 Night TR-1031 49,389.3 49,399.1 9.80 Hauling OB 15421 AGUS A 3 3 3 4 4 2 4 4 4 4 2 37 OB Outpit EX-5022 PIT 5 EXT IPD 10 24 888 - 24 -
5-Sep-21 Night TR-1032 51,102.6 51,113.2 10.60 Hauling OB 15468 PADLIANSYAH 3 3 4 4 4 3 4 4 4 4 2 39 OB Outpit EX-5022 PIT 5 EXT IPD 10 24 936 - 24 -
5-Sep-21 Night TR-1033 51,543.6 51,544.1 0.53 Hauling OB 15636 AKHMAD NOOR 2 2 OB Outpit EX-5022 PIT 5 EXT IPD 10 24 48 - 24 -
5-Sep-21 Night TR-1033 51,544.1 51,544.9 0.79 Hauling Solid Mud 15636 AKHMAD NOOR 1 2 3 Solid Mud Outpit EX-2058 PIT 5 EXT IPD 10 19 58 - 19 -
5-Sep-21 Night TR-1033 51,544.9 51,549.4 4.48 Hauling OB 15636 AKHMAD NOOR 1 2 2 3 4 4 1 17 OB Outpit EX-5037 PIT 5 EXT IPD 10 24 408 - 24 -
5-Sep-21 Night TR-1033 51,549.4 51,551.5 2.11 Hauling OB 15636 AKHMAD NOOR 2 2 3 1 8 OB Outpit EX-6016 PIT 5 EXT IPD 10 24 192 - 24 -
5-Sep-21 Night TR-1033 51,551.5 51,552.6 1.05 Hauling OB 15636 AKHMAD NOOR 2 2 4 OB Outpit EX-6022 PIT 5 EXT IPD 10 24 96 - 24 -
5-Sep-21 Night TR-1033 51,552.6 51,553.1 0.53 Hauling OB 15636 AKHMAD NOOR 2 2 OB Outpit EX-6014 PIT 5 EXT IPD 10 24 48 - 24 -
5-Sep-21 Night TR-1034 49,333.7 49,334.5 0.78 Hauling OB 15397 YUSUF 3 3 OB Outpit EX-5022 PIT 5 EXT IPD 10 24 72 - 24 -
5-Sep-21 Night TR-1034 49,334.5 49,335.3 0.78 Hauling OB 15397 YUSUF 3 3 OB Outpit EX-6016 PIT 5 EXT IPD 10 24 72 - 24 -
5-Sep-21 Night TR-1034 49,335.3 49,337.3 2.07 Hauling OB 15397 YUSUF 3 4 1 8 OB Outpit EX-5037 PIT 5 EXT IPD 10 24 192 - 24 -
5-Sep-21 Night TR-1034 49,335.3 49,337.3 2.07 Hauling OB 15397 YUSUF 4 4 8 OB Outpit EX-6022 PIT 5 EXT IPD 10 24 192 - 24 -
5-Sep-21 Night TR-1034 49,337.3 49,340.2 2.86 Hauling OB 15420 M ABD MADI 3 3 2 8 OB Outpit EX-5037 PIT 5 IPD 10 24 192 - 24 -
5-Sep-21 Night TR-1034 49,340.2 49,342.0 1.79 Hauling Solid Mud 15420 M ABD MADI 2 3 5 Solid Mud Outpit EX-2058 PIT 5 EXT IPD 10 19 96 - 19 -
5-Sep-21 Night TR-1034 49,342.0 49,342.7 0.71 Hauling OB 15420 M ABD MADI 2 2 OB Outpit EX-6014 PIT 5 EXT IPD 10 24 48 - 24 -
5-Sep-21 Night TR-1034 49,342.7 49,343.4 0.71 Hauling OB 15420 M ABD MADI 2 2 OB Outpit EX-6016 PIT 5 EXT IPD 10 24 48 - 24 -
5-Sep-21 Night TR-1036 50,572.9 50,583.2 10.30 Hauling OB 15398 SIGIT SUSANTO 2 4 3 3 4 4 4 3 4 4 3 38 OB Outpit EX-5022 PIT 5 EXT IPD 10 24 912 - 24 -
5-Sep-21 Night TR-1048 52,157.4 52,158.2 0.80 Hauling OB 15420 M ABD MADI 1 1 OB Outpit EX-5037 PIT 5 IPD 10 24 24 - 24 -
5-Sep-21 Night TR-1048 52,158.2 52,159.0 0.80 Hauling OB 15420 M ABD MADI 1 1 OB Outpit EX-6016 PIT 5 EXT IPD 10 24 24 - 24 -
5-Sep-21 Night TR-1049 45,996.2 46,005.3 9.14 Hauling OB 15376 EKO FAJAR S 3 3 3 3 4 4 4 4 2 3 3 36 OB Outpit EX-5022 PIT 5 EXT IPD 10 24 864 - 24 -
5-Sep-21 Night TR-1049 46,005.3 46,005.6 0.25 Hauling OB 15376 EKO FAJAR S 1 1 OB Outpit EX-5037 PIT 5 IPD 10 24 24 - 24 -
5-Sep-21 Night TR-1049 46,005.6 46,006.1 0.51 Hauling Solid Mud 15376 EKO FAJAR S 2 2 Solid Mud Outpit EX-2058 PIT 5 EXT IPD 10 19 38 - 19 -
5-Sep-21 Night TR-1050 45,811.5 45,811.5 - Unscheduled - WORKSHOP - - -
5-Sep-21 Night TA-7009 27,785.8 27,791.3 5.47 Hauling Solid Mud 15818 AGUS SUGIANTO 2 3 1 5 2 4 3 20 Solid Mud Outpit EX-2058 PIT 5 EXT IPD 10 11 224 - 11 -
5-Sep-21 Night TA-7009 27,791.3 27,794.5 3.23 Hauling OB 15818 AGUS SUGIANTO 3 4 4 2 13 OB Outpit EX-5037 PIT 5 EXT IPD 10 14 182 - 14 -
5-Sep-21 Night TA-7009 27,794.5 27,795.0 0.50 Hauling OB 15818 AGUS SUGIANTO 2 2 OB Outpit EX-6014 PIT 5 EXT IPD 10 14 28 - 14 -
5-Sep-21 Night TA-7010 25,115.1 25,117.3 2.24 Hauling Solid Mud 15817 YUSANDI 3 1 5 9 Solid Mud Outpit EX-2058 PIT 5 EXT IPD 10 11 101 - 11 -
5-Sep-21 Night TA-7010 25,117.3 25,120.1 2.74 Hauling OB 15817 YUSANDI 4 3 4 11 OB Outpit EX-5022 PIT 5 EXT IPD 10 14 154 - 14 -
5-Sep-21 Night TA-7010 25,120.1 25,122.1 1.99 Hauling OB 15653 M. ILIAS 4 4 8 OB Outpit EX-5037 PIT 5 IPD 10 14 112 - 14 -
5-Sep-21 Night TA-7010 25,122.1 25,124.1 1.99 Hauling Solid Mud 15653 M. ILIAS 4 4 8 Solid Mud Outpit EX-2058 PIT 5 EXT IPD 10 11 90 - 11 -
5-Sep-21 Night TA-7010 25,124.1 25,124.8 0.75 Hauling OB 15653 M. ILIAS 3 3 OB Outpit EX-6014 PIT 5 EXT IPD 10 14 42 - 14 -
5-Sep-21 Night TA-7022 - - - Unscheduled - WORKSHOP - - -
5-Sep-21 Night TA-7029 28,505.5 28,506.0 0.50 Hauling OB 15819 AHNIANSYAH 2 2 OB Outpit EX-5037 PIT 5 IPD 10 14 28 - 14 -
5-Sep-21 Night TA-7029 28,506.0 28,508.3 2.30 Hauling Solid Mud 15819 AHNIANSYAH 5 1 6 Solid Mud Outpit EX-2058 PIT 5 EXT IPD 10 11 67 - 11 -
5-Sep-21 Night TA-7030 28,223.6 28,223.6 - Unscheduled - PIT 5 - - -
5-Sep-21 Night BD-4005 13,770.7 13,770.7 - Scheduled - WORKSHOP - - -
5-Sep-21 Night BD-5035 3,351.1 3,358.8 7.70 Disposal maintenance 14963 MAULANA ISHAK - IPD 10 - - -
5-Sep-21 Night BD-6025 2,717.1 2,717.1 - Standby - KCP - - -
5-Sep-21 Night BD-6026 30,198.7 30,198.7 - Standby - WORKSHOP - - -
5-Sep-21 Night BD-6028 4,109.2 4,109.2 - Standby - KCP - - -
5-Sep-21 Night BD-6036 34,088.6 34,098.9 10.30 Unit Rental 14964 JOKO P (Dozer) - KCP - - -
5-Sep-21 Night BD-6038 33,875.6 33,883.8 8.20 Unit Rental 14708 ADEFI P - KCP - - -
5-Sep-21 Night BD-6069 10,362.8 10,373.2 10.40 Disposal maintenance 15747 MUSTAQIM D6 - IPD 10 - - -
5-Sep-21 Night BD-7013 39,807.5 39,818.0 10.50 Ripping 11676 SUDARSONO - PIT 5 - - -
5-Sep-21 Night BD-7026 26,466.4 26,475.6 9.20 Front maintenance 14709 A. FATHONI - PIT 5 EXT - - -
5-Sep-21 Night BD-7034 9,879.9 9,891.1 11.20 Disposal maintenance 15639 A. BUDIMAN - IPD 10 - - -
5-Sep-21 Night GR-2012 22,215.8 22,215.8 - Unscheduled - WORKSHOP - - -
5-Sep-21 Night GR-3007 39,130.4 39,135.4 5.00 Road Maintenance Support 8925 AGUS SUNARWAN - PIT 5 - - -
5-Sep-21 Night GR-3008 46,833.3 46,843.0 9.70 Road Maintenance Support 15571 YOHANIS L - PIT 5 - - -
5-Sep-21 Night TW-3001 8,492.0 8,493.0 1.00 Road Maintenance Support 15106 AHMAD NURANI - PIT 5 - - -
5-Sep-21 Night TW-4001 18,756.0 18,756.00 - Standby - WORKSHOP - - -
5-Sep-21 Night PU-4002 19,056.0 19,056.0 - Standby - PIT 11 - - -
5-Sep-21 Night PU-2026 6,187.2 6,187.2 - Standby 10914 SETYO BUDI UTOMO - PIT 11 - - -
5-Sep-21 Night PU-3026 12,307.0 12,307.0 - Standby - ROM TEMPORARY - - -
5-Sep-21 Night PU-3015 1,696.0 1,696.0 - Standby - PIT 11 - - -
5-Sep-21 Night PU-3014 27,240.4 27,240.4 - Standby - ROM TEMPORARY - - -
5-Sep-21 Night LP-2165 13,458.0 13,470.0 12.00 Unit Rental 4671 NURUDIN - KCP - - -
5-Sep-21 Night LP-2166 12,955.0 12,967.0 12.00 Unit Rental 4671 NURUDIN - KCP - - -
5-Sep-21 Night LP-2167 13,945.0 13,948.0 3.00 Unit Rental 4671 NURUDIN - KCP - - -
5-Sep-21 Night LP-2168 12,751.0 12,762.0 11.00 Unit Rental 4671 NURUDIN - KCP - - -
5-Sep-21 Night LP-2169 12,493.0 12,505.0 12.00 Unit Rental 4671 NURUDIN - KCP - - -
5-Sep-21 Night TS-4007 - - - Standby - KCP - - -
5-Sep-21 Night TS-4017 16,066.0 16,074.0 8.00 Unit Rental 15472 RIZKA M - KCP - - -
5-Sep-21 Night TF-4013 20,320.0 20,325.0 5.00 Unit Rental 15746 SYARIFUDDI - KCP - - -
5-Sep-21 Night TF-4014 34,550.0 34,550.0 - Standby - KCP - - -
6-Sep-21 Day EX-2037 22,104.9 22,106.7 1.80 Side casting 8371 DWI RUPAWAN - JALAN SAKA - - -
6-Sep-21 Day EX-2058 17,407.8 17,408.8 1.00 Side casting 11330 EKO PURWANTO - PIT 5 EXT - 1,162 -
6-Sep-21 Day EX-2058 17,408.8 17,417.4 8.60 Drainage 11330 EKO PURWANTO - PIT 5 EXT - 1,162 -
6-Sep-21 Day EX-4006 35,177.0 35,177.0 - Unscheduled - PARKIRAN SCANIA - 1,254 -
6-Sep-21 Day EX-5014 38,602.0 38,602.0 - Unscheduled - KCP - - -
6-Sep-21 Day EX-5022 11,274.0 11,278.7 4.73 Side casting 12534 PUJIYANTO - PIT 5 EXT - 1,243 -
6-Sep-21 Day EX-5022 11,278.7 11,282.0 3.27 Loading Waste 12534 PUJIYANTO - OB Outpit PIT 5 EXT IPD 10 - 1,243 -
6-Sep-21 Day EX-5037 19,035.0 19,035.0 - Unscheduled - PIT 5 - 1,258 -
6-Sep-21 Day EX-6014 57,537.0 57,537.0 - No Operator - PIT 5 EXT - - -
6-Sep-21 Day EX-6016 44,139.0 44,143.0 4.00 Loading Waste 10917 SETA VERDY KARYA - OB Outpit PIT 5 EXT IPD 10 - 1,344 -
6-Sep-21 Day EX-6022 18,478.1 18,482.9 4.80 Loading Waste 15568 FUAD EFENDI - OB Outpit PIT 5 EXT IPD 10 - - -
6-Sep-21 Day TR-3080 42,613.6 42,618.0 4.40 Hauling OB 9214 MUSTOFA ADI PRAYITNO 2 3 5 4 5 19 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 798 - 42 -
6-Sep-21 Day TR-3174 41,338.9 41,341.3 2.40 Hauling OB 15350 HERMAN 3 2 3 8 OB Outpit EX-6016 PIT 5 EXT IPD 10 42 336 - 42 -
6-Sep-21 Day TR-3175 38,733.1 38,737.6 4.50 Hauling OB 9354 JIDIN 1 2 3 3 9 OB Outpit EX-6016 PIT 5 EXT IPD 10 42 378 - 42 -
6-Sep-21 Day TR-3195 24,595.5 24,599.3 3.80 Hauling OB 3669 SUYANTO 1 3 4 8 OB Outpit EX-6016 PIT 5 EXT IPD 10 42 336 - 42 -
6-Sep-21 Day TR-3202 26,739.1 26,743.4 4.30 Hauling OB 15230 MARGONO 2 4 5 4 5 20 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 840 - 42 -
6-Sep-21 Day TR-3203 26,840.3 26,844.5 4.20 Hauling OB 8920 VERRY EKO SETIAWAN 1 5 5 4 5 20 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 840 - 42 -
6-Sep-21 Day TR-3204 26,155.0 26,159.3 4.30 Hauling OB 15349 ARDIANSYAH 1 5 5 3 5 19 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 798 - 42 -
6-Sep-21 Day TR-3205 25,707.2 25,708.0 0.80 Hauling OB 15350 HERMAN 2 2 OB Outpit EX-6016 PIT 5 EXT IPD 10 42 84 - 42 -
6-Sep-21 Day TR-3206 24,918.2 24,918.2 - Scheduled - WORKSHOP - - -
6-Sep-21 Day TR-3220 25,882.0 25,884.6 2.60 Hauling OB 11619 DWI WARDOYO 1 1 3 3 8 OB Outpit EX-6016 PIT 5 EXT IPD 10 42 336 - 42 -
6-Sep-21 Day TR-1024 31,335.8 31,335.8 - Unscheduled - WORKSHOP - - -
6-Sep-21 Day TR-1025 47,105.0 47,105.0 - Standby - PIT 5 EXT - - -
6-Sep-21 Day TR-1031 49,399.1 49,402.2 3.14 Hauling OB 15485 ROBY TM 1 2 3 2 4 12 OB Outpit EX-5022 PIT 5 EXT IPD 10 24 288 - 24 -
6-Sep-21 Day TR-1031 49,402.2 49,402.5 0.26 Hauling OB 15485 ROBY TM 1 1 OB Outpit EX-6022 PIT 5 EXT IPD 10 24 24 - 24 -
6-Sep-21 Day TR-1032 51,113.2 51,116.4 3.16 Hauling OB 15377 RIZALI RAHMAN 2 1 3 3 4 13 OB Outpit EX-5022 PIT 5 EXT IPD 10 24 312 - 24 -
6-Sep-21 Day TR-1032 51,116.4 51,116.6 0.24 Hauling OB 15377 RIZALI RAHMAN 1 1 OB Outpit EX-6022 PIT 5 EXT IPD 10 24 24 - 24 -
6-Sep-21 Day TR-1033 51,553.1 51,555.3 2.19 Hauling OB 15470 IJAI 1 2 3 1 7 OB Outpit EX-5022 PIT 5 EXT IPD 10 24 168 - 24 -
6-Sep-21 Day TR-1033 51,555.3 51,555.6 0.31 Hauling OB 15470 IJAI 1 1 OB Outpit EX-6022 PIT 5 EXT IPD 10 24 24 - 24 -
6-Sep-21 Day TR-1034 49,343.4 49,345.5 2.13 Hauling OB 15471 MULYADI 1 3 4 8 OB Outpit EX-5022 PIT 5 EXT IPD 10 24 192 - 24 -
6-Sep-21 Day TR-1034 49,345.5 49,345.8 0.27 Hauling OB 15471 MULYADI 1 1 OB Outpit EX-6022 PIT 5 EXT IPD 10 24 24 - 24 -
6-Sep-21 Day TR-1036 50,583.2 50,584.4 1.20 Hauling OB 15346 MUSA 1 2 1 4 OB Outpit EX-5022 PIT 5 EXT IPD 10 24 96 - 24 -
6-Sep-21 Day TR-1036 50,584.4 50,585.0 0.60 Hauling OB 15346 MUSA 2 2 OB Outpit EX-6016 PIT 5 EXT IPD 10 24 48 - 24 -
6-Sep-21 Day TR-1048 52,159.0 52,159.0 - Standby - PIT 5 EXT - - -
6-Sep-21 Day TR-1049 46,006.1 46,009.6 3.50 Hauling OB 15744 MARYANTO 1 2 2 3 4 12 OB Outpit EX-5022 PIT 5 EXT IPD 10 24 288 - 24 -
6-Sep-21 Day TR-1050 45,811.5 45,811.5 - Unscheduled - WORKSHOP - - -
6-Sep-21 Day TA-7009 27,795.0 27,797.9 2.90 Hauling OB 15862 RUDY AMRIYADI 1 2 3 OB Outpit EX-5022 JALAN SAKA 14 42 - 14 -
6-Sep-21 Day TA-7010 25,124.8 25,127.4 2.60 Hauling OB 15861 AGUSTIAN 1 2 3 OB Outpit EX-5022 JALAN SAKA 14 42 - 14 -
6-Sep-21 Day TA-7022 - - - Unscheduled - WORKSHOP - - -
6-Sep-21 Day TA-7029 28,508.3 28,508.3 - Unscheduled - PIT 5 EXT - - -
6-Sep-21 Day TA-7030 28,223.6 28,223.6 - Unscheduled - PIT 5 EXT - - -
6-Sep-21 Day BD-4005 13,770.7 13,770.7 - Scheduled - WORKSHOP - - -
k 6-Sep-21 Day BD-5035 3,358.8 3,361.0 2.20 Disposal maintenance 9978 KARSIANTO - IPD 10 - - -
6-Sep-21 Day BD-6025 2,717.1 2,722.0 4.90 Unit Rental 11169 ANNAS - KCP - - -
6-Sep-21 Day BD-6026 30,198.7 30,198.7 - Standby - WORKSHOP - - -
6-Sep-21 Day BD-6028 4,109.2 4,109.2 - Standby - KCP - - -
6-Sep-21 Day BD-6036 34,098.9 34,104.2 5.30 Unit Rental 14710 AGUS S - KCP - - -
6-Sep-21 Day BD-6038 33,883.8 33,889.1 5.30 Unit Rental 15570 HENDRY S - KCP - - -
6-Sep-21 Day BD-6069 10,373.2 10,379.9 6.70 Disposal maintenance - IPD 10 - - -
6-Sep-21 Day BD-7013 39,818.0 39,822.0 4.00 Front maintenance 9978 KARSIANTO - PIT 5 EXT - - -
6-Sep-21 Day BD-7026 26,475.6 26,476.9 1.30 Ripping 15606 FATHUR - PIT 5 EXT - - -
6-Sep-21 Day BD-7026 26,476.9 26,483.8 6.90 Front maintenance 15606 FATHUR - PIT 5 EXT - - -
6-Sep-21 Day BD-7034 9,891.1 9,897.5 6.40 Disposal maintenance 8157 SAMIDI - IPD 10 - - -
6-Sep-21 Day GR-2012 22,215.8 22,215.8 - Standby - WORKSHOP - - -
6-Sep-21 Day GR-3007 39,135.4 39,144.7 9.30 Road Maintenance Support 9103 WAWAN WIDODO - PIT 5 EXT - - -
6-Sep-21 Day GR-3008 46,843.0 46,846.5 3.50 Road Maintenance Support 12344 M FAJRI - PIT 5 EXT - - -
6-Sep-21 Day TW-3001 8,493.0 8,495.0 2.00 Road Maintenance Support - PIT 5 EXT - - -
6-Sep-21 Day TW-4001 18,756.0 18,756.00 - Standby - WORKSHOP - - -
6-Sep-21 Day PU-4002 19,056.0 19,056.00 - Unscheduled - PIT 11 - - -
6-Sep-21 Day PU-2026 6,187.2 6,187.8 0.60 Dewatering Z7354 M. ALMA DENNY - PIT 11 - - -
6-Sep-21 Day PU-3026 12,307.0 12,307.00 - Standby - ROM TEMPORARY - - -
6-Sep-21 Day PU-3015 1,696.0 1,696.00 - Standby - PIT 11 - - -
6-Sep-21 Day PU-3014 27,240.4 27,240.40 - Standby - ROM TEMPORARY - - -
6-Sep-21 Day LP-2165 13,470.0 13,470.00 - Standby - KCP - - -
6-Sep-21 Day LP-2166 12,967.0 12,967.00 - Standby - KCP - - -
6-Sep-21 Day LP-2167 13,948.0 13,948.00 - Standby - KCP - - -
6-Sep-21 Day LP-2168 12,762.0 12,763.00 1.00 Unit Rental 4671 NURUDIN - KCP - - -
6-Sep-21 Day LP-2169 12,505.0 12,505.00 - Standby - KCP - - -
6-Sep-21 Day TS-4007 - - - Standby - KCP - - -
6-Sep-21 Day TS-4017 16,074.0 16,081.0 7.00 Unit Rental 15310 ALDI ALFI SAPUTRA - KCP - - -
6-Sep-21 Day TF-4013 20,325.0 20,329.0 4.00 Unit Rental - KCP - - -
6-Sep-21 Day TF-4014 34,550.0 34,550.0 - Standby - KCP - - -
6-Sep-21 Night EX-2037 22,106.7 22,111.4 4.70 Side casting 15504 SLAMET WIDODO - JALAN SAKA - - -
6-Sep-21 Night EX-2058 17,417.4 17,418.1 0.68 Side casting 15504 SLAMET WIDODO - PIT 5 EXT - 1,162 -
6-Sep-21 Night EX-2058 17,418.1 17,422.2 4.12 Loading Solid Mud 15504 SLAMET WIDODO - Solid Mud Outpit PIT 5 EXT IPD 10 - - 1,162 - -
6-Sep-21 Night EX-4006 35,177.0 35,177.0 - Unscheduled - WORKSHOP - 1,254 -
6-Sep-21 Night EX-5014 38,602.0 38,602.0 - Unscheduled - KCP - - -
6-Sep-21 Night EX-5022 11,282.0 11,293.0 11.00 Loading Waste 15604 AHMAD SYAFI'I - OB Outpit PIT 5 EXT IPD 10 - 1,243 -
6-Sep-21 Night EX-5037 19,035.0 19,036.0 1.00 Loading Waste - OB Outpit PIT 5 IPD 10 - 1,258 -
6-Sep-21 Night EX-6014 57,537.0 57,546.0 9.00 Loading Waste 8952 DIDI SETIAWAN - OB Outpit PIT 5 EXT IPD 10 - - -
6-Sep-21 Night EX-6016 44,143.0 44,151.0 8.00 Loading Waste 9423 BILMAR SIMANJUNTAK - OB Outpit PIT 5 EXT IPD 10 - 1,344 -
6-Sep-21 Night EX-6022 18,482.9 18,493.3 10.40 Loading Waste 15486 SUGENG PRAYETNO - OB Outpit PIT 5 EXT IPD 10 - - -
6-Sep-21 Night TR-3080 42,618.0 42,627.7 9.70 Hauling OB 10881 BURHANUDDIN 3 5 4 4 5 4 4 3 4 4 3 43 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 1,806 - 42 -
6-Sep-21 Night TR-3174 41,341.3 41,343.2 1.90 Hauling OB 8958 MUKHROMIN 1 3 2 6 OB Outpit EX-6016 PIT 5 EXT IPD 10 42 252 - 42 -
6-Sep-21 Night TR-3174 41,343.2 41,343.5 0.30 Hauling OB 8958 MUKHROMIN 1 1 OB Outpit EX-6014 PIT 5 IPD 10 42 42 - 42 -
6-Sep-21 Night TR-3175 38,737.6 38,737.8 0.24 Hauling OB 11474 SARINDI 1 1 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 42 - 42 -
6-Sep-21 Night TR-3175 38,737.8 38,738.1 0.24 Hauling OB 8958 MUKHROMIN 3 4 4 4 4 5 3 2 29 OB Outpit EX-6014 PIT 5 IPD 10 42 1,218 - 42 -
6-Sep-21 Night TR-3175 38,738.1 38,745.0 6.92 Hauling OB 8958 MUKHROMIN - OB Outpit EX-6014 PIT 5 IPD 10 42 - - 42 -
6-Sep-21 Night TR-3195 24,599.3 24,600.6 1.28 Hauling OB 15229 ARDIANSYAH 2 3 5 OB Outpit EX-6016 PIT 5 EXT IPD 10 42 210 - 42 -
6-Sep-21 Night TR-3195 24,600.6 24,609.0 8.42 Hauling OB 15229 ARDIANSYAH 3 3 4 4 5 4 4 4 2 33 OB Outpit EX-6014 PIT 5 IPD 10 42 1,386 - 42 -
6-Sep-21 Night TR-3202 26,743.4 26,753.0 9.60 Hauling OB 11474 SARINDI 4 5 2 5 4 4 4 4 3 5 2 42 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 1,764 - 1 42 42
6-Sep-21 Night TR-3203 26,844.5 26,854.6 10.10 Hauling OB 8892 BAGUS PURWONO 4 5 4 4 5 4 5 3 5 4 2 45 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 1,890 - 42 -
6-Sep-21 Night TR-3204 26,159.3 26,169.4 10.10 Hauling OB 10969 JOKO PRIONO 3 5 3 4 4 5 4 3 4 5 3 43 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 1,806 - 42 -
6-Sep-21 Night TR-3205 25,708.0 25,709.8 1.84 Hauling OB 10882 SABIRIN 2 3 2 7 OB Outpit EX-6016 PIT 5 EXT IPD 10 42 294 - 42 -
6-Sep-21 Night TR-3205 25,709.8 25,718.0 8.16 Hauling OB 10882 SABIRIN 1 3 4 4 5 4 4 4 2 31 OB Outpit EX-6014 PIT 5 IPD 10 42 1,302 - 42 -
6-Sep-21 Night TR-3206 24,918.2 24,918.2 - Scheduled - WORKSHOP - - -
6-Sep-21 Night TR-3220 25,884.6 25,886.2 1.60 Hauling OB 10968 SUKIRNO 3 3 6 OB Outpit EX-6016 PIT 5 EXT IPD 10 42 252 - 42 -
6-Sep-21 Night TR-3220 25,886.2 25,893.4 7.20 Hauling OB 10968 SUKIRNO 1 3 5 4 4 4 4 2 27 OB Outpit EX-6014 PIT 5 IPD 10 42 1,134 - 42 -
6-Sep-21 Night TR-1024 31,335.8 31,335.8 - Unscheduled - WORKSHOP - - -
6-Sep-21 Night TR-1025 47,105.0 47,108.0 2.97 Hauling OB 15576 JOKO SANTOSO 2 3 4 2 11 OB Outpit EX-5022 PIT 5 EXT IPD 10 24 264 - 24 -
6-Sep-21 Night TR-1025 47,108.0 47,112.3 4.33 Hauling OB 15576 JOKO SANTOSO 1 4 5 4 2 16 OB Outpit EX-6016 PIT 5 EXT IPD 10 24 384 - 24 -
6-Sep-21 Night TR-1031 49,402.5 49,406.6 4.10 Hauling OB 15421 AGUS A 3 3 3 4 3 16 OB Outpit EX-5022 PIT 5 EXT IPD 10 24 384 - 24 -
6-Sep-21 Night TR-1031 49,406.6 49,412.5 5.90 Hauling OB 15421 AGUS A 1 4 5 4 4 4 1 23 OB Outpit EX-6016 PIT 5 EXT IPD 10 24 552 - 3 24 72
6-Sep-21 Night TR-1032 51,116.6 51,120.7 4.13 Hauling OB 15468 PADLIANSYAH 3 3 4 5 2 17 OB Outpit EX-5022 PIT 5 EXT IPD 10 24 408 - 24 -
6-Sep-21 Night TR-1032 51,120.7 51,126.8 6.07 Hauling OB 15468 PADLIANSYAH 1 5 4 5 4 4 2 25 OB Outpit EX-6016 PIT 5 EXT IPD 10 24 600 - 1 24 24
6-Sep-21 Night TR-1033 51,555.6 51,564.6 9.00 Hauling OB 15636 AKHMAD NOOR 3 2 3 5 1 4 5 4 4 4 2 37 OB Outpit EX-5022 PIT 5 EXT IPD 10 24 888 - 24 -
6-Sep-21 Night TR-1033 51,564.6 51,565.0 0.40 Hauling OB 15636 AKHMAD NOOR 2 2 OB Outpit EX-5037 PIT 5 EXT IPD 10 24 48 - 24 -
6-Sep-21 Night TR-1034 49,345.8 49,346.2 0.42 Hauling OB 15420 M ABD MADI 1 4 5 4 5 5 2 3 29 OB Outpit EX-5022 PIT 5 EXT IPD 10 24 696 - 24 -
6-Sep-21 Night TR-1034 49,346.2 49,352.3 6.10 Hauling OB 15420 M ABD MADI 2 3 5 OB Outpit EX-6014 PIT 5 IPD 10 24 120 - 24 -
6-Sep-21 Night TR-1034 49,352.3 49,353.4 1.05 Hauling OB 15420 M ABD MADI 3 3 OB Outpit EX-6016 PIT 5 EXT IPD 10 24 72 - 24 -
6-Sep-21 Night TR-1034 49,352.3 49,353.0 0.63 Hauling OB 15420 M ABD MADI - OB Outpit EX-6016 PIT 5 EXT IPD 10 24 - - 24 -
6-Sep-21 Night TR-1036 50,585.0 50,586.3 1.28 Hauling OB 15398 SIGIT SUSANTO 1 1 3 5 OB Outpit EX-5022 PIT 5 EXT IPD 10 24 120 - 24 -
6-Sep-21 Night TR-1036 50,586.3 50,587.3 1.02 Hauling Solid Mud 15398 SIGIT SUSANTO 1 3 4 Solid Mud Outpit EX-2058 PIT 5 EXT IPD 10 19 77 - 19 -
6-Sep-21 Night TR-1036 50,587.3 50,587.6 0.26 Hauling OB 15398 SIGIT SUSANTO 1 1 OB Outpit EX-5037 PIT 5 EXT IPD 10 24 24 - 24 -
6-Sep-21 Night TR-1036 50,587.6 50,587.8 0.26 Hauling OB 15398 SIGIT SUSANTO 1 1 OB Outpit EX-6014 PIT 5 IPD 10 24 24 - 24 -
6-Sep-21 Night TR-1036 50,587.8 50,594.2 6.39 Hauling OB 15398 SIGIT SUSANTO 1 5 4 5 4 4 2 25 OB Outpit EX-6016 PIT 5 EXT IPD 10 24 600 - 24 -
6-Sep-21 Night TR-1048 52,159.0 52,159.7 0.70 Hauling OB 15420 M ABD MADI 3 3 OB Outpit EX-5037 PIT 5 EXT IPD 10 24 72 - 24 -
6-Sep-21 Night TR-1049 46,009.6 46,010.6 0.99 Hauling OB 15376 EKO FAJAR S 3 1 4 OB Outpit EX-5022 PIT 5 EXT IPD 10 24 96 - 24 -
6-Sep-21 Night TR-1049 46,010.6 46,011.3 0.75 Hauling OB 15376 EKO FAJAR S 3 3 OB Outpit EX-5037 PIT 5 EXT IPD 10 24 72 - 24 -
6-Sep-21 Night TR-1049 46,011.3 46,013.3 1.99 Hauling OB 15376 EKO FAJAR S 3 2 1 2 8 OB Outpit EX-6014 PIT 5 IPD 10 24 192 - 24 -
6-Sep-21 Night TR-1049 46,013.3 46,019.3 5.97 Hauling OB 15376 EKO FAJAR S 2 2 5 4 4 4 3 24 OB Outpit EX-6016 PIT 5 EXT IPD 10 24 576 - 24 -
6-Sep-21 Night TR-1050 45,811.5 45,811.5 - Unscheduled - WORKSHOP - - -
6-Sep-21 Night TA-7009 27,797.9 27,802.2 4.31 Hauling Solid Mud 15817 YUSANDI 3 3 3 4 5 18 Solid Mud Outpit EX-2058 PIT 5 EXT IPD 10 11 202 - 11 -
6-Sep-21 Night TA-7009 27,802.2 27,808.2 5.99 Hauling OB 15818 AGUS SUGIANTO 5 5 3 5 4 3 25 OB Outpit EX-5022 PIT 5 EXT IPD 10 14 350 - 14 -
6-Sep-21 Night TA-7010 25,127.4 25,131.3 3.90 Hauling Solid Mud 15863 HENDRA M 3 3 3 4 13 Solid Mud Outpit EX-2058 PIT 5 EXT IPD 10 11 146 - 11 -
6-Sep-21 Night TA-7010 25,131.3 25,137.6 6.30 Hauling OB 15863 HENDRA M 5 4 2 4 2 2 2 21 OB Outpit EX-5022 PIT 5 EXT IPD 10 14 294 - 1 14 14
6-Sep-21 Night TA-7022 - - - Unscheduled - WORKSHOP - - -
6-Sep-21 Night TA-7029 28,508.3 28,509.8 1.51 Hauling Solid Mud 15819 AHNIANSYAH 2 4 6 Solid Mud Outpit EX-2058 PIT 5 EXT IPD 10 11 67 - 11 -
6-Sep-21 Night TA-7029 28,509.8 28,515.1 5.29 Hauling OB 15819 AHNIANSYAH 4 5 4 4 4 21 OB Outpit EX-5022 PIT 5 EXT IPD 10 14 294 - 14 -
6-Sep-21 Night TA-7030 28,223.6 28,223.6 - Unscheduled - PIT 5 EXT - - -
6-Sep-21 Night BD-4005 13,770.7 13,770.7 - Scheduled - WORKSHOP - - -
6-Sep-21 Night BD-5035 3,361.0 3,369.5 8.50 Disposal maintenance 11676 SUDARSONO - IPD 10 - - -
6-Sep-21 Night BD-6025 2,722.1 2,729.8 7.70 Unit Rental 15464 MARJUKI - KCP - - -
6-Sep-21 Night BD-6026 30,198.7 30,198.7 - Standby - WORKSHOP - - -
6-Sep-21 Night BD-6028 4,109.2 4,109.2 - Standby - KCP - - -
6-Sep-21 Night BD-6036 34,104.2 34,112.2 8.00 Unit Rental 14964 JOKO P (Dozer) - KCP - - -
6-Sep-21 Night BD-6038 33,889.1 33,897.5 8.40 Unit Rental 14708 ADEFI P - KCP - - -
6-Sep-21 Night BD-6069 10,379.9 10,384.9 5.00 Disposal maintenance 15747 MUSTAQIM D6 - IPD 10 - - -
6-Sep-21 Night BD-7013 39,822.0 39,823.7 1.70 Front maintenance 11676 SUDARSONO - PIT 5 EXT - - -
6-Sep-21 Night BD-7026 26,483.8 26,489.4 5.60 Front maintenance 15639 A. BUDIMAN - PIT 5 EXT - - -
6-Sep-21 Night BD-7034 9,897.5 9,908.5 11.00 Disposal maintenance 9492 MAHFUDI - IPD 10 - - -
6-Sep-21 Night GR-2012 22,215.8 22,215.8 - Standby - WORKSHOP - - -
6-Sep-21 Night GR-3007 39,144.7 39,155.0 10.30 Road Maintenance Support 15571 YOHANIS L - PIT 5 EXT - - -
6-Sep-21 Night GR-3008 46,846.5 46,846.5 - Unscheduled - PIT 5 EXT - - -
6-Sep-21 Night TW-3001 8,495.0 8,497.0 2.00 Road Maintenance Support - PIT 5 EXT - - -
6-Sep-21 Night TW-4001 18,756.0 18,756.00 - Standby - WORKSHOP - - -
6-Sep-21 Night PU-4002 19,056.0 19,056.0 - Unscheduled - PIT 11 - - -
6-Sep-21 Night PU-2026 6,187.8 6,187.8 - Standby - PIT 11 - - -
6-Sep-21 Night PU-3026 12,307.0 12,307.0 - Standby - ROM TEMPORARY - - -
6-Sep-21 Night PU-3015 1,696.0 1,696.0 - Standby - PIT 11 - - -
6-Sep-21 Night PU-3014 27,240.4 27,240.4 - Standby - ROM TEMPORARY - - -
6-Sep-21 Night LP-2165 13,470.0 13,482.0 12.00 Unit Rental 4671 NURUDIN - KCP - - -
6-Sep-21 Night LP-2166 12,967.0 12,978.0 11.00 Unit Rental 4671 NURUDIN - KCP - - -
6-Sep-21 Night LP-2167 13,948.0 13,952.0 4.00 Unit Rental 4671 NURUDIN - KCP - - -
6-Sep-21 Night LP-2168 12,763.0 12,775.0 12.00 Unit Rental 4671 NURUDIN - KCP - - -
6-Sep-21 Night LP-2169 12,505.0 12,517.0 12.00 Unit Rental 4671 NURUDIN - KCP - - -
6-Sep-21 Night TS-4007 - - - Standby - KCP - - -
6-Sep-21 Night TS-4017 16,081.0 16,084.0 3.00 Unit Rental 15470 IJAI - KCP - - -
6-Sep-21 Night TF-4013 20,329.0 20,335.0 6.00 Unit Rental 15746 SYARIFUDDI - KCP - - -
6-Sep-21 Night TF-4014 34,550.0 34,550.0 - Standby - KCP - - -
7-Sep-21 Day EX-2037 22,111.4 22,111.4 - No Operator - PIT 9 - - -
7-Sep-21 Day EX-2058 17,422.2 17,423.2 1.00 Rehandling Coal 11330 EKO PURWANTO - COAL PIT 5 EXT - - 1,230 - -
7-Sep-21 Day EX-2058 17,423.2 17,431.2 8.00 Side casting 11330 EKO PURWANTO - PIT 5 EXT - 1,230 -
7-Sep-21 Day EX-4006 35,177.0 35,177.0 - Unscheduled - WORKSHOP - 1,177 -
7-Sep-21 Day EX-5014 38,602.0 38,602.0 - Unscheduled - KCP - - -
7-Sep-21 Day EX-5022 11,293.0 11,299.0 6.00 Loading Waste 9590F SIRATAL RAYYAN - OB Outpit PIT 5 EXT IPD 10 - 1,176 -
7-Sep-21 Day EX-5037 19,036.0 19,036.0 - Unscheduled - PIT 5 EXT - 1,177 -
7-Sep-21 Day EX-6014 57,546.0 57,552.0 6.00 Loading Waste 10917 SETA VERDY KARYA - OB Outpit PIT 5 EXT IPD 10 - - -
7-Sep-21 Day EX-6016 44,151.0 44,156.0 5.00 Loading Waste 15568 FUAD EFENDI - OB Outpit PIT 5 EXT IPD 10 - - -
7-Sep-21 Day EX-6022 18,493.3 18,499.7 6.40 Loading Waste 11146 PURWANTO - OB Outpit PIT 5 EXT IPD 10 - - -
7-Sep-21 Day TR-3080 42,627.7 42,633.0 5.30 Hauling OB 15349 ARDIANSYAH 3 3 2 3 2 3 3 19 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 798 - 42 -
7-Sep-21 Day TR-3174 41,343.5 41,344.6 1.13 Hauling OB 11619 DWI WARDOYO 3 1 4 OB Outpit EX-6016 PIT 5 EXT IPD 10 42 168 - 42 -
7-Sep-21 Day TR-3174 41,344.6 41,344.9 0.28 Hauling OB 11619 DWI WARDOYO 1 1 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 42 - 42 -
7-Sep-21 Day TR-3174 41,344.9 41,348.0 3.09 Hauling OB 11619 DWI WARDOYO 4 3 1 3 11 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 462 - 42 -
7-Sep-21 Day TR-3175 38,745.0 38,746.5 1.47 Hauling OB 9354 JIDIN 3 1 4 8 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 336 - 42 -
7-Sep-21 Day TR-3175 38,746.5 38,748.3 1.83 Hauling OB 9354 JIDIN 3 3 4 10 OB Outpit EX-6016 PIT 5 EXT IPD 10 42 420 - 42 -
7-Sep-21 Day TR-3195 24,609.0 24,613.2 4.21 Hauling OB 1354 SUDIYANTO 3 2 2 2 2 2 13 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 546 - 42 -
7-Sep-21 Day TR-3195 24,613.2 24,614.5 1.29 Hauling OB 1354 SUDIYANTO 1 3 4 OB Outpit EX-6016 PIT 5 EXT IPD 10 42 168 - 42 -
7-Sep-21 Day TR-3202 26,753.0 26,758.0 5.00 Hauling OB 3669 SUYANTO 4 2 2 3 3 3 4 21 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 882 - 1 42 42
7-Sep-21 Day TR-3203 26,854.6 26,856.0 1.39 Hauling OB 8920 VERRY EKO SETIAWAN 3 2 5 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 210 - 42 -
7-Sep-21 Day TR-3203 26,856.0 26,859.9 3.91 Hauling OB 8920 VERRY EKO SETIAWAN 1 2 3 4 1 3 14 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 588 - 42 -
7-Sep-21 Day TR-3204 26,169.4 26,175.0 5.60 Hauling OB 1303 EFENDI 3 3 2 3 3 3 4 21 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 882 - 42 -
7-Sep-21 Day TR-3205 25,718.0 25,723.4 5.40 Hauling OB 7170F TRI PRASETIYO 2 2 3 3 4 2 4 20 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 840 - 42 -
7-Sep-21 Day TR-3206 24,918.2 24,918.2 - Scheduled - WORKSHOP - - -
7-Sep-21 Day TR-3220 25,893.4 25,898.7 5.30 Hauling OB 8965 HADI SUTIKNO 4 2 1 3 2 4 3 19 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 798 - 42 -
7-Sep-21 Day TR-1024 31,335.8 31,335.8 - Unscheduled - WORKSHOP - - -
7-Sep-21 Day TR-1025 47,112.3 47,116.6 4.28 Hauling OB 16024 QORI 2 3 4 3 3 15 OB Outpit EX-5022 PIT 5 EXT IPD 10 24 360 - 24 -
7-Sep-21 Day TR-1025 47,116.6 47,118.0 1.43 Hauling OB 16024 QORI 5 5 OB Outpit EX-6016 PIT 5 EXT IPD 10 24 120 - 24 -
7-Sep-21 Day TR-1031 49,412.5 49,413.0 0.49 Rehandling Coal 15466 SUPRIYANTO 2 2 COAL EX-2058 PIT 5 EXT 19 - - 19 -
7-Sep-21 Day TR-1031 49,413.0 49,413.5 0.49 Hauling OB 15466 SUPRIYANTO 2 2 OB Outpit EX-6014 PIT 5 EXT IPD 10 24 48 - 24 -
7-Sep-21 Day TR-1031 49,413.5 49,414.0 0.49 Hauling OB 15466 SUPRIYANTO 2 2 OB Outpit EX-5022 PIT 5 EXT IPD 10 24 48 - 24 -
7-Sep-21 Day TR-1031 49,414.0 49,416.4 2.44 Hauling OB 15466 SUPRIYANTO 2 3 5 10 OB Outpit EX-6016 PIT 5 EXT IPD 10 24 240 - 24 -
7-Sep-21 Day TR-1032 51,126.8 51,127.3 0.50 Hauling OB 15377 RIZALI RAHMAN 1 1 2 OB Outpit EX-6014 PIT 5 EXT IPD 10 24 48 - 1 24 24
7-Sep-21 Day TR-1032 51,127.3 51,130.1 2.78 Hauling OB 15377 RIZALI RAHMAN 1 2 2 4 2 11 OB Outpit EX-6016 PIT 5 EXT IPD 10 24 264 - 24 -
7-Sep-21 Day TR-1032 51,130.1 51,132.1 2.02 Hauling OB 15377 RIZALI RAHMAN 2 2 4 8 OB Outpit EX-5022 PIT 5 EXT IPD 10 24 192 - 24 -
7-Sep-21 Day TR-1033 51,565.0 51,566.4 1.38 Hauling OB 15470 IJAI 1 2 1 1 5 OB Outpit EX-5022 PIT 5 EXT IPD 10 24 120 - 24 -
7-Sep-21 Day TR-1033 51,566.4 51,566.7 0.28 Hauling OB 15470 IJAI 1 1 OB Outpit EX-6014 PIT 5 EXT IPD 10 24 24 - 24 -
7-Sep-21 Day TR-1033 51,566.7 51,567.5 0.83 Hauling OB 15470 IJAI 3 3 OB Outpit EX-6016 PIT 5 EXT IPD 10 24 72 - 24 -
7-Sep-21 Day TR-1033 51,567.5 51,570.5 3.03 Hauling OB 15471 MULYADI 2 3 2 4 11 OB Outpit EX-5022 PIT 5 EXT IPD 10 24 264 - 24 -
7-Sep-21 Day TR-1034 49,353.4 49,356.3 2.88 Hauling OB 15397 YUSUF 2 2 2 2 8 OB Outpit EX-5022 PIT 5 EXT IPD 10 24 192 - 24 -
7-Sep-21 Day TR-1034 49,356.3 49,357.0 0.72 Hauling OB 15397 YUSUF 2 2 OB Outpit EX-6016 PIT 5 EXT IPD 10 24 48 - 24 -
7-Sep-21 Day TR-1036 50,594.2 50,594.7 0.50 Hauling OB 15346 MUSA 2 2 OB Outpit EX-6014 PIT 5 EXT IPD 10 24 48 - 24 -
7-Sep-21 Day TR-1036 50,594.7 50,599.0 4.28 Hauling OB 15346 MUSA 1 2 3 5 2 4 17 OB Outpit EX-6016 PIT 5 EXT IPD 10 24 408 - 24 -
7-Sep-21 Day TR-1036 50,599.0 50,599.5 0.50 Hauling OB 15346 MUSA 1 1 2 OB Outpit EX-5022 PIT 5 EXT IPD 10 24 48 - 24 -
7-Sep-21 Day TR-1048 52,159.7 52,159.7 - Unscheduled - IPD 10 - - -
7-Sep-21 Day TR-1049 46,019.3 46,020.5 1.16 Hauling OB 15744 MARYANTO 1 4 5 OB Outpit EX-6014 PIT 5 EXT IPD 10 24 120 - 24 -
7-Sep-21 Day TR-1049 46,020.5 46,021.9 1.39 Hauling OB 15744 MARYANTO 1 3 1 1 6 OB Outpit EX-5022 PIT 5 EXT IPD 10 24 144 - 24 -
7-Sep-21 Day TR-1049 46,021.9 46,025.1 3.25 Hauling OB 15744 MARYANTO 3 5 2 4 14 OB Outpit EX-6016 PIT 5 EXT IPD 10 24 336 - 24 -
7-Sep-21 Day TR-1050 45,811.5 45,811.5 - Unscheduled - WORKSHOP - - -
7-Sep-21 Day TA-7009 27,808.2 27,809.3 1.10 Hauling OB 15653 M. ILIAS 1 3 4 OB Outpit EX-5022 PIT 5 EXT IPD 10 14 56 - 14 -
7-Sep-21 Day TA-7009 27,809.3 27,813.4 4.10 Hauling OB 16026 BAHRUNI 2 2 2 4 2 3 15 OB Outpit EX-5022 PIT 5 EXT IPD 10 14 210 - 14 -
7-Sep-21 Day TA-7010 25,137.6 25,140.6 3.00 Hauling OB 15861 AGUSTIAN 2 3 3 2 10 OB Outpit EX-5022 PIT 5 EXT IPD 10 14 140 - 14 -
7-Sep-21 Day TA-7022 - - - Unscheduled - WORKSHOP - - -
7-Sep-21 Day TA-7029 28,515.1 28,521.1 6.00 Hauling OB 15816 M. YUSUF 2 2 3 2 4 3 3 19 OB Outpit EX-5022 PIT 5 EXT IPD 10 14 266 - 14 -
7-Sep-21 Day TA-7030 28,223.6 28,223.6 - Unscheduled - PIT 5 EXT - - -
7-Sep-21 Day BD-4005 13,770.7 13,770.7 - Scheduled - WORKSHOP - - -
k 7-Sep-21 Day BD-5035 3,369.5 3,379.6 10.10 Disposal maintenance 14963 MAULANA ISHAK - IPD 10 - - -
7-Sep-21 Day BD-6025 2,729.8 2,738.9 9.10 Unit Rental 11169 ANNAS - KCP - - -
7-Sep-21 Day BD-6026 30,198.7 30,198.7 - Standby - WORKSHOP - - -
7-Sep-21 Day BD-6028 4,109.2 4,109.2 - Standby - KCP - - -
7-Sep-21 Day BD-6036 34,112.2 34,121.0 8.80 Unit Rental 14710 AGUS S - KCP - - -
7-Sep-21 Day BD-6038 33,897.5 33,905.9 8.40 Unit Rental 15569 SUJIONO - KCP - - -
7-Sep-21 Day BD-6069 10,384.9 10,384.9 - Unscheduled - PIT 5 EXT - - -
7-Sep-21 Day BD-7013 39,823.7 39,823.7 - Unscheduled - WORKSHOP - - -
7-Sep-21 Day BD-7026 26,489.4 26,500.8 11.40 Front maintenance 9978 KARSIANTO - PIT 5 EXT - - -
7-Sep-21 Day BD-7034 9,908.5 9,920.0 11.50 Disposal maintenance 8157 SAMIDI - IPD 10 - - -
7-Sep-21 Day GR-2012 22,215.8 22,215.8 - Standby - WORKSHOP - - -
7-Sep-21 Day GR-3007 39,155.0 39,160.7 5.70 Road Maintenance Support 9103 WAWAN WIDODO - PIT 5 EXT - - -
7-Sep-21 Day GR-3008 46,846.5 46,850.9 4.40 Road Maintenance Support 9214 MUSTOFA ADI PRAYITNO - PIT 5 EXT - - -
7-Sep-21 Day TW-3001 8,497.0 8,499.0 2.00 Road Maintenance Support - PIT 5 EXT - - -
7-Sep-21 Day TW-4001 18,756.0 18,756.00 - Standby - WORKSHOP - - -
7-Sep-21 Day PU-4002 19,056.0 19,056.00 - Unscheduled - PIT 11 - - -
7-Sep-21 Day PU-2026 6,187.8 6,188.2 0.40 Dewatering Z7354 M. ALMA DENNY - PIT 11 - - -
7-Sep-21 Day PU-3026 12,307.0 12,307.00 - Standby - ROM TEMPORARY - - -
7-Sep-21 Day PU-3015 1,696.0 1,696.00 - Standby - ROM TEMPORARY - - -
7-Sep-21 Day PU-3014 27,240.4 27,240.40 - Standby - ROM TEMPORARY - - -
7-Sep-21 Day LP-2165 13,482.0 13,482.00 - Standby - KCP - - -
7-Sep-21 Day LP-2166 12,978.0 12,978.00 - Standby - KCP - - -
7-Sep-21 Day LP-2167 13,952.0 13,952.00 - Standby - KCP - - -
7-Sep-21 Day LP-2168 12,775.0 12,775.00 - Standby - KCP - - -
7-Sep-21 Day LP-2169 12,517.0 12,517.00 - Standby - KCP - - -
7-Sep-21 Day TS-4007 - - - Standby - KCP - - -
7-Sep-21 Day TS-4017 16,084.0 16,090.0 6.00 Unit Rental 15745 SURYANATA - KCP - - -
7-Sep-21 Day TF-4013 20,335.0 20,338.0 3.00 Unit Rental 15105 HADIANOR - KCP - - -
7-Sep-21 Day TF-4014 34,550.0 34,550.0 - Standby - KCP - - -
7-Sep-21 Night EX-2037 22,111.4 22,111.4 - No Operator - PIT 9 - - -
7-Sep-21 Night EX-2058 17,431.2 17,434.7 3.50 Sloping 15504 SLAMET WIDODO - PIT 5 EXT - 1,230 -
7-Sep-21 Night EX-2058 17,434.7 17,437.7 3.00 Side casting 15504 SLAMET WIDODO - PIT 5 EXT - 1,230 -
7-Sep-21 Night EX-2058 17,437.7 17,438.7 1.00 Evakuasi unit 15504 SLAMET WIDODO - PIT 5 EXT - 1,230 -
7-Sep-21 Night EX-4006 35,177.0 35,177.0 - Unscheduled - WORKSHOP - 1,177 -
7-Sep-21 Night EX-5014 38,602.0 38,602.0 - Unscheduled - KCP - - -
7-Sep-21 Night EX-5022 11,299.0 11,305.0 6.00 Loading Waste 12534 PUJIYANTO - OB Outpit PIT 5 EXT IPD 10 - 1,176 -
7-Sep-21 Night EX-5037 19,036.0 19,036.0 - Unscheduled - PIT 5 EXT - 1,177 -
7-Sep-21 Night EX-6014 57,552.0 57,562.0 10.00 Loading Waste 9136 AHMAD YANI - OB Outpit PIT 5 EXT IPD 10 - - -
7-Sep-21 Night EX-6016 44,156.0 44,164.0 8.00 Loading Waste 15567 ARIF WAHYUDI - OB Outpit PIT 5 EXT IPD 10 - - -
7-Sep-21 Night EX-6022 18,499.7 18,509.3 9.60 Loading Waste 15486 SUGENG PRAYETNO - OB Outpit PIT 5 EXT IPD 10 - - -
7-Sep-21 Night TR-3080 42,633.0 42,635.8 2.76 Hauling OB 10881 BURHANUDDIN 3 4 3 10 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 420 - 42 -
7-Sep-21 Night TR-3080 42,635.8 42,642.1 6.34 Hauling OB 10881 BURHANUDDIN 1 2 4 3 4 4 1 1 3 23 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 966 - 2 42 84
7-Sep-21 Night TR-3174 41,348.0 41,348.3 0.30 Hauling OB 8958 MUKHROMIN 1 1 OB Outpit EX-6016 PIT 5 EXT IPD 10 42 42 - 42 -
7-Sep-21 Night TR-3174 41,348.3 41,357.5 9.20 Hauling OB 8958 MUKHROMIN 2 3 3 3 4 3 4 4 1 2 2 31 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 1,302 - 42 -
7-Sep-21 Night TR-3174 41,357.5 41,357.8 0.30 Hauling OB 8958 MUKHROMIN 1 1 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 42 - 42 -
7-Sep-21 Night TR-3175 38,748.3 38,748.3 - Standby - PIT 5 EXT - - -
7-Sep-21 Night TR-3195 24,614.5 24,614.7 0.23 Hauling OB 10762 SYAMSUDDIN 1 1 OB Outpit EX-6016 PIT 5 EXT IPD 10 42 42 - 42 -
7-Sep-21 Night TR-3195 24,614.7 24,616.1 1.40 Hauling OB 10762 SYAMSUDDIN 2 3 1 6 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 252 - 42 -
7-Sep-21 Night TR-3195 24,616.1 24,623.8 7.67 Hauling OB 10762 SYAMSUDDIN 1 4 5 5 5 5 2 3 3 33 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 1,386 - 42 -
7-Sep-21 Night TR-3202 26,758.0 26,767.4 9.40 Hauling OB 15350 HERMAN 1 4 3 5 5 4 6 6 2 3 4 43 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 1,806 - 42 -
7-Sep-21 Night TR-3203 26,859.9 26,869.1 9.20 Hauling OB 8892 BAGUS PURWONO 2 3 3 3 4 3 4 4 2 2 3 33 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 1,386 - 42 -
7-Sep-21 Night TR-3204 26,175.0 26,184.0 9.00 Hauling OB 10969 JOKO PRIONO 4 4 4 4 5 5 4 5 2 3 3 43 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 1,806 - 42 -
7-Sep-21 Night TR-3205 25,723.4 25,723.7 0.30 Hauling OB 10882 SABIRIN 1 1 OB Outpit EX-6016 PIT 5 EXT IPD 10 42 42 - 42 -
7-Sep-21 Night TR-3205 25,723.7 25,732.7 9.00 Hauling OB 10882 SABIRIN 2 3 3 3 3 4 4 4 2 1 3 32 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 1,344 - 1 42 42
7-Sep-21 Night TR-3206 24,918.2 24,918.2 - Scheduled - WORKSHOP - - -
7-Sep-21 Night TR-3220 25,898.7 25,907.6 8.90 Hauling OB 10968 SUKIRNO 2 3 4 5 5 3 6 5 2 4 4 43 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 1,806 - 1 42 42
7-Sep-21 Night TR-1024 31,335.8 31,335.8 - Unscheduled - WORKSHOP - - -
7-Sep-21 Night TR-1025 47,118.0 47,120.9 2.88 Hauling OB 15576 JOKO SANTOSO 3 2 3 3 11 OB Outpit EX-5022 PIT 5 EXT IPD 10 24 264 - 24 -
7-Sep-21 Night TR-1025 47,120.9 47,126.4 5.50 Hauling OB 15576 JOKO SANTOSO 4 3 3 4 5 2 21 OB Outpit EX-6016 PIT 5 EXT IPD 10 24 504 - 24 -
7-Sep-21 Night TR-1025 47,126.4 47,127.7 1.31 Hauling OB 15576 JOKO SANTOSO 2 3 5 OB Outpit EX-6014 PIT 5 EXT IPD 10 24 120 - 24 -
7-Sep-21 Night TR-1031 49,416.4 49,416.4 - Unscheduled - PIT 5 EXT - - -
7-Sep-21 Night TR-1032 51,132.1 51,136.6 4.50 Hauling OB 15468 PADLIANSYAH 3 2 4 4 2 3 18 OB Outpit EX-6016 PIT 5 EXT IPD 10 24 432 - 24 -
7-Sep-21 Night TR-1032 51,136.6 51,137.4 0.75 Hauling OB 15468 PADLIANSYAH 1 2 3 OB Outpit EX-6014 PIT 5 EXT IPD 10 24 72 - 24 -
7-Sep-21 Night TR-1032 51,137.4 51,141.6 4.25 Hauling OB 15468 PADLIANSYAH 2 3 4 2 4 2 17 OB Outpit EX-5022 PIT 5 EXT IPD 10 24 408 - 1 24 24
7-Sep-21 Night TR-1033 51,570.5 51,572.8 2.23 Hauling OB 15636 AKHMAD NOOR 3 3 3 9 OB Outpit EX-5022 PIT 5 EXT IPD 10 24 216 - 24 -
7-Sep-21 Night TR-1033 51,572.8 51,575.2 2.48 Hauling OB 15636 AKHMAD NOOR 4 2 4 10 OB Outpit EX-6016 PIT 5 EXT IPD 10 24 240 - 24 -
7-Sep-21 Night TR-1033 51,575.2 51,578.7 3.47 Hauling OB 15485 ROBY TM 4 5 2 3 14 OB Outpit EX-6016 PIT 5 EXT IPD 10 24 336 - 24 -
7-Sep-21 Night TR-1034 49,357.0 49,361.0 4.03 Hauling OB 15421 AGUS A 4 5 2 1 2 14 OB Outpit EX-6016 PIT 5 EXT IPD 10 24 336 - 24 -
7-Sep-21 Night TR-1036 50,599.5 50,604.3 4.84 Hauling OB 15398 SIGIT SUSANTO 3 4 4 3 2 1 2 19 OB Outpit EX-6016 PIT 5 EXT IPD 10 24 456 - 24 -
7-Sep-21 Night TR-1036 50,604.3 50,607.1 2.80 Hauling OB 15398 SIGIT SUSANTO 1 4 3 3 11 OB Outpit EX-5022 PIT 5 EXT IPD 10 24 264 - 24 -
7-Sep-21 Night TR-1036 50,607.1 50,608.4 1.27 Hauling OB 15398 SIGIT SUSANTO 1 4 5 OB Outpit EX-6022 PIT 5 EXT IPD 10 24 120 - 24 -
7-Sep-21 Night TR-1048 52,159.7 52,159.7 - Unscheduled - IPD 10 - - -
7-Sep-21 Night TR-1049 46,025.1 46,028.7 3.56 Hauling OB 15376 EKO FAJAR S 3 4 3 4 14 OB Outpit EX-6016 PIT 5 EXT IPD 10 24 336 - 24 -
7-Sep-21 Night TR-1049 46,028.7 46,030.4 1.78 Hauling OB 15376 EKO FAJAR S 3 4 7 OB Outpit EX-5022 PIT 5 EXT IPD 10 24 168 - 24 -
7-Sep-21 Night TR-1049 46,030.4 46,034.3 3.81 Hauling OB 15420 M ABD MADI 5 4 2 1 3 15 OB Outpit EX-6016 PIT 5 EXT IPD 10 24 360 - 24 -
7-Sep-21 Night TR-1049 46,034.3 46,034.5 0.25 Hauling OB 15420 M ABD MADI 1 1 OB Outpit EX-6014 PIT 5 EXT IPD 10 24 24 - 24 -
7-Sep-21 Night TR-1050 45,811.5 45,811.5 - Unscheduled - WORKSHOP - - -
7-Sep-21 Night TA-7009 27,813.4 27,814.1 0.68 Hauling OB 15862 RUDY AMRIYADI 1 1 2 OB Outpit EX-6014 PIT 5 EXT IPD 10 14 28 - 1 14 14
7-Sep-21 Night TA-7009 27,814.1 27,818.2 4.09 Hauling OB 15862 RUDY AMRIYADI 2 1 4 3 1 1 12 OB Outpit EX-5022 PIT 5 EXT IPD 10 14 168 - 2 14 28
7-Sep-21 Night TA-7009 27,818.2 27,819.2 1.02 Hauling OB 15862 RUDY AMRIYADI 2 1 3 OB Outpit EX-6016 PIT 5 EXT IPD 10 14 42 - 14 -
7-Sep-21 Night TA-7010 25,140.6 25,144.4 3.80 Hauling OB 15863 HENDRA M 4 3 2 3 12 OB Outpit EX-5022 PIT 5 EXT IPD 10 14 168 - 14 -
7-Sep-21 Night TA-7022 - - - Unscheduled - WORKSHOP - - -
7-Sep-21 Night TA-7029 28,521.1 28,526.4 5.25 Hauling OB 15819 AHNIANSYAH 3 3 4 4 4 2 20 OB Outpit EX-5022 PIT 5 EXT IPD 10 14 280 - 14 -
7-Sep-21 Night TA-7029 28,526.4 28,529.5 3.15 Hauling OB 15819 AHNIANSYAH 3 4 4 1 12 OB Outpit EX-6016 PIT 5 EXT IPD 10 14 168 - 14 -
7-Sep-21 Night TA-7030 28,223.6 28,223.6 - Unscheduled - PIT 5 EXT - - -
7-Sep-21 Night BD-4005 13,770.7 13,770.7 - Scheduled - WORKSHOP - - -
7-Sep-21 Night BD-5035 3,379.6 3,387.9 8.30 Disposal maintenance 15747 MUSTAQIM D6 - IPD 10 - - -
7-Sep-21 Night BD-6025 2,738.9 2,742.8 3.90 Unit Rental 15570 HENDRY S - KCP - - -
7-Sep-21 Night BD-6026 30,198.7 30,198.7 - Standby - WORKSHOP - - -
7-Sep-21 Night BD-6028 4,109.2 4,109.2 - Standby - KCP - - -
7-Sep-21 Night BD-6036 34,121.0 34,123.5 2.50 Unit Rental 14964 JOKO P (Dozer) - KCP - - -
7-Sep-21 Night BD-6038 33,905.9 33,908.8 2.90 Unit Rental 14708 ADEFI P - KCP - - -
7-Sep-21 Night BD-6069 10,384.9 10,384.9 - Unscheduled - PIT 5 EXT - - -
7-Sep-21 Night BD-7013 39,823.7 39,832.4 8.70 Front maintenance 11676 SUDARSONO - PIT 5 EXT - - -
7-Sep-21 Night BD-7026 26,500.8 26,511.1 10.30 Ripping 15639 A. BUDIMAN - PIT 5 EXT - - -
7-Sep-21 Night BD-7034 9,920.0 9,922.5 2.50 Disposal maintenance 9492 MAHFUDI - IPD 10 - - -
7-Sep-21 Night GR-2012 22,231.1 22,232.5 1.40 Road Maintenance Support 12344 M FAJRI - PIT 5 EXT - - -
7-Sep-21 Night GR-3007 39,160.7 39,170.9 10.20 Road Maintenance Support 8925 AGUS SUNARWAN - PIT 5 EXT - - -
7-Sep-21 Night GR-3008 46,850.9 46,858.1 7.20 Road Maintenance Support 12344 M FAJRI - PIT 5 EXT - - -
7-Sep-21 Night TW-3001 8,499.0 8,500.0 1.00 Road Maintenance Support - PIT 5 EXT - - -
7-Sep-21 Night TW-4001 18,756.0 18,756.00 - Standby - WORKSHOP - - -
7-Sep-21 Night PU-4002 19,056.0 19,056.0 - Unscheduled - PIT 11 - - -
7-Sep-21 Night PU-2026 6,188.2 6,188.2 - Standby - PIT 11 - - -
7-Sep-21 Night PU-3026 12,307.0 12,307.0 - Standby - ROM TEMPORARY - - -
7-Sep-21 Night PU-3015 1,696.0 1,696.0 - Standby - ROM TEMPORARY - - -
7-Sep-21 Night PU-3014 27,240.4 27,240.4 - Standby - ROM TEMPORARY - - -
7-Sep-21 Night LP-2165 13,482.0 13,494.0 12.00 Unit Rental 7813 YOSEF SIMORANGKIR - KCP - - -
7-Sep-21 Night LP-2166 12,978.0 12,990.0 12.00 Unit Rental 7813 YOSEF SIMORANGKIR - KCP - - -
7-Sep-21 Night LP-2167 13,952.0 13,952.0 - Unit Rental 7813 YOSEF SIMORANGKIR - KCP - - -
7-Sep-21 Night LP-2168 12,775.0 12,783.0 8.00 Unit Rental 7813 YOSEF SIMORANGKIR - KCP - - -
7-Sep-21 Night LP-2169 12,517.0 12,529.0 12.00 Unit Rental 7813 YOSEF SIMORANGKIR - KCP - - -
7-Sep-21 Night TS-4007 - - - Standby - KCP - - -
7-Sep-21 Night TS-4017 16,090.0 16,093.0 3.00 Unit Rental 15472 RIZKA M - KCP - - -
7-Sep-21 Night TF-4013 20,338.0 20,345.0 7.00 Unit Rental 15310 ALDI ALFI SAPUTRA - KCP - - -
7-Sep-21 Night TF-4014 34,550.0 34,550.0 - Standby - KCP - - -
8-Sep-21 Day EX-2037 22,111.4 22,118.5 7.10 Road Maintenance Support 8371 DWI RUPAWAN - JALAN SAKA - - -
8-Sep-21 Day EX-2058 17,438.7 17,450.4 11.70 Side casting 11330 EKO PURWANTO - PIT 5 EXT - 895 -
8-Sep-21 Day EX-4006 35,177.0 35,177.0 - Unscheduled - WORKSHOP - 1,040 -
8-Sep-21 Day EX-5014 38,604.0 38,614.0 10.00 Unit Rental 15345 SUTONO - KCP - - -
8-Sep-21 Day EX-5022 11,305.0 11,313.0 8.00 Loading Waste 9590F SIRATAL RAYYAN - OB Outpit PIT 5 EXT IPD 10 - 1,040 -
8-Sep-21 Day EX-5037 19,036.0 19,036.0 - Unscheduled - PIT 5 EXT - 1,039 -
8-Sep-21 Day EX-6014 57,562.0 57,572.0 10.00 Loading Waste 8952 DIDI SETIAWAN - OB Outpit PIT 5 EXT IPD 10 - - -
8-Sep-21 Day EX-6016 44,164.0 44,174.0 10.00 Loading Waste 15568 FUAD EFENDI - OB Outpit PIT 5 EXT IPD 10 - 1,445 -
8-Sep-21 Day EX-6022 18,509.3 18,519.9 10.60 Loading Waste 11146 PURWANTO - OB Outpit PIT 5 IPD 10 - - -
8-Sep-21 Day TR-3080 42,642.1 42,651.8 9.70 Hauling OB 15349 ARDIANSYAH 4 4 3 4 3 1 4 3 4 2 4 36 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 1,512 - 42 -
8-Sep-21 Day TR-3174 41,357.8 41,367.4 9.60 Hauling OB 11328 JUSESLAF BANJAR NAHOR 3 2 3 4 3 1 4 3 3 3 3 32 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 1,344 - 2 42 84
8-Sep-21 Day TR-3175 38,748.3 38,749.2 0.90 Hauling OB 9354 JIDIN 3 3 OB Outpit EX-6016 PIT 5 EXT IPD 10 42 126 - 42 -
8-Sep-21 Day TR-3175 38,749.2 38,758.3 9.10 Hauling OB 9354 JIDIN 3 3 4 2 1 4 3 3 3 3 29 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 1,218 - 42 -
8-Sep-21 Day TR-3195 24,623.8 24,632.9 9.10 Hauling OB 1354 SUDIYANTO 4 5 4 5 4 4 5 5 4 40 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 1,680 - 42 -
8-Sep-21 Day TR-3202 26,767.4 26,777.2 9.80 Hauling OB 11474 SARINDI 4 5 4 5 4 3 5 5 4 3 4 46 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 1,932 - 1 42 42
8-Sep-21 Day TR-3203 26,869.1 26,869.9 0.79 Hauling OB 8920 VERRY EKO SETIAWAN 3 3 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 126 - 42 -
8-Sep-21 Day TR-3203 26,869.9 26,877.3 7.41 Hauling OB 8920 VERRY EKO SETIAWAN 3 4 2 3 2 5 4 3 2 28 OB Outpit EX-6016 PIT 5 EXT IPD 10 42 1,176 - 42 -
8-Sep-21 Day TR-3203 26,877.3 26,878.1 0.79 Hauling OB 8920 VERRY EKO SETIAWAN 3 3 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 126 - 42 -
8-Sep-21 Day TR-3204 26,184.0 26,193.0 9.00 Hauling OB 1303 EFENDI 3 4 5 4 4 3 5 5 4 3 4 44 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 1,848 - 42 -
8-Sep-21 Day TR-3205 25,732.7 25,741.7 9.00 Hauling OB 7170F TRI PRASETIYO 2 3 4 3 3 2 4 3 3 3 3 33 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 1,386 - 42 -
8-Sep-21 Day TR-3206 24,918.2 24,918.2 - Unscheduled - WORKSHOP - - -
8-Sep-21 Day TR-3220 25,907.6 25,917.5 9.90 Hauling OB 8965 HADI SUTIKNO 5 4 5 4 5 2 5 5 4 4 4 47 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 1,974 - 42 -
8-Sep-21 Day TR-1024 31,335.8 31,335.8 - Unscheduled - WORKSHOP - - -
8-Sep-21 Day TR-1025 47,127.7 47,137.1 9.40 Hauling OB 15466 SUPRIYANTO 3 2 3 3 4 3 4 4 3 2 4 35 OB Outpit EX-6016 PIT 5 EXT IPD 10 24 840 - 1 24 24
8-Sep-21 Day TR-1031 49,416.4 49,416.4 - Unscheduled - PIT 5 EXT - - -
8-Sep-21 Day TR-1032 51,141.6 51,146.2 4.58 Hauling OB 15377 RIZALI RAHMAN 4 3 4 2 5 2 20 OB Outpit EX-6016 PIT 5 EXT IPD 10 24 480 - 24 -
8-Sep-21 Day TR-1032 51,146.2 51,150.3 4.12 Hauling OB 15471 MULYADI 5 4 4 2 3 18 OB Outpit EX-6016 PIT 5 EXT IPD 10 24 432 - 24 -
8-Sep-21 Day TR-1033 51,578.7 51,583.7 5.04 Hauling OB 16024 QORI 4 2 4 2 4 2 2 20 OB Outpit EX-6016 PIT 5 EXT IPD 10 24 480 - 24 -
8-Sep-21 Day TR-1033 51,583.7 51,584.8 1.01 Hauling OB 16024 QORI 2 2 4 OB Outpit EX-5022 PIT 5 IPD 10 24 96 - 24 -
8-Sep-21 Day TR-1033 51,584.8 51,585.0 0.25 Hauling OB 16024 QORI 1 1 OB Outpit EX-6014 PIT 5 EXT IPD 10 24 24 - 24 -
8-Sep-21 Day TR-1034 49,361.0 49,367.7 6.71 Hauling OB 15397 YUSUF 2 3 2 4 4 3 3 3 24 OB Outpit EX-6016 PIT 5 EXT IPD 10 24 576 - 24 -
8-Sep-21 Day TR-1034 49,367.7 49,370.5 2.79 Hauling OB 15397 YUSUF 2 4 4 10 OB Outpit EX-5022 PIT 5 IPD 10 24 240 - 24 -
8-Sep-21 Day TR-1036 50,608.4 50,611.7 3.30 Hauling OB 15346 MUSA 1 1 3 2 3 3 13 OB Outpit EX-6016 PIT 5 EXT IPD 10 24 312 - 24 -
8-Sep-21 Day TR-1036 50,611.7 50,617.8 6.10 Hauling OB 15346 MUSA 2 4 3 2 2 4 4 3 24 OB Outpit EX-5022 PIT 5 IPD 10 24 576 - 24 -
8-Sep-21 Day TR-1048 52,159.7 52,159.7 - Unscheduled - IPD 10 - - -
8-Sep-21 Day TR-1049 46,034.5 46,037.0 2.50 Hauling OB 15744 MARYANTO 4 3 2 9 OB Outpit EX-6016 PIT 5 EXT IPD 10 24 216 - 24 -
8-Sep-21 Day TR-1050 45,811.5 45,811.5 - Unscheduled - WORKSHOP - - -
8-Sep-21 Day TA-7009 27,819.2 27,824.7 5.51 Hauling OB 16026 BAHRUNI 2 2 2 2 3 4 3 18 OB Outpit EX-5022 PIT 5 IPD 10 14 252 - 14 -
8-Sep-21 Day TA-7010 25,144.4 25,151.6 7.20 Hauling OB 15653 M. ILIAS 4 4 3 2 2 4 4 4 27 OB Outpit EX-5022 PIT 5 IPD 10 14 378 - 14 -
8-Sep-21 Day TA-7022 - - - Unscheduled - WORKSHOP - - -
8-Sep-21 Day TA-7029 28,529.5 28,532.5 3.00 Hauling OB 15818 AGUS SUGIANTO 1 2 4 2 1 10 OB Outpit EX-5022 PIT 5 IPD 10 14 140 - 14 -
8-Sep-21 Day TA-7030 28,223.6 28,223.6 - Unscheduled - PIT 5 EXT - - -
8-Sep-21 Day BD-4005 13,770.7 13,770.7 - Scheduled - WORKSHOP - - -
k 8-Sep-21 Day BD-5035 3,387.9 3,398.3 10.40 Disposal maintenance 10013 ADI SUSANTO - IPD 10 - - -
8-Sep-21 Day BD-6025 2,742.8 2,745.4 2.60 Unit Rental 15464 MARJUKI - KCP - - -
8-Sep-21 Day BD-6026 30,198.7 30,198.7 - Standby - WORKSHOP - - -
8-Sep-21 Day BD-6028 4,109.2 4,109.2 - Standby - KCP - - -
8-Sep-21 Day BD-6036 34,123.5 34,130.9 7.40 Unit Rental 15464 MARJUKI - KCP - - -
8-Sep-21 Day BD-6038 33,908.8 33,918.7 9.90 Unit Rental 11169 ANNAS - KCP - - -
8-Sep-21 Day BD-6069 10,384.9 10,384.9 - Unscheduled - PIT 5 EXT - - -
8-Sep-21 Day BD-7013 39,832.4 39,844.0 11.60 Front maintenance 9978 KARSIANTO - PIT 5 EXT - - -
8-Sep-21 Day BD-7026 26,511.1 26,522.7 11.60 Disposal maintenance 8157 SAMIDI - IPD 10 - - -
8-Sep-21 Day BD-7034 9,922.5 9,924.6 2.10 Disposal maintenance 8157 SAMIDI - IPD 10 - - -
8-Sep-21 Day GR-2012 22,232.5 22,232.5 - Standby - PIT 5 EXT - - -
8-Sep-21 Day GR-3007 39,170.9 39,174.5 3.60 Road Maintenance Support 9103 WAWAN WIDODO - PIT 5 EXT - - -
8-Sep-21 Day GR-3008 46,858.1 46,864.9 6.80 Road Maintenance Support 9103 WAWAN WIDODO - PIT 5 EXT - - -
8-Sep-21 Day TW-3001 8,500.0 8,505.0 5.00 Road Maintenance Support 15106 AHMAD NURANI - PIT 5 EXT - - -
8-Sep-21 Day TW-4001 18,756.0 18,756.00 - Standby - WORKSHOP - - -
8-Sep-21 Day PU-4002 19,056.0 19,056.00 - Unscheduled - PIT 11 - - -
8-Sep-21 Day PU-2026 6,188.2 6,188.5 0.30 Dewatering 10914 SETYO BUDI UTOMO - PIT 11 - - -
8-Sep-21 Day PU-3026 12,307.0 12,307.00 - Standby - ROM TEMPORARY - - -
8-Sep-21 Day PU-3015 1,696.0 1,696.00 - Standby - ROM TEMPORARY - - -
8-Sep-21 Day PU-3014 27,240.4 27,240.40 - Standby - ROM TEMPORARY - - -
8-Sep-21 Day LP-2165 13,494.0 13,494.00 - Standby - KCP - - -
8-Sep-21 Day LP-2166 12,990.0 12,990.00 - Standby - KCP - - -
8-Sep-21 Day LP-2167 13,952.0 13,952.00 - Standby - KCP - - -
8-Sep-21 Day LP-2168 12,783.0 12,784.00 1.00 Unit Rental 4671 NURUDIN - KCP - - -
8-Sep-21 Day LP-2169 12,529.0 12,529.00 - Standby - KCP - - -
8-Sep-21 Day TS-4007 - - - Standby - KCP - - -
8-Sep-21 Day TS-4017 16,093.0 16,101.0 8.00 Unit Rental 15745 SURYANATA - KCP - - -
8-Sep-21 Day TF-4013 20,345.0 20,355.0 10.00 Unit Rental 10884 HAMDANI - KCP - - -
8-Sep-21 Day TF-4014 34,550.0 34,550.0 - Standby - KCP - - -
8-Sep-21 Night EX-2037 22,118.5 22,122.5 4.00 Side casting 15617 ZAENAL - JALAN SAKA - - -
8-Sep-21 Night EX-2037 22,122.5 22,128.1 5.60 Sloping 15617 ZAENAL - PIT 5 EXT - - -
8-Sep-21 Night EX-2058 17,450.4 17,451.6 1.20 Sloping 15504 SLAMET WIDODO - PIT 5 EXT - 895 -
8-Sep-21 Night EX-2058 17,451.6 17,453.4 1.80 Side casting 15504 SLAMET WIDODO - PIT 5 EXT - 895 -
8-Sep-21 Night EX-2058 17,453.4 17,460.7 7.30 Loading Solid Mud 15504 SLAMET WIDODO - Solid Mud Outpit PIT 5 EXT IPD 10 - - 895 - -
8-Sep-21 Night EX-4006 35,177.0 35,177.0 - Unscheduled - WORKSHOP - 1,040 -
8-Sep-21 Night EX-5014 38,614.0 38,624.0 10.00 Unit Rental 15616 JOKO SUDIRO - KCP - - -
8-Sep-21 Night EX-5022 11,313.0 11,313.0 - Unscheduled - OB Outpit PIT 5 EXT IPD 10 - 1,040 -
8-Sep-21 Night EX-5037 19,036.0 19,036.0 - Unscheduled - PIT 5 EXT - 1,039 -
8-Sep-21 Night EX-6014 57,572.0 57,577.0 5.00 Loading Waste 10917 SETA VERDY KARYA - OB Outpit PIT 5 EXT IPD 10 - - -
8-Sep-21 Night EX-6014 57,577.0 57,582.0 5.00 Loading Waste 10917 SETA VERDY KARYA - OB Ripping Outpit PIT 5 EXT IPD 10 - - -
8-Sep-21 Night EX-6016 44,174.0 44,185.0 11.00 Loading Waste 15567 ARIF WAHYUDI - OB Outpit PIT 5 EXT IPD 10 - 1,445 -
8-Sep-21 Night EX-6022 18,519.9 18,529.7 9.80 Loading Waste 15486 SUGENG PRAYETNO - OB Outpit PIT 5 IPD 10 - - -
8-Sep-21 Night TR-3080 42,651.8 42,661.3 9.50 Hauling OB 10881 BURHANUDDIN 2 3 1 4 3 3 4 3 3 3 3 32 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 1,344 - 42 -
8-Sep-21 Night TR-3174 41,367.4 41,373.4 6.00 Hauling OB 8958 MUKHROMIN 1 4 3 4 5 4 2 23 OB Outpit EX-6016 PIT 5 EXT IPD 10 42 966 - 42 -
8-Sep-21 Night TR-3175 38,758.3 38,767.8 9.50 Hauling OB 15350 HERMAN 3 3 1 2 4 3 3 4 3 3 3 32 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 1,344 - 1 42 42
8-Sep-21 Night TR-3195 24,632.9 24,642.0 9.10 Hauling OB 10762 SYAMSUDDIN 3 4 1 4 3 4 4 4 5 2 3 37 OB Outpit EX-6022 PIT 5 IPD 10 42 1,554 - 42 -
8-Sep-21 Night TR-3202 26,777.2 26,786.0 8.80 Hauling OB 10882 SABIRIN 3 4 1 5 4 3 4 3 4 3 2 36 OB Outpit EX-6022 PIT 5 IPD 10 42 1,512 - 42 -
8-Sep-21 Night TR-3203 26,878.1 26,878.7 0.61 Hauling OB 8892 BAGUS PURWONO 2 2 OB Outpit EX-6016 PIT 5 EXT IPD 10 42 84 - 42 -
8-Sep-21 Night TR-3203 26,878.7 26,887.8 9.10 Hauling OB 8892 BAGUS PURWONO 1 3 1 4 3 2 4 3 4 3 2 30 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 1,260 - 2 42 84
8-Sep-21 Night TR-3204 26,193.0 26,202.7 9.70 Hauling OB 10969 JOKO PRIONO 4 4 1 4 4 4 4 4 4 3 2 38 OB Outpit EX-6022 PIT 5 IPD 10 42 1,596 - 1 42 42
8-Sep-21 Night TR-3205 25,741.7 25,751.3 9.60 Hauling OB 10695 SUPIYANDI 2 4 1 3 3 3 4 3 4 3 2 32 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 1,344 - 42 -
8-Sep-21 Night TR-3206 24,918.2 24,918.2 - Unscheduled - WORKSHOP - - -
8-Sep-21 Night TR-3220 25,917.5 25,927.2 9.70 Hauling OB 10968 SUKIRNO 3 4 2 4 4 4 5 4 4 2 2 38 OB Outpit EX-6022 PIT 5 IPD 10 42 1,596 - 42 -
8-Sep-21 Night TR-1024 31,335.8 31,335.8 - Unscheduled - WORKSHOP - - -
8-Sep-21 Night TR-1025 47,137.1 47,146.7 9.60 Hauling OB 15421 AGUS A 3 4 1 5 4 4 3 4 4 4 3 39 OB Outpit EX-6016 PIT 5 EXT IPD 10 24 936 - 24 -
8-Sep-21 Night TR-1031 49,416.4 49,416.4 - Unscheduled - PIT 5 EXT - - -
8-Sep-21 Night TR-1032 51,150.3 51,154.0 3.71 Hauling OB 15468 PADLIANSYAH 4 3 5 3 15 OB Outpit EX-6016 PIT 5 EXT IPD 10 24 360 - 24 -
8-Sep-21 Night TR-1032 51,154.0 51,158.7 4.69 Hauling OB 15576 JOKO SANTOSO 4 4 4 4 3 19 OB Outpit EX-6016 PIT 5 EXT IPD 10 24 456 - 24 -
8-Sep-21 Night TR-1033 51,585.0 51,595.0 10.00 Hauling OB 15470 IJAI 3 4 1 4 4 4 3 4 4 4 3 38 OB Outpit EX-6016 PIT 5 EXT IPD 10 24 912 - 24 -
8-Sep-21 Night TR-1034 49,370.5 49,377.5 7.00 Hauling OB 15420 M ABD MADI 3 4 1 5 4 3 5 3 28 OB Outpit EX-6016 PIT 5 EXT IPD 10 24 672 - 24 -
8-Sep-21 Night TR-1036 50,617.8 50,627.2 9.40 Hauling OB 15398 SIGIT SUSANTO 3 4 4 5 3 4 4 4 4 3 38 OB Outpit EX-6016 PIT 5 EXT IPD 10 24 912 - 24 -
8-Sep-21 Night TR-1048 52,159.7 52,159.7 - Unscheduled - IPD 10 - - -
8-Sep-21 Night TR-1049 46,037.0 46,045.7 8.70 Hauling OB 15485 ROBY TM 4 4 4 3 5 3 5 3 31 OB Outpit EX-6016 PIT 5 EXT IPD 10 24 744 - 24 -
8-Sep-21 Night TR-1050 45,811.5 45,811.5 - Unscheduled - WORKSHOP - - -
8-Sep-21 Night TA-7009 27,824.7 27,830.7 6.00 Hauling Solid Mud 5 3 4 5 6 6 2 31 Solid Mud Outpit EX-2058 PIT 5 EXT IPD 10 11 347 - 11 -
8-Sep-21 Night TA-7010 25,151.6 25,151.9 0.30 Hauling OB 15861 AGUSTIAN 1 1 OB Outpit EX-6016 PIT 5 EXT IPD 10 14 14 - 14 -
8-Sep-21 Night TA-7010 25,151.9 25,160.0 8.10 Hauling Solid Mud 15861 AGUSTIAN 5 6 4 5 5 6 6 1 38 Solid Mud Outpit EX-2058 PIT 5 EXT IPD 10 11 426 - 11 -
8-Sep-21 Night TA-7022 - - - Unscheduled - WORKSHOP - - -
8-Sep-21 Night TA-7029 28,532.5 28,534.5 2.00 Hauling Solid Mud 1 5 5 11 Solid Mud Outpit EX-2058 PIT 5 EXT IPD 10 11 123 - 11 -
8-Sep-21 Night TA-7030 28,223.6 28,223.6 - Unscheduled - PIT 5 EXT - - -
8-Sep-21 Night BD-4005 13,770.7 13,770.7 - Scheduled - WORKSHOP - - -
8-Sep-21 Night BD-5035 3,398.3 3,407.0 8.70 Disposal maintenance 15747 MUSTAQIM D6 - IPD 10 - - -
8-Sep-21 Night BD-6025 2,745.4 2,745.4 - Standby - KCP - - -
8-Sep-21 Night BD-6026 30,198.7 30,198.7 - Standby - WORKSHOP - - -
8-Sep-21 Night BD-6028 4,109.9 4,113.1 3.20 Unit Rental 14710 AGUS S - KCP - - -
8-Sep-21 Night BD-6036 34,130.9 34,140.0 9.10 Unit Rental 14964 JOKO P (Dozer) - KCP - - -
8-Sep-21 Night BD-6038 33,918.7 33,927.8 9.10 Unit Rental 15570 HENDRY S - KCP - - -
8-Sep-21 Night BD-6069 10,384.9 10,384.9 - Unscheduled - PIT 5 EXT - - -
8-Sep-21 Night BD-7013 39,844.0 39,846.7 2.70 Ripping 15606 FATHUR - PIT 5 EXT - - -
8-Sep-21 Night BD-7013 39,846.7 39,852.6 5.90 Front maintenance 15606 FATHUR - PIT 5 EXT - - -
8-Sep-21 Night BD-7026 26,522.7 26,527.7 5.00 Ripping 15639 A. BUDIMAN - PIT 5 EXT - - -
8-Sep-21 Night BD-7026 26,527.7 26,531.7 4.00 Front maintenance 15639 A. BUDIMAN - PIT 5 EXT - - -
8-Sep-21 Night BD-7034 9,924.6 9,934.6 10.00 Disposal maintenance 9492 MAHFUDI - IPD 10 - - -
8-Sep-21 Night GR-2012 22,232.5 22,232.5 - Standby - PIT 5 EXT - - -
8-Sep-21 Night GR-3007 39,174.5 39,184.2 9.70 Road Maintenance Support 9214 MUSTOFA ADI PRAYITNO - PIT 5 EXT - - -
8-Sep-21 Night GR-3008 46,864.9 46,874.6 9.70 Road Maintenance Support 12344 M FAJRI - PIT 5 EXT - - -
8-Sep-21 Night TW-3001 8,505.0 8,508.0 3.00 Road Maintenance Support 15743 LANA - PIT 5 EXT - - -
8-Sep-21 Night TW-4001 18,756.0 18,756.00 - Standby - WORKSHOP - - -
8-Sep-21 Night PU-4002 19,056.0 19,056.0 - Unscheduled - PIT 11 - - -
8-Sep-21 Night PU-2026 6,188.5 6,188.5 - Standby Z7354 M. ALMA DENNY - PIT 11 - - -
8-Sep-21 Night PU-3026 12,307.0 12,307.0 - Standby - ROM TEMPORARY - - -
8-Sep-21 Night PU-3015 1,696.0 1,696.0 - Standby - ROM TEMPORARY - - -
8-Sep-21 Night PU-3014 27,240.4 27,240.4 - Standby - ROM TEMPORARY - - -
8-Sep-21 Night LP-2165 13,494.0 13,505.0 11.00 Unit Rental 4671 NURUDIN - KCP - - -
8-Sep-21 Night LP-2166 12,990.0 13,002.0 12.00 Unit Rental 4671 NURUDIN - KCP - - -
8-Sep-21 Night LP-2167 13,952.0 13,963.0 11.00 Unit Rental 4671 NURUDIN - KCP - - -
8-Sep-21 Night LP-2168 12,784.0 12,796.0 12.00 Unit Rental 4671 NURUDIN - KCP - - -
8-Sep-21 Night LP-2169 12,529.0 12,540.0 11.00 Unit Rental 4671 NURUDIN - KCP - - -
8-Sep-21 Night TS-4007 - - - Standby - KCP - - -
8-Sep-21 Night TS-4017 16,101.0 16,106.0 5.00 Unit Rental 15472 RIZKA M - KCP - - -
8-Sep-21 Night TF-4013 20,355.0 20,364.0 9.00 Unit Rental 15310 ALDI ALFI SAPUTRA - KCP - - -
8-Sep-21 Night TF-4014 34,550.0 34,550.0 - Standby - KCP - - -
9-Sep-21 Day EX-2037 22,128.1 22,133.1 5.00 Road Maintenance Support 10916 DANI NOVI KUSYANTO - PIT 5 EXT - - -
9-Sep-21 Day EX-2058 17,460.7 17,461.7 1.00 Rehandling Coal 11330 EKO PURWANTO - COAL PIT 5 EXT - - 1,168 - -
9-Sep-21 Day EX-2058 17,461.7 17,467.7 6.00 Side casting 11330 EKO PURWANTO - PIT 5 EXT - 1,168 -
9-Sep-21 Day EX-2058 17,467.7 17,470.7 3.00 Drainage 11330 EKO PURWANTO - PIT 5 EXT - 1,168 -
9-Sep-21 Day EX-4006 35,177.0 35,177.0 - Unscheduled - WORKSHOP - 1,240 -
9-Sep-21 Day EX-5014 38,624.0 38,633.0 9.00 Unit Rental 15345 SUTONO - KCP - - -
9-Sep-21 Day EX-5022 11,314.0 11,315.8 1.75 Side casting 9590F SIRATAL RAYYAN - PIT 5 EXT - 1,238 -
9-Sep-21 Day EX-5022 11,315.8 11,317.0 1.25 Loading Solid Mud 9590F SIRATAL RAYYAN - Solid Mud Outpit PIT 5 EXT IPD 11 - 1,238 -
9-Sep-21 Day EX-5037 19,036.0 19,036.0 - Unscheduled - PIT 5 EXT - 1,242 -
9-Sep-21 Day EX-6014 57,582.0 57,590.0 8.00 Loading Waste 8952 DIDI SETIAWAN - OB Outpit PIT 5 EXT IPD 10 - - -
9-Sep-21 Day EX-6016 44,185.0 44,192.0 7.00 Loading Waste 9136 AHMAD YANI - OB Outpit PIT 5 EXT IPD 10 - - -
9-Sep-21 Day EX-6022 18,529.7 18,537.8 8.10 Loading Waste 11146 PURWANTO - OB Outpit PIT 5 IPD 10 - - -
9-Sep-21 Day TR-3080 42,661.3 42,668.5 7.20 Hauling OB 1354 SUDIYANTO 2 2 4 3 4 5 4 4 28 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 1,176 - 1 42 42
9-Sep-21 Day TR-3174 41,373.4 41,374.2 0.75 Hauling OB 11328 JUSESLAF BANJAR NAHOR 2 1 3 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 126 - 42 -
9-Sep-21 Day TR-3174 41,374.2 41,380.2 6.00 Hauling OB 11328 JUSESLAF BANJAR NAHOR 1 5 3 5 3 4 3 24 OB Outpit EX-6016 PIT 5 EXT IPD 10 42 1,008 - 42 -
9-Sep-21 Day TR-3174 41,380.2 41,380.4 0.25 Hauling OB 11328 JUSESLAF BANJAR NAHOR 1 1 OB Outpit EX-6022 PIT 5 IPD 10 42 42 - 42 -
9-Sep-21 Day TR-3175 38,767.8 38,775.7 7.90 Hauling OB 9354 JIDIN 3 2 4 4 5 4 4 4 30 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 1,260 - 42 -
9-Sep-21 Day TR-3195 24,642.0 24,645.4 3.44 Hauling OB 15229 ARDIANSYAH 3 2 4 4 13 OB Outpit EX-6022 PIT 5 IPD 10 42 546 - 1 42 42
9-Sep-21 Day TR-3195 24,645.4 24,649.4 3.96 Hauling OB 15229 ARDIANSYAH 4 4 3 4 15 OB Ripping Outpit EX-6022 PIT 5 IPD 10 42 630 - 1 42 42
9-Sep-21 Day TR-3202 26,786.0 26,789.6 3.57 Hauling OB 11474 SARINDI 4 2 4 4 14 OB Outpit EX-6022 PIT 5 IPD 10 42 588 - 42 -
9-Sep-21 Day TR-3202 26,789.6 26,793.4 3.83 Hauling OB 11474 SARINDI 4 4 3 4 15 OB Ripping Outpit EX-6022 PIT 5 IPD 10 42 630 - 42 -
9-Sep-21 Day TR-3203 26,887.8 26,894.9 7.10 Hauling OB 8920 VERRY EKO SETIAWAN 2 2 4 4 4 4 4 3 27 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 1,134 - 42 -
9-Sep-21 Day TR-3204 26,202.7 26,205.9 3.15 Hauling OB 1303 EFENDI 4 2 3 5 14 OB Outpit EX-6022 PIT 5 IPD 10 42 588 - 42 -
9-Sep-21 Day TR-3204 26,205.9 26,209.0 3.15 Hauling OB 1303 EFENDI 3 4 3 4 14 OB Ripping Outpit EX-6022 PIT 5 IPD 10 42 588 - 42 -
9-Sep-21 Day TR-3205 25,751.3 25,758.7 7.40 Hauling OB 7170F TRI PRASETIYO 3 2 3 4 5 4 3 4 28 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 1,176 - 2 42 84
9-Sep-21 Day TR-3206 24,918.2 24,918.2 - Scheduled - WORKSHOP - - -
9-Sep-21 Day TR-3220 25,927.2 25,930.4 3.18 Hauling OB 8965 HADI SUTIKNO 3 2 4 4 13 OB Outpit EX-6022 PIT 5 IPD 10 42 546 - 42 -
9-Sep-21 Day TR-3220 25,930.4 25,934.3 3.92 Hauling OB 8965 HADI SUTIKNO 4 4 3 5 16 OB Ripping Outpit EX-6022 PIT 5 IPD 10 42 672 - 42 -
9-Sep-21 Day TR-1024 31,335.8 31,335.8 - Unscheduled - WORKSHOP - - -
9-Sep-21 Day TR-1025 47,146.7 47,153.8 7.10 Hauling OB 15466 SUPRIYANTO 2 3 4 5 4 5 3 4 30 OB Outpit EX-6016 PIT 5 EXT IPD 10 24 720 - 24 -
9-Sep-21 Day TR-1031 49,416.4 49,416.4 - Unscheduled - PIT 5 EXT - - -
9-Sep-21 Day TR-1032 51,158.7 51,166.0 7.30 Hauling OB 15377 RIZALI RAHMAN 4 2 5 5 4 4 4 4 32 OB Outpit EX-6016 PIT 5 EXT IPD 10 24 768 - 24 -
9-Sep-21 Day TR-1033 51,595.0 51,599.7 4.70 Hauling OB 15471 MULYADI 3 1 5 4 3 1 17 OB Outpit EX-6016 PIT 5 EXT IPD 10 24 408 - 24 -
9-Sep-21 Day TR-1034 49,377.5 49,380.8 3.32 Hauling OB 15397 YUSUF 3 2 4 3 12 OB Outpit EX-6016 PIT 5 EXT IPD 10 24 288 - 24 -
9-Sep-21 Day TR-1034 49,380.8 49,381.1 0.28 Hauling OB 15397 YUSUF 1 1 OB Outpit EX-6014 PIT 5 EXT IPD 10 24 24 - 24 -
9-Sep-21 Day TR-1036 50,627.2 50,634.0 6.80 Hauling OB 16024 QORI 3 3 4 5 5 4 3 4 31 OB Outpit EX-6016 PIT 5 EXT IPD 10 24 744 - 24 -
9-Sep-21 Day TR-1048 52,159.7 52,159.7 - Unscheduled - IPD 10 - - -
9-Sep-21 Day TR-1049 46,045.7 46,052.4 6.70 Hauling OB 15376 EKO FAJAR S 3 3 4 3 4 4 3 2 26 OB Outpit EX-6016 PIT 5 EXT IPD 10 24 624 - 24 -
9-Sep-21 Day TR-1050 45,811.5 45,811.5 - Unscheduled - WORKSHOP - - -
9-Sep-21 Day TA-7009 27,830.7 27,831.6 0.90 Rehandling Coal 15818 AGUS SUGIANTO 3 3 COAL EX-2058 PIT 5 EXT 11 - - 11 -
9-Sep-21 Day TA-7009 27,831.6 27,833.5 1.90 Hauling Solid Mud 15818 AGUS SUGIANTO 1 5 6 Solid Mud Outpit EX-5022 PIT 5 EXT IPD 11 11 67 - 1 11 11
9-Sep-21 Day TA-7010 25,160.0 25,162.4 2.40 Hauling Solid Mud 15653 M. ILIAS 2 6 8 Solid Mud Outpit EX-5022 PIT 5 EXT IPD 11 11 90 - 11 -
9-Sep-21 Day TA-7022 - - - Unscheduled - WORKSHOP - - -
9-Sep-21 Day TA-7029 28,534.5 28,534.5 - Unscheduled - PIT 5 EXT - - -
9-Sep-21 Day TA-7030 28,223.6 28,223.6 - Unscheduled - PIT 5 EXT - - -
9-Sep-21 Day BD-4005 13,770.7 13,770.7 - Scheduled - WORKSHOP - - -
k 9-Sep-21 Day BD-5035 3,407.0 3,416.1 9.10 Disposal maintenance 14963 MAULANA ISHAK - IPD 10 - - -
9-Sep-21 Day BD-6025 2,745.4 2,745.4 - Standby - KCP - - -
9-Sep-21 Day BD-6026 30,198.7 30,198.7 - Standby - WORKSHOP - - -
9-Sep-21 Day BD-6028 4,113.1 4,118.7 5.60 Unit Rental 14744 NOORDIANTO - KCP - - -
9-Sep-21 Day BD-6036 34,140.0 34,150.5 10.50 Unit Rental 15464 MARJUKI - KCP - - -
9-Sep-21 Day BD-6038 33,927.8 33,938.0 10.20 Unit Rental 14708 ADEFI P - KCP - - -
9-Sep-21 Day BD-6069 10,384.9 10,384.9 - Unscheduled - PIT 5 EXT - - -
9-Sep-21 Day BD-7013 39,852.6 39,863.0 10.40 Front maintenance 10013 ADI SUSANTO - PIT 5 EXT - - -
9-Sep-21 Day BD-7026 26,531.7 26,536.7 5.00 Ripping 11676 SUDARSONO - PIT 5 EXT - - -
9-Sep-21 Day BD-7026 26,536.7 26,542.3 5.60 Front maintenance 11676 SUDARSONO - PIT 5 EXT - - -
9-Sep-21 Day BD-7034 9,934.6 9,944.0 9.40 Disposal maintenance 8157 SAMIDI - IPD 10 - - -
9-Sep-21 Day GR-2012 22,232.5 22,236.4 3.90 Road Maintenance Support - WORKSHOP - - -
9-Sep-21 Day GR-3007 39,184.2 39,190.3 6.10 Road Maintenance Support 9103 WAWAN WIDODO - PIT 5 EXT - - -
9-Sep-21 Day GR-3008 46,874.6 46,883.6 9.00 Road Maintenance Support 15571 YOHANIS L - PIT 5 EXT - - -
9-Sep-21 Day TW-3001 8,508.0 8,512.0 4.00 Road Maintenance Support 15106 AHMAD NURANI - PIT 5 EXT - - -
9-Sep-21 Day TW-4001 18,756.0 18,756.00 - Standby - WORKSHOP - - -
9-Sep-21 Day PU-4002 19,056.0 19,056.00 - Unscheduled - PIT 11 - - -
9-Sep-21 Day PU-2026 6,188.5 6,188.5 - Standby - PIT 11 - - -
9-Sep-21 Day PU-3026 12,307.0 12,307.00 - Standby - ROM TEMPORARY - - -
9-Sep-21 Day PU-3015 1,696.0 1,696.00 - Standby - ROM TEMPORARY - - -
9-Sep-21 Day PU-3014 27,240.4 27,240.40 - Standby - ROM TEMPORARY - - -
9-Sep-21 Day LP-2165 13,505.0 13,505.00 - Standby - KCP - - -
9-Sep-21 Day LP-2166 13,002.0 13,002.00 - Standby - KCP - - -
9-Sep-21 Day LP-2167 13,963.0 13,963.00 - Standby - KCP - - -
9-Sep-21 Day LP-2168 12,796.0 12,796.00 - Standby - KCP - - -
9-Sep-21 Day LP-2169 12,540.0 12,540.00 - Standby - KCP - - -
9-Sep-21 Day TS-4007 - - - Standby - KCP - - -
9-Sep-21 Day TS-4017 16,106.0 16,115.0 9.00 Unit Rental 15745 SURYANATA - KCP - - -
9-Sep-21 Day TF-4013 20,364.0 20,371.0 7.00 Unit Rental 15746 SYARIFUDDI - KCP - - -
9-Sep-21 Day TF-4014 34,550.0 34,550.0 - Standby - KCP - - -
9-Sep-21 Night EX-2037 22,133.1 22,133.1 - Standby - PIT 5 EXT - - -
9-Sep-21 Night EX-2058 17,470.7 17,471.2 0.50 Rehandling Coal 15504 SLAMET WIDODO - PIT 5 EXT - 1,168 -
9-Sep-21 Night EX-2058 17,471.2 17,471.7 0.50 Evakuasi unit 15504 SLAMET WIDODO - PIT 5 EXT - 1,168 -
9-Sep-21 Night EX-2058 17,471.7 17,477.7 6.00 Side casting 15617 ZAENAL - PIT 5 EXT - 1,168 -
9-Sep-21 Night EX-4006 35,177.0 35,177.0 - Unscheduled - WORKSHOP - 1,240 -
9-Sep-21 Night EX-5014 38,633.0 38,634.0 1.00 Unit Rental 15616 JOKO SUDIRO - KCP - - -
9-Sep-21 Night EX-5022 11,317.0 11,322.0 5.00 Loading Waste 12534 PUJIYANTO - OB Outpit PIT 5 EXT IPD 11 - 1,238 -
9-Sep-21 Night EX-5037 19,036.0 19,036.0 - Unscheduled - PIT 5 EXT - 1,242 -
9-Sep-21 Night EX-6014 57,590.0 57,598.0 8.00 Loading Waste 10916 DANI NOVI KUSYANTO - OB Outpit PIT 5 EXT IPD 10 - - -
9-Sep-21 Night EX-6016 44,192.0 44,198.0 6.00 Loading Waste 15568 FUAD EFENDI - OB Outpit PIT 5 EXT IPD 10 - - -
9-Sep-21 Night EX-6022 18,537.8 18,544.5 6.70 Loading Waste 15486 SUGENG PRAYETNO - OB Outpit PIT 5 IPD 10 - - -
9-Sep-21 Night TR-3080 42,668.5 42,669.8 1.31 Hauling OB 10881 BURHANUDDIN 2 3 5 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 210 - 42 -
9-Sep-21 Night TR-3080 42,669.8 42,672.2 2.36 Hauling OB 9214 MUSTOFA ADI PRAYITNO 4 2 2 1 9 OB Outpit EX-6016 PIT 5 EXT IPD 10 42 378 - 42 -
9-Sep-21 Night TR-3080 42,672.2 42,673.8 1.58 Hauling OB 9214 MUSTOFA ADI PRAYITNO 2 3 1 6 OB Outpit EX-6022 PIT 5 IPD 10 42 252 - 42 -
9-Sep-21 Night TR-3080 42,673.8 42,674.8 1.05 Hauling OB 9214 MUSTOFA ADI PRAYITNO 2 2 4 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 168 - 42 -
9-Sep-21 Night TR-3174 41,380.4 41,385.4 4.97 Hauling OB 8958 MUKHROMIN 4 3 1 3 4 3 18 OB Outpit EX-6022 PIT 5 IPD 10 42 756 - 42 -
9-Sep-21 Night TR-3174 41,385.4 41,385.9 0.55 Hauling OB 8958 MUKHROMIN 1 1 2 OB Outpit EX-6016 PIT 5 EXT IPD 10 42 84 - 42 -
9-Sep-21 Night TR-3174 41,385.9 41,386.2 0.28 Hauling OB 8958 MUKHROMIN 1 1 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 42 - 42 -
9-Sep-21 Night TR-3175 38,775.7 38,780.6 4.91 Hauling OB 15349 ARDIANSYAH 1 4 4 4 3 3 19 OB Outpit EX-6022 PIT 5 IPD 10 42 798 - 42 -
9-Sep-21 Night TR-3175 38,780.6 38,781.9 1.29 Hauling OB 15349 ARDIANSYAH 5 5 OB Outpit EX-6016 PIT 5 EXT IPD 10 42 210 - 42 -
9-Sep-21 Night TR-3195 24,649.4 24,654.1 4.74 Hauling OB 10762 SYAMSUDDIN 1 2 3 2 3 2 4 4 21 OB Outpit EX-6022 PIT 5 IPD 10 42 882 - 42 -
9-Sep-21 Night TR-3195 24,654.1 24,655.5 1.36 Hauling OB 10762 SYAMSUDDIN 2 2 2 6 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 252 - 42 -
9-Sep-21 Night TR-3202 26,793.4 26,795.0 1.62 Hauling OB 10882 SABIRIN 1 1 4 6 OB Outpit EX-6022 PIT 5 IPD 10 42 252 - 42 -
9-Sep-21 Night TR-3202 26,795.0 26,798.3 3.23 Hauling OB 15350 HERMAN 2 2 3 3 2 12 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 504 - 42 -
9-Sep-21 Night TR-3202 26,798.3 26,799.6 1.35 Hauling OB 15350 HERMAN 2 2 1 5 OB Outpit EX-6022 PIT 5 IPD 10 42 210 - 42 -
9-Sep-21 Night TR-3203 26,894.9 26,896.5 1.63 Hauling OB 8892 BAGUS PURWONO 2 1 2 1 6 OB Outpit EX-6022 PIT 5 IPD 10 42 252 - 42 -
9-Sep-21 Night TR-3203 26,896.5 26,900.9 4.33 Hauling OB 8892 BAGUS PURWONO 3 4 3 4 2 16 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 672 - 42 -
9-Sep-21 Night TR-3203 26,900.9 26,901.4 0.54 Hauling OB 8892 BAGUS PURWONO 2 2 OB Outpit EX-6016 PIT 5 EXT IPD 10 42 84 - 42 -
9-Sep-21 Night TR-3204 26,209.0 26,214.3 5.26 Hauling OB 10969 JOKO PRIONO 2 1 3 4 2 3 2 1 18 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 756 - 42 -
9-Sep-21 Night TR-3204 26,214.3 26,215.7 1.46 Hauling OB 10969 JOKO PRIONO 1 1 1 2 5 OB Outpit EX-6022 PIT 5 IPD 10 42 210 - 42 -
9-Sep-21 Night TR-3204 26,215.7 26,216.3 0.58 Hauling OB 10969 JOKO PRIONO 1 1 2 OB Outpit EX-6016 PIT 5 EXT IPD 10 42 84 - 42 -
9-Sep-21 Night TR-3205 25,758.7 25,765.2 6.50 Hauling OB 10695 SUPIYANDI 2 3 4 3 4 4 3 23 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 966 - 42 -
9-Sep-21 Night TR-3206 24,918.2 24,918.2 - Scheduled - WORKSHOP - - -
9-Sep-21 Night TR-3220 25,934.3 25,936.0 1.65 Hauling OB 10968 SUKIRNO 1 2 2 1 6 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 252 - 42 -
9-Sep-21 Night TR-3220 25,936.0 25,940.1 4.13 Hauling OB 10968 SUKIRNO 1 3 4 2 3 2 15 OB Outpit EX-6022 PIT 5 IPD 10 42 630 - 42 -
9-Sep-21 Night TR-3220 25,940.1 25,940.9 0.83 Hauling OB 10968 SUKIRNO 2 1 3 OB Outpit EX-6016 PIT 5 EXT IPD 10 42 126 - 42 -
9-Sep-21 Night TR-1024 31,335.8 31,335.8 - Unscheduled - WORKSHOP - - -
9-Sep-21 Night TR-1025 47,153.8 47,154.1 0.25 Hauling OB 15485 ROBY TM 1 1 OB Outpit EX-6014 PIT 5 EXT IPD 10 24 24 - 24 -
9-Sep-21 Night TR-1025 47,154.1 47,157.8 3.78 Hauling OB 15485 ROBY TM 4 4 4 2 1 15 OB Outpit EX-6016 PIT 5 EXT IPD 10 24 360 - 24 -
9-Sep-21 Night TR-1025 47,157.8 47,159.6 1.77 Hauling OB 15485 ROBY TM 2 3 2 7 OB Outpit EX-5022 PIT 5 EXT IPD 11 24 168 - 24 -
9-Sep-21 Night TR-1031 49,416.4 49,416.4 - Unscheduled - PIT 5 EXT - - -
9-Sep-21 Night TR-1032 51,166.0 51,166.3 0.27 Hauling OB 15468 PADLIANSYAH 1 1 OB Outpit EX-6014 PIT 5 EXT IPD 10 24 24 - 24 -
9-Sep-21 Night TR-1032 51,166.3 51,170.6 4.31 Hauling OB 15468 PADLIANSYAH 4 3 3 2 2 2 16 OB Outpit EX-6016 PIT 5 EXT IPD 10 24 384 - 2 24 48
9-Sep-21 Night TR-1032 51,170.6 51,172.2 1.62 Hauling OB 15468 PADLIANSYAH 1 2 2 1 6 OB Outpit EX-5022 PIT 5 EXT IPD 11 24 144 - 24 -
9-Sep-21 Night TR-1033 51,599.7 51,600.0 0.28 Hauling OB 15470 IJAI 1 1 OB Outpit EX-6014 PIT 5 EXT IPD 10 24 24 - 24 -
9-Sep-21 Night TR-1033 51,600.0 51,602.2 2.21 Hauling OB 15470 IJAI 3 1 2 2 8 OB Outpit EX-6016 PIT 5 EXT IPD 10 24 192 - 24 -
9-Sep-21 Night TR-1033 51,602.2 51,605.5 3.31 Hauling OB 15470 IJAI 3 2 4 1 2 12 OB Outpit EX-5022 PIT 5 EXT IPD 11 24 288 - 24 -
9-Sep-21 Night TR-1034 49,381.1 49,385.3 4.17 Hauling OB 15420 M ABD MADI 4 4 3 4 2 17 OB Outpit EX-6016 PIT 5 EXT IPD 10 24 408 - 24 -
9-Sep-21 Night TR-1034 49,385.3 49,386.5 1.23 Hauling OB 15420 M ABD MADI 1 4 5 OB Outpit EX-5022 PIT 5 EXT IPD 11 24 120 - 24 -
9-Sep-21 Night TR-1036 50,634.0 50,634.3 0.27 Hauling OB 15398 SIGIT SUSANTO 1 1 OB Outpit EX-6014 PIT 5 EXT IPD 10 24 24 - 24 -
9-Sep-21 Night TR-1036 50,634.3 50,638.8 4.53 Hauling OB 15398 SIGIT SUSANTO 4 5 4 2 2 17 OB Outpit EX-6016 PIT 5 EXT IPD 10 24 408 - 24 -
9-Sep-21 Night TR-1036 50,638.8 50,640.4 1.60 Hauling OB 15398 SIGIT SUSANTO 2 4 6 OB Outpit EX-5022 PIT 5 EXT IPD 11 24 144 - 24 -
9-Sep-21 Night TR-1048 52,159.7 52,159.7 - Unscheduled - IPD 10 - - -
9-Sep-21 Night TR-1049 46,052.4 46,054.3 1.85 Hauling OB 15576 JOKO SANTOSO 4 1 2 7 OB Outpit EX-6016 PIT 5 EXT IPD 10 24 168 - 24 -
9-Sep-21 Night TR-1049 46,054.3 46,058.2 3.95 Hauling OB 15576 JOKO SANTOSO 4 3 1 4 3 15 OB Outpit EX-5022 PIT 5 EXT IPD 11 24 360 - 24 -
9-Sep-21 Night TR-1050 45,811.5 45,811.5 - Unscheduled - WORKSHOP - - -
9-Sep-21 Night TA-7009 27,833.5 27,833.8 0.30 Rehandling Coal 15862 RUDY AMRIYADI 1 1 COAL EX-2058 PIT 5 EXT 11 - - 11 -
9-Sep-21 Night TA-7009 27,833.8 27,838.9 5.10 Hauling OB 15862 RUDY AMRIYADI 4 4 3 4 3 18 OB Outpit EX-5022 PIT 5 EXT IPD 11 14 252 - 14 -
9-Sep-21 Night TA-7010 25,162.4 25,163.3 0.90 Rehandling Coal 15861 AGUSTIAN 2 2 COAL EX-2058 PIT 5 EXT 11 - - 11 -
9-Sep-21 Night TA-7010 25,163.3 25,168.4 5.10 Hauling OB 15861 AGUSTIAN 4 4 3 4 3 18 OB Outpit EX-5022 PIT 5 EXT IPD 11 14 252 - 14 -
9-Sep-21 Night TA-7022 - - - Unscheduled - WORKSHOP - - -
9-Sep-21 Night TA-7029 28,534.5 28,534.5 - Unscheduled - PIT 5 EXT - - -
9-Sep-21 Night TA-7030 28,223.6 28,223.6 - Unscheduled - PIT 5 EXT - - -
9-Sep-21 Night BD-4005 13,770.7 13,770.7 - Scheduled - WORKSHOP - - -
9-Sep-21 Night BD-5035 3,416.1 3,425.8 9.70 Disposal maintenance 15747 MUSTAQIM D6 - IPD 10 - - -
9-Sep-21 Night BD-6025 2,745.4 2,745.4 - Standby - KCP - - -
9-Sep-21 Night BD-6026 30,198.7 30,198.7 - Standby - WORKSHOP - - -
9-Sep-21 Night BD-6028 4,119.1 4,122.1 3.00 Unit Rental 11169 ANNAS - KCP - - -
9-Sep-21 Night BD-6036 34,150.5 34,157.0 6.50 Unit Rental 14710 AGUS S - KCP - - -
9-Sep-21 Night BD-6038 33,938.0 33,943.4 5.40 Unit Rental 15570 HENDRY S - KCP - - -
9-Sep-21 Night BD-6069 10,384.9 10,384.9 - Unscheduled - PIT 5 EXT - - -
9-Sep-21 Night BD-7013 39,863.0 39,868.8 5.80 Front maintenance 15606 FATHUR - PIT 5 EXT - - -
9-Sep-21 Night BD-7026 26,542.3 26,545.9 3.60 Front maintenance 15606 FATHUR - PIT 5 EXT - - -
9-Sep-21 Night BD-7034 9,944.0 9,952.2 8.20 Disposal maintenance 9492 MAHFUDI - IPD 10 - - -
9-Sep-21 Night GR-2012 22,236.4 22,236.4 - Standby - WORKSHOP - - -
9-Sep-21 Night GR-3007 39,190.3 39,196.5 6.20 Road Maintenance Support 12344 M FAJRI - PIT 5 EXT - - -
9-Sep-21 Night GR-3008 46,883.6 46,885.7 2.10 Road Maintenance Support 9426 ADE SUPIANA - PIT 5 EXT - - -
9-Sep-21 Night TW-3001 8,512.0 8,512.0 - Standby 15743 LANA - PIT 5 EXT - - -
9-Sep-21 Night TW-4001 18,756.0 18,756.00 - Standby - WORKSHOP - - -
9-Sep-21 Night PU-4002 19,056.0 19,056.0 - Unscheduled - PIT 11 - - -
9-Sep-21 Night PU-2026 6,188.5 6,188.5 - Standby - PIT 11 - - -
9-Sep-21 Night PU-3026 12,307.0 12,307.0 - Standby - ROM TEMPORARY - - -
9-Sep-21 Night PU-3015 1,696.0 1,696.0 - Standby - ROM TEMPORARY - - -
9-Sep-21 Night PU-3014 27,240.4 27,240.4 - Standby - ROM TEMPORARY - - -
9-Sep-21 Night LP-2165 13,505.0 13,517.0 12.00 Unit Rental 4671 NURUDIN - KCP - - -
9-Sep-21 Night LP-2166 13,002.0 13,014.0 12.00 Unit Rental 4671 NURUDIN - KCP - - -
9-Sep-21 Night LP-2167 13,963.0 13,972.0 9.00 Unit Rental 4671 NURUDIN - KCP - - -
9-Sep-21 Night LP-2168 12,796.0 12,806.0 10.00 Unit Rental 4671 NURUDIN - KCP - - -
9-Sep-21 Night LP-2169 12,540.0 12,540.0 - Unit Rental 4671 NURUDIN - KCP - - -
9-Sep-21 Night TS-4007 - - - Standby - KCP - - -
9-Sep-21 Night TS-4017 16,115.0 16,120.0 5.00 Unit Rental 15310 ALDI ALFI SAPUTRA - KCP - - -
9-Sep-21 Night TF-4013 20,371.0 20,372.0 1.00 Unit Rental 13708 AHMAD SALIM - KCP - - -
9-Sep-21 Night TF-4014 34,550.0 34,550.0 - Standby - KCP - - -
10-Sep-21 Day EX-2037 22,133.1 22,135.1 2.00 Drainage 10916 DANI NOVI KUSYANTO - PIT 5 EXT - - -
10-Sep-21 Day EX-2037 22,133.1 22,139.0 5.90 Road Maintenance Support 10916 DANI NOVI KUSYANTO - PIT 5 EXT - - -
10-Sep-21 Day EX-2058 17,477.7 17,478.2 0.50 Drainage 11330 EKO PURWANTO - PIT 5 EXT - 891 -
10-Sep-21 Day EX-2058 17,478.2 17,488.1 9.90 Side casting 11330 EKO PURWANTO - PIT 5 EXT - 891 -
10-Sep-21 Day EX-4006 35,177.0 35,177.0 - Unscheduled - WORKSHOP - 999 -
10-Sep-21 Day EX-5014 38,634.0 38,635.0 1.00 Unit Rental 15345 SUTONO - KCP - - -
10-Sep-21 Day EX-5022 11,322.0 11,325.0 3.00 Loading Waste 9590F SIRATAL RAYYAN - OB Outpit PIT 5 IPD 10 - 1,008 -
10-Sep-21 Day EX-5037 19,036.0 19,036.0 - Unscheduled - PARKIRAN SCANIA - 987 -
10-Sep-21 Day EX-6014 57,598.0 57,600.0 2.00 Unscheduled 8952 DIDI SETIAWAN - PIT 5 EXT - - -
10-Sep-21 Day EX-6014 57,600.0 57,601.0 1.00 Loading Waste 8952 DIDI SETIAWAN - OB Outpit PIT 5 EXT IPD 10 - - -
10-Sep-21 Day EX-6016 44,198.0 44,203.0 5.00 Loading Waste 9136 AHMAD YANI - OB Outpit PIT 5 EXT IPD 10 - - -
10-Sep-21 Day EX-6022 18,544.5 18,548.5 4.00 Loading Waste 11146 PURWANTO - OB Outpit PIT 5 IPD 10 - - -
10-Sep-21 Day TR-3080 42,674.8 42,676.2 1.40 Hauling OB 15230 MARGONO 2 3 5 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 210 - 42 -
10-Sep-21 Day TR-3080 42,676.2 42,676.5 0.28 Hauling OB 15230 MARGONO 1 1 OB Outpit EX-5022 PIT 5 IPD 10 42 42 - 42 -
10-Sep-21 Day TR-3080 42,676.5 42,677.6 1.12 Hauling OB 15230 MARGONO 1 3 4 OB Outpit EX-6016 PIT 5 EXT IPD 10 42 168 - 42 -
10-Sep-21 Day TR-3174 41,386.2 41,389.1 2.90 Hauling OB 11328 JUSESLAF BANJAR NAHOR 1 3 3 1 4 12 OB Outpit EX-6022 PIT 5 IPD 10 42 504 - 42 -
10-Sep-21 Day TR-3175 38,781.9 38,783.8 1.90 Hauling OB 9354 JIDIN 4 1 4 2 11 OB Outpit EX-6016 PIT 5 EXT IPD 10 42 462 - 42 -
10-Sep-21 Day TR-3195 24,655.5 24,657.6 2.10 Hauling OB 15229 ARDIANSYAH 2 3 2 7 OB Outpit EX-6022 PIT 5 IPD 10 42 294 - 42 -
10-Sep-21 Day TR-3202 26,799.6 26,800.7 1.07 Hauling OB 1354 SUDIYANTO 1 3 4 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 168 - 42 -
10-Sep-21 Day TR-3202 26,800.7 26,802.0 1.33 Hauling OB 1354 SUDIYANTO 2 3 5 OB Outpit EX-6016 PIT 5 EXT IPD 10 42 210 - 42 -
10-Sep-21 Day TR-3203 26,901.4 26,902.5 1.08 Hauling OB 8920 VERRY EKO SETIAWAN 1 3 4 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 168 - 42 -
10-Sep-21 Day TR-3203 26,902.5 26,904.1 1.62 Hauling OB 8920 VERRY EKO SETIAWAN 2 4 6 OB Outpit EX-6022 PIT 5 IPD 10 42 252 - 1 42 42
10-Sep-21 Day TR-3204 26,216.3 26,217.3 1.03 Hauling OB 1303 EFENDI 1 3 4 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 168 - 42 -
10-Sep-21 Day TR-3204 26,217.3 26,217.6 0.26 Hauling OB 1303 EFENDI 1 1 OB Outpit EX-6022 PIT 5 IPD 10 42 42 - 42 -
10-Sep-21 Day TR-3204 26,217.6 26,219.4 1.81 Hauling OB 1303 EFENDI 3 4 7 OB Outpit EX-6016 PIT 5 EXT IPD 10 42 294 - 42 -
10-Sep-21 Day TR-3205 25,765.2 25,768.8 3.60 Hauling OB 7170F TRI PRASETIYO 2 3 4 3 5 17 OB Outpit EX-6022 PIT 5 IPD 10 42 714 - 42 -
10-Sep-21 Day TR-3206 24,918.2 24,918.2 - Scheduled - WORKSHOP - - -
10-Sep-21 Day TR-3220 25,940.9 25,944.4 3.49 Hauling OB 8965 HADI SUTIKNO 2 3 3 3 5 16 OB Outpit EX-6022 PIT 5 IPD 10 42 672 - 42 -
10-Sep-21 Day TR-1024 31,335.8 31,335.8 - Unscheduled - WORKSHOP - - -
10-Sep-21 Day TR-1025 47,159.6 47,162.2 2.64 Hauling OB 15466 SUPRIYANTO 1 3 4 2 10 OB Outpit EX-6016 PIT 5 EXT IPD 10 24 240 - 1 24 24
10-Sep-21 Day TR-1025 47,162.2 47,163.3 1.06 Hauling OB 15466 SUPRIYANTO 4 4 OB Outpit EX-5022 PIT 5 IPD 10 24 96 - 24 -
10-Sep-21 Day TR-1031 49,416.4 49,416.4 - Unscheduled - PIT 5 EXT - - -
10-Sep-21 Day TR-1032 51,172.2 51,174.8 2.60 Hauling OB 16025 IMTIKAN 2 2 5 1 10 OB Outpit EX-6016 PIT 5 EXT IPD 10 24 240 - 24 -
10-Sep-21 Day TR-1032 51,174.8 51,176.1 1.30 Hauling OB 16025 IMTIKAN 1 4 5 OB Outpit EX-5022 PIT 5 IPD 10 24 120 - 24 -
10-Sep-21 Day TR-1033 51,605.5 51,608.8 3.30 Hauling OB 15421 AGUS A 2 3 3 4 12 OB Outpit EX-6016 PIT 5 EXT IPD 10 24 288 - 24 -
10-Sep-21 Day TR-1034 49,386.5 49,389.0 2.50 Hauling OB 15397 YUSUF 2 3 3 8 OB Outpit EX-5022 PIT 5 IPD 10 24 192 - 24 -
10-Sep-21 Day TR-1036 50,640.4 50,643.7 3.26 Hauling OB 15346 MUSA 2 4 4 3 2 15 OB Outpit EX-6016 PIT 5 EXT IPD 10 24 360 - 24 -
10-Sep-21 Day TR-1036 50,643.7 50,644.1 0.44 Hauling OB 15346 MUSA 2 2 OB Outpit EX-5022 PIT 5 IPD 10 24 48 - 24 -
10-Sep-21 Day TR-1048 52,160.3 52,161.2 0.90 Hauling OB 15421 AGUS A 3 3 OB Outpit EX-6016 PIT 5 EXT IPD 10 24 72 - 24 -
10-Sep-21 Day TR-1049 46,058.2 46,060.7 2.50 Hauling OB 16024 QORI 2 3 3 8 OB Outpit EX-5022 PIT 5 IPD 10 24 192 - 24 -
10-Sep-21 Day TR-1050 45,811.5 45,811.5 - Unscheduled - WORKSHOP - - -
10-Sep-21 Day TA-7009 27,838.9 27,840.6 1.70 Hauling OB 15818 AGUS SUGIANTO 3 2 5 OB Outpit EX-5022 PIT 5 IPD 10 14 70 - 14 -
10-Sep-21 Day TA-7010 25,168.4 25,169.6 1.20 Hauling OB 15819 AHNIANSYAH 3 3 OB Outpit EX-5022 PIT 5 IPD 10 14 42 - 14 -
10-Sep-21 Day TA-7010 25,169.6 25,170.4 0.80 Hauling OB 15653 M. ILIAS 2 2 OB Outpit EX-5022 PIT 5 IPD 10 14 28 - 14 -
10-Sep-21 Day TA-7022 - - - Unscheduled - WORKSHOP - - -
10-Sep-21 Day TA-7029 28,534.5 28,534.5 - Unscheduled - PIT 5 EXT - - -
10-Sep-21 Day TA-7030 28,223.6 28,223.6 - Standby - PIT 5 EXT - - -
10-Sep-21 Day BD-4005 13,770.7 13,770.7 - Scheduled - WORKSHOP - - -
k 10-Sep-21 Day BD-5035 3,425.8 3,433.5 7.70 Disposal maintenance 14963 MAULANA ISHAK - IPD 10 - - -
10-Sep-21 Day BD-6025 2,746.2 2,751.6 5.40 Unit Rental 14744 NOORDIANTO - KCP - - -
10-Sep-21 Day BD-6026 30,198.7 30,198.7 - Standby - WORKSHOP - - -
10-Sep-21 Day BD-6028 4,122.1 4,122.1 - Unscheduled - KCP - - -
10-Sep-21 Day BD-6036 34,157.1 34,164.1 7.00 Unit Rental 14964 JOKO P (Dozer) - KCP - - -
10-Sep-21 Day BD-6038 33,943.4 33,947.3 3.90 Unit Rental 15464 MARJUKI - KCP - - -
10-Sep-21 Day BD-6069 10,384.9 10,384.9 - Unscheduled - PIT 5 EXT - - -
10-Sep-21 Day BD-7013 39,868.8 39,876.8 8.00 Front maintenance - PIT 5 EXT - - -
10-Sep-21 Day BD-7026 26,545.9 26,553.5 7.60 Front maintenance 15639 A. BUDIMAN - PIT 5 EXT - - -
10-Sep-21 Day BD-7034 9,952.2 9,960.6 8.40 Disposal maintenance 8157 SAMIDI - IPD 10 - - -
10-Sep-21 Day GR-2012 22,236.4 22,236.4 - Standby - WORKSHOP - - -
10-Sep-21 Day GR-3007 39,196.5 39,202.5 6.00 Road Maintenance Support 9103 WAWAN WIDODO - PIT 5 EXT - - -
10-Sep-21 Day GR-3008 46,885.7 46,890.0 4.30 Road Maintenance Support - PIT 5 EXT - - -
10-Sep-21 Day TW-3001 8,512.0 8,514.0 2.00 Road Maintenance Support 15106 AHMAD NURANI - PIT 5 EXT - - -
10-Sep-21 Day TW-4001 18,756.0 18,756.00 - Standby - WORKSHOP - - -
10-Sep-21 Day PU-4002 19,056.0 19,056.00 - Unscheduled - PIT 11 - - -
10-Sep-21 Day PU-2026 6,188.5 6,188.5 - Standby - PIT 11 - - -
10-Sep-21 Day PU-3026 12,307.0 12,307.00 - Standby - ROM TEMPORARY - - -
10-Sep-21 Day PU-3015 1,696.0 1,696.00 - Standby - ROM TEMPORARY - - -
10-Sep-21 Day PU-3014 27,240.4 27,240.40 - Standby - ROM TEMPORARY - - -
10-Sep-21 Day LP-2165 13,517.0 13,518.00 1.00 Unit Rental 4671 NURUDIN - KCP - - -
10-Sep-21 Day LP-2166 13,014.0 13,014.00 - Standby - KCP - - -
10-Sep-21 Day LP-2167 13,972.0 13,973.00 1.00 Unit Rental 4671 NURUDIN - KCP - - -
10-Sep-21 Day LP-2168 12,806.0 12,806.00 - Standby - KCP - - -
10-Sep-21 Day LP-2169 12,540.0 12,540.00 - Standby - KCP - - -
10-Sep-21 Day TS-4007 - - - Standby - KCP - - -
10-Sep-21 Day TS-4017 16,120.0 16,122.0 2.00 Unit Rental 13709 RISNO PATALLE - KCP - - -
10-Sep-21 Day TF-4013 20,372.0 20,376.0 4.00 Unit Rental 15746 SYARIFUDDI - KCP - - -
10-Sep-21 Day TF-4014 34,550.0 34,550.0 - Standby - KCP - - -
10-Sep-21 Night EX-2037 22,139.0 22,139.0 - Standby - PIT 5 EXT - - -
10-Sep-21 Night EX-2058 17,488.1 17,490.1 2.00 Rehandling Coal - COAL PIT 5 EXT - - 891 - -
10-Sep-21 Night EX-2058 17,490.1 17,492.1 2.00 Sloping - PIT 5 EXT - 891 -
10-Sep-21 Night EX-2058 17,492.1 17,495.0 2.90 Drainage - PIT 5 EXT - 891 -
10-Sep-21 Night EX-4006 35,177.0 35,177.0 - Unscheduled - WORKSHOP - 999 -
10-Sep-21 Night EX-5014 38,635.0 38,635.0 - Standby 15616 JOKO SUDIRO - KCP - - -
10-Sep-21 Night EX-5022 11,325.0 11,328.0 3.00 Loading Waste 12534 PUJIYANTO - OB Outpit PIT 5 IPD 10 - 1,008 -
10-Sep-21 Night EX-5037 19,036.0 19,036.0 - Unscheduled - PARKIRAN SCANIA - 987 -
10-Sep-21 Night EX-6014 57,601.0 57,601.0 - Unscheduled 10917 SETA VERDY KARYA - PIT 5 EXT - - -
10-Sep-21 Night EX-6016 44,203.0 44,206.0 3.00 Loading Waste 15567 ARIF WAHYUDI - OB Outpit PIT 5 EXT IPD 10 - - -
10-Sep-21 Night EX-6022 18,548.5 18,551.4 2.90 Loading Waste 15568 FUAD EFENDI - OB Outpit PIT 5 IPD 10 - - -
10-Sep-21 Night TR-3080 42,677.6 42,680.4 2.80 Hauling OB 15350 HERMAN 2 3 5 1 11 OB Outpit EX-6016 PIT 5 EXT IPD 10 42 462 - 42 -
10-Sep-21 Night TR-3174 41,389.1 41,391.8 2.70 Hauling OB 8958 MUKHROMIN 3 3 3 2 11 OB Outpit EX-6022 PIT 5 IPD 10 42 462 - 42 -
10-Sep-21 Night TR-3175 38,783.8 38,783.8 - Standby 15347 TAHMID - PIT 5 EXT - - -
10-Sep-21 Night TR-3195 24,657.6 24,658.5 0.90 Hauling OB 10762 SYAMSUDDIN 2 1 3 OB Outpit EX-6022 PIT 5 IPD 10 42 126 - 42 -
10-Sep-21 Night TR-3202 26,802.0 26,805.0 3.00 Hauling OB 3669 SUYANTO 3 3 4 2 12 OB Outpit EX-6016 PIT 5 EXT IPD 10 42 504 - 42 -
10-Sep-21 Night TR-3203 26,904.1 26,907.1 3.00 Hauling OB 3 3 5 2 13 OB Outpit EX-6022 PIT 5 IPD 10 42 546 - 42 -
10-Sep-21 Night TR-3204 26,219.4 26,222.1 2.70 Hauling OB 15349 ARDIANSYAH 3 3 4 2 12 OB Outpit EX-6022 PIT 5 IPD 10 42 504 - 42 -
10-Sep-21 Night TR-3205 25,768.8 25,771.1 2.33 Hauling OB 10695 SUPIYANDI 3 3 4 10 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 420 - 42 -
10-Sep-21 Night TR-3205 25,771.1 25,771.6 0.47 Hauling OB 10695 SUPIYANDI 2 2 OB Outpit EX-6016 PIT 5 EXT IPD 10 42 84 - 42 -
10-Sep-21 Night TR-3206 24,918.2 24,918.2 - Scheduled - WORKSHOP - - -
10-Sep-21 Night TR-3220 25,944.4 25,947.4 3.00 Hauling OB 3 3 5 1 12 OB Outpit EX-6016 PIT 5 EXT IPD 10 42 504 - 42 -
10-Sep-21 Night TR-1024 31,335.8 31,335.8 - Unscheduled - WORKSHOP - - -
10-Sep-21 Night TR-1025 47,163.3 47,164.3 1.00 Hauling OB 15744 MARYANTO 3 3 OB Outpit EX-5022 PIT 5 IPD 10 24 72 - 24 -
10-Sep-21 Night TR-1031 49,416.4 49,416.4 - Unscheduled - PIT 5 EXT - - -
10-Sep-21 Night TR-1032 51,176.1 51,177.4 1.30 Hauling OB 15485 ROBY TM 3 2 5 OB Outpit EX-5022 PIT 5 IPD 10 24 120 - 24 -
10-Sep-21 Night TR-1033 51,608.8 51,608.8 - Unscheduled - PIT 5 EXT - - -
10-Sep-21 Night TR-1034 49,389.0 49,389.9 0.90 Hauling OB 15471 MULYADI 1 2 3 OB Outpit EX-6016 PIT 5 EXT IPD 10 24 72 - 24 -
10-Sep-21 Night TR-1034 49,389.9 49,391.1 1.20 Hauling OB 15471 MULYADI 2 2 4 OB Outpit EX-5022 PIT 5 IPD 10 24 96 - 24 -
10-Sep-21 Night TR-1036 50,644.1 50,646.8 2.66 Hauling OB 15470 IJAI 3 3 4 1 11 OB Outpit EX-6016 PIT 5 EXT IPD 10 24 264 - 24 -
10-Sep-21 Night TR-1036 50,646.8 50,647.0 0.24 Hauling OB 15470 IJAI 1 1 OB Outpit EX-5022 PIT 5 IPD 10 24 24 - 24 -
10-Sep-21 Night TR-1048 52,161.2 52,161.2 - Unscheduled - IPD 10 - - -
10-Sep-21 Night TR-1049 46,060.7 46,061.9 1.20 Hauling OB 15576 JOKO SANTOSO 3 2 5 OB Outpit EX-5022 PIT 5 IPD 10 24 120 - 24 -
10-Sep-21 Night TR-1050 45,811.5 45,811.5 - Unscheduled - WORKSHOP - - -
10-Sep-21 Night TA-7009 27,840.6 27,842.7 2.08 Hauling Coal 1 7 1 9 COAL EX-2058 PIT 5 EXT 11 - - 11 -
10-Sep-21 Night TA-7009 27,842.7 27,843.6 0.92 Hauling OB 3 1 4 OB Outpit EX-5022 PIT 5 EXT IPD 10 14 56 - 14 -
10-Sep-21 Night TA-7010 25,170.4 25,172.3 1.88 Hauling Coal 15816 M. YUSUF 8 1 9 COAL EX-2058 PIT 5 EXT 11 - - 11 -
10-Sep-21 Night TA-7010 25,170.4 25,171.0 0.63 Hauling OB 15816 M. YUSUF 3 3 OB Outpit EX-5022 PIT 5 IPD 10 14 42 - 14 -
10-Sep-21 Night TA-7022 - - - Unscheduled - WORKSHOP - - -
10-Sep-21 Night TA-7029 28,534.5 28,534.5 - Unscheduled - PIT 5 EXT - - -
10-Sep-21 Night TA-7030 28,223.6 28,223.6 - Unscheduled - OB Outpit PIT 5 EXT IPD 10 14 - - 14 -
10-Sep-21 Night BD-4005 13,770.7 13,770.7 - Scheduled - WORKSHOP - - -
10-Sep-21 Night BD-5035 3,433.5 3,433.5 - Standby - IPD 10 - - -
10-Sep-21 Night BD-6025 2,751.6 2,751.8 0.20 Unit Rental 11169 ANNAS - KCP - - -
10-Sep-21 Night BD-6026 30,198.7 30,198.7 - Standby - WORKSHOP - - -
10-Sep-21 Night BD-6028 4,122.1 4,122.1 - Unscheduled - KCP - - -
10-Sep-21 Night BD-6036 34,164.1 34,166.5 2.40 Unit Rental 14710 AGUS S - KCP - - -
10-Sep-21 Night BD-6038 33,947.3 33,948.6 1.30 Unit Rental 15570 HENDRY S - KCP - - -
10-Sep-21 Night BD-6069 10,384.9 10,384.9 - Unscheduled - PIT 5 EXT - - -
10-Sep-21 Night BD-7013 39,876.8 39,880.6 3.80 Ripping 15606 FATHUR - PIT 5 EXT - - -
10-Sep-21 Night BD-7013 39,880.6 39,881.1 0.50 Front maintenance 15606 FATHUR - PIT 5 EXT - - -
10-Sep-21 Night BD-7026 26,553.5 26,557.0 3.50 Front maintenance 9978 KARSIANTO - PIT 5 EXT - - -
10-Sep-21 Night BD-7034 9,960.6 9,967.2 6.60 Disposal maintenance 9492 MAHFUDI - IPD 10 - - -
10-Sep-21 Night GR-2012 22,236.4 22,236.4 - Standby - WORKSHOP - - -
10-Sep-21 Night GR-3007 39,202.5 39,206.0 3.50 Road Maintenance Support 9214 MUSTOFA ADI PRAYITNO - PIT 5 - - -
10-Sep-21 Night GR-3008 46,890.0 46,893.2 3.20 Road Maintenance Support 12344 M FAJRI - PIT 5 EXT - - -
10-Sep-21 Night TW-3001 8,514.0 8,514.0 - Standby 15743 LANA - PIT 5 EXT - - -
10-Sep-21 Night TW-4001 18,756.0 18,756.00 - Standby - WORKSHOP - - -
10-Sep-21 Night PU-4002 19,056.0 19,056.0 - Unscheduled - PIT 11 - - -
10-Sep-21 Night PU-2026 6,188.5 6,188.5 - Standby - PIT 11 - - -
10-Sep-21 Night PU-3026 12,307.0 12,307.0 - Standby - ROM TEMPORARY - - -
10-Sep-21 Night PU-3015 1,696.0 1,696.0 - Standby - ROM TEMPORARY - - -
10-Sep-21 Night PU-3014 27,240.4 27,240.4 - Standby - ROM TEMPORARY - - -
10-Sep-21 Night LP-2165 13,518.0 13,530.0 12.00 Unit Rental 4671 NURUDIN - KCP - - -
10-Sep-21 Night LP-2166 13,014.0 13,023.0 9.00 Unit Rental 4671 NURUDIN - KCP - - -
10-Sep-21 Night LP-2167 13,973.0 13,985.0 12.00 Unit Rental 4671 NURUDIN - KCP - - -
10-Sep-21 Night LP-2168 12,806.0 12,811.0 5.00 Unit Rental 4671 NURUDIN - KCP - - -
10-Sep-21 Night LP-2169 12,540.0 12,540.0 - Standby 4671 NURUDIN - KCP - - -
10-Sep-21 Night TS-4007 - - - Standby - KCP - - -
10-Sep-21 Night TS-4017 16,122.0 16,126.0 4.00 Unit Rental 15310 ALDI ALFI SAPUTRA - KCP - - -
10-Sep-21 Night TF-4013 20,376.0 20,379.0 3.00 Unit Rental 15745 SURYANATA - KCP - - -
10-Sep-21 Night TF-4014 34,550.0 34,550.0 - Standby - KCP - - -
11-Sep-21 Day EX-2037 22,139.0 22,147.40 8.40 Side casting 8371 DWI RUPAWAN - JALAN SAKA - - -
11-Sep-21 Day EX-2058 17,495.0 17,504.7 9.70 Drainage 15504 SLAMET WIDODO - PIT 5 EXT - - -
11-Sep-21 Day EX-4006 35,177.0 35,177.0 - Unscheduled - PARKIRAN SCANIA - - -
11-Sep-21 Day EX-5014 38,636.0 38,636.0 - Standby 9590F SIRATAL RAYYAN - KCP - - -
11-Sep-21 Day EX-5022 11,328.0 11,331.0 3.00 Side casting 15604 AHMAD SYAFI'I - PIT 5 - - -
11-Sep-21 Day EX-5037 19,036.0 19,036.0 - Unscheduled - PARKIRAN SCANIA - - -
11-Sep-21 Day EX-6014 57,601.0 57,601.0 - Standby 8952 DIDI SETIAWAN - PIT 5 EXT - - -
11-Sep-21 Day EX-6016 44,206.0 44,206.0 - Standby 9136 AHMAD YANI - PIT 5 EXT - - -
11-Sep-21 Day EX-6022 18,551.4 18,551.4 - Standby 15486 SUGENG PRAYETNO - PIT 5 - - -
11-Sep-21 Day TR-3080 42,680.4 42,680.4 - Standby - PIT 5 EXT - - -
11-Sep-21 Day TR-3174 41,391.8 41,391.8 - Standby 11328 JUSESLAF BANJAR NAHOR - PIT 5 EXT - - -
11-Sep-21 Day TR-3175 38,783.8 38,783.8 - Standby 9354 JIDIN - PIT 5 EXT - - -
11-Sep-21 Day TR-3195 24,658.5 24,658.5 - Standby 15229 ARDIANSYAH - PIT 5 EXT - - -
11-Sep-21 Day TR-3202 26,805.0 26,805.0 - Standby 15230 MARGONO - PIT 5 EXT - - -
11-Sep-21 Day TR-3203 26,907.1 26,907.1 - Standby 10882 SABIRIN - PIT 5 EXT - - -
11-Sep-21 Day TR-3204 26,222.1 26,222.1 - Standby 1303 EFENDI - PIT 5 EXT - - -
11-Sep-21 Day TR-3205 25,771.6 25,771.6 - Standby 7170F TRI PRASETIYO - PIT 5 EXT - - -
11-Sep-21 Day TR-3206 24,918.2 24,918.2 - Scheduled - WORKSHOP - - -
11-Sep-21 Day TR-3220 25,947.4 25,947.4 - Standby 8965 HADI SUTIKNO - PIT 5 EXT - - -
11-Sep-21 Day TR-1024 31,335.8 31,335.8 - Unscheduled - WORKSHOP - - -
11-Sep-21 Day TR-1025 47,164.3 47,164.3 - Standby 15955 RIZKY IHWAN - PIT 5 EXT - - -
11-Sep-21 Day TR-1031 49,416.4 49,416.4 - Unscheduled - PIT 5 EXT - - -
11-Sep-21 Day TR-1032 51,177.4 51,177.4 - Standby 16025 IMTIKAN - PIT 5 EXT - - -
11-Sep-21 Day TR-1033 51,608.8 51,608.8 - Standby 15420 M ABD MADI - PIT 5 EXT - - -
11-Sep-21 Day TR-1034 49,391.1 49,391.1 - Standby 15397 YUSUF - PIT 5 EXT - - -
11-Sep-21 Day TR-1036 50,647.0 50,647.0 - Standby 15398 SIGIT SUSANTO - PIT 5 EXT - - -
11-Sep-21 Day TR-1048 52,161.2 52,161.2 - Unscheduled - IPD 10 - - -
11-Sep-21 Day TR-1049 46,061.9 46,061.9 - Standby 15376 EKO FAJAR S - PIT 5 EXT - - -
11-Sep-21 Day TR-1050 45,811.5 45,811.5 - Unscheduled - WORKSHOP - - -
11-Sep-21 Day TA-7009 27,843.6 27,843.6 - Standby - PIT 5 EXT - - -
11-Sep-21 Day TA-7010 25,172.3 25,172.3 - Standby 15653 M. ILIAS - PIT 5 EXT - - -
11-Sep-21 Day TA-7022 - - - Unscheduled - WORKSHOP - - -
11-Sep-21 Day TA-7029 28,534.5 28,534.5 - Standby - PIT 5 EXT - - -
11-Sep-21 Day TA-7030 28,223.6 28,223.6 - Standby - PIT 5 EXT - - -
11-Sep-21 Day BD-4005 13,770.7 13,770.7 - Scheduled - WORKSHOP - - -
k 11-Sep-21 Day BD-5035 3,433.5 3,435.8 2.30 Front maintenance 14963 MAULANA ISHAK - PIT 5 - - -
11-Sep-21 Day BD-6025 2,751.8 2,751.8 - Standby 15464 MARJUKI - KCP - - -
11-Sep-21 Day BD-6026 30,198.7 30,198.7 - Standby - WORKSHOP - - -
11-Sep-21 Day BD-6028 4,122.1 4,122.1 - Unscheduled - KCP - - -
11-Sep-21 Day BD-6036 34,166.5 34,166.6 0.10 Unit Rental - KCP - - -
11-Sep-21 Day BD-6038 33,948.8 33,948.8 - Standby 14708 ADEFI P - KCP - - -
11-Sep-21 Day BD-6069 10,384.9 10,384.9 - Unscheduled - PIT 5 EXT - - -
11-Sep-21 Day BD-7013 39,881.1 39,886.3 5.20 Front maintenance 11676 SUDARSONO - PIT 5 EXT - - -
11-Sep-21 Day BD-7026 26,557.0 26,561.2 4.20 Front maintenance 15639 A. BUDIMAN - PIT 5 EXT - - -
11-Sep-21 Day BD-7034 9,967.2 9,969.7 2.50 Disposal maintenance 8157 SAMIDI - IPD 10 - - -
11-Sep-21 Day GR-2012 22,236.4 22,236.4 - Standby - WORKSHOP - - -
11-Sep-21 Day GR-3007 39,206.0 39,207.7 1.70 Road Maintenance Support 8925 AGUS SUNARWAN - PIT 5 EXT - - -
11-Sep-21 Day GR-3008 46,893.2 46,895.4 2.20 Road Maintenance Support 15571 YOHANIS L - PIT 5 EXT - - -
11-Sep-21 Day TW-3001 8,514.0 8,514.0 - Standby 15106 AHMAD NURANI - PIT 5 EXT - - -
11-Sep-21 Day TW-4001 18,756.0 18,756.00 - Standby - WORKSHOP - - -
11-Sep-21 Day PU-4002 19,056.0 19,064.00 8.00 Dewatering 10914 SETYO BUDI UTOMO - PIT 11 - - -
11-Sep-21 Day PU-2026 6,188.5 6,188.5 - Standby 10914 SETYO BUDI UTOMO - PIT 11 - - -
11-Sep-21 Day PU-3026 12,307.0 12,307.00 - Standby - ROM TEMPORARY - - -
11-Sep-21 Day PU-3015 1,696.0 1,696.00 - Standby - ROM TEMPORARY - - -
11-Sep-21 Day PU-3014 27,240.4 27,240.40 - Standby - ROM TEMPORARY - - -
11-Sep-21 Day LP-2165 13,530.0 13,530.00 - Standby - KCP - - -
11-Sep-21 Day LP-2166 13,023.0 13,023.00 - Standby - KCP - - -
11-Sep-21 Day LP-2167 13,985.0 13,985.00 - Standby - KCP - - -
11-Sep-21 Day LP-2168 12,811.0 12,811.00 - Standby - KCP - - -
11-Sep-21 Day LP-2169 12,540.0 12,540.00 - Standby - KCP - - -
11-Sep-21 Day TS-4007 - - - Standby - KCP - - -
11-Sep-21 Day TS-4017 16,126.0 16,126.0 - Standby 13709 RISNO PATALLE - KCP - - -
11-Sep-21 Day TF-4013 20,379.0 20,379.0 - Standby 15746 SYARIFUDDI - KCP - - -
11-Sep-21 Day TF-4014 34,550.0 34,550.0 - Standby - KCP - - -
11-Sep-21 Night EX-2037 22,147.4 22,147.4 - Standby - PARKIRAN SCANIA - - -
11-Sep-21 Night EX-2058 17,504.7 17,511.3 6.60 Drainage 11330 EKO PURWANTO - PIT 5 EXT - - -
11-Sep-21 Night EX-4006 35,177.0 35,177.0 - Unscheduled - PARKIRAN SCANIA - - -
11-Sep-21 Night EX-5014 38,636.0 38,636.0 - Standby 15345 SUTONO - KCP - - -
11-Sep-21 Night EX-5022 11,331.0 11,331.0 - Standby 12534 PUJIYANTO - PIT 5 - - -
11-Sep-21 Night EX-5037 19,036.0 19,036.0 - Unscheduled - PARKIRAN SCANIA - - -
11-Sep-21 Night EX-6014 57,601.0 57,601.0 - Standby 10917 SETA VERDY KARYA - PIT 5 EXT - - -
11-Sep-21 Night EX-6016 44,206.0 44,206.0 - Standby 15567 ARIF WAHYUDI - PIT 5 EXT - - -
11-Sep-21 Night EX-6022 18,551.4 18,551.4 - Standby 15568 FUAD EFENDI - PIT 5 EXT - - -
11-Sep-21 Night TR-3080 42,680.4 42,680.4 - Standby 10881 BURHANUDDIN - PIT 5 EXT - - -
11-Sep-21 Night TR-3174 41,391.8 41,391.8 - Standby 15347 TAHMID - PIT 5 EXT - - -
11-Sep-21 Night TR-3175 38,783.8 38,783.8 - Standby 15349 ARDIANSYAH - PIT 5 EXT - - -
11-Sep-21 Night TR-3195 24,658.5 24,658.5 - Standby 10762 SYAMSUDDIN - PIT 5 EXT - - -
11-Sep-21 Night TR-3202 26,805.0 26,805.0 - Standby 11474 SARINDI - PIT 5 EXT - - -
11-Sep-21 Night TR-3203 26,907.1 26,907.1 - Standby 8920 VERRY EKO SETIAWAN - PIT 5 EXT - - -
11-Sep-21 Night TR-3204 26,222.1 26,222.1 - Standby 15349 ARDIANSYAH - PIT 5 EXT - - -
11-Sep-21 Night TR-3205 25,771.6 25,771.6 - Standby 10695 SUPIYANDI - PIT 5 EXT - - -
11-Sep-21 Night TR-3206 24,918.2 24,918.2 - Scheduled WORKSHOP - - -
11-Sep-21 Night TR-3220 25,947.4 25,947.4 - Standby 10968 SUKIRNO - PIT 5 EXT - - -
11-Sep-21 Night TR-1024 31,335.8 31,335.8 - Unscheduled - WORKSHOP - - -
11-Sep-21 Night TR-1025 47,164.3 47,164.3 - Standby 15350 HERMAN - PIT 5 EXT - - -
11-Sep-21 Night TR-1031 49,416.4 49,416.4 - Unscheduled - PIT 5 EXT - - -
11-Sep-21 Night TR-1032 51,177.4 51,177.4 - Standby 15377 RIZALI RAHMAN - PIT 5 EXT - - -
11-Sep-21 Night TR-1033 51,608.8 51,608.8 - Standby 15470 IJAI - PIT 5 EXT - - -
11-Sep-21 Night TR-1034 49,391.1 49,391.1 - Standby 15471 MULYADI - PIT 5 EXT - - -
11-Sep-21 Night TR-1036 50,647.0 50,647.0 - Standby 15346 MUSA - PIT 5 EXT - - -
11-Sep-21 Night TR-1048 52,161.2 52,161.2 - Unscheduled - IPD 10 - - -
11-Sep-21 Night TR-1049 46,061.9 46,061.9 - Standby 15744 MARYANTO - PIT 5 EXT - - -
11-Sep-21 Night TR-1050 45,811.5 45,811.5 - Unscheduled - WORKSHOP - - -
11-Sep-21 Night TA-7009 27,843.6 27,843.6 - Standby 15862 RUDY AMRIYADI - PIT 5 EXT - - -
11-Sep-21 Night TA-7010 25,172.3 25,172.3 - Standby 15861 AGUSTIAN - PIT 5 EXT - - -
11-Sep-21 Night TA-7022 - - - Unscheduled - WORKSHOP - - -
11-Sep-21 Night TA-7029 28,534.5 28,534.5 - Standby - PIT 5 EXT - - -
11-Sep-21 Night TA-7030 28,223.6 28,223.6 - Standby - PIT 5 EXT - - -
11-Sep-21 Night BD-4005 13,770.7 13,770.7 - Scheduled - WORKSHOP - - -
11-Sep-21 Night BD-5035 3,435.8 3,435.8 - Standby - PIT 5 - - -
11-Sep-21 Night BD-6025 2,751.8 2,751.8 - Standby 11169 ANNAS - KCP - - -
11-Sep-21 Night BD-6026 30,198.7 30,198.7 - Standby - WORKSHOP - - -
11-Sep-21 Night BD-6028 4,122.1 4,122.1 - Unscheduled - KCP - - -
11-Sep-21 Night BD-6036 34,166.6 34,166.6 - Standby 14710 AGUS S - KCP - - -
11-Sep-21 Night BD-6038 33,948.8 33,948.8 - Standby 15570 HENDRY S - KCP - - -
11-Sep-21 Night BD-6069 10,384.9 10,384.9 - Unscheduled - PIT 5 - - -
11-Sep-21 Night BD-7013 39,886.3 39,892.6 6.30 Front maintenance 10013 ADI SUSANTO - PIT 5 - - -
11-Sep-21 Night BD-7026 26,561.2 26,567.2 6.00 Front maintenance 9978 KARSIANTO - PIT 5 - - -
11-Sep-21 Night BD-7034 9,969.7 9,976.3 6.60 Disposal maintenance 15606 FATHUR - IPD 10 - - -
11-Sep-21 Night GR-2012 22,236.4 22,236.4 - Standby - WORKSHOP - - -
11-Sep-21 Night GR-3007 39,207.7 39,209.3 1.60 Road Maintenance Support 9103 WAWAN WIDODO - PIT 5 - - -
11-Sep-21 Night GR-3008 46,895.4 46,895.4 - Standby - PIT 5 - - -
11-Sep-21 Night TW-3001 8,514.0 8,514.0 - Standby 15743 LANA - PIT 5 - - -
11-Sep-21 Night TW-4001 18,756.0 18,756.00 - Standby - WORKSHOP - - -
11-Sep-21 Night PU-4002 19,064.0 19,069.0 5.00 Dewatering 10847 FAUZI AHMAD - PIT 11 - - -
11-Sep-21 Night PU-2026 6,188.5 6,188.5 - Standby - PIT 11 - - -
11-Sep-21 Night PU-3026 12,307.0 12,307.0 - Standby - ROM TEMPORARY - - -
11-Sep-21 Night PU-3015 1,696.0 1,696.0 - Standby - ROM TEMPORARY - - -
11-Sep-21 Night PU-3014 27,240.4 27,240.4 - Standby - ROM TEMPORARY - - -
11-Sep-21 Night LP-2165 13,530.0 13,539.0 9.00 Unit Rental 4671 NURUDIN - KCP - - -
11-Sep-21 Night LP-2166 13,023.0 13,023.0 - Standby 4671 NURUDIN - KCP - - -
11-Sep-21 Night LP-2167 13,985.0 13,995.0 10.00 Unit Rental 4671 NURUDIN - KCP - - -
11-Sep-21 Night LP-2168 12,811.0 12,811.0 - Standby 4671 NURUDIN - KCP - - -
11-Sep-21 Night LP-2169 12,540.0 12,540.0 - Standby 4671 NURUDIN - KCP - - -
11-Sep-21 Night TS-4007 - - - Standby - KCP - - -
11-Sep-21 Night TS-4017 16,126.0 16,126.0 - Standby 15310 ALDI ALFI SAPUTRA - KCP - - -
11-Sep-21 Night TF-4013 20,379.0 20,380.0 1.00 Unit Rental 15745 SURYANATA - KCP - - -
11-Sep-21 Night TF-4014 34,550.0 34,550.0 - Standby - KCP - - -
12-Sep-21 Day EX-2037 22,147.4 22,151.0 3.60 Evakuasi unit 15617 ZAENAL - PARKIRAN SCANIA - - -
12-Sep-21 Day EX-2058 17,511.3 17,517.0 5.70 Road Maintenance Support 15504 SLAMET WIDODO - PIT 5 EXT - 1,069 -
12-Sep-21 Day EX-2058 17,517.0 17,522.1 5.10 Drainage 15504 SLAMET WIDODO - PIT 5 EXT - 1,069 -
12-Sep-21 Day EX-4006 35,177.0 35,177.0 - Unscheduled - PARKIRAN SCANIA - 1,033 -
12-Sep-21 Day EX-5014 38,636.0 38,636.0 - Standby 15616 JOKO SUDIRO - KCP - - -
12-Sep-21 Day EX-5022 11,331.0 11,334.0 3.00 Loading Liquid Mud 15604 AHMAD SYAFI'I - Liquid Mud Outpit PIT 5 IPD 10 - 832 -
12-Sep-21 Day EX-5037 19,036.0 19,036.0 - Unscheduled - PARKIRAN SCANIA - 1,079 -
12-Sep-21 Day EX-6014 57,601.0 57,602.0 1.00 Loading Solid Mud 8952 DIDI SETIAWAN - Solid Mud Outpit PIT 5 EXT IPD 10 - - -
12-Sep-21 Day EX-6014 57,602.0 57,603.0 1.00 Moving - pindah lokasi kerja 8952 DIDI SETIAWAN - Outpit PIT 5 EXT - - -
12-Sep-21 Day EX-6016 44,206.0 44,206.0 - Standby 9136 AHMAD YANI - PIT 5 EXT - - -
12-Sep-21 Day EX-6022 18,551.4 18,554.0 2.60 Loading Solid Mud 15486 SUGENG PRAYETNO - Solid Mud Outpit PIT 5 EXT IPD 10 - - -
12-Sep-21 Day TR-3080 42,680.4 42,681.3 0.85 Hauling Solid Mud 10881 BURHANUDDIN 2 1 3 Solid Mud Outpit EX-6022 PIT 5 EXT IPD 10 34 101 - 34 -
12-Sep-21 Day TR-3080 42,681.3 42,682.1 0.85 Hauling Solid Mud 10881 BURHANUDDIN 3 3 Solid Mud Outpit EX-6014 PIT 5 EXT IPD 10 34 101 - 34 -
12-Sep-21 Day TR-3174 41,391.8 41,392.6 0.80 Hauling Solid Mud 11328 JUSESLAF BANJAR NAHOR 2 2 Solid Mud Outpit EX-6022 PIT 5 EXT IPD 10 34 67 - 34 -
12-Sep-21 Day TR-3175 38,783.8 38,785.4 1.60 Hauling Solid Mud 1354 SUDIYANTO 2 2 Solid Mud Outpit EX-6022 PIT 5 EXT IPD 10 34 67 - 34 -
12-Sep-21 Day TR-3195 24,658.5 24,659.5 1.00 Hauling Solid Mud 15229 ARDIANSYAH 2 2 Solid Mud Outpit EX-6022 PIT 5 EXT IPD 10 34 67 - 34 -
12-Sep-21 Day TR-3202 26,805.0 26,806.0 1.00 Hauling Solid Mud 10882 SABIRIN 3 2 5 Solid Mud Outpit EX-6022 PIT 5 EXT IPD 10 34 168 - 34 -
12-Sep-21 Day TR-3202 26,806.0 26,806.2 0.22 Hauling Solid Mud 10882 SABIRIN 1 1 Solid Mud Outpit EX-6014 PIT 5 EXT IPD 10 34 34 - 34 -
12-Sep-21 Day TR-3203 26,907.1 26,907.9 0.80 Hauling Liquid Mud 8892 BAGUS PURWONO 2 2 Liquid Mud Outpit EX-5022 PIT 5 IPD 10 21 42 - 21 -
12-Sep-21 Day TR-3204 26,222.1 26,222.3 0.20 Hauling Solid Mud 1303 EFENDI 1 1 Solid Mud Outpit EX-6022 PIT 5 EXT IPD 10 34 34 - 34 -
12-Sep-21 Day TR-3205 25,771.6 25,772.4 0.78 Hauling Solid Mud 7170F TRI PRASETIYO 1 2 3 Solid Mud Outpit EX-6022 PIT 5 EXT IPD 10 34 101 - 34 -
12-Sep-21 Day TR-3205 25,772.4 25,772.9 0.52 Hauling Solid Mud 7170F TRI PRASETIYO 2 2 Solid Mud Outpit EX-6014 PIT 5 EXT IPD 10 34 67 - 34 -
12-Sep-21 Day TR-3206 24,918.2 24,918.2 - Unscheduled - WORKSHOP - - -
12-Sep-21 Day TR-3220 25,947.4 25,948.4 1.00 Hauling Solid Mud 8965 HADI SUTIKNO 3 1 4 Solid Mud Outpit EX-6022 PIT 5 EXT IPD 10 34 134 - 34 -
12-Sep-21 Day TR-3220 25,948.4 25,948.9 0.50 Hauling Solid Mud 8965 HADI SUTIKNO 2 2 Solid Mud Outpit EX-6014 PIT 5 EXT IPD 10 34 67 - 34 -
12-Sep-21 Day TR-1024 31,335.8 31,335.8 - Unscheduled - WORKSHOP - - -
12-Sep-21 Day TR-1025 47,164.3 47,165.0 0.70 Hauling Liquid Mud 16024 QORI 3 3 Liquid Mud Outpit EX-5022 PIT 5 IPD 10 12 36 - 12 -
12-Sep-21 Day TR-1031 49,418.1 49,418.1 - Unscheduled 15485 ROBY TM - PIT 5 EXT - - -
12-Sep-21 Day TR-1032 51,177.4 51,177.7 0.31 Hauling Solid Mud 15468 PADLIANSYAH 1 1 Solid Mud Outpit EX-6014 PIT 5 EXT IPD 10 19 19 - 19 -
12-Sep-21 Day TR-1032 51,177.7 51,178.0 0.31 Hauling Solid Mud 15468 PADLIANSYAH 1 1 Solid Mud Outpit EX-6022 PIT 5 EXT IPD 10 19 19 - 19 -
12-Sep-21 Day TR-1032 51,178.0 51,179.6 1.57 Hauling Liquid Mud 15468 PADLIANSYAH 2 3 5 Liquid Mud Outpit EX-5022 PIT 5 IPD 10 12 60 - 12 -
12-Sep-21 Day TR-1033 51,608.8 51,609.5 0.67 Hauling Liquid Mud 15636 AKHMAD NOOR 2 2 Liquid Mud Outpit EX-5022 PIT 5 IPD 10 12 24 - 12 -
12-Sep-21 Day TR-1033 51,609.5 51,609.8 0.33 Hauling Solid Mud 15636 AKHMAD NOOR 1 1 Solid Mud Outpit EX-6022 PIT 5 EXT IPD 10 19 19 - 19 -
12-Sep-21 Day TR-1034 49,391.1 49,392.0 0.86 Hauling Solid Mud 15397 YUSUF 3 3 Solid Mud Outpit EX-6022 PIT 5 EXT IPD 10 19 58 - 19 -
12-Sep-21 Day TR-1034 49,392.0 49,393.1 1.14 Hauling Liquid Mud 15397 YUSUF 4 4 Liquid Mud Outpit EX-5022 PIT 5 IPD 10 12 48 - 12 -
12-Sep-21 Day TR-1036 50,647.0 50,648.0 0.95 Hauling Solid Mud 15398 SIGIT SUSANTO 3 3 Solid Mud Outpit EX-6022 PIT 5 EXT IPD 10 19 58 - 19 -
12-Sep-21 Day TR-1036 50,648.0 50,648.9 0.95 Hauling Liquid Mud 15398 SIGIT SUSANTO 3 3 Liquid Mud Outpit EX-5022 PIT 5 IPD 10 12 36 - 12 -
12-Sep-21 Day TR-1048 52,161.2 52,161.2 - Unscheduled 15420 M ABD MADI - PIT 5 IPD 10 - - -
12-Sep-21 Day TR-1049 46,061.9 46,063.0 1.10 Hauling Liquid Mud 15376 EKO FAJAR S 1 3 4 Liquid Mud Outpit EX-5022 PIT 5 IPD 10 12 48 - 12 -
12-Sep-21 Day TR-1049 46,063.0 46,064.1 1.10 Hauling Solid Mud 15376 EKO FAJAR S 1 3 4 Solid Mud Outpit EX-6022 PIT 5 EXT IPD 10 19 77 - 19 -
12-Sep-21 Day TR-1050 45,811.5 45,811.5 - Standby - WORKSHOP - - -
12-Sep-21 Day TA-7009 27,843.6 27,844.8 1.17 Hauling Liquid Mud 15818 AGUS SUGIANTO 2 3 5 Liquid Mud Outpit EX-5022 PIT 5 IPD 10 7 35 - 7 -
12-Sep-21 Day TA-7009 27,844.8 27,845.0 0.23 Hauling Solid Mud 15818 AGUS SUGIANTO 1 1 Solid Mud Outpit EX-6014 PIT 5 EXT IPD 10 11 11 - 11 -
12-Sep-21 Day TA-7010 25,172.3 25,175.3 3.02 Hauling Liquid Mud 15863 HENDRA M 2 4 1 7 Liquid Mud Outpit EX-5022 PIT 5 IPD 10 7 49 - 7 -
12-Sep-21 Day TA-7022 - - - Unscheduled - WORKSHOP - - -
12-Sep-21 Day TA-7029 28,534.5 28,534.5 - Standby 16026 BAHRUNI - PIT 5 EXT - - -
12-Sep-21 Day TA-7030 28,223.6 28,223.6 - Standby 15817 YUSANDI - PIT 5 EXT - - -
12-Sep-21 Day BD-4005 13,770.7 13,770.7 - Scheduled - WORKSHOP - - -
k 12-Sep-21 Day BD-5035 3,435.8 3,439.5 3.70 Front maintenance 14963 MAULANA ISHAK - PIT 5 EXT - - -
12-Sep-21 Day BD-6025 2,751.8 2,751.8 - Standby 14750 MUSTAKIM - KCP - - -
12-Sep-21 Day BD-6026 30,198.7 30,198.7 - Standby - WORKSHOP - - -
12-Sep-21 Day BD-6028 4,122.1 4,122.1 - Unscheduled - KCP - - -
12-Sep-21 Day BD-6036 34,166.6 34,166.6 - Standby 14964 JOKO P (Dozer) - KCP - - -
12-Sep-21 Day BD-6038 33,948.8 33,948.8 - Standby 15464 MARJUKI - KCP - - -
12-Sep-21 Day BD-6069 10,384.9 10,384.9 - Unscheduled - PIT 5 EXT - - -
12-Sep-21 Day BD-7013 39,892.6 39,898.2 5.60 Front maintenance 11676 SUDARSONO - PIT 5 EXT - - -
12-Sep-21 Day BD-7026 26,567.2 26,571.8 4.60 Front maintenance 15639 A. BUDIMAN - PIT 5 EXT - - -
12-Sep-21 Day BD-7034 9,976.3 9,985.2 8.90 Disposal maintenance 9492 MAHFUDI - IPD 10 - - -
12-Sep-21 Day GR-2012 22,246.8 22,249.6 2.80 Road Maintenance Support 12344 M FAJRI - PIT 5 EXT - - -
12-Sep-21 Day GR-3007 39,209.3 39,211.5 2.20 Road Maintenance Support 8925 AGUS SUNARWAN - PIT 5 EXT - - -
12-Sep-21 Day GR-3008 46,895.4 46,895.4 - Standby - WORKSHOP - - -
12-Sep-21 Day TW-3001 8,514.0 8,514.0 - Standby - PIT 5 EXT - - -
12-Sep-21 Day TW-4001 18,756.0 18,756.00 - Standby - WORKSHOP - - -
12-Sep-21 Day PU-4002 19,069.0 19,076.00 7.00 Dewatering 10914 SETYO BUDI UTOMO - PIT 11 - - -
12-Sep-21 Day PU-2026 6,188.5 6,188.5 - Standby 10914 SETYO BUDI UTOMO - PIT 11 - - -
12-Sep-21 Day PU-3026 12,307.0 12,307.00 - Standby - ROM TEMPORARY - - -
12-Sep-21 Day PU-3015 1,696.0 1,696.00 - Standby - ROM TEMPORARY - - -
12-Sep-21 Day PU-3014 27,240.4 27,240.40 - Standby - ROM TEMPORARY - - -
12-Sep-21 Day LP-2165 13,539.0 13,539.00 - Standby - KCP - - -
12-Sep-21 Day LP-2166 13,023.0 13,023.00 - Standby - KCP - - -
12-Sep-21 Day LP-2167 13,995.0 13,995.00 - Standby - KCP - - -
12-Sep-21 Day LP-2168 12,811.0 12,811.00 - Standby - KCP - - -
12-Sep-21 Day LP-2169 12,540.0 12,540.00 - Standby - KCP - - -
12-Sep-21 Day TS-4007 - - - Standby - KCP - - -
12-Sep-21 Day TS-4017 16,126.0 16,126.0 - Standby 13709 RISNO PATALLE - KCP - - -
12-Sep-21 Day TF-4013 20,380.0 20,380.0 - Standby 15746 SYARIFUDDI - KCP - - -
12-Sep-21 Day TF-4014 34,550.0 34,550.0 - Standby - KCP - - -
12-Sep-21 Night EX-2037 22,151.0 22,158.2 7.20 Side casting 11330 EKO PURWANTO - PIT 5 EXT - - -
12-Sep-21 Night EX-2037 22,158.2 22,160.2 2.00 Rehandling Coal 11330 EKO PURWANTO - PIT 5 EXT - - -
12-Sep-21 Night EX-2058 17,522.1 17,522.1 - Unscheduled - PIT 5 EXT - 1,069 -
12-Sep-21 Night EX-4006 35,177.0 35,177.0 - Unscheduled - PARKIRAN SCANIA - 1,033 -
12-Sep-21 Night EX-5014 38,636.0 38,636.0 - Standby 15345 SUTONO - KCP - - -
12-Sep-21 Night EX-5022 11,334.0 11,341.0 7.00 Hauling OB 12534 PUJIYANTO - OB Outpit PIT 5 IPD 10 - 832 -
12-Sep-21 Night EX-5037 19,036.0 19,036.0 - Unscheduled - PARKIRAN SCANIA - 1,079 -
12-Sep-21 Night EX-6014 57,603.0 57,608.0 5.00 Loading Waste 10917 SETA VERDY KARYA - OB Outpit PIT 5 EXT IPD 10 - - -
12-Sep-21 Night EX-6016 44,206.0 44,208.0 2.00 Loading Waste 15567 ARIF WAHYUDI - OB Outpit PIT 5 EXT IPD 10 - - -
12-Sep-21 Night EX-6016 44,208.0 44,209.0 1.00 Moving - pindah lokasi kerja 15567 ARIF WAHYUDI - PIT 5 EXT - - -
12-Sep-21 Night EX-6022 18,554.0 18,558.7 4.70 Loading Waste 11146 PURWANTO - OB Outpit PIT 5 EXT IPD 10 - - -
12-Sep-21 Night TR-3080 42,682.1 42,683.9 1.76 Hauling OB 9214 MUSTOFA ADI PRAYITNO 1 1 2 2 6 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 252 - 42 -
12-Sep-21 Night TR-3080 42,683.9 42,685.6 1.76 Hauling OB 9214 MUSTOFA ADI PRAYITNO 2 3 5 OB Outpit EX-6016 PIT 5 EXT IPD 10 42 210 - 42 -
12-Sep-21 Night TR-3080 42,685.6 42,685.9 0.29 Hauling OB 9214 MUSTOFA ADI PRAYITNO 1 1 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 42 - 42 -
12-Sep-21 Night TR-3080 42,685.9 42,686.5 0.59 Hauling OB 9214 MUSTOFA ADI PRAYITNO 2 2 OB Outpit EX-5022 PIT 5 IPD 10 42 84 - 42 -
12-Sep-21 Night TR-3174 41,392.6 41,394.6 1.96 Hauling OB 15349 ARDIANSYAH 2 3 2 7 OB Outpit EX-5022 PIT 5 IPD 10 42 294 - 42 -
12-Sep-21 Night TR-3174 41,394.6 41,395.1 0.56 Hauling OB 15349 ARDIANSYAH 2 2 OB Outpit EX-6016 PIT 5 EXT IPD 10 42 84 - 42 -
12-Sep-21 Night TR-3174 41,395.1 41,396.8 1.68 Hauling OB 15349 ARDIANSYAH 4 2 6 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 252 - 42 -
12-Sep-21 Night TR-3175 38,785.4 38,787.1 1.69 Hauling OB 9354 JIDIN 2 4 6 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 252 - 42 -
12-Sep-21 Night TR-3175 38,787.1 38,789.9 2.81 Hauling OB 9354 JIDIN 4 3 3 10 OB Outpit EX-5022 PIT 5 IPD 10 42 420 - 42 -
12-Sep-21 Night TR-3195 24,659.5 24,662.3 2.80 Hauling OB 10762 SYAMSUDDIN 2 2 3 1 2 10 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 420 - 42 -
12-Sep-21 Night TR-3195 24,662.3 24,662.6 0.30 Hauling OB 10762 SYAMSUDDIN 1 1 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 42 - 42 -
12-Sep-21 Night TR-3202 26,806.2 26,809.9 3.65 Hauling OB 11474 SARINDI 2 4 2 2 1 11 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 462 - 42 -
12-Sep-21 Night TR-3202 26,809.9 26,810.2 0.33 Hauling OB 11474 SARINDI 1 1 OB Outpit EX-6016 PIT 5 EXT IPD 10 42 42 - 42 -
12-Sep-21 Night TR-3202 26,810.2 26,811.2 1.00 Hauling OB 11474 SARINDI 2 1 3 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 126 - 42 -
12-Sep-21 Night TR-3203 26,907.9 26,911.4 3.50 Hauling OB 8920 VERRY EKO SETIAWAN 2 3 2 4 3 14 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 588 - 42 -
12-Sep-21 Night TR-3203 26,911.4 26,911.9 0.50 Hauling OB 8920 VERRY EKO SETIAWAN 2 2 OB Outpit EX-6016 PIT 5 EXT IPD 10 42 84 - 42 -
12-Sep-21 Night TR-3204 26,222.3 26,224.6 2.29 Hauling OB 3669 SUYANTO 1 2 1 2 1 7 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 294 - 42 -
12-Sep-21 Night TR-3204 26,224.6 26,225.9 1.31 Hauling OB 3669 SUYANTO 1 2 1 4 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 168 - 42 -
12-Sep-21 Night TR-3204 26,225.9 26,227.2 1.31 Hauling OB 3669 SUYANTO 2 3 5 OB Outpit EX-6016 PIT 5 EXT IPD 10 42 210 - 42 -
12-Sep-21 Night TR-3205 25,772.9 25,776.1 3.23 Hauling OB 10695 SUPIYANDI 2 3 4 3 12 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 504 - 42 -
12-Sep-21 Night TR-3205 25,776.1 25,777.2 1.08 Hauling OB 10695 SUPIYANDI 4 4 OB Outpit EX-6016 PIT 5 EXT IPD 10 42 168 - 42 -
12-Sep-21 Night TR-3206 24,918.2 24,918.2 - Unscheduled - WORKSHOP - - -
12-Sep-21 Night TR-3220 25,948.9 25,951.2 2.27 Hauling OB 10968 SUKIRNO 1 5 2 8 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 336 - 42 -
12-Sep-21 Night TR-3220 25,951.2 25,952.3 1.13 Hauling OB 10968 SUKIRNO 2 1 1 4 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 168 - 42 -
12-Sep-21 Night TR-1024 31,335.8 31,335.8 - Unscheduled - WORKSHOP - - -
12-Sep-21 Night TR-1025 47,165.0 47,170.3 5.30 Hauling OB 15350 HERMAN 1 3 2 1 4 4 3 18 OB Outpit EX-5022 PIT 5 IPD 10 24 432 - 2 24 48
12-Sep-21 Night TR-1031 49,418.1 49,418.1 - Unscheduled - PIT 5 EXT - - -
12-Sep-21 Night TR-1032 51,179.6 51,180.1 0.51 Hauling OB 15377 RIZALI RAHMAN 1 1 OB Outpit EX-6016 PIT 5 EXT IPD 10 24 24 - 24 -
12-Sep-21 Night TR-1033 51,609.8 51,612.5 2.70 Hauling OB 15470 IJAI 1 3 3 7 OB Outpit EX-5022 PIT 5 IPD 10 24 168 - 24 -
12-Sep-21 Night TR-1034 49,393.1 49,395.6 2.50 Hauling OB 15471 MULYADI 3 3 3 9 OB Outpit EX-5022 PIT 5 IPD 10 24 216 - 24 -
12-Sep-21 Night TR-1036 50,648.9 50,648.9 - Standby - PIT 5 EXT - - -
12-Sep-21 Night TR-1048 52,161.2 52,164.4 3.20 Hauling OB 15347 TAHMID 3 2 1 1 4 11 OB Outpit EX-5022 PIT 5 IPD 10 24 264 - 24 -
12-Sep-21 Night TR-1049 46,064.1 46,069.4 5.30 Hauling OB 15744 MARYANTO 2 3 2 4 3 4 3 21 OB Outpit EX-5022 PIT 5 IPD 10 24 504 - 24 -
12-Sep-21 Night TR-1050 45,811.5 45,811.5 - Standby - WORKSHOP - - -
12-Sep-21 Night TA-7009 27,845.0 27,845.4 0.43 Hauling OB 15862 RUDY AMRIYADI 2 2 OB Outpit EX-5022 PIT 5 IPD 10 14 28 - 14 -
12-Sep-21 Night TA-7009 27,845.4 27,846.5 1.07 Hauling OB 15862 RUDY AMRIYADI 2 3 5 COAL EX-2037 PIT 5 EXT 11 - - 11 -
12-Sep-21 Night TA-7010 25,175.3 25,175.8 0.54 Hauling OB 15861 AGUSTIAN 3 3 OB Outpit EX-5022 PIT 5 IPD 10 14 42 - 14 -
12-Sep-21 Night TA-7010 25,175.8 25,177.1 1.26 Rehandling Coal 15861 AGUSTIAN 1 6 7 COAL EX-2037 PIT 5 EXT 11 - - 11 -
12-Sep-21 Night TA-7022 - - - Unscheduled - WORKSHOP - - -
12-Sep-21 Night TA-7029 28,536.3 28,537.0 0.70 Hauling OB 15653 M. ILIAS 2 2 OB Outpit EX-5022 PIT 5 IPD 10 14 28 - 14 -
12-Sep-21 Night TA-7030 28,223.6 28,223.6 - Unscheduled - PIT 5 EXT - - -
12-Sep-21 Night BD-4005 13,770.7 13,770.7 - Scheduled - WORKSHOP - - -
12-Sep-21 Night BD-5035 3,439.5 3,439.5 - Standby - PIT 5 EXT - - -
12-Sep-21 Night BD-6025 2,751.8 2,752.4 0.60 Unit Rental 14744 NOORDIANTO - KCP - - -
12-Sep-21 Night BD-6026 30,198.7 30,198.7 - Standby - WORKSHOP - - -
12-Sep-21 Night BD-6028 4,122.1 4,122.1 - Unscheduled 11169 ANNAS - KCP - - -
12-Sep-21 Night BD-6036 34,166.6 34,167.1 0.50 Unit Rental 14710 AGUS S - KCP - - -
12-Sep-21 Night BD-6038 33,948.8 33,949.2 0.40 Unit Rental 15570 HENDRY S - KCP - - -
12-Sep-21 Night BD-6069 10,384.9 10,384.9 - Unscheduled - PIT 5 EXT - - -
12-Sep-21 Night BD-7013 39,898.2 39,906.6 8.40 Front maintenance - PIT 5 EXT - - -
12-Sep-21 Night BD-7026 26,571.8 26,579.8 8.00 Front maintenance 9978 KARSIANTO - PIT 5 EXT - - -
12-Sep-21 Night BD-7034 9,985.2 9,995.7 10.50 Disposal maintenance 15606 FATHUR - IPD 10 - - -
12-Sep-21 Night GR-2012 22,249.6 22,254.0 4.40 Road Maintenance Support - PIT 5 EXT - - -
12-Sep-21 Night GR-3007 39,211.5 39,218.7 7.20 Road Maintenance Support 9103 WAWAN WIDODO - PIT 5 EXT - - -
12-Sep-21 Night GR-3008 46,895.4 46,898.2 2.80 Road Maintenance Support 9426 ADE SUPIANA - PIT 5 EXT - - -
12-Sep-21 Night TW-3001 8,514.0 8,514.0 - Standby - PIT 5 EXT - - -
12-Sep-21 Night TW-4001 18,756.0 18,756.00 - Standby - WORKSHOP - - -
12-Sep-21 Night PU-4002 19,076.0 19,080.0 4.00 Dewatering Z7354 M. ALMA DENNY - PIT 11 - - -
12-Sep-21 Night PU-2026 6,188.5 6,188.5 - Standby - PIT 11 - - -
12-Sep-21 Night PU-3026 12,307.0 12,307.0 - Standby - ROM TEMPORARY - - -
12-Sep-21 Night PU-3015 1,696.0 1,696.0 - Standby - ROM TEMPORARY - - -
12-Sep-21 Night PU-3014 27,240.4 27,240.4 - Standby - ROM TEMPORARY - - -
12-Sep-21 Night LP-2165 13,539.0 13,539.0 - Standby 4671 NURUDIN - KCP - - -
12-Sep-21 Night LP-2166 13,023.0 13,023.0 - Standby 4671 NURUDIN - KCP - - -
12-Sep-21 Night LP-2167 13,995.0 14,004.0 9.00 Unit Rental 4671 NURUDIN - KCP - - -
12-Sep-21 Night LP-2168 12,811.0 12,811.0 - Standby 4671 NURUDIN - KCP - - -
12-Sep-21 Night LP-2169 12,540.0 12,540.0 - Standby 4671 NURUDIN - KCP - - -
12-Sep-21 Night TS-4007 - - - Standby - KCP - - -
12-Sep-21 Night TS-4017 16,126.0 16,127.0 1.00 Unit Rental 15310 ALDI ALFI SAPUTRA - KCP - - -
12-Sep-21 Night TF-4013 20,380.0 20,382.0 2.00 Unit Rental 15745 SURYANATA - KCP - - -
12-Sep-21 Night TF-4014 34,550.0 34,550.0 - Standby - KCP - - -
13-Sep-21 Day EX-2037 22,160.2 22,163.2 3.00 Coal/Ore - Cleaning 15504 SLAMET WIDODO - PIT 5 EXT - - -
13-Sep-21 Day EX-2037 22,163.2 22,165.2 2.00 Drainage 15504 SLAMET WIDODO - PIT 5 EXT - - -
13-Sep-21 Day EX-2037 22,165.2 22,169.9 4.70 Road Maintenance Support 15504 SLAMET WIDODO - PIT 5 EXT - - -
13-Sep-21 Day EX-2058 17,522.1 17,522.1 - Unscheduled - ROM TEMPORARY - 915 -
13-Sep-21 Day EX-4006 35,177.0 35,177.0 - Unscheduled - PARKIRAN SCANIA - 975 -
13-Sep-21 Day EX-5014 38,636.0 38,636.0 - Standby 15616 JOKO SUDIRO - KCP - - -
13-Sep-21 Day EX-5022 11,341.0 11,352.0 11.00 Loading Waste 15604 AHMAD SYAFI'I - OB Outpit PIT 5 EXT IPD 10 - 966 -
13-Sep-21 Day EX-5037 19,036.0 19,036.0 - Unscheduled - PARKIRAN SCANIA - 984 -
13-Sep-21 Day EX-6014 57,608.0 57,618.0 10.00 Loading Waste 8952 DIDI SETIAWAN - OB Outpit PIT 5 EXT IPD 10 - - -
13-Sep-21 Day EX-6016 44,209.0 44,218.0 9.00 Loading Waste 9136 AHMAD YANI - OB Outpit PIT 5 EXT IPD 10 - - -
13-Sep-21 Day EX-6022 18,558.7 18,567.1 8.40 Loading Waste 15486 SUGENG PRAYETNO - OB Outpit PIT 5 EXT IPD 10 - - -
13-Sep-21 Day TR-3080 42,686.5 42,693.0 6.48 Hauling OB 10881 BURHANUDDIN 2 1 2 2 2 3 4 1 1 2 3 23 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 966 - 42 -
13-Sep-21 Day TR-3080 42,693.0 42,695.0 1.97 Hauling OB 10881 BURHANUDDIN 1 1 1 2 2 7 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 294 - 42 -
13-Sep-21 Day TR-3080 42,695.0 42,695.8 0.85 Hauling OB 10881 BURHANUDDIN 2 1 3 OB Outpit EX-6016 PIT 5 EXT IPD 10 42 126 - 42 -
13-Sep-21 Day TR-3174 41,396.8 41,402.0 5.15 Hauling OB 11328 JUSESLAF BANJAR NAHOR 3 1 1 4 4 3 3 19 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 798 - 42 -
13-Sep-21 Day TR-3174 41,402.0 41,403.9 1.90 Hauling OB 11328 JUSESLAF BANJAR NAHOR 2 2 1 1 1 7 OB Outpit EX-6016 PIT 5 EXT IPD 10 42 294 - 42 -
13-Sep-21 Day TR-3174 41,403.9 41,405.2 1.35 Hauling OB 11328 JUSESLAF BANJAR NAHOR 1 1 3 5 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 210 - 42 -
13-Sep-21 Day TR-3175 38,789.9 38,790.8 0.85 Hauling OB 8958 MUKHROMIN 1 2 3 OB Outpit EX-5022 PIT 5 EXT IPD 10 42 126 - 42 -
13-Sep-21 Day TR-3175 38,790.8 38,793.3 2.55 Hauling OB 8958 MUKHROMIN 1 1 2 1 1 2 1 9 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 378 - 42 -
13-Sep-21 Day TR-3175 38,793.3 38,795.0 1.70 Hauling OB 8958 MUKHROMIN 1 1 2 1 1 6 OB Outpit EX-6016 PIT 5 EXT IPD 10 42 252 - 42 -
13-Sep-21 Day TR-3175 38,795.0 38,798.4 3.40 Hauling OB 8958 MUKHROMIN 2 1 1 3 2 1 2 12 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 504 - 42 -
13-Sep-21 Day TR-3195 24,662.6 24,664.0 1.38 Hauling OB 15229 ARDIANSYAH 1 2 2 5 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 210 - 42 -
13-Sep-21 Day TR-3195 24,664.0 24,668.4 4.42 Hauling OB 15229 ARDIANSYAH 1 2 3 3 5 2 16 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 672 - 42 -
13-Sep-21 Day TR-3195 24,668.4 24,669.5 1.10 Hauling OB 15229 ARDIANSYAH 2 2 4 OB Outpit EX-6016 PIT 5 EXT IPD 10 42 168 - 42 -
13-Sep-21 Day TR-3202 26,811.2 26,816.1 4.94 Hauling OB 15230 MARGONO 2 2 2 2 3 4 2 2 19 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 798 - 42 -
13-Sep-21 Day TR-3202 26,816.1 26,817.2 1.04 Hauling OB 15230 MARGONO 1 1 2 4 OB Outpit EX-6016 PIT 5 EXT IPD 10 42 168 - 42 -
13-Sep-21 Day TR-3202 26,817.2 26,818.7 1.56 Hauling OB 15230 MARGONO 1 1 2 2 6 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 252 - 42 -
13-Sep-21 Day TR-3202 26,818.7 26,819.0 0.26 Hauling OB 15230 MARGONO 1 1 OB Outpit EX-5022 PIT 5 EXT IPD 10 42 42 - 42 -
13-Sep-21 Day TR-3203 26,911.9 26,916.8 4.93 Hauling OB 8892 BAGUS PURWONO 2 2 2 3 3 4 2 1 19 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 798 - 1 42 42
13-Sep-21 Day TR-3203 26,916.8 26,921.0 4.15 Hauling OB 8892 BAGUS PURWONO 1 2 1 1 4 1 1 3 2 16 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 672 - 42 -
13-Sep-21 Day TR-3203 26,921.0 26,921.5 0.52 Hauling OB 8892 BAGUS PURWONO 1 1 2 OB Outpit EX-6016 PIT 5 EXT IPD 10 42 84 - 42 -
13-Sep-21 Day TR-3204 26,227.2 26,232.2 4.96 Hauling OB 10969 JOKO PRIONO 1 1 2 1 3 4 3 1 1 2 19 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 798 - 42 -
13-Sep-21 Day TR-3204 26,232.2 26,236.1 3.91 Hauling OB 10969 JOKO PRIONO 1 2 1 3 1 3 2 2 15 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 630 - 42 -
13-Sep-21 Day TR-3204 26,236.1 26,236.6 0.52 Hauling OB 10969 JOKO PRIONO 2 2 OB Outpit EX-6016 PIT 5 EXT IPD 10 42 84 - 42 -
13-Sep-21 Day TR-3205 25,777.2 25,782.9 5.69 Hauling OB 10882 SABIRIN 2 3 2 2 1 4 4 4 22 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 924 - 42 -
13-Sep-21 Day TR-3205 25,782.9 25,786.0 3.10 Hauling OB 10882 SABIRIN 2 1 1 2 3 3 12 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 504 - 42 -
13-Sep-21 Day TR-3206 24,918.2 24,918.2 - Scheduled - WORKSHOP - - -
13-Sep-21 Day TR-3220 25,952.3 25,956.2 3.87 Hauling OB 8965 HADI SUTIKNO 2 1 2 2 3 3 1 1 15 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 630 - 42 -
13-Sep-21 Day TR-3220 25,956.2 25,956.4 0.26 Hauling OB 8965 HADI SUTIKNO 1 1 OB Outpit EX-6016 PIT 5 EXT IPD 10 42 42 - 42 -
13-Sep-21 Day TR-3220 25,956.4 25,960.3 3.87 Hauling OB 8965 HADI SUTIKNO 1 1 3 2 2 3 3 15 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 630 - 42 -
13-Sep-21 Day TR-1024 31,335.8 31,335.8 - Unscheduled - WORKSHOP - - -
13-Sep-21 Day TR-1025 47,170.3 47,172.5 2.17 Hauling OB 16025 IMTIKAN 1 3 4 2 10 OB Outpit EX-5022 PIT 5 EXT IPD 10 24 240 - 24 -
13-Sep-21 Day TR-1025 47,172.5 47,179.4 6.93 Hauling OB 16025 IMTIKAN 2 1 5 6 5 5 4 4 32 OB Outpit EX-6016 PIT 5 EXT IPD 10 24 768 - 24 -
13-Sep-21 Day TR-1031 49,418.1 49,418.1 - Unscheduled 15485 ROBY TM - WORKSHOP - - -
13-Sep-21 Day TR-1032 51,180.1 51,180.8 0.73 Hauling OB 15468 PADLIANSYAH 1 2 3 OB Outpit EX-5022 PIT 5 EXT IPD 10 24 72 - 4 24 96
13-Sep-21 Day TR-1032 51,180.8 51,182.8 1.95 Hauling OB 15468 PADLIANSYAH 1 3 4 8 OB Outpit EX-6016 PIT 5 EXT IPD 10 24 192 - 24 -
13-Sep-21 Day TR-1032 51,182.8 51,187.7 4.88 Hauling OB 15636 AKHMAD NOOR 2 5 4 4 5 20 OB Outpit EX-6016 PIT 5 EXT IPD 10 24 480 - 24 -
13-Sep-21 Day TR-1032 51,187.7 51,188.4 0.73 Hauling OB 15636 AKHMAD NOOR 3 3 OB Outpit EX-5022 PIT 5 EXT IPD 10 24 72 - 24 -
13-Sep-21 Day TR-1033 51,612.5 51,615.5 2.95 Hauling OB 16024 QORI 2 3 4 2 2 13 OB Outpit EX-5022 PIT 5 EXT IPD 10 24 312 - 2 24 48
13-Sep-21 Day TR-1033 51,615.5 51,620.0 4.55 Hauling OB 16024 QORI 2 1 5 3 5 3 1 20 OB Outpit EX-6016 PIT 5 EXT IPD 10 24 480 - 1 24 24
13-Sep-21 Day TR-1034 49,395.6 49,395.6 - Unscheduled - WORKSHOP - - -
13-Sep-21 Day TR-1036 50,648.9 50,651.6 2.74 Hauling OB 15955 RIZKY IHWAN 1 3 4 3 11 OB Outpit EX-5022 PIT 5 EXT IPD 10 24 264 - 24 -
13-Sep-21 Day TR-1036 50,651.6 50,659.6 7.96 Hauling OB 15955 RIZKY IHWAN 1 3 4 6 4 5 4 5 32 OB Outpit EX-6016 PIT 5 EXT IPD 10 24 768 - 24 -
13-Sep-21 Day TR-1048 52,164.4 52,165.2 0.80 Hauling OB 15420 M ABD MADI 2 1 3 OB Outpit EX-5022 PIT 5 EXT IPD 10 24 72 - 24 -
13-Sep-21 Day TR-1049 46,069.4 46,072.3 2.93 Hauling OB 15376 EKO FAJAR S 1 3 4 1 4 1 14 OB Outpit EX-5022 PIT 5 EXT IPD 10 24 336 - 24 -
13-Sep-21 Day TR-1049 46,072.3 46,074.0 1.67 Hauling OB 15376 EKO FAJAR S 2 6 8 OB Outpit EX-6016 PIT 5 EXT IPD 10 24 192 - 24 -
13-Sep-21 Day TR-1049 46,074.0 46,076.5 2.51 Hauling OB 15576 JOKO SANTOSO 2 2 5 3 12 OB Outpit EX-5022 PIT 5 EXT IPD 10 24 288 - 24 -
13-Sep-21 Day TR-1049 46,076.5 46,078.6 2.09 Hauling OB 15576 JOKO SANTOSO 3 3 4 10 OB Outpit EX-6016 PIT 5 EXT IPD 10 24 240 - 24 -
13-Sep-21 Day TR-1050 45,813.0 45,816.0 2.96 Unscheduled 1 1 3 4 3 12 OB Outpit EX-6016 PIT 5 EXT IPD 10 24 288 - 24 -
13-Sep-21 Day TR-1050 45,816.0 45,816.7 0.74 Unscheduled 1 2 3 OB Outpit EX-5022 PIT 5 EXT IPD 10 24 72 - 24 -
13-Sep-21 Day TA-7009 27,846.5 27,852.5 6.00 Hauling OB 16026 BAHRUNI 2 5 5 5 5 5 1 28 OB Outpit EX-5022 PIT 5 EXT IPD 10 14 392 - 14 -
13-Sep-21 Day TA-7010 25,177.1 25,184.4 7.30 Hauling OB 15863 HENDRA M 2 6 4 4 4 5 3 4 32 OB Outpit EX-5022 PIT 5 EXT IPD 10 14 448 - 2 14 28
13-Sep-21 Day TA-7022 - - - Unscheduled - - - -
13-Sep-21 Day TA-7029 28,537.0 28,544.2 7.20 Hauling OB 15819 AHNIANSYAH 3 5 5 4 6 5 2 4 34 OB Outpit EX-5022 PIT 5 EXT IPD 10 14 476 - 14 -
13-Sep-21 Day TA-7030 28,223.6 28,223.6 - Unscheduled - IPD 10 - - -
13-Sep-21 Day BD-4005 13,770.7 13,770.7 - Scheduled - WORKSHOP - - -
k 13-Sep-21 Day BD-5035 3,439.5 3,444.6 5.10 Front maintenance 15747 MUSTAQIM D6 - PIT 5 EXT - - -
13-Sep-21 Day BD-6025 2,752.5 2,755.9 3.40 Unit Rental 14750 MUSTAKIM - KCP - - -
13-Sep-21 Day BD-6026 30,198.7 30,198.7 - Standby - WORKSHOP - - -
13-Sep-21 Day BD-6028 4,122.1 4,122.1 - Unscheduled - KCP - - -
13-Sep-21 Day BD-6036 34,167.1 34,174.1 7.00 Unit Rental 14964 JOKO P (Dozer) - KCP - - -
13-Sep-21 Day BD-6038 33,949.2 33,954.1 4.90 Unit Rental 14708 ADEFI P - KCP - - -
13-Sep-21 Day BD-6069 10,393.0 10,395.6 2.60 Front maintenance 15747 MUSTAQIM D6 - PIT 5 EXT - - -
13-Sep-21 Day BD-7013 39,906.6 39,917.0 10.40 Front maintenance 11676 SUDARSONO - PIT 5 EXT - - -
13-Sep-21 Day BD-7026 26,579.8 26,585.8 6.00 Disposal maintenance 15639 A. BUDIMAN - IPD 10 - - -
13-Sep-21 Day BD-7034 9,995.7 10,005.6 9.90 Disposal maintenance 9492 MAHFUDI - IPD 10 - - -
13-Sep-21 Day GR-2012 22,254.0 22,264.2 10.20 Road Maintenance Support 12344 M FAJRI - PIT 5 EXT - - -
13-Sep-21 Day GR-3007 39,218.7 39,226.4 7.70 Road Maintenance Support 8925 AGUS SUNARWAN - PIT 5 EXT - - -
13-Sep-21 Day GR-3008 46,898.2 46,898.2 - Standby - WORKSHOP - - -
13-Sep-21 Day TW-3001 8,514.0 8,518.0 4.00 Road Maintenance Support 15106 AHMAD NURANI - PIT 5 EXT - - -
13-Sep-21 Day TW-4001 18,756.0 18,756.00 - Standby - WORKSHOP - - -
13-Sep-21 Day PU-4002 19,080.0 19,080.00 - Unscheduled - PIT 11 - - -
13-Sep-21 Day PU-2026 6,188.5 6,189.0 0.50 Dewatering Z7354 M. ALMA DENNY - PIT 11 - - -
13-Sep-21 Day PU-3026 12,307.0 12,307.00 - Standby - ROM TEMPORARY - - -
13-Sep-21 Day PU-3015 1,696.0 1,696.00 - Standby - ROM TEMPORARY - - -
13-Sep-21 Day PU-3014 27,240.4 27,240.40 - Standby - ROM TEMPORARY - - -
13-Sep-21 Day LP-2165 13,539.0 13,539.00 - Standby - KCP - - -
13-Sep-21 Day LP-2166 13,023.0 13,023.00 - Standby - KCP - - -
13-Sep-21 Day LP-2167 14,004.0 14,004.00 - Standby - KCP - - -
13-Sep-21 Day LP-2168 12,811.0 12,811.00 - Standby - KCP - - -
13-Sep-21 Day LP-2169 12,540.0 12,540.00 - Standby - KCP - - -
13-Sep-21 Day TS-4007 - - - Standby - KCP - - -
13-Sep-21 Day TS-4017 16,127.0 16,129.0 2.00 Unit Rental 13708 AHMAD SALIM - KCP - - -
13-Sep-21 Day TF-4013 20,382.0 20,384.0 2.00 Unit Rental 15746 SYARIFUDDI - KCP - - -
13-Sep-21 Day TF-4014 34,550.0 34,550.0 - Standby - KCP - - -
13-Sep-21 Night EX-2037 22,169.9 22,180.0 10.10 Side casting 11330 EKO PURWANTO - PIT 5 EXT - - -
13-Sep-21 Night EX-2058 17,522.1 17,522.1 - Unscheduled - PIT 5 EXT - 915 -
13-Sep-21 Night EX-4006 35,177.0 35,177.0 - Unscheduled - PARKIRAN SCANIA - 975 -
13-Sep-21 Night EX-5014 38,636.0 38,639.0 3.00 Unit Rental - KCP - - -
13-Sep-21 Night EX-5022 11,352.0 11,356.0 4.00 Loading Waste 9590F SIRATAL RAYYAN - OB Outpit PIT 5 EXT IPD 10 - 966 -
13-Sep-21 Night EX-5037 19,036.0 19,036.0 - Unscheduled - PARKIRAN SCANIA - 984 -
13-Sep-21 Night EX-6014 57,618.0 57,629.0 11.00 Loading Waste 10917 SETA VERDY KARYA - OB Outpit PIT 5 EXT IPD 10 - - -
13-Sep-21 Night EX-6016 44,218.0 44,229.0 11.00 Loading Waste 15568 FUAD EFENDI - OB Outpit PIT 5 EXT IPD 10 - - -
13-Sep-21 Night EX-6022 18,567.1 18,575.2 8.10 Loading Waste 11146 PURWANTO - OB Outpit PIT 5 EXT IPD 10 - - -
13-Sep-21 Night TR-3080 42,695.8 42,706.1 10.30 Hauling OB 9214 MUSTOFA ADI PRAYITNO 3 4 4 5 3 5 5 5 4 4 4 46 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 1,932 - 42 -
13-Sep-21 Night TR-3174 41,405.2 41,414.0 8.84 Hauling OB 1354 SUDIYANTO 2 4 3 5 5 5 3 4 3 34 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 1,428 - 42 -
13-Sep-21 Night TR-3174 41,414.0 41,415.6 1.56 Hauling OB 1354 SUDIYANTO 3 3 6 OB Outpit EX-6016 PIT 5 EXT IPD 10 42 252 - 42 -
13-Sep-21 Night TR-3175 38,798.4 38,803.3 4.94 Hauling OB 9354 JIDIN 4 3 5 4 4 20 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 840 - 42 -
13-Sep-21 Night TR-3175 38,803.3 38,807.3 3.96 Hauling OB 9354 JIDIN 4 3 4 1 1 3 16 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 672 - 42 -
13-Sep-21 Night TR-3195 24,669.5 24,669.5 - Unscheduled - PIT 5 EXT - - -
13-Sep-21 Night TR-3202 26,819.0 26,822.4 3.43 Hauling OB 11474 SARINDI 3 3 4 3 13 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 546 - 42 -
13-Sep-21 Night TR-3202 26,822.4 26,824.8 2.37 Hauling OB 11474 SARINDI 2 4 3 9 OB Outpit EX-6016 PIT 5 EXT IPD 10 42 378 - 42 -
13-Sep-21 Night TR-3203 26,921.5 26,929.0 7.52 Hauling OB 8920 VERRY EKO SETIAWAN 3 4 4 5 5 4 4 2 31 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 1,302 - 42 -
13-Sep-21 Night TR-3203 26,929.0 26,931.2 2.18 Hauling OB 8920 VERRY EKO SETIAWAN 2 3 4 9 OB Outpit EX-6016 PIT 5 EXT IPD 10 42 378 - 42 -
13-Sep-21 Night TR-3204 26,236.6 26,246.0 9.40 Hauling OB 1303 EFENDI 2 3 4 4 5 4 3 4 4 4 3 40 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 1,680 - 42 -
13-Sep-21 Night TR-3205 25,786.0 25,794.4 8.42 Hauling OB 7170F TRI PRASETIYO 3 5 4 5 4 3 2 4 3 33 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 1,386 - 42 -
13-Sep-21 Night TR-3205 25,794.4 25,796.2 1.79 Hauling OB 7170F TRI PRASETIYO 1 3 3 7 OB Outpit EX-6016 PIT 5 EXT IPD 10 42 294 - 42 -
13-Sep-21 Night TR-3206 24,918.2 24,918.2 - Scheduled - WORKSHOP - - -
13-Sep-21 Night TR-3220 25,960.3 25,969.5 9.20 Hauling OB 3669 SUYANTO 3 1 3 5 5 4 5 4 4 5 2 41 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 1,722 - 42 -
13-Sep-21 Night TR-3220 25,969.5 25,970.4 0.90 Hauling OB 3669 SUYANTO 3 3 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 126 - 42 -
13-Sep-21 Night TR-1024 31,335.8 31,335.8 - Unscheduled - WORKSHOP - - -
13-Sep-21 Night TR-1025 47,179.4 47,185.5 6.13 Hauling OB 15466 SUPRIYANTO 1 3 5 4 5 1 4 4 27 OB Outpit EX-6016 PIT 5 EXT IPD 10 24 648 - 24 -
13-Sep-21 Night TR-1025 47,185.5 47,186.7 1.14 Hauling OB 15466 SUPRIYANTO 1 4 5 OB Outpit EX-6014 PIT 5 EXT IPD 10 24 120 - 24 -
13-Sep-21 Night TR-1025 47,186.7 47,187.8 1.14 Hauling OB 15466 SUPRIYANTO 2 3 5 OB Outpit EX-5022 PIT 5 EXT IPD 10 24 120 - 24 -
13-Sep-21 Night TR-1031 49,418.1 49,418.1 - Unscheduled - WORKSHOP - - -
13-Sep-21 Night TR-1032 51,188.4 51,193.5 5.11 Hauling OB 15377 RIZALI RAHMAN 4 5 2 4 4 5 24 OB Outpit EX-6016 PIT 5 EXT IPD 10 24 576 - 24 -
13-Sep-21 Night TR-1032 51,193.5 51,193.9 0.43 Hauling OB 15377 RIZALI RAHMAN 2 2 OB Outpit EX-6014 PIT 5 EXT IPD 10 24 48 - 24 -
13-Sep-21 Night TR-1032 51,193.9 51,195.6 1.70 Hauling OB 15397 YUSUF 3 4 7 OB Outpit EX-5022 PIT 5 EXT IPD 10 24 168 - 24 -
13-Sep-21 Night TR-1032 51,195.6 51,196.9 1.28 Hauling OB 15397 YUSUF 3 3 6 OB Outpit EX-6016 PIT 5 EXT IPD 10 24 144 - 24 -
13-Sep-21 Night TR-1033 51,620.0 51,624.3 4.25 Hauling OB 15470 IJAI 1 5 1 5 3 15 OB Outpit EX-6016 PIT 5 EXT IPD 10 24 360 - 24 -
13-Sep-21 Night TR-1033 51,624.3 51,624.5 0.28 Hauling OB 15470 IJAI 2 2 OB Outpit EX-5022 PIT 5 EXT IPD 10 24 48 - 24 -
13-Sep-21 Night TR-1033 51,624.5 51,625.1 0.57 Hauling OB 15470 IJAI 2 2 OB Outpit EX-6014 PIT 5 EXT IPD 10 24 48 - 24 -
13-Sep-21 Night TR-1034 49,395.6 49,395.6 - Unscheduled - WORKSHOP - - -
13-Sep-21 Night TR-1036 50,659.6 50,666.5 6.90 Hauling OB 15346 MUSA 4 5 2 5 4 3 1 4 3 31 OB Outpit EX-6016 PIT 5 EXT IPD 10 24 744 - 24 -
13-Sep-21 Night TR-1036 50,666.5 50,666.7 0.22 Hauling OB 15346 MUSA 1 1 OB Outpit EX-6022 PIT 5 EXT IPD 10 24 24 - 24 -
13-Sep-21 Night TR-1036 50,666.7 50,667.2 0.45 Hauling OB 15346 MUSA 1 1 2 OB Outpit EX-6014 PIT 5 EXT IPD 10 24 48 - 24 -
13-Sep-21 Night TR-1036 50,667.2 50,668.5 1.34 Hauling OB 15346 MUSA 2 4 6 OB Outpit EX-5022 PIT 5 EXT IPD 10 24 144 - 24 -
13-Sep-21 Night TR-1048 52,165.2 52,165.2 - Unscheduled - IPD 10 - - -
13-Sep-21 Night TR-1049 46,078.6 46,084.9 6.31 Hauling OB 15744 MARYANTO 4 5 5 5 4 5 2 30 OB Outpit EX-6016 PIT 5 EXT IPD 10 24 720 - 24 -
13-Sep-21 Night TR-1049 46,084.9 46,086.2 1.26 Hauling OB 15744 MARYANTO 2 4 6 OB Outpit EX-6014 PIT 5 EXT IPD 10 24 144 - 24 -
13-Sep-21 Night TR-1049 46,086.2 46,086.8 0.63 Hauling OB 15744 MARYANTO 3 3 OB Outpit EX-5022 PIT 5 EXT IPD 10 24 72 - 24 -
13-Sep-21 Night TR-1050 45,816.7 45,823.7 6.97 Hauling OB 15471 MULYADI 3 6 2 4 5 5 1 1 5 32 OB Outpit EX-6016 PIT 5 EXT IPD 10 24 768 - 24 -
13-Sep-21 Night TR-1050 45,823.7 45,825.2 1.53 Hauling OB 15471 MULYADI 4 3 7 OB Outpit EX-5022 PIT 5 EXT IPD 10 24 168 - 24 -
13-Sep-21 Night TA-7009 27,852.5 27,854.8 2.30 Hauling OB 15818 AGUS SUGIANTO 1 7 3 11 OB Outpit EX-5022 PIT 5 EXT IPD 10 14 154 - 14 -
13-Sep-21 Night TA-7010 25,184.4 25,186.8 2.40 Hauling OB 15861 AGUSTIAN 2 6 3 11 OB Outpit EX-5022 PIT 5 EXT IPD 10 14 154 - 14 -
13-Sep-21 Night TA-7022 - - - Unscheduled - WORKSHOP - - -
13-Sep-21 Night TA-7029 28,544.2 28,546.6 2.40 Hauling OB 15653 M. ILIAS 1 7 3 11 OB Outpit EX-5022 PIT 5 EXT IPD 10 14 154 - 14 -
13-Sep-21 Night TA-7030 28,225.5 28,226.5 1.00 Hauling OB 15816 M. YUSUF 1 4 5 OB Outpit EX-5022 PIT 5 EXT IPD 10 14 70 - 14 -
13-Sep-21 Night BD-4005 13,770.7 13,770.7 - Scheduled - WORKSHOP - - -
13-Sep-21 Night BD-5035 3,444.6 3,454.6 10.00 Front maintenance 14963 MAULANA ISHAK - PIT 5 EXT - - -
13-Sep-21 Night BD-6025 2,755.9 2,758.1 2.20 Unit Rental 11169 ANNAS - KCP - - -
13-Sep-21 Night BD-6026 30,198.7 30,198.7 - Standby - WORKSHOP - - -
13-Sep-21 Night BD-6028 4,122.1 4,122.1 - Unscheduled - KCP - - -
13-Sep-21 Night BD-6036 34,174.2 34,178.1 3.90 Unit Rental 14710 AGUS S - KCP - - -
13-Sep-21 Night BD-6038 33,954.1 33,964.2 10.10 Unit Rental 15570 HENDRY S - KCP - - -
13-Sep-21 Night BD-6069 10,395.6 10,395.6 - Unscheduled - PIT 5 EXT - - -
13-Sep-21 Night BD-7013 39,917.0 39,927.9 10.90 Front maintenance 10013 ADI SUSANTO - PIT 5 EXT - - -
13-Sep-21 Night BD-7026 26,585.8 26,585.8 - Unscheduled - WORKSHOP - - -
13-Sep-21 Night BD-7034 10,005.6 10,017.0 11.40 Disposal maintenance 8157 SAMIDI - IPD 10 - - -
13-Sep-21 Night GR-2012 22,264.2 22,270.7 6.50 Road Maintenance Support 15571 YOHANIS L - PIT 5 EXT - - -
13-Sep-21 Night GR-3007 39,226.4 39,232.3 5.90 Road Maintenance Support 9426 ADE SUPIANA - PIT 5 EXT - - -
13-Sep-21 Night GR-3008 46,898.2 46,898.2 - Unscheduled - WORKSHOP - - -
13-Sep-21 Night TW-3001 8,518.0 8,520.0 2.00 Road Maintenance Support 15743 LANA - PIT 5 EXT - - -
13-Sep-21 Night TW-4001 18,756.0 18,756.00 - Standby - WORKSHOP - - -
13-Sep-21 Night PU-4002 19,080.0 19,080.0 - Unscheduled - PIT 11 - - -
13-Sep-21 Night PU-2026 6,189.0 6,189.5 0.50 Dewatering 10847 FAUZI AHMAD - PIT 11 - - -
13-Sep-21 Night PU-3026 12,307.0 12,307.0 - Standby - ROM TEMPORARY - - -
13-Sep-21 Night PU-3015 1,696.0 1,696.0 - Standby - ROM TEMPORARY - - -
13-Sep-21 Night PU-3014 27,240.4 27,240.4 - Standby - ROM TEMPORARY - - -
13-Sep-21 Night LP-2165 13,539.0 13,551.0 12.00 Unit Rental 4671 NURUDIN - KCP - - -
13-Sep-21 Night LP-2166 13,023.0 13,034.0 11.00 Unit Rental 4671 NURUDIN - KCP - - -
13-Sep-21 Night LP-2167 14,004.0 14,014.0 10.00 Unit Rental 4671 NURUDIN - KCP - - -
13-Sep-21 Night LP-2168 12,811.0 12,822.0 11.00 Unit Rental 4671 NURUDIN - KCP - - -
13-Sep-21 Night LP-2169 12,540.0 12,552.0 12.00 Unit Rental 4671 NURUDIN - KCP - - -
13-Sep-21 Night TS-4007 - - - Standby - KCP - - -
13-Sep-21 Night TS-4017 16,129.0 16,137.0 8.00 Unit Rental 15310 ALDI ALFI SAPUTRA - KCP - - -
13-Sep-21 Night TF-4013 20,384.0 20,393.0 9.00 Unit Rental 15745 SURYANATA - KCP - - -
13-Sep-21 Night TF-4014 34,550.0 34,550.0 - Standby - KCP - - -
14-Sep-21 Day EX-2037 22,180.0 22,190.6 10.60 Side casting 15504 SLAMET WIDODO - PIT 5 EXT - - -
14-Sep-21 Day EX-2058 17,522.1 17,523.9 1.80 Moving - pindah lokasi kerja 15604 AHMAD SYAFI'I - PIT 5 EXT - 963 -
14-Sep-21 Day EX-2058 17,523.9 17,531.0 7.10 Road Maintenance Support 15604 AHMAD SYAFI'I - JALAN SAKA - 963 -
14-Sep-21 Day EX-4006 35,190.0 35,191.0 1.00 Moving - pindah lokasi kerja 15617 ZAENAL - PARKIRAN SCANIA - 959 -
14-Sep-21 Day EX-4006 35,191.0 35,198.0 7.00 Loading Solid Mud 15617 ZAENAL - Solid Mud Outpit PIT 5 EXT IPD 11 - 959 -
14-Sep-21 Day EX-5014 38,639.0 38,647.0 8.00 Unit Rental 15616 JOKO SUDIRO - KCP - - -
14-Sep-21 Day EX-5022 11,356.0 11,359.0 3.00 Loading Solid Mud 12534 PUJIYANTO - Solid Mud Outpit PIT 5 EXT IPD 10 - 960 -
14-Sep-21 Day EX-5022 11,359.0 11,362.0 3.00 Loading Waste 12534 PUJIYANTO - OB Outpit PIT 5 EXT IPD 10 - 960 -
14-Sep-21 Day EX-5037 19,036.0 19,036.0 - Unscheduled - PARKIRAN SCANIA - 958 -
14-Sep-21 Day EX-6014 57,629.0 57,640.0 11.00 Loading Waste 9136 AHMAD YANI - OB Outpit PIT 5 IPD 10 - - -
14-Sep-21 Day EX-6016 44,229.0 44,238.0 9.00 Loading Waste 15567 ARIF WAHYUDI - OB Outpit PIT 5 EXT IPD 10 - - -
14-Sep-21 Day EX-6022 18,575.2 18,576.2 1.00 Loading Solid Mud 15486 SUGENG PRAYETNO - Solid Mud Outpit PIT 5 EXT IPD 10 - 1,114 -
14-Sep-21 Day EX-6022 18,576.2 18,585.3 9.10 Loading Waste 15486 SUGENG PRAYETNO - OB Outpit PIT 5 EXT IPD 10 - 1,114 -
14-Sep-21 Day TR-3080 42,706.1 42,707.8 1.65 Hauling OB 10881 BURHANUDDIN 3 4 7 OB Outpit EX-6016 PIT 5 EXT IPD 10 42 294 - 42 -
14-Sep-21 Day TR-3080 42,707.8 42,716.0 8.25 Hauling OB 10881 BURHANUDDIN 3 4 4 3 5 5 4 4 3 35 OB Outpit EX-6014 PIT 5 IPD 10 42 1,470 - 42 -
14-Sep-21 Day TR-3174 41,415.6 41,422.1 6.52 Hauling OB 8958 MUKHROMIN 3 4 2 1 2 4 3 2 1 22 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 924 - 42 -
14-Sep-21 Day TR-3174 41,422.1 41,422.7 0.59 Hauling Solid Mud 8958 MUKHROMIN 2 2 Solid Mud Outpit EX-6022 PIT 5 EXT IPD 10 34 67 - 34 -
14-Sep-21 Day TR-3174 41,422.7 41,423.9 1.19 Hauling OB 8958 MUKHROMIN 2 2 4 OB Outpit Ex-6016 PIT 5 EXT IPD 10 42 168 - 42 -
14-Sep-21 Day TR-3175 38,807.3 38,807.8 0.51 Hauling OB 15350 HERMAN 2 2 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 84 - 1 42 42
14-Sep-21 Day TR-3175 38,807.8 38,808.8 1.03 Hauling OB 15350 HERMAN 3 1 4 OB Outpit EX-6016 PIT 5 EXT IPD 10 42 168 - 42 -
14-Sep-21 Day TR-3175 38,808.8 38,817.3 8.46 Hauling OB 15350 HERMAN 2 5 3 4 3 5 4 3 3 1 33 OB Outpit EX-6014 PIT 5 IPD 10 42 1,386 - 42 -
14-Sep-21 Day TR-3195 24,669.5 24,676.0 6.49 Hauling OB 10762 SYAMSUDDIN 1 4 4 4 3 3 3 2 24 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 1,008 - 42 -
14-Sep-21 Day TR-3195 24,676.0 24,676.3 0.27 Hauling OB 10762 SYAMSUDDIN 1 1 OB Outpit EX-6016 PIT 5 EXT IPD 10 42 42 - 42 -
14-Sep-21 Day TR-3195 24,676.3 24,676.8 0.54 Hauling OB 10762 SYAMSUDDIN 2 2 OB Outpit EX-6014 PIT 5 IPD 10 42 84 - 42 -
14-Sep-21 Day TR-3202 26,824.8 26,833.1 8.29 Hauling OB 15230 MARGONO 3 1 4 3 3 4 4 3 3 2 30 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 1,260 - 42 -
14-Sep-21 Day TR-3202 26,833.1 26,833.6 0.55 Hauling Solid Mud 15230 MARGONO 2 2 Solid Mud Outpit EX-6022 PIT 5 EXT IPD 10 34 67 - 34 -
14-Sep-21 Day TR-3202 26,833.6 26,834.2 0.56 Hauling OB 15230 MARGONO 2 2 OB Outpit EX-6016 PIT 5 EXT IPD 10 42 84 - 42 -
14-Sep-21 Day TR-3203 26,931.2 26,938.2 6.99 Hauling OB 8892 BAGUS PURWONO 3 1 4 2 3 3 4 3 23 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 966 - 2 42 84
14-Sep-21 Day TR-3203 26,938.2 26,938.8 0.61 Hauling Solid Mud 8892 BAGUS PURWONO 2 2 Solid Mud Outpit EX-6022 PIT 5 EXT IPD 10 34 67 - 34 -
14-Sep-21 Day TR-3204 26,246.0 26,246.5 0.54 Hauling OB 10969 JOKO PRIONO 2 2 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 84 - 42 -
14-Sep-21 Day TR-3204 26,246.5 26,247.9 1.34 Hauling OB 10969 JOKO PRIONO 3 2 5 OB Outpit EX-6016 PIT 5 EXT IPD 10 42 210 - 42 -
14-Sep-21 Day TR-3204 26,247.9 26,257.0 9.12 Hauling OB 10969 JOKO PRIONO 3 5 3 2 5 3 4 4 3 32 OB Outpit EX-6014 PIT 5 IPD 10 42 1,344 - 2 42 84
14-Sep-21 Day TR-3205 25,796.2 25,805.0 8.82 Hauling OB 10695 SUPIYANDI 4 3 3 4 4 3 3 3 4 31 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 1,302 - 42 -
14-Sep-21 Day TR-3205 25,805.0 25,805.6 0.57 Hauling Solid Mud 10695 SUPIYANDI 2 2 Solid Mud Outpit EX-6022 PIT 5 EXT IPD 10 34 67 - 34 -
14-Sep-21 Day TR-3206 24,918.2 24,918.2 - Scheduled - WORKSHOP - - -
14-Sep-21 Day TR-3220 25,970.4 25,971.4 0.95 Hauling OB 10968 SUKIRNO 2 2 4 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 168 - 42 -
14-Sep-21 Day TR-3220 25,971.4 25,972.3 0.95 Hauling OB 10968 SUKIRNO 2 2 4 OB Outpit EX-6016 PIT 5 EXT IPD 10 42 168 - 42 -
14-Sep-21 Day TR-3220 25,972.3 25,980.4 8.10 Hauling OB 10968 SUKIRNO 3 4 5 4 3 4 5 2 4 34 OB Outpit EX-6014 PIT 5 IPD 10 42 1,428 - 3 42 126
14-Sep-21 Day TR-1024 31,335.8 31,335.8 - Unscheduled - WORKSHOP - - -
14-Sep-21 Day TR-1025 47,187.8 47,194.6 6.81 Hauling OB 15955 RIZKY IHWAN 2 4 4 2 4 4 5 1 26 OB Outpit EX-6016 PIT 5 EXT IPD 10 24 624 - 24 -
14-Sep-21 Day TR-1025 47,194.6 47,195.7 1.05 Hauling OB 15955 RIZKY IHWAN 4 4 OB Outpit EX-6014 PIT 5 IPD 10 24 96 - 24 -
14-Sep-21 Day TR-1025 47,195.7 47,197.5 1.83 Hauling Solid Mud 15955 RIZKY IHWAN 4 3 7 Solid Mud Outpit EX-4006 PIT 5 EXT IPD 10 19 134 - 24 -
14-Sep-21 Day TR-1031 49,418.1 49,418.1 - Unscheduled - WORKSHOP - - 3 -
14-Sep-21 Day TR-1032 51,196.9 51,200.4 3.45 Hauling OB 15468 PADLIANSYAH 2 4 3 2 11 OB Outpit EX-6016 PIT 5 EXT IPD 10 24 264 - 3 24 72
14-Sep-21 Day TR-1032 51,200.4 51,202.9 2.51 Hauling OB 15468 PADLIANSYAH 2 4 2 8 OB Outpit EX-5022 PIT 5 EXT IPD 10 24 192 - 2 24 48
14-Sep-21 Day TR-1032 51,202.9 51,203.2 0.31 Hauling Solid Mud 15468 PADLIANSYAH 1 1 Solid Mud Outpit EX-5022 PIT 5 EXT IPD 10 19 19 - 19 -
14-Sep-21 Day TR-1032 51,203.2 51,203.8 0.63 Hauling Solid Mud 15468 PADLIANSYAH 2 2 Solid Mud Outpit EX-4006 PIT 5 EXT IPD 11 19 38 - 19 -
14-Sep-21 Day TR-1033 51,625.1 51,626.8 1.70 Hauling OB 15419 HUSEN 2 4 1 3 10 OB Outpit EX-6016 PIT 5 EXT IPD 10 24 240 - 24 -
14-Sep-21 Day TR-1034 49,396.3 49,396.9 0.58 Hauling OB 15420 M ABD MADI 2 2 OB Outpit EX-6016 PIT 5 EXT IPD 10 24 48 - 24 -
14-Sep-21 Day TR-1034 49,396.9 49,398.0 1.16 Hauling OB 15420 M ABD MADI 2 2 4 OB Outpit EX-5022 PIT 5 EXT IPD 10 24 96 - 24 -
14-Sep-21 Day TR-1034 49,398.0 49,399.5 1.45 Hauling Solid Mud 15420 M ABD MADI 1 3 1 5 Solid Mud Outpit EX-4006 PIT 5 EXT IPD 11 19 96 - 19 -
14-Sep-21 Day TR-1034 49,399.5 49,402.6 3.08 Hauling OB 15485 ROBY TM 5 4 5 14 OB Outpit EX-6016 PIT 5 EXT IPD 10 24 336 - 24 -
14-Sep-21 Day TR-1034 49,402.6 49,404.0 1.43 Hauling OB 15485 ROBY TM 2 4 6 OB Outpit EX-6014 PIT 5 IPD 10 24 144 - 24 -
14-Sep-21 Day TR-1036 50,668.5 50,674.2 5.68 Hauling OB 16024 QORI 2 4 2 2 4 3 5 22 OB Outpit EX-6016 PIT 5 EXT IPD 10 24 528 - 1 24 24
14-Sep-21 Day TR-1036 50,674.2 50,675.7 1.55 Hauling OB 16024 QORI 2 4 6 OB Outpit EX-6014 PIT 5 IPD 10 24 144 - 24 -
14-Sep-21 Day TR-1036 50,675.7 50,677.8 2.06 Hauling OB 16024 QORI 2 3 3 8 OB Outpit EX-5022 PIT 5 EXT IPD 10 24 192 - 24 -
14-Sep-21 Day TR-1048 52,165.2 52,168.3 3.05 Hauling OB 15636 AKHMAD NOOR 4 4 5 13 OB Outpit EX-5022 PIT 5 EXT IPD 10 24 312 - 24 -
14-Sep-21 Day TR-1048 52,168.3 52,169.9 1.64 Hauling OB 15636 AKHMAD NOOR 4 3 7 OB Outpit EX-6016 PIT 5 EXT IPD 10 24 168 - 24 -
14-Sep-21 Day TR-1048 52,169.9 52,172.0 2.11 Hauling OB 15636 AKHMAD NOOR 4 3 2 9 OB Outpit EX-6014 PIT 5 EXT IPD 10 24 216 - 24 -
14-Sep-21 Day TR-1049 46,086.8 46,092.2 5.40 Hauling OB 15576 JOKO SANTOSO 4 3 5 12 OB Outpit EX-6016 PIT 5 EXT IPD 10 24 288 - 24 -
14-Sep-21 Day TR-1049 46,092.2 46,092.2 - Hauling OB 15576 JOKO SANTOSO 4 3 2 9 OB Outpit EX-5022 PIT 5 EXT IPD 10 24 216 - 24 -
14-Sep-21 Day TR-1050 45,825.2 45,828.6 3.35 Hauling OB 16025 IMTIKAN 3 5 3 1 12 OB Outpit EX-6016 PIT 5 EXT IPD 10 24 288 - 24 -
14-Sep-21 Day TR-1050 45,828.6 45,829.9 1.39 Hauling OB 16025 IMTIKAN 2 3 5 OB Outpit EX-5022 PIT 5 EXT IPD 10 24 120 - 24 -
14-Sep-21 Day TR-1050 45,829.9 45,830.5 0.56 Hauling Solid Mud 16025 IMTIKAN 2 2 Solid Mud Outpit EX-4006 PIT 5 EXT IPD 11 19 38 - 19 -
14-Sep-21 Day TR-1050 45,830.5 45,833.4 2.86 Hauling OB 15421 AGUS A 4 4 5 13 OB Outpit EX-6016 PIT 5 EXT IPD 10 24 312 - 24 -
14-Sep-21 Day TR-1050 45,833.4 45,834.9 1.54 Hauling OB 15421 AGUS A 4 3 7 OB Outpit EX-6014 PIT 5 IPD 10 24 168 - 24 -
14-Sep-21 Day TA-7009 27,854.8 27,856.8 2.01 Hauling Solid Mud 15862 RUDY AMRIYADI 2 3 1 6 Solid Mud Outpit EX-5022 PIT 5 EXT IPD 10 11 67 - 11 -
14-Sep-21 Day TA-7009 27,856.8 27,857.5 0.67 Hauling OB 15862 RUDY AMRIYADI 2 2 OB Outpit EX-5022 PIT 5 EXT IPD 10 14 28 - 14 -
14-Sep-21 Day TA-7009 27,857.5 27,862.5 5.02 Hauling Solid Mud 15862 RUDY AMRIYADI 4 3 2 1 3 2 15 Solid Mud Outpit EX-4006 PIT 5 EXT IPD 11 11 168 - 2 11 22
14-Sep-21 Day TA-7010 25,186.8 25,189.3 2.48 Hauling Solid Mud 16026 BAHRUNI 2 4 3 9 Solid Mud Outpit EX-5022 PIT 5 EXT IPD 10 11 101 - 11 -
14-Sep-21 Day TA-7010 25,189.3 25,189.8 0.55 Hauling OB 16026 BAHRUNI 2 2 OB Outpit EX-5022 PIT 5 EXT IPD 10 14 28 - 14 -
14-Sep-21 Day TA-7010 25,189.8 25,195.9 6.07 Hauling Solid Mud 16026 BAHRUNI 4 3 3 2 3 4 3 22 Solid Mud Outpit EX-4006 PIT 5 EXT IPD 11 11 246 - 11 -
14-Sep-21 Day TA-7022 - - - Unscheduled - WORKSHOP - - -
14-Sep-21 Day TA-7029 28,546.6 28,549.4 2.80 Hauling Solid Mud 15819 AHNIANSYAH 2 5 3 10 Solid Mud Outpit EX-5022 PIT 5 EXT IPD 10 11 112 - 11 -
14-Sep-21 Day TA-7029 28,549.4 28,550.0 0.56 Hauling OB 15819 AHNIANSYAH 2 2 OB Outpit EX-5022 PIT 5 EXT IPD 10 14 28 - 14 -
14-Sep-21 Day TA-7029 28,550.0 28,556.4 6.44 Hauling Solid Mud 15819 AHNIANSYAH 4 4 2 2 3 5 3 23 Solid Mud Outpit EX-4006 PIT 5 EXT IPD 11 11 258 - 11 -
14-Sep-21 Day TA-7030 28,226.5 28,229.3 2.80 Hauling Solid Mud 15817 YUSANDI 2 4 4 10 Solid Mud Outpit EX-5022 PIT 5 EXT IPD 10 11 112 - 11 -
14-Sep-21 Day BD-4005 13,770.7 13,770.7 - Scheduled - WORKSHOP - - -
k 14-Sep-21 Day BD-5035 3,454.6 3,457.6 3.00 Front maintenance 15747 MUSTAQIM D6 - PIT 5 EXT - - -
k 14-Sep-21 Day BD-5035 3,457.6 3,464.0 6.40 Road Maintenance Support 15747 MUSTAQIM D6 - PIT 11 - - -
14-Sep-21 Day BD-6025 2,758.5 2,759.5 1.00 Unit Rental 14750 MUSTAKIM - KCP - - -
14-Sep-21 Day BD-6026 30,198.7 30,198.7 - Standby - WORKSHOP - - -
14-Sep-21 Day BD-6028 4,123.0 4,126.4 3.40 Unit Rental 14750 MUSTAKIM - KCP - - -
14-Sep-21 Day BD-6036 34,178.1 34,186.1 8.00 Unit Rental 14964 JOKO P (Dozer) - KCP - - -
14-Sep-21 Day BD-6038 33,964.2 33,973.9 9.70 Unit Rental 14708 ADEFI P - KCP - - -
14-Sep-21 Day BD-6069 10,395.6 10,395.6 - Unscheduled - PIT 5 EXT - - -
14-Sep-21 Day BD-7013 39,927.9 39,938.6 10.70 Front maintenance 11676 SUDARSONO - PIT 5 EXT - - -
14-Sep-21 Day BD-7026 26,585.8 26,592.6 6.80 Front maintenance 15639 A. BUDIMAN - PIT 11 - - -
14-Sep-21 Day BD-7034 10,017.0 10,027.7 10.70 Disposal maintenance 9492 MAHFUDI - IPD 10 - - -
14-Sep-21 Day GR-2012 22,270.7 22,278.2 7.50 Road Maintenance Support 12344 M FAJRI - PIT 5 EXT - - -
14-Sep-21 Day GR-3007 39,232.3 39,241.7 9.40 Road Maintenance Support 8925 AGUS SUNARWAN - PIT 5 EXT - - -
14-Sep-21 Day GR-3008 46,898.2 46,898.2 - Unscheduled - WORKSHOP - - -
14-Sep-21 Day TW-3001 8,520.0 8,529.0 9.00 Road Maintenance Support 15106 AHMAD NURANI - PIT 5 EXT - - -
14-Sep-21 Day TW-4001 18,756.0 18,756.00 - Standby - WORKSHOP - - -
14-Sep-21 Day PU-4002 19,080.0 19,080.00 - Unscheduled - PIT 11 - - -
14-Sep-21 Day PU-2026 6,189.5 6,190.0 0.50 Dewatering - PIT 11 - - -
14-Sep-21 Day PU-3026 12,307.0 12,307.00 - Standby - ROM TEMPORARY - - -
14-Sep-21 Day PU-3015 1,696.0 1,696.00 - Standby - ROM TEMPORARY - - -
14-Sep-21 Day PU-3014 27,240.4 27,240.40 - Standby - KCP - - -
14-Sep-21 Day LP-2165 13,551.0 13,551.00 - Standby - KCP - - -
14-Sep-21 Day LP-2166 13,034.0 13,034.00 - Standby - KCP - - -
14-Sep-21 Day LP-2167 14,014.0 14,014.00 - Standby - KCP - - -
14-Sep-21 Day LP-2168 12,822.0 12,822.00 - Standby - KCP - - -
14-Sep-21 Day LP-2169 12,552.0 12,552.00 - Standby - KCP - - -
14-Sep-21 Day TS-4007 - - - Standby - KCP - - -
14-Sep-21 Day TS-4017 16,137.0 16,139.0 2.00 Unit Rental 13708 AHMAD SALIM - KCP - - -
14-Sep-21 Day TF-4013 20,393.0 20,400.0 7.00 Unit Rental 15746 SYARIFUDDI - KCP - - -
14-Sep-21 Day TF-4014 34,550.0 34,550.0 - Standby - KCP - - -
14-Sep-21 Night EX-2037 22,190.6 22,197.7 7.10 Side casting - PIT 5 EXT - - -
14-Sep-21 Night EX-2058 17,531.0 17,531.0 - Standby - JALAN SAKA - 963 -
14-Sep-21 Night EX-4006 35,198.0 35,201.0 3.00 Side casting 11330 EKO PURWANTO - PIT 5 EXT - 959 -
14-Sep-21 Night EX-5014 38,647.0 38,649.0 2.00 Unit Rental 15345 SUTONO - KCP - - -
14-Sep-21 Night EX-5022 11,362.0 11,372.0 10.00 Loading Waste 9590F SIRATAL RAYYAN - OB Outpit PIT 5 EXT IPD 10 - 960 -
14-Sep-21 Night EX-5037 19,036.0 19,036.0 - Unscheduled - PARKIRAN SCANIA - 958 -
14-Sep-21 Night EX-6014 57,640.0 57,649.0 9.00 Loading Waste 8952 DIDI SETIAWAN - OB Outpit PIT 5 IPD 10 - - -
14-Sep-21 Night EX-6016 44,238.0 44,248.0 10.00 Loading Waste 15568 FUAD EFENDI - OB Outpit PIT 5 EXT IPD 10 - - -
14-Sep-21 Night EX-6022 18,585.3 18,594.6 9.30 Loading Waste 11146 PURWANTO - OB Outpit PIT 5 EXT IPD 10 - 1,114 -
14-Sep-21 Night TR-3080 42,716.0 42,721.4 5.42 Hauling OB 15347 TAHMID 2 5 3 3 4 4 21 OB Outpit EX-6016 PIT 5 EXT IPD 10 42 882 - 42 -
14-Sep-21 Night TR-3080 42,721.4 42,725.8 4.38 Hauling OB 15347 TAHMID 2 4 3 5 3 17 OB Outpit EX-6014 PIT 5 IPD 10 42 714 - 42 -
14-Sep-21 Night TR-3174 41,423.9 41,424.7 0.75 Hauling OB 11328 JUSESLAF BANJAR NAHOR 1 2 3 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 126 - 42 -
14-Sep-21 Night TR-3174 41,424.7 41,425.4 0.75 Hauling OB 11328 JUSESLAF BANJAR NAHOR 1 2 3 OB Outpit EX-6016 PIT 5 EXT IPD 10 42 126 - 42 -
14-Sep-21 Night TR-3174 41,425.4 41,432.1 6.71 Hauling OB 11328 JUSESLAF BANJAR NAHOR 2 5 4 5 2 3 4 2 27 OB Outpit EX-6014 PIT 5 IPD 10 42 1,134 - 42 -
14-Sep-21 Night TR-3175 38,817.3 38,823.8 6.50 Hauling OB 9354 JIDIN 4 3 4 4 4 4 3 26 OB Outpit EX-6016 PIT 5 EXT IPD 10 42 1,092 - 42 -
14-Sep-21 Night TR-3175 38,823.8 38,825.1 1.25 Hauling OB 9354 JIDIN 2 3 5 OB Outpit EX-6014 PIT 5 IPD 10 42 210 - 42 -
14-Sep-21 Night TR-3175 38,825.1 38,826.8 1.75 Hauling OB 9354 JIDIN 1 3 3 7 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 294 - 42 -
14-Sep-21 Night TR-3195 24,676.8 24,685.1 8.27 Hauling OB 1354 SUDIYANTO 2 4 2 3 4 4 3 3 1 3 29 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 1,218 - 42 -
14-Sep-21 Night TR-3195 24,685.1 24,686.5 1.43 Hauling OB 1354 SUDIYANTO 3 2 5 OB Outpit EX-6016 PIT 5 EXT IPD 10 42 210 - 42 -
14-Sep-21 Night TR-3202 26,834.2 26,843.0 8.80 Hauling OB 11474 SARINDI 3 3 2 1 4 4 3 4 3 3 3 33 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 1,386 - 3 42 126
14-Sep-21 Night TR-3203 26,938.8 26,939.1 0.26 Hauling OB 8920 VERRY EKO SETIAWAN 1 1 OB Outpit EX-5022 PIT 5 EXT IPD 10 42 42 - 42 -
14-Sep-21 Night TR-3203 26,939.1 26,939.3 0.26 Hauling OB 8920 VERRY EKO SETIAWAN 1 1 OB Outpit EX-6014 PIT 5 IPD 10 42 42 - 42 -
14-Sep-21 Night TR-3203 26,939.3 26,940.6 1.31 Hauling OB 8920 VERRY EKO SETIAWAN 1 3 1 5 OB Outpit EX-6016 PIT 5 EXT IPD 10 42 210 - 42 -
14-Sep-21 Night TR-3203 26,940.6 26,947.7 7.07 Hauling OB 8920 VERRY EKO SETIAWAN 2 3 3 4 3 3 3 1 3 2 27 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 1,134 - 1 42 42
14-Sep-21 Night TR-3204 26,257.0 26,261.2 4.21 Hauling OB 1303 EFENDI 2 3 3 4 4 4 20 OB Outpit EX-6016 PIT 5 EXT IPD 10 42 840 - 42 -
14-Sep-21 Night TR-3204 26,261.2 26,261.4 0.21 Hauling OB 1303 EFENDI 1 1 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 42 - 42 -
14-Sep-21 Night TR-3204 26,261.4 26,265.0 3.58 Hauling OB 1303 EFENDI 3 3 4 4 3 17 OB Outpit EX-6014 PIT 5 IPD 10 42 714 - 42 -
14-Sep-21 Night TR-3205 25,805.6 25,814.7 9.10 Hauling OB 7170F TRI PRASETIYO 4 2 3 3 4 4 3 3 3 3 3 35 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 1,470 - 1 42 42
14-Sep-21 Night TR-3206 24,918.2 24,918.2 - Scheduled - WORKSHOP - - -
14-Sep-21 Night TR-3220 25,980.4 25,985.6 5.24 Hauling OB 8965 HADI SUTIKNO 2 4 3 4 3 4 20 OB Outpit EX-6016 PIT 5 EXT IPD 10 42 840 - 42 -
14-Sep-21 Night TR-3220 25,985.6 25,990.1 4.46 Hauling OB 8965 HADI SUTIKNO 3 3 4 4 3 17 OB Outpit EX-6014 PIT 5 IPD 10 42 714 - 42 -
14-Sep-21 Night TR-1024 31,335.8 31,335.8 - Unscheduled - WORKSHOP - - -
14-Sep-21 Night TR-1025 47,197.5 47,201.8 4.32 Hauling OB 15469 BASUNI 2 2 4 5 4 17 OB Outpit EX-6014 PIT 5 IPD 10 24 408 - 24 -
14-Sep-21 Night TR-1025 47,201.8 47,202.8 1.02 Hauling OB 15469 BASUNI 1 3 4 OB Outpit EX-5022 PIT 5 EXT IPD 10 24 96 - 24 -
14-Sep-21 Night TR-1025 47,202.8 47,206.7 3.81 Hauling OB 15469 BASUNI 3 3 2 4 3 15 OB Outpit EX-6016 PIT 5 EXT IPD 10 24 360 - 24 -
14-Sep-21 Night TR-1025 47,206.7 47,207.4 0.76 Hauling OB 15469 BASUNI 2 1 3 OB Outpit EX-5022 PIT 5 EXT IPD 10 24 72 - 24 -
14-Sep-21 Night TR-1031 49,418.1 49,418.1 - Unscheduled - WORKSHOP - - -
14-Sep-21 Night TR-1032 51,206.6 51,212.9 6.34 Hauling OB 2 3 3 4 5 5 4 26 OB Outpit EX-5022 PIT 5 EXT IPD 10 24 624 - 24 -
14-Sep-21 Night TR-1032 51,212.9 51,216.6 3.66 Hauling OB 3 5 4 3 15 OB Outpit EX-6016 PIT 5 EXT IPD 10 24 360 - 24 -
14-Sep-21 Night TR-1033 51,628.3 51,628.7 0.40 Hauling OB 15470 IJAI 1 1 OB Outpit EX-6016 PIT 5 EXT IPD 10 24 24 - 24 -
14-Sep-21 Night TR-1034 49,404.0 49,404.0 - Unscheduled - PIT 5 EXT - - -
14-Sep-21 Night TR-1036 50,677.8 50,682.8 4.95 Hauling OB 15346 MUSA 2 2 4 4 4 2 4 22 OB Outpit EX-6014 PIT 5 IPD 10 24 528 - 24 -
14-Sep-21 Night TR-1036 50,682.8 50,685.5 2.70 Hauling OB 15346 MUSA 1 3 1 1 1 4 1 12 OB Outpit EX-5022 PIT 5 EXT IPD 10 24 288 - 24 -
14-Sep-21 Night TR-1036 50,685.5 50,686.8 1.35 Hauling OB 15346 MUSA 3 3 6 OB Outpit EX-6016 PIT 5 EXT IPD 10 24 144 - 24 -
14-Sep-21 Night TR-1048 52,172.0 52,173.3 1.30 Hauling OB 15471 MULYADI 2 2 OB Outpit EX-6014 PIT 5 IPD 10 24 48 - 24 -
14-Sep-21 Night TR-1049 46,092.2 46,094.8 2.57 Hauling OB 15349 ARDIANSYAH 2 5 4 11 OB Outpit EX-5022 PIT 5 EXT IPD 10 24 264 - 24 -
14-Sep-21 Night TR-1049 46,094.8 46,097.6 2.80 Hauling OB 15349 ARDIANSYAH 3 4 5 12 OB Outpit EX-6014 PIT 5 IPD 10 24 288 - 24 -
14-Sep-21 Night TR-1049 46,097.6 46,100.6 3.03 Hauling OB 15349 ARDIANSYAH 2 4 4 3 13 OB Outpit EX-6016 PIT 5 EXT IPD 10 24 312 - 24 -
14-Sep-21 Night TR-1050 45,834.9 45,838.3 3.36 Hauling OB 15744 MARYANTO 2 4 3 2 4 15 OB Outpit EX-6014 PIT 5 IPD 10 24 360 - 24 -
14-Sep-21 Night TR-1050 45,838.3 45,841.2 2.91 Hauling OB 15744 MARYANTO 3 1 4 1 3 1 13 OB Outpit EX-5022 PIT 5 EXT IPD 10 24 312 - 24 -
14-Sep-21 Night TR-1050 45,841.2 45,844.3 3.13 Hauling OB 15744 MARYANTO 3 4 3 4 14 OB Outpit EX-6016 PIT 5 EXT IPD 10 24 336 - 24 -
14-Sep-21 Night TA-7009 27,862.5 27,868.6 6.10 Hauling OB 15818 AGUS SUGIANTO 2 3 1 4 3 5 5 4 27 OB Outpit EX-5022 PIT 5 EXT IPD 10 14 378 - 14 -
14-Sep-21 Night TA-7010 25,195.9 25,203.0 7.10 Hauling OB 15861 AGUSTIAN 3 4 6 4 3 5 5 5 35 OB Outpit EX-5022 PIT 5 EXT IPD 10 14 490 - 14 -
14-Sep-21 Night TA-7022 - - - Unscheduled - WORKSHOP - - -
14-Sep-21 Night TA-7029 28,556.4 28,557.5 1.10 Hauling OB 15653 M. ILIAS 2 1 3 OB Outpit EX-5022 PIT 5 EXT IPD 10 14 42 - 14 -
14-Sep-21 Night TA-7030 28,229.3 28,232.3 3.00 Hauling OB 15653 M. ILIAS 2 4 5 4 15 OB Outpit EX-5022 PIT 5 EXT IPD 10 14 210 - 14 -
14-Sep-21 Night BD-4005 13,770.7 13,770.7 - Scheduled - WORKSHOP - - -
14-Sep-21 Night BD-5035 3,464.0 3,473.1 9.10 Front maintenance 14963 MAULANA ISHAK - PIT 5 EXT - - -
14-Sep-21 Night BD-6025 2,759.5 2,761.9 2.40 Unit Rental 11169 ANNAS - KCP - - -
14-Sep-21 Night BD-6026 30,198.7 30,198.7 - Standby - WORKSHOP - - -
14-Sep-21 Night BD-6028 4,126.4 4,126.4 - Unscheduled - KCP - - -
14-Sep-21 Night BD-6036 34,186.1 34,189.2 3.10 Unit Rental 14710 AGUS S - KCP - - -
14-Sep-21 Night BD-6038 33,973.9 33,977.0 3.10 Unit Rental 14744 NOORDIANTO - KCP - - -
14-Sep-21 Night BD-6069 10,395.6 10,395.6 - Unscheduled - PIT 5 EXT - - -
14-Sep-21 Night BD-7013 39,938.6 39,948.1 9.50 Front maintenance 10013 ADI SUSANTO - PIT 5 EXT - - -
14-Sep-21 Night BD-7026 26,592.6 26,596.6 4.00 Front maintenance 10013 ADI SUSANTO - PIT 11 - - -
14-Sep-21 Night BD-7034 10,027.7 10,039.4 11.70 Disposal maintenance 8157 SAMIDI - IPD 10 - - -
14-Sep-21 Night GR-2012 22,278.2 22,278.2 - Standby - PIT 5 EXT - - -
14-Sep-21 Night GR-3007 39,241.7 39,249.9 8.20 Road Maintenance Support - PIT 5 EXT - - -
14-Sep-21 Night GR-3008 46,902.3 46,910.2 7.90 Road Maintenance Support 15571 YOHANIS L - WORKSHOP - - -
14-Sep-21 Night TW-3001 8,529.0 8,532.0 3.00 Road Maintenance Support 3669 SUYANTO - PIT 5 EXT - - -
14-Sep-21 Night TW-4001 18,756.0 18,756.00 - Standby - WORKSHOP - - -
14-Sep-21 Night PU-4002 19,080.0 19,080.0 - Unscheduled - PIT 11 - - -
14-Sep-21 Night PU-2026 6,190.0 6,190.0 - Standby - PIT 11 - - -
14-Sep-21 Night PU-3026 12,307.0 12,307.0 - Standby - ROM TEMPORARY - - -
14-Sep-21 Night PU-3015 1,696.0 1,696.0 - Standby - ROM TEMPORARY - - -
14-Sep-21 Night PU-3014 27,240.4 27,240.4 - Standby - KCP - - -
14-Sep-21 Night LP-2165 13,551.0 13,558.0 7.00 Unit Rental 4671 NURUDIN - KCP - - -
14-Sep-21 Night LP-2166 13,034.0 13,044.0 10.00 Unit Rental 4671 NURUDIN - KCP - - -
14-Sep-21 Night LP-2167 14,014.0 14,025.0 11.00 Unit Rental 4671 NURUDIN - KCP - - -
14-Sep-21 Night LP-2168 12,822.0 12,833.0 11.00 Unit Rental 4671 NURUDIN - KCP - - -
14-Sep-21 Night LP-2169 12,552.0 12,563.0 11.00 Unit Rental 4671 NURUDIN - KCP - - -
14-Sep-21 Night TS-4007 - - - Standby - KCP - - -
14-Sep-21 Night TS-4017 16,139.0 16,140.0 1.00 Unit Rental 15745 SURYANATA - KCP - - -
14-Sep-21 Night TF-4013 20,400.0 20,403.0 3.00 Unit Rental 13564 BAGUS HADI SUYONO - KCP - - -
14-Sep-21 Night TF-4014 34,550.0 34,550.0 - Standby - KCP - - -
15-Sep-21 Day EX-2037 22,197.7 22,203.7 6.00 Side casting 15504 SLAMET WIDODO - PIT 5 EXT - - -
15-Sep-21 Day EX-2037 22,203.7 22,206.4 2.70 Drainage 15504 SLAMET WIDODO - PIT 5 EXT - - -
15-Sep-21 Day EX-2037 22,206.4 22,207.1 0.70 Loading Solid Mud 15504 SLAMET WIDODO - Solid Mud Outpit PIT 5 EXT IPD 10 - - - - -
15-Sep-21 Day EX-2058 17,531.0 17,533.0 2.00 Moving - pindah lokasi kerja 15604 AHMAD SYAFI'I - JALAN SAKA - 1,167 -
15-Sep-21 Day EX-2058 17,533.0 17,535.0 2.00 Side casting 15604 AHMAD SYAFI'I - WORKSHOP - 1,167 -
15-Sep-21 Day EX-2058 17,535.0 17,537.0 2.00 Road Maintenance Support 15604 AHMAD SYAFI'I - PIT 5 EXT - 1,167 -
15-Sep-21 Day EX-4006 35,201.0 35,202.5 1.50 Side casting 15617 ZAENAL - PIT 5 EXT - 1,052 -
15-Sep-21 Day EX-4006 35,202.5 35,203.0 0.50 Loading Solid Mud 15617 ZAENAL - Solid Mud Outpit PIT 5 EXT IPD 10 - 1,052 -
15-Sep-21 Day EX-5014 38,649.0 38,649.0 - Standby 15616 JOKO SUDIRO - KCP - - -
15-Sep-21 Day EX-5022 11,372.0 11,373.0 1.00 Loading Solid Mud 12534 PUJIYANTO - Solid Mud Outpit PIT 5 IPD 10 - 1,070 -
15-Sep-21 Day EX-5037 19,036.0 19,036.0 - Unscheduled - PARKIRAN SCANIA - 1,050 -
15-Sep-21 Day EX-6014 57,649.0 57,651.0 2.00 Loading Waste 10917 SETA VERDY KARYA - OB Outpit PIT 5 IPD 10 - 1,009 -
15-Sep-21 Day EX-6016 44,248.0 44,251.0 3.00 Loading Waste 15567 ARIF WAHYUDI - OB Outpit PIT 5 EXT IPD 10 - - -
15-Sep-21 Day EX-6022 18,594.6 18,597.0 2.40 Loading Waste 15486 SUGENG PRAYETNO - OB Outpit PIT 5 IPD 10 - 682 -
15-Sep-21 Day TR-3080 42,725.8 42,727.0 1.20 Hauling OB 10881 BURHANUDDIN 2 2 OB Outpit EX-6016 PIT 5 EXT IPD 10 42 84 - 3 42 126
15-Sep-21 Day TR-3174 41,432.1 41,433.2 1.09 Hauling OB 8958 MUKHROMIN 2 1 3 OB Outpit EX-6014 PIT 5 IPD 10 42 126 - 42 -
15-Sep-21 Day TR-3175 38,826.8 38,827.1 0.30 Hauling OB 9214 MUSTOFA ADI PRAYITNO 1 1 OB Outpit EX-6014 PIT 5 IPD 10 42 42 - 42 -
15-Sep-21 Day TR-3175 38,827.1 38,827.7 0.60 Hauling OB 9214 MUSTOFA ADI PRAYITNO 2 2 OB Outpit EX-6016 PIT 5 EXT IPD 10 42 84 - 42 -
15-Sep-21 Day TR-3175 38,827.7 38,828.6 0.90 Hauling OB 9214 MUSTOFA ADI PRAYITNO 3 3 OB Outpit EX-6022 PIT 5 IPD 10 42 126 - 42 -
15-Sep-21 Day TR-3195 24,686.5 24,688.3 1.80 Hauling OB 10882 SABIRIN 2 1 3 6 OB Outpit EX-6022 PIT 5 IPD 10 42 252 - 42 -
15-Sep-21 Day TR-3202 26,843.0 26,844.4 1.40 Hauling OB 15350 HERMAN 2 1 2 5 OB Outpit EX-6022 PIT 5 IPD 10 42 210 - 42 -
15-Sep-21 Day TR-3202 26,844.4 26,844.7 0.30 Hauling OB 15350 HERMAN 1 1 OB Outpit EX-6016 PIT 5 EXT IPD 10 42 42 - 42 -
15-Sep-21 Day TR-3203 26,947.7 26,949.4 1.70 Hauling OB 8892 BAGUS PURWONO 2 4 6 OB Outpit EX-6022 PIT 5 IPD 10 42 252 - 1 42 42
15-Sep-21 Day TR-3204 26,265.0 26,266.4 1.35 Hauling OB 10969 JOKO PRIONO 3 1 4 OB Outpit EX-6014 PIT 5 IPD 10 42 168 - 42 -
15-Sep-21 Day TR-3204 26,266.4 26,267.4 1.01 Hauling OB 10969 JOKO PRIONO 2 1 3 OB Outpit EX-6016 PIT 5 EXT IPD 10 42 126 - 42 -
15-Sep-21 Day TR-3204 26,267.4 26,267.7 0.34 Hauling OB 10969 JOKO PRIONO 1 1 OB Outpit EX-6022 PIT 5 IPD 10 42 42 - 42 -
15-Sep-21 Day TR-3205 25,814.7 25,816.4 1.70 Hauling OB 10695 SUPIYANDI 2 1 2 5 OB Outpit EX-6022 PIT 5 IPD 10 42 210 - 1 42 42
15-Sep-21 Day TR-3206 24,918.2 24,918.2 - Scheduled - WORKSHOP - - -
15-Sep-21 Day TR-3220 25,990.1 25,990.7 0.55 Hauling OB 10968 SUKIRNO 2 2 OB Outpit EX-6014 PIT 5 IPD 10 42 84 - 42 -
15-Sep-21 Day TR-3220 25,990.7 25,990.9 0.28 Hauling OB 10968 SUKIRNO 1 1 OB Outpit EX-6022 PIT 5 IPD 10 42 42 - 42 -
15-Sep-21 Day TR-3220 25,990.9 25,991.2 0.28 Hauling OB 10968 SUKIRNO 1 1 OB Outpit EX-6016 PIT 5 EXT IPD 10 42 42 - 42 -
15-Sep-21 Day TR-1024 31,335.8 31,335.8 - Unscheduled - WORKSHOP - - -
15-Sep-21 Day TR-1025 47,207.4 47,208.1 0.70 Hauling OB 15636 AKHMAD NOOR 3 3 OB Outpit EX-6016 PIT 5 EXT IPD 10 24 72 - 24 -
15-Sep-21 Day TR-1031 49,418.1 49,418.1 - Unscheduled - WORKSHOP - - -
15-Sep-21 Day TR-1032 51,216.6 51,218.6 2.00 Hauling OB 15468 PADLIANSYAH 3 3 6 OB Outpit EX-6016 PIT 5 EXT IPD 10 24 144 - 2 24 48
15-Sep-21 Day TR-1032 51,218.6 51,218.9 0.30 Hauling OB 15468 PADLIANSYAH 1 1 Solid Mud Outpit EX-5022 PIT 5 IPD 10 19 19 - 19 -
15-Sep-21 Day TR-1033 51,628.7 51,628.7 - Unscheduled - PIT 5 EXT - - -
15-Sep-21 Day TR-1034 49,404.0 49,404.0 - Standby - WORKSHOP - - -
15-Sep-21 Day TR-1036 50,686.8 50,687.3 0.50 Hauling OB 15398 SIGIT SUSANTO 1 1 OB Outpit EX-6016 PIT 5 EXT IPD 10 24 24 - 24 -
15-Sep-21 Day TR-1048 52,173.3 52,173.3 - Unscheduled - PIT 5 EXT - - -
15-Sep-21 Day TR-1049 46,100.6 46,102.2 1.60 Hauling OB 16025 IMTIKAN 2 2 2 6 OB Outpit EX-6016 PIT 5 EXT IPD 10 24 144 - 24 -
15-Sep-21 Day TR-1049 46,102.2 46,102.7 0.50 Hauling OB 16025 IMTIKAN 2 2 OB Outpit EX-6014 PIT 5 IPD 10 24 48 - 24 -
15-Sep-21 Day TR-1050 45,844.3 45,846.2 1.90 Hauling OB 15421 AGUS A 2 2 3 7 OB Outpit EX-6016 PIT 5 EXT IPD 10 24 168 - 24 -
15-Sep-21 Day TA-7009 27,868.6 27,868.6 - Standby 15862 RUDY AMRIYADI - PIT 5 EXT - - -
15-Sep-21 Day TA-7010 25,203.0 25,205.8 2.79 Hauling Solid Mud 15863 HENDRA M 3 3 Solid Mud Outpit EX-4006 PIT 5 EXT IPD 10 11 34 - 11 -
15-Sep-21 Day TA-7010 25,205.8 25,206.8 1.05 Hauling Solid Mud 15863 HENDRA M 1 3 4 Solid Mud Outpit EX-5022 PIT 5 IPD 10 11 45 - 11 -
15-Sep-21 Day TA-7010 25,206.8 25,207.1 0.26 Hauling Solid Mud 15863 HENDRA M 1 1 Solid Mud Outpit EX-2037 PIT 5 EXT IPD 10 11 11 - 11 -
15-Sep-21 Day TA-7022 - - - Unscheduled - WORKSHOP - - -
15-Sep-21 Day TA-7029 28,557.5 28,557.5 - Unscheduled - PIT 5 EXT - - -
15-Sep-21 Day TA-7030 28,232.3 28,233.0 0.71 Hauling Solid Mud 15817 YUSANDI 3 3 Solid Mud Outpit EX-4006 PIT 5 EXT IPD 10 11 34 - 11 -
15-Sep-21 Day TA-7030 28,233.0 28,233.7 0.71 Hauling Solid Mud 15817 YUSANDI 2 1 3 Solid Mud Outpit EX-5022 PIT 5 IPD 10 11 34 - 11 -
15-Sep-21 Day TA-7030 28,233.7 28,234.2 0.48 Hauling Solid Mud 15817 YUSANDI 2 2 Solid Mud Outpit EX-2037 PIT 5 EXT IPD 10 11 22 - 11 -
15-Sep-21 Day BD-4005 13,770.7 13,770.7 - Scheduled - WORKSHOP - - -
k 15-Sep-21 Day BD-5035 3,473.1 3,478.2 5.10 Front maintenance 15747 MUSTAQIM D6 - PIT 5 EXT - - -
15-Sep-21 Day BD-6025 2,761.9 2,761.9 - Standby - KCP - - -
15-Sep-21 Day BD-6026 30,198.7 30,198.7 - Standby - WORKSHOP - - -
15-Sep-21 Day BD-6028 4,126.9 4,130.5 3.60 Unit Rental 14750 MUSTAKIM - KCP - - -
15-Sep-21 Day BD-6036 34,189.2 34,192.5 3.30 Unit Rental 14964 JOKO P (Dozer) - KCP - - -
15-Sep-21 Day BD-6038 33,977.0 33,979.8 2.80 Unit Rental 15570 HENDRY S - KCP - - -
15-Sep-21 Day BD-6069 10,395.6 10,395.6 - Unscheduled - PIT 5 EXT - - -
15-Sep-21 Day BD-7013 39,948.1 39,952.5 4.40 Front maintenance 15606 FATHUR - PIT 5 EXT - - -
15-Sep-21 Day BD-7026 26,596.6 26,602.1 5.50 Front maintenance 15639 A. BUDIMAN - PIT 5 EXT - - -
15-Sep-21 Day BD-7034 10,039.4 10,044.7 5.30 Disposal maintenance 9492 MAHFUDI - IPD 10 - - -
15-Sep-21 Day GR-2012 22,278.2 22,278.2 - Standby - PIT 5 EXT - - -
15-Sep-21 Day GR-3007 39,249.9 39,252.6 2.70 Road Maintenance Support - PIT 5 EXT - - -
15-Sep-21 Day GR-3008 46,910.2 46,913.7 3.50 Road Maintenance Support 12344 M FAJRI - PIT 5 EXT - - -
15-Sep-21 Day TW-3001 8,532.0 8,533.0 1.00 Road Maintenance Support 15743 LANA - PIT 5 EXT - - -
15-Sep-21 Day TW-4001 18,756.0 18,756.0 - Standby - WORKSHOP - - -
15-Sep-21 Day PU-4002 19,080.0 19,080.0 - Unscheduled - PIT 11 - - -
15-Sep-21 Day PU-2026 6,190.0 6,190.0 - Dewatering - PIT 11 - - -
15-Sep-21 Day PU-3026 12,307.0 12,307.0 - Standby - ROM TEMPORARY - - -
15-Sep-21 Day PU-3015 1,696.0 1,696.0 - Standby - ROM TEMPORARY - - -
15-Sep-21 Day PU-3014 27,240.4 27,240.4 - Standby - ROM TEMPORARY - - -
15-Sep-21 Day LP-2165 13,558.0 13,558.0 - Standby - KCP - - -
15-Sep-21 Day LP-2166 13,044.0 13,045.0 1.00 Unit Rental 4671 NURUDIN - KCP - - -
15-Sep-21 Day LP-2167 14,025.0 14,026.0 1.00 Unit Rental 4671 NURUDIN - KCP - - -
15-Sep-21 Day LP-2168 12,833.0 12,833.0 - Standby - KCP - - -
15-Sep-21 Day LP-2169 12,563.0 12,564.0 1.00 Unit Rental 4671 NURUDIN - KCP - - -
15-Sep-21 Day TS-4007 - - - Standby - KCP - - -
15-Sep-21 Day TS-4017 16,140.0 16,141.0 1.00 Unit Rental 15310 ALDI ALFI SAPUTRA - KCP - - -
15-Sep-21 Day TF-4013 20,403.0 20,405.0 2.00 Unit Rental 13708 AHMAD SALIM - KCP - - -
15-Sep-21 Day TF-4014 34,550.0 34,550.0 - Standby - KCP - - -
15-Sep-21 Night EX-2037 22,207.1 22,209.1 2.00 Rehandling Coal 10916 DANI NOVI KUSYANTO - COAL PIT 5 EXT - - - - -
15-Sep-21 Night EX-2037 22,209.1 22,214.9 5.80 Road Maintenance Support 10916 DANI NOVI KUSYANTO - PIT 5 EXT - - -
15-Sep-21 Night EX-2058 17,537.0 17,537.0 - Standby - ROM TEMPORARY - 1,167 -
15-Sep-21 Night EX-4006 35,203.0 35,203.5 0.50 Moving - pindah lokasi kerja 11330 EKO PURWANTO - PIT 5 EXT - 1,052 -
15-Sep-21 Night EX-4006 35,203.5 35,204.0 0.50 Side casting 11330 EKO PURWANTO - PIT 5 EXT - 1,052 -
15-Sep-21 Night EX-4006 35,204.0 35,207.0 3.00 Loading Waste 11330 EKO PURWANTO - OB Outpit PIT 5 EXT IPD 10 - 1,052 -
15-Sep-21 Night EX-5014 38,649.0 38,654.0 5.00 Unit Rental 15745 SURYANATA - KCP - - -
15-Sep-21 Night EX-5022 11,373.0 11,374.0 1.00 Side casting 9590F SIRATAL RAYYAN - OB Outpit PIT 5 IPD 10 - 1,070 -
15-Sep-21 Night EX-5022 11,374.0 11,379.0 5.00 Loading Waste 9590F SIRATAL RAYYAN - OB Outpit PIT 5 IPD 10 - 1,070 -
15-Sep-21 Night EX-5037 19,036.0 19,036.0 - Unscheduled - PARKIRAN SCANIA - 1,050 -
15-Sep-21 Night EX-6014 57,651.0 57,661.0 10.00 Loading Waste 8952 DIDI SETIAWAN - OB Outpit PIT 5 IPD 10 - 1,009 -
15-Sep-21 Night EX-6016 44,251.0 44,260.0 9.00 Loading Waste 11146 PURWANTO - OB Outpit PIT 5 EXT IPD 10 - - -
15-Sep-21 Night EX-6022 18,597.0 18,607.3 10.30 Loading Waste 9136 AHMAD YANI - OB Outpit PIT 5 IPD 10 - 682 -
15-Sep-21 Night TR-3080 42,727.0 42,729.2 2.16 Hauling OB 3669 SUYANTO 1 4 3 8 OB Outpit EX-6022 PIT 5 IPD 10 42 336 - 42 -
15-Sep-21 Night TR-3080 42,729.2 42,732.9 3.77 Hauling OB 3669 SUYANTO 2 4 3 2 3 14 OB Outpit EX-6014 PIT 5 IPD 10 42 588 - 42 -
15-Sep-21 Night TR-3080 42,732.9 42,736.7 3.77 Hauling OB 3669 SUYANTO 1 3 4 3 3 14 OB Outpit EX-6016 PIT 5 EXT IPD 10 42 588 - 2 42 84
15-Sep-21 Night TR-3174 41,433.2 41,442.8 9.60 Hauling OB 11328 JUSESLAF BANJAR NAHOR 2 4 3 3 4 3 4 4 4 3 3 37 OB Outpit EX-6022 PIT 5 IPD 10 42 1,554 - 42 -
15-Sep-21 Night TR-3175 38,828.6 38,829.8 1.20 Hauling OB 9354 JIDIN 4 4 OB Outpit EX-6014 PIT 5 IPD 10 42 168 - 42 -
15-Sep-21 Night TR-3175 38,829.8 38,838.3 8.50 Hauling OB 9354 JIDIN 3 3 4 4 3 4 3 3 2 3 32 OB Outpit EX-6022 PIT 5 IPD 10 42 1,344 - 42 -
15-Sep-21 Night TR-3195 24,688.3 24,692.3 3.99 Hauling OB 15229 ARDIANSYAH 3 4 3 1 3 14 OB Outpit EX-6014 PIT 5 IPD 10 42 588 - 42 -
15-Sep-21 Night TR-3195 24,692.3 24,697.7 5.41 Hauling OB 15229 ARDIANSYAH 4 3 4 3 3 2 19 OB Outpit EX-6016 PIT 5 EXT IPD 10 42 798 - 42 -
15-Sep-21 Night TR-3202 26,844.7 26,845.9 1.16 Hauling OB 11474 SARINDI 2 2 4 OB Outpit EX-6022 PIT 5 IPD 10 42 168 - 42 -
15-Sep-21 Night TR-3202 26,845.9 26,849.0 3.18 Hauling OB 11474 SARINDI 2 1 2 3 3 11 OB Outpit EX-6014 PIT 5 IPD 10 42 462 - 3 42 126
15-Sep-21 Night TR-3202 26,849.0 26,849.9 0.87 Hauling OB 11474 SARINDI 3 3 OB Outpit EX-6016 PIT 5 EXT IPD 10 42 126 - 42 -
15-Sep-21 Night TR-3203 26,949.4 26,959.0 9.60 Hauling OB 15230 MARGONO 2 4 2 2 4 4 3 4 4 5 2 36 OB Outpit EX-6022 PIT 5 IPD 10 42 1,512 - 42 -
15-Sep-21 Night TR-3204 26,267.7 26,271.2 3.48 Hauling OB 1303 EFENDI 1 3 2 3 4 13 OB Outpit EX-6022 PIT 5 IPD 10 42 546 - 42 -
15-Sep-21 Night TR-3204 26,271.2 26,272.0 0.80 Hauling OB 1303 EFENDI 1 2 3 OB Outpit EX-6014 PIT 5 IPD 10 42 126 - 42 -
15-Sep-21 Night TR-3204 26,272.0 26,276.0 4.02 Hauling OB 1303 EFENDI 3 3 3 4 2 15 OB Outpit EX-6016 PIT 5 EXT IPD 10 42 630 - 42 -
15-Sep-21 Night TR-3205 25,816.4 25,825.9 9.50 Hauling OB 7170F TRI PRASETIYO 2 4 3 2 4 4 3 4 4 4 3 37 OB Outpit EX-6022 PIT 5 IPD 10 42 1,554 - 42 -
15-Sep-21 Night TR-3206 24,918.2 24,918.2 - Scheduled - WORKSHOP - - -
15-Sep-21 Night TR-3220 25,991.2 25,995.1 3.85 Hauling OB 8965 HADI SUTIKNO 2 4 3 1 4 14 OB Outpit EX-6014 PIT 5 IPD 10 42 588 - 42 -
15-Sep-21 Night TR-3220 25,995.1 26,000.0 4.94 Hauling OB 8965 HADI SUTIKNO 3 3 3 3 3 3 18 OB Outpit EX-6016 PIT 5 EXT IPD 10 42 756 - 42 -
15-Sep-21 Night TR-1024 31,335.8 31,335.8 - Unscheduled - WORKSHOP - - -
15-Sep-21 Night TR-1025 47,208.1 47,209.7 1.62 Hauling OB 15469 BASUNI 2 2 3 7 OB Outpit EX-6016 PIT 5 EXT IPD 10 24 168 - 24 -
15-Sep-21 Night TR-1025 47,209.7 47,216.0 6.27 Hauling OB 15469 BASUNI 1 4 4 5 5 5 3 27 OB Outpit EX-6014 PIT 5 IPD 10 24 648 - 24 -
15-Sep-21 Night TR-1031 49,418.1 49,418.1 - Unscheduled - WORKSHOP - - -
15-Sep-21 Night TR-1032 51,218.9 51,219.8 0.90 Hauling OB 15377 RIZALI RAHMAN 3 3 OB Outpit EX-4006 PIT 5 EXT IPD 10 24 72 - 24 -
15-Sep-21 Night TR-1032 51,219.8 51,225.4 5.60 Hauling OB 15377 RIZALI RAHMAN 5 4 5 5 5 2 26 OB Outpit EX-6014 PIT 5 IPD 10 24 624 - 24 -
15-Sep-21 Night TR-1033 51,628.7 51,630.4 1.71 Hauling OB 15466 SUPRIYANTO 1 2 3 6 OB Outpit EX-6014 PIT 5 IPD 10 24 144 - 24 -
15-Sep-21 Night TR-1033 51,630.4 51,632.7 2.29 Hauling OB 15466 SUPRIYANTO 1 3 3 1 8 OB Outpit EX-6016 PIT 5 EXT IPD 10 24 192 - 24 -
15-Sep-21 Night TR-1034 49,404.0 49,405.3 1.31 Hauling OB 8920 VERRY EKO SETIAWAN 3 2 5 OB Outpit EX-4006 PIT 5 EXT IPD 10 24 120 - 24 -
15-Sep-21 Night TR-1034 49,405.3 49,410.0 4.72 Hauling OB 8920 VERRY EKO SETIAWAN 3 4 6 6 19 OB Outpit EX-5022 PIT 5 IPD 10 24 456 - 24 -
15-Sep-21 Night TR-1034 49,410.0 49,411.6 1.57 Hauling OB 8920 VERRY EKO SETIAWAN 4 2 6 OB Outpit EX-6016 PIT 5 EXT IPD 10 24 144 - 24 -
15-Sep-21 Night TR-1036 50,687.3 50,689.1 1.76 Hauling OB 15346 MUSA 3 2 3 8 OB Outpit EX-6016 PIT 5 EXT IPD 10 24 192 - 24 -
15-Sep-21 Night TR-1036 50,689.1 50,695.0 5.94 Hauling OB 15346 MUSA 5 4 5 5 5 3 27 OB Outpit EX-6014 PIT 5 IPD 10 24 648 - 24 -
15-Sep-21 Night TR-1048 52,173.3 52,173.3 - Unscheduled - PIT 5 EXT - - -
15-Sep-21 Night TR-1049 46,102.7 46,104.1 1.42 Hauling OB 15376 EKO FAJAR S 2 4 6 OB Outpit EX-6014 PIT 5 IPD 10 24 144 - 24 -
15-Sep-21 Night TR-1049 46,104.1 46,109.1 4.97 Hauling OB 15376 EKO FAJAR S 3 2 3 5 4 4 21 OB Outpit EX-6016 PIT 5 EXT IPD 10 24 504 - 24 -
15-Sep-21 Night TR-1049 46,109.1 46,112.4 3.31 Hauling OB 15376 EKO FAJAR S 3 4 6 2 15 OB Outpit EX-5022 PIT 5 IPD 10 24 360 - 24 -
15-Sep-21 Night TR-1050 45,846.2 45,853.4 7.23 Hauling OB 15471 MULYADI 2 3 5 3 5 5 5 3 31 OB Outpit EX-6014 PIT 5 IPD 10 24 744 - 24 -
15-Sep-21 Night TR-1050 45,853.4 45,855.1 1.63 Hauling OB 15471 MULYADI 2 1 3 1 7 OB Outpit EX-6016 PIT 5 EXT IPD 10 24 168 - 24 -
15-Sep-21 Night TR-1050 45,855.1 45,855.3 0.23 Hauling OB 15471 MULYADI 1 1 OB Outpit EX-4006 PIT 5 EXT IPD 10 24 24 - 24 -
15-Sep-21 Night TA-7009 27,868.6 27,869.0 0.40 Hauling OB 16026 BAHRUNI 1 1 OB Outpit EX-4006 PIT 5 EXT IPD 10 14 14 - 14 -
15-Sep-21 Night TA-7010 25,207.1 25,209.2 2.09 Hauling OB 15816 M. YUSUF 5 3 4 12 OB Outpit EX-4006 PIT 5 EXT IPD 10 14 168 - 14 -
15-Sep-21 Night TA-7010 25,209.2 25,210.9 1.74 Hauling OB 15816 M. YUSUF 4 4 2 10 OB Outpit EX-5022 PIT 5 IPD 10 14 140 - 14 -
15-Sep-21 Night TA-7010 25,210.9 25,212.2 1.22 Rehandling Coal 15816 M. YUSUF 4 3 7 COAL EX-2037 PIT 5 EXT 11 - - 11 -
15-Sep-21 Night TA-7010 25,212.2 25,213.2 1.05 Hauling OB 15816 M. YUSUF 4 2 6 OB Outpit EX-6014 PIT 5 IPD 11 14 84 - 14 -
15-Sep-21 Night TA-7022 - - - Unscheduled - WORKSHOP - - -
15-Sep-21 Night TA-7029 28,557.5 28,560.7 3.20 Hauling OB 15819 AHNIANSYAH 2 1 4 4 11 OB Outpit EX-4006 PIT 5 EXT IPD 10 14 154 - 14 -
15-Sep-21 Night TA-7029 28,560.7 28,563.9 3.20 Hauling OB 15653 M. ILIAS 4 6 6 16 OB Outpit EX-5022 PIT 5 IPD 10 14 224 - 14 -
15-Sep-21 Night TA-7030 28,234.2 28,236.6 2.41 Hauling OB 16026 BAHRUNI 3 2 2 2 9 OB Outpit EX-4006 PIT 5 EXT IPD 10 14 126 - 14 -
15-Sep-21 Night TA-7030 28,236.6 28,237.7 1.07 Hauling OB 16026 BAHRUNI 3 3 OB Outpit EX-5022 PIT 5 IPD 10 14 42 - 14 -
15-Sep-21 Night TA-7030 28,237.7 28,239.6 1.88 Hauling OB 15818 AGUS SUGIANTO 4 1 2 7 OB Outpit EX-5022 PIT 5 IPD 10 14 98 - 14 -
15-Sep-21 Night TA-7030 28,239.6 28,240.9 1.34 Hauling OB 15818 AGUS SUGIANTO 3 2 5 OB Outpit EX-6016 PIT 5 EXT IPD 10 14 70 - 14 -
15-Sep-21 Night BD-4005 13,770.7 13,770.7 - Scheduled - WORKSHOP - - -
15-Sep-21 Night BD-5035 3,478.2 3,488.3 10.10 Front maintenance 14963 MAULANA ISHAK - IPD 10 - - -
15-Sep-21 Night BD-6025 2,761.9 2,761.9 - Standby - KCP - - -
15-Sep-21 Night BD-6026 30,198.7 30,198.7 - Standby - WORKSHOP - - -
15-Sep-21 Night BD-6028 4,130.5 4,136.7 6.20 Unit Rental 11169 ANNAS - KCP - - -
15-Sep-21 Night BD-6036 34,192.5 34,202.8 10.30 Unit Rental 14744 NOORDIANTO - KCP - - -
15-Sep-21 Night BD-6038 33,979.8 33,988.8 9.00 Unit Rental 14708 ADEFI P - KCP - - -
15-Sep-21 Night BD-6069 10,395.6 10,395.6 - Unscheduled - PIT 5 EXT - - -
15-Sep-21 Night BD-7013 39,952.5 39,961.0 8.50 Front maintenance 10013 ADI SUSANTO - PIT 5 EXT - - -
15-Sep-21 Night BD-7026 26,602.1 26,612.3 10.20 Front maintenance 11676 SUDARSONO - PIT 5 EXT - - -
15-Sep-21 Night BD-7034 10,044.7 10,054.8 10.10 Disposal maintenance 8157 SAMIDI - IPD 10 - - -
15-Sep-21 Night GR-2012 22,278.2 22,278.2 - Standby - PIT 5 EXT - - -
15-Sep-21 Night GR-3007 39,252.6 39,252.6 - Standby - PIT 5 EXT - - -
15-Sep-21 Night GR-3008 46,913.7 46,924.5 10.80 Road Maintenance Support 15571 YOHANIS L - PIT 5 EXT - - -
15-Sep-21 Night TW-3001 8,533.0 8,533.0 - Standby - PIT 5 EXT - - -
15-Sep-21 Night TW-4001 18,756.0 18,756.00 - Standby - WORKSHOP - - -
15-Sep-21 Night PU-4002 19,080.0 19,080.0 - Unscheduled - PIT 11 - - -
15-Sep-21 Night PU-2026 6,190.0 6,193.2 3.20 Dewatering - PIT 11 - - -
15-Sep-21 Night PU-3026 12,307.0 12,307.0 - Standby - ROM TEMPORARY - - -
15-Sep-21 Night PU-3015 1,696.0 1,696.0 - Standby - ROM TEMPORARY - - -
15-Sep-21 Night PU-3014 27,240.4 27,240.4 - Standby - ROM TEMPORARY - - -
15-Sep-21 Night LP-2165 13,558.0 13,558.0 - Standby 4671 NURUDIN - KCP - - -
15-Sep-21 Night LP-2166 13,045.0 13,057.0 12.00 Unit Rental 4671 NURUDIN - KCP - - -
15-Sep-21 Night LP-2167 14,026.0 14,038.0 12.00 Unit Rental 4671 NURUDIN - KCP - - -
15-Sep-21 Night LP-2168 12,833.0 12,845.0 12.00 Unit Rental 4671 NURUDIN - KCP - - -
15-Sep-21 Night LP-2169 12,564.0 12,576.0 12.00 Unit Rental 4671 NURUDIN - KCP - - -
15-Sep-21 Night TS-4007 - - - Standby - KCP - - -
15-Sep-21 Night TS-4017 16,141.0 16,146.0 5.00 Unit Rental 15745 SURYANATA - KCP - - -
15-Sep-21 Night TF-4013 20,405.0 20,413.0 8.00 Unit Rental 15746 SYARIFUDDI - KCP - - -
15-Sep-21 Night TF-4014 34,550.0 34,550.0 - Standby - KCP - - -
16-Sep-21 Day EX-2037 22,214.9 22,222.4 7.50 Side casting 15504 SLAMET WIDODO - PIT 5 EXT - - -
16-Sep-21 Day EX-2037 22,222.4 22,225.4 3.00 Rehandling Coal 15504 SLAMET WIDODO - COAL PIT 5 EXT - - - - -
16-Sep-21 Day EX-2058 17,537.0 17,541.3 4.30 Road Maintenance Support 15617 ZAENAL - ROM TEMPORARY - 1,198 -
16-Sep-21 Day EX-2058 17,541.3 17,543.0 1.70 Loading Solid Mud 15617 ZAENAL - Solid Mud Outpit PIT 5 EXT IPD 10 - - 1,198 - -
16-Sep-21 Day EX-4006 35,207.0 35,208.0 1.00 Loading Waste 15617 ZAENAL - OB Outpit PIT 5 EXT IPD 10 - 1,101 -
16-Sep-21 Day EX-4006 35,208.0 35,210.0 2.00 Side casting 15617 ZAENAL - OB Outpit PIT 5 EXT IPD 10 - 1,101 -
16-Sep-21 Day EX-5014 38,654.0 38,664.0 10.00 Unit Rental 15616 JOKO SUDIRO - KCP - - -
16-Sep-21 Day EX-5022 11,379.0 11,384.0 5.00 Loading Solid Mud 12534 PUJIYANTO - Solid Mud Outpit PIT 5 EXT IPD 10 - 1,105 -
16-Sep-21 Day EX-5022 11,384.0 11,387.0 3.00 Loading Waste 12534 PUJIYANTO - OB Outpit PIT 5 EXT IPD 10 - 1,105 -
16-Sep-21 Day EX-5037 19,036.0 19,036.0 - Unscheduled - PARKIRAN SCANIA - 1,095 -
16-Sep-21 Day EX-6014 57,661.0 57,671.0 10.00 Loading Waste 10916 DANI NOVI KUSYANTO - OB Outpit PIT 5 EXT IPD 10 - - -
16-Sep-21 Day EX-6016 44,260.0 44,271.0 11.00 Loading Waste 15567 ARIF WAHYUDI - OB Outpit PIT 5 EXT IPD 10 - 636 -
16-Sep-21 Day EX-6022 18,607.3 18,618.2 10.90 Loading Waste 15568 FUAD EFENDI - OB Outpit PIT 5 EXT IPD 10 - 636 -
16-Sep-21 Day TR-3080 42,736.7 42,738.0 1.33 Hauling OB 9214 MUSTOFA ADI PRAYITNO 2 3 5 OB Outpit EX-6016 PIT 5 EXT IPD 10 42 210 - 42 -
16-Sep-21 Day TR-3080 42,738.0 42,738.6 0.53 Hauling OB 9214 MUSTOFA ADI PRAYITNO 1 1 2 OB Outpit EX-6022 PIT 5 IPD 10 42 84 - 42 -
16-Sep-21 Day TR-3080 42,738.6 42,747.3 8.75 Hauling OB 9214 MUSTOFA ADI PRAYITNO 2 4 4 3 5 4 4 3 4 33 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 1,386 - 42 -
16-Sep-21 Day TR-3174 41,442.8 41,445.0 2.16 Hauling OB 8958 MUKHROMIN 4 3 3 10 OB Outpit EX-6022 PIT 5 IPD 10 42 420 - 42 -
16-Sep-21 Day TR-3174 41,445.0 41,445.2 0.22 Hauling OB 8958 MUKHROMIN 2 2 OB Outpit EX-6016 PIT 5 EXT IPD 10 42 84 - 42 -
16-Sep-21 Day TR-3174 41,445.2 41,452.3 7.13 Hauling OB 8958 MUKHROMIN 1 4 4 3 5 4 5 3 4 33 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 1,386 - 42 -
16-Sep-21 Day TR-3175 38,838.3 38,840.4 2.05 Hauling OB 10881 BURHANUDDIN 3 4 1 8 OB Outpit EX-6022 PIT 5 IPD 10 42 336 - 42 -
16-Sep-21 Day TR-3175 38,840.4 38,843.9 3.59 Hauling OB 10881 BURHANUDDIN 3 4 3 4 14 OB Outpit EX-6016 PIT 5 EXT IPD 10 42 588 - 42 -
16-Sep-21 Day TR-3175 38,843.9 38,848.8 4.87 Hauling OB 15350 HERMAN 4 4 4 3 4 19 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 798 - 42 -
16-Sep-21 Day TR-3195 24,697.7 24,698.4 0.72 Hauling OB 15347 TAHMID 2 2 4 OB Outpit EX-6016 PIT 5 EXT IPD 10 42 168 - 42 -
16-Sep-21 Day TR-3195 24,698.4 24,708.2 9.78 Hauling OB 15347 TAHMID 1 3 3 3 4 4 4 4 4 2 4 36 OB Outpit EX-6022 PIT 5 IPD 10 42 1,512 - 1 42 42
16-Sep-21 Day TR-3202 26,849.9 26,849.9 - Unscheduled - IPD 10 - - -
16-Sep-21 Day TR-3203 26,959.0 26,963.1 4.07 Hauling OB 8892 BAGUS PURWONO 2 1 3 3 4 4 17 OB Outpit EX-6022 PIT 5 IPD 10 42 714 - 42 -
16-Sep-21 Day TR-3203 26,963.1 26,964.3 1.20 Hauling OB 8892 BAGUS PURWONO 2 2 2 6 OB Outpit EX-6016 PIT 5 EXT IPD 10 42 252 - 42 -
16-Sep-21 Day TR-3203 26,964.3 26,969.3 5.03 Hauling OB 10882 SABIRIN 5 4 4 3 4 20 OB Outpit EX-6022 PIT 5 IPD 10 42 840 - 42 -
16-Sep-21 Day TR-3204 26,276.0 26,276.5 0.49 Hauling OB 10969 JOKO PRIONO 2 2 4 OB Outpit EX-6016 PIT 5 EXT IPD 10 42 168 - 42 -
16-Sep-21 Day TR-3204 26,276.5 26,286.6 10.11 Hauling OB 10969 JOKO PRIONO 3 3 3 3 3 5 4 4 4 3 4 39 OB Outpit EX-6022 PIT 5 IPD 10 42 1,638 - 42 -
16-Sep-21 Day TR-3205 25,825.9 25,828.5 2.59 Hauling OB 10695 SUPIYANDI 4 3 2 9 OB Outpit EX-6022 PIT 5 IPD 10 42 378 - 42 -
16-Sep-21 Day TR-3205 25,828.5 25,836.5 8.01 Hauling OB 10695 SUPIYANDI 3 2 4 3 4 5 3 4 3 31 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 1,302 - 42 -
16-Sep-21 Day TR-3206 24,918.2 24,918.2 - Scheduled - WORKSHOP - - -
16-Sep-21 Day TR-3220 26,000.0 26,001.4 1.40 Hauling OB 10968 SUKIRNO 4 2 1 7 OB Outpit EX-6016 PIT 5 EXT IPD 10 42 294 - 42 -
16-Sep-21 Day TR-3220 26,001.4 26,010.3 8.90 Hauling OB 10968 SUKIRNO 2 3 4 4 4 5 4 4 3 4 37 OB Outpit EX-6022 PIT 5 IPD 10 42 1,554 - 42 -
16-Sep-21 Day TR-1024 31,335.8 31,335.8 - Unscheduled - WORKSHOP - - -
16-Sep-21 Day TR-1025 47,216.0 47,217.8 1.84 Hauling Solid Mud 3 1 4 8 Solid Mud Outpit EX-5022 PIT 5 EXT IPD 10 19 154 - 19 -
16-Sep-21 Day TR-1025 47,217.8 47,219.2 1.38 Hauling OB 5 1 6 OB Outpit EX-6014 PIT 5 EXT IPD 10 24 144 - 24 -
16-Sep-21 Day TR-1025 47,219.2 47,223.4 4.14 Hauling OB 2 4 3 3 2 4 18 OB Outpit EX-6016 PIT 5 EXT IPD 10 24 432 - 24 -
16-Sep-21 Day TR-1025 47,223.4 47,225.9 2.53 Hauling OB 5 5 1 11 OB Outpit EX-5022 PIT 5 EXT IPD 10 24 264 - 24 -
16-Sep-21 Day TR-1031 49,418.1 49,418.1 - Unscheduled - WORKSHOP - - -
16-Sep-21 Day TR-1032 51,225.4 51,226.3 0.92 Hauling Solid Mud 15468 PADLIANSYAH 3 1 4 Solid Mud Outpit EX-5022 PIT 5 EXT IPD 10 19 77 - 19 -
16-Sep-21 Day TR-1032 51,226.3 51,228.4 2.07 Hauling OB 15468 PADLIANSYAH 1 5 3 9 OB Outpit EX-6014 PIT 5 EXT IPD 10 24 216 - 24 -
16-Sep-21 Day TR-1032 51,228.4 51,230.7 2.30 Hauling OB 15468 PADLIANSYAH 1 3 2 4 10 OB Outpit EX-6016 PIT 5 EXT IPD 10 24 240 - 24 -
16-Sep-21 Day TR-1032 51,230.7 51,231.2 0.46 Hauling OB 15468 PADLIANSYAH 2 2 OB Outpit EX-6022 PIT 5 IPD 10 24 48 - 24 -
16-Sep-21 Day TR-1032 51,231.2 51,236.2 5.06 Hauling OB 16025 IMTIKAN 5 6 4 3 4 22 OB Outpit EX-6016 PIT 5 EXT IPD 10 24 528 - 24 -
16-Sep-21 Day TR-1033 51,632.7 51,633.2 0.52 Hauling Solid Mud 15470 IJAI 1 1 2 Solid Mud Outpit EX-5022 PIT 5 EXT IPD 10 19 38 - 19 -
16-Sep-21 Day TR-1033 51,633.2 51,633.5 0.26 Hauling OB 15470 IJAI 1 1 OB Outpit EX-4006 PIT 5 EXT IPD 10 24 24 - 24 -
16-Sep-21 Day TR-1033 51,633.5 51,634.5 1.05 Hauling OB 15470 IJAI 4 4 OB Outpit EX-6014 PIT 5 EXT IPD 10 24 96 - 24 -
16-Sep-21 Day TR-1033 51,634.5 51,640.8 6.27 Hauling OB 15470 IJAI 2 4 4 4 5 5 24 OB Outpit EX-6016 PIT 5 EXT IPD 10 24 576 - 24 -
16-Sep-21 Day TR-1034 49,411.6 49,414.4 2.81 Hauling OB 15420 M ABD MADI 1 1 1 3 OB Outpit EX-6016 PIT 5 EXT IPD 10 24 72 - 24 -
16-Sep-21 Day TR-1034 49,414.4 49,415.5 1.08 Hauling Solid Mud 15420 M ABD MADI 3 1 4 3 2 13 Solid Mud Outpit EX-5022 PIT 5 EXT IPD 10 19 250 - 19 -
16-Sep-21 Day TR-1034 49,415.5 49,420.9 5.41 Hauling OB 15576 JOKO SANTOSO 3 2 5 OB Outpit EX-6016 PIT 5 EXT IPD 10 24 120 - 24 -
16-Sep-21 Day TR-1036 50,695.0 50,695.9 0.88 Hauling OB 15398 SIGIT SUSANTO 2 2 5 5 5 2 4 25 OB Outpit EX-6014 PIT 5 EXT IPD 10 24 600 - 24 -
16-Sep-21 Day TR-1036 50,695.9 50,697.0 1.10 Hauling Solid Mud 15398 SIGIT SUSANTO 1 4 5 Solid Mud Outpit EX-5022 PIT 5 EXT IPD 10 19 96 - 19 -
16-Sep-21 Day TR-1036 50,697.0 50,700.3 3.30 Hauling OB 15398 SIGIT SUSANTO 1 2 5 4 3 15 OB Outpit EX-6016 PIT 5 EXT IPD 10 24 360 - 24 -
16-Sep-21 Day TR-1036 50,700.3 50,704.0 3.74 Hauling OB 16024 QORI 3 3 5 2 4 17 OB Outpit EX-6016 PIT 5 EXT IPD 10 24 408 - 24 -
16-Sep-21 Day TR-1036 50,704.0 50,704.9 0.88 Hauling OB 16024 QORI 2 2 4 OB Outpit EX-5022 PIT 5 EXT IPD 10 24 96 - 24 -
16-Sep-21 Day TR-1048 52,173.3 52,173.3 - Unscheduled - PIT 5 EXT - - -
16-Sep-21 Day TR-1049 46,112.4 46,113.7 1.33 Hauling Solid Mud 15955 RIZKY IHWAN 3 1 2 6 Solid Mud Outpit EX-5022 PIT 5 EXT IPD 10 19 115 - 19 -
16-Sep-21 Day TR-1049 46,113.7 46,114.8 1.10 Hauling OB 15955 RIZKY IHWAN 5 5 OB Outpit EX-6014 PIT 5 EXT IPD 10 24 120 - 24 -
16-Sep-21 Day TR-1049 46,114.8 46,121.9 7.07 Hauling OB 15955 RIZKY IHWAN 2 2 4 3 5 5 4 4 3 32 OB Outpit EX-6016 PIT 5 EXT IPD 10 24 768 - 24 -
16-Sep-21 Day TR-1050 45,855.3 45,856.0 0.75 Hauling OB 15467 HUSNI 3 3 OB Outpit EX-4006 PIT 5 EXT IPD 10 24 72 - 24 -
16-Sep-21 Day TR-1050 45,856.0 45,856.5 0.50 Hauling OB 15467 HUSNI 2 2 OB Outpit EX-6014 PIT 5 EXT IPD 10 24 48 - 24 -
16-Sep-21 Day TR-1050 45,856.5 45,864.6 8.05 Hauling OB 15467 HUSNI 3 4 4 4 5 2 3 3 4 32 OB Outpit EX-6016 PIT 5 EXT IPD 10 24 768 - 24 -
16-Sep-21 Day TR-1050 45,864.6 45,865.6 1.01 Rehandling Coal 15467 HUSNI 2 2 4 COAL EX-2037 PIT 5 EXT 19 - - 19 -
16-Sep-21 Day TA-7009 27,869.0 27,869.8 0.76 Rehandling Coal 15862 RUDY AMRIYADI 3 3 COAL EX-2037 PIT 5 EXT 11 - - 11 -
16-Sep-21 Day TA-7009 27,869.8 27,874.8 5.04 Hauling OB 15862 RUDY AMRIYADI 4 5 5 4 2 20 Solid Mud Outpit EX-5022 PIT 5 EXT IPD 10 11 224 - 1 11 11
16-Sep-21 Day TA-7010 25,213.2 25,214.8 1.58 Rehandling Coal 15861 AGUSTIAN 3 1 3 7 COAL EX-2037 PIT 5 EXT 11 - - 11 -
16-Sep-21 Day TA-7010 25,214.8 25,218.8 4.05 Hauling Solid Mud 15861 AGUSTIAN 3 5 3 4 3 18 Solid Mud Outpit EX-5022 PIT 5 EXT IPD 10 11 202 - 3 11 34
16-Sep-21 Day TA-7010 25,218.8 25,221.5 2.70 Hauling OB 15861 AGUSTIAN 6 5 1 12 OB Outpit EX-5022 PIT 5 EXT IPD 10 14 168 - 14 -
16-Sep-21 Day TA-7010 25,221.5 25,223.1 1.58 Hauling Solid Mud 15861 AGUSTIAN 3 4 7 Solid Mud Outpit EX-2058 PIT 5 EXT IPD 11 11 78 - 11 -
16-Sep-21 Day TA-7022 - - - Unscheduled - WORKSHOP - - -
16-Sep-21 Day TA-7029 28,563.9 28,564.6 0.68 Hauling OB 15863 HENDRA M 2 2 OB Outpit EX-4006 PIT 5 EXT IPD 10 14 28 - 14 -
16-Sep-21 Day TA-7029 28,564.6 28,565.9 1.35 Hauling Solid Mud 15863 HENDRA M 4 4 Solid Mud Outpit EX-5022 PIT 5 EXT IPD 10 11 45 - 11 -
16-Sep-21 Day TA-7029 28,565.9 28,566.6 0.68 Hauling OB 15863 HENDRA M 2 2 OB Outpit EX-5022 PIT 5 EXT IPD 10 14 28 - 14 -
16-Sep-21 Day TA-7030 28,240.9 28,241.4 0.47 Hauling OB 15817 YUSANDI 2 2 OB Outpit EX-4006 PIT 5 EXT IPD 10 14 28 - 14 -
16-Sep-21 Day TA-7030 28,241.4 28,245.8 4.42 Hauling Solid Mud 15817 YUSANDI 5 4 5 2 3 19 Solid Mud Outpit EX-5022 PIT 5 EXT IPD 10 11 213 - 11 -
16-Sep-21 Day TA-7030 28,245.8 28,248.4 2.56 Hauling OB 15817 YUSANDI 5 5 1 11 OB Outpit EX-5022 PIT 5 EXT IPD 10 14 154 - 14 -
16-Sep-21 Day TA-7030 28,248.4 28,249.1 0.70 Rehandling Coal 15817 YUSANDI 3 3 COAL EX-2037 PIT 5 EXT 11 - - 11 -
16-Sep-21 Day TA-7030 28,249.1 28,250.9 1.86 Hauling Solid Mud 15817 YUSANDI 4 4 8 Solid Mud Outpit EX-2058 PIT 5 EXT IPD 11 11 90 - 11 -
16-Sep-21 Day BD-4005 13,770.7 13,770.7 - Scheduled - WORKSHOP - - -
k 16-Sep-21 Day BD-5035 3,488.3 3,497.0 8.70 Disposal maintenance 15747 MUSTAQIM D6 - IPD 11 - - -
16-Sep-21 Day BD-6025 2,761.9 2,761.9 - Standby - KCP - - -
16-Sep-21 Day BD-6026 30,198.7 30,198.7 - Standby - WORKSHOP - - -
16-Sep-21 Day BD-6028 4,136.7 4,145.7 9.00 Unit Rental 14750 MUSTAKIM - KCP - - -
16-Sep-21 Day BD-6036 34,202.8 34,212.3 9.50 Unit Rental 14710 AGUS S - KCP - - -
16-Sep-21 Day BD-6038 33,988.8 33,997.6 8.80 Unit Rental 15570 HENDRY S - KCP - - -
16-Sep-21 Day BD-6069 10,395.6 10,395.6 - Unscheduled - PIT 5 EXT - - -
16-Sep-21 Day BD-7013 39,961.0 39,971.8 10.80 Front maintenance 15606 FATHUR - PIT 5 EXT - - -
16-Sep-21 Day BD-7026 26,612.3 26,616.3 4.00 Front maintenance 9978 KARSIANTO - PIT 5 EXT - - -
16-Sep-21 Day BD-7026 26,616.3 26,622.0 5.70 Ripping 9978 KARSIANTO - PIT 5 EXT - - -
16-Sep-21 Day BD-7034 10,054.8 10,064.4 9.60 Disposal maintenance 9492 MAHFUDI - IPD 10 - - -
16-Sep-21 Day GR-2012 22,278.2 22,278.2 - Standby - PIT 5 EXT - - -
16-Sep-21 Day GR-3007 39,252.6 39,259.7 7.10 Road Maintenance Support 8925 AGUS SUNARWAN - PIT 5 EXT - - -
16-Sep-21 Day GR-3008 46,924.5 46,933.7 9.20 Road Maintenance Support 9426 ADE SUPIANA - PIT 5 EXT - - -
16-Sep-21 Day TW-3001 8,533.0 8,536.0 3.00 Road Maintenance Support 15743 LANA - PIT 5 EXT - - -
16-Sep-21 Day TW-4001 18,756.0 18,756.00 - Standby - WORKSHOP - - -
16-Sep-21 Day PU-4002 19,080.0 19,080.00 - Unscheduled - PIT 11 - - -
16-Sep-21 Day PU-2026 6,193.2 6,193.2 - Standby - PIT 11 - - -
16-Sep-21 Day PU-3026 12,307.0 12,307.00 - Standby - ROM TEMPORARY - - -
16-Sep-21 Day PU-3015 1,696.0 1,696.00 - Standby - ROM TEMPORARY - - -
16-Sep-21 Day PU-3014 27,240.4 27,240.40 - Standby - ROM TEMPORARY - - -
16-Sep-21 Day LP-2165 13,558.0 13,558.00 - Standby - KCP - - -
16-Sep-21 Day LP-2166 13,057.0 13,058.00 1.00 Unit Rental 4671 NURUDIN - KCP - - -
16-Sep-21 Day LP-2167 14,038.0 14,038.00 - Standby - KCP - - -
16-Sep-21 Day LP-2168 12,845.0 12,848.00 3.00 Unit Rental 4671 NURUDIN - KCP - - -
16-Sep-21 Day LP-2169 12,576.0 12,576.00 - Standby - KCP - - -
16-Sep-21 Day TS-4007 - - - Standby - KCP - - -
16-Sep-21 Day TS-4017 16,147.0 16,155.0 8.00 Unit Rental 15310 ALDI ALFI SAPUTRA - KCP - - -
16-Sep-21 Day TF-4013 20,413.0 20,417.0 4.00 Unit Rental 15105 HADIANOR - KCP - - -
16-Sep-21 Day TF-4014 34,550.0 34,550.0 - Standby - KCP - - -
16-Sep-21 Night EX-2037 22,225.4 22,229.7 4.30 Side casting 11330 EKO PURWANTO - PIT 5 EXT - - -
16-Sep-21 Night EX-2037 22,229.7 22,234.7 5.00 Sloping 11330 EKO PURWANTO - PIT 5 EXT - - -
16-Sep-21 Night EX-2058 17,543.0 17,544.8 1.80 Side casting 9590F SIRATAL RAYYAN - PIT 5 EXT - 1,198 -
16-Sep-21 Night EX-2058 17,544.8 17,549.4 4.60 Loading Solid Mud 9590F SIRATAL RAYYAN - Solid Mud Outpit PIT 5 EXT IPD 11 - - 1,198 - -
16-Sep-21 Night EX-4006 35,210.0 35,212.0 2.00 Side casting 15604 AHMAD SYAFI'I - PIT 5 EXT - 1,101 -
16-Sep-21 Night EX-4006 35,212.0 35,213.0 1.00 Rehandling Coal 15604 AHMAD SYAFI'I - COAL PIT 5 EXT - 1,101 -
16-Sep-21 Night EX-5014 38,664.0 38,674.0 10.00 Unit Rental 15345 SUTONO - KCP - - -
16-Sep-21 Night EX-5022 11,387.0 11,392.0 5.00 Loading Waste 15604 AHMAD SYAFI'I - OB Outpit PIT 5 EXT IPD 10 - 1,105 -
16-Sep-21 Night EX-5037 19,041.0 19,042.0 1.00 Moving - pindah lokasi kerja 10916 DANI NOVI KUSYANTO - PARKIRAN SCANIA - 1,095 -
16-Sep-21 Night EX-6014 57,671.0 57,682.0 11.00 Loading Waste 8952 DIDI SETIAWAN - OB Outpit PIT 5 EXT IPD 10 - - -
16-Sep-21 Night EX-6016 44,271.0 44,277.0 6.00 Loading Waste 9136 AHMAD YANI - OB Outpit PIT 5 EXT IPD 10 - 636 -
16-Sep-21 Night EX-6022 18,618.2 18,628.7 10.50 Loading Waste 15486 SUGENG PRAYETNO - OB Outpit PIT 5 EXT IPD 10 - 636 -
16-Sep-21 Night TR-3080 42,747.3 42,753.3 5.99 Hauling OB 1354 SUDIYANTO 2 4 2 5 3 4 3 23 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 966 - 42 -
16-Sep-21 Night TR-3174 41,452.3 41,454.1 1.75 Hauling OB 11328 JUSESLAF BANJAR NAHOR 3 4 7 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 294 - 42 -
16-Sep-21 Night TR-3174 41,454.1 41,463.3 9.24 Hauling OB 11328 JUSESLAF BANJAR NAHOR 3 5 4 5 5 4 5 4 2 37 OB Outpit EX-6022 PIT 5 IPD 10 42 1,554 - 42 -
16-Sep-21 Night TR-3175 38,848.8 38,856.7 7.89 Hauling OB 9354 JIDIN 2 3 4 4 5 4 4 4 5 4 3 42 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 1,764 - 42 -
16-Sep-21 Night TR-3195 24,708.2 24,718.3 10.10 Hauling OB 15229 ARDIANSYAH 3 5 3 5 4 5 5 5 4 4 3 46 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 1,932 - 42 -
16-Sep-21 Night TR-3202 26,849.9 26,855.2 5.29 Hauling OB 11474 SARINDI 3 4 5 4 3 19 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 798 - 42 -
16-Sep-21 Night TR-3203 26,969.3 26,971.4 2.10 Hauling OB 8920 VERRY EKO SETIAWAN 3 4 7 OB Outpit EX-6022 PIT 5 IPD 10 42 294 - 42 -
16-Sep-21 Night TR-3204 26,286.6 26,296.7 10.10 Hauling OB 1303 EFENDI 4 4 3 4 4 5 5 5 4 5 2 45 OB Outpit EX-6022 PIT 5 IPD 10 42 1,890 - 42 -
16-Sep-21 Night TR-3205 25,836.5 25,846.4 9.90 Hauling OB 7170F TRI PRASETIYO 3 4 4 4 4 4 4 4 4 5 3 43 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 1,806 - 42 -
16-Sep-21 Night TR-3206 24,918.2 24,918.2 - Scheduled - WORKSHOP - - -
16-Sep-21 Night TR-3220 26,010.3 26,020.3 10.00 Hauling OB 8965 HADI SUTIKNO 3 5 3 3 5 4 5 4 4 4 3 43 OB Outpit EX-6022 PIT 5 IPD 10 42 1,806 - 42 -
16-Sep-21 Night TR-1024 31,335.8 31,335.8 - Unscheduled - WORKSHOP - - -
16-Sep-21 Night TR-1025 47,225.9 47,228.0 2.09 Hauling OB 15469 BASUNI 2 2 1 2 2 1 2 12 OB Outpit EX-6016 PIT 5 EXT IPD 10 24 288 - 24 -
16-Sep-21 Night TR-1025 47,228.0 47,233.1 5.12 Hauling OB 15469 BASUNI 2 2 4 4 1 4 2 2 1 22 OB Outpit EX-6014 PIT 5 EXT IPD 10 24 528 - 24 -
16-Sep-21 Night TR-1025 47,233.1 47,235.9 2.79 Hauling OB 15469 BASUNI 6 6 12 OB Outpit EX-5022 PIT 5 EXT IPD 10 24 288 - 24 -
16-Sep-21 Night TR-1031 49,418.1 49,418.1 - Unscheduled - WORKSHOP - - -
16-Sep-21 Night TR-1032 51,236.2 51,241.2 4.99 Hauling OB 15377 RIZALI RAHMAN 2 3 2 4 4 4 2 21 OB Outpit EX-6016 PIT 5 EXT IPD 10 24 504 - 24 -
16-Sep-21 Night TR-1032 51,241.2 51,241.7 0.50 Hauling OB 15377 RIZALI RAHMAN 1 1 2 OB Outpit EX-5022 PIT 5 EXT IPD 10 24 48 - 24 -
16-Sep-21 Night TR-1032 51,241.7 51,245.7 4.00 Hauling OB 15377 RIZALI RAHMAN 3 5 4 4 16 OB Outpit EX-6014 PIT 5 EXT IPD 10 24 384 - 24 -
16-Sep-21 Night TR-1033 51,640.8 51,640.8 - Hauling OB - PIT 5 EXT - - -
16-Sep-21 Night TR-1034 49,420.9 49,426.0 5.07 Hauling OB 15419 HUSEN 2 2 2 4 3 4 3 20 OB Outpit EX-6016 PIT 5 EXT IPD 10 24 480 - 24 -
16-Sep-21 Night TR-1034 49,426.0 49,426.2 0.25 Hauling OB 15419 HUSEN 1 1 OB Outpit EX-6014 PIT 5 EXT IPD 10 24 24 - 24 -
16-Sep-21 Night TR-1034 49,426.2 49,428.5 2.28 Hauling OB 15419 HUSEN 5 4 9 OB Outpit EX-5022 PIT 5 EXT IPD 10 24 216 - 24 -
16-Sep-21 Night TR-1036 50,704.9 50,706.3 1.41 Hauling OB 15636 AKHMAD NOOR 2 4 6 OB Outpit EX-5022 PIT 5 EXT IPD 10 24 144 - 24 -
16-Sep-21 Night TR-1036 50,706.3 50,707.5 1.17 Hauling OB 15346 MUSA 3 2 5 OB Outpit EX-6014 PIT 5 EXT IPD 10 24 120 - 24 -
16-Sep-21 Night TR-1036 50,707.5 50,709.6 2.11 Hauling OB 2 2 4 2 10 OB Outpit EX-6016 PIT 5 EXT IPD 10 24 240 - 24 -
16-Sep-21 Night TR-1036 50,709.6 50,711.0 1.41 Rehandling Coal 2 4 6 COAL EX-4006 PIT 5 EXT 19 - - 19 -
16-Sep-21 Night TR-1048 52,175.5 52,175.8 0.30 Hauling OB 8920 VERRY EKO SETIAWAN 1 1 OB Outpit EX-6016 PIT 5 EXT IPD 10 24 24 - 24 -
16-Sep-21 Night TR-1048 52,175.8 52,177.9 2.10 Hauling OB 8920 VERRY EKO SETIAWAN 1 5 3 9 OB Outpit EX-6014 PIT 5 EXT IPD 10 24 216 - 24 -
16-Sep-21 Night TR-1049 46,121.9 46,122.2 0.30 Hauling OB 15375 A JEFRI M 1 1 OB Outpit EX-5022 PIT 5 EXT IPD 10 24 24 - 24 -
16-Sep-21 Night TR-1049 46,122.2 46,131.0 8.80 Hauling OB 15375 A JEFRI M 3 4 4 4 3 18 OB Outpit EX-6016 PIT 5 EXT IPD 10 24 432 - 24 -
16-Sep-21 Night TR-1050 45,865.6 45,870.3 4.71 Hauling OB 15421 AGUS A 2 3 2 4 3 4 3 21 OB Outpit EX-6016 PIT 5 EXT IPD 10 24 504 - 24 -
16-Sep-21 Night TR-1050 45,870.3 45,872.7 2.36 Hauling OB 15421 AGUS A 2 4 4 10 OB Outpit EX-6014 PIT 5 EXT IPD 10 24 240 - 24 -
16-Sep-21 Night TR-1050 45,872.7 45,875.5 2.83 Hauling OB 15421 AGUS A 1 6 5 12 OB Outpit EX-5022 PIT 5 EXT IPD 10 24 288 - 24 -
16-Sep-21 Night TA-7009 27,874.8 27,874.8 - Unscheduled - PIT 5 EXT - - -
16-Sep-21 Night TA-7010 25,223.1 25,227.6 4.44 Hauling OB 15653 M. ILIAS 4 5 4 5 18 OB Outpit EX-5022 PIT 5 EXT IPD 10 14 252 - 14 -
16-Sep-21 Night TA-7010 25,227.6 25,231.5 3.95 Hauling Solid Mud 15819 AHNIANSYAH 3 1 5 4 3 16 Solid Mud Outpit EX-2058 PIT 5 EXT IPD 10 11 179 - 11 -
16-Sep-21 Night TA-7022 - - - Unscheduled - WORKSHOP - - -
16-Sep-21 Night TA-7029 28,566.6 28,569.6 2.98 Hauling OB 15818 AGUS SUGIANTO 3 4 4 11 OB Outpit EX-5022 PIT 5 EXT IPD 10 14 154 - 14 -
16-Sep-21 Night TA-7029 28,569.6 28,574.2 4.61 Hauling Solid Mud 15818 AGUS SUGIANTO 3 4 5 3 2 17 Solid Mud Outpit EX-2058 PIT 5 EXT IPD 11 11 190 - 11 -
16-Sep-21 Night TA-7030 28,250.9 28,252.7 1.79 Hauling OB 16026 BAHRUNI 3 4 7 OB Outpit EX-5022 PIT 5 EXT IPD 10 14 98 - 14 -
16-Sep-21 Night TA-7030 28,252.7 28,257.3 4.60 Hauling Solid Mud 16026 BAHRUNI 3 3 5 4 3 18 Solid Mud Outpit EX-2058 PIT 5 EXT IPD 11 11 202 - 11 -
16-Sep-21 Night BD-4005 13,770.7 13,770.7 - Scheduled - WORKSHOP - - -
16-Sep-21 Night BD-5035 3,497.0 3,506.7 9.70 Disposal maintenance 14963 MAULANA ISHAK - IPD 11 - - -
16-Sep-21 Night BD-6025 2,761.9 2,761.9 - Standby - KCP - - -
16-Sep-21 Night BD-6026 30,198.7 30,198.7 - Standby - WORKSHOP - - -
16-Sep-21 Night BD-6028 4,145.7 4,150.5 4.80 Unit Rental 14744 NOORDIANTO - KCP - - -
16-Sep-21 Night BD-6036 34,212.3 34,218.8 6.50 Unit Rental 14964 JOKO P (Dozer) - KCP - - -
16-Sep-21 Night BD-6038 33,997.7 34,001.1 3.40 Unit Rental 14708 ADEFI P - KCP - - -
16-Sep-21 Night BD-6069 10,395.6 10,395.6 - Unscheduled - PIT 5 EXT - - -
16-Sep-21 Night BD-7013 39,971.8 39,983.1 11.30 Front maintenance 11676 SUDARSONO - PIT 5 EXT - - -
16-Sep-21 Night BD-7026 26,622.0 26,630.6 8.60 Front maintenance 15639 A. BUDIMAN - PIT 5 EXT - - -
16-Sep-21 Night BD-7034 10,064.4 10,074.5 10.10 Disposal maintenance 8157 SAMIDI - IPD 10 - - -
16-Sep-21 Night GR-2012 22,278.2 22,278.2 - Standby - PIT 5 EXT - - -
16-Sep-21 Night GR-3007 39,259.7 39,269.8 10.10 Road Maintenance Support 12344 M FAJRI - PIT 5 EXT - - -
16-Sep-21 Night GR-3008 46,933.7 46,943.9 10.20 Road Maintenance Support 15571 YOHANIS L - PIT 5 EXT - - -
16-Sep-21 Night TW-3001 8,536.0 8,538.0 2.00 Road Maintenance Support 15106 AHMAD NURANI - PIT 5 EXT - - -
16-Sep-21 Night TW-4001 18,756.0 18,756.00 - Standby - WORKSHOP - - -
16-Sep-21 Night PU-4002 19,080.0 19,080.0 - Unscheduled - PIT 11 - - -
16-Sep-21 Night PU-2026 6,193.2 6,193.2 - Standby - PIT 11 - - -
16-Sep-21 Night PU-3026 12,307.0 12,307.0 - Standby - ROM TEMPORARY - - -
16-Sep-21 Night PU-3015 1,696.0 1,696.0 - Standby - ROM TEMPORARY - - -
16-Sep-21 Night PU-3014 27,240.4 27,240.4 - Standby - ROM TEMPORARY - - -
16-Sep-21 Night LP-2165 13,558.0 13,569.0 11.00 Unit Rental 4671 NURUDIN - KCP - - -
16-Sep-21 Night LP-2166 13,058.0 13,070.0 12.00 Unit Rental 4671 NURUDIN - KCP - - -
16-Sep-21 Night LP-2167 14,038.0 14,049.0 11.00 Unit Rental 4671 NURUDIN - KCP - - -
16-Sep-21 Night LP-2168 12,848.0 12,860.0 12.00 Unit Rental 4671 NURUDIN - KCP - - -
16-Sep-21 Night LP-2169 12,576.0 12,588.0 12.00 Unit Rental 4671 NURUDIN - KCP - - -
16-Sep-21 Night TS-4007 - - - Standby - KCP - - -
16-Sep-21 Night TS-4017 16,155.0 16,160.0 5.00 Unit Rental 15745 SURYANATA - KCP - - -
16-Sep-21 Night TF-4013 20,417.0 20,423.0 6.00 Unit Rental 15746 SYARIFUDDI - KCP - - -
16-Sep-21 Night TF-4014 34,550.0 34,550.0 - Standby - KCP - - -
17-Sep-21 Day EX-2037 22,234.7 22,236.3 1.60 Side casting - PIT 5 EXT - - -
17-Sep-21 Day EX-2058 17,549.4 17,553.8 4.40 Loading Solid Mud 15504 SLAMET WIDODO - Solid Mud Outpit PIT 5 EXT IPD 11 - - 1,017 - -
17-Sep-21 Day EX-2058 17,553.8 17,559.3 5.50 Side casting 15504 SLAMET WIDODO - PIT 5 EXT - 1,017 -
17-Sep-21 Day EX-4006 35,213.0 35,213.0 - Standby - PIT 5 EXT - 1,151 -
17-Sep-21 Day EX-5014 38,674.0 38,682.0 8.00 Unit Rental 15616 JOKO SUDIRO - KCP - - -
17-Sep-21 Day EX-5022 11,392.0 11,395.0 3.00 Loading Waste 12534 PUJIYANTO - OB Outpit PIT 5 IPD 10 - 1,126 -
17-Sep-21 Day EX-5022 11,395.0 11,397.0 2.00 Side casting 12534 PUJIYANTO - PIT 5 - 1,126 -
17-Sep-21 Day EX-5037 19,042.0 19,046.0 4.00 Loading Waste 15567 ARIF WAHYUDI - OB Outpit PIT 5 EXT IPD 10 - 1,178 -
17-Sep-21 Day EX-5037 19,046.0 19,047.0 1.00 Moving - pindah lokasi kerja 15567 ARIF WAHYUDI - PIT 5 EXT - 1,178 -
17-Sep-21 Day EX-5037 19,047.0 19,049.0 2.00 Side casting 15567 ARIF WAHYUDI - PIT 5 EXT - 1,178 -
17-Sep-21 Day EX-6014 57,682.0 57,691.0 9.00 Loading Waste 10917 SETA VERDY KARYA - OB Outpit PIT 5 EXT IPD 10 - - -
17-Sep-21 Day EX-6016 44,277.0 44,281.0 4.00 Loading Waste 15567 ARIF WAHYUDI - OB Outpit PIT 5 EXT IPD 10 - 619 -
17-Sep-21 Day EX-6022 18,628.7 18,637.7 9.00 Loading Waste 15568 FUAD EFENDI - OB Outpit PIT 5 EXT IPD 10 - 1,297 -
17-Sep-21 Day TR-3080 42,753.3 42,756.0 2.70 Hauling OB 9214 MUSTOFA ADI PRAYITNO 4 1 4 3 12 OB Outpit EX-6022 PIT 5 IPD 10 42 504 - 42 -
17-Sep-21 Day TR-3080 42,756.0 42,760.3 4.30 Hauling OB 8892 BAGUS PURWONO 3 4 5 4 4 20 OB Outpit EX-6022 PIT 5 IPD 10 42 840 - 42 -
17-Sep-21 Day TR-3174 41,463.3 41,471.8 8.50 Hauling OB 8958 MUKHROMIN 2 3 4 2 4 2 5 4 4 5 35 OB Outpit EX-6022 PIT 5 IPD 10 42 1,470 - 42 -
17-Sep-21 Day TR-3175 38,856.7 38,867.2 10.50 Hauling OB 15350 HERMAN 2 3 3 2 4 2 3 3 4 3 3 32 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 1,344 - 42 -
17-Sep-21 Day TR-3195 24,718.3 24,727.0 8.70 Hauling OB 15347 TAHMID 2 4 4 1 4 3 2 5 4 4 5 38 OB Outpit EX-6022 PIT 5 IPD 10 42 1,596 - 42 -
17-Sep-21 Day TR-3202 26,855.2 26,863.3 8.10 Hauling OB 3669 SUYANTO 2 2 4 4 3 2 4 4 3 4 32 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 1,344 - 42 -
17-Sep-21 Day TR-3203 26,971.4 26,975.0 3.60 Hauling OB 9214 MUSTOFA ADI PRAYITNO 1 5 2 4 12 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 504 - 42 -
17-Sep-21 Day TR-3204 26,296.7 26,305.1 8.40 Hauling OB 15349 ARDIANSYAH 2 4 5 5 3 3 4 5 4 4 39 OB Outpit EX-6022 PIT 5 IPD 10 42 1,638 - 42 -
17-Sep-21 Day TR-3205 25,846.4 25,850.1 3.70 Hauling OB 10695 SUPIYANDI 3 3 3 1 3 1 14 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 588 - 42 -
17-Sep-21 Day TR-3206 24,918.2 24,918.2 - Scheduled - WORKSHOP - - -
17-Sep-21 Day TR-3220 26,020.3 26,022.5 2.20 Hauling OB 10968 SUKIRNO 3 2 2 7 OB Outpit EX-6022 PIT 5 IPD 10 42 294 - 1 42 42
17-Sep-21 Day TR-1024 31,335.8 31,335.8 - Unscheduled - WORKSHOP - - -
17-Sep-21 Day TR-1025 47,235.9 47,239.8 3.88 Hauling OB 16025 IMTIKAN 1 3 4 3 3 14 OB Outpit EX-6016 PIT 5 EXT IPD 10 24 336 - 24 -
17-Sep-21 Day TR-1025 47,239.8 47,241.7 1.94 Hauling OB 16025 IMTIKAN 1 2 3 1 7 OB Outpit EX-5022 PIT 5 IPD 10 24 168 - 24 -
17-Sep-21 Day TR-1025 47,241.7 47,244.2 2.49 Hauling OB 16025 IMTIKAN 3 2 4 9 OB Outpit EX-5037 PIT 5 EXT IPD 10 24 216 - 24 -
17-Sep-21 Day TR-1031 49,418.1 49,418.1 - Unscheduled - WORKSHOP - - -
17-Sep-21 Day TR-1032 51,245.7 51,248.1 2.42 Hauling OB 15485 ROBY TM 2 4 4 10 OB Outpit EX-6016 PIT 5 EXT IPD 10 24 240 - 24 -
17-Sep-21 Day TR-1032 51,248.1 51,252.0 3.88 Hauling OB 15485 ROBY TM 2 3 4 4 3 16 OB Outpit EX-6014 PIT 5 EXT IPD 10 24 384 - 24 -
17-Sep-21 Day TR-1033 51,640.8 51,644.6 3.81 Hauling OB 15470 IJAI 2 2 4 4 3 15 OB Outpit EX-6016 PIT 5 EXT IPD 10 24 360 - 24 -
17-Sep-21 Day TR-1033 51,644.6 51,645.4 0.76 Hauling OB 15470 IJAI 2 1 3 OB Outpit EX-5022 PIT 5 IPD 10 24 72 - 24 -
17-Sep-21 Day TR-1033 51,645.4 51,647.4 2.03 Hauling OB 15470 IJAI 2 1 5 8 OB Outpit EX-5037 PIT 5 EXT IPD 10 24 192 - 24 -
17-Sep-21 Day TR-1034 49,428.5 49,433.3 4.80 Hauling OB 15744 MARYANTO 1 1 3 2 4 4 3 18 OB Outpit EX-6014 PIT 5 EXT IPD 10 24 432 - 24 -
17-Sep-21 Day TR-1034 49,433.3 49,435.2 1.87 Hauling OB 15744 MARYANTO 2 4 1 7 OB Outpit EX-5022 PIT 5 IPD 10 24 168 - 24 -
17-Sep-21 Day TR-1034 49,435.2 49,435.7 0.53 Hauling OB 15744 MARYANTO 2 2 OB Outpit EX-5037 PIT 5 EXT IPD 10 24 48 - 24 -
17-Sep-21 Day TR-1036 50,711.0 50,714.1 3.14 Hauling OB 15398 SIGIT SUSANTO 2 2 3 4 2 13 OB Outpit EX-6016 PIT 5 EXT IPD 10 24 312 - 24 -
17-Sep-21 Day TR-1036 50,714.1 50,714.6 0.48 Hauling OB 15398 SIGIT SUSANTO 2 2 OB Outpit EX-6014 PIT 5 EXT IPD 10 24 48 - 24 -
17-Sep-21 Day TR-1036 50,714.6 50,716.8 2.17 Hauling OB 15398 SIGIT SUSANTO 2 3 4 9 OB Outpit EX-5022 PIT 5 IPD 10 24 216 - 24 -
17-Sep-21 Day TR-1036 50,716.8 50,719.2 2.41 Hauling OB 15398 SIGIT SUSANTO 2 1 2 5 10 OB Outpit EX-5037 PIT 5 EXT IPD 10 24 240 - 24 -
17-Sep-21 Day TR-1048 52,177.9 52,179.1 1.15 Hauling OB 15471 MULYADI 2 2 4 OB Outpit EX-6014 PIT 5 EXT IPD 10 24 96 - 24 -
17-Sep-21 Day TR-1048 52,179.1 52,180.2 1.15 Hauling OB 15471 MULYADI 2 2 4 OB Outpit EX-5022 PIT 5 IPD 10 24 96 - 24 -
17-Sep-21 Day TR-1049 46,131.0 46,135.9 4.87 Hauling OB 15576 JOKO SANTOSO 1 2 5 4 3 4 19 OB Outpit EX-6016 PIT 5 EXT IPD 10 24 456 - 24 -
17-Sep-21 Day TR-1049 46,135.9 46,136.4 0.51 Hauling OB 15576 JOKO SANTOSO 1 1 2 OB Outpit EX-6014 PIT 5 EXT IPD 10 24 48 - 24 -
17-Sep-21 Day TR-1049 46,136.4 46,137.9 1.54 Hauling OB 15576 JOKO SANTOSO 3 3 6 OB Outpit EX-5022 PIT 5 IPD 10 24 144 - 24 -
17-Sep-21 Day TR-1049 46,137.9 46,139.2 1.28 Hauling OB 15576 JOKO SANTOSO 1 3 1 5 OB Outpit EX-5037 PIT 5 EXT IPD 10 24 120 - 24 -
17-Sep-21 Day TR-1050 45,875.5 45,878.6 3.11 Hauling OB 15467 HUSNI 2 4 4 2 12 OB Outpit EX-6016 PIT 5 EXT IPD 10 24 288 - 24 -
17-Sep-21 Day TR-1050 45,878.6 45,881.2 2.59 Hauling OB 15467 HUSNI 2 3 1 4 10 OB Outpit EX-5037 PIT 5 EXT IPD 10 24 240 - 24 -
17-Sep-21 Day TA-7009 27,874.8 27,874.8 - Unscheduled - PIT 5 EXT - - -
17-Sep-21 Day TA-7010 25,231.5 25,232.3 0.83 Hauling OB 15861 AGUSTIAN 3 3 OB Outpit EX-5022 PIT 5 IPD 10 14 42 - 14 -
17-Sep-21 Day TA-7010 25,232.3 25,237.9 5.57 Hauling Solid Mud 15861 AGUSTIAN 4 4 4 5 3 1 8 29 Solid Mud Outpit EX-2058 PIT 5 EXT IPD 11 11 325 - 11 -
17-Sep-21 Day TA-7022 - - - Unscheduled - - - -
17-Sep-21 Day TA-7029 28,574.2 28,574.5 0.34 Hauling OB 15816 M. YUSUF 1 1 OB Outpit EX-5022 PIT 5 IPD 10 14 14 - 14 -
17-Sep-21 Day TA-7029 28,574.5 28,575.9 1.36 Hauling Solid Mud 15816 M. YUSUF 4 4 Solid Mud Outpit EX-2058 PIT 5 EXT IPD 11 11 45 - 11 -
17-Sep-21 Day TA-7030 28,257.3 28,262.7 5.40 Hauling Solid Mud 15863 HENDRA M 3 4 3 4 3 3 20 Solid Mud Outpit EX-2058 PIT 5 EXT IPD 11 11 224 - 11 -
17-Sep-21 Day BD-4005 13,770.7 13,770.7 - Scheduled - WORKSHOP - - -
k 17-Sep-21 Day BD-5035 3,506.7 3,514.6 7.90 Disposal maintenance - IPD 11 - - -
17-Sep-21 Day BD-6025 2,761.9 2,761.9 - Standby - KCP - - -
17-Sep-21 Day BD-6026 30,198.7 30,198.7 - Standby - WORKSHOP - - -
17-Sep-21 Day BD-6028 4,150.5 4,159.0 8.50 Unit Rental 11169 ANNAS - KCP - - -
17-Sep-21 Day BD-6036 34,218.8 34,224.5 5.70 Unit Rental 14710 AGUS S - KCP - - -
17-Sep-21 Day BD-6038 34,001.1 34,008.8 7.70 Unit Rental 15570 HENDRY S - KCP - - -
17-Sep-21 Day BD-6069 10,395.6 10,395.6 - Unscheduled - PIT 5 EXT - - -
17-Sep-21 Day BD-7013 39,983.1 39,993.6 10.50 Front maintenance 15606 FATHUR - PIT 5 EXT - - -
17-Sep-21 Day BD-7026 26,630.6 26,635.0 4.40 Front maintenance 9978 KARSIANTO - PIT 5 EXT - - -
17-Sep-21 Day BD-7034 10,074.5 10,084.3 9.80 Disposal maintenance 9492 MAHFUDI - IPD 10 - - -
17-Sep-21 Day GR-2012 22,278.2 22,278.2 - Standby - PIT 5 EXT - - -
17-Sep-21 Day GR-3007 39,269.8 39,279.0 9.20 Road Maintenance Support 8925 AGUS SUNARWAN - PIT 5 EXT - - -
17-Sep-21 Day GR-3008 46,943.9 46,952.9 9.00 Road Maintenance Support 9426 ADE SUPIANA - PIT 5 EXT - - -
17-Sep-21 Day TW-3001 8,538.0 8,541.0 3.00 Road Maintenance Support 15743 LANA - PIT 5 EXT - - -
17-Sep-21 Day TW-4001 18,756.0 18,756.00 - Standby - WORKSHOP - - -
17-Sep-21 Day PU-4002 19,080.0 19,080.00 - Unscheduled - PIT 11 - - -
17-Sep-21 Day PU-2026 6,193.2 6,193.2 - Dewatering - PIT 11 - - -
17-Sep-21 Day PU-3026 12,307.0 12,307.00 - Standby - ROM TEMPORARY - - -
17-Sep-21 Day PU-3015 1,696.0 1,696.00 - Standby - ROM TEMPORARY - - -
17-Sep-21 Day PU-3014 27,240.4 27,240.40 - Standby - ROM TEMPORARY - - -
17-Sep-21 Day LP-2165 13,569.0 13,569.00 - Standby 4671 NURUDIN - KCP - - -
17-Sep-21 Day LP-2166 13,070.0 13,070.00 - Standby 4671 NURUDIN - KCP - - -
17-Sep-21 Day LP-2167 14,049.0 14,049.00 - Standby 4671 NURUDIN - KCP - - -
17-Sep-21 Day LP-2168 12,860.0 12,860.00 - Standby 4671 NURUDIN - KCP - - -
17-Sep-21 Day LP-2169 12,588.0 12,588.00 - Standby 4671 NURUDIN - KCP - - -
17-Sep-21 Day TS-4007 - - - Standby - KCP - - -
17-Sep-21 Day TS-4017 16,160.0 16,167.0 7.00 Unit Rental 15310 ALDI ALFI SAPUTRA - KCP - - -
17-Sep-21 Day TF-4013 20,423.0 20,431.0 8.00 Unit Rental 15105 HADIANOR - KCP - - -
17-Sep-21 Day TF-4014 34,550.0 34,550.0 - Standby - KCP - - -
17-Sep-21 Night EX-2037 22,236.3 22,241.4 5.10 Side casting 9590F SIRATAL RAYYAN - PIT 5 EXT - - -
17-Sep-21 Night EX-2058 17,559.3 17,563.3 4.00 Side casting 15617 ZAENAL - PIT 5 EXT - 1,017 -
17-Sep-21 Night EX-2058 17,563.3 17,570.1 6.80 sloping 15617 ZAENAL - PIT 5 EXT - 1,017 -
17-Sep-21 Night EX-4006 35,213.0 35,217.0 4.00 sloping 15604 AHMAD SYAFI'I - PIT 5 EXT - 1,151 -
17-Sep-21 Night EX-4006 35,217.0 35,220.0 3.00 Loading Waste 15604 AHMAD SYAFI'I - OB Outpit PIT 5 EXT - 1,151 -
17-Sep-21 Night EX-5014 38,682.0 38,690.0 8.00 Unit Rental 15345 SUTONO - KCP - - -
17-Sep-21 Night EX-5022 11,397.0 11,405.0 8.00 Loading Waste 9136 AHMAD YANI - OB Outpit PIT 5 - 1,126 -
17-Sep-21 Night EX-5037 19,049.0 19,050.0 1.00 Loading Waste 9590F SIRATAL RAYYAN - OB Outpit PIT 5 EXT - 1,178 -
17-Sep-21 Night EX-6014 57,691.0 57,700.0 9.00 Loading Waste 8952 DIDI SETIAWAN - OB Outpit PIT 5 EXT - - -
17-Sep-21 Night EX-6016 44,281.0 44,286.0 5.00 Loading Waste 15486 SUGENG PRAYETNO - OB Outpit PIT 5 EXT - 619 -
17-Sep-21 Night EX-6022 18,637.7 18,643.3 5.60 Loading Waste 11146 PURWANTO - OB Outpit PIT 5 - 1,297 -
17-Sep-21 Night TR-3080 42,760.3 42,765.8 5.46 Hauling OB 10881 BURHANUDDIN 3 3 4 3 5 4 22 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 924 - 42 -
17-Sep-21 Night TR-3080 42,765.8 42,768.0 2.24 Hauling OB 10881 BURHANUDDIN 1 4 4 9 OB Outpit EX-6016 PIT 5 EXT IPD 10 42 378 - 42 -
17-Sep-21 Night TR-3174 41,471.8 41,477.2 5.36 Hauling OB 11328 JUSESLAF BANJAR NAHOR 3 4 4 3 5 19 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 798 - 42 -
17-Sep-21 Night TR-3174 41,477.2 41,479.7 2.54 Hauling OB 11328 JUSESLAF BANJAR NAHOR 1 4 4 9 OB Outpit EX-6016 PIT 5 EXT IPD 10 42 378 - 42 -
17-Sep-21 Night TR-3175 38,867.2 38,875.2 8.00 Hauling OB 9354 JIDIN 3 2 3 3 3 3 3 3 3 26 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 1,092 - 42 -
17-Sep-21 Night TR-3195 24,727.0 24,735.0 8.00 Hauling OB 15229 ARDIANSYAH 3 5 3 4 4 19 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 798 - 42 -
17-Sep-21 Night TR-3195 24,727.0 24,735.0 8.00 Hauling OB 15229 ARDIANSYAH 2 3 4 9 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 378 - 42 -
17-Sep-21 Night TR-3202 26,863.3 26,870.3 7.00 Hauling OB 11474 SARINDI 3 2 2 3 3 3 3 3 3 25 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 1,050 - 42 -
17-Sep-21 Night TR-3203 26,975.0 26,982.5 7.50 Hauling OB 15230 MARGONO 2 2 1 3 3 3 3 3 3 23 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 966 - 42 -
17-Sep-21 Night TR-3204 26,305.1 26,312.0 6.90 Hauling OB 1303 EFENDI 3 4 4 4 4 4 1 3 4 1 32 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 1,344 - 42 -
17-Sep-21 Night TR-3205 25,850.1 25,858.3 8.20 Hauling OB 7170F TRI PRASETIYO 2 2 4 3 2 3 3 3 3 25 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 1,050 - 42 -
17-Sep-21 Night TR-3206 24,918.2 24,918.2 - Scheduled - - - -
17-Sep-21 Night TR-3220 26,022.5 26,022.5 - Unscheduled - PIT 5 EXT - - -
17-Sep-21 Night TR-1024 31,335.8 31,335.8 - Unscheduled - - - -
17-Sep-21 Night TR-1025 47,244.2 47,246.3 2.06 Hauling OB 15466 SUPRIYANTO 2 2 1 3 8 OB Outpit EX-6016 PIT 5 EXT IPD 10 24 192 - 24 -
17-Sep-21 Night TR-1025 47,246.3 47,251.2 4.90 Hauling OB 15466 SUPRIYANTO 3 3 1 2 3 2 3 1 1 19 OB Outpit EX-5022 PIT 5 EXT IPD 10 24 456 - 24 -
17-Sep-21 Night TR-1025 47,251.2 47,252.2 1.04 Hauling OB 15466 SUPRIYANTO 2 2 4 OB Outpit EX-5037 PIT 5 EXT IPD 10 24 96 - 24 -
17-Sep-21 Night TR-1031 49,418.1 49,420.2 2.14 Hauling OB 15421 AGUS A 2 1 1 2 6 OB Outpit EX-6016 PIT 5 EXT IPD 10 24 144 - 24 -
17-Sep-21 Night TR-1031 49,420.2 49,423.4 3.20 Hauling OB 15421 AGUS A 1 1 OB Outpit EX-6014 PIT 5 EXT IPD 10 24 24 - 24 -
17-Sep-21 Night TR-1031 49,423.4 49,425.6 2.16 Hauling OB 15421 AGUS A 1 1 2 3 3 1 2 1 14 OB Outpit EX-5022 PIT 5 EXT IPD 10 24 336 - 24 -
17-Sep-21 Night TR-1032 51,252.0 51,252.7 0.65 Hauling OB 15468 PADLIANSYAH 1 1 2 OB Outpit EX-6016 PIT 5 EXT IPD 10 24 48 - 24 -
17-Sep-21 Night TR-1032 51,252.7 51,254.0 1.39 Hauling OB 15468 PADLIANSYAH 3 2 3 1 1 10 OB Outpit EX-6014 PIT 5 EXT IPD 10 24 240 - 24 -
17-Sep-21 Night TR-1032 51,254.0 51,255.7 1.67 Hauling OB 15468 PADLIANSYAH 3 3 6 OB Outpit EX-5022 PIT 5 EXT IPD 10 24 144 - 24 -
17-Sep-21 Night TR-1032 51,255.7 51,258.4 2.69 Hauling OB 15468 PADLIANSYAH 2 4 3 1 10 OB Outpit EX-4006 PIT 5 EXT IPD 10 24 240 - 24 -
17-Sep-21 Night TR-1033 51,647.4 51,649.0 1.60 Hauling OB 15419 HUSEN 2 3 5 OB Outpit EX-6014 PIT 5 EXT IPD 10 24 120 - 24 -
17-Sep-21 Night TR-1033 51,649.0 51,652.2 3.20 Hauling OB 15419 HUSEN 2 4 4 10 OB Outpit EX-4006 PIT 5 EXT IPD 10 24 240 - 24 -
17-Sep-21 Night TR-1034 49,435.7 49,437.2 1.52 Hauling OB 15420 M ABD MADI 2 3 5 OB Outpit EX-6014 PIT 5 EXT IPD 10 24 120 - 24 -
17-Sep-21 Night TR-1034 49,437.2 49,442.1 4.88 Hauling OB 15420 M ABD MADI 3 2 3 4 4 16 OB Outpit EX-5022 PIT 5 EXT IPD 10 24 384 - 24 -
17-Sep-21 Night TR-1036 50,719.2 50,721.1 1.91 Hauling OB 15636 AKHMAD NOOR 3 1 2 1 1 8 OB Outpit EX-6016 PIT 5 EXT IPD 10 24 192 - 24 -
17-Sep-21 Night TR-1036 50,721.1 50,725.9 4.77 Hauling OB 15636 AKHMAD NOOR 4 4 2 3 3 2 2 20 OB Outpit EX-5022 PIT 5 EXT IPD 10 24 480 - 24 -
17-Sep-21 Night TR-1036 50,725.9 50,726.6 0.72 Hauling OB 15636 AKHMAD NOOR 3 3 OB Outpit EX-5037 PIT 5 EXT IPD 10 24 72 - 24 -
17-Sep-21 Night TR-1048 52,180.2 52,180.2 - Unscheduled - PIT 5 EXT - - -
17-Sep-21 Night TR-1049 46,139.2 46,140.3 1.10 Hauling OB 15376 EKO FAJAR S 4 4 OB Outpit EX-6016 PIT 5 EXT IPD 10 24 96 - 24 -
17-Sep-21 Night TR-1049 46,140.3 46,144.2 3.85 Hauling OB 15376 EKO FAJAR S 5 3 3 3 14 OB Outpit EX-5022 PIT 5 EXT IPD 10 24 336 - 24 -
17-Sep-21 Night TR-1049 46,144.2 46,144.7 0.55 Hauling OB 15376 EKO FAJAR S 2 2 OB Outpit EX-5037 PIT 5 EXT IPD 10 24 48 - 24 -
17-Sep-21 Night TR-1049 46,144.7 46,145.1 0.37 Hauling OB 15469 BASUNI 2 2 OB Outpit EX-6016 PIT 5 EXT IPD 10 24 48 - 24 -
17-Sep-21 Night TR-1049 46,144.2 46,147.0 2.85 Hauling OB 15469 BASUNI 2 2 4 8 OB Outpit EX-5022 PIT 5 EXT IPD 10 24 192 - 24 -
17-Sep-21 Night TR-1050 45,881.2 45,882.2 1.01 Hauling OB 16024 QORI - OB Outpit PIT 5 EXT IPD 10 24 - - 24 -
17-Sep-21 Night TR-1050 45,882.2 45,888.3 6.04 Hauling OB 16024 QORI 1 1 1 1 4 OB Outpit EX-6016 PIT 5 EXT IPD 10 24 96 - 24 -
17-Sep-21 Night TR-1050 45,888.3 45,889.0 0.75 Hauling OB 16024 QORI 5 3 2 3 3 2 3 3 24 OB Outpit EX-5022 PIT 5 EXT IPD 10 24 576 - 24 -
17-Sep-21 Night TA-7009 27,874.8 27,874.8 - Unscheduled - PIT 5 EXT - - -
17-Sep-21 Night TA-7010 25,237.9 25,240.6 2.67 Hauling OB 15653 M. ILIAS 2 2 2 6 OB Outpit EX-6022 PIT 5 EXT IPD 10 14 84 - 14 -
17-Sep-21 Night TA-7010 25,240.6 25,242.8 2.23 Hauling OB 15653 M. ILIAS 2 2 1 5 OB Outpit EX-4006 PIT 5 EXT IPD 10 14 70 - 6 14 84
17-Sep-21 Night TA-7022 - - - Unscheduled - WORKSHOP - - -
17-Sep-21 Night TA-7029 28,575.9 28,579.1 3.20 Hauling OB 15819 AHNIANSYAH 2 4 4 1 11 OB Outpit EX-4006 PIT 5 EXT IPD 10 14 154 - 14 -
17-Sep-21 Night TA-7030 28,262.7 28,262.7 - Unscheduled 16026 BAHRUNI - PIT 5 EXT - - -
17-Sep-21 Night BD-4005 13,770.7 13,770.7 - Scheduled - WORKSHOP - - -
17-Sep-21 Night BD-5035 3,514.6 3,514.6 - Unscheduled 14963 MAULANA ISHAK - PIT 5 EXT - - -
17-Sep-21 Night BD-6025 2,761.9 2,761.9 - Standby - KCP - - -
17-Sep-21 Night BD-6026 30,198.7 30,198.7 - Standby - KCP - - -
17-Sep-21 Night BD-6028 4,159.0 4,166.6 7.60 Unit Rental 14750 MUSTAKIM - KCP - - -
17-Sep-21 Night BD-6036 34,224.5 34,225.2 0.70 Unit Rental 14964 JOKO P (Dozer) - KCP - - -
17-Sep-21 Night BD-6038 34,008.8 34,013.5 4.70 Unit Rental 14744 NOORDIANTO - KCP - - -
17-Sep-21 Night BD-6069 10,395.6 10,395.6 - Unscheduled - PIT 5 EXT - - -
17-Sep-21 Night BD-7013 39,993.6 39,999.0 5.40 Ripping 11676 SUDARSONO - PIT 5 EXT - - -
17-Sep-21 Night BD-7013 39,999.0 40,003.9 4.90 Front maintenance 11676 SUDARSONO - PIT 5 EXT - - -
17-Sep-21 Night BD-7026 26,635.0 26,645.5 10.50 Front maintenance 15639 A. BUDIMAN - PIT 5 EXT - - -
17-Sep-21 Night BD-7034 10,084.3 10,094.8 10.50 Disposal maintenance - IPD 10 - - -
17-Sep-21 Night GR-2012 22,278.2 22,278.2 - Standby - - - -
17-Sep-21 Night GR-3007 39,279.0 39,288.1 9.10 Road Maintenance Support 12344 M FAJRI - PIT 5 EXT - - -
17-Sep-21 Night GR-3008 46,952.9 46,961.9 9.00 Road Maintenance Support - - - -
17-Sep-21 Night TW-3001 8,541.0 8,544.0 3.00 Road Maintenance Support 15106 AHMAD NURANI - PIT 5 EXT - - -
17-Sep-21 Night TW-4001 18,756.0 18,756.00 - Standby - WORKSHOP - - -
17-Sep-21 Night PU-4002 19,080.0 19,080.0 - Unscheduled - - - -
17-Sep-21 Night PU-2026 6,193.2 6,193.2 - Dewatering - PIT 11 - - -
17-Sep-21 Night PU-3026 12,307.0 12,307.0 - Standby - - - -
17-Sep-21 Night PU-3015 1,696.0 1,696.0 - Standby - - - -
17-Sep-21 Night PU-3014 27,240.4 27,240.4 - Standby - - - -
17-Sep-21 Night LP-2165 13,569.0 13,573.0 4.00 Unit Rental 4671 NURUDIN - KCP - - -
17-Sep-21 Night LP-2166 13,070.0 13,082.0 12.00 Unit Rental 4671 NURUDIN - KCP - - -
17-Sep-21 Night LP-2167 14,049.0 14,061.0 12.00 Unit Rental 4671 NURUDIN - KCP - - -
17-Sep-21 Night LP-2168 12,860.0 12,871.0 11.00 Unit Rental 4671 NURUDIN - KCP - - -
17-Sep-21 Night LP-2169 12,588.0 12,600.0 12.00 Unit Rental 4671 NURUDIN - KCP - - -
17-Sep-21 Night TS-4007 - - - Standby - - - -
17-Sep-21 Night TS-4017 16,167.0 16,173.0 6.00 Unit Rental 10884 HAMDANI - KCP - - -
17-Sep-21 Night TF-4013 20,431.0 20,437.0 6.00 Unit Rental 15746 SYARIFUDDI - KCP - - -
17-Sep-21 Night TF-4014 34,550.0 34,550.0 - Standby - - - -
18-Sep-21 Day EX-2037 22,241.4 22,246.4 5.00 Side casting 11330 EKO PURWANTO - PIT 5 EXT - - -
18-Sep-21 Day EX-2037 22,246.4 22,249.1 2.70 Loading Solid Mud 11330 EKO PURWANTO - Solid Mud Outpit PIT 5 EXT IPD 10 - - - - -
18-Sep-21 Day EX-2058 17,570.1 17,570.1 - Standby 15504 SLAMET WIDODO - PIT 5 EXT - 1,086 -
18-Sep-21 Day EX-4006 35,220.0 35,225.0 5.00 Loading Waste 11330 EKO PURWANTO - OB Outpit PIT 5 EXT IPD 11 - 1,237 -
18-Sep-21 Day EX-5014 38,690.0 38,698.0 8.00 Unit Rental - KCP - - -
18-Sep-21 Day EX-5022 11,405.0 11,412.0 7.00 Loading Waste 12534 PUJIYANTO - OB Outpit PIT 5 IPD 10 - 1,247 -
18-Sep-21 Day EX-5037 19,050.0 19,050.0 - Unscheduled - PIT 5 EXT - 1,230 -
18-Sep-21 Day EX-6014 57,700.0 57,709.0 9.00 Loading Waste - OB Outpit PIT 5 EXT IPD 10 - 1,018 -
18-Sep-21 Day EX-6016 44,286.0 44,294.0 8.00 Loading Waste 15567 ARIF WAHYUDI - OB Outpit PIT 5 EXT IPD 10 - 1,401 -
18-Sep-21 Day EX-6022 18,643.3 18,650.4 7.10 Loading Waste 15568 FUAD EFENDI - OB Outpit PIT 5 EXT IPD 10 - 525 -
18-Sep-21 Day TR-3080 42,768.0 42,774.2 6.21 Hauling OB 15350 HERMAN 2 4 4 4 4 3 4 25 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 1,050 - 42 -
18-Sep-21 Day TR-3080 42,774.2 42,775.2 0.99 Hauling OB 15350 HERMAN 1 3 4 OB Outpit EX-5022 PIT 5 IPD 10 42 168 - 42 -
18-Sep-21 Day TR-3174 41,479.7 41,485.9 6.22 Hauling OB 15349 ARDIANSYAH 3 4 3 4 3 4 3 24 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 1,008 - 42 -
18-Sep-21 Day TR-3174 41,485.9 41,486.7 0.78 Hauling OB 15349 ARDIANSYAH 1 2 3 OB Outpit EX-5022 PIT 5 IPD 10 42 126 - 42 -
18-Sep-21 Day TR-3175 38,875.2 38,881.3 6.10 Hauling OB 10968 SUKIRNO 1 2 1 3 4 3 3 4 21 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 882 - 42 -
18-Sep-21 Day TR-3195 24,735.0 24,742.2 7.20 Hauling OB 15347 TAHMID 2 4 3 4 3 4 3 3 26 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 1,092 - 42 -
18-Sep-21 Day TR-3202 26,870.3 26,876.1 5.82 Hauling OB 3669 SUYANTO 1 4 3 2 4 3 4 21 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 882 - 1 42 42
18-Sep-21 Day TR-3202 26,876.1 26,877.5 1.38 Hauling OB 3669 SUYANTO 3 2 5 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 210 - 42 -
18-Sep-21 Day TR-3203 26,982.5 26,990.6 8.10 Hauling OB 8892 BAGUS PURWONO 1 2 4 3 4 3 4 3 3 27 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 1,134 - 42 -
18-Sep-21 Day TR-3204 26,312.0 26,319.1 7.07 Hauling OB 10969 JOKO PRIONO 1 4 4 3 4 3 4 23 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 966 - 1 42 42
18-Sep-21 Day TR-3204 26,319.1 26,320.3 1.23 Hauling OB 10969 JOKO PRIONO 2 2 4 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 168 - 42 -
18-Sep-21 Day TR-3205 25,858.3 25,866.4 8.10 Hauling OB 10695 SUPIYANDI 1 3 4 3 4 3 3 4 3 28 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 1,176 - 42 -
18-Sep-21 Day TR-3206 24,918.2 24,918.2 - Scheduled - WORKSHOP - - -
18-Sep-21 Day TR-3220 26,022.5 26,022.5 - Unscheduled - PIT 5 EXT - - -
18-Sep-21 Day TR-1024 31,338.1 31,340.1 2.00 Hauling OB 15377 RIZALI RAHMAN 5 4 9 OB Outpit EX-5022 PIT 5 IPD 10 24 216 - 24 -
18-Sep-21 Day TR-1025 47,252.2 47,259.3 7.11 Hauling OB 15955 RIZKY IHWAN 2 3 2 5 5 4 4 4 29 OB Outpit EX-6016 PIT 5 EXT IPD 10 24 696 - 1 24 24
18-Sep-21 Day TR-1025 47,259.3 47,259.8 0.49 Hauling OB 15955 RIZKY IHWAN 2 2 OB Outpit EX-6014 PIT 5 EXT IPD 10 24 48 - 1 24 24
18-Sep-21 Day TR-1031 49,425.6 49,431.8 6.17 Hauling OB 15485 ROBY TM 1 4 4 4 5 2 3 4 27 OB Outpit EX-6016 PIT 5 EXT IPD 10 24 648 - 24 -
18-Sep-21 Day TR-1031 49,431.8 49,433.6 1.83 Hauling OB 15485 ROBY TM 1 2 5 8 OB Outpit EX-5022 PIT 5 IPD 10 24 192 - 24 -
18-Sep-21 Day TR-1032 51,258.4 51,260.2 1.75 Hauling OB 15377 RIZALI RAHMAN 1 3 1 5 OB Outpit EX-6016 PIT 5 EXT IPD 10 24 120 - 1 24 24
18-Sep-21 Day TR-1032 51,260.2 51,261.9 1.75 Hauling OB 15377 RIZALI RAHMAN 1 1 1 2 5 OB Outpit EX-6014 PIT 5 EXT IPD 10 24 120 - 24 -
18-Sep-21 Day TR-1033 51,652.2 51,659.5 7.30 Hauling OB 15744 MARYANTO 1 3 5 5 5 5 4 4 32 OB Outpit EX-6016 PIT 5 EXT IPD 10 24 768 - 24 -
18-Sep-21 Day TR-1033 51,659.5 51,660.2 0.70 Hauling OB 15744 MARYANTO 2 1 3 OB Outpit EX-5022 PIT 5 IPD 10 24 72 - 24 -
18-Sep-21 Day TR-1034 49,442.1 49,443.3 1.20 Hauling OB 15471 MULYADI 2 4 6 OB Outpit EX-6016 PIT 5 EXT IPD 10 24 144 - 24 -
18-Sep-21 Day TR-1034 49,443.3 49,447.3 4.00 Hauling OB 15471 MULYADI 2 3 1 5 4 5 20 OB Outpit EX-5022 PIT 5 IPD 10 24 480 - 24 -
18-Sep-21 Day TR-1036 50,726.6 50,733.8 7.22 Hauling OB 15346 MUSA 2 3 4 5 5 4 4 5 32 OB Outpit EX-6016 PIT 5 EXT IPD 10 24 768 - 24 -
18-Sep-21 Day TR-1036 50,733.8 50,734.5 0.68 Hauling OB 15346 MUSA 1 2 3 OB Outpit EX-6014 PIT 5 EXT IPD 10 24 72 - 24 -
18-Sep-21 Day TR-1048 52,180.2 52,180.2 - Unscheduled - PIT 5 EXT - - -
18-Sep-21 Day TR-1049 46,147.0 46,148.5 1.45 Hauling OB 16025 IMTIKAN 4 2 6 OB Outpit EX-6016 PIT 5 EXT IPD 10 24 144 - 24 -
18-Sep-21 Day TR-1049 46,148.5 46,151.1 2.67 Hauling OB 16025 IMTIKAN 2 3 4 2 11 OB Outpit EX-6014 PIT 5 EXT IPD 10 24 264 - 24 -
18-Sep-21 Day TR-1049 46,151.1 46,155.0 3.88 Hauling OB 16025 IMTIKAN 1 6 4 5 16 OB Outpit EX-5022 PIT 5 IPD 10 24 384 - 24 -
18-Sep-21 Day TR-1050 45,889.0 45,897.1 8.10 Hauling OB 15467 HUSNI 1 3 3 5 4 5 5 3 3 32 OB Outpit EX-6016 PIT 5 EXT IPD 10 24 768 - 24 -
18-Sep-21 Day TA-7009 27,874.8 27,874.8 - Unscheduled - PIT 5 EXT - - -
18-Sep-21 Day TA-7010 25,242.8 25,243.6 0.77 Hauling OB 15861 AGUSTIAN 2 2 4 OB Outpit EX-5022 PIT 5 IPD 10 14 56 - 14 -
18-Sep-21 Day TA-7010 25,243.6 25,245.0 1.38 Hauling Solid Mud 15861 AGUSTIAN 3 5 3 11 Solid Mud Outpit EX-2037 PIT 5 EXT IPD 10 11 123 - 11 -
18-Sep-21 Day TA-7010 25,245.0 25,248.2 3.25 Hauling OB 15861 AGUSTIAN 3 5 5 13 OB Outpit EX-4006 PIT 5 EXT IPD 11 14 182 - 14 -
18-Sep-21 Day TA-7022 - - - Unscheduled 15863 HENDRA M - PIT 5 EXT - - -
18-Sep-21 Day TA-7029 28,579.1 28,580.1 0.96 Hauling Solid Mud 15816 M. YUSUF 2 3 5 OB Outpit EX-5022 PIT 5 IPD 10 14 70 - 14 -
18-Sep-21 Day TA-7029 28,580.1 28,584.5 4.44 Hauling Solid Mud 15816 M. YUSUF 4 5 5 14 OB Outpit EX-4006 PIT 5 EXT IPD 11 14 196 - 14 -
18-Sep-21 Day TA-7029 28,584.5 28,587.2 2.70 Hauling Solid Mud 15816 M. YUSUF 2 5 2 9 Solid Mud Outpit EX-2037 PIT 5 EXT IPD 10 11 101 - 11 -
18-Sep-21 Day TA-7030 28,262.7 28,262.7 - Unscheduled - PIT 5 EXT - - -
18-Sep-21 Day BD-4005 13,770.7 13,770.7 - Scheduled - WORKSHOP - - -
k 18-Sep-21 Day BD-5035 3,514.6 3,524.8 10.20 Front maintenance 15747 MUSTAQIM D6 - PIT 5 EXT - - -
18-Sep-21 Day BD-6025 2,761.9 2,761.9 - Standby - KCP - - -
18-Sep-21 Day BD-6026 30,198.7 30,198.7 - Standby - WORKSHOP - - -
18-Sep-21 Day BD-6028 4,166.6 4,176.1 9.50 Unit Rental 11169 ANNAS - KCP - - -
18-Sep-21 Day BD-6036 34,225.2 34,233.2 8.00 Unit Rental 14710 AGUS S - KCP - - -
18-Sep-21 Day BD-6038 34,013.5 34,017.5 4.00 Unit Rental 15570 HENDRY S - KCP - - -
18-Sep-21 Day BD-6069 10,395.6 10,395.6 - Unscheduled - PIT 5 EXT - - -
18-Sep-21 Day BD-7013 40,003.9 40,014.7 10.80 Front maintenance 15606 FATHUR - PIT 5 EXT - - -
18-Sep-21 Day BD-7026 26,645.5 26,652.0 6.50 Front maintenance 9978 KARSIANTO - PIT 5 EXT - - -
18-Sep-21 Day BD-7034 10,094.8 10,103.9 9.10 Disposal maintenance 10013 ADI SUSANTO - IPD 10 - - -
18-Sep-21 Day GR-2012 22,278.2 22,278.2 - Standby - WORKSHOP - - -
18-Sep-21 Day GR-3007 39,288.1 39,294.7 6.60 Road Maintenance Support 9426 ADE SUPIANA - PIT 5 EXT - - -
18-Sep-21 Day GR-3008 46,961.9 46,972.4 10.50 Road Maintenance Support 9214 MUSTOFA ADI PRAYITNO - PIT 5 EXT - - -
18-Sep-21 Day TW-3001 8,544.0 8,549.0 5.00 Road Maintenance Support 15743 LANA - PIT 5 EXT - - -
18-Sep-21 Day TW-4001 18,756.0 18,756.00 - Standby - WORKSHOP - - -
18-Sep-21 Day PU-4002 19,080.0 19,080.00 - Unscheduled - ROM TEMPORARY - - -
18-Sep-21 Day PU-2026 6,193.2 6,195.1 1.90 Dewatering - PIT 11 - - -
18-Sep-21 Day PU-3026 12,307.0 12,307.00 - Standby - - - -
18-Sep-21 Day PU-3015 1,696.0 1,696.00 - Standby - - - -
18-Sep-21 Day PU-3014 27,240.4 27,240.40 - Standby - - - -
18-Sep-21 Day LP-2165 13,573.0 13,573.00 - Standby 4671 NURUDIN - KCP - - -
18-Sep-21 Day LP-2166 13,082.0 13,082.00 - Standby 4671 NURUDIN - KCP - - -
18-Sep-21 Day LP-2167 14,061.0 14,061.00 - Standby 4671 NURUDIN - KCP - - -
18-Sep-21 Day LP-2168 12,871.0 12,871.00 - Standby 4671 NURUDIN - KCP - - -
18-Sep-21 Day LP-2169 12,600.0 12,600.00 - Standby 4671 NURUDIN - KCP - - -
18-Sep-21 Day TS-4007 - - - Standby - - - -
18-Sep-21 Day TS-4017 16,173.0 16,182.0 9.00 Unit Rental 15310 ALDI ALFI SAPUTRA - KCP - - -
18-Sep-21 Day TF-4013 20,437.0 20,443.0 6.00 Unit Rental 15745 SURYANATA - KCP - - -
18-Sep-21 Day TF-4014 34,550.0 34,550.0 - Standby - - - -
18-Sep-21 Night EX-2037 22,249.1 22,249.1 - Standby - PIT 5 EXT - - -
18-Sep-21 Night EX-2058 17,570.1 17,578.9 8.80 Loading Solid Mud 15617 ZAENAL - Solid Mud Outpit PIT 5 EXT IPD 10 - - 1,086 - -
18-Sep-21 Night EX-4006 35,225.0 35,226.0 1.00 Loading Waste 15617 ZAENAL - OB Outpit PIT 5 EXT IPD 11 - 1,237 -
18-Sep-21 Night EX-4006 35,226.0 35,227.0 1.00 Moving - pindah lokasi kerja 15617 ZAENAL - PIT 5 EXT - 1,237 -
18-Sep-21 Night EX-5014 38,698.0 38,709.0 11.00 Unit Rental - KCP - - -
18-Sep-21 Night EX-5022 11,412.0 11,422.0 10.00 Loading Waste 1604 - OB Outpit PIT 5 EXT IPD 10 - 1,247 -
18-Sep-21 Night EX-5037 19,051.0 19,062.0 11.00 Loading Waste 9590F SIRATAL RAYYAN - OB Outpit PIT 5 EXT IPD 10 - 1,230 -
18-Sep-21 Night EX-6014 57,709.0 57,719.0 10.00 Loading Waste 8952 DIDI SETIAWAN - OB Outpit PIT 5 EXT IPD 10 - 1,018 -
18-Sep-21 Night EX-6016 44,294.0 44,294.0 - Standby - - 1,401 -
18-Sep-21 Night EX-6022 18,650.4 18,660.9 10.50 Loading Waste 15486 SUGENG PRAYETNO - OB Outpit PIT 5 EXT IPD 10 - 525 -
18-Sep-21 Night TR-3080 42,775.2 42,785.3 10.10 Hauling OB 10881 BURHANUDDIN 3 3 2 4 4 4 5 4 4 4 2 39 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 1,638 - 2 42 84
18-Sep-21 Night TR-3174 41,486.7 41,496.8 10.10 Hauling OB 11328 JUSESLAF BANJAR NAHOR 3 4 3 4 4 4 4 5 3 4 3 41 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 1,722 - 42 -
18-Sep-21 Night TR-3175 38,881.3 38,890.6 9.30 Hauling OB 1354 SUDIYANTO 3 4 3 4 4 4 3 2 1 4 2 34 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 1,428 - 42 -
18-Sep-21 Night TR-3195 24,742.2 24,751.0 8.80 Hauling OB 15229 ARDIANSYAH 2 4 3 4 4 4 4 1 2 4 2 34 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 1,428 - 42 -
18-Sep-21 Night TR-3202 26,877.5 26,888.0 10.50 Hauling OB 15230 MARGONO 3 4 3 4 4 5 5 4 4 4 2 42 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 1,764 - 42 -
18-Sep-21 Night TR-3203 26,990.6 26,993.9 3.28 Hauling OB 8958 MUKHROMIN 2 3 4 3 12 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 504 - 42 -
18-Sep-21 Night TR-3203 26,993.9 27,000.7 6.82 Hauling OB 8958 MUKHROMIN 3 4 3 4 3 4 3 1 25 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 1,050 - 42 -
18-Sep-21 Night TR-3204 26,320.3 26,330.3 10.00 Hauling OB 1303 EFENDI 3 4 3 4 3 4 4 5 4 4 2 40 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 1,680 - 42 -
18-Sep-21 Night TR-3205 25,866.4 25,875.3 8.90 Hauling OB 10882 SABIRIN 2 5 3 4 4 3 4 2 1 4 32 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 1,344 - 42 -
18-Sep-21 Night TR-3206 24,918.2 24,918.2 - Scheduled - WORKSHOP - - -
18-Sep-21 Night TR-3220 26,022.5 26,022.5 - Unscheduled - PIT 5 EXT - - -
18-Sep-21 Night TR-1024 31,340.1 31,349.5 9.40 Hauling OB 15576 JOKO SANTOSO 2 4 1 3 4 4 4 3 4 3 32 OB Outpit EX-5037 PIT 5 EXT IPD 10 24 768 - 24 -
18-Sep-21 Night TR-1025 47,259.8 47,269.0 9.20 Hauling OB 15469 BASUNI 2 5 2 4 6 7 5 4 3 5 43 OB Outpit EX-6022 PIT 5 EXT IPD 10 24 1,032 - 24 -
18-Sep-21 Night TR-1031 49,433.6 49,439.3 5.70 Hauling OB 15421 AGUS A 3 3 3 4 4 4 1 22 OB Outpit EX-5037 PIT 5 EXT IPD 10 24 528 - 24 -
18-Sep-21 Night TR-1031 49,439.3 49,443.4 4.10 Hauling OB 15636 AKHMAD NOOR 2 4 3 3 3 15 OB Outpit EX-5037 PIT 5 EXT IPD 10 24 360 - 24 -
18-Sep-21 Night TR-1032 51,261.9 51,263.6 1.68 Hauling OB 15468 PADLIANSYAH 1 4 3 8 OB Outpit EX-6014 PIT 5 EXT IPD 10 24 192 - 24 -
18-Sep-21 Night TR-1032 51,263.6 51,270.7 7.12 Hauling OB 15468 PADLIANSYAH 4 2 4 6 6 5 4 3 34 OB Outpit EX-5022 PIT 5 IPD 10 24 816 - 24 -
18-Sep-21 Night TR-1033 51,660.2 51,669.2 9.00 Hauling OB 15419 HUSEN 2 3 3 3 4 4 1 3 3 3 2 31 OB Outpit EX-5037 PIT 5 EXT IPD 10 24 744 - 24 -
18-Sep-21 Night TR-1034 49,447.3 49,457.6 10.30 Hauling OB 15420 M ABD MADI 3 4 3 3 4 4 4 4 4 3 3 39 OB Outpit EX-5037 PIT 5 EXT IPD 10 24 936 - 24 -
18-Sep-21 Night TR-1036 50,734.5 50,742.7 8.20 Hauling OB 15398 SIGIT SUSANTO 3 4 3 3 2 4 3 4 2 28 OB Outpit EX-5037 PIT 5 EXT IPD 10 24 672 - 24 -
18-Sep-21 Night TR-1048 52,180.2 52,180.2 - Unscheduled - PIT 5 EXT - - -
18-Sep-21 Night TR-1049 46,155.0 46,155.4 0.39 Hauling OB 15376 EKO FAJAR S 1 1 2 OB Outpit EX-6014 PIT 5 EXT IPD 10 24 48 - 24 -
18-Sep-21 Night TR-1049 46,155.4 46,164.0 8.61 Hauling OB 15376 EKO FAJAR S 2 5 2 4 6 6 5 4 3 4 3 44 OB Outpit EX-5022 PIT 5 IPD 10 24 1,056 - 24 -
18-Sep-21 Night TR-1050 45,897.1 45,905.0 7.91 Hauling OB 16024 QORI 2 5 1 4 6 7 5 4 3 3 40 OB Outpit EX-5022 PIT 5 IPD 10 24 960 - 24 -
18-Sep-21 Night TR-1050 45,905.0 45,906.0 0.99 Hauling OB 16024 QORI 5 5 OB Outpit EX-4006 PIT 5 EXT IPD 11 24 120 - 24 -
18-Sep-21 Night TA-7009 27,874.8 27,874.8 - Unscheduled - PIT 5 EXT - - -
18-Sep-21 Night TA-7010 25,248.2 25,249.3 1.12 Hauling OB 16026 BAHRUNI 1 5 6 OB Outpit EX-5022 PIT 5 IPD 10 14 84 - 14 -
18-Sep-21 Night TA-7010 25,249.3 25,250.1 0.75 Hauling OB 16026 BAHRUNI 4 4 OB Outpit EX-4006 PIT 5 EXT IPD 11 14 56 - 14 -
18-Sep-21 Night TA-7010 25,250.1 25,257.9 7.83 Hauling Solid Mud 16026 BAHRUNI 3 5 5 4 6 6 5 5 3 42 Solid Mud Outpit EX-2058 PIT 5 EXT IPD 10 11 470 - 11 -
18-Sep-21 Night TA-7022 30,875.7 30,877.7 2.00 Hauling Solid Mud 15817 YUSANDI 1 1 2 4 Solid Mud Outpit EX-2058 PIT 5 EXT IPD 10 11 45 - 11 -
18-Sep-21 Night TA-7029 28,587.2 28,586.3 - 0.90 Hauling Solid Mud 15819 AHNIANSYAH 2 5 2 9 Solid Mud Outpit EX-2058 PIT 5 EXT IPD 10 11 101 - 11 -
18-Sep-21 Night TA-7030 28,262.7 28,262.7 - Unscheduled - PIT 5 EXT - - -
18-Sep-21 Night BD-4005 13,770.7 13,770.7 - Scheduled - WORKSHOP - - -
18-Sep-21 Night BD-5035 3,524.8 3,531.2 6.40 Front maintenance 11676 SUDARSONO - PIT 5 EXT - - -
18-Sep-21 Night BD-6025 2,761.9 2,761.9 - Unit Rental - KCP - - -
18-Sep-21 Night BD-6026 30,198.7 30,198.7 - Standby - WORKSHOP - - -
18-Sep-21 Night BD-6028 4,176.1 4,185.6 9.50 Unit Rental 14750 MUSTAKIM - KCP - - -
18-Sep-21 Night BD-6036 34,233.2 34,243.5 10.30 Unit Rental 14964 JOKO P (Dozer) - KCP - - -
18-Sep-21 Night BD-6038 34,017.5 34,026.8 9.30 Unit Rental 14708 ADEFI P - KCP - - -
18-Sep-21 Night BD-6069 10,395.6 10,395.6 - Unscheduled - PIT 5 EXT - - -
18-Sep-21 Night BD-7013 40,014.7 40,016.7 2.00 Ripping 8157 SAMIDI - PIT 5 EXT - - -
18-Sep-21 Night BD-7013 40,016.7 40,026.7 10.00 Front maintenance 8157 SAMIDI - PIT 5 EXT - - -
18-Sep-21 Night BD-7026 26,652.0 26,661.6 9.60 Front maintenance 15639 A. BUDIMAN - PIT 5 EXT - - -
18-Sep-21 Night BD-7034 10,103.9 10,113.8 9.90 Disposal maintenance 9492 MAHFUDI - IPD 10 - - -
18-Sep-21 Night GR-2012 22,278.2 22,278.2 - Standby - WORKSHOP - - -
18-Sep-21 Night GR-3007 39,294.7 39,303.5 8.80 Road Maintenance Support 8925 AGUS SUNARWAN - PIT 5 EXT - - -
18-Sep-21 Night GR-3008 46,972.4 46,981.8 9.40 Road Maintenance Support 15571 YOHANIS L - PIT 5 EXT - - -
18-Sep-21 Night TW-3001 8,549.0 8,553.0 4.00 Road Maintenance Support - PIT 5 EXT - - -
18-Sep-21 Night TW-4001 18,756.0 18,756.00 - Standby - WORKSHOP - - -
18-Sep-21 Night PU-4002 19,080.0 19,080.0 - Unscheduled - PIT 11 - - -
18-Sep-21 Night PU-2026 6,195.1 6,195.1 - Dewatering - PIT 11 - - -
18-Sep-21 Night PU-3026 12,307.0 12,307.0 - Standby - ROM TEMPORARY - - -
18-Sep-21 Night PU-3015 1,696.0 1,696.0 - Standby - ROM TEMPORARY - - -
18-Sep-21 Night PU-3014 27,240.4 27,240.4 - Standby - ROM TEMPORARY - - -
18-Sep-21 Night LP-2165 13,573.0 13,573.0 - Standby 4671 NURUDIN - KCP - - -
18-Sep-21 Night LP-2166 13,082.0 13,093.0 11.00 Unit Rental 4671 NURUDIN - KCP - - -
18-Sep-21 Night LP-2167 14,061.0 14,061.0 - Unscheduled 4671 NURUDIN - KCP - - -
18-Sep-21 Night LP-2168 12,871.0 12,881.0 10.00 Unit Rental 4671 NURUDIN - KCP - - -
18-Sep-21 Night LP-2169 12,600.0 12,611.0 11.00 Unit Rental 4671 NURUDIN - KCP - - -
18-Sep-21 Night TS-4007 - - - Standby - KCP - - -
18-Sep-21 Night TS-4017 16,182.0 16,189.0 7.00 Unit Rental 15473 ISMAIL SAIDI - KCP - - -
18-Sep-21 Night TF-4013 20,443.0 20,451.0 8.00 Unit Rental 15746 SYARIFUDDI - KCP - - -
18-Sep-21 Night TF-4014 34,550.0 34,550.0 - Standby - PIT 5 EXT - - -
19-Sep-21 Day EX-2037 22,249.1 22,257.1 8.00 Road Maintenance Support 8371 DWI RUPAWAN - PIT 5 EXT - - -
19-Sep-21 Day EX-2058 17,579.7 17,590.2 10.50 Side casting 15504 SLAMET WIDODO - PIT 5 EXT - 1,136 -
19-Sep-21 Day EX-4006 35,227.0 35,237.0 10.00 Loading Waste 11330 EKO PURWANTO - OB Outpit PIT 5 EXT IPD 11 - 1,321 -
19-Sep-21 Day EX-5014 38,709.0 38,714.0 5.00 Unit Rental 15616 JOKO SUDIRO - KCP - - -
19-Sep-21 Day EX-5022 11,422.0 11,433.0 11.00 Loading Waste 15568 FUAD EFENDI - OB Outpit PIT 5 IPD 10 - 1,294 -
19-Sep-21 Day EX-5037 19,062.0 19,062.0 - Unscheduled - PIT 5 EXT - 1,347 -
19-Sep-21 Day EX-6014 57,719.0 57,724.0 5.00 Loading Waste 10917 SETA VERDY KARYA - OB Outpit PIT 5 EXT IPD 10 - - -
19-Sep-21 Day EX-6016 44,295.0 44,300.0 5.00 Loading Waste - OB Outpit PIT 5 EXT IPD 10 - - -
19-Sep-21 Day EX-6022 18,660.9 18,671.0 10.10 Loading Waste 11146 PURWANTO - OB Outpit PIT 5 EXT IPD 10 - 1,594 -
19-Sep-21 Day TR-3080 42,785.3 42,794.7 9.35 Hauling OB 7170F TRI PRASETIYO 4 4 4 3 4 4 3 4 5 3 38 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 1,596 - 42 -
19-Sep-21 Day TR-3080 42,794.7 42,794.9 0.25 Hauling OB 7170F TRI PRASETIYO 1 1 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 42 - 42 -
19-Sep-21 Day TR-3174 41,496.8 41,506.2 9.44 Hauling OB 15349 ARDIANSYAH 3 4 3 4 3 4 4 4 4 3 36 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 1,512 - 42 -
19-Sep-21 Day TR-3174 41,506.2 41,506.5 0.26 Hauling OB 15349 ARDIANSYAH 1 1 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 42 - 42 -
19-Sep-21 Day TR-3175 38,890.6 38,895.3 4.70 Hauling OB 10968 SUKIRNO 2 3 4 4 3 3 19 OB Outpit EX-6016 PIT 5 EXT IPD 10 42 798 - 42 -
19-Sep-21 Day TR-3175 38,895.3 38,899.5 4.20 Hauling OB 10968 SUKIRNO 4 4 4 3 2 17 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 714 - 42 -
19-Sep-21 Day TR-3195 24,751.0 24,755.8 4.80 Hauling OB 15347 TAHMID 1 4 4 4 3 3 19 OB Outpit EX-6016 PIT 5 EXT IPD 10 42 798 - 42 -
19-Sep-21 Day TR-3195 24,755.8 24,760.1 4.30 Hauling OB 15347 TAHMID 4 3 4 4 2 17 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 714 - 42 -
19-Sep-21 Day TR-3202 26,888.0 26,896.9 8.87 Hauling OB 11474 SARINDI 3 5 4 3 4 4 3 4 4 4 38 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 1,596 - 42 -
19-Sep-21 Day TR-3202 26,896.9 26,897.1 0.23 Hauling OB 11474 SARINDI 1 1 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 42 - 42 -
19-Sep-21 Day TR-3203 27,000.7 27,008.9 8.17 Hauling OB 8920 VERRY EKO SETIAWAN 3 3 3 4 3 4 3 4 5 3 35 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 1,470 - 42 -
19-Sep-21 Day TR-3203 27,008.9 27,009.1 0.23 Hauling OB 8920 VERRY EKO SETIAWAN 1 1 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 42 - 42 -
19-Sep-21 Day TR-3204 26,330.3 26,335.4 5.07 Hauling OB 3669 SUYANTO 2 4 3 4 3 3 19 OB Outpit EX-6016 PIT 5 EXT IPD 10 42 798 - 42 -
19-Sep-21 Day TR-3204 26,335.4 26,339.1 3.73 Hauling OB 3669 SUYANTO 3 4 3 2 2 14 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 588 - 42 -
19-Sep-21 Day TR-3205 25,875.3 25,880.3 5.01 Hauling OB 10695 SUPIYANDI 1 4 4 4 3 3 19 OB Outpit EX-6016 PIT 5 EXT IPD 10 42 798 - 42 -
19-Sep-21 Day TR-3205 25,880.3 25,884.8 4.49 Hauling OB 10695 SUPIYANDI 4 4 4 3 2 17 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 714 - 42 -
19-Sep-21 Day TR-3206 24,918.2 24,918.2 - Scheduled - WORKSHOP - - -
19-Sep-21 Day TR-3220 26,022.5 26,022.5 - Scheduled - WORKSHOP - - -
19-Sep-21 Day TR-1024 31,349.5 31,354.8 5.30 Hauling OB 15350 HERMAN 4 5 5 4 5 23 OB Outpit EX-5022 PIT 5 IPD 10 24 552 - 24 -
19-Sep-21 Day TR-1025 47,269.0 47,279.5 10.50 Hauling OB 16025 IMTIKAN 4 5 5 5 4 4 3 5 4 5 4 48 OB Outpit EX-5022 PIT 5 IPD 10 24 1,152 - 24 -
19-Sep-21 Day TR-1031 49,443.4 49,453.0 9.60 Hauling OB 15466 SUPRIYANTO 3 4 4 4 4 3 4 4 2 3 35 OB Outpit EX-4006 PIT 5 EXT IPD 11 24 840 - 24 -
19-Sep-21 Day TR-1032 51,270.7 51,280.2 9.50 Hauling OB 15377 RIZALI RAHMAN 1 5 5 4 4 4 4 5 5 4 3 44 OB Outpit EX-5022 PIT 5 IPD 10 24 1,056 - 24 -
19-Sep-21 Day TR-1033 51,669.2 51,679.4 10.20 Hauling OB 15955 RIZKY IHWAN 4 4 5 5 4 4 3 5 5 4 4 47 OB Outpit EX-5022 PIT 5 IPD 10 24 1,128 - 24 -
19-Sep-21 Day TR-1034 49,457.6 49,464.9 7.30 Hauling OB 15471 MULYADI 1 3 1 2 4 3 4 3 3 3 27 OB Outpit EX-4006 PIT 5 EXT IPD 11 24 648 - 24 -
19-Sep-21 Day TR-1036 50,742.7 50,752.1 9.40 Hauling OB 15346 MUSA 4 4 4 4 3 3 4 3 2 2 33 OB Outpit EX-4006 PIT 5 EXT IPD 11 24 792 - 24 -
19-Sep-21 Day TR-1048 52,180.2 52,180.2 - Unscheduled - PIT 5 EXT - - -
19-Sep-21 Day TR-1049 46,164.0 46,173.8 9.80 Hauling OB 15744 MARYANTO 4 4 5 5 4 4 4 1 5 4 4 44 OB Outpit EX-5022 PIT 5 IPD 10 24 1,056 - 24 -
19-Sep-21 Day TR-1050 45,906.0 45,908.9 2.93 Hauling OB 15467 HUSNI 4 5 2 11 OB Outpit EX-5022 PIT 5 IPD 10 24 264 - 24 -
19-Sep-21 Day TR-1050 45,908.9 45,916.4 7.47 Hauling OB 15467 HUSNI 1 5 3 4 3 3 3 3 3 28 OB Outpit EX-4006 PIT 5 EXT IPD 11 24 672 - 24 -
19-Sep-21 Day TA-7009 27,874.8 27,874.8 - Unscheduled - PIT 5 EXT - - -
19-Sep-21 Day TA-7010 25,257.9 25,261.9 4.00 Hauling OB 15861 AGUSTIAN 4 4 4 4 16 OB Outpit EX-5022 PIT 5 IPD 10 14 224 - 14 -
19-Sep-21 Day TA-7010 25,261.9 25,262.4 0.50 Hauling OB 15861 AGUSTIAN 1 1 2 OB Outpit EX-4006 PIT 5 EXT IPD 11 14 28 - 14 -
19-Sep-21 Day TA-7010 25,262.4 25,266.7 4.30 Hauling OB 15653 M. ILIAS 2 2 2 2 1 9 OB Outpit EX-4006 PIT 5 EXT IPD 11 14 126 - 14 -
19-Sep-21 Day TA-7022 30,877.7 30,877.7 - Unscheduled - PIT 5 EXT - - -
19-Sep-21 Day TA-7029 28,586.3 28,586.3 - Unscheduled - PIT 5 EXT - - -
19-Sep-21 Day TA-7030 28,262.7 28,262.7 - Unscheduled - PIT 5 EXT - - -
19-Sep-21 Day BD-4005 13,770.7 13,770.7 - Scheduled - WORKSHOP - - -
k 19-Sep-21 Day BD-5035 3,531.2 3,540.4 9.20 Front maintenance 14963 MAULANA ISHAK - PIT 5 EXT - - -
19-Sep-21 Day BD-6025 2,761.9 2,761.9 - Standby - KCP - - -
W 19-Sep-21 Day BD-6026 30,198.7 30,198.7 - Standby - WORKSHOP - - -
19-Sep-21 Day BD-6028 4,185.7 4,196.1 10.40 Unit Rental 15570 HENDRY S - KCP - - -
19-Sep-21 Day BD-6036 34,243.5 34,252.9 9.40 Unit Rental 14710 AGUS S - KCP - - -
19-Sep-21 Day BD-6038 34,026.8 34,036.9 10.10 Unit Rental 14744 NOORDIANTO - KCP - - -
19-Sep-21 Day BD-6069 10,395.6 10,395.6 - Unscheduled - PIT 5 EXT - - -
19-Sep-21 Day BD-7013 40,026.7 40,036.7 10.00 Front maintenance 15606 FATHUR - PIT 5 EXT - - -
19-Sep-21 Day BD-7026 26,661.6 26,671.0 9.40 Front maintenance 9978 KARSIANTO - PIT 5 EXT - - -
19-Sep-21 Day BD-7034 10,113.8 10,124.2 10.40 Disposal maintenance 10013 ADI SUSANTO - IPD 10 - - -
19-Sep-21 Day GR-2012 22,278.2 22,290.0 11.80 Road Maintenance Support 8371 DWI RUPAWAN - WORKSHOP - - -
19-Sep-21 Day GR-3007 39,303.5 39,311.5 8.00 Road Maintenance Support 9426 ADE SUPIANA - PIT 5 EXT - - -
19-Sep-21 Day GR-3008 46,981.8 46,990.5 8.70 Road Maintenance Support 15571 YOHANIS L - PIT 5 EXT - - -
19-Sep-21 Day TW-3001 8,553.0 8,561.0 8.00 Road Maintenance Support 15743 LANA - PIT 5 EXT - - -
19-Sep-21 Day TW-4001 18,756.0 18,757.00 1.00 Road Maintenance Support 15439 YOSEF S - PIT 5 EXT - - -
19-Sep-21 Day PU-4002 19,080.0 19,080.00 - Unscheduled - PIT 11 - - -
19-Sep-21 Day PU-2026 6,195.1 6,195.1 - Dewatering - PIT 11 - - -
19-Sep-21 Day PU-3026 12,307.0 12,307.00 - Standby - ROM TEMPORARY - - -
19-Sep-21 Day PU-3015 1,696.0 1,696.00 - Standby - PIT 11 - - -
19-Sep-21 Day PU-3014 27,240.4 27,240.40 - Standby - ROM TEMPORARY - - -
19-Sep-21 Day LP-2165 13,573.0 13,573.00 - Standby 4671 NURUDIN - KCP - - -
19-Sep-21 Day LP-2166 13,093.0 13,093.00 - Standby 4671 NURUDIN - KCP - - -
19-Sep-21 Day LP-2167 14,061.0 14,061.00 - Standby 4671 NURUDIN - KCP - - -
19-Sep-21 Day LP-2168 12,881.0 12,881.00 - Standby 4671 NURUDIN - KCP - - -
19-Sep-21 Day LP-2169 12,611.0 12,611.00 - Standby 4671 NURUDIN - KCP - - -
19-Sep-21 Day TS-4007 - - - Standby - KCP - - -
19-Sep-21 Day TS-4017 16,189.0 16,198.0 9.00 Unit Rental 15310 ALDI ALFI SAPUTRA - KCP - - -
19-Sep-21 Day TF-4013 20,451.0 20,461.0 10.00 Unit Rental 15745 SURYANATA - KCP - - -
19-Sep-21 Day TF-4014 34,550.0 34,550.0 - Standby - KCP - - -
19-Sep-21 Night EX-2037 22,257.1 22,257.1 - Standby - PIT 5 EXT - - -
19-Sep-21 Night EX-2058 17,590.2 17,591.2 1.00 Side casting 9590F SIRATAL RAYYAN - PIT 5 EXT - 1,136 -
19-Sep-21 Night EX-2058 17,591.2 17,600.0 8.80 Sloping 9590F SIRATAL RAYYAN - PIT 5 EXT - 1,136 -
19-Sep-21 Night EX-4006 35,237.0 35,246.0 9.00 Loading Waste 15617 ZAENAL - OB Outpit PIT 5 EXT IPD 11 - 1,321 -
19-Sep-21 Night EX-5014 38,720.0 38,729.0 9.00 Unit Rental 15345 SUTONO - KCP - - -
19-Sep-21 Night EX-5022 11,433.0 11,442.0 9.00 Loading Waste 15604 AHMAD SYAFI'I - OB Outpit PIT 5 IPD 10 - 1,294 -
19-Sep-21 Night EX-5037 19,062.0 19,062.0 - Unscheduled - PIT 5 EXT - 1,347 -
19-Sep-21 Night EX-6014 57,724.0 57,733.0 9.00 Loading Waste 8952 DIDI SETIAWAN - OB Outpit PIT 5 EXT IPD 10 - - -
19-Sep-21 Night EX-6016 44,300.0 44,309.0 9.00 Loading Waste 9136 AHMAD YANI - OB Outpit PIT 5 EXT IPD 10 - - -
19-Sep-21 Night EX-6022 18,671.0 18,680.2 9.20 Loading Waste 15486 SUGENG PRAYETNO - OB Outpit PIT 5 EXT IPD 10 - 1,594 -
19-Sep-21 Night TR-3080 42,794.9 42,801.3 6.44 Hauling OB 10881 BURHANUDDIN 4 4 4 4 4 4 4 1 29 OB Outpit EX-6016 PIT 5 EXT IPD 10 42 1,218 - 42 -
19-Sep-21 Night TR-3080 42,801.3 42,804.8 3.46 Hauling OB 10881 BURHANUDDIN 3 4 3 2 12 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 504 - 42 -
19-Sep-21 Night TR-3174 41,506.5 41,509.9 3.44 Hauling OB 11328 JUSESLAF BANJAR NAHOR 2 4 4 4 14 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 588 - 42 -
19-Sep-21 Night TR-3174 41,509.9 41,511.9 1.96 Hauling OB 11328 JUSESLAF BANJAR NAHOR 3 4 1 8 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 336 - 42 -
19-Sep-21 Night TR-3174 41,511.9 41,516.3 4.40 Hauling OB 15229 ARDIANSYAH 3 4 3 5 2 17 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 714 - 42 -
19-Sep-21 Night TR-3175 38,899.5 38,906.0 6.45 Hauling OB 1354 SUDIYANTO 1 2 6 4 4 4 4 25 OB Outpit EX-6016 PIT 5 EXT IPD 10 42 1,050 - 42 -
19-Sep-21 Night TR-3175 38,906.0 38,910.6 4.65 Hauling OB 1354 SUDIYANTO 2 2 4 4 4 2 18 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 756 - 42 -
19-Sep-21 Night TR-3195 24,760.1 24,764.7 4.57 Hauling OB 8965 HADI SUTIKNO 3 4 4 4 4 2 21 OB Outpit EX-6016 PIT 5 EXT IPD 10 42 882 - 42 -
19-Sep-21 Night TR-3195 24,764.7 24,767.5 2.83 Hauling OB 8965 HADI SUTIKNO 2 4 4 3 13 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 546 - 42 -
19-Sep-21 Night TR-3202 26,897.1 26,904.1 7.03 Hauling OB 15230 MARGONO 3 4 4 4 4 4 3 2 28 OB Outpit EX-6016 PIT 5 EXT IPD 10 42 1,176 - 42 -
19-Sep-21 Night TR-3202 26,904.1 26,907.4 3.27 Hauling OB 15230 MARGONO 2 4 4 3 13 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 546 - 42 -
19-Sep-21 Night TR-3203 27,009.1 27,017.1 7.95 Hauling OB 8892 BAGUS PURWONO 1 3 3 4 5 3 3 3 4 2 31 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 1,302 - 42 -
19-Sep-21 Night TR-3203 27,017.1 27,019.1 2.05 Hauling OB 8892 BAGUS PURWONO 4 3 1 8 OB Outpit EX-6016 PIT 5 EXT IPD 10 42 336 - 42 -
19-Sep-21 Night TR-3204 26,339.1 26,346.9 7.76 Hauling OB 1303 EFENDI 3 3 3 4 4 3 3 3 5 3 34 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 1,428 - 42 -
19-Sep-21 Night TR-3204 26,346.9 26,348.7 1.84 Hauling OB 1303 EFENDI 3 2 5 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 210 - 42 -
19-Sep-21 Night TR-3205 25,884.8 25,893.3 8.51 Hauling OB 10882 SABIRIN 2 4 4 4 4 2 4 3 4 2 33 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 1,386 - 42 -
19-Sep-21 Night TR-3205 25,893.3 25,894.6 1.29 Hauling OB 10882 SABIRIN 4 1 5 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 210 - 42 -
19-Sep-21 Night TR-3206 24,918.2 24,918.2 - Scheduled - WORKSHOP - - -
19-Sep-21 Night TR-3220 26,022.5 26,022.5 - Scheduled - WORKSHOP - - -
19-Sep-21 Night TR-1024 31,354.8 31,356.7 1.87 Hauling OB 15636 AKHMAD NOOR 1 5 2 8 OB Outpit EX-6016 PIT 5 EXT IPD 10 24 192 - 24 -
19-Sep-21 Night TR-1024 31,356.7 31,359.9 3.27 Hauling OB 15636 AKHMAD NOOR 3 5 5 1 14 OB Outpit EX-6014 PIT 5 EXT IPD 10 24 336 - 24 -
19-Sep-21 Night TR-1024 31,359.9 31,360.9 0.93 Hauling OB 15636 AKHMAD NOOR 1 1 2 4 OB Outpit EX-5022 PIT 5 IPD 10 24 96 - 24 -
19-Sep-21 Night TR-1024 31,360.9 31,362.7 1.83 Hauling OB 15636 AKHMAD NOOR 2 3 2 7 OB Outpit EX-4006 PIT 5 EXT IPD 11 24 168 - 24 -
19-Sep-21 Night TR-1025 47,279.5 47,285.6 6.10 Hauling OB 15469 BASUNI 3 5 3 2 4 5 22 OB Outpit EX-5022 PIT 5 IPD 10 24 528 - 24 -
19-Sep-21 Night TR-1031 49,453.0 49,457.6 4.59 Hauling OB 15485 ROBY TM 2 4 4 4 3 17 OB Outpit EX-5022 PIT 5 IPD 10 24 408 - 24 -
19-Sep-21 Night TR-1031 49,457.6 49,462.8 5.20 Hauling OB 15485 ROBY TM 3 2 3 4 5 4 2 23 OB Outpit EX-4006 PIT 5 EXT IPD 11 24 552 - 24 -
19-Sep-21 Night TR-1032 51,280.2 51,285.0 4.79 Hauling OB 15468 PADLIANSYAH 3 1 4 5 4 4 21 OB Outpit EX-5022 PIT 5 IPD 10 24 504 - 24 -
19-Sep-21 Night TR-1032 51,285.0 51,290.0 5.01 Hauling OB 15468 PADLIANSYAH 3 3 5 4 4 3 22 OB Outpit EX-4006 PIT 5 EXT IPD 11 24 528 - 24 -
19-Sep-21 Night TR-1033 51,679.4 51,679.7 0.28 Hauling OB 15419 HUSEN 1 1 OB Outpit EX-6016 PIT 5 EXT IPD 10 24 24 - 24 -
19-Sep-21 Night TR-1033 51,679.7 51,682.7 3.06 Hauling OB 15419 HUSEN 4 5 2 11 OB Outpit EX-6014 PIT 5 EXT IPD 10 24 264 - 24 -
19-Sep-21 Night TR-1033 51,682.7 51,686.9 4.18 Hauling OB 15419 HUSEN 2 5 4 4 15 OB Outpit EX-5022 PIT 5 IPD 10 24 360 - 24 -
19-Sep-21 Night TR-1033 51,686.9 51,689.7 2.78 Hauling OB 15419 HUSEN 2 3 3 2 10 OB Outpit EX-4006 PIT 5 EXT IPD 11 24 240 - 24 -
19-Sep-21 Night TR-1034 49,464.9 49,466.4 1.52 Hauling OB 15420 M ABD MADI 4 4 8 OB Outpit EX-6014 PIT 5 EXT IPD 10 24 192 - 24 -
19-Sep-21 Night TR-1034 49,466.4 49,467.8 1.33 Hauling OB 15420 M ABD MADI 3 4 7 OB Outpit EX-5022 PIT 5 IPD 10 24 168 - 24 -
19-Sep-21 Night TR-1034 49,467.8 49,468.9 1.15 Hauling OB 15420 M ABD MADI 3 3 6 OB Outpit EX-4006 PIT 5 EXT IPD 11 24 144 - 24 -
19-Sep-21 Night TR-1034 49,467.8 49,472.0 4.24 Hauling OB 15576 JOKO SANTOSO 4 3 7 OB Outpit EX-6014 PIT 5 EXT IPD 10 24 168 - 24 -
19-Sep-21 Night TR-1034 49,472.0 49,474.6 2.61 Hauling OB 15576 JOKO SANTOSO 1 4 3 2 10 OB Outpit EX-4006 PIT 5 EXT IPD 11 24 240 - 24 -
19-Sep-21 Night TR-1036 50,752.1 50,752.7 0.56 Hauling OB 15398 SIGIT SUSANTO 2 2 OB Outpit EX-6016 PIT 5 EXT IPD 10 24 48 - 24 -
19-Sep-21 Night TR-1036 50,752.7 50,756.6 3.91 Hauling OB 15398 SIGIT SUSANTO 3 5 4 2 14 OB Outpit EX-6014 PIT 5 EXT IPD 10 24 336 - 24 -
19-Sep-21 Night TR-1036 50,756.6 50,758.8 2.24 Hauling OB 15398 SIGIT SUSANTO 1 4 1 2 8 OB Outpit EX-5022 PIT 5 IPD 10 24 192 - 24 -
19-Sep-21 Night TR-1036 50,758.8 50,761.6 2.79 Hauling OB 15398 SIGIT SUSANTO 2 3 1 3 1 10 OB Outpit EX-4006 PIT 5 EXT IPD 11 24 240 - 24 -
19-Sep-21 Night TR-1048 52,180.2 52,180.2 - Unscheduled - PIT 5 EXT - - -
19-Sep-21 Night TR-1049 46,173.8 46,177.4 3.62 Hauling OB 15376 EKO FAJAR S 4 5 2 2 2 15 OB Outpit EX-6014 PIT 5 EXT IPD 10 24 360 - 24 -
19-Sep-21 Night TR-1049 46,177.4 46,181.3 3.86 Hauling OB 15376 EKO FAJAR S 3 5 4 4 16 OB Outpit EX-5022 PIT 5 IPD 10 24 384 - 24 -
19-Sep-21 Night TR-1049 46,181.3 46,183.7 2.42 Hauling OB 15376 EKO FAJAR S 1 2 2 3 2 10 OB Outpit EX-4006 PIT 5 EXT IPD 11 24 240 - 24 -
19-Sep-21 Night TR-1050 45,916.4 45,918.4 1.98 Hauling OB 15421 AGUS A 1 4 1 2 8 OB Outpit EX-6016 PIT 5 EXT IPD 10 24 192 - 24 -
19-Sep-21 Night TR-1050 45,918.4 45,921.6 3.21 Hauling OB 15421 AGUS A 4 4 3 2 13 OB Outpit EX-6014 PIT 5 EXT IPD 10 24 312 - 24 -
19-Sep-21 Night TR-1050 45,921.6 45,924.3 2.72 Hauling OB 15421 AGUS A 2 1 5 3 11 OB Outpit EX-5022 PIT 5 IPD 10 24 264 - 24 -
19-Sep-21 Night TR-1050 45,924.3 45,924.8 0.49 Hauling OB 15421 AGUS A 1 1 2 OB Outpit EX-4006 PIT 5 EXT IPD 11 24 48 - 24 -
19-Sep-21 Night TA-7009 27,874.8 27,874.8 - Unscheduled - PIT 5 EXT - - -
19-Sep-21 Night TA-7010 25,266.7 25,272.3 5.56 Hauling OB 15863 HENDRA M 4 3 3 4 4 4 22 OB Outpit EX-5022 PIT 5 IPD 10 14 308 - 14 -
19-Sep-21 Night TA-7010 25,272.3 25,275.3 3.04 Hauling OB 15863 HENDRA M 4 1 3 4 12 OB Outpit EX-4006 PIT 5 EXT IPD 11 14 168 - 14 -
19-Sep-21 Night TA-7022 30,877.7 30,877.7 - Unscheduled - PIT 5 EXT - - -
19-Sep-21 Night TA-7029 28,586.3 28,586.3 - Unscheduled 16026 BAHRUNI - PIT 5 EXT - - -
19-Sep-21 Night TA-7030 28,262.7 28,262.7 - Unscheduled - PIT 5 EXT - - -
19-Sep-21 Night BD-4005 13,770.7 13,770.7 - Scheduled - WORKSHOP - - -
19-Sep-21 Night BD-5035 3,540.4 3,543.4 3.00 Front maintenance 15747 MUSTAQIM D6 - PIT 5 EXT - - -
19-Sep-21 Night BD-6025 2,761.9 2,761.9 - Unit Rental - KCP - - -
19-Sep-21 Night BD-6026 30,198.7 30,198.7 - Standby - WORKSHOP - - -
19-Sep-21 Night BD-6028 4,196.1 4,198.8 2.70 Unit Rental 14750 MUSTAKIM - KCP - - -
19-Sep-21 Night BD-6036 34,252.9 34,262.8 9.90 Unit Rental 14964 JOKO P (Dozer) - KCP - - -
19-Sep-21 Night BD-6038 34,036.9 34,041.4 4.50 Unit Rental 14708 ADEFI P - KCP - - -
19-Sep-21 Night BD-6069 10,395.6 10,395.6 - Unscheduled - PIT 5 EXT - - -
19-Sep-21 Night BD-7013 40,036.7 40,047.1 10.40 Front maintenance 11676 SUDARSONO - PIT 5 EXT - - -
19-Sep-21 Night BD-7026 26,671.0 26,675.8 4.80 Front maintenance 15639 A. BUDIMAN - PIT 5 EXT - - -
19-Sep-21 Night BD-7034 10,124.2 10,135.5 11.30 Disposal maintenance 9492 MAHFUDI - IPD 10 - - -
19-Sep-21 Night GR-2012 22,290.0 22,290.0 - Standby - WORKSHOP - - -
19-Sep-21 Night GR-3007 39,311.5 39,320.3 8.80 Road Maintenance Support 8925 AGUS SUNARWAN - PIT 5 EXT - - -
19-Sep-21 Night GR-3008 46,990.5 47,000.4 9.90 Road Maintenance Support 12344 M FAJRI - PIT 5 EXT - - -
19-Sep-21 Night TW-3001 8,561.0 8,563.0 2.00 Road Maintenance Support 15106 AHMAD NURANI - PIT 5 EXT - - -
19-Sep-21 Night TW-4001 18,757.0 18,757.00 - Standby - WORKSHOP - - -
19-Sep-21 Night PU-4002 19,080.0 19,080.0 - Unscheduled - PIT 11 - - -
19-Sep-21 Night PU-2026 6,195.1 6,195.1 - Dewatering - PIT 11 - - -
19-Sep-21 Night PU-3026 12,307.0 12,307.0 - Standby - ROM TEMPORARY - - -
19-Sep-21 Night PU-3015 1,696.0 1,696.0 - Standby - PIT 11 - - -
19-Sep-21 Night PU-3014 27,240.4 27,240.4 - Standby - ROM TEMPORARY - - -
19-Sep-21 Night LP-2165 13,573.0 13,584.0 11.00 Unit Rental 4671 NURUDIN - KCP - - -
19-Sep-21 Night LP-2166 13,093.0 13,105.0 12.00 Unit Rental 4671 NURUDIN - KCP - - -
19-Sep-21 Night LP-2167 14,073.0 14,084.0 11.00 Unit Rental 4671 NURUDIN - KCP - - -
19-Sep-21 Night LP-2168 12,881.0 12,883.0 2.00 Unit Rental 4671 NURUDIN - KCP - - -
19-Sep-21 Night LP-2169 12,611.0 12,623.0 12.00 Unit Rental 4671 NURUDIN - KCP - - -
19-Sep-21 Night TS-4007 - - - Standby - KCP - - -
19-Sep-21 Night TS-4017 16,198.0 16,204.0 6.00 Unit Rental 15473 ISMAIL SAIDI - KCP - - -
19-Sep-21 Night TF-4013 20,461.0 20,467.0 6.00 Unit Rental 15746 SYARIFUDDI - KCP - - -
19-Sep-21 Night TF-4014 34,550.0 34,550.0 - Standby - KCP - - -
20-Sep-21 Day EX-2037 22,257.1 22,264.6 7.50 Road Maintenance Support 8371 DWI RUPAWAN - JALAN SAKA - - -
20-Sep-21 Day EX-2058 17,600.0 17,611.2 11.20 Side casting 15504 SLAMET WIDODO - PIT 5 EXT - - -
20-Sep-21 Day EX-4006 35,246.0 35,258.0 12.00 Loading Waste 8920 VERRY EKO SETIAWAN - OB Outpit PIT 5 EXT IPD 10 - 1,466 -
20-Sep-21 Day EX-5014 38,729.0 38,739.0 10.00 Unit Rental 15616 JOKO SUDIRO - KCP - - -
20-Sep-21 Day EX-5022 11,442.0 11,450.0 8.00 Loading Waste 15568 FUAD EFENDI - OB Outpit PIT 5 EXT IPD 10 - 1,456 -
20-Sep-21 Day EX-5037 19,062.0 19,062.0 - Unscheduled - PIT 5 EXT - 1,498 -
20-Sep-21 Day EX-6014 57,733.0 57,743.0 10.00 Loading Waste 10917 SETA VERDY KARYA - OB Outpit PIT 5 EXT IPD 10 - - -
20-Sep-21 Day EX-6016 44,309.0 44,312.0 3.00 Loading Waste 11146 PURWANTO - OB Outpit PIT 5 EXT IPD 10 - - -
20-Sep-21 Day EX-6022 18,680.2 18,683.8 3.60 Loading Waste 11146 PURWANTO - OB Outpit PIT 5 EXT IPD 10 - 1,633 -
20-Sep-21 Day TR-3080 42,804.8 42,815.4 10.60 Hauling OB 9214 MUSTOFA ADI PRAYITNO 4 3 4 4 5 4 4 4 5 2 4 43 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 1,806 - 42 -
20-Sep-21 Day TR-3174 41,516.3 41,519.0 2.69 Hauling OB 10968 SUKIRNO 4 4 4 12 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 504 - 42 -
20-Sep-21 Day TR-3174 41,519.0 41,521.0 2.01 Hauling OB 10968 SUKIRNO 3 3 3 9 OB Outpit EX-6016 PIT 5 EXT IPD 10 42 378 - 42 -
20-Sep-21 Day TR-3175 38,910.6 38,916.9 6.30 Hauling OB 1330 SUTRISNO 3 4 5 4 4 3 4 27 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 1,134 - 42 -
20-Sep-21 Day TR-3195 24,767.5 24,771.2 3.70 Hauling OB 15347 TAHMID 3 4 2 3 12 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 504 - 42 -
20-Sep-21 Day TR-3195 24,771.2 24,771.8 0.62 Hauling OB 15347 TAHMID 2 2 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 84 - 42 -
20-Sep-21 Day TR-3195 24,771.8 24,774.9 3.08 Hauling OB 15347 TAHMID 4 2 4 10 OB Outpit EX-6016 PIT 5 EXT IPD 10 42 420 - 42 -
20-Sep-21 Day TR-3202 26,907.4 26,917.5 10.10 Hauling OB 11474 SARINDI 4 3 4 3 3 4 4 4 5 3 3 40 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 1,680 - 42 -
20-Sep-21 Day TR-3203 27,019.1 27,022.1 2.97 Hauling OB 8920 VERRY EKO SETIAWAN 4 5 3 12 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 504 - 42 -
20-Sep-21 Day TR-3203 27,022.1 27,029.5 7.43 Hauling OB 8920 VERRY EKO SETIAWAN 3 4 4 4 4 5 3 3 30 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 1,260 - 42 -
20-Sep-21 Day TR-3204 26,348.7 26,351.8 3.10 Hauling OB 3669 SUYANTO 4 4 4 12 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 504 - 42 -
20-Sep-21 Day TR-3204 26,351.8 26,354.4 2.58 Hauling OB 3669 SUYANTO 1 4 3 2 10 OB Outpit EX-5022 PIT 5 EXT IPD 10 42 420 - 42 -
20-Sep-21 Day TR-3204 26,354.4 26,356.7 2.32 Hauling OB 3669 SUYANTO 3 2 4 9 OB Outpit EX-6016 PIT 5 EXT IPD 10 42 378 - 42 -
20-Sep-21 Day TR-3205 25,894.6 25,897.8 3.24 Hauling OB 15349 ARDIANSYAH 4 4 4 12 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 504 - 42 -
20-Sep-21 Day TR-3205 25,897.8 25,901.1 3.24 Hauling OB 15349 ARDIANSYAH 2 4 3 3 12 OB Outpit EX-5022 PIT 5 EXT IPD 10 42 504 - 42 -
20-Sep-21 Day TR-3205 25,901.1 25,903.5 2.43 Hauling OB 15349 ARDIANSYAH 3 3 3 9 OB Outpit EX-6016 PIT 5 EXT IPD 10 42 378 - 42 -
20-Sep-21 Day TR-3206 24,918.2 24,918.2 - Scheduled - WORKSHOP - - -
20-Sep-21 Day TR-3220 26,022.5 26,022.8 0.25 Hauling OB 10968 SUKIRNO 1 1 OB Outpit EX-5022 PIT 5 EXT IPD 10 42 42 - 42 -
20-Sep-21 Day TR-1024 31,362.7 31,366.2 3.50 Hauling OB 15349 ARDIANSYAH 1 4 3 3 4 15 OB Outpit EX-5022 PIT 5 EXT IPD 10 24 360 - 24 -
20-Sep-21 Day TR-1025 47,285.6 47,287.5 1.90 Hauling OB 15349 ARDIANSYAH 2 3 2 7 OB Outpit EX-5022 PIT 5 EXT IPD 10 24 168 - 24 -
20-Sep-21 Day TR-1031 49,462.8 49,466.7 3.90 Hauling OB 15466 SUPRIYANTO 1 1 3 3 5 13 OB Outpit EX-5022 PIT 5 EXT IPD 10 24 312 - 24 -
20-Sep-21 Day TR-1031 49,466.7 49,472.1 5.41 Hauling OB 15466 SUPRIYANTO 2 3 3 2 2 3 3 18 OB Outpit EX-4006 PIT 5 EXT IPD 10 24 432 - 24 -
20-Sep-21 Day TR-1032 51,290.0 51,296.1 6.06 Hauling OB 16025 IMTIKAN 3 4 3 2 12 OB Outpit EX-6014 PIT 5 EXT IPD 10 24 288 - 24 -
20-Sep-21 Day TR-1032 51,296.1 51,300.1 4.04 Hauling OB 16025 IMTIKAN 1 2 3 2 8 OB Outpit EX-4006 PIT 5 EXT IPD 10 24 192 - 26 24 624
20-Sep-21 Day TR-1033 51,689.7 51,699.4 9.70 Hauling OB 15955 RIZKY IHWAN 2 3 3 2 2 3 4 19 OB Outpit EX-4006 PIT 5 EXT IPD 10 24 456 - 23 24 552
20-Sep-21 Day TR-1034 49,474.6 49,478.6 3.97 Hauling OB 15471 MULYADI 3 3 3 1 1 2 3 16 OB Outpit EX-4006 PIT 5 EXT IPD 10 24 384 - 24 -
20-Sep-21 Day TR-1034 49,478.6 49,482.3 3.73 Hauling OB 15471 MULYADI 3 1 3 4 4 15 OB Outpit EX-5022 PIT 5 EXT IPD 10 24 360 - 24 -
20-Sep-21 Day TR-1036 50,761.6 50,764.9 3.30 Hauling OB 15467 HUSNI 2 4 3 2 11 OB Outpit EX-6014 PIT 5 EXT IPD 10 24 264 - 24 -
20-Sep-21 Day TR-1036 50,764.9 50,767.6 2.70 Hauling OB 15467 HUSNI 1 2 3 3 9 OB Outpit EX-4006 PIT 5 EXT IPD 10 24 216 - 24 -
20-Sep-21 Day TR-1036 50,767.6 50,770.6 3.00 Hauling OB 15467 HUSNI 1 3 3 3 10 OB Outpit EX-5022 PIT 5 EXT IPD 10 24 240 - 24 -
20-Sep-21 Day TR-1048 52,180.2 52,180.2 - Unscheduled - OB Outpit PIT 5 EXT IPD 10 24 - - 24 -
20-Sep-21 Day TR-1049 46,183.7 46,188.1 4.35 Hauling OB 15376 EKO FAJAR S 3 2 4 6 1 16 OB Outpit EX-4006 PIT 5 EXT IPD 10 24 384 - 24 -
20-Sep-21 Day TR-1049 46,183.7 46,190.0 6.26 Hauling OB 15376 EKO FAJAR S 3 3 4 3 3 3 4 23 OB Outpit EX-5022 PIT 5 EXT IPD 10 24 552 - 24 -
20-Sep-21 Day TR-1050 45,924.8 45,924.8 - Unscheduled - WORKSHOP - - -
20-Sep-21 Day TA-7009 27,874.8 27,874.8 - Unscheduled - PIT 5 EXT - - -
20-Sep-21 Day TA-7010 25,275.3 25,281.2 5.90 Hauling OB 15816 M. YUSUF 3 2 5 OB Outpit EX-4006 PIT 5 EXT IPD 10 14 70 - 23 14 322
20-Sep-21 Day TA-7022 30,877.7 30,877.7 - Unscheduled - PIT 5 EXT - - -
20-Sep-21 Day TA-7029 28,586.3 28,586.3 - Unscheduled - PIT 5 EXT - - -
20-Sep-21 Day TA-7030 28,262.7 28,262.7 - Unscheduled - PIT 5 EXT - - -
20-Sep-21 Day BD-4005 13,770.7 13,770.7 - Scheduled - WORKSHOP - - -
k 20-Sep-21 Day BD-5035 3,543.4 3,553.5 10.10 Front maintenance - PIT 5 EXT - - -
20-Sep-21 Day BD-6025 2,761.9 2,761.9 - Standby - KCP - - -
20-Sep-21 Day BD-6026 30,198.7 30,198.7 - Standby - WORKSHOP - - -
20-Sep-21 Day BD-6028 4,198.8 4,204.2 5.40 Unit Rental 11169 ANNAS - KCP - - -
20-Sep-21 Day BD-6036 34,262.8 34,272.3 9.50 Unit Rental 14710 AGUS S - KCP - - -
20-Sep-21 Day BD-6038 34,041.4 34,047.5 6.10 Unit Rental 14744 NOORDIANTO - KCP - - -
20-Sep-21 Day BD-6069 10,395.6 10,395.6 - Unscheduled - PIT 5 EXT - - -
20-Sep-21 Day BD-7013 40,047.1 40,057.2 10.10 Front maintenance 15606 FATHUR - PIT 5 EXT - - -
20-Sep-21 Day BD-7026 26,675.8 26,678.8 3.00 Front maintenance - PIT 5 EXT - - -
20-Sep-21 Day BD-7034 10,135.5 10,147.1 11.60 Disposal maintenance 10013 ADI SUSANTO - IPD 10 - - -
20-Sep-21 Day GR-2012 22,290.0 22,296.4 6.40 Road Maintenance Support 15571 YOHANIS L - WORKSHOP - - -
20-Sep-21 Day GR-3007 39,320.3 39,327.3 7.00 Road Maintenance Support 9426 ADE SUPIANA - PIT 5 EXT - - -
20-Sep-21 Day GR-3008 47,000.4 47,007.4 7.00 Road Maintenance Support - PIT 5 EXT - - -
20-Sep-21 Day TW-3001 8,563.0 8,568.0 5.00 Road Maintenance Support - PIT 5 EXT - - -
20-Sep-21 Day TW-4001 18,757.0 18,757.00 - Standby - WORKSHOP - - -
20-Sep-21 Day PU-4002 19,080.0 19,080.00 - Unscheduled - ROM TEMPORARY - - -
20-Sep-21 Day PU-2026 6,195.1 6,195.1 - Standby - PIT 11 - - -
20-Sep-21 Day PU-3026 12,307.6 12,309.10 1.50 Dewatering - PIT 11 - - -
20-Sep-21 Day PU-3015 1,696.0 1,696.00 - Standby - PIT 11 - - -
20-Sep-21 Day PU-3014 27,240.4 27,240.40 - Standby - ROM TEMPORARY - - -
20-Sep-21 Day LP-2165 13,584.0 13,584.00 - Standby - KCP - - -
20-Sep-21 Day LP-2166 13,105.0 13,105.00 - Standby - KCP - - -
20-Sep-21 Day LP-2167 14,084.0 14,084.00 - Standby - KCP - - -
20-Sep-21 Day LP-2168 12,883.0 12,883.00 - Standby - KCP - - -
20-Sep-21 Day LP-2169 12,623.0 12,623.00 - Standby - KCP - - -
20-Sep-21 Day TS-4007 - - - Standby - KCP - - -
20-Sep-21 Day TS-4017 16,204.0 16,215.0 11.00 Unit Rental 10884 HAMDANI - KCP - - -
20-Sep-21 Day TF-4013 20,467.0 20,474.0 7.00 Unit Rental 15745 SURYANATA - KCP - - -
20-Sep-21 Day TF-4014 34,550.0 34,550.0 - Standby - KCP - - -
20-Sep-21 Night EX-2037 22,264.6 22,264.6 - Standby - - - -
20-Sep-21 Night EX-2058 17,611.2 17,620.0 8.80 - - - -
20-Sep-21 Night EX-4006 35,258.0 35,263.0 5.00 - - 1,466 -
20-Sep-21 Night EX-5014 38,739.0 38,743.0 4.00 Unit Rental 15345 SUTONO - KCP - - -
20-Sep-21 Night EX-5022 11,450.0 11,453.0 3.00 - - 1,456 -
20-Sep-21 Night EX-5037 19,062.0 19,062.0 - - - 1,498 -
20-Sep-21 Night EX-6014 57,743.0 57,746.0 3.00 Loading Waste 15486 SUGENG PRAYETNO - OB Outpit PIT 5 EXT IPD 10 - - -
20-Sep-21 Night EX-6016 44,312.0 44,315.0 3.00 Loading Waste 9136 AHMAD YANI - OB Outpit PIT 5 EXT IPD 10 - - -
20-Sep-21 Night EX-6022 18,683.8 18,683.8 - Unscheduled - - 1,633 -
20-Sep-21 Night TR-3080 42,815.4 42,816.3 0.90 Hauling OB 8958 MUKHROMIN 3 3 OB Outpit EX-6016 PIT 5 EXT IPD 10 42 126 - 42 -
20-Sep-21 Night TR-3174 41,521.0 41,522.4 1.40 Hauling OB 8958 MUKHROMIN 1 1 OB Outpit EX-6016 PIT 5 EXT IPD 10 42 42 - 42 -
20-Sep-21 Night TR-3175 38,916.9 38,918.6 1.70 Hauling OB 8958 MUKHROMIN 3 1 4 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 168 - 42 -
20-Sep-21 Night TR-3195 24,774.9 24,777.6 2.70 Hauling OB 15229 ARDIANSYAH 1 4 4 1 10 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 420 - 42 -
20-Sep-21 Night TR-3202 26,917.5 26,922.2 4.70 Hauling OB 2 4 4 1 11 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 462 - 42 -
20-Sep-21 Night TR-3203 27,029.5 27,034.3 4.82 Hauling OB 2 4 4 1 11 OB Outpit EX-6016 PIT 5 EXT IPD 10 42 462 - 42 -
20-Sep-21 Night TR-3204 26,356.7 26,361.0 4.30 Hauling OB 2 4 4 1 11 OB Outpit EX-6016 PIT 5 EXT IPD 10 42 462 - 42 -
20-Sep-21 Night TR-3205 25,903.5 25,906.7 3.19 Hauling OB 10695 SUPIYANDI 2 3 4 1 10 OB Outpit EX-6016 PIT 5 EXT IPD 10 42 420 - 42 -
20-Sep-21 Night TR-3206 24,918.2 24,918.2 - Scheduled - WORKSHOP - - -
20-Sep-21 Night TR-3220 26,022.8 26,027.4 4.60 Hauling OB 1 1 4 3 1 10 OB Outpit EX-6016 PIT 5 EXT - - 42 -
20-Sep-21 Night TR-1024 31,366.2 31,368.8 2.60 Hauling OB 15636 AKHMAD NOOR 1 5 4 1 11 OB Outpit EX-5022 PIT 5 EXT IPD 10 24 264 - 24 -
20-Sep-21 Night TR-1025 47,287.5 47,287.5 - Standby - OB Outpit PIT 5 EXT IPD 10 24 - - 24 -
20-Sep-21 Night TR-1031 49,472.1 49,475.1 3.00 Hauling OB 2 1 4 7 OB Outpit EX-5022 PIT 5 EXT IPD 10 24 168 - 24 -
20-Sep-21 Night TR-1032 51,300.1 51,303.6 3.52 Hauling OB 1 2 8 4 7 3 25 OB Outpit EX-4006 PIT 5 EXT IPD 10 24 600 - 24 -
20-Sep-21 Night TR-1033 51,699.4 51,702.8 3.35 Hauling OB 2 2 6 9 8 2 29 OB Outpit EX-4006 PIT 5 EXT IPD 10 24 696 - 24 -
20-Sep-21 Night TR-1034 49,482.3 49,485.6 3.26 Hauling OB 3 4 5 1 13 OB Outpit EX-6014 PIT 5 EXT IPD 10 24 312 - 24 -
20-Sep-21 Night TR-1036 50,770.6 50,774.3 3.74 Hauling OB 1 4 5 1 11 OB Outpit EX-6016 PIT 5 EXT IPD 10 24 264 - 24 -
20-Sep-21 Night TR-1048 52,180.2 52,180.2 - Unscheduled - OB Outpit PIT 5 EXT IPD 10 24 - - 24 -
20-Sep-21 Night TR-1049 46,190.0 46,192.6 2.60 Hauling OB 1 4 4 2 11 OB Outpit EX-5022 PIT 5 EXT IPD 10 24 264 - 24 -
20-Sep-21 Night TR-1050 45,924.8 45,924.8 - Unscheduled - WORKSHOP - - -
20-Sep-21 Night TA-7009 27,874.8 27,874.8 - Unscheduled - PIT 5 EXT - - -
20-Sep-21 Night TA-7010 25,281.2 25,283.8 2.60 Hauling OB 9 8 17 OB Outpit EX-4006 PIT 5 EXT IPD 10 14 238 - 14 -
20-Sep-21 Night TA-7022 30,877.7 30,877.7 - Unscheduled - PIT 5 EXT - - -
20-Sep-21 Night TA-7029 28,586.3 28,586.3 - Unscheduled - PIT 5 EXT - - -
20-Sep-21 Night TA-7030 28,262.7 28,262.7 - Unscheduled - PIT 5 EXT - - -
20-Sep-21 Night BD-4005 13,770.7 13,770.7 - Scheduled - WORKSHOP - - -
20-Sep-21 Night BD-5035 3,553.5 3,558.9 5.40 Front maintenance - PIT 5 EXT - - -
20-Sep-21 Night BD-6025 2,761.9 2,761.9 - Standby - KCP - - -
20-Sep-21 Night BD-6026 30,198.7 30,198.7 - Standby - WORKSHOP - - -
20-Sep-21 Night BD-6028 4,204.2 4,205.4 1.20 Unit Rental 14750 MUSTAKIM - KCP - - -
20-Sep-21 Night BD-6036 34,272.3 34,273.5 1.20 Unit Rental 14964 JOKO P (Dozer) - KCP - - -
20-Sep-21 Night BD-6038 34,047.5 34,048.7 1.20 Unit Rental 15570 HENDRY S - KCP - - -
20-Sep-21 Night BD-6069 10,395.6 10,395.6 - Unscheduled - PIT 5 EXT - - -
20-Sep-21 Night BD-7013 40,057.2 40,059.6 2.43 Front maintenance - PIT 5 EXT - - -
20-Sep-21 Night BD-7026 26,678.8 26,681.0 2.20 Front maintenance - PIT 5 EXT - - -
20-Sep-21 Night BD-7034 10,147.1 10,153.9 6.80 Disposal maintenance - IPD 10 - - -
20-Sep-21 Night GR-2012 22,296.4 22,296.4 - Standby - WORKSHOP - - -
20-Sep-21 Night GR-3007 39,327.3 39,332.4 5.10 Road Maintenance Support - PIT 5 EXT - - -
20-Sep-21 Night GR-3008 47,007.4 47,012.5 5.10 Road Maintenance Support - PIT 5 EXT - - -
20-Sep-21 Night TW-3001 8,568.0 8,571.0 3.00 Road Maintenance Support - PIT 5 EXT - - -
20-Sep-21 Night TW-4001 18,757.0 18,757.00 - Standby - WORKSHOP - - -
20-Sep-21 Night PU-4002 19,080.0 19,080.0 - Unscheduled - ROM TEMPORARY - - -
20-Sep-21 Night PU-2026 6,195.1 6,195.1 - Standby - PIT 11 - - -
20-Sep-21 Night PU-3026 12,309.1 12,309.1 - Standby - PIT 11 - - -
20-Sep-21 Night PU-3015 1,696.0 1,696.0 - Standby - PIT 11 - - -
20-Sep-21 Night PU-3014 27,240.4 27,240.4 - Standby - ROM TEMPORARY - - -
20-Sep-21 Night LP-2165 13,584.0 13,592.0 8.00 Unit Rental - KCP - - -
20-Sep-21 Night LP-2166 13,105.0 13,117.0 12.00 Unit Rental - KCP - - -
20-Sep-21 Night LP-2167 14,084.0 14,095.0 11.00 Unit Rental - KCP - - -
20-Sep-21 Night LP-2168 12,883.0 12,883.0 - Standby - KCP - - -
20-Sep-21 Night LP-2169 12,623.0 12,633.0 10.00 Unit Rental - KCP - - -
20-Sep-21 Night TS-4007 - - - Standby - KCP - - -
20-Sep-21 Night TS-4017 16,215.0 16,220.0 5.00 Unit Rental 15473 ISMAIL SAIDI - KCP - - -
20-Sep-21 Night TF-4013 20,474.0 20,474.0 - Standby 15746 SYARIFUDDI - KCP - - -
20-Sep-21 Night TF-4014 34,550.0 34,550.0 - Standby - KCP - - -
21-Sep-21 Day EX-2037 22,264.6 22,264.6 - Standby - PARKIRAN SCANIA - - -
21-Sep-21 Day EX-2058 17,620.0 17,625.0 5.00 Drainage 15504 SLAMET WIDODO - IPD 10 - 1,502 -
21-Sep-21 Day EX-2058 17,625.0 17,630.7 5.70 Side casting 15504 SLAMET WIDODO - PIT 5 EXT - 1,502 -
21-Sep-21 Day EX-4006 35,263.0 35,266.0 3.00 Loading Waste 11330 EKO PURWANTO - OB Outpit PIT 5 EXT IPD 11 - 1,485 -
21-Sep-21 Day EX-5014 38,743.0 38,746.0 3.00 Unit Rental 9590F SIRATAL RAYYAN - KCP - - -
21-Sep-21 Day EX-5022 11,453.0 11,453.0 - Standby - PIT 5 EXT - 1,395 -
21-Sep-21 Day EX-5037 19,062.0 19,065.0 3.00 Loading Waste 15568 FUAD EFENDI - OB Outpit PIT 5 EXT IPD 10 - 1,501 -
21-Sep-21 Day EX-6014 57,746.0 57,749.0 3.00 Loading Waste 8952 DIDI SETIAWAN - OB Outpit PIT 5 EXT IPD 10 - - -
21-Sep-21 Day EX-6016 44,315.0 44,316.0 1.00 Loading Waste 11146 PURWANTO - OB Outpit PIT 5 EXT IPD 10 - - -
21-Sep-21 Day EX-6022 18,683.8 18,683.8 - Unscheduled - PIT 5 EXT - 1,586 -
21-Sep-21 Day TR-3080 42,816.3 42,818.2 1.90 Hauling OB 9214 MUSTOFA ADI PRAYITNO 2 4 6 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 252 - 42 -
21-Sep-21 Day TR-3174 41,522.4 41,522.4 - Unscheduled - PIT 5 EXT - - -
21-Sep-21 Day TR-3175 38,918.3 38,918.7 0.40 Hauling OB 1330 SUTRISNO 2 2 OB Outpit EX-6016 PIT 5 EXT IPD 10 42 84 - 42 -
21-Sep-21 Day TR-3195 24,777.6 24,779.4 1.80 Hauling OB 1354 SUDIYANTO 3 3 6 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 252 - 42 -
21-Sep-21 Day TR-3202 26,920.5 26,922.2 1.70 Hauling OB 11474 SARINDI 3 3 6 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 252 - 42 -
21-Sep-21 Day TR-3203 27,032.6 27,033.3 0.70 Hauling OB 8920 VERRY EKO SETIAWAN 2 2 OB Outpit EX-6016 PIT 5 EXT IPD 10 42 84 - 42 -
21-Sep-21 Day TR-3204 26,359.0 26,361.0 2.00 Hauling OB 1303 EFENDI 4 3 7 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 294 - 42 -
21-Sep-21 Day TR-3205 25,906.7 25,908.0 1.30 Hauling OB 7170F TRI PRASETIYO 2 3 5 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 210 - 42 -
21-Sep-21 Day TR-3206 24,918.2 24,918.2 - Scheduled - WORKSHOP - - -
21-Sep-21 Day TR-3220 26,028.3 26,029.1 0.80 Hauling OB 3669 SUYANTO 2 2 OB Outpit EX-6016 PIT 5 EXT IPD 10 42 84 - 42 -
21-Sep-21 Day TR-1024 31,368.8 31,369.8 1.00 Hauling OB 15955 RIZKY IHWAN 1 1 2 OB Outpit EX-4006 PIT 5 EXT IPD 10 24 48 - 24 -
21-Sep-21 Day TR-1025 47,287.5 47,289.7 2.20 Hauling OB 15469 BASUNI 2 2 4 8 OB Outpit EX-5037 PIT 5 EXT IPD 10 24 192 - 24 -
21-Sep-21 Day TR-1031 49,474.2 49,474.8 0.60 Hauling OB 15471 MULYADI 1 1 2 OB Outpit EX-6016 PIT 5 EXT IPD 10 24 48 - 24 -
21-Sep-21 Day TR-1032 51,304.5 51,305.9 1.40 Hauling OB 15377 RIZALI RAHMAN 1 4 5 OB Outpit EX-4006 PIT 5 EXT IPD 10 24 120 - 24 -
21-Sep-21 Day TR-1033 51,703.4 51,705.6 2.20 Hauling OB 15467 HUSNI 2 3 4 9 OB Outpit EX-5037 PIT 5 EXT IPD 10 24 216 - 24 -
21-Sep-21 Day TR-1034 49,485.6 49,485.6 - Standby - PIT 5 EXT - - -
21-Sep-21 Day TR-1036 50,773.3 50,775.3 2.00 Hauling OB 15346 MUSA 2 4 3 9 OB Outpit EX-5037 PIT 5 EXT 24 216 - 24 -
21-Sep-21 Day TR-1048 52,180.2 52,180.2 - Unscheduled - PIT 5 EXT - - -
21-Sep-21 Day TR-1049 46,196.1 46,198.2 2.10 Hauling OB 15744 MARYANTO 2 4 4 10 OB Outpit EX-5037 PIT 5 EXT IPD 10 24 240 - 24 -
21-Sep-21 Day TR-1050 45,924.8 45,924.8 - Unscheduled - WORKSHOP - - -
21-Sep-21 Day TA-7009 27,874.8 27,874.8 - Unscheduled - PIT 5 EXT - - -
21-Sep-21 Day TA-7010 25,284.0 25,285.7 1.70 Hauling OB 15861 AGUSTIAN 2 4 6 OB Outpit EX-4006 PIT 5 EXT IPD 10 14 84 - 14 -
21-Sep-21 Day TA-7022 30,877.7 30,877.7 - Unscheduled WORKSHOP - - -
21-Sep-21 Day TA-7029 28,586.3 28,586.3 - Unscheduled - WORKSHOP - - -
21-Sep-21 Day TA-7030 28,262.7 28,262.7 - Unscheduled - WORKSHOP - - -
21-Sep-21 Day BD-4005 13,770.7 13,770.7 - Scheduled - WORKSHOP - - -
k 21-Sep-21 Day BD-5035 3,558.9 3,564.5 5.60 Front maintenance 14963 MAULANA ISHAK - PIT 5 EXT - - -
21-Sep-21 Day BD-6025 2,761.9 2,761.9 - Unit Rental - KCP - - -
21-Sep-21 Day BD-6026 30,198.7 30,198.7 - Standby - WORKSHOP - - -
21-Sep-21 Day BD-6028 4,203.4 4,211.1 7.70 Unit Rental 11169 ANNAS - KCP - - -
21-Sep-21 Day BD-6036 34,273.5 34,276.6 3.10 Unit Rental 15569 SUJIONO - KCP - - -
21-Sep-21 Day BD-6038 34,048.7 34,053.9 5.20 Unit Rental 14708 ADEFI P - KCP - - -
21-Sep-21 Day BD-6069 10,395.6 10,395.6 - Unscheduled - PIT 5 EXT - - -
21-Sep-21 Day BD-7013 40,062.2 40,067.0 4.80 Front maintenance 10013 ADI SUSANTO - PIT 5 EXT - - -
21-Sep-21 Day BD-7026 26,681.0 26,681.0 - Unscheduled - - - -
21-Sep-21 Day BD-7034 10,153.9 10,159.6 5.70 Disposal maintenance 8157 SAMIDI - IPD 10 - - -
21-Sep-21 Day GR-2012 22,296.4 22,296.4 - Standby - WORKSHOP - - -
21-Sep-21 Day GR-3007 39,332.4 39,336.7 4.30 Road Maintenance Support 9426 ADE SUPIANA - PIT 5 EXT - - -
21-Sep-21 Day GR-3008 47,005.9 47,010.4 4.50 Road Maintenance Support 15571 YOHANIS L - PIT 5 EXT - - -
21-Sep-21 Day TW-3001 8,571.0 8,571.0 - Standby 15409 YOSEF SALEMBE - PIT 5 EXT - - -
21-Sep-21 Day TW-4001 18,757.0 18,757.00 - Standby - WORKSHOP - - -
21-Sep-21 Day PU-4002 19,080.0 19,080.00 - Unscheduled - ROM TEMPORARY - - -
21-Sep-21 Day PU-2026 6,195.1 6,195.1 - Standby - PIT 11 - - -
21-Sep-21 Day PU-3026 12,309.1 12,313.80 4.70 Dewatering - PIT 11 - - -
21-Sep-21 Day PU-3015 1,696.0 1,696.00 - Standby - PIT 11 - - -
21-Sep-21 Day PU-3014 27,240.4 27,240.40 - Standby - ROM TEMPORARY - - -
21-Sep-21 Day LP-2165 13,592.0 13,592.00 - Unit Rental - KCP - - -
21-Sep-21 Day LP-2166 13,117.0 13,117.00 - Unit Rental - KCP - - -
21-Sep-21 Day LP-2167 14,095.0 14,095.00 - Unit Rental - KCP - - -
21-Sep-21 Day LP-2168 12,883.0 12,883.00 - Unit Rental - KCP - - -
21-Sep-21 Day LP-2169 12,633.0 12,633.00 - Unit Rental - KCP - - -
21-Sep-21 Day TS-4007 - - - Standby - KCP - - -
21-Sep-21 Day TS-4017 16,220.0 16,222.0 2.00 Unit Rental 15745 SURYANATA - KCP - - -
21-Sep-21 Day TF-4013 20,475.0 20,476.0 1.00 Unit Rental 15310 ALDI ALFI SAPUTRA - KCP - - -
21-Sep-21 Day TF-4014 34,550.0 34,550.0 - Standby - KCP - - -
21-Sep-21 Night EX-2037 22,264.6 22,264.6 - Standby - PARKIRAN SCANIA - - -
21-Sep-21 Night EX-2058 17,630.7 17,639.0 8.30 Side casting 15604 AHMAD SYAFI'I - PIT 5 EXT - 1,502 -
21-Sep-21 Night EX-4006 35,266.0 35,277.0 11.00 Loading Waste - OB Outpit PIT 5 EXT IPD 11 - 1,485 -
21-Sep-21 Night EX-5014 38,746.0 38,757.0 11.00 Unit Rental 15616 JOKO SUDIRO - KCP - - -
21-Sep-21 Night EX-5022 11,453.0 11,453.0 - Standby - PIT 5 EXT - 1,395 -
21-Sep-21 Night EX-5037 19,065.0 19,069.0 4.00 Loading Waste 12534 PUJIYANTO - OB Outpit PIT 5 EXT IPD 10 - 1,501 -
21-Sep-21 Night EX-6014 57,749.0 57,758.0 9.00 Loading Waste 15486 SUGENG PRAYETNO - OB Outpit PIT 5 EXT IPD 10 - - -
21-Sep-21 Night EX-6016 44,316.0 44,322.0 6.00 Loading Waste - OB Outpit PIT 5 EXT IPD 10 - - -
21-Sep-21 Night EX-6022 18,685.3 18,688.5 3.20 Loading Waste - OB Outpit PIT 5 EXT IPD 10 - 1,586 -
21-Sep-21 Night TR-3080 42,818.2 42,827.1 8.90 Hauling OB 10881 BURHANUDDIN 3 3 1 2 2 11 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 462 - 42 -
21-Sep-21 Night TR-3080 42,827.1 42,827.1 - Hauling OB 10881 BURHANUDDIN 1 2 3 1 2 3 3 3 2 20 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 840 - 42 -
21-Sep-21 Night TR-3174 41,522.4 41,522.4 - Standby - PIT 5 EXT - - -
21-Sep-21 Night TR-3175 38,918.7 38,922.4 3.71 Hauling OB 10882 SABIRIN 2 4 3 2 2 13 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 546 - 42 -
21-Sep-21 Night TR-3175 38,922.4 38,926.4 3.99 Hauling OB 10882 SABIRIN 1 4 2 4 3 14 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 588 - 42 -
21-Sep-21 Night TR-3195 24,779.4 24,779.4 - Unscheduled - PIT 5 EXT - - -
21-Sep-21 Night TR-3202 26,922.2 26,926.0 3.80 Hauling OB 15230 MARGONO 3 2 3 2 2 12 OB Outpit EX-6016 PIT 5 EXT IPD 10 42 504 - 42 -
21-Sep-21 Night TR-3202 26,926.0 26,931.7 5.70 Hauling OB 15230 MARGONO 2 4 2 3 3 4 18 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 756 - 42 -
21-Sep-21 Night TR-3203 27,033.3 27,037.2 3.90 Hauling OB 15350 HERMAN 2 3 3 2 3 13 OB Outpit EX-6016 PIT 5 EXT IPD 10 42 546 - 42 -
21-Sep-21 Night TR-3203 27,037.2 27,042.6 5.40 Hauling OB 15350 HERMAN 3 3 3 3 3 3 18 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 756 - 42 -
21-Sep-21 Night TR-3204 26,361.0 26,365.4 4.41 Hauling OB 10969 JOKO PRIONO 1 4 2 4 3 14 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 588 - 42 -
21-Sep-21 Night TR-3204 26,365.4 26,371.4 5.99 Hauling OB 10969 JOKO PRIONO 2 1 4 3 3 4 2 19 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 798 - 42 -
21-Sep-21 Night TR-3205 25,908.0 25,912.2 4.15 Hauling OB 10695 SUPIYANDI 3 3 3 2 3 14 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 588 - 42 -
21-Sep-21 Night TR-3205 25,912.2 25,916.0 3.85 Hauling OB 10695 SUPIYANDI 4 3 3 3 13 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 546 - 42 -
21-Sep-21 Night TR-3206 24,918.2 24,918.2 - Scheduled - WORKSHOP - - -
21-Sep-21 Night TR-3220 26,029.1 26,038.8 9.70 Hauling OB 10968 SUKIRNO 3 4 3 3 4 3 2 3 3 3 2 33 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 1,386 - 42 -
21-Sep-21 Night TR-1024 31,369.8 31,379.7 9.90 Hauling OB 15636 AKHMAD NOOR 5 7 1 8 8 6 6 6 6 4 57 OB Outpit EX-4006 PIT 5 EXT IPD 11 24 1,368 - 24 -
21-Sep-21 Night TR-1025 47,289.7 47,289.7 - Standby - PIT 5 EXT - - -
21-Sep-21 Night TR-1031 49,474.8 49,478.6 3.78 Hauling OB 15485 ROBY TM 2 3 3 3 2 13 OB Outpit EX-6016 PIT 5 EXT IPD 10 24 312 - 24 -
21-Sep-21 Night TR-1031 49,478.6 49,484.0 5.42 Hauling OB 15485 ROBY TM 3 4 2 4 4 3 20 OB Outpit EX-6014 PIT 5 EXT IPD 10 24 480 - 24 -
21-Sep-21 Night TR-1032 51,305.9 51,310.9 4.95 Hauling OB 15468 PADLIANSYAH 4 2 3 3 3 2 17 OB Outpit EX-6016 PIT 5 EXT IPD 10 24 408 - 24 -
21-Sep-21 Night TR-1032 51,310.9 51,315.5 4.65 Hauling OB 15468 PADLIANSYAH 4 4 3 1 4 16 OB Outpit EX-5037 PIT 5 EXT IPD 10 24 384 - 24 -
21-Sep-21 Night TR-1033 51,705.6 51,705.6 - Standby - PIT 5 EXT - - -
21-Sep-21 Night TR-1034 49,485.6 49,485.6 - Standby - PIT 5 EXT - - -
21-Sep-21 Night TR-1036 50,775.3 50,778.6 3.33 Hauling OB 15398 SIGIT SUSANTO 3 3 3 3 12 OB Outpit EX-6014 PIT 5 EXT IPD 10 24 288 - 24 -
21-Sep-21 Night TR-1036 50,778.6 50,783.9 5.27 Hauling OB 15398 SIGIT SUSANTO 3 3 4 3 2 4 19 OB Outpit EX-5037 PIT 5 EXT IPD 10 24 456 - 24 -
21-Sep-21 Night TR-1048 52,180.2 52,180.2 - Unscheduled - PIT 5 EXT - - -
21-Sep-21 Night TR-1049 46,198.2 46,202.9 4.74 Hauling OB 16025 IMTIKAN 3 1 3 5 12 OB Outpit EX-5037 PIT 5 EXT IPD 10 24 288 - 24 -
21-Sep-21 Night TR-1049 46,202.9 46,207.4 4.46 Hauling OB 16025 IMTIKAN 2 6 6 8 6 6 4 38 OB Outpit EX-4006 PIT 5 EXT IPD 11 24 912 - 24 -
21-Sep-21 Night TR-1050 45,924.8 45,924.8 - Unscheduled - WORKSHOP - - -
21-Sep-21 Night TA-7009 27,874.8 27,874.8 - Unscheduled - PIT 5 EXT - - -
21-Sep-21 Night TA-7010 25,285.7 25,292.2 6.50 Hauling OB 15862 RUDY AMRIYADI 6 9 6 8 7 7 6 49 OB Outpit EX-4006 PIT 5 EXT IPD 11 14 686 - 14 -
21-Sep-21 Night TA-7022 30,877.7 30,877.7 - Unscheduled WORKSHOP - - -
21-Sep-21 Night TA-7029 28,586.3 28,586.3 - Unscheduled - WORKSHOP - - -
21-Sep-21 Night TA-7030 28,262.7 28,262.7 - Unscheduled - WORKSHOP - - -
21-Sep-21 Night BD-4005 13,770.7 13,770.7 - Scheduled - WORKSHOP - - -
21-Sep-21 Night BD-5035 3,564.5 3,574.6 10.10 Front maintenance 15747 MUSTAQIM D6 - PIT 5 EXT - - -
21-Sep-21 Night BD-6025 2,761.9 2,761.9 - Unit Rental - KCP - - -
21-Sep-21 Night BD-6026 30,198.7 30,198.7 - Scheduled - WORKSHOP - - -
21-Sep-21 Night BD-6028 4,211.1 4,217.5 6.40 Unit Rental 14750 MUSTAKIM - KCP - - -
21-Sep-21 Night BD-6036 34,276.6 34,285.1 8.50 Unit Rental 14710 AGUS S - KCP - - -
21-Sep-21 Night BD-6038 34,053.9 34,063.3 9.40 Unit Rental 15570 HENDRY S - KCP - - -
21-Sep-21 Night BD-6069 10,395.6 10,395.6 - Unscheduled - PIT 5 EXT - - -
21-Sep-21 Night BD-7013 40,067.0 40,077.8 10.80 Front maintenance 15606 FATHUR - PIT 5 EXT - - -
21-Sep-21 Night BD-7026 26,681.0 26,681.0 - Unscheduled - - - -
21-Sep-21 Night BD-7034 10,159.6 10,170.3 10.70 Disposal maintenance 9492 MAHFUDI - IPD 10 - - -
21-Sep-21 Night GR-2012 22,296.4 22,296.4 - Standby - WORKSHOP - - -
21-Sep-21 Night GR-3007 39,336.7 39,346.9 10.20 Road Maintenance Support 8925 AGUS SUNARWAN - PIT 5 EXT - - -
21-Sep-21 Night GR-3008 47,010.4 47,020.2 9.80 Road Maintenance Support 12344 M FAJRI - PIT 5 EXT - - -
21-Sep-21 Night TW-3001 8,571.0 8,575.0 4.00 Standby 15743 LANA - PIT 5 EXT - - -
21-Sep-21 Night TW-4001 18,757.0 18,757.00 - Standby - WORKSHOP - - -
21-Sep-21 Night PU-4002 19,080.0 19,080.0 - Unscheduled - ROM TEMPORARY - - -
21-Sep-21 Night PU-2026 6,195.1 6,195.1 - Standby - PIT 11 - - -
21-Sep-21 Night PU-3026 12,313.8 12,325.8 12.00 Dewatering Z7354 M. ALMA DENNY - PIT 11 - - -
21-Sep-21 Night PU-3015 1,696.0 1,696.0 - Standby - PIT 11 - - -
21-Sep-21 Night PU-3014 27,240.4 27,240.4 - Standby - ROM TEMPORARY - - -
21-Sep-21 Night LP-2165 13,592.0 13,604.0 12.00 Unit Rental - KCP - - -
21-Sep-21 Night LP-2166 13,117.0 13,129.0 12.00 Unit Rental - KCP - - -
21-Sep-21 Night LP-2167 14,095.0 14,106.0 11.00 Unit Rental - KCP - - -
21-Sep-21 Night LP-2168 12,883.0 12,894.0 11.00 Unit Rental - KCP - - -
21-Sep-21 Night LP-2169 12,633.0 12,642.0 9.00 Unit Rental - KCP - - -
21-Sep-21 Night TS-4007 - - - Standby - KCP - - -
21-Sep-21 Night TS-4017 16,222.0 16,228.0 6.00 Unit Rental 13709 RISNO PATALLE - KCP - - -
21-Sep-21 Night TF-4013 20,477.0 20,482.0 5.00 Unit Rental 15746 SYARIFUDDI - KCP - - -
21-Sep-21 Night TF-4014 34,550.0 34,550.0 - Standby - KCP - - -
22-Sep-21 Day EX-2037 22,264.6 22,265.6 1.00 Moving - pindah lokasi kerja 15503 ASHARI SETIYO NUGROHO - PIT 5 EXT - - -
22-Sep-21 Day EX-2037 22,265.6 22,271.3 5.70 Side casting 15503 ASHARI SETIYO NUGROHO - PIT 5 EXT - - -
22-Sep-21 Day EX-2058 17,639.0 17,649.7 10.70 Side casting 15504 SLAMET WIDODO - PIT 5 EXT - 1,533 -
22-Sep-21 Day EX-4006 35,277.0 35,280.6 3.62 Side casting 11330 EKO PURWANTO - - 1,131 -
22-Sep-21 Day EX-4006 35,280.6 35,284.0 3.38 Loading Waste 11330 EKO PURWANTO - OB Outpit PIT 5 EXT - 1,131 -
22-Sep-21 Day EX-5014 38,757.0 38,764.0 7.00 Unit Rental 15345 SUTONO - KCP - - -
22-Sep-21 Day EX-5022 11,453.0 11,462.0 9.00 Loading Waste 9136 AHMAD YANI - OB Outpit PIT 5 EXT - 1,153 -
22-Sep-21 Day EX-5037 19,069.0 19,080.0 11.00 Loading Waste 9590F SIRATAL RAYYAN - OB Outpit PIT 5 EXT - 1,105 -
22-Sep-21 Day EX-6014 57,758.0 57,769.0 11.00 Loading Waste 8952 DIDI SETIAWAN - OB Outpit PIT 5 EXT - - -
22-Sep-21 Day EX-6016 44,322.0 44,325.0 3.00 Loading Waste 9136 AHMAD YANI - OB Outpit PIT 5 - - -
22-Sep-21 Day EX-6022 18,688.5 18,695.9 7.40 Loading Waste 11146 PURWANTO - OB Outpit PIT 5 EXT - 1,411 -
22-Sep-21 Day TR-3080 42,827.1 42,829.6 2.48 Hauling OB 1354 SUDIYANTO 3 4 2 9 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 378 - 42 -
22-Sep-21 Day TR-3080 42,829.6 42,832.3 2.75 Hauling OB 1354 SUDIYANTO 4 2 4 10 OB Outpit EX-5022 PIT 5 EXT IPD 10 42 420 - 42 -
22-Sep-21 Day TR-3080 42,832.3 42,834.0 1.65 Hauling OB 1354 SUDIYANTO 1 3 2 6 OB Outpit EX-5037 PIT 5 EXT IPD 10 42 252 - 42 -
22-Sep-21 Day TR-3080 42,834.0 42,834.8 0.82 Hauling OB 1354 SUDIYANTO 1 1 1 3 OB Outpit EX-4006 PIT 5 EXT IPD 10 42 126 - 42 -
22-Sep-21 Day TR-3174 41,522.4 41,528.2 5.80 Hauling OB 11619 DWI WARDOYO 1 4 4 5 3 4 21 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 882 - 42 -
22-Sep-21 Day TR-3175 38,926.4 38,928.5 2.09 Hauling OB 1330 SUTRISNO 2 4 2 8 OB Outpit EX-6016 PIT 5 IPD 10 42 336 - 42 -
22-Sep-21 Day TR-3175 38,928.5 38,933.7 5.22 Hauling OB 1330 SUTRISNO 2 3 4 4 3 4 20 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 840 - 42 -
22-Sep-21 Day TR-3175 38,933.7 38,935.3 1.57 Hauling OB 1330 SUTRISNO 2 3 1 6 OB Outpit EX-5022 PIT 5 EXT IPD 10 42 252 - 42 -
22-Sep-21 Day TR-3175 38,926.4 38,935.8 9.40 Hauling OB 1330 SUTRISNO 2 2 OB Outpit EX-5037 PIT 5 EXT IPD 10 42 84 - 42 -
22-Sep-21 Day TR-3195 24,779.4 24,781.5 2.11 Hauling OB 15229 ARDIANSYAH 3 4 1 8 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 336 - 42 -
22-Sep-21 Day TR-3195 24,781.5 24,786.3 4.75 Hauling OB 15229 ARDIANSYAH 3 4 4 3 4 18 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 756 - 42 -
22-Sep-21 Day TR-3195 24,786.3 24,788.1 1.85 Hauling OB 15229 ARDIANSYAH 4 3 7 OB Outpit EX-5037 PIT 5 EXT IPD 10 42 294 - 42 -
22-Sep-21 Day TR-3195 24,788.1 24,789.7 1.59 Hauling OB 15229 ARDIANSYAH 2 4 6 OB Outpit EX-4006 PIT 5 EXT IPD 10 42 252 - 42 -
22-Sep-21 Day TR-3202 26,931.7 26,936.5 4.82 Hauling OB 11474 SARINDI 2 5 4 3 4 18 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 756 - 42 -
22-Sep-21 Day TR-3202 26,936.5 26,939.2 2.68 Hauling OB 11474 SARINDI 4 4 2 10 OB Outpit EX-6016 PIT 5 IPD 10 42 420 - 42 -
22-Sep-21 Day TR-3202 26,939.2 26,941.6 2.40 Hauling OB 11474 SARINDI 3 2 2 2 9 OB Outpit EX-5022 PIT 5 EXT IPD 10 42 378 - 42 -
22-Sep-21 Day TR-3203 27,042.6 27,044.8 2.16 Hauling OB 8920 VERRY EKO SETIAWAN 3 3 2 8 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 336 - 42 -
22-Sep-21 Day TR-3203 27,044.8 27,049.6 4.86 Hauling OB 8920 VERRY EKO SETIAWAN 3 4 4 3 4 18 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 756 - 42 -
22-Sep-21 Day TR-3203 27,049.6 27,052.6 2.98 Hauling OB 8920 VERRY EKO SETIAWAN 1 3 3 4 11 OB Outpit EX-5037 PIT 5 EXT IPD 10 42 462 - 42 -
22-Sep-21 Day TR-3204 26,371.4 26,374.3 2.88 Hauling OB 1303 EFENDI 4 3 4 11 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 462 - 42 -
22-Sep-21 Day TR-3204 26,374.3 26,379.0 4.72 Hauling OB 1303 EFENDI 2 3 3 2 3 5 18 OB Outpit EX-5022 PIT 5 EXT IPD 10 42 756 - 42 -
22-Sep-21 Day TR-3205 25,916.0 25,918.6 2.62 Hauling OB 7170F TRI PRASETIYO 3 5 2 10 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 420 - 42 -
22-Sep-21 Day TR-3205 25,918.6 25,923.3 4.71 Hauling OB 7170F TRI PRASETIYO 3 4 4 3 4 18 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 756 - 42 -
22-Sep-21 Day TR-3205 25,923.3 25,926.2 2.87 Hauling OB 7170F TRI PRASETIYO 1 3 3 4 11 OB Outpit EX-5037 PIT 5 EXT IPD 10 42 462 - 42 -
22-Sep-21 Day TR-3206 24,918.2 24,918.2 - Scheduled - WORKSHOP - - -
22-Sep-21 Day TR-3220 26,038.8 26,043.8 4.95 Hauling OB 3669 SUYANTO 3 5 5 3 4 20 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 840 - 42 -
22-Sep-21 Day TR-3220 26,043.8 26,046.0 2.23 Hauling OB 3669 SUYANTO 4 3 2 9 OB Outpit EX-6016 PIT 5 IPD 10 42 378 - 42 -
22-Sep-21 Day TR-3220 26,046.0 26,048.2 2.22 Hauling OB 3669 SUYANTO 3 3 2 1 9 OB Outpit EX-5022 PIT 5 EXT IPD 10 42 378 - 42 -
22-Sep-21 Day TR-1024 31,379.7 31,381.4 1.70 Hauling OB 8920 VERRY EKO SETIAWAN 1 6 7 OB Outpit EX-5037 PIT 5 EXT IPD 10 24 168 - 24 -
22-Sep-21 Day TR-1025 47,289.7 47,293.2 3.53 Hauling OB 16024 QORI 6 7 6 19 OB Outpit EX-6014 PIT 5 EXT IPD 10 24 456 - 24 -
22-Sep-21 Day TR-1025 47,293.2 47,296.4 3.16 Hauling OB 16024 QORI 3 4 4 3 3 17 OB Outpit EX-5022 PIT 5 EXT IPD 10 24 408 - 24 -
22-Sep-21 Day TR-1025 47,296.4 47,299.0 2.61 Hauling OB 16024 QORI 4 5 3 2 14 OB Outpit EX-5037 PIT 5 EXT IPD 10 24 336 - 24 -
22-Sep-21 Day TR-1031 49,484.0 49,490.2 6.21 Hauling OB 15466 SUPRIYANTO 4 7 8 8 7 7 41 OB Outpit EX-6014 PIT 5 EXT IPD 10 24 984 - 24 -
22-Sep-21 Day TR-1031 49,490.2 49,494.5 4.29 Hauling OB 15466 SUPRIYANTO 5 6 4 4 4 23 OB Outpit EX-5037 PIT 5 EXT IPD 10 24 552 - 24 -
22-Sep-21 Day TR-1032 51,315.5 51,317.2 1.70 Hauling OB 15377 RIZALI RAHMAN 3 4 7 OB Outpit EX-6016 PIT 5 IPD 10 24 168 - 24 -
22-Sep-21 Day TR-1032 51,317.2 51,322.1 4.85 Hauling OB 15377 RIZALI RAHMAN 2 1 4 5 3 5 20 OB Outpit EX-5037 PIT 5 EXT IPD 10 24 480 - 24 -
22-Sep-21 Day TR-1032 51,322.1 51,325.2 3.15 Hauling OB 15377 RIZALI RAHMAN 2 3 2 3 3 13 OB Outpit EX-4006 PIT 5 EXT IPD 10 24 312 - 24 -
22-Sep-21 Day TR-1033 51,705.6 51,711.8 6.19 Hauling OB 15419 HUSEN 1 4 3 2 5 3 3 3 24 OB Outpit EX-5022 PIT 5 EXT IPD 10 24 576 - 24 -
22-Sep-21 Day TR-1033 51,711.8 51,712.6 0.77 Hauling OB 15419 HUSEN 2 1 3 OB Outpit EX-5037 PIT 5 EXT IPD 10 24 72 - 24 -
22-Sep-21 Day TR-1033 51,712.6 51,715.4 2.84 Hauling OB 15419 HUSEN 1 3 4 3 11 OB Outpit EX-4006 PIT 5 EXT IPD 10 24 264 - 24 -
22-Sep-21 Day TR-1034 49,485.6 49,485.6 - Standby - PIT 5 EXT - - -
22-Sep-21 Day TR-1036 50,783.9 50,791.0 7.05 Hauling OB 15346 MUSA 3 7 9 8 6 6 39 OB Outpit EX-6014 PIT 5 EXT IPD 10 24 936 - 24 -
22-Sep-21 Day TR-1036 50,791.0 50,794.2 3.25 Hauling OB 15346 MUSA 1 3 5 3 3 3 18 OB Outpit EX-5022 PIT 5 EXT IPD 10 24 432 - 24 -
22-Sep-21 Day TR-1048 52,180.2 52,180.2 - Standby - PIT 5 EXT - - -
22-Sep-21 Day TR-1049 46,207.4 46,214.0 6.64 Hauling OB 15349 ARDIANSYAH 6 6 10 8 7 6 43 OB Outpit EX-6014 PIT 5 EXT IPD 10 24 1,032 - 24 -
22-Sep-21 Day TR-1049 46,214.0 46,217.9 3.86 Hauling OB 15349 ARDIANSYAH 6 6 5 4 4 25 OB Outpit EX-5037 PIT 5 EXT IPD 10 24 600 - 24 -
22-Sep-21 Day TR-1050 45,924.8 45,924.8 - Unscheduled - WORKSHOP - - -
22-Sep-21 Day TA-7009 27,874.8 27,874.8 - Unscheduled - PIT 5 EXT - - -
22-Sep-21 Day TA-7010 25,292.2 25,302.7 10.50 Hauling OB 15818 AGUS SUGIANTO 4 4 3 2 2 2 4 5 4 4 4 38 OB Outpit EX-5037 PIT 5 EXT IPD 10 14 532 - 14 -
22-Sep-21 Day TA-7022 30,877.7 30,877.7 - Unscheduled - WORKSHOP - - -
22-Sep-21 Day TA-7029 28,587.0 28,592.5 5.50 Hauling OB 15819 AHNIANSYAH 1 4 1 2 1 3 12 OB Outpit EX-5037 PIT 5 EXT IPD 10 14 168 - 14 -
22-Sep-21 Day TA-7029 28,592.5 28,596.2 3.70 Hauling OB 15653 M. ILIAS 6 4 2 5 17 OB Outpit EX-5037 PIT 5 EXT IPD 10 14 238 - 14 -
22-Sep-21 Day TA-7030 28,262.7 28,262.7 - Unscheduled - WORKSHOP - - -
22-Sep-21 Day BD-4005 13,770.7 13,770.7 - Scheduled - WORKSHOP - - -
k 22-Sep-21 Day BD-5035 3,574.6 3,585.3 10.70 Front maintenance 14963 MAULANA ISHAK - PIT 5 EXT - - -
22-Sep-21 Day BD-6025 2,761.9 2,761.9 - Unscheduled - KCP - - -
22-Sep-21 Day BD-6026 30,198.7 30,198.7 - Standby - WORKSHOP - - -
22-Sep-21 Day BD-6028 4,217.7 4,227.9 10.20 Unit Rental 14744 NOORDIANTO - KCP - - -
22-Sep-21 Day BD-6036 34,285.1 34,294.8 9.70 Unit Rental 15569 SUJIONO - KCP - - -
22-Sep-21 Day BD-6038 34,063.3 34,071.4 8.10 Unit Rental 14708 ADEFI P - KCP - - -
22-Sep-21 Day BD-6069 10,395.6 10,395.6 - Unscheduled - PIT 5 EXT - - -
22-Sep-21 Day BD-7013 40,077.8 40,088.0 10.20 Front maintenance 10013 ADI SUSANTO - PIT 5 EXT - - -
22-Sep-21 Day BD-7026 26,681.0 26,691.8 10.80 Front maintenance 11676 SUDARSONO - PIT 5 EXT - - -
22-Sep-21 Day BD-7034 10,170.3 10,181.7 11.40 Disposal maintenance 8157 SAMIDI - IPD 10 - - -
22-Sep-21 Day GR-2012 22,296.4 22,306.7 10.30 Road Maintenance Support 8371 DWI RUPAWAN - JALAN SAKA - - -
22-Sep-21 Day GR-3007 39,346.9 39,356.9 10.00 Road Maintenance Support 9426 ADE SUPIANA - PIT 5 EXT - - -
22-Sep-21 Day GR-3008 47,020.2 47,028.0 7.80 Road Maintenance Support - PIT 5 EXT - - -
22-Sep-21 Day TW-3001 8,575.0 8,580.0 5.00 Road Maintenance Support 15409 YOSEF SALEMBE - PIT 5 EXT - - -
22-Sep-21 Day TW-4001 18,757.0 18,757.00 - Unscheduled - WORKSHOP - - -
22-Sep-21 Day PU-4002 19,080.0 19,080.00 - Unscheduled - ROM TEMPORARY - - -
22-Sep-21 Day PU-2026 6,195.1 6,195.1 - Unscheduled - PIT 11 - - -
22-Sep-21 Day PU-3026 12,325.8 12,329.80 4.00 Dewatering 14932 SARA - PIT 11 - - -
22-Sep-21 Day PU-3015 1,696.0 1,696.00 - Standby - PIT 11 - - -
22-Sep-21 Day PU-3014 27,240.4 27,240.40 - Standby - ROM TEMPORARY - - -
22-Sep-21 Day LP-2165 13,604.0 13,604.00 - Standby 4671 NURUDIN - KCP - - -
22-Sep-21 Day LP-2166 13,129.0 13,129.00 - Standby 4671 NURUDIN - KCP - - -
22-Sep-21 Day LP-2167 14,106.0 14,106.00 - Standby 4671 NURUDIN - KCP - - -
22-Sep-21 Day LP-2168 12,894.0 12,894.00 - Standby 4671 NURUDIN - KCP - - -
22-Sep-21 Day LP-2169 12,642.0 12,642.00 - Standby 4671 NURUDIN - KCP - - -
22-Sep-21 Day TS-4007 - - - Standby - KCP - - -
22-Sep-21 Day TS-4017 16,228.0 16,239.0 11.00 Unit Rental 10884 HAMDANI - KCP - - -
22-Sep-21 Day TF-4013 20,482.0 20,490.0 8.00 Unit Rental 15745 SURYANATA - KCP - - -
22-Sep-21 Day TF-4014 34,550.0 34,550.0 - Standby - KCP - - -
22-Sep-21 Night EX-2037 22,271.3 22,271.3 - Standby - - - -
22-Sep-21 Night EX-2058 17,649.7 17,651.4 1.70 Side casting 15604 AHMAD SYAFI'I - - 1,533 -
22-Sep-21 Night EX-4006 35,284.0 35,295.0 11.00 Loading Waste 15617 ZAENAL - OB Outpit PIT 5 EXT - 1,131 -
22-Sep-21 Night EX-5014 38,764.0 38,767.0 3.00 Unit Rental 15616 JOKO SUDIRO - KCP - - -
22-Sep-21 Night EX-5022 11,462.0 11,465.0 3.00 Loading Waste 15604 AHMAD SYAFI'I - OB Outpit PIT 5 EXT - 1,153 -
22-Sep-21 Night EX-5037 19,080.0 19,089.0 9.00 Loading Waste 12534 PUJIYANTO - OB Outpit PIT 5 EXT - 1,105 -
22-Sep-21 Night EX-6014 57,769.0 57,780.0 11.00 Loading Waste 15568 FUAD EFENDI - OB Outpit PIT 5 - - -
22-Sep-21 Night EX-6016 44,325.0 44,330.0 5.00 Loading Waste 15486 SUGENG PRAYETNO - OB Outpit PIT 5 EXT - - -
22-Sep-21 Night EX-6022 18,695.9 18,698.9 3.00 Loading Waste - OB Outpit PIT 5 EXT - 1,411 -
22-Sep-21 Night TR-3080 42,834.8 42,839.6 4.80 Hauling OB 9214 MUSTOFA ADI PRAYITNO 3 2 3 4 3 15 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 630 - 42 -
22-Sep-21 Night TR-3174 41,528.2 41,532.0 3.80 Hauling OB 8958 MUKHROMIN 2 4 3 2 1 12 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 504 - 42 -
22-Sep-21 Night TR-3174 41,532.0 41,537.7 5.70 Hauling OB 8958 MUKHROMIN 2 4 4 3 3 2 18 OB Outpit EX-6016 PIT 5 IPD 10 42 756 - 42 -
22-Sep-21 Night TR-3175 38,935.8 38,941.0 5.23 Hauling OB 10882 SABIRIN 3 3 4 4 3 2 19 OB Outpit EX-6016 PIT 5 IPD 10 42 798 - 42 -
22-Sep-21 Night TR-3175 38,941.0 38,945.7 4.67 Hauling OB 10882 SABIRIN 3 4 3 3 4 17 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 714 - 42 -
22-Sep-21 Night TR-3195 24,789.7 24,793.1 3.43 Hauling OB 15347 TAHMID 3 4 2 3 12 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 504 - 42 -
22-Sep-21 Night TR-3195 24,793.1 24,799.7 6.57 Hauling OB 15347 TAHMID 4 4 3 3 4 3 2 23 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 966 - 42 -
22-Sep-21 Night TR-3202 26,941.6 26,944.1 2.49 Hauling OB 15350 HERMAN 3 3 3 9 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 378 - 42 -
22-Sep-21 Night TR-3202 26,944.1 26,948.8 4.71 Hauling OB 15350 HERMAN 4 4 3 3 3 17 OB Outpit EX-6016 PIT 5 IPD 10 42 714 - 42 -
22-Sep-21 Night TR-3202 26,948.8 26,951.3 2.50 Hauling OB 15350 HERMAN 3 3 3 9 OB Outpit EX-5037 PIT 5 EXT IPD 10 42 378 - 42 -
22-Sep-21 Night TR-3203 27,052.6 27,062.9 10.30 Hauling OB 8892 BAGUS PURWONO 3 4 2 3 4 3 4 3 3 4 2 35 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 1,470 - 42 -
22-Sep-21 Night TR-3204 26,379.0 26,379.0 - Standby - PIT 5 EXT - - -
22-Sep-21 Night TR-3205 25,926.2 25,936.2 10.00 Hauling OB 10695 SUPIYANDI 3 3 3 3 4 3 4 3 3 3 3 35 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 1,470 - 42 -
22-Sep-21 Night TR-3206 24,918.2 24,918.2 - Scheduled - WORKSHOP - - -
22-Sep-21 Night TR-3220 26,048.2 26,051.7 3.50 Hauling OB 10968 SUKIRNO 3 4 3 2 12 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 504 - 42 -
22-Sep-21 Night TR-3220 26,051.7 26,058.4 6.70 Hauling OB 10968 SUKIRNO 2 3 4 3 3 4 3 1 23 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 966 - 42 -
22-Sep-21 Night TR-1024 31,381.4 31,383.5 2.08 Hauling OB 16025 IMTIKAN 3 6 9 OB Outpit EX-6014 PIT 5 EXT IPD 10 24 216 - 24 -
22-Sep-21 Night TR-1024 31,383.5 31,385.1 1.62 Hauling OB 16025 IMTIKAN 3 4 7 OB Outpit EX-5022 PIT 5 EXT IPD 10 24 168 - 24 -
22-Sep-21 Night TR-1024 31,385.1 31,390.9 5.78 Hauling OB 16025 IMTIKAN 4 3 5 5 5 3 25 OB Outpit EX-5037 PIT 5 EXT IPD 10 24 600 - 24 -
22-Sep-21 Night TR-1024 31,390.9 31,391.8 0.92 Hauling OB 16025 IMTIKAN 4 4 OB Outpit EX-4006 PIT 5 EXT IPD 10 24 96 - 24 -
22-Sep-21 Night TR-1025 47,299.0 47,299.0 - Standby - PIT 5 EXT - - -
22-Sep-21 Night TR-1031 49,494.5 49,497.3 2.79 Hauling OB 15485 ROBY TM 3 4 2 4 13 OB Outpit EX-6014 PIT 5 EXT IPD 10 24 312 - 24 -
22-Sep-21 Night TR-1031 49,497.3 49,500.3 3.01 Hauling OB 15485 ROBY TM 2 2 5 2 3 14 OB Outpit EX-5037 PIT 5 EXT IPD 10 24 336 - 24 -
22-Sep-21 Night TR-1032 51,325.2 51,328.7 3.50 Hauling OB 15420 M ABD MADI 2 3 4 6 15 OB Outpit EX-6016 PIT 5 IPD 10 24 360 - 24 -
22-Sep-21 Night TR-1032 51,328.7 51,331.5 2.80 Hauling OB 15420 M ABD MADI 3 3 3 3 12 OB Outpit EX-5022 PIT 5 EXT IPD 10 24 288 - 24 -
22-Sep-21 Night TR-1032 51,331.5 51,333.6 2.10 Hauling OB 15420 M ABD MADI 3 5 1 9 OB Outpit EX-5037 PIT 5 EXT IPD 10 24 216 - 24 -
22-Sep-21 Night TR-1033 51,715.4 51,717.8 2.40 Hauling OB 15955 RIZKY IHWAN 1 3 4 2 10 OB Outpit EX-5022 PIT 5 EXT IPD 10 24 240 - 24 -
22-Sep-21 Night TR-1033 51,717.8 51,722.6 4.80 Hauling OB 15955 RIZKY IHWAN 4 4 3 4 2 3 20 OB Outpit EX-5037 PIT 5 EXT IPD 10 24 480 - 24 -
22-Sep-21 Night TR-1034 49,485.6 49,496.1 10.54 Hauling OB 15744 MARYANTO 4 4 4 3 3 5 5 6 6 6 3 49 OB Outpit EX-5037 PIT 5 EXT IPD 10 24 1,176 - 24 -
22-Sep-21 Night TR-1036 50,794.2 50,796.0 1.80 Hauling OB 15420 M ABD MADI 5 4 9 OB Outpit EX-6014 PIT 5 EXT IPD 10 24 216 - 24 -
22-Sep-21 Night TR-1036 50,796.0 50,798.1 2.10 Hauling OB 15955 RIZKY IHWAN 2 6 3 11 OB Outpit EX-5037 PIT 5 EXT IPD 10 24 264 - 24 -
22-Sep-21 Night TR-1048 52,180.2 52,183.8 3.60 Hauling OB 15485 ROBY TM 6 4 10 OB Outpit EX-5037 PIT 5 EXT IPD 10 24 240 - 24 -
22-Sep-21 Night TR-1049 46,217.9 46,221.4 3.51 Hauling OB 15576 JOKO SANTOSO 3 3 2 4 4 16 OB Outpit EX-6014 PIT 5 EXT IPD 10 24 384 - 24 -
22-Sep-21 Night TR-1049 46,221.4 46,223.2 1.76 Hauling OB 15576 JOKO SANTOSO 1 3 2 2 8 OB Outpit EX-5022 PIT 5 EXT IPD 10 24 192 - 24 -
22-Sep-21 Night TR-1049 46,223.2 46,228.0 4.83 Hauling OB 15576 JOKO SANTOSO 2 1 2 1 5 1 1 6 3 22 OB Outpit EX-5037 PIT 5 EXT IPD 10 24 528 - 24 -
22-Sep-21 Night TR-1050 45,924.8 45,924.8 - Unscheduled - WORKSHOP - - -
22-Sep-21 Night TA-7009 27,874.8 27,874.8 - Unscheduled - PIT 5 EXT - - -
22-Sep-21 Night TA-7010 25,302.7 25,313.3 10.60 Hauling OB 15863 HENDRA M 3 5 4 5 5 4 5 5 5 6 4 51 OB Outpit EX-4006 PIT 5 EXT IPD 10 14 714 - 14 -
22-Sep-21 Night TA-7022 30,877.7 30,877.7 - Unscheduled - WORKSHOP - - -
22-Sep-21 Night TA-7029 28,596.2 28,606.3 10.10 Hauling OB 15816 M. YUSUF 2 4 4 5 5 4 4 6 5 5 3 47 OB Outpit EX-4006 PIT 5 EXT IPD 10 14 658 - 14 -
22-Sep-21 Night TA-7030 28,262.7 28,262.7 - Unscheduled - WORKSHOP - - -
22-Sep-21 Night BD-4005 13,770.7 13,770.7 - Scheduled - WORKSHOP - - -
22-Sep-21 Night BD-5035 3,585.3 3,585.3 - Standby - PIT 5 EXT - - -
22-Sep-21 Night BD-6025 2,761.9 2,761.9 - Scheduled - KCP - - -
22-Sep-21 Night BD-6026 30,198.7 30,198.7 - Standby - WORKSHOP - - -
22-Sep-21 Night BD-6028 4,227.9 4,237.7 9.80 Unit Rental 11169 ANNAS - KCP - - -
22-Sep-21 Night BD-6036 34,294.8 34,300.8 6.00 Unit Rental 14710 AGUS S - KCP - - -
22-Sep-21 Night BD-6038 34,071.5 34,081.7 10.20 Unit Rental 15570 HENDRY S - KCP - - -
22-Sep-21 Night BD-6069 10,395.6 10,395.6 - Unscheduled - PIT 5 EXT - - -
22-Sep-21 Night BD-7013 40,088.0 40,094.0 6.00 Front maintenance 15606 FATHUR - PIT 5 EXT - - -
22-Sep-21 Night BD-7013 40,094.0 40,098.6 4.60 Front maintenance 15639 A. BUDIMAN - PIT 5 EXT - - -
22-Sep-21 Night BD-7026 26,691.8 26,702.0 10.20 Disposal maintenance 9978 KARSIANTO - IPD 10 - - -
22-Sep-21 Night BD-7034 10,181.7 10,191.7 10.00 Disposal maintenance 9492 MAHFUDI - IPD 10 - - -
22-Sep-21 Night GR-2012 22,306.7 22,310.9 4.20 Road Maintenance Support 9214 MUSTOFA ADI PRAYITNO - IPD 11 - - -
22-Sep-21 Night GR-3007 39,356.9 39,356.9 - Unscheduled - PIT 5 EXT - - -
22-Sep-21 Night GR-3008 47,028.0 47,036.7 8.70 Road Maintenance Support 8925 AGUS SUNARWAN - PIT 5 EXT - - -
22-Sep-21 Night TW-3001 8,580.0 8,585.0 5.00 Road Maintenance Support 15743 LANA - PIT 5 EXT - - -
22-Sep-21 Night TW-4001 18,757.0 18,757.00 - Unscheduled - WORKSHOP - - -
22-Sep-21 Night PU-4002 19,080.0 19,080.0 - Unscheduled - ROM TEMPORARY - - -
22-Sep-21 Night PU-2026 6,195.1 6,195.1 - Dewatering - PIT 11 - - -
22-Sep-21 Night PU-3026 12,329.8 12,333.8 4.00 Dewatering - PIT 11 - - -
22-Sep-21 Night PU-3015 1,696.0 1,696.0 - Standby - PIT 11 - - -
22-Sep-21 Night PU-3014 27,240.4 27,240.4 - Standby - ROM TEMPORARY - - -
22-Sep-21 Night LP-2165 13,604.0 13,615.0 11.00 Unit Rental 4671 NURUDIN - KCP - - -
22-Sep-21 Night LP-2166 13,129.0 13,140.0 11.00 Unit Rental 4671 NURUDIN - KCP - - -
22-Sep-21 Night LP-2167 14,106.0 14,118.0 12.00 Unit Rental 4671 NURUDIN - KCP - - -
22-Sep-21 Night LP-2168 12,894.0 12,905.0 11.00 Unit Rental 4671 NURUDIN - KCP - - -
22-Sep-21 Night LP-2169 12,642.0 12,642.0 - Standby 4671 NURUDIN - KCP - - -
22-Sep-21 Night TS-4007 - - - Standby - KCP - - -
22-Sep-21 Night TS-4017 16,239.0 16,247.0 8.00 Unit Rental 15473 ISMAIL SAIDI - KCP - - -
22-Sep-21 Night TF-4013 20,490.0 20,498.0 8.00 Unit Rental 15310 ALDI ALFI SAPUTRA - KCP - - -
22-Sep-21 Night TF-4014 34,550.0 34,550.0 - Standby - KCP - - -
23-Sep-21 Day EX-2037 22,271.3 22,271.3 - Standby - WORKSHOP - - -
23-Sep-21 Day EX-2058 17,651.4 17,656.4 5.00 Side casting 15504 SLAMET WIDODO - PIT 5 EXT - - -
23-Sep-21 Day EX-2058 17,656.4 17,658.7 2.30 Rehandling Coal 15504 SLAMET WIDODO - Coal PIT 5 EXT - - - - -
23-Sep-21 Day EX-2058 17,658.7 17,661.2 2.50 sloping 15504 SLAMET WIDODO - PIT 5 EXT - - -
23-Sep-21 Day EX-4006 35,295.0 35,303.0 8.00 Loading Waste 15375 A JEFRI M - OB Outpit PIT 5 EXT - 632 -
23-Sep-21 Day EX-5014 38,768.0 38,778.0 10.00 Unit Rental 15345 SUTONO - KCP - - -
23-Sep-21 Day EX-5022 11,465.0 11,475.0 10.00 Loading Waste 11146 PURWANTO - OB Outpit PIT 5 EXT - 1,145 -
23-Sep-21 Day EX-5037 19,089.0 19,100.0 11.00 Loading Waste 9590F SIRATAL RAYYAN - OB Outpit PIT 5 EXT - - -
23-Sep-21 Day EX-6014 57,780.0 57,790.0 10.00 Loading Waste 8952 DIDI SETIAWAN - OB Outpit PIT 5 EXT - - -
23-Sep-21 Day EX-6016 44,330.0 44,341.0 11.00 Loading Waste 9136 AHMAD YANI - OB Outpit PIT 5 EXT - - -
23-Sep-21 Day EX-6022 18,698.9 18,698.9 - Unscheduled - PIT 5 EXT - 360 -
23-Sep-21 Day TR-3080 42,839.6 42,845.0 5.40 Hauling OB 10881 BURHANUDDIN 3 3 3 4 3 2 18 OB Outpit EX-6016 PIT 5 EXT IPD 10 42 756 - 42 -
23-Sep-21 Day TR-3080 42,845.0 42,846.8 1.80 Hauling OB 10881 BURHANUDDIN 2 2 2 6 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 252 - 42 -
23-Sep-21 Day TR-3080 42,846.8 42,848.3 1.50 Hauling OB 10881 BURHANUDDIN 1 2 2 5 OB Outpit EX-5022 PIT 5 IPD 10 42 210 - 42 -
23-Sep-21 Day TR-3174 41,537.7 41,542.0 4.27 Hauling OB 15230 MARGONO 3 3 1 4 2 13 OB Outpit EX-6016 PIT 5 EXT IPD 10 42 546 - 42 -
23-Sep-21 Day TR-3174 41,542.0 41,546.6 4.63 Hauling OB 15230 MARGONO 3 4 3 2 3 15 OB Outpit EX-5037 PIT 5 EXT IPD 11 42 630 - 42 -
23-Sep-21 Day TR-3175 38,945.7 38,948.0 2.32 Hauling OB 1330 SUTRISNO 1 2 4 1 8 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 336 - 42 -
23-Sep-21 Day TR-3175 38,948.0 38,954.1 6.08 Hauling OB 1330 SUTRISNO 4 2 1 4 4 2 2 2 21 OB Outpit EX-5022 PIT 5 IPD 10 42 882 - 42 -
23-Sep-21 Day TR-3195 24,799.7 24,809.2 9.50 Hauling OB 15229 ARDIANSYAH 3 3 4 3 3 2 2 3 2 3 2 30 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 1,260 - 42 -
23-Sep-21 Day TR-3202 26,951.3 26,960.6 9.30 Hauling OB 11474 SARINDI 3 3 4 3 3 2 4 22 OB Outpit EX-6016 PIT 5 EXT IPD 10 42 924 - 42 -
23-Sep-21 Day TR-3202 26,960.6 26,960.6 - Hauling OB 11474 SARINDI 4 3 2 3 12 OB Outpit EX-5037 PIT 5 EXT IPD 11 42 504 - 42 -
23-Sep-21 Day TR-3203 27,062.9 27,072.1 9.20 Hauling OB 8920 VERRY EKO SETIAWAN 3 3 4 3 3 1 3 2 2 3 3 30 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 1,260 - 42 -
23-Sep-21 Day TR-3204 26,379.0 26,383.2 4.20 Hauling OB 1303 EFENDI 3 3 3 3 4 1 17 OB Outpit EX-6016 PIT 5 EXT IPD 10 42 714 - 42 -
23-Sep-21 Day TR-3204 26,383.2 26,387.0 3.80 Hauling OB 1303 EFENDI 3 4 3 2 2 14 OB Outpit EX-5037 PIT 5 EXT IPD 11 42 588 - 42 -
23-Sep-21 Day TR-3205 25,936.2 25,945.9 9.70 Hauling OB 7170F TRI PRASETIYO 2 4 3 3 4 2 2 2 3 2 3 30 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 1,260 - 42 -
23-Sep-21 Day TR-3206 24,918.2 24,918.2 - Scheduled - WORKSHOP - - -
23-Sep-21 Day TR-3220 26,058.4 26,068.2 9.80 Hauling OB 8965 HADI SUTIKNO 3 5 3 3 4 1 3 2 3 2 3 32 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 1,344 - 42 -
23-Sep-21 Day TR-1024 31,391.8 31,394.4 2.60 Hauling OB 15421 AGUS A 2 4 6 12 OB Outpit EX-6016 PIT 5 EXT IPD 10 24 288 - 24 -
23-Sep-21 Day TR-1024 31,394.4 31,399.8 5.42 Hauling OB 15421 AGUS A 4 1 6 4 2 3 3 2 25 OB Outpit EX-5022 PIT 5 IPD 10 24 600 - 24 -
23-Sep-21 Day TR-1024 31,399.8 31,400.9 1.08 Hauling OB 15421 AGUS A 4 1 5 OB Outpit EX-5037 PIT 5 EXT IPD 11 24 120 - 24 -
23-Sep-21 Day TR-1025 47,300.0 47,303.8 3.84 Hauling OB 16024 QORI 5 6 6 4 6 27 OB Outpit EX-6016 PIT 5 EXT IPD 10 24 648 - 24 -
23-Sep-21 Day TR-1025 47,303.8 47,306.0 2.16 Hauling OB 16024 QORI 5 5 3 13 OB Outpit EX-5037 PIT 5 EXT IPD 11 24 312 - 24 -
23-Sep-21 Day TR-1031 49,500.3 49,503.8 3.51 Hauling OB 15466 SUPRIYANTO 6 7 2 15 OB Outpit EX-6016 PIT 5 EXT IPD 10 24 360 - 24 -
23-Sep-21 Day TR-1031 49,503.8 49,506.2 2.34 Hauling OB 15466 SUPRIYANTO 1 1 3 5 10 OB Outpit EX-5022 PIT 5 IPD 10 24 240 - 24 -
23-Sep-21 Day TR-1031 49,506.2 49,509.2 3.05 Hauling OB 15466 SUPRIYANTO 4 2 1 1 2 3 13 OB Outpit EX-5037 PIT 5 EXT IPD 11 24 312 - 24 -
23-Sep-21 Day TR-1032 51,333.6 51,338.7 5.10 Hauling OB 15377 RIZALI RAHMAN 3 2 6 6 6 4 5 32 OB Outpit EX-6016 PIT 5 EXT IPD 10 24 768 - 24 -
23-Sep-21 Day TR-1032 51,338.7 51,343.5 4.80 Hauling OB 15377 RIZALI RAHMAN 5 4 2 2 5 3 21 OB Outpit EX-5037 PIT 5 EXT IPD 11 24 504 - 24 -
23-Sep-21 Day TR-1033 51,722.6 51,727.1 4.50 Hauling OB 8920 VERRY EKO SETIAWAN 3 4 4 4 5 20 OB Outpit EX-4006 PIT 5 EXT IPD 11 24 480 - 24 -
23-Sep-21 Day TR-1034 49,496.1 49,499.7 3.63 Hauling OB 15419 HUSEN 1 2 4 2 3 1 2 15 OB Outpit EX-5022 PIT 5 IPD 10 24 360 - 24 -
23-Sep-21 Day TR-1034 49,499.7 49,503.6 3.87 Hauling OB 15419 HUSEN 4 5 5 2 16 OB Outpit EX-5037 PIT 5 EXT IPD 11 24 384 - 24 -
23-Sep-21 Day TR-1036 50,798.1 50,802.8 4.70 Hauling OB 15346 MUSA 6 5 6 4 6 27 OB Outpit EX-6016 PIT 5 EXT IPD 10 24 648 - 24 -
23-Sep-21 Day TR-1036 50,802.8 50,807.7 4.90 Hauling OB 15346 MUSA 4 4 3 5 6 1 23 OB Outpit EX-5037 PIT 5 EXT IPD 11 24 552 - 24 -
23-Sep-21 Day TR-1048 52,184.8 52,185.1 0.30 Hauling OB 8920 VERRY EKO SETIAWAN 1 1 OB Outpit EX-5037 PIT 5 EXT IPD 11 24 24 - 24 -
23-Sep-21 Day TR-1049 46,228.0 46,232.5 4.50 Hauling OB 15376 EKO FAJAR S 6 6 6 4 5 27 OB Outpit EX-6016 PIT 5 EXT IPD 10 24 648 - 24 -
23-Sep-21 Day TR-1049 46,232.5 46,237.9 5.40 Hauling OB 15376 EKO FAJAR S 4 4 5 6 5 2 26 OB Outpit EX-5037 PIT 5 EXT IPD 11 24 624 - 24 -
23-Sep-21 Day TR-1050 45,924.8 45,924.8 - Unscheduled - WORKSHOP - - -
23-Sep-21 Day TA-7009 27,874.8 27,874.8 - Unscheduled - WORKSHOP - - -
23-Sep-21 Day TA-7010 25,313.3 25,323.2 9.90 Hauling OB 15653 M. ILIAS 3 4 4 3 5 3 5 4 4 2 2 39 OB Outpit EX-4006 PIT 5 EXT IPD 11 14 546 - 14 -
23-Sep-21 Day TA-7022 30,877.7 30,877.7 - Unscheduled - WORKSHOP - - -
23-Sep-21 Day TA-7029 28,606.3 28,615.9 9.60 Hauling OB 15819 AHNIANSYAH 3 5 3 4 6 1 5 4 5 4 5 45 OB Outpit EX-4006 PIT 5 EXT IPD 11 14 630 - 14 -
23-Sep-21 Day TA-7030 28,262.7 28,272.0 9.30 Hauling OB 15818 AGUS SUGIANTO 1 4 5 2 4 3 5 4 6 34 OB Outpit EX-4006 PIT 5 EXT IPD 11 14 476 - 14 -
23-Sep-21 Day BD-4005 13,770.7 13,770.7 - Scheduled - WORKSHOP - - -
k 23-Sep-21 Day BD-5035 3,585.3 3,594.5 9.20 Front maintenance 14963 MAULANA ISHAK - PIT 5 EXT - - -
23-Sep-21 Day BD-6025 2,761.9 2,761.9 - Scheduled - KCP - - -
23-Sep-21 Day BD-6026 30,198.7 30,198.7 - Standby - WORKSHOP - - -
23-Sep-21 Day BD-6028 4,237.7 4,248.1 10.40 Unit Rental 15569 SUJIONO - KCP - - -
23-Sep-21 Day BD-6036 34,300.8 34,310.2 9.40 Unit Rental 14964 JOKO P (Dozer) - KCP - - -
23-Sep-21 Day BD-6038 34,081.7 34,091.5 9.80 Unit Rental 14708 ADEFI P - KCP - - -
23-Sep-21 Day BD-6069 10,395.6 10,395.6 - Unscheduled - PIT 5 EXT - - -
23-Sep-21 Day BD-7013 40,098.6 40,110.0 11.40 Front maintenance 10013 ADI SUSANTO - PIT 5 EXT - - -
23-Sep-21 Day BD-7026 26,702.0 26,712.8 10.80 Disposal maintenance 11676 SUDARSONO - IPD 10 - - -
23-Sep-21 Day BD-7034 10,191.7 10,202.0 10.30 Disposal maintenance 8157 SAMIDI - IPD 10 - - -
23-Sep-21 Day GR-2012 22,310.9 22,314.9 4.00 Road Maintenance Support 12344 M FAJRI - WORKSHOP - - -
23-Sep-21 Day GR-3007 39,356.9 39,356.9 - Unscheduled - PIT 5 EXT - - -
23-Sep-21 Day GR-3008 47,036.7 47,044.5 7.80 Road Maintenance Support 15571 YOHANIS L - PIT 5 EXT - - -
23-Sep-21 Day TW-3001 8,585.0 8,590.0 5.00 Road Maintenance Support 15409 YOSEF SALEMBE - PIT 5 EXT - - -
23-Sep-21 Day TW-4001 18,757.0 18,762.00 5.00 Road Maintenance Support - WORKSHOP - - -
23-Sep-21 Day PU-4002 19,080.0 19,080.00 - Unscheduled - ROM TEMPORARY - - -
23-Sep-21 Day PU-2026 6,195.1 6,199.1 4.00 Dewatering - PIT 11 - - -
23-Sep-21 Day PU-3026 12,333.8 12,344.00 10.20 Dewatering 10847 FAUZI AHMAD - PIT 11 - - -
23-Sep-21 Day PU-3015 1,696.0 1,696.00 - Standby - PIT 11 - - -
23-Sep-21 Day PU-3014 27,240.4 27,240.40 - Standby - ROM TEMPORARY - - -
23-Sep-21 Day LP-2165 13,615.0 13,615.00 - Unit Rental 4671 NURUDIN - KCP - - -
23-Sep-21 Day LP-2166 13,140.0 13,140.00 - Unit Rental 4671 NURUDIN - KCP - - -
23-Sep-21 Day LP-2167 14,118.0 14,118.00 - Unit Rental 4671 NURUDIN - KCP - - -
23-Sep-21 Day LP-2168 12,905.0 12,905.00 - Unit Rental 4671 NURUDIN - KCP - - -
23-Sep-21 Day LP-2169 12,643.0 12,643.00 - Unit Rental 4671 NURUDIN - KCP - - -
23-Sep-21 Day TS-4007 - - - Standby - KCP - - -
23-Sep-21 Day TS-4017 16,247.0 16,259.0 12.00 Unit Rental 15745 SURYANATA - KCP - - -
23-Sep-21 Day TF-4013 20,498.0 20,506.0 8.00 Unit Rental 15746 SYARIFUDDI - KCP - - -
23-Sep-21 Day TF-4014 34,550.0 34,550.0 - Standby - KCP - - -
23-Sep-21 Night EX-2037 22,271.3 22,271.3 - Standby - WORKSHOP - - -
23-Sep-21 Night EX-2058 17,661.2 17,666.0 4.80 sloping 15503 ASHARI SETIYO NUGROHO - PIT 5 EXT - - -
23-Sep-21 Night EX-2058 17,666.0 17,671.0 5.00 Side casting 15503 ASHARI SETIYO NUGROHO - PIT 5 EXT - - -
23-Sep-21 Night EX-4006 35,303.0 35,311.0 8.00 Loading Waste 11330 EKO PURWANTO - OB Outpit PIT 5 EXT - 632 -
23-Sep-21 Night EX-5014 38,778.0 38,780.0 2.00 Unit Rental 15616 JOKO SUDIRO - KCP - - -
23-Sep-21 Night EX-5022 11,475.0 11,482.0 7.00 Loading Waste 15604 AHMAD SYAFI'I - OB Outpit PIT 5 EXT - 1,145 -
23-Sep-21 Night EX-5037 19,100.0 19,107.0 7.00 Loading Waste 12534 PUJIYANTO - OB Outpit PIT 5 EXT - - -
23-Sep-21 Night EX-6014 57,790.0 57,798.0 8.00 Loading Waste 10917 SETA VERDY KARYA - OB Outpit PIT 5 EXT - - -
23-Sep-21 Night EX-6016 44,341.0 44,350.0 9.00 Loading Waste 15568 FUAD EFENDI - OB Outpit PIT 5 EXT - - -
23-Sep-21 Night EX-6022 18,698.9 18,698.9 - Unscheduled - OB Outpit PIT 5 EXT - 360 -
23-Sep-21 Night TR-3080 42,848.3 42,850.9 2.59 Hauling OB 9214 MUSTOFA ADI PRAYITNO 1 3 3 2 9 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 378 - 42 -
23-Sep-21 Night TR-3080 42,850.9 42,855.2 4.31 Hauling OB 9214 MUSTOFA ADI PRAYITNO 1 2 4 3 2 3 15 OB Outpit EX-5022 PIT 5 IPD 11 42 630 - 42 -
23-Sep-21 Night TR-3174 41,546.6 41,553.0 6.40 Hauling OB 8958 MUKHROMIN 1 1 3 2 3 4 2 2 18 OB Outpit EX-5037 PIT 5 EXT IPD 10 42 756 - 42 -
23-Sep-21 Night TR-3175 38,954.1 38,960.0 5.90 Hauling OB 15350 HERMAN 1 2 3 3 2 4 3 3 3 24 OB Outpit EX-5022 PIT 5 IPD 11 42 1,008 - 42 -
23-Sep-21 Night TR-3195 24,809.2 24,816.1 6.90 Hauling OB 15347 TAHMID 2 2 4 2 3 4 4 3 2 26 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 1,092 - 42 -
23-Sep-21 Night TR-3202 26,960.6 26,966.5 5.90 Hauling OB 3669 SUYANTO 2 2 1 3 3 3 3 2 19 OB Outpit EX-5037 PIT 5 EXT IPD 10 42 798 - 42 -
23-Sep-21 Night TR-3203 27,072.1 27,079.7 7.60 Hauling OB 8892 BAGUS PURWONO 3 1 4 3 2 4 3 3 3 26 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 1,092 - 42 -
23-Sep-21 Night TR-3204 26,387.0 26,394.0 7.00 Hauling OB 10969 JOKO PRIONO 1 1 3 3 3 3 3 1 18 OB Outpit EX-5037 PIT 5 EXT IPD 10 42 756 - 42 -
23-Sep-21 Night TR-3205 25,945.9 25,953.2 7.30 Hauling OB 10695 SUPIYANDI 2 2 3 2 3 4 3 3 3 25 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 1,050 - 42 -
23-Sep-21 Night TR-3206 24,918.2 24,918.2 - Scheduled - WORKSHOP - - -
23-Sep-21 Night TR-3220 26,068.2 26,075.9 7.70 Hauling OB 10968 SUKIRNO 3 1 3 3 3 4 3 3 2 25 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 1,050 - 42 -
23-Sep-21 Night TR-1024 31,400.9 31,406.0 5.10 Hauling OB 15349 ARDIANSYAH 1 3 3 3 4 3 2 19 OB Outpit EX-5022 PIT 5 IPD 11 24 456 - 24 -
23-Sep-21 Night TR-1025 47,306.0 47,314.0 8.00 Hauling OB 16025 IMTIKAN 3 1 5 6 5 5 5 5 6 3 44 OB Outpit EX-6016 PIT 5 EXT IPD 11 24 1,056 - 24 -
23-Sep-21 Night TR-1031 49,509.2 49,514.3 5.10 Hauling OB 15485 ROBY TM 1 4 4 4 4 2 19 OB Outpit EX-5022 PIT 5 IPD 11 24 456 - 24 -
23-Sep-21 Night TR-1032 51,343.5 51,351.7 8.20 Hauling OB 15744 MARYANTO 4 1 5 5 6 5 6 5 5 3 45 OB Outpit EX-6016 PIT 5 EXT IPD 11 24 1,080 - 24 -
23-Sep-21 Night TR-1033 51,727.1 51,735.5 8.40 Hauling OB 15955 RIZKY IHWAN 2 1 5 6 5 5 6 5 4 4 43 OB Outpit EX-6016 PIT 5 EXT IPD 11 24 1,032 - 24 -
23-Sep-21 Night TR-1034 49,503.6 49,510.0 6.40 Hauling OB 15471 MULYADI 1 2 3 3 2 4 4 3 2 24 OB Outpit EX-5022 PIT 5 IPD 11 24 576 - 24 -
23-Sep-21 Night TR-1036 50,807.7 50,815.9 8.20 Hauling OB 15467 HUSNI 3 5 6 5 5 5 6 5 3 43 OB Outpit EX-6016 PIT 5 EXT IPD 11 24 1,032 - 24 -
23-Sep-21 Night TR-1048 52,185.1 52,185.1 - Unscheduled - PIT 5 EXT - - -
23-Sep-21 Night TR-1049 46,237.9 46,246.1 8.20 Hauling OB 15576 JOKO SANTOSO 3 1 5 5 5 5 5 6 5 3 43 OB Outpit EX-6016 PIT 5 EXT IPD 11 24 1,032 - 1 24 24
23-Sep-21 Night TR-1050 45,924.8 45,924.8 - Unscheduled - WORKSHOP - - -
23-Sep-21 Night TA-7009 27,874.8 27,874.8 - Unscheduled - WORKSHOP - - -
23-Sep-21 Night TA-7010 25,323.2 25,331.4 8.20 Hauling OB 15861 AGUSTIAN 5 5 5 5 5 5 5 4 39 OB Outpit EX-4006 PIT 5 EXT IPD 11 14 546 - 14 -
23-Sep-21 Night TA-7022 30,877.7 30,877.7 - Unscheduled - WORKSHOP - - -
23-Sep-21 Night TA-7029 28,615.9 28,624.7 8.80 Hauling OB 15816 M. YUSUF 3 5 4 5 5 5 5 5 4 41 OB Outpit EX-4006 PIT 5 EXT IPD 11 14 574 - 14 -
23-Sep-21 Night TA-7030 28,272.0 28,280.4 8.40 Hauling OB 15863 HENDRA M 2 5 5 5 5 5 5 5 3 40 OB Outpit EX-4006 PIT 5 EXT IPD 11 14 560 - 14 -
23-Sep-21 Night BD-4005 13,770.7 13,770.7 - Scheduled - WORKSHOP - - -
23-Sep-21 Night BD-5035 3,594.5 3,600.0 5.50 Front maintenance 15747 MUSTAQIM D6 - PIT 5 EXT - - -
23-Sep-21 Night BD-6025 2,761.9 2,761.9 - Scheduled - KCP - - -
23-Sep-21 Night BD-6026 30,198.7 30,198.7 - Standby - WORKSHOP - - -
23-Sep-21 Night BD-6028 4,248.1 4,249.7 1.60 Unit Rental 11169 ANNAS - KCP - - -
23-Sep-21 Night BD-6036 34,310.2 34,312.1 1.90 Unit Rental 14710 AGUS S - KCP - - -
23-Sep-21 Night BD-6038 34,091.5 34,093.3 1.80 Unit Rental 14744 NOORDIANTO - KCP - - -
23-Sep-21 Night BD-6069 10,395.6 10,395.6 - Unscheduled - PIT 5 EXT - - -
23-Sep-21 Night BD-7013 40,110.0 40,119.5 9.50 Front maintenance 14709 A. FATHONI - PIT 5 EXT - - -
23-Sep-21 Night BD-7026 26,712.8 26,720.0 7.20 Front maintenance - IPD 10 - - -
23-Sep-21 Night BD-7034 10,202.0 10,210.7 8.70 Disposal maintenance 9492 MAHFUDI - IPD 10 - - -
23-Sep-21 Night GR-2012 22,314.9 22,314.9 - Standby - WORKSHOP - - -
23-Sep-21 Night GR-3007 39,356.9 39,356.9 - Unscheduled - PIT 5 EXT - - -
23-Sep-21 Night GR-3008 47,044.5 47,053.5 9.00 Road Maintenance Support 9426 ADE SUPIANA - PIT 5 EXT - - -
23-Sep-21 Night TW-3001 8,590.0 8,591.0 1.00 Road Maintenance Support 15743 LANA - PIT 5 EXT - - -
23-Sep-21 Night TW-4001 18,762.0 18,762.00 - Unscheduled - WORKSHOP - - -
23-Sep-21 Night PU-4002 19,080.0 19,080.0 - Unscheduled - ROM TEMPORARY - - -
23-Sep-21 Night PU-2026 6,199.1 6,199.1 - Dewatering - PIT 11 - - -
23-Sep-21 Night PU-3026 12,344.0 12,356.0 12.00 Dewatering - PIT 11 - - -
23-Sep-21 Night PU-3015 1,696.0 1,696.0 - Standby - PIT 11 - - -
23-Sep-21 Night PU-3014 27,240.4 27,240.4 - Standby - ROM TEMPORARY - - -
23-Sep-21 Night LP-2165 13,615.0 13,626.0 11.00 Unit Rental 4671 NURUDIN - KCP - - -
23-Sep-21 Night LP-2166 13,140.0 13,152.0 12.00 Unit Rental 4671 NURUDIN - KCP - - -
23-Sep-21 Night LP-2167 14,118.0 14,130.0 12.00 Unit Rental 4671 NURUDIN - KCP - - -
23-Sep-21 Night LP-2168 12,905.0 12,916.0 11.00 Unit Rental 4671 NURUDIN - KCP - - -
23-Sep-21 Night LP-2169 12,643.0 12,653.0 10.00 Unit Rental 4671 NURUDIN - KCP - - -
23-Sep-21 Night TS-4007 - - - Standby - KCP - - -
23-Sep-21 Night TS-4017 16,259.0 16,259.0 - Unit Rental 15473 ISMAIL SAIDI - KCP - - -
23-Sep-21 Night TF-4013 20,506.0 20,507.0 1.00 Unit Rental 15310 ALDI ALFI SAPUTRA - KCP - - -
23-Sep-21 Night TF-4014 34,550.0 34,550.0 - Standby - KCP - - -
24-Sep-21 Day EX-2037 22,271.3 22,271.3 - Standby - - - -
24-Sep-21 Day EX-2058 17,671.0 17,681.6 10.60 sloping 15617 ZAENAL - - 1,628 -
24-Sep-21 Day EX-4006 35,311.0 35,318.0 7.00 Loading Waste 9590F SIRATAL RAYYAN - OB Outpit PIT 5 EXT - 1,438 -
24-Sep-21 Day EX-5014 38,780.0 38,788.0 8.00 Unit Rental 15345 SUTONO - KCP - - -
24-Sep-21 Day EX-5022 11,482.0 11,488.0 6.00 Loading Waste 9864 UJANG FERNANDES GUCIANO - OB Outpit PIT 5 EXT - 1,347 -
24-Sep-21 Day EX-5037 19,107.0 19,113.0 6.00 Loading Waste 9136 AHMAD YANI - OB Outpit PIT 5 EXT - 1,489 -
24-Sep-21 Day EX-6014 57,798.0 57,803.0 5.00 Loading Waste 8952 DIDI SETIAWAN - OB Outpit PIT 5 EXT - - -
24-Sep-21 Day EX-6016 44,350.0 44,356.0 6.00 Loading Waste 15486 SUGENG PRAYETNO - OB Outpit PIT 5 EXT - - -
24-Sep-21 Day EX-6022 18,698.9 18,700.5 1.60 Loading Waste 9864 UJANG FERNANDES GUCIANO - OB Outpit PIT 5 EXT - 716 -
24-Sep-21 Day TR-3080 42,855.2 42,859.7 4.50 Hauling OB 10881 BURHANUDDIN 4 2 1 3 3 2 15 OB Outpit EX-6016 PIT 5 EXT IPD 11 42 630 - 42 -
24-Sep-21 Day TR-3080 42,859.7 42,860.3 0.60 Hauling OB 10881 BURHANUDDIN 2 1 3 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 126 - 42 -
24-Sep-21 Day TR-3174 41,553.0 41,558.6 5.60 Hauling OB 15230 MARGONO 2 4 2 1 3 3 3 18 OB Outpit EX-6016 PIT 5 EXT IPD 11 42 756 - 42 -
24-Sep-21 Day TR-3175 38,960.0 38,960.4 0.40 Hauling OB 1330 SUTRISNO 3 3 OB Outpit EX-6022 PIT 5 EXT IPD 11 42 126 - 42 -
24-Sep-21 Day TR-3175 38,960.4 38,966.6 6.20 Hauling OB 1330 SUTRISNO 2 3 3 3 2 1 14 OB Outpit EX-6016 PIT 5 EXT IPD 11 42 588 - 42 -
24-Sep-21 Day TR-3195 24,816.1 24,816.8 0.70 Hauling OB 15229 ARDIANSYAH 4 4 OB Outpit EX-6022 PIT 5 EXT IPD 11 42 168 - 42 -
24-Sep-21 Day TR-3195 24,816.8 24,821.2 4.40 Hauling OB 15229 ARDIANSYAH 2 3 3 1 3 2 14 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 588 - 42 -
24-Sep-21 Day TR-3202 26,966.5 26,972.3 5.80 Hauling OB 10882 SABIRIN 3 3 3 1 3 3 4 20 OB Outpit EX-6016 PIT 5 EXT IPD 11 42 840 - 42 -
24-Sep-21 Day TR-3203 27,079.7 27,080.4 0.70 Hauling OB 8920 VERRY EKO SETIAWAN 4 4 OB Outpit EX-6022 PIT 5 EXT IPD 11 42 168 - 42 -
24-Sep-21 Day TR-3203 27,080.4 27,084.0 3.60 Hauling OB 8920 VERRY EKO SETIAWAN 1 3 2 1 3 10 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 420 - 42 -
24-Sep-21 Day TR-3204 26,394.0 26,399.0 5.00 Hauling OB 1303 EFENDI 2 4 2 1 3 3 4 19 OB Outpit EX-6016 PIT 5 EXT IPD 11 42 798 - 42 -
24-Sep-21 Day TR-3205 25,953.2 25,953.9 0.70 Hauling OB 11619 DWI WARDOYO 4 4 OB Outpit EX-6022 PIT 5 EXT IPD 11 42 168 - 42 -
24-Sep-21 Day TR-3205 25,953.9 25,958.5 4.60 Hauling OB 11619 DWI WARDOYO 1 3 2 1 3 3 13 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 546 - 42 -
24-Sep-21 Day TR-3206 24,918.2 24,918.2 - Scheduled - WORKSHOP - - -
24-Sep-21 Day TR-3220 26,075.9 26,076.6 0.70 Hauling OB 8965 HADI SUTIKNO 3 3 OB Outpit EX-6022 PIT 5 EXT IPD 11 42 126 - 42 -
24-Sep-21 Day TR-3220 26,076.6 26,081.1 4.50 Hauling OB 8965 HADI SUTIKNO 1 3 3 3 3 13 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 546 - 42 -
24-Sep-21 Day TR-1024 31,406.0 31,410.9 4.90 Hauling OB 15636 AKHMAD NOOR 2 4 4 2 2 4 4 22 OB Outpit EX-5037 PIT 5 EXT IPD 10 24 528 - 24 -
24-Sep-21 Day TR-1025 47,314.0 47,317.7 3.70 Hauling OB 15466 SUPRIYANTO 5 4 3 12 OB Outpit EX-5037 PIT 5 EXT IPD 10 24 288 - 24 -
24-Sep-21 Day TR-1025 47,317.7 47,319.9 2.20 Hauling OB 15395 ANDRI SUSANTO 2 4 5 11 OB Outpit EX-5037 PIT 5 EXT IPD 10 24 264 - 24 -
24-Sep-21 Day TR-1031 49,514.3 49,519.2 4.90 Hauling OB 15421 AGUS A 1 5 4 1 2 5 3 21 OB Outpit EX-5037 PIT 5 EXT IPD 10 24 504 - 24 -
24-Sep-21 Day TR-1032 51,351.7 51,355.9 4.20 Hauling OB 15468 PADLIANSYAH 5 5 3 3 3 5 24 OB Outpit EX-5022 PIT 5 EXT IPD 11 24 576 - 24 -
24-Sep-21 Day TR-1032 51,355.9 51,356.7 0.80 Hauling OB 15468 PADLIANSYAH 2 3 5 OB Outpit EX-5037 PIT 5 EXT IPD 10 24 120 - 24 -
24-Sep-21 Day TR-1033 51,735.5 51,737.0 1.50 Hauling OB 15419 HUSEN 3 5 8 OB Outpit EX-5022 PIT 5 EXT IPD 11 24 192 - 24 -
24-Sep-21 Day TR-1034 49,510.0 49,515.4 5.40 Hauling OB 15420 M ABD MADI 2 4 4 2 3 4 4 23 OB Outpit EX-5037 PIT 5 EXT IPD 10 24 552 - 24 -
24-Sep-21 Day TR-1036 50,815.9 50,816.7 0.80 Hauling OB 16024 QORI 6 6 OB Outpit EX-6014 PIT 5 EXT IPD 10 24 144 - 24 -
24-Sep-21 Day TR-1036 50,816.7 50,822.0 5.30 Hauling OB 16024 QORI 3 5 5 3 2 5 4 27 OB Outpit EX-5022 PIT 5 EXT IPD 11 24 648 - 24 -
24-Sep-21 Day TR-1048 52,185.1 52,186.6 1.50 Hauling OB 11474 SARINDI 2 5 7 OB Outpit EX-6014 PIT 5 EXT IPD 10 24 168 - 24 -
24-Sep-21 Day TR-1048 52,186.6 52,190.1 3.50 Hauling OB 11474 SARINDI 4 3 5 2 14 OB Outpit EX-5022 PIT 5 EXT IPD 11 24 336 - 24 -
24-Sep-21 Day TR-1048 52,190.1 52,191.0 0.90 Hauling OB 11474 SARINDI 5 5 OB Outpit EX-4006 PIT 5 EXT IPD 11 24 120 - 24 -
24-Sep-21 Day TR-1049 46,246.1 46,247.9 1.80 Hauling OB 15376 EKO FAJAR S 5 5 10 OB Outpit EX-6014 PIT 5 EXT IPD 10 24 240 - 24 -
24-Sep-21 Day TR-1049 46,247.9 46,252.3 4.40 Hauling OB 15376 EKO FAJAR S 3 5 5 2 2 5 22 OB Outpit EX-5022 PIT 5 EXT IPD 11 24 528 - 24 -
24-Sep-21 Day TR-1050 45,924.8 45,924.8 - Unscheduled - WORKSHOP - - -
24-Sep-21 Day TA-7009 27,874.8 27,874.8 - Unscheduled - WORKSHOP - - -
24-Sep-21 Day TA-7010 25,331.4 25,338.5 7.10 Hauling OB 15653 M. ILIAS 2 4 5 2 2 4 6 5 4 34 OB Outpit EX-4006 PIT 5 EXT IPD 11 14 476 - 14 -
24-Sep-21 Day TA-7022 30,877.7 30,877.7 - Unscheduled - WORKSHOP - - -
24-Sep-21 Day TA-7029 28,624.7 28,631.7 7.00 Hauling OB 16026 BAHRUNI 2 4 5 3 1 5 5 5 4 34 OB Outpit EX-4006 PIT 5 EXT IPD 11 14 476 - 14 -
24-Sep-21 Day TA-7030 28,280.4 28,287.4 7.00 Hauling OB 15817 YUSANDI 1 4 5 3 2 4 5 5 5 34 OB Outpit EX-4006 PIT 5 EXT IPD 11 14 476 - 14 -
24-Sep-21 Day BD-4005 13,770.7 13,770.7 - Scheduled - WORKSHOP - - -
k 24-Sep-21 Day BD-5035 3,600.0 3,601.6 1.60 Front maintenance 14963 MAULANA ISHAK - PIT 5 EXT - - -
24-Sep-21 Day BD-6025 2,761.9 2,761.9 - Scheduled - KCP - - -
24-Sep-21 Day BD-6026 30,198.7 30,198.7 - Standby - WORKSHOP - - -
24-Sep-21 Day BD-6028 4,249.7 4,258.0 8.30 Unit Rental 14750 MUSTAKIM - KCP - - -
24-Sep-21 Day BD-6036 34,312.1 34,320.2 8.10 Unit Rental 14964 JOKO P (Dozer) - KCP - - -
24-Sep-21 Day BD-6038 34,093.3 34,101.0 7.70 Unit Rental 15569 SUJIONO - KCP - - -
24-Sep-21 Day BD-6069 10,395.6 10,395.6 - Unscheduled - PIT 5 EXT - - -
24-Sep-21 Day BD-7013 40,119.5 40,127.2 7.70 Front maintenance 15639 A. BUDIMAN - PIT 5 EXT - - -
24-Sep-21 Day BD-7026 26,720.0 26,728.4 8.40 Disposal maintenance 9339F ANTON WIBOWO - IPD 11 - - -
24-Sep-21 Day BD-7034 10,210.7 10,218.4 7.70 Disposal maintenance 8157 SAMIDI - IPD 10 - - -
24-Sep-21 Day GR-2012 22,314.9 22,322.0 7.10 Road Maintenance Support 15571 YOHANIS L - PIT 5 EXT - - -
24-Sep-21 Day GR-3007 39,356.9 39,356.9 - Unscheduled - PIT 5 EXT - - -
24-Sep-21 Day GR-3008 47,053.5 47,060.7 7.20 Road Maintenance Support 12344 M FAJRI - PIT 5 EXT - - -
24-Sep-21 Day TW-3001 8,591.0 8,593.0 2.00 Road Maintenance Support 15106 AHMAD NURANI - PIT 5 EXT - - -
24-Sep-21 Day TW-4001 18,762.0 18,762.00 - Standby - WORKSHOP - - -
24-Sep-21 Day PU-4002 19,080.0 19,080.00 - Unscheduled - ROM TEMPORARY - - -
24-Sep-21 Day PU-2026 6,199.1 6,200.1 1.00 Dewatering - PIT 11 - - -
24-Sep-21 Day PU-3026 12,356.0 12,360.00 4.00 Dewatering - PIT 11 - - -
24-Sep-21 Day PU-3015 1,696.0 1,696.00 - Standby - PIT 11 - - -
24-Sep-21 Day PU-3014 27,240.4 27,240.40 - Standby - ROM TEMPORARY - - -
24-Sep-21 Day LP-2165 13,626.0 13,626.00 - Unit Rental - KCP - - -
24-Sep-21 Day LP-2166 13,152.0 13,153.00 1.00 Unit Rental - KCP - - -
24-Sep-21 Day LP-2167 14,130.0 14,130.00 - Unit Rental - KCP - - -
24-Sep-21 Day LP-2168 12,916.0 12,917.00 1.00 Unit Rental - KCP - - -
24-Sep-21 Day LP-2169 12,653.0 12,653.00 - Unit Rental - KCP - - -
24-Sep-21 Day TS-4007 - - - Standby - KCP - - -
24-Sep-21 Day TS-4017 16,259.0 16,268.0 9.00 Unit Rental 15472 RIZKA M - KCP - - -
24-Sep-21 Day TF-4013 20,507.0 20,511.0 4.00 Unit Rental 15746 SYARIFUDDI - KCP - - -
24-Sep-21 Day TF-4014 34,550.0 34,550.0 - Standby - KCP - - -
24-Sep-21 Night EX-2037 22,271.3 22,271.3 - Standby - - - -
24-Sep-21 Night EX-2058 17,681.6 17,690.6 9.00 Side casting 15503 ASHARI SETIYO NUGROHO - - 1,628 -
24-Sep-21 Night EX-4006 35,318.0 35,329.0 11.00 Loading Waste 11330 EKO PURWANTO - OB Outpit PIT 5 EXT - 1,438 -
24-Sep-21 Night EX-5014 38,788.0 38,799.0 11.00 Unit Rental 15616 JOKO SUDIRO - KCP - - -
24-Sep-21 Night EX-5022 11,488.0 11,490.0 2.00 Loading Waste 15568 FUAD EFENDI - OB Outpit PIT 5 EXT - 1,347 -
24-Sep-21 Night EX-5037 19,113.0 19,122.0 9.00 Loading Waste 12534 PUJIYANTO - OB Outpit PIT 5 EXT - 1,489 -
24-Sep-21 Night EX-6014 57,803.0 57,814.0 11.00 Loading Waste 10917 SETA VERDY KARYA - OB Outpit PIT 5 EXT - - -
24-Sep-21 Night EX-6016 44,356.0 44,364.0 8.00 Loading Waste 15568 FUAD EFENDI - OB Outpit PIT 5 EXT - - -
24-Sep-21 Night EX-6022 18,700.5 18,710.7 10.20 Loading Waste 11146 PURWANTO - OB Outpit PIT 5 EXT - 716 -
24-Sep-21 Night TR-3080 42,860.3 42,860.3 - Unscheduled - PIT 5 EXT - - -
24-Sep-21 Night TR-3174 41,558.6 41,560.1 1.50 Hauling OB 15349 ARDIANSYAH 1 3 2 6 OB Outpit EX-5022 PIT 5 EXT IPD 11 42 252 - 42 -
24-Sep-21 Night TR-3174 41,560.1 41,567.8 7.70 Hauling OB 15349 ARDIANSYAH 1 4 3 3 4 2 4 3 2 26 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 1,092 - 42 -
24-Sep-21 Night TR-3175 38,966.6 38,974.8 8.20 Hauling OB 15350 HERMAN 1 4 3 4 3 3 3 3 3 27 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 1,134 - 42 -
24-Sep-21 Night TR-3175 38,974.8 38,976.1 1.30 Hauling OB 15350 HERMAN 1 3 1 5 OB Outpit EX-5022 PIT 5 EXT IPD 11 42 210 - 42 -
24-Sep-21 Night TR-3195 24,821.2 24,830.5 9.30 Hauling OB 15347 TAHMID 3 4 3 3 3 4 3 4 4 3 3 37 OB Outpit EX-6022 PIT 5 EXT IPD 11 42 1,554 - 42 -
24-Sep-21 Night TR-3202 26,972.3 26,972.7 0.40 Hauling OB 3669 SUYANTO 2 2 OB Outpit EX-6022 PIT 5 EXT IPD 11 42 84 - 42 -
24-Sep-21 Night TR-3202 26,972.7 26,980.9 8.20 Hauling OB 3669 SUYANTO 2 3 4 3 3 3 4 3 2 27 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 1,134 - 42 -
24-Sep-21 Night TR-3202 26,980.9 26,982.0 1.10 Hauling OB 3669 SUYANTO 3 1 4 OB Outpit EX-5022 PIT 5 EXT IPD 11 42 168 - 42 -
24-Sep-21 Night TR-3203 27,084.0 27,094.0 10.00 Hauling OB 8892 BAGUS PURWONO 2 4 3 4 3 4 4 3 4 4 3 38 OB Outpit EX-6022 PIT 5 EXT IPD 11 42 1,596 - 42 -
24-Sep-21 Night TR-3204 26,399.0 26,408.9 9.90 Hauling OB 9043 SAMSUL ARIF 3 4 3 4 3 3 4 3 4 3 3 37 OB Outpit EX-6022 PIT 5 EXT IPD 11 42 1,554 - 42 -
24-Sep-21 Night TR-3205 25,958.5 25,968.3 9.80 Hauling OB 10695 SUPIYANDI 3 4 3 4 3 3 3 4 3 4 3 37 OB Outpit EX-6022 PIT 5 EXT IPD 11 42 1,554 - 42 -
24-Sep-21 Night TR-3206 24,922.5 24,929.2 6.70 Hauling OB 10969 JOKO PRIONO 1 3 2 4 3 3 3 2 21 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 882 - 42 -
24-Sep-21 Night TR-3220 26,081.1 26,091.3 10.20 Hauling OB 10968 SUKIRNO 3 4 3 4 3 3 4 3 4 5 2 38 OB Outpit EX-6022 PIT 5 EXT IPD 11 42 1,596 - 42 -
24-Sep-21 Night TR-1024 31,410.9 31,413.5 2.60 Hauling OB 15955 RIZKY IHWAN 1 2 4 2 9 OB Outpit EX-6014 PIT 5 EXT IPD 10 24 216 - 24 -
24-Sep-21 Night TR-1024 31,413.5 31,419.9 6.40 Hauling OB 15955 RIZKY IHWAN 2 1 4 4 5 5 4 3 28 OB Outpit EX-5037 PIT 5 EXT IPD 10 24 672 - 24 -
24-Sep-21 Night TR-1024 31,419.9 31,420.9 1.00 Hauling OB 15955 RIZKY IHWAN 3 2 5 OB Outpit EX-4006 PIT 5 EXT IPD 11 24 120 - 24 -
24-Sep-21 Night TR-1025 47,319.9 47,325.6 5.70 Hauling OB 15467 HUSNI 5 6 5 5 5 3 29 OB Outpit EX-6016 PIT 5 EXT IPD 11 24 696 - 24 -
24-Sep-21 Night TR-1025 47,325.6 47,327.7 2.10 Hauling OB 15467 HUSNI 1 4 2 3 10 OB Outpit EX-6014 PIT 5 EXT IPD 10 24 240 - 24 -
24-Sep-21 Night TR-1025 47,327.7 47,329.8 2.10 Hauling OB 15467 HUSNI 2 1 4 2 9 OB Outpit EX-5037 PIT 5 EXT IPD 10 24 216 - 24 -
24-Sep-21 Night TR-1031 49,519.2 49,525.5 6.30 Hauling OB 15485 ROBY TM 2 6 5 5 5 5 3 31 OB Outpit EX-6016 PIT 5 EXT IPD 11 24 744 - 24 -
24-Sep-21 Night TR-1031 49,525.5 49,527.6 2.10 Hauling OB 15485 ROBY TM 1 5 6 OB Outpit EX-6014 PIT 5 EXT IPD 10 24 144 - 24 -
24-Sep-21 Night TR-1031 49,527.6 49,528.9 1.30 Hauling OB 15485 ROBY TM 2 1 5 2 10 OB Outpit EX-5037 PIT 5 EXT IPD 10 24 240 - 24 -
24-Sep-21 Night TR-1032 51,356.7 51,361.9 5.20 Hauling OB 1 6 5 5 3 20 OB Outpit EX-6016 PIT 5 EXT IPD 11 24 480 - 24 -
24-Sep-21 Night TR-1033 51,737.0 51,737.0 - Unscheduled - PIT 5 EXT - - -
24-Sep-21 Night TR-1034 49,515.4 49,521.6 6.20 Hauling OB 15471 MULYADI 2 5 4 5 5 5 3 29 OB Outpit EX-6016 PIT 5 EXT IPD 11 24 696 - 24 -
24-Sep-21 Night TR-1034 49,521.6 49,523.0 1.40 Hauling OB 15471 MULYADI 4 1 5 OB Outpit EX-5022 PIT 5 EXT IPD 11 24 120 - 24 -
24-Sep-21 Night TR-1034 49,523.0 49,524.6 1.60 Hauling OB 15471 MULYADI 2 4 3 9 OB Outpit EX-5037 PIT 5 EXT IPD 10 24 216 - 24 -
24-Sep-21 Night TR-1036 50,822.0 50,826.3 4.30 Hauling OB 15346 MUSA 2 5 5 5 5 5 4 31 OB Outpit EX-6016 PIT 5 EXT IPD 11 24 744 - 24 -
24-Sep-21 Night TR-1036 50,826.3 50,832.0 5.70 Hauling OB 15346 MUSA 4 4 2 5 2 17 OB Outpit EX-5037 PIT 5 EXT IPD 10 24 408 - 24 -
24-Sep-21 Night TR-1048 52,191.0 52,193.4 2.40 Hauling OB 16025 IMTIKAN 3 6 3 12 OB Outpit EX-6016 PIT 5 EXT IPD 11 24 288 - 24 -
24-Sep-21 Night TR-1048 52,193.4 52,195.7 2.30 Hauling OB 16025 IMTIKAN 4 4 1 9 OB Outpit EX-6014 PIT 5 EXT IPD 10 24 216 - 24 -
24-Sep-21 Night TR-1048 52,195.7 52,197.0 1.30 Hauling OB 16025 IMTIKAN 1 4 2 7 OB Outpit EX-5037 PIT 5 EXT IPD 10 24 168 - 24 -
24-Sep-21 Night TR-1049 46,252.3 46,256.5 4.20 Hauling OB 4 5 2 4 1 16 OB Outpit EX-6014 PIT 5 EXT IPD 10 24 384 - 24 -
24-Sep-21 Night TR-1049 46,256.5 46,262.3 5.80 Hauling OB 1 1 4 5 5 4 5 3 28 OB Outpit EX-5037 PIT 5 EXT IPD 10 24 672 - 24 -
24-Sep-21 Night TR-1050 45,926.6 45,933.0 6.40 Hauling OB 15377 RIZALI RAHMAN 1 1 4 5 4 4 5 3 27 OB Outpit EX-5037 PIT 5 EXT IPD 10 24 648 - 24 -
24-Sep-21 Night TA-7009 27,876.3 27,881.9 5.60 Hauling OB 15861 AGUSTIAN 2 4 4 4 3 3 3 23 OB Outpit EX-5037 PIT 5 EXT IPD 10 14 322 - 14 -
24-Sep-21 Night TA-7009 27,881.9 27,885.0 3.10 Hauling OB 15861 AGUSTIAN 1 3 4 2 10 OB Outpit EX-4006 PIT 5 EXT IPD 11 14 140 - 14 -
24-Sep-21 Night TA-7010 25,338.5 25,348.8 10.30 Hauling OB 15816 M. YUSUF 3 4 4 4 5 5 4 4 5 5 4 47 OB Outpit EX-4006 PIT 5 EXT IPD 11 14 658 - 14 -
24-Sep-21 Night TA-7022 30,877.7 30,877.7 - Unscheduled - WORKSHOP - - -
24-Sep-21 Night TA-7029 28,631.7 28,641.2 9.50 Hauling OB 15862 RUDY AMRIYADI 4 3 3 4 5 5 5 5 5 4 3 46 OB Outpit EX-4006 PIT 5 EXT IPD 11 14 644 - 14 -
24-Sep-21 Night TA-7030 28,287.4 28,297.6 10.20 Hauling OB 15863 HENDRA M 4 3 3 5 4 5 4 5 5 4 3 45 OB Outpit EX-4006 PIT 5 EXT IPD 11 14 630 - 14 -
24-Sep-21 Night BD-4005 13,770.7 13,770.7 - Scheduled - WORKSHOP - - -
24-Sep-21 Night BD-5035 3,601.6 3,601.6 - Unscheduled - PIT 5 EXT - - -
24-Sep-21 Night BD-6025 2,761.9 2,761.9 - Scheduled - KCP - - -
24-Sep-21 Night BD-6026 30,198.7 30,198.7 - Standby - WORKSHOP - - -
24-Sep-21 Night BD-6028 4,258.0 4,268.2 10.20 Unit Rental 14744 NOORDIANTO - KCP - - -
24-Sep-21 Night BD-6036 34,320.2 34,329.3 9.10 Unit Rental 14710 AGUS S - KCP - - -
24-Sep-21 Night BD-6038 34,101.0 34,110.4 9.40 Unit Rental 15570 HENDRY S - KCP - - -
24-Sep-21 Night BD-6069 10,399.6 10,400.9 1.30 Front maintenance 9492 MAHFUDI - PIT 5 EXT - - -
24-Sep-21 Night BD-7013 40,127.2 40,138.3 11.10 Front maintenance 10013 ADI SUSANTO - PIT 5 EXT - - -
24-Sep-21 Night BD-7026 26,728.4 26,738.0 9.60 Disposal maintenance 9978 KARSIANTO - IPD 11 - - -
24-Sep-21 Night BD-7034 10,218.4 10,229.3 10.90 Disposal maintenance 9492 MAHFUDI - IPD 10 - - -
24-Sep-21 Night GR-2012 22,322.0 22,328.2 6.20 Road Maintenance Support 9426 ADE SUPIANA - PIT 5 EXT - - -
24-Sep-21 Night GR-3007 39,356.9 39,356.9 - Unscheduled - PIT 5 EXT - - -
24-Sep-21 Night GR-3008 47,060.7 47,070.6 9.90 Road Maintenance Support 9214 MUSTOFA ADI PRAYITNO - PIT 5 EXT - - -
24-Sep-21 Night TW-3001 8,593.0 8,595.0 2.00 Road Maintenance Support 15743 LANA - PIT 5 EXT - - -
24-Sep-21 Night TW-4001 18,762.0 18,762.00 - Standby - WORKSHOP - - -
24-Sep-21 Night PU-4002 19,080.0 19,080.0 - Unscheduled - ROM TEMPORARY - - -
24-Sep-21 Night PU-2026 6,200.1 6,200.1 - Dewatering - PIT 11 - - -
24-Sep-21 Night PU-3026 12,360.0 12,364.9 4.90 Dewatering - PIT 11 - - -
24-Sep-21 Night PU-3015 1,696.0 1,696.0 - Standby - PIT 11 - - -
24-Sep-21 Night PU-3014 27,240.4 27,240.4 - Standby - ROM TEMPORARY - - -
24-Sep-21 Night LP-2165 13,626.0 13,638.0 12.00 Unit Rental - KCP - - -
24-Sep-21 Night LP-2166 13,153.0 13,165.0 12.00 Unit Rental - KCP - - -
24-Sep-21 Night LP-2167 14,130.0 14,139.0 9.00 Unit Rental - KCP - - -
24-Sep-21 Night LP-2168 12,917.0 12,929.0 12.00 Unit Rental - KCP - - -
24-Sep-21 Night LP-2169 12,653.0 12,663.0 10.00 Unit Rental - KCP - - -
24-Sep-21 Night TS-4007 - - - Standby - KCP - - -
24-Sep-21 Night TS-4017 16,268.0 16,275.0 7.00 Unit Rental 15473 ISMAIL SAIDI - KCP - - -
24-Sep-21 Night TF-4013 20,511.0 20,520.0 9.00 Unit Rental 15310 ALDI ALFI SAPUTRA - KCP - - -
24-Sep-21 Night TF-4014 34,550.0 34,550.0 - Standby - KCP - - -
25-Sep-21 Day EX-2037 22,271.3 22,276.2 4.90 Side casting 8371 DWI RUPAWAN - WORKSHOP - - -
25-Sep-21 Day EX-2058 17,690.6 17,700.9 10.30 sloping 9590F SIRATAL RAYYAN - - 1,681 -
25-Sep-21 Day EX-4006 35,329.0 35,331.0 2.00 Loading Waste 15617 ZAENAL - OB Outpit PIT 5 EXT - 1,358 -
25-Sep-21 Day EX-4006 35,331.0 35,332.0 1.00 Moving - pindah lokasi kerja 15617 ZAENAL - PIT 5 EXT - 1,358 -
25-Sep-21 Day EX-5014 38,799.0 38,810.0 11.00 Unit Rental 15375 A JEFRI M - KCP - - -
25-Sep-21 Day EX-5022 11,490.0 11,499.0 9.00 Loading Waste 9590F SIRATAL RAYYAN - OB Outpit PIT 5 EXT - 1,364 -
25-Sep-21 Day EX-5037 19,122.0 19,129.0 7.00 Loading Waste 9136 AHMAD YANI - OB Outpit PIT 5 EXT - 1,329 -
25-Sep-21 Day EX-6014 57,814.0 57,825.0 11.00 Loading Waste 8952 DIDI SETIAWAN - OB Outpit PIT 5 EXT - - -
25-Sep-21 Day EX-6016 44,364.0 44,374.0 10.00 Loading Waste 15486 SUGENG PRAYETNO - OB Outpit PIT 5 EXT - - -
25-Sep-21 Day EX-6022 18,710.7 18,721.4 10.70 Loading Waste 9864 UJANG FERNANDES GUCIANO - OB Outpit PIT 5 EXT - 753 -
25-Sep-21 Day TR-3080 42,860.3 42,864.3 3.98 Hauling OB 10881 BURHANUDDIN 3 3 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 126 - 42 -
25-Sep-21 Day TR-3080 42,864.3 42,865.1 0.85 Hauling OB 10881 BURHANUDDIN 2 1 1 3 4 3 14 OB Outpit EX-6016 PIT 5 EXT IPD 11 42 588 - 42 -
25-Sep-21 Day TR-3080 42,865.1 42,871.1 5.97 Hauling OB 10881 BURHANUDDIN 4 2 3 3 4 3 2 21 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 882 - 42 -
25-Sep-21 Day TR-3174 41,567.8 41,575.2 7.40 Hauling OB 8958 MUKHROMIN 3 4 4 4 2 17 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 714 - 42 -
25-Sep-21 Day TR-3175 38,976.1 38,985.0 8.87 Hauling OB 1330 SUTRISNO 3 3 3 4 4 4 3 4 3 31 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 1,302 - 42 -
25-Sep-21 Day TR-3175 38,985.0 38,986.3 1.33 Hauling OB 1330 SUTRISNO 2 4 6 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 252 - 42 -
25-Sep-21 Day TR-3195 24,830.5 24,840.9 10.40 Hauling OB 15229 ARDIANSYAH 3 3 3 4 3 4 4 4 4 3 3 38 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 1,596 - 42 -
25-Sep-21 Day TR-3202 26,982.0 26,992.6 10.60 Hauling OB 15230 MARGONO 4 3 4 3 4 3 4 5 4 3 3 40 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 1,680 - 42 -
25-Sep-21 Day TR-3203 27,094.0 27,102.5 8.50 Hauling OB 10882 SABIRIN 3 4 3 3 4 3 4 1 3 3 31 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 1,302 - 42 -
25-Sep-21 Day TR-3204 26,408.9 26,419.0 10.10 Hauling OB 1303 EFENDI 3 3 4 3 4 3 4 4 4 3 4 39 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 1,638 - 42 -
25-Sep-21 Day TR-3205 25,968.3 25,978.7 10.40 Hauling OB 7170F TRI PRASETIYO 3 3 4 3 4 3 4 4 4 3 2 37 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 1,554 - 42 -
25-Sep-21 Day TR-3206 24,929.2 24,932.4 3.22 Hauling OB 1354 SUDIYANTO 3 3 3 2 11 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 462 - 42 -
25-Sep-21 Day TR-3206 24,932.4 24,937.7 5.28 Hauling OB 1354 SUDIYANTO 4 3 4 3 4 18 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 756 - 42 -
25-Sep-21 Day TR-3220 26,091.3 26,101.4 10.10 Hauling OB 8965 HADI SUTIKNO 4 3 4 3 3 3 3 4 3 3 3 36 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 1,512 - 1 42 42
25-Sep-21 Day TR-1024 31,420.9 31,424.5 3.63 Hauling OB 15636 AKHMAD NOOR 5 5 3 3 16 OB Outpit EX-6014 PIT 5 EXT IPD 10 24 384 - 24 -
25-Sep-21 Day TR-1024 31,424.5 31,426.8 2.27 Hauling OB 15636 AKHMAD NOOR 3 5 1 1 10 OB Outpit EX-5022 PIT 5 EXT IPD 11 24 240 - 24 -
25-Sep-21 Day TR-1024 31,426.8 31,431.8 5.00 Hauling OB 15636 AKHMAD NOOR 4 5 4 4 3 2 22 OB Outpit EX-5037 PIT 5 EXT IPD 10 24 528 - 24 -
25-Sep-21 Day TR-1025 47,329.8 47,334.7 4.93 Hauling OB 15469 BASUNI 3 1 5 6 5 3 23 OB Outpit EX-6016 PIT 5 EXT IPD 11 24 552 - 24 -
25-Sep-21 Day TR-1025 47,334.7 47,337.5 2.79 Hauling OB 15469 BASUNI 4 3 1 5 13 OB Outpit EX-6014 PIT 5 EXT IPD 10 24 312 - 24 -
25-Sep-21 Day TR-1025 47,337.5 47,340.3 2.78 Hauling OB 15469 BASUNI 4 4 2 3 13 OB Outpit EX-5037 PIT 5 EXT IPD 10 24 312 - 24 -
25-Sep-21 Day TR-1031 49,528.9 49,531.2 2.28 Hauling OB 15421 AGUS A 5 2 3 10 OB Outpit EX-6016 PIT 5 EXT IPD 11 24 240 - 1 24 24
25-Sep-21 Day TR-1031 49,531.2 49,532.3 1.14 Hauling OB 15421 AGUS A 1 1 3 5 OB Outpit EX-6014 PIT 5 EXT IPD 10 24 120 - 24 -
25-Sep-21 Day TR-1031 49,532.3 49,534.6 2.28 Hauling OB 15421 AGUS A 5 4 1 10 OB Outpit EX-5037 PIT 5 EXT IPD 10 24 240 - 24 -
25-Sep-21 Day TR-1031 49,534.6 49,539.2 4.60 Hauling OB 15576 JOKO SANTOSO 4 6 5 4 3 22 OB Outpit EX-6016 PIT 5 EXT IPD 11 24 528 - 24 -
25-Sep-21 Day TR-1032 51,361.9 51,369.8 7.92 Hauling OB 15468 PADLIANSYAH 5 2 4 2 6 4 5 6 4 1 39 OB Outpit EX-6016 PIT 5 EXT IPD 11 24 936 - 3 24 72
25-Sep-21 Day TR-1032 51,369.8 51,371.1 1.25 Hauling OB 15468 PADLIANSYAH 1 2 3 6 OB Outpit EX-6014 PIT 5 EXT IPD 10 24 144 - 24 -
25-Sep-21 Day TR-1032 51,371.1 51,371.9 0.83 Hauling OB 15468 PADLIANSYAH 3 1 4 OB Outpit EX-5022 PIT 5 EXT IPD 11 24 96 - 24 -
25-Sep-21 Day TR-1033 51,737.0 51,737.0 - Unscheduled - PIT 5 EXT - - -
25-Sep-21 Day TR-1034 49,524.6 49,527.0 2.40 Hauling OB 15420 M ABD MADI 5 4 3 12 OB Outpit EX-6016 PIT 5 EXT IPD 11 24 288 - 24 -
25-Sep-21 Day TR-1034 49,527.0 49,530.2 3.20 Hauling OB 15420 M ABD MADI 4 5 4 3 16 OB Outpit EX-5022 PIT 5 EXT IPD 11 24 384 - 24 -
25-Sep-21 Day TR-1036 50,832.0 50,836.9 4.85 Hauling OB 15398 SIGIT SUSANTO 5 2 3 2 6 2 1 2 23 OB Outpit EX-6016 PIT 5 EXT IPD 11 24 552 - 1 24 24
25-Sep-21 Day TR-1036 50,836.9 50,839.4 2.53 Hauling OB 15398 SIGIT SUSANTO 1 5 6 12 OB Outpit EX-6014 PIT 5 EXT IPD 10 24 288 - 1 24 24
25-Sep-21 Day TR-1036 50,839.4 50,841.7 2.32 Hauling OB 15398 SIGIT SUSANTO 3 2 2 3 1 11 OB Outpit EX-5022 PIT 5 EXT IPD 11 24 264 - 24 -
25-Sep-21 Day TR-1048 52,197.3 52,197.7 0.40 Hauling OB 15420 M ABD MADI 1 1 OB Outpit EX-6016 PIT 5 EXT IPD 11 24 24 - 24 -
25-Sep-21 Day TR-1048 52,197.7 52,199.5 1.80 Hauling OB 15376 EKO FAJAR S 3 4 7 OB Outpit EX-5022 PIT 5 EXT IPD 11 24 168 - 24 -
25-Sep-21 Day TR-1049 46,262.3 46,267.6 5.27 Hauling OB 15376 EKO FAJAR S 2 5 5 6 5 3 26 OB Outpit EX-6016 PIT 5 EXT IPD 11 24 624 - 24 -
25-Sep-21 Day TR-1049 46,267.6 46,272.7 5.13 Hauling OB 15376 EKO FAJAR S 3 5 4 3 4 2 21 OB Outpit EX-5037 PIT 5 EXT IPD 10 24 504 - 24 -
25-Sep-21 Day TR-1050 45,933.0 45,938.0 5.00 Hauling OB 16024 QORI 4 4 3 4 4 5 24 OB Outpit EX-5037 PIT 5 EXT IPD 10 24 576 - 24 -
25-Sep-21 Day TR-1050 45,938.0 45,943.4 5.40 Hauling OB 15419 HUSEN 4 6 5 4 4 23 OB Outpit EX-6016 PIT 5 EXT IPD 11 24 552 - 24 -
25-Sep-21 Day TA-7009 27,885.0 27,892.4 7.40 Hauling OB 15818 AGUS SUGIANTO 2 3 3 5 5 6 5 2 1 32 OB Outpit EX-5022 PIT 5 EXT IPD 11 14 448 - 14 -
25-Sep-21 Day TA-7009 27,892.4 27,895.2 2.80 Hauling OB 15818 AGUS SUGIANTO 5 3 2 10 OB Outpit EX-4006 PIT 5 EXT IPD 11 14 140 - 14 -
25-Sep-21 Day TA-7010 25,348.8 25,356.1 7.34 Hauling OB 16026 BAHRUNI 2 2 2 4 5 6 3 1 4 29 OB Outpit EX-5022 PIT 5 EXT IPD 11 14 406 - 14 -
25-Sep-21 Day TA-7010 25,356.1 25,358.6 2.46 Hauling OB 16026 BAHRUNI 4 4 2 10 OB Outpit EX-4006 PIT 5 EXT IPD 11 14 140 - 14 -
25-Sep-21 Day TA-7022 30,877.7 30,877.7 - Unscheduled - WORKSHOP - - -
25-Sep-21 Day TA-7029 28,641.2 28,643.7 2.51 Hauling OB 15819 AHNIANSYAH 2 1 3 6 OB Outpit EX-5022 PIT 5 EXT IPD 11 14 84 - 14 -
25-Sep-21 Day TA-7029 28,643.7 28,645.5 1.79 Hauling OB 15819 AHNIANSYAH 4 1 5 OB Outpit EX-4006 PIT 5 EXT IPD 11 14 70 - 14 -
25-Sep-21 Day TA-7030 28,297.6 28,305.4 7.80 Hauling OB 15817 YUSANDI 4 3 3 4 6 5 5 2 3 35 OB Outpit EX-5022 PIT 5 EXT IPD 11 14 490 - 14 -
25-Sep-21 Day TA-7030 28,305.4 28,306.7 1.30 Hauling OB 15817 YUSANDI 1 4 5 OB Outpit EX-4006 PIT 5 EXT IPD 11 14 70 - 14 -
25-Sep-21 Day BD-4005 13,770.7 13,770.7 - Scheduled - WORKSHOP - - -
k 25-Sep-21 Day BD-5035 3,601.6 3,601.6 - Standby - PIT 5 EXT - - -
25-Sep-21 Day BD-6025 2,761.9 2,761.9 - Scheduled - KCP - - -
25-Sep-21 Day BD-6026 30,198.7 30,198.7 - Standby - WORKSHOP - - -
25-Sep-21 Day BD-6028 4,268.2 4,277.9 9.70 Unit Rental 14750 MUSTAKIM - KCP - - -
25-Sep-21 Day BD-6036 34,329.3 34,339.3 10.00 Unit Rental 14964 JOKO P (Dozer) - KCP - - -
25-Sep-21 Day BD-6038 34,110.4 34,118.8 8.40 Unit Rental 14708 ADEFI P - KCP - - -
25-Sep-21 Day BD-6069 10,400.9 10,411.4 10.50 Front maintenance 15747 MUSTAQIM D6 - PIT 5 EXT - - -
25-Sep-21 Day BD-7013 40,138.3 40,148.6 10.30 Front maintenance 11676 SUDARSONO - PIT 5 EXT - - -
25-Sep-21 Day BD-7026 26,738.0 26,744.2 6.20 Disposal maintenance 9339F ANTON WIBOWO - IPD 11 - - -
25-Sep-21 Day BD-7026 26,744.2 26,749.3 5.10 Disposal maintenance 15639 A. BUDIMAN - IPD 11 - - -
25-Sep-21 Day BD-7034 10,229.3 10,234.7 5.40 Disposal maintenance 8157 SAMIDI - IPD 10 - - -
25-Sep-21 Day GR-2012 22,328.2 22,329.1 0.90 Road Maintenance Support - PIT 5 EXT - - -
25-Sep-21 Day GR-3007 39,356.9 39,356.9 - Unscheduled - PIT 5 EXT - - -
25-Sep-21 Day GR-3008 47,070.6 47,079.6 9.00 Road Maintenance Support 8925 AGUS SUNARWAN - PIT 5 EXT - - -
25-Sep-21 Day TW-3001 8,595.0 8,599.0 4.00 Road Maintenance Support 15106 AHMAD NURANI - PIT 5 EXT - - -
25-Sep-21 Day TW-4001 18,762.0 18,762.00 - Standby 15409 YOSEF SALEMBE - PIT 5 EXT - - -
25-Sep-21 Day PU-4002 19,080.0 19,080.00 - Unscheduled - ROM TEMPORARY - - -
25-Sep-21 Day PU-2026 6,200.1 6,201.6 1.50 Dewatering - PIT 11 - - -
25-Sep-21 Day PU-3026 12,364.9 12,374.10 9.20 Dewatering 10847 FAUZI AHMAD - PIT 11 - - -
25-Sep-21 Day PU-3015 1,696.0 1,696.00 - Standby - PIT 11 - - -
25-Sep-21 Day PU-3014 27,240.4 27,240.40 - Standby - ROM TEMPORARY - - -
25-Sep-21 Day LP-2165 13,638.0 13,638.00 - Unit Rental 4671 NURUDIN - KCP - - -
25-Sep-21 Day LP-2166 13,165.0 13,165.00 - Unit Rental 4671 NURUDIN - KCP - - -
25-Sep-21 Day LP-2167 14,139.0 14,139.00 - Unit Rental 4671 NURUDIN - KCP - - -
25-Sep-21 Day LP-2168 12,929.0 12,929.00 - Unit Rental 4671 NURUDIN - KCP - - -
25-Sep-21 Day LP-2169 12,663.0 12,663.00 - Unit Rental 4671 NURUDIN - KCP - - -
25-Sep-21 Day TS-4007 - - - Standby - KCP - - -
25-Sep-21 Day TS-4017 16,275.0 16,284.0 9.00 Unit Rental 15472 RIZKA M - KCP - - -
25-Sep-21 Day TF-4013 20,520.0 20,528.0 8.00 Unit Rental 15746 SYARIFUDDI - KCP - - -
25-Sep-21 Day TF-4014 34,550.0 34,550.0 - Standby - KCP - - -
25-Sep-21 Night EX-2037 22,276.2 22,276.2 - Standby - WORKSHOP - - -
25-Sep-21 Night EX-2058 17,700.9 17,704.3 3.40 Side casting 15503 ASHARI SETIYO NUGROHO - PIT 5 EXT - 1,681 -
25-Sep-21 Night EX-2058 17,704.3 17,710.6 6.30 Drainage 15503 ASHARI SETIYO NUGROHO - PIT 5 EXT - 1,681 -
25-Sep-21 Night EX-4006 35,332.0 35,332.0 - Unscheduled - PIT 5 EXT - 1,358 -
25-Sep-21 Night EX-5014 38,810.0 38,814.0 4.00 Unit Rental 15616 JOKO SUDIRO - KCP - - -
25-Sep-21 Night EX-5022 11,499.0 11,501.0 2.00 Loading Waste 12534 PUJIYANTO - OB Outpit PIT 5 EXT - 1,364 -
25-Sep-21 Night EX-5037 19,129.0 19,129.0 - Standby - PIT 5 EXT - 1,329 -
25-Sep-21 Night EX-6014 57,825.0 57,828.0 3.00 Loading Waste 10917 SETA VERDY KARYA - OB Outpit PIT 5 EXT - - -
25-Sep-21 Night EX-6016 44,374.0 44,376.0 2.00 Loading Waste 15568 FUAD EFENDI - OB Outpit PIT 5 EXT - - -
25-Sep-21 Night EX-6022 18,721.4 18,723.9 2.50 Loading Waste 11146 PURWANTO - OB Outpit PIT 5 EXT - 753 -
25-Sep-21 Night TR-3080 42,871.1 42,873.0 1.90 Hauling OB 9214 MUSTOFA ADI PRAYITNO 3 4 1 8 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 336 - 42 -
25-Sep-21 Night TR-3174 41,575.2 41,575.2 - Unscheduled - WORKSHOP - - -
25-Sep-21 Night TR-3175 38,986.3 38,987.2 0.87 Hauling OB 15349 ARDIANSYAH 3 3 OB Outpit EX-6016 PIT 5 EXT IPD 10 42 126 - 42 -
25-Sep-21 Night TR-3175 38,987.2 38,988.5 1.33 Hauling OB 15349 ARDIANSYAH 3 1 4 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 168 - 42 -
25-Sep-21 Night TR-3195 24,840.9 24,843.2 2.30 Hauling OB 15347 TAHMID 3 4 1 8 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 336 - 42 -
25-Sep-21 Night TR-3202 26,992.6 26,994.6 2.00 Hauling OB 11474 SARINDI 3 2 2 7 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 294 - 42 -
25-Sep-21 Night TR-3203 27,102.5 27,104.8 2.30 Hauling OB 8920 VERRY EKO SETIAWAN 3 4 1 8 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 336 - 42 -
25-Sep-21 Night TR-3204 26,419.0 26,421.6 2.60 Hauling OB 9043 SAMSUL ARIF 2 4 1 7 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 294 - 42 -
25-Sep-21 Night TR-3205 25,978.7 25,980.8 2.10 Hauling OB 11619 DWI WARDOYO 3 4 7 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 294 - 42 -
25-Sep-21 Night TR-3206 24,937.7 24,939.9 2.20 Hauling OB 15350 HERMAN 3 4 1 8 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 336 - 42 -
25-Sep-21 Night TR-3220 26,101.4 26,103.9 2.50 Hauling OB 10968 SUKIRNO 4 3 3 10 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 420 - 42 -
25-Sep-21 Night TR-1024 31,431.8 31,433.6 1.80 Hauling OB 15955 RIZKY IHWAN 3 3 6 OB Outpit EX-6014 PIT 5 EXT IPD 10 24 144 - 24 -
25-Sep-21 Night TR-1025 47,340.3 47,340.3 - Unscheduled 15471 MULYADI - PIT 5 EXT - - -
25-Sep-21 Night TR-1031 49,539.2 49,541.3 2.10 Hauling OB 15466 SUPRIYANTO 3 6 1 10 OB Outpit EX-6016 PIT 5 EXT IPD 11 24 240 - 24 -
25-Sep-21 Night TR-1032 51,371.9 51,374.2 2.30 Hauling OB 15377 RIZALI RAHMAN 5 5 1 11 OB Outpit EX-6016 PIT 5 EXT IPD 11 24 264 - 24 -
25-Sep-21 Night TR-1033 51,737.0 51,737.0 - Unscheduled - PIT 5 EXT - - -
25-Sep-21 Night TR-1034 49,530.2 49,531.4 1.20 Hauling OB 15395 ANDRI SUSANTO 1 1 2 4 OB Outpit EX-6014 PIT 5 EXT IPD 10 24 96 - 24 -
25-Sep-21 Night TR-1034 49,531.4 49,532.4 1.00 Hauling OB 15395 ANDRI SUSANTO 3 4 7 OB Outpit EX-5022 PIT 5 EXT IPD 11 24 168 - 24 -
25-Sep-21 Night TR-1036 50,841.7 50,843.5 1.80 Hauling OB 15346 MUSA 2 2 OB Outpit EX-6016 PIT 5 EXT IPD 11 24 48 - 24 -
25-Sep-21 Night TR-1036 50,843.5 50,843.9 0.40 Hauling OB 15346 MUSA 4 4 8 OB Outpit EX-5022 PIT 5 EXT IPD 11 24 192 - 24 -
25-Sep-21 Night TR-1048 52,199.5 52,201.7 2.20 Hauling OB 16025 IMTIKAN 3 5 2 10 OB Outpit EX-6016 PIT 5 EXT IPD 11 24 240 - 24 -
25-Sep-21 Night TR-1049 46,272.7 46,274.9 2.20 Hauling OB 15744 MARYANTO 5 4 9 OB Outpit EX-6016 PIT 5 EXT IPD 11 24 216 - 24 -
25-Sep-21 Night TR-1050 45,943.4 45,945.6 2.20 Hauling OB 15467 HUSNI 4 5 2 11 OB Outpit EX-6016 PIT 5 EXT IPD 11 24 264 - 24 -
25-Sep-21 Night TA-7009 27,895.2 27,897.0 1.80 Hauling OB 15862 RUDY AMRIYADI 4 4 8 OB Outpit EX-5022 PIT 5 EXT IPD 11 14 112 - 14 -
25-Sep-21 Night TA-7010 25,358.6 25,360.4 1.80 Hauling OB 15861 AGUSTIAN 4 3 7 OB Outpit EX-5022 PIT 5 EXT IPD 11 14 98 - 14 -
25-Sep-21 Night TA-7022 30,877.7 30,877.7 - Unscheduled - WORKSHOP - - -
25-Sep-21 Night TA-7029 28,645.5 28,645.5 - Unscheduled - WORKSHOP - - -
25-Sep-21 Night TA-7030 28,307.0 28,307.0 - Unscheduled 15816 M. YUSUF - PIT 5 EXT - - -
25-Sep-21 Night BD-4005 13,770.7 13,770.7 - Scheduled - WORKSHOP - - -
25-Sep-21 Night BD-5035 3,601.6 3,606.6 5.00 Front maintenance 14963 MAULANA ISHAK - PIT 5 EXT - - -
25-Sep-21 Night BD-6025 2,761.9 2,761.9 - Scheduled - KCP - - -
25-Sep-21 Night BD-6026 30,198.7 30,198.7 - Standby - WORKSHOP - - -
25-Sep-21 Night BD-6028 4,277.9 4,279.6 1.70 Unit Rental 11169 ANNAS - KCP - - -
25-Sep-21 Night BD-6036 34,339.3 34,341.2 1.90 Unit Rental 14744 NOORDIANTO - KCP - - -
25-Sep-21 Night BD-6038 34,118.8 34,120.2 1.40 Unit Rental 15570 HENDRY S - KCP - - -
25-Sep-21 Night BD-6069 10,411.4 10,416.0 4.60 Front maintenance 9978 KARSIANTO - IPD 10 - - -
25-Sep-21 Night BD-7013 40,148.6 40,153.6 5.00 Front maintenance 10013 ADI SUSANTO - PIT 5 EXT - - -
25-Sep-21 Night BD-7026 26,749.3 26,752.2 2.90 Front maintenance - IPD 11 - - -
25-Sep-21 Night BD-7034 10,234.7 10,244.8 10.10 Disposal maintenance 14709 A. FATHONI - IPD 11 - - -
25-Sep-21 Night GR-2012 22,329.1 22,332.7 3.60 Road Maintenance Support 9426 ADE SUPIANA - PIT 5 EXT - - -
25-Sep-21 Night GR-3007 39,356.9 39,356.9 - Unscheduled - PIT 5 EXT - - -
25-Sep-21 Night GR-3008 47,079.6 47,081.9 2.30 Road Maintenance Support 15571 YOHANIS L - PIT 5 EXT - - -
25-Sep-21 Night TW-3001 8,599.0 8,600.0 1.00 Road Maintenance Support 15743 LANA - PIT 5 EXT - - -
25-Sep-21 Night TW-4001 18,762.0 18,762.00 - Standby - WORKSHOP - - -
25-Sep-21 Night PU-4002 19,080.0 19,080.0 - Unscheduled - ROM TEMPORARY - - -
25-Sep-21 Night PU-2026 6,201.6 6,201.6 - Dewatering - PIT 11 - - -
25-Sep-21 Night PU-3026 12,374.1 12,374.1 - Dewatering - PIT 11 - - -
25-Sep-21 Night PU-3015 1,696.0 1,696.0 - Standby - PIT 11 - - -
25-Sep-21 Night PU-3014 27,240.4 27,240.4 - Standby - ROM TEMPORARY - - -
25-Sep-21 Night LP-2165 13,638.0 13,649.0 11.00 Unit Rental 4671 NURUDIN - KCP - - -
25-Sep-21 Night LP-2166 13,165.0 13,177.0 12.00 Unit Rental 4671 NURUDIN - KCP - - -
25-Sep-21 Night LP-2167 14,139.0 14,151.0 12.00 Unit Rental 4671 NURUDIN - KCP - - -
25-Sep-21 Night LP-2168 12,929.0 12,940.0 11.00 Unit Rental 4671 NURUDIN - KCP - - -
25-Sep-21 Night LP-2169 12,663.0 12,663.0 - Standby 4671 NURUDIN - KCP - - -
25-Sep-21 Night TS-4007 - - - Standby - KCP - - -
25-Sep-21 Night TS-4017 16,284.0 16,289.0 5.00 Unit Rental 15473 ISMAIL SAIDI - KCP - - -
25-Sep-21 Night TF-4013 20,528.0 20,529.0 1.00 Unit Rental 15745 SURYANATA - KCP - - -
25-Sep-21 Night TF-4014 34,550.0 34,550.0 - Standby - KCP - - -
26-Sep-21 Day EX-2037 22,276.2 22,280.7 4.50 Side casting - WORKSHOP - - -
26-Sep-21 Day EX-2058 17,710.6 17,713.6 3.00 Side casting 15617 ZAENAL - PIT 5 EXT - 1,726 -
26-Sep-21 Day EX-2058 17,713.6 17,715.6 2.00 sloping 15617 ZAENAL - PIT 5 EXT - 1,726 -
26-Sep-21 Day EX-2058 17,715.6 17,720.9 5.30 Drainage 15617 ZAENAL - PIT 5 EXT - 1,726 -
26-Sep-21 Day EX-4006 35,332.0 35,332.0 - Scheduled - PIT 5 EXT - 1,327 -
26-Sep-21 Day EX-5014 38,814.0 38,819.0 5.00 Unit Rental 15345 SUTONO - KCP - - -
26-Sep-21 Day EX-5022 11,501.0 11,510.0 9.00 Loading Waste 9590F SIRATAL RAYYAN - OB Outpit PIT 5 EXT - 1,285 -
26-Sep-21 Day EX-5022 11,510.0 11,511.0 1.00 Loading Solid Mud 9590F SIRATAL RAYYAN - Solid Mud Outpit PIT 5 EXT - 1,285 -
26-Sep-21 Day EX-5037 19,129.0 19,131.0 2.00 Loading Waste 15486 SUGENG PRAYETNO - OB Outpit PIT 5 EXT - 1,354 -
26-Sep-21 Day EX-5037 19,131.0 19,133.0 2.00 Loading Solid Mud 15486 SUGENG PRAYETNO - Solid Mud Outpit PIT 5 EXT - 1,354 -
26-Sep-21 Day EX-6014 57,828.0 57,829.0 1.00 Loading Solid Mud 8952 DIDI SETIAWAN - Solid Mud Outpit PIT 5 EXT - - -
26-Sep-21 Day EX-6014 57,829.0 57,834.0 5.00 Loading Waste 8952 DIDI SETIAWAN - OB Outpit PIT 5 EXT - - -
26-Sep-21 Day EX-6016 44,376.0 44,379.0 3.00 Loading Waste 9136 AHMAD YANI - OB Outpit PIT 5 EXT - - -
26-Sep-21 Day EX-6016 44,379.0 44,380.0 1.00 Loading Solid Mud 9136 AHMAD YANI - Solid Mud Outpit PIT 5 EXT - - -
26-Sep-21 Day EX-6022 18,723.9 18,725.4 1.50 Loading Waste 9864 UJANG FERNANDES GUCIANO - OB Outpit PIT 5 EXT - 654 -
26-Sep-21 Day EX-6022 18,725.4 18,729.4 4.00 Loading Waste 9864 UJANG FERNANDES GUCIANO - OB Outpit PIT 5 EXT - 654 -
26-Sep-21 Day TR-3080 42,873.0 42,877.7 4.70 Hauling OB 10881 BURHANUDDIN 4 2 2 4 12 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 504 - 42 -
26-Sep-21 Day TR-3174 41,575.2 41,575.2 - Unscheduled - WORKSHOP - - -
26-Sep-21 Day TR-3175 38,988.5 38,993.7 5.20 Hauling OB 1330 SUTRISNO 1 2 4 3 2 2 3 17 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 714 - 42 -
26-Sep-21 Day TR-3195 24,843.2 24,848.5 5.30 Hauling OB 15229 ARDIANSYAH 1 3 3 3 3 2 3 18 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 756 - 42 -
26-Sep-21 Day TR-3202 26,994.6 26,994.6 - Scheduled - WORKSHOP - - -
26-Sep-21 Day TR-3203 27,104.8 27,109.7 4.90 Hauling OB 8892 BAGUS PURWONO 1 3 4 3 3 3 17 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 714 - 42 -
26-Sep-21 Day TR-3203 27,109.7 27,111.0 1.30 Hauling Solid Mud 8892 BAGUS PURWONO 1 3 4 Solid Mud Outpit EX-6022 PIT 5 EXT IPD 10 34 134 - 34 -
26-Sep-21 Day TR-3204 26,421.6 26,425.0 3.40 Hauling OB 1303 EFENDI 4 2 3 3 12 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 504 - 42 -
26-Sep-21 Day TR-3204 26,425.0 26,426.8 1.80 Hauling Solid Mud 1303 EFENDI 1 4 1 6 Solid Mud Outpit EX-6022 PIT 5 EXT IPD 10 34 202 - 34 -
26-Sep-21 Day TR-3205 25,980.8 25,986.1 5.30 Hauling OB 10695 SUPIYANDI 1 3 4 3 4 2 2 3 22 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 924 - 42 -
26-Sep-21 Day TR-3206 24,939.9 24,945.8 5.90 Hauling OB 10969 JOKO PRIONO 1 3 3 4 2 1 2 4 20 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 840 - 42 -
26-Sep-21 Day TR-3220 26,103.9 26,108.6 4.70 Hauling OB 8965 HADI SUTIKNO 4 5 4 2 2 3 20 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 840 - 42 -
26-Sep-21 Day TR-1024 31,433.6 31,435.5 1.90 Hauling OB 15636 AKHMAD NOOR 5 4 9 OB Outpit EX-5022 PIT 5 EXT IPD 10 24 216 - 24 -
26-Sep-21 Day TR-1024 31,435.5 31,437.3 1.80 Hauling Solid Mud 15636 AKHMAD NOOR 3 4 7 Solid Mud Outpit EX-5037 PIT 5 EXT IPD 10 19 134 - 19 -
26-Sep-21 Day TR-1025 47,340.3 47,341.1 0.80 Hauling OB 15469 BASUNI 2 2 OB Outpit EX-6016 PIT 5 EXT IPD 10 24 48 - 24 -
26-Sep-21 Day TR-1025 47,341.1 47,342.4 1.30 Hauling Solid Mud 15469 BASUNI 2 2 Solid Mud Outpit EX-6016 PIT 5 EXT IPD 10 19 38 - 19 -
26-Sep-21 Day TR-1031 49,541.3 49,543.7 2.38 Hauling OB 15485 ROBY TM 1 4 3 2 10 OB Outpit EX-6016 PIT 5 EXT IPD 11 24 240 - 24 -
26-Sep-21 Day TR-1031 49,543.7 49,545.8 2.15 Hauling OB 15485 ROBY TM 3 2 4 9 OB Outpit EX-5022 PIT 5 EXT IPD 10 24 216 - 1 24 24
26-Sep-21 Day TR-1031 49,543.7 49,544.4 0.72 Hauling OB 15485 ROBY TM 2 1 3 OB Outpit EX-5037 PIT 5 EXT IPD 10 24 72 - 24 -
26-Sep-21 Day TR-1031 49,544.4 49,545.4 0.95 Hauling Solid Mud 15485 ROBY TM 4 4 Solid Mud Outpit EX-5037 PIT 5 EXT IPD 10 19 77 - 19 -
26-Sep-21 Day TR-1032 51,374.2 51,376.0 1.80 Hauling OB 15468 PADLIANSYAH 2 2 1 3 8 OB Outpit EX-6016 PIT 5 EXT IPD 11 24 192 - 24 -
26-Sep-21 Day TR-1032 51,376.0 51,377.5 1.50 Hauling OB 15468 PADLIANSYAH 2 3 1 1 7 OB Outpit EX-6016 PIT 5 EXT IPD 10 24 168 - 1 24 24
26-Sep-21 Day TR-1032 51,377.5 51,380.2 2.70 Hauling OB 15468 PADLIANSYAH 1 5 3 3 12 OB Outpit EX-5022 PIT 5 EXT IPD 10 24 288 - 24 -
26-Sep-21 Day TR-1032 51,380.2 51,382.3 2.10 Hauling Solid Mud 15468 PADLIANSYAH 4 3 2 9 Solid Mud Outpit EX-5037 PIT 5 EXT IPD 10 19 173 - 19 -
26-Sep-21 Day TR-1033 51,737.0 51,737.0 - Unscheduled - PIT 5 EXT - - -
26-Sep-21 Day TR-1034 49,532.4 49,534.8 2.40 Hauling OB 15420 M ABD MADI 3 4 4 11 OB Outpit EX-6016 PIT 5 EXT IPD 11 24 264 - 24 -
26-Sep-21 Day TR-1034 49,534.8 49,539.5 4.70 Hauling Solid Mud 15420 M ABD MADI 5 1 1 4 3 2 16 Solid Mud Outpit EX-5037 PIT 5 EXT IPD 10 19 307 - 19 -
26-Sep-21 Day TR-1036 50,843.9 50,845.6 1.69 Hauling OB 15419 HUSEN 3 4 7 OB Outpit EX-6016 PIT 5 EXT IPD 11 24 168 - 24 -
26-Sep-21 Day TR-1036 50,845.6 50,847.5 1.93 Hauling Solid Mud 15419 HUSEN 3 5 8 Solid Mud Outpit EX-6016 PIT 5 EXT IPD 11 19 154 - 19 -
26-Sep-21 Day TR-1036 50,847.5 50,849.0 1.44 Hauling OB 15419 HUSEN 3 3 6 OB Outpit EX-5022 PIT 5 EXT IPD 10 24 144 - 24 -
26-Sep-21 Day TR-1036 50,849.0 50,850.4 1.44 Hauling Solid Mud 15419 HUSEN 2 4 6 Solid Mud Outpit EX-5022 PIT 5 EXT IPD 10 19 115 - 19 -
26-Sep-21 Day TR-1048 52,201.7 52,204.9 3.20 Hauling OB 16047 NAULI 2 5 3 2 12 OB Outpit EX-5037 PIT 5 EXT IPD 10 24 288 - 24 -
26-Sep-21 Day TR-1048 52,204.9 52,206.2 1.30 Hauling Solid Mud 16047 NAULI 2 2 4 Solid Mud Outpit EX-5037 PIT 5 EXT IPD 10 19 77 - 19 -
26-Sep-21 Day TR-1049 46,274.9 46,282.3 7.40 Hauling OB 15376 EKO FAJAR S 3 3 3 9 OB Outpit EX-6016 PIT 5 EXT IPD 11 24 216 - 24 -
26-Sep-21 Day TR-1049 46,282.3 46,282.3 - Hauling OB 15376 EKO FAJAR S 5 5 OB Outpit EX-6014 PIT 5 EXT IPD 10 24 120 - 24 -
26-Sep-21 Day TR-1049 46,282.3 46,282.3 - Hauling OB 15376 EKO FAJAR S 1 2 5 3 4 15 OB Outpit EX-5022 PIT 5 EXT IPD 10 24 360 - 24 -
26-Sep-21 Day TR-1049 46,282.3 46,282.3 - Hauling Solid Mud 15376 EKO FAJAR S 4 4 Solid Mud Outpit EX-5037 PIT 5 EXT IPD 10 19 77 - 19 -
26-Sep-21 Day TR-1050 45,945.6 45,948.3 2.70 Hauling OB 15576 JOKO SANTOSO 2 4 1 7 OB Outpit EX-6016 PIT 5 EXT IPD 11 24 168 - 24 -
26-Sep-21 Day TR-1050 45,948.3 45,951.8 3.50 Hauling Solid Mud 15576 JOKO SANTOSO 1 1 4 3 2 4 15 Solid Mud Outpit EX-5022 PIT 5 EXT IPD 10 19 288 - 19 -
26-Sep-21 Day TA-7009 27,897.0 27,904.1 7.10 Hauling OB 15817 YUSANDI 3 4 6 6 6 4 3 4 36 OB Outpit EX-6016 PIT 5 EXT IPD 10 14 504 - 14 -
26-Sep-21 Day TA-7009 27,904.1 27,904.5 0.40 Hauling Solid Mud 15817 YUSANDI 3 3 Solid Mud Outpit EX-5022 PIT 5 EXT IPD 10 11 34 - 11 -
26-Sep-21 Day TA-7010 25,360.4 25,367.3 6.90 Hauling OB 15819 AHNIANSYAH 3 5 5 5 2 4 3 3 30 OB Outpit EX-5022 PIT 5 EXT IPD 10 14 420 - 14 -
26-Sep-21 Day TA-7010 25,367.3 25,367.9 0.60 Hauling Solid Mud 15819 AHNIANSYAH 4 4 Solid Mud Outpit EX-5022 PIT 5 EXT IPD 10 11 45 - 11 -
26-Sep-21 Day TA-7022 30,877.7 30,877.7 - Unscheduled - WORKSHOP - - -
26-Sep-21 Day TA-7029 28,645.5 28,645.5 - Unscheduled - WORKSHOP - - -
26-Sep-21 Day TA-7030 28,307.0 28,312.4 5.40 Hauling OB 15863 HENDRA M 4 6 7 5 4 26 OB Outpit EX-5022 PIT 5 EXT IPD 10 14 364 - 3 14 42
26-Sep-21 Day TA-7030 28,312.4 28,313.0 0.60 Hauling Solid Mud 15863 HENDRA M 3 3 Solid Mud Outpit EX-5022 PIT 5 EXT IPD 10 11 34 - 11 -
26-Sep-21 Day BD-4005 13,770.7 13,770.7 - Scheduled - WORKSHOP - - -
k 26-Sep-21 Day BD-5035 3,606.6 3,617.3 10.70 Front maintenance 15747 MUSTAQIM D6 - PIT 5 EXT - - -
26-Sep-21 Day BD-6025 2,761.9 2,761.9 - Scheduled - KCP - - -
26-Sep-21 Day BD-6026 30,198.7 30,198.7 - Standby - WORKSHOP - - -
26-Sep-21 Day BD-6028 4,279.6 4,289.0 9.40 Unit Rental 14750 MUSTAKIM - KCP - - -
26-Sep-21 Day BD-6036 34,341.2 34,351.1 9.90 Unit Rental 15569 SUJIONO - KCP - - -
26-Sep-21 Day BD-6038 34,120.2 34,130.2 10.00 Unit Rental 14708 ADEFI P - KCP - - -
26-Sep-21 Day BD-6069 10,416.0 10,416.5 0.52 Front maintenance - PIT 5 EXT - - -
26-Sep-21 Day BD-7013 40,153.6 40,163.8 10.20 Front maintenance 11676 SUDARSONO - PIT 5 EXT - - -
26-Sep-21 Day BD-7026 26,752.2 26,756.7 4.50 Disposal maintenance 9339F ANTON WIBOWO - IPD 11 - - -
26-Sep-21 Day BD-7034 10,244.8 10,256.0 11.20 Disposal maintenance 9492 MAHFUDI - IPD 10 - - -
26-Sep-21 Day GR-2012 22,332.7 22,342.4 9.70 Road Maintenance Support 12344 M FAJRI - PIT 5 EXT - - -
26-Sep-21 Day GR-3007 39,356.9 39,356.9 - Unscheduled - WORKSHOP - - -
26-Sep-21 Day GR-3008 47,081.9 47,090.5 8.60 Road Maintenance Support 8925 AGUS SUNARWAN - PIT 5 EXT - - -
26-Sep-21 Day TW-3001 8,600.0 8,603.0 3.00 Road Maintenance Support 15106 AHMAD NURANI - PIT 5 EXT - - -
26-Sep-21 Day TW-4001 18,762.0 18,762.00 - Unscheduled - WORKSHOP - - -
26-Sep-21 Day PU-4002 19,080.0 19,080.00 - Unscheduled - ROM TEMPORARY - - -
26-Sep-21 Day PU-2026 6,201.6 6,201.6 - Dewatering 10847 FAUZI AHMAD - PIT 11 - - -
26-Sep-21 Day PU-3026 12,374.1 12,374.1 - Standby - PIT 11 - - -
26-Sep-21 Day PU-3015 1,696.0 1,696.0 - Standby - PIT 11 - - -
26-Sep-21 Day PU-3014 27,240.4 27,240.4 - Standby - ROM TEMPORARY - - -
26-Sep-21 Day LP-2165 13,649.0 13,649.0 - Unit Rental 4671 NURUDIN - KCP - - -
26-Sep-21 Day LP-2166 13,177.0 13,177.0 - Unit Rental 4671 NURUDIN - KCP - - -
26-Sep-21 Day LP-2167 14,151.0 14,151.0 - Unit Rental 4671 NURUDIN - KCP - - -
26-Sep-21 Day LP-2168 12,940.0 12,940.0 - Unit Rental 4671 NURUDIN - KCP - - -
26-Sep-21 Day LP-2169 12,663.0 12,663.0 - Unit Rental 4671 NURUDIN - KCP - - -
26-Sep-21 Day TS-4007 - - - Standby - WORKSHOP - - -
26-Sep-21 Day TS-4017 16,289.0 16,297.0 8.00 Unit Rental 15472 RIZKA M - KCP - - -
26-Sep-21 Day TF-4013 20,529.0 20,536.0 7.00 Unit Rental 15746 SYARIFUDDI - KCP - - -
26-Sep-21 Day TF-4014 34,550.0 34,550.0 - Standby - KCP - - -
26-Sep-21 Night EX-2037 22,280.7 22,280.7 - Standby - WORKSHOP - - -
26-Sep-21 Night EX-2058 17,720.9 17,730.4 9.50 Side casting 15503 ASHARI SETIYO NUGROHO - PIT 5 EXT - 1,726 -
26-Sep-21 Night EX-4006 35,332.0 35,333.0 1.00 Moving - pindah lokasi kerja 11330 EKO PURWANTO - IPD 10 - 1,327 -
26-Sep-21 Night EX-4006 35,333.0 35,341.0 8.00 Loading Waste 11330 EKO PURWANTO - IPD 10 - 1,327 -
26-Sep-21 Night EX-5014 38,819.0 38,829.0 10.00 Unit Rental 15616 JOKO SUDIRO - KCP - - -
26-Sep-21 Night EX-5022 11,511.0 11,522.0 11.00 Loading Waste 12534 PUJIYANTO - OB Outpit PIT 5 EXT - 1,285 -
26-Sep-21 Night EX-5037 19,133.0 19,135.0 2.00 Loading Waste 15568 FUAD EFENDI - OB Outpit PIT 5 EXT - 1,354 -
26-Sep-21 Night EX-6014 57,834.0 57,845.0 11.00 Loading Waste 10917 SETA VERDY KARYA - OB Outpit PIT 5 EXT - - -
26-Sep-21 Night EX-6016 44,380.0 44,382.7 2.65 Unscheduled 15568 FUAD EFENDI - OB Outpit PIT 5 EXT - - -
26-Sep-21 Night EX-6016 44,382.7 44,383.0 0.35 Loading Waste 15568 FUAD EFENDI - OB Outpit PIT 5 EXT - - -
26-Sep-21 Night EX-6022 18,729.4 18,739.7 10.30 Loading Waste 11146 PURWANTO - OB Outpit PIT 5 EXT - 654 -
26-Sep-21 Night TR-3080 42,877.7 42,887.6 9.90 Hauling OB 9214 MUSTOFA ADI PRAYITNO 2 4 2 4 2 4 3 4 4 4 2 35 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 1,470 - 42 -
26-Sep-21 Night TR-3174 41,575.2 41,575.2 - Unscheduled - - - -
26-Sep-21 Night TR-3175 38,993.7 39,001.6 7.90 Hauling OB 11619 DWI WARDOYO 1 3 3 3 4 4 4 3 2 27 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 1,134 - 42 -
26-Sep-21 Night TR-3195 24,848.5 24,854.4 5.89 Hauling OB 3669 SUYANTO 1 2 4 3 4 4 4 1 23 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 966 - 42 -
26-Sep-21 Night TR-3195 24,854.4 24,858.3 3.91 Hauling OB 3669 SUYANTO 1 4 3 3 1 12 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 504 - 42 -
26-Sep-21 Night TR-3202 26,994.6 26,994.6 - Scheduled - WORKSHOP - - -
26-Sep-21 Night TR-3203 27,111.0 27,120.9 9.90 Hauling OB 8920 VERRY EKO SETIAWAN 2 4 3 3 3 4 3 4 4 4 1 35 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 1,470 - 42 -
26-Sep-21 Night TR-3204 26,426.8 26,436.9 10.10 Hauling OB 9043 SAMSUL ARIF 2 4 3 3 4 3 4 3 4 4 2 36 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 1,512 - 42 -
26-Sep-21 Night TR-3205 25,986.1 25,996.2 10.10 Hauling OB 7170F TRI PRASETIYO 3 4 3 3 3 3 4 4 4 3 2 36 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 1,512 - 42 -
26-Sep-21 Night TR-3206 24,945.8 24,955.0 9.20 Hauling OB 15350 HERMAN 2 3 3 3 3 3 4 4 4 3 2 34 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 1,428 - 42 -
26-Sep-21 Night TR-3220 26,108.6 26,118.3 9.70 Hauling OB 10968 SUKIRNO 3 3 3 3 3 4 4 4 1 28 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 1,176 - 42 -
26-Sep-21 Night TR-3220 26,118.3 26,119.0 0.70 Hauling OB 10968 SUKIRNO 4 4 OB Outpit EX-6016 PIT 5 EXT IPD 11 42 168 - 42 -
26-Sep-21 Night TR-1024 31,437.3 31,440.7 3.40 Hauling OB 16025 IMTIKAN 2 4 2 4 4 16 OB Outpit EX-6014 PIT 5 EXT IPD 10 24 384 - 24 -
26-Sep-21 Night TR-1025 47,342.4 47,346.7 4.30 Hauling OB 15955 RIZKY IHWAN 3 4 4 3 2 16 OB Outpit EX-6014 PIT 5 EXT IPD 10 24 384 - 24 -
26-Sep-21 Night TR-1031 49,545.8 49,555.2 9.40 Hauling OB 15466 SUPRIYANTO 3 5 5 5 3 5 3 5 1 35 OB Outpit EX-5022 PIT 5 EXT IPD 11 24 840 - 24 -
26-Sep-21 Night TR-1031 49,555.2 49,556.7 1.47 Hauling OB 15466 SUPRIYANTO 2 3 5 OB Outpit EX-5037 PIT 5 EXT IPD 10 24 120 - 24 -
26-Sep-21 Night TR-1032 51,382.3 51,392.1 9.80 Hauling OB 15377 RIZALI RAHMAN 3 4 3 5 5 5 4 6 5 4 3 47 OB Outpit EX-5022 PIT 5 EXT IPD 11 24 1,128 - 24 -
26-Sep-21 Night TR-1033 51,737.0 51,737.0 - Unscheduled - IPD 11 - - -
26-Sep-21 Night TR-1034 49,539.5 49,549.3 9.80 Hauling OB 15395 ANDRI SUSANTO 2 4 3 3 4 3 4 3 4 4 3 37 OB Outpit EX-6014 PIT 5 EXT IPD 10 24 888 - 24 -
26-Sep-21 Night TR-1036 50,850.4 50,860.2 9.80 Hauling OB 15346 MUSA 3 3 4 4 5 5 4 4 5 5 3 45 OB Outpit EX-5022 PIT 5 EXT IPD 11 24 1,080 - 24 -
26-Sep-21 Night TR-1048 52,206.2 52,208.0 1.80 Hauling OB 15471 MULYADI 1 3 4 OB Outpit EX-5022 PIT 5 EXT IPD 11 24 96 - 24 -
26-Sep-21 Night TR-1049 46,282.3 46,291.3 9.00 Hauling OB 15744 MARYANTO 2 3 4 4 5 5 4 5 4 1 2 39 OB Outpit EX-5022 PIT 5 EXT IPD 11 24 936 - 24 -
26-Sep-21 Night TR-1050 45,951.8 45,953.8 2.00 Hauling OB 15467 HUSNI 1 4 2 7 OB Outpit EX-6016 PIT 5 EXT IPD 11 24 168 - 24 -
26-Sep-21 Night TR-1050 45,953.8 45,956.1 2.30 Hauling OB 15467 HUSNI 2 2 3 7 OB Outpit EX-5037 PIT 5 EXT IPD 10 24 168 - 24 -
26-Sep-21 Night TR-1050 45,956.1 45,961.3 5.20 Hauling OB 15467 HUSNI 5 5 4 4 4 3 25 OB Outpit EX-4006 PIT 5 EXT IPD 11 24 600 - 1 24 24
26-Sep-21 Night TA-7009 27,904.5 27,913.7 9.20 Hauling OB 15862 RUDY AMRIYADI 2 2 5 3 12 OB Outpit EX-5022 PIT 5 EXT IPD 11 14 168 - 14 -
26-Sep-21 Night TA-7009 27,913.7 27,913.7 - Hauling OB 15862 RUDY AMRIYADI 1 5 5 4 4 5 5 29 OB Outpit EX-4006 PIT 5 EXT IPD 11 14 406 - 14 -
26-Sep-21 Night TA-7010 25,367.9 25,372.5 4.60 Hauling OB 15861 AGUSTIAN 6 5 4 4 19 OB Outpit EX-4006 PIT 5 EXT IPD 11 14 266 - 14 -
26-Sep-21 Night TA-7010 25,372.5 25,376.8 4.30 Hauling OB 15653 M. ILIAS 4 5 4 4 2 19 OB Outpit EX-5022 PIT 5 EXT IPD 11 14 266 - 14 -
26-Sep-21 Night TA-7022 30,877.7 30,877.7 - Unscheduled - WORKSHOP - - -
26-Sep-21 Night TA-7029 28,645.5 28,645.5 - Unscheduled - WORKSHOP - - -
26-Sep-21 Night TA-7030 28,313.0 28,313.9 0.90 Hauling OB 15653 M. ILIAS 2 2 OB Outpit EX-5037 PIT 5 EXT IPD 10 14 28 - 14 -
26-Sep-21 Night BD-4005 13,770.7 13,770.7 - Scheduled - WORKSHOP - - -
26-Sep-21 Night BD-5035 3,617.3 3,626.9 9.60 Front maintenance 14963 MAULANA ISHAK - PIT 5 EXT - - -
26-Sep-21 Night BD-6025 2,761.9 2,761.9 - Scheduled - KCP - - -
26-Sep-21 Night BD-6026 30,198.7 30,198.7 - Standby - WORKSHOP - - -
26-Sep-21 Night BD-6028 4,289.8 4,299.1 9.30 Unit Rental 11169 ANNAS - KCP - - -
26-Sep-21 Night BD-6036 34,351.1 34,359.1 8.00 Unit Rental 14710 AGUS S - KCP - - -
26-Sep-21 Night BD-6038 34,130.2 34,137.5 7.30 Unit Rental 15570 HENDRY S - KCP - - -
26-Sep-21 Night BD-6069 10,416.5 10,416.5 - Unscheduled - PIT 5 EXT - - -
26-Sep-21 Night BD-7013 40,163.8 40,174.8 11.00 Front maintenance 10013 ADI SUSANTO - PIT 5 EXT - - -
26-Sep-21 Night BD-7026 26,756.7 26,760.0 3.30 Disposal maintenance 9978 KARSIANTO - IPD 10 - - -
26-Sep-21 Night BD-7034 10,256.0 10,267.7 11.70 Disposal maintenance 14709 A. FATHONI - IPD 11 - - -
26-Sep-21 Night GR-2012 22,342.4 22,350.7 8.30 Road Maintenance Support 9426 ADE SUPIANA - PIT 5 EXT - - -
26-Sep-21 Night GR-3007 39,356.9 39,356.9 - Unscheduled - WORKSHOP - - -
26-Sep-21 Night GR-3008 47,090.5 47,095.6 5.10 Road Maintenance Support 15571 YOHANIS L - PIT 5 EXT - - -
26-Sep-21 Night TW-3001 8,603.0 8,604.0 1.00 Road Maintenance Support - PIT 5 EXT - - -
26-Sep-21 Night TW-4001 18,762.0 18,762.00 - Unscheduled - WORKSHOP - - -
26-Sep-21 Night PU-4002 19,080.0 19,080.0 - Unscheduled - ROM TEMPORARY - - -
26-Sep-21 Night PU-2026 6,201.6 6,201.6 - Standby - PIT 11 - - -
26-Sep-21 Night PU-3026 12,374.1 12,374.1 - Standby - PIT 11 - - -
26-Sep-21 Night PU-3015 1,696.0 1,696.0 - Standby - PIT 11 - - -
26-Sep-21 Night PU-3014 27,240.4 27,240.4 - Standby - ROM TEMPORARY - - -
26-Sep-21 Night LP-2165 13,649.0 13,660.0 11.00 Unit Rental 4671 NURUDIN - KCP - - -
26-Sep-21 Night LP-2166 13,177.0 13,188.0 11.00 Unit Rental 4671 NURUDIN - KCP - - -
26-Sep-21 Night LP-2167 14,151.0 14,161.0 10.00 Unit Rental 4671 NURUDIN - KCP - - -
26-Sep-21 Night LP-2168 12,940.0 12,952.0 12.00 Unit Rental 4671 NURUDIN - KCP - - -
26-Sep-21 Night LP-2169 12,663.0 12,673.0 10.00 Unit Rental 4671 NURUDIN - KCP - - -
26-Sep-21 Night TS-4007 - - - Standby - WORKSHOP - - -
26-Sep-21 Night TS-4017 16,297.0 16,307.0 10.00 Unit Rental 15473 ISMAIL SAIDI - KCP - - -
26-Sep-21 Night TF-4013 20,536.0 20,542.0 6.00 Unit Rental 15310 ALDI ALFI SAPUTRA - KCP - - -
26-Sep-21 Night TF-4014 34,550.0 34,550.0 - Standby - KCP - - -
27-Sep-21 Day EX-2037 22,280.7 22,289.0 8.30 Side casting - WORKSHOP - - -
27-Sep-21 Day EX-2058 17,730.4 17,740.4 10.00 Side casting 15617 ZAENAL - PIT 5 EXT - 1,746 -
27-Sep-21 Day EX-4006 35,341.0 35,344.0 3.00 Loading Waste 15617 ZAENAL - OB Outpit PIT 5 EXT - 1,576 -
27-Sep-21 Day EX-5014 38,829.0 38,838.0 9.00 Unit Rental 15375 A JEFRI M - KCP - - -
27-Sep-21 Day EX-5022 11,522.0 11,532.0 10.00 Loading Waste 9590F SIRATAL RAYYAN - OB Outpit PIT 5 EXT - 1,595 -
27-Sep-21 Day EX-5037 19,135.0 19,141.0 6.00 Loading Waste - OB Outpit PIT 5 EXT - 1,554 -
27-Sep-21 Day EX-6014 57,845.0 57,855.0 10.00 Loading Waste 9136 AHMAD YANI - OB Outpit PIT 5 EXT - - -
27-Sep-21 Day EX-6016 44,383.0 44,384.0 1.00 Loading Waste 15567 ARIF WAHYUDI - OB Outpit PIT 5 EXT - 1,789 -
27-Sep-21 Day EX-6022 18,739.7 18,750.5 10.80 Loading Waste 9864 UJANG FERNANDES GUCIANO - OB Outpit PIT 5 EXT - 723 -
27-Sep-21 Day TR-3080 42,887.6 42,892.7 5.07 Hauling OB 10881 BURHANUDDIN 2 3 4 3 4 3 19 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 798 - 42 -
27-Sep-21 Day TR-3080 42,892.7 42,898.0 5.33 Hauling OB 10881 BURHANUDDIN 1 4 4 3 3 4 1 20 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 840 - 42 -
27-Sep-21 Day TR-3174 41,575.2 41,575.2 - Unscheduled - WORKSHOP - - -
27-Sep-21 Day TR-3175 39,001.6 39,011.7 10.10 Hauling OB 10882 SABIRIN 3 4 3 3 4 4 4 4 4 3 3 39 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 1,638 - 42 -
27-Sep-21 Day TR-3195 24,858.3 24,868.1 9.80 Hauling OB 15229 ARDIANSYAH 3 4 3 3 4 3 4 2 4 3 3 36 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 1,512 - 42 -
27-Sep-21 Day TR-3202 26,994.6 26,994.6 - Unscheduled - WORKSHOP - - -
27-Sep-21 Day TR-3203 27,120.9 27,127.8 6.89 Hauling OB 8892 BAGUS PURWONO 4 3 3 4 4 4 3 25 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 1,050 - 42 -
27-Sep-21 Day TR-3203 27,127.8 27,130.0 2.21 Hauling OB 8892 BAGUS PURWONO 2 2 4 8 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 336 - 42 -
27-Sep-21 Day TR-3204 26,436.9 26,437.5 0.57 Hauling OB 8958 MUKHROMIN 2 2 OB Outpit EX-6016 PIT 5 EXT IPD 11 42 84 - 42 -
27-Sep-21 Day TR-3204 26,437.5 26,446.9 9.43 Hauling OB 8958 MUKHROMIN 4 4 2 2 4 4 4 3 2 4 33 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 1,386 - 42 -
27-Sep-21 Day TR-3205 25,996.2 26,006.8 10.60 Hauling OB 10695 SUPIYANDI 3 4 3 4 4 3 4 4 4 3 4 40 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 1,680 - 42 -
27-Sep-21 Day TR-3206 24,955.0 24,965.5 10.50 Hauling OB 10969 JOKO PRIONO 2 4 3 4 4 4 3 4 4 3 4 39 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 1,638 - 42 -
27-Sep-21 Day TR-3206 24,965.5 24,966.0 0.50 Hauling OB 10969 JOKO PRIONO 2 2 OB Outpit EX-6016 PIT 5 EXT IPD 11 42 84 - 42 -
27-Sep-21 Day TR-3220 26,119.0 26,129.6 10.60 Hauling OB 15230 MARGONO 4 3 4 4 4 3 4 4 3 4 3 40 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 1,680 - 42 -
27-Sep-21 Day TR-1024 31,440.7 31,444.0 3.30 Hauling OB 16024 QORI 3 4 2 4 13 OB Outpit EX-6016 PIT 5 EXT IPD 11 24 312 - 24 -
27-Sep-21 Day TR-1025 47,346.7 47,348.3 1.60 Hauling OB 15420 M ABD MADI 2 4 2 8 OB Outpit EX-6014 PIT 5 EXT IPD 10 24 192 - 24 -
27-Sep-21 Day TR-1025 47,348.3 47,353.1 4.80 Hauling OB 15420 M ABD MADI 2 5 2 2 4 5 20 OB Outpit EX-5037 PIT 5 EXT IPD 10 24 480 - 24 -
27-Sep-21 Day TR-1031 49,556.7 49,566.7 10.00 Hauling OB 15485 ROBY TM 3 5 5 4 4 3 4 4 2 3 2 39 OB Outpit EX-5022 PIT 5 EXT IPD 11 24 936 - 24 -
27-Sep-21 Day TR-1032 51,392.1 51,403.0 10.90 Hauling OB 15468 PADLIANSYAH 5 5 4 4 4 4 4 4 4 2 3 43 OB Outpit EX-5022 PIT 5 EXT IPD 11 24 1,032 - 24 -
27-Sep-21 Day TR-1033 51,737.0 51,737.0 - Unscheduled - IPD 11 - - -
27-Sep-21 Day TR-1034 49,549.3 49,549.8 0.54 Hauling OB 15419 HUSEN 2 2 OB Outpit EX-6016 PIT 5 EXT IPD 11 24 48 - 24 -
27-Sep-21 Day TR-1034 49,549.8 49,559.3 9.46 Hauling OB 15419 HUSEN 1 3 4 3 4 4 5 3 4 2 4 37 OB Outpit EX-6014 PIT 5 EXT IPD 10 24 888 - 24 -
27-Sep-21 Day TR-1036 50,860.2 50,870.6 10.40 Hauling OB 15398 SIGIT SUSANTO 4 5 4 4 4 3 4 3 4 2 3 40 OB Outpit EX-5022 PIT 5 EXT IPD 11 24 960 - 24 -
27-Sep-21 Day TR-1048 52,208.0 52,217.8 9.80 Hauling OB 15576 JOKO SANTOSO 2 4 4 3 4 3 4 4 2 3 33 OB Outpit EX-5022 PIT 5 EXT IPD 11 24 792 - 24 -
27-Sep-21 Day TR-1049 46,291.3 46,300.7 9.40 Hauling OB 15376 EKO FAJAR S 4 4 4 4 4 4 4 4 2 3 37 OB Outpit EX-6014 PIT 5 EXT IPD 10 24 888 - 24 -
27-Sep-21 Day TR-1049 46,300.7 46,301.2 0.50 Hauling OB 15376 EKO FAJAR S 3 3 OB Outpit EX-6016 PIT 5 EXT IPD 11 24 72 - 24 -
27-Sep-21 Day TR-1049 46,301.2 46,301.5 0.30 Hauling OB 15376 EKO FAJAR S 1 1 OB Outpit EX-5022 PIT 5 EXT IPD 11 24 24 - 24 -
27-Sep-21 Day TR-1050 45,961.3 45,971.8 10.50 Hauling OB 16047 NAULI 3 4 5 4 3 4 4 4 3 4 2 40 OB Outpit EX-5022 PIT 5 EXT IPD 11 24 960 - 24 -
27-Sep-21 Day TA-7009 27,913.7 27,920.2 6.52 Hauling OB 16026 BAHRUNI 1 3 5 4 4 4 4 25 OB Outpit EX-5037 PIT 5 EXT IPD 10 14 350 - 14 -
27-Sep-21 Day TA-7009 27,920.2 27,923.1 2.88 Hauling OB 16026 BAHRUNI 4 5 5 14 OB Outpit EX-4006 PIT 5 EXT IPD 11 14 196 - 14 -
27-Sep-21 Day TA-7010 25,376.8 25,383.6 6.80 Hauling OB 15863 HENDRA M 1 1 4 2 3 1 5 17 OB Outpit EX-5037 PIT 5 EXT IPD 10 14 238 - 14 -
27-Sep-21 Day TA-7010 25,383.6 25,386.5 2.90 Hauling OB 15863 HENDRA M 4 5 5 14 OB Outpit EX-4006 PIT 5 EXT IPD 11 14 196 - 14 -
27-Sep-21 Day TA-7022 30,877.7 30,877.7 - Unscheduled - WORKSHOP - - -
27-Sep-21 Day TA-7029 28,645.5 28,645.5 - Unscheduled - WORKSHOP - - -
27-Sep-21 Day TA-7030 28,313.9 28,320.4 6.50 Hauling OB 15817 YUSANDI 1 1 3 2 2 3 3 15 OB Outpit EX-5037 PIT 5 EXT IPD 10 14 210 - 14 -
27-Sep-21 Day TA-7030 28,320.4 28,321.3 0.90 Hauling OB 15817 YUSANDI 4 4 OB Outpit EX-4006 PIT 5 EXT IPD 11 14 56 - 14 -
27-Sep-21 Day BD-4005 13,770.7 13,770.7 - Scheduled - WORKSHOP - - -
k 27-Sep-21 Day BD-5035 3,626.9 3,635.6 8.70 Front maintenance 15747 MUSTAQIM D6 - PIT 5 EXT - - -
27-Sep-21 Day BD-6025 2,761.9 2,761.9 - Scheduled - KCP - - -
27-Sep-21 Day BD-6026 30,198.7 30,198.7 - Standby - WORKSHOP - - -
27-Sep-21 Day BD-6028 4,299.1 4,310.1 11.00 Unit Rental 14750 MUSTAKIM - KCP - - -
27-Sep-21 Day BD-6036 34,359.1 34,370.0 10.90 Unit Rental 14964 JOKO P (Dozer) - KCP - - -
27-Sep-21 Day BD-6038 34,137.5 34,148.2 10.70 Unit Rental 15569 SUJIONO - KCP - - -
27-Sep-21 Day BD-6069 10,416.5 10,416.5 - Unscheduled - PIT 5 EXT - - -
27-Sep-21 Day BD-7013 40,174.8 40,183.3 8.51 Front maintenance - PIT 5 EXT - - -
27-Sep-21 Day BD-7026 26,760.0 26,760.0 - Unscheduled 9339F ANTON WIBOWO - WORKSHOP - - -
27-Sep-21 Day BD-7034 10,267.7 10,273.3 5.60 Disposal maintenance 9492 MAHFUDI - IPD 10 - - -
27-Sep-21 Day BD-7034 10,273.3 10,278.4 5.10 Disposal maintenance 15639 A. BUDIMAN - IPD 10 - - -
27-Sep-21 Day GR-2012 22,350.7 22,351.4 0.70 Road Maintenance Support 9103 WAWAN WIDODO - PIT 5 EXT - - -
27-Sep-21 Day GR-3007 39,356.9 39,356.9 - Unscheduled - WORKSHOP - - -
27-Sep-21 Day GR-3008 47,095.6 47,106.1 10.50 Road Maintenance Support 8925 AGUS SUNARWAN - PIT 5 EXT - - -
27-Sep-21 Day TW-3001 8,604.0 8,610.0 6.00 Road Maintenance Support 15106 AHMAD NURANI - PIT 5 EXT - - -
27-Sep-21 Day TW-4001 18,762.0 18,762.00 - Unscheduled - WORKSHOP - - -
27-Sep-21 Day PU-4002 19,080.0 19,080.00 - Scheduled - ROM TEMPORARY - - -
27-Sep-21 Day PU-2026 6,201.6 6,203.1 1.50 Dewatering - PIT 11 - - -
27-Sep-21 Day PU-3026 12,374.1 12,384.35 10.25 Dewatering 10847 FAUZI AHMAD - PIT 11 - - -
27-Sep-21 Day PU-3015 1,696.0 1,696.00 - Standby - PIT 11 - - -
27-Sep-21 Day PU-3014 27,240.4 27,240.40 - Standby - ROM TEMPORARY - - -
27-Sep-21 Day LP-2165 13,660.0 13,660.00 - Unit Rental 4671 NURUDIN - KCP - - -
27-Sep-21 Day LP-2166 13,188.0 13,188.00 - Unit Rental 4671 NURUDIN - KCP - - -
27-Sep-21 Day LP-2167 14,161.0 14,162.00 1.00 Unit Rental 4671 NURUDIN - KCP - - -
27-Sep-21 Day LP-2168 12,952.0 12,952.00 - Unit Rental 4671 NURUDIN - KCP - - -
27-Sep-21 Day LP-2169 12,673.0 12,673.00 - Unit Rental 4671 NURUDIN - KCP - - -
27-Sep-21 Day TS-4007 - - - Standby - KCP - - -
27-Sep-21 Day TS-4017 16,307.0 16,317.0 10.00 Unit Rental 15472 RIZKA M - KCP - - -
27-Sep-21 Day TF-4013 20,542.0 20,549.0 7.00 Unit Rental 15746 SYARIFUDDI - KCP - - -
27-Sep-21 Day TF-4014 34,550.0 34,550.0 - Standby - KCP - - -
27-Sep-21 Night EX-2037 22,289.0 22,289.0 - Standby - WORKSHOP - - -
27-Sep-21 Night EX-2058 17,740.4 17,748.1 7.65 Side casting 15503 ASHARI SETIYO NUGROHO - PIT 5 EXT - 1,746 -
27-Sep-21 Night EX-2058 17,748.1 17,749.8 1.75 Rehandling Coal 15503 ASHARI SETIYO NUGROHO - COAL Outpit PIT 5 EXT - - 1,746 - -
27-Sep-21 Night EX-4006 35,344.0 35,344.0 - Unscheduled - PIT 5 EXT - 1,576 -
27-Sep-21 Night EX-5014 38,838.0 38,848.0 10.00 Unit Rental 15616 JOKO SUDIRO - KCP - - -
27-Sep-21 Night EX-5022 11,532.0 11,536.0 4.00 Loading Waste 15568 FUAD EFENDI - OB Outpit PIT 5 EXT - 1,595 -
27-Sep-21 Night EX-5037 19,141.0 19,148.0 7.00 Loading Waste 12534 PUJIYANTO - OB Outpit PIT 5 EXT - 1,554 -
27-Sep-21 Night EX-6014 57,855.0 57,865.0 10.00 Loading Waste 8952 DIDI SETIAWAN - OB Outpit PIT 5 EXT - - -
27-Sep-21 Night EX-6016 44,384.0 44,387.0 3.00 Loading Waste 15486 SUGENG PRAYETNO - OB Outpit PIT 5 EXT - 1,789 -
27-Sep-21 Night EX-6022 18,750.5 18,759.5 9.00 Loading Waste 11146 PURWANTO - OB Outpit PIT 5 EXT - 723 -
27-Sep-21 Night TR-3080 42,898.0 42,906.6 8.60 Hauling OB 15349 ARDIANSYAH 2 4 3 4 4 3 3 4 4 31 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 1,302 - 42 -
27-Sep-21 Night TR-3174 41,575.2 41,579.0 3.80 Hauling OB 9214 MUSTOFA ADI PRAYITNO 2 4 4 4 4 2 20 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 840 - 42 -
27-Sep-21 Night TR-3175 39,011.7 39,020.9 9.23 Hauling OB 11619 DWI WARDOYO 3 4 4 4 3 3 4 3 4 2 34 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 1,428 - 42 -
27-Sep-21 Night TR-3175 39,020.9 39,021.2 0.27 Hauling OB 11619 DWI WARDOYO 3 3 OB Outpit EX-5037 PIT 5 EXT IPD 10 42 126 - 42 -
27-Sep-21 Night TR-3195 24,868.1 24,876.2 8.10 Hauling OB 15347 TAHMID 3 3 3 4 4 4 1 4 4 30 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 1,260 - 42 -
27-Sep-21 Night TR-3202 26,994.6 26,994.6 - Unscheduled - WORKSHOP - - -
27-Sep-21 Night TR-3203 27,130.0 27,139.2 9.20 Hauling OB 8920 VERRY EKO SETIAWAN 2 4 2 5 3 4 4 3 4 4 2 37 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 1,554 - 42 -
27-Sep-21 Night TR-3204 26,446.9 26,456.0 9.10 Hauling OB 1303 EFENDI 3 4 2 4 4 3 4 4 4 4 2 38 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 1,596 - 42 -
27-Sep-21 Night TR-3205 26,006.8 26,015.2 8.40 Hauling OB 7170F TRI PRASETIYO 2 4 3 4 4 3 3 4 4 31 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 1,302 - 42 -
27-Sep-21 Night TR-3206 24,966.0 24,974.3 8.30 Hauling OB 1354 SUDIYANTO 2 3 3 4 4 4 2 4 4 30 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 1,260 - 42 -
27-Sep-21 Night TR-3220 26,129.6 26,137.8 8.20 Hauling OB 8965 HADI SUTIKNO 3 3 5 4 4 3 3 4 3 32 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 1,344 - 42 -
27-Sep-21 Night TR-1024 31,444.0 31,448.2 4.21 Hauling OB 15471 MULYADI 4 1 4 4 3 16 OB Outpit EX-6014 PIT 5 EXT IPD 10 24 384 - 24 -
27-Sep-21 Night TR-1024 31,448.2 31,452.6 4.39 Hauling OB 15471 MULYADI 2 1 4 3 1 4 3 18 OB Outpit EX-5037 PIT 5 EXT IPD 10 24 432 - 24 -
27-Sep-21 Night TR-1025 47,353.1 47,355.6 2.53 Hauling OB 15469 BASUNI 1 3 4 1 9 OB Outpit EX-6016 PIT 5 EXT IPD 11 24 216 - 24 -
27-Sep-21 Night TR-1025 47,355.6 47,356.2 0.56 Hauling OB 15469 BASUNI 2 2 OB Outpit EX-6014 PIT 5 EXT IPD 10 24 48 - 24 -
27-Sep-21 Night TR-1025 47,356.2 47,359.3 3.09 Hauling OB 15469 BASUNI 2 4 1 1 3 11 OB Outpit EX-5022 PIT 5 EXT IPD 11 24 264 - 24 -
27-Sep-21 Night TR-1025 47,359.3 47,362.1 2.82 Hauling OB 15469 BASUNI 1 1 4 1 3 10 OB Outpit EX-5037 PIT 5 EXT IPD 10 24 240 - 24 -
27-Sep-21 Night TR-1031 49,566.7 49,569.4 2.70 Hauling OB 15955 RIZKY IHWAN 3 4 3 10 OB Outpit EX-6016 PIT 5 EXT IPD 11 24 240 - 24 -
27-Sep-21 Night TR-1031 49,569.4 49,572.4 2.97 Hauling OB 15955 RIZKY IHWAN 1 4 2 1 3 11 OB Outpit EX-5022 PIT 5 EXT IPD 11 24 264 - 24 -
27-Sep-21 Night TR-1031 49,572.4 49,575.6 3.23 Hauling OB 15955 RIZKY IHWAN 3 1 4 2 2 12 OB Outpit EX-5037 PIT 5 EXT IPD 10 24 288 - 24 -
27-Sep-21 Night TR-1032 51,403.0 51,405.5 2.54 Hauling OB 15377 RIZALI RAHMAN 3 3 3 1 10 OB Outpit EX-6016 PIT 5 EXT IPD 11 24 240 - 24 -
27-Sep-21 Night TR-1032 51,405.5 51,406.1 0.51 Hauling OB 15377 RIZALI RAHMAN 2 2 OB Outpit EX-6014 PIT 5 EXT IPD 10 24 48 - 24 -
27-Sep-21 Night TR-1032 51,406.1 51,408.8 2.79 Hauling OB 15377 RIZALI RAHMAN 2 4 1 1 3 11 OB Outpit EX-5022 PIT 5 EXT IPD 11 24 264 - 24 -
27-Sep-21 Night TR-1032 51,408.8 51,409.6 0.76 Hauling OB 15377 RIZALI RAHMAN 3 3 OB Outpit EX-5037 PIT 5 EXT IPD 10 24 72 - 24 -
27-Sep-21 Night TR-1033 51,737.0 51,737.0 - Unscheduled - IPD 11 - - -
27-Sep-21 Night TR-1034 49,559.3 49,563.6 4.30 Hauling OB 15395 ANDRI SUSANTO 3 4 3 4 3 17 OB Outpit EX-6014 PIT 5 EXT IPD 10 24 408 - 24 -
27-Sep-21 Night TR-1036 50,870.6 50,873.4 2.78 Hauling OB 15346 MUSA 3 4 3 1 11 OB Outpit EX-6016 PIT 5 EXT IPD 11 24 264 - 24 -
27-Sep-21 Night TR-1036 50,873.4 50,875.9 2.53 Hauling OB 15346 MUSA 2 4 4 10 OB Outpit EX-6014 PIT 5 EXT IPD 10 24 240 - 24 -
27-Sep-21 Night TR-1036 50,875.9 50,879.7 3.79 Hauling OB 15346 MUSA 4 3 1 4 3 15 OB Outpit EX-5037 PIT 5 EXT IPD 10 24 360 - 24 -
27-Sep-21 Night TR-1048 52,217.8 52,217.8 - Unscheduled - PIT 5 EXT - - -
27-Sep-21 Night TR-1049 46,301.5 46,308.7 7.20 Hauling OB 15744 MARYANTO 4 4 4 2 14 OB Outpit EX-6016 PIT 5 EXT IPD 11 24 336 - 24 -
27-Sep-21 Night TR-1049 46,308.7 46,308.7 - Hauling OB 15744 MARYANTO 3 4 1 2 1 3 14 OB Outpit EX-5022 PIT 5 EXT IPD 11 24 336 - 24 -
27-Sep-21 Night TR-1050 45,971.8 45,974.9 3.05 Hauling OB 15467 HUSNI 3 4 3 2 12 OB Outpit EX-6016 PIT 5 EXT IPD 11 24 288 - 24 -
27-Sep-21 Night TR-1050 45,974.9 45,977.7 2.80 Hauling OB 15467 HUSNI 2 3 2 1 3 11 OB Outpit EX-5022 PIT 5 EXT IPD 11 24 264 - 24 -
27-Sep-21 Night TR-1050 45,977.7 45,980.2 2.55 Hauling OB 15467 HUSNI 1 1 4 2 2 10 OB Outpit EX-5037 PIT 5 EXT IPD 10 24 240 - 24 -
27-Sep-21 Night TA-7009 27,923.1 27,926.4 3.25 Hauling OB 15818 AGUS SUGIANTO 2 4 1 3 10 OB Outpit EX-5037 PIT 5 EXT IPD 10 14 140 - 14 -
27-Sep-21 Night TA-7009 27,926.4 27,927.1 0.75 Hauling Coal 15818 AGUS SUGIANTO 1 3 4 COAL Outpit EX-2058 PIT 5 EXT 11 44 - 11 -
27-Sep-21 Night TA-7010 25,386.5 25,387.5 1.00 Hauling OB 15861 AGUSTIAN 2 2 4 OB Outpit EX-5037 PIT 5 EXT IPD 10 14 56 - 14 -
27-Sep-21 Night TA-7010 25,387.5 25,388.5 1.00 Hauling Coal 15861 AGUSTIAN 1 3 4 COAL Outpit EX-2058 PIT 5 EXT 11 44 - 11 -
27-Sep-21 Night TA-7010 25,388.5 25,390.2 1.70 Hauling OB 15653 M. ILIAS 2 2 3 7 OB Outpit EX-5037 PIT 5 EXT IPD 10 14 98 - 14 -
27-Sep-21 Night TA-7022 30,877.7 30,877.7 - Unscheduled - WORKSHOP - - -
27-Sep-21 Night TA-7029 28,645.5 28,645.5 - Unscheduled - WORKSHOP - - -
27-Sep-21 Night TA-7030 28,321.3 28,321.3 - Unscheduled - PIT 5 EXT - - -
27-Sep-21 Night BD-4005 13,774.0 13,776.4 2.40 Front maintenance 14709 A. FATHONI - PIT 5 EXT - - -
27-Sep-21 Night BD-5035 3,635.6 3,645.9 10.30 Front maintenance 14963 MAULANA ISHAK - PIT 5 EXT - - -
27-Sep-21 Night BD-6025 2,761.9 2,761.9 - Scheduled - KCP - - -
27-Sep-21 Night BD-6026 30,198.7 30,198.7 - Standby - WORKSHOP - - -
27-Sep-21 Night BD-6028 4,310.1 4,319.0 8.90 Unit Rental 14744 NOORDIANTO - KCP - - -
27-Sep-21 Night BD-6036 34,370.0 34,374.8 4.80 Unit Rental 14710 AGUS S - KCP - - -
27-Sep-21 Night BD-6038 34,148.2 34,154.4 6.20 Unit Rental 14708 ADEFI P - KCP - - -
27-Sep-21 Night BD-6069 10,416.5 10,416.5 - Unscheduled - PIT 5 EXT - - -
27-Sep-21 Night BD-7013 40,183.3 40,183.3 - Unscheduled - PIT 5 EXT - - -
27-Sep-21 Night BD-7026 26,760.0 26,760.0 - Unscheduled - WORKSHOP - - -
27-Sep-21 Night BD-7034 10,278.4 10,289.6 11.20 Disposal maintenance 14709 A. FATHONI - IPD 11 - - -
27-Sep-21 Night GR-2012 22,351.4 22,359.0 7.60 Road Maintenance Support 9426 ADE SUPIANA - PIT 5 EXT - - -
27-Sep-21 Night GR-3007 39,356.9 39,356.9 - Unscheduled - WORKSHOP - - -
27-Sep-21 Night GR-3008 47,106.1 47,114.8 8.70 Road Maintenance Support 15571 YOHANIS L - PIT 5 EXT - - -
27-Sep-21 Night TW-3001 8,610.0 8,612.0 2.00 Road Maintenance Support 15743 LANA - PIT 5 EXT - - -
27-Sep-21 Night TW-4001 18,762.0 18,762.00 - Unscheduled - WORKSHOP - - -
27-Sep-21 Night PU-4002 19,080.0 19,080.0 - Scheduled - ROM TEMPORARY - - -
27-Sep-21 Night PU-2026 6,203.1 6,203.1 - Dewatering - PIT 11 - - -
27-Sep-21 Night PU-3026 12,384.4 12,384.4 - Dewatering - PIT 11 - - -
27-Sep-21 Night PU-3015 1,696.0 1,696.0 - Standby - PIT 11 - - -
27-Sep-21 Night PU-3014 27,240.4 27,240.4 - Standby - ROM TEMPORARY - - -
27-Sep-21 Night LP-2165 13,660.0 13,672.0 12.00 Unit Rental 4671 NURUDIN - KCP - - -
27-Sep-21 Night LP-2166 13,188.0 13,200.0 12.00 Unit Rental 4671 NURUDIN - KCP - - -
27-Sep-21 Night LP-2167 14,162.0 14,174.0 12.00 Unit Rental 4671 NURUDIN - KCP - - -
27-Sep-21 Night LP-2168 12,952.0 12,964.0 12.00 Unit Rental 4671 NURUDIN - KCP - - -
27-Sep-21 Night LP-2169 12,673.0 12,684.0 11.00 Unit Rental 4671 NURUDIN - KCP - - -
27-Sep-21 Night TS-4007 - - - Standby - KCP - - -
27-Sep-21 Night TS-4017 16,317.0 16,323.0 6.00 Unit Rental 15310 ALDI ALFI SAPUTRA - KCP - - -
27-Sep-21 Night TF-4013 20,549.0 20,555.0 6.00 Unit Rental 15745 SURYANATA - KCP - - -
27-Sep-21 Night TF-4014 34,550.0 34,550.0 - Standby - KCP - - -
28-Sep-21 Day EX-2037 22,289.0 22,290.0 1.00 Moving - repair & maintanance 8371 DWI RUPAWAN - JALAN SAKA - - -
28-Sep-21 Day EX-2037 22,290.0 22,297.0 7.00 Side casting 8371 DWI RUPAWAN - JALAN SAKA - - -
28-Sep-21 Day EX-2058 17,749.8 17,755.5 5.70 Drainage 11330 EKO PURWANTO - PIT 5 EXT - 1,617 -
28-Sep-21 Day EX-2058 17,755.5 17,760.4 4.90 Side casting 11330 EKO PURWANTO - PIT 5 EXT - 1,617 -
28-Sep-21 Day EX-4006 35,344.0 35,344.0 - Unscheduled - PIT 5 EXT - 1,583 -
28-Sep-21 Day EX-5014 38,848.0 38,856.0 8.00 Unit Rental 15375 A JEFRI M - KCP - - -
28-Sep-21 Day EX-5022 11,536.0 11,536.7 0.70 Loading Solid Mud 9590F SIRATAL RAYYAN - Solid Mud Outpit PIT 5 EXT - 1,571 -
28-Sep-21 Day EX-5022 11,536.7 11,541.0 4.30 Loading Waste 9590F SIRATAL RAYYAN - OB Outpit PIT 5 EXT - 1,571 -
28-Sep-21 Day EX-5037 19,148.0 19,149.0 1.00 Loading Solid Mud 15567 ARIF WAHYUDI - Solid Mud Outpit PIT 5 EXT - 1,587 -
28-Sep-21 Day EX-5037 19,149.0 19,152.0 3.00 Loading Waste 15567 ARIF WAHYUDI - OB Outpit PIT 5 EXT - 1,587 -
28-Sep-21 Day EX-6014 57,865.0 57,865.9 0.90 Loading Solid Mud 9423 BILMAR SIMANJUNTAK - Solid Mud Outpit PIT 5 EXT - - -
28-Sep-21 Day EX-6014 57,865.9 57,869.0 3.10 Loading Waste 9423 BILMAR SIMANJUNTAK - OB Outpit PIT 5 EXT - - -
28-Sep-21 Day EX-6016 44,387.0 44,387.0 - Unscheduled - PIT 5 EXT - - -
28-Sep-21 Day EX-6022 18,759.5 18,762.5 3.00 Loading Waste 9864 UJANG FERNANDES GUCIANO - OB Outpit PIT 5 EXT - - -
28-Sep-21 Day TR-3080 42,906.6 42,909.8 3.20 Hauling OB 10881 BURHANUDDIN 1 4 3 4 12 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 504 - 42 -
28-Sep-21 Day TR-3174 41,579.0 41,582.3 3.30 Hauling OB 8958 MUKHROMIN 1 4 3 3 11 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 462 - 42 -
28-Sep-21 Day TR-3174 41,582.3 41,583.0 0.70 Hauling Solid Mud 8958 MUKHROMIN 2 2 Solid Mud Outpit EX-6014 PIT 5 EXT IPD 10 34 67 - 34 -
28-Sep-21 Day TR-3175 39,021.2 39,024.7 3.50 Hauling OB 1330 SUTRISNO 1 1 3 3 4 12 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 504 - 42 -
28-Sep-21 Day TR-3195 24,876.2 24,879.0 2.80 Hauling OB 15350 HERMAN 4 3 3 10 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 420 - 42 -
28-Sep-21 Day TR-3202 26,994.6 26,994.6 - Unscheduled - WORKSHOP - - -
28-Sep-21 Day TR-3203 27,139.2 27,143.3 4.10 Hauling OB 10882 SABIRIN 1 3 3 3 3 13 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 546 - 42 -
28-Sep-21 Day TR-3204 26,456.0 26,459.2 3.20 Hauling OB 9043 SAMSUL ARIF 1 4 3 3 11 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 462 - 42 -
28-Sep-21 Day TR-3204 26,459.2 26,459.9 0.70 Hauling Solid Mud 9043 SAMSUL ARIF 3 3 Solid Mud Outpit EX-6014 PIT 5 EXT IPD 10 34 101 - 34 -
28-Sep-21 Day TR-3205 26,015.2 26,018.1 2.90 Hauling OB 10695 SUPIYANDI 1 4 3 4 12 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 504 - 42 -
28-Sep-21 Day TR-3206 24,974.3 24,976.8 2.50 Hauling OB 10969 JOKO PRIONO 4 3 4 11 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 462 - 42 -
28-Sep-21 Day TR-3206 24,976.8 24,977.3 0.50 Hauling Solid Mud 10969 JOKO PRIONO 2 2 Solid Mud Outpit EX-6014 PIT 5 EXT IPD 10 34 67 - 34 -
28-Sep-21 Day TR-3220 26,137.8 26,140.8 3.00 Hauling OB 10968 SUKIRNO 1 4 3 4 12 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 504 - 42 -
28-Sep-21 Day TR-1024 31,452.6 31,454.8 2.20 Hauling OB 15636 AKHMAD NOOR 1 3 3 7 OB Outpit EX-6014 PIT 5 EXT IPD 10 24 168 - 24 -
28-Sep-21 Day TR-1024 31,454.8 31,455.6 0.80 Hauling Solid Mud 15636 AKHMAD NOOR 5 5 Solid Mud Outpit EX-5037 PIT 5 EXT IPD 10 19 96 - 19 -
28-Sep-21 Day TR-1025 47,362.1 47,364.2 2.10 Hauling OB 16047 NAULI 4 3 7 OB Outpit EX-5022 PIT 5 EXT IPD 10 24 168 - 1 24 24
28-Sep-21 Day TR-1025 47,364.2 47,365.5 1.30 Hauling Solid Mud 16047 NAULI 4 4 Solid Mud Outpit EX-5022 PIT 5 EXT IPD 10 19 77 - 19 -
28-Sep-21 Day TR-1031 49,575.6 49,578.0 2.40 Hauling OB 15485 ROBY TM 2 3 5 OB Outpit EX-5037 PIT 5 EXT IPD 10 24 120 - 24 -
28-Sep-21 Day TR-1031 49,578.0 49,578.5 0.50 Hauling Solid Mud 15485 ROBY TM 5 5 Solid Mud Outpit EX-5037 PIT 5 EXT IPD 10 19 96 - 19 -
28-Sep-21 Day TR-1031 49,578.5 49,578.9 0.40 Hauling OB 15485 ROBY TM 3 3 OB Outpit EX-6014 PIT 5 EXT IPD 10 24 72 - 24 -
28-Sep-21 Day TR-1032 51,409.6 51,411.9 2.30 Hauling OB 15468 PADLIANSYAH 1 2 5 1 9 OB Outpit EX-5022 PIT 5 EXT IPD 10 24 216 - 24 -
28-Sep-21 Day TR-1032 51,411.9 51,413.6 1.70 Hauling OB 15420 M ABD MADI 4 4 8 OB Outpit EX-5022 PIT 5 EXT IPD 10 24 192 - 24 -
28-Sep-21 Day TR-1033 51,737.0 51,737.0 - Unscheduled - IPD 11 - - -
28-Sep-21 Day TR-1034 49,563.6 49,563.6 - Unscheduled - PIT 5 EXT - - -
28-Sep-21 Day TR-1036 50,879.7 50,882.3 2.60 Hauling OB 15398 SIGIT SUSANTO 2 4 3 9 OB Outpit EX-5037 PIT 5 EXT IPD 10 24 216 - 24 -
28-Sep-21 Day TR-1036 50,882.3 50,883.1 0.80 Hauling Solid Mud 15398 SIGIT SUSANTO 4 4 Solid Mud Outpit EX-5037 PIT 5 EXT IPD 10 19 77 - 19 -
28-Sep-21 Day TR-1048 52,217.8 52,217.8 - Unscheduled - PIT 5 EXT - - -
28-Sep-21 Day TR-1049 46,308.7 46,312.3 3.60 Hauling OB 15576 JOKO SANTOSO 2 5 3 5 15 OB Outpit EX-5022 PIT 5 EXT IPD 10 24 360 - 24 -
28-Sep-21 Day TR-1050 45,980.2 45,983.6 3.40 Hauling OB 16025 IMTIKAN 1 1 5 3 4 14 OB Outpit EX-5022 PIT 5 EXT IPD 10 24 336 - 24 -
28-Sep-21 Day TA-7009 27,927.1 27,927.1 - Unscheduled - PIT 5 EXT - - -
28-Sep-21 Day TA-7010 25,390.2 25,393.8 3.60 Hauling OB 16026 BAHRUNI 1 1 3 3 4 12 OB Outpit EX-5037 PIT 5 EXT IPD 10 14 168 - 14 -
28-Sep-21 Day TA-7022 30,877.7 30,877.7 - Unscheduled - WORKSHOP - - -
28-Sep-21 Day TA-7029 28,645.5 28,645.5 - Unscheduled - WORKSHOP - - -
28-Sep-21 Day TA-7030 28,322.0 28,323.9 1.90 Hauling OB 15817 YUSANDI 4 3 7 OB Outpit EX-5037 PIT 5 EXT IPD 10 14 98 - 14 -
28-Sep-21 Day BD-4005 13,776.4 13,782.7 6.30 Front maintenance 15639 A. BUDIMAN - PIT 5 EXT - - -
k 28-Sep-21 Day BD-5035 3,645.9 3,654.9 9.00 Front maintenance 15747 MUSTAQIM D6 - PIT 5 EXT - - -
28-Sep-21 Day BD-6025 2,761.9 2,761.9 - Scheduled - KCP - - -
28-Sep-21 Day BD-6026 30,198.7 30,198.7 - Standby - WORKSHOP - - -
28-Sep-21 Day BD-6028 4,319.0 4,323.3 4.30 Unit Rental 15464 MARJUKI - KCP - - -
28-Sep-21 Day BD-6036 34,374.8 34,382.0 7.20 Unit Rental 14964 JOKO P (Dozer) - KCP - - -
28-Sep-21 Day BD-6038 34,154.5 34,162.7 8.20 Unit Rental 15570 HENDRY S - KCP - - -
28-Sep-21 Day BD-6069 10,416.5 10,416.5 - Unscheduled - PIT 5 EXT - - -
28-Sep-21 Day BD-7013 40,183.3 40,183.3 - Unscheduled - PIT 5 EXT - - -
28-Sep-21 Day BD-7026 26,760.0 26,760.0 - Unscheduled - WORKSHOP - - -
28-Sep-21 Day BD-7034 10,289.6 10,294.6 5.00 Front maintenance 9492 MAHFUDI - PIT 5 EXT - - -
28-Sep-21 Day BD-7034 10,294.6 10,299.2 4.60 Disposal maintenance 9492 MAHFUDI - IPD 10 - - -
28-Sep-21 Day GR-2012 22,359.0 22,363.9 4.90 Road Maintenance Support 8925 AGUS SUNARWAN - PIT 5 EXT - - -
28-Sep-21 Day GR-3007 39,356.9 39,356.9 - Unscheduled - PIT 5 EXT - - -
28-Sep-21 Day GR-3008 47,114.8 47,120.0 5.20 Road Maintenance Support 9103 WAWAN WIDODO - PIT 5 EXT - - -
28-Sep-21 Day TW-3001 8,612.0 8,615.0 3.00 Road Maintenance Support 15106 AHMAD NURANI - PIT 5 EXT - - -
28-Sep-21 Day TW-4001 18,762.0 18,762.00 - Standby - WORKSHOP - - -
28-Sep-21 Day PU-4002 19,080.0 19,080.00 - Scheduled - ROM TEMPORARY - - -
28-Sep-21 Day PU-2026 6,203.1 6,203.1 - Dewatering - PIT 11 - - -
28-Sep-21 Day PU-3026 12,384.4 12,395.90 11.55 Dewatering - PIT 11 - - -
28-Sep-21 Day PU-3015 1,696.0 1,696.00 - Standby - PIT 11 - - -
28-Sep-21 Day PU-3014 27,240.4 27,240.40 - Standby - ROM TEMPORARY - - -
28-Sep-21 Day LP-2165 13,672.0 13,672.00 - Unit Rental 4671 NURUDIN - KCP - - -
28-Sep-21 Day LP-2166 13,200.0 13,200.00 - Unit Rental 4671 NURUDIN - KCP - - -
28-Sep-21 Day LP-2167 14,174.0 14,174.00 - Unit Rental 4671 NURUDIN - KCP - - -
28-Sep-21 Day LP-2168 12,964.0 12,964.00 - Unit Rental 4671 NURUDIN - KCP - - -
28-Sep-21 Day LP-2169 12,684.0 12,684.00 - Unit Rental 4671 NURUDIN - KCP - - -
28-Sep-21 Day TS-4007 - - - Standby - KCP - - -
28-Sep-21 Day TS-4017 16,323.0 16,331.0 8.00 Unit Rental 15473 ISMAIL SAIDI - KCP - - -
28-Sep-21 Day TF-4013 20,555.0 20,560.0 5.00 Unit Rental 15746 SYARIFUDDI - KCP - - -
28-Sep-21 Day TF-4014 34,550.0 34,550.0 - Standby - KCP - - -
28-Sep-21 Night EX-2037 22,297.0 22,297.0 - Standby - JALAN SAKA - - -
28-Sep-21 Night EX-2058 17,760.4 17,769.2 8.80 Road Maintenance Support 15503 ASHARI SETIYO NUGROHO - PIT 5 EXT - 1,617 -
28-Sep-21 Night EX-4006 35,344.0 35,344.0 - Unscheduled - PIT 5 EXT - 1,583 -
28-Sep-21 Night EX-5014 38,856.0 38,862.0 6.00 Unit Rental 15345 SUTONO - KCP - - -
28-Sep-21 Night EX-5022 11,541.0 11,549.0 8.00 Loading Waste 9136 AHMAD YANI - OB Outpit PIT 5 EXT - 1,571 -
28-Sep-21 Night EX-5037 19,152.0 19,156.0 4.00 Loading Waste 15568 FUAD EFENDI - OB Outpit PIT 5 EXT - 1,587 -
28-Sep-21 Night EX-6014 57,869.0 57,880.0 11.00 Loading Waste 8952 DIDI SETIAWAN - OB Outpit PIT 5 EXT - - -
28-Sep-21 Night EX-6016 44,387.0 44,387.0 - Unscheduled - PIT 5 EXT - - -
28-Sep-21 Night EX-6022 18,762.5 18,773.0 10.50 Loading Waste 15486 SUGENG PRAYETNO - OB Outpit PIT 5 EXT - - -
28-Sep-21 Night TR-3080 42,909.8 42,919.0 9.20 Hauling OB 11474 SARINDI 2 4 3 3 4 3 4 4 4 4 3 38 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 1,596 - 42 -
28-Sep-21 Night TR-3174 41,583.0 41,595.0 12.00 Hauling OB 15349 ARDIANSYAH 3 4 3 3 4 3 4 4 4 4 2 38 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 1,596 - 42 -
28-Sep-21 Night TR-3175 39,024.7 39,025.0 0.30 Hauling OB 11619 DWI WARDOYO 2 2 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 84 - 42 -
28-Sep-21 Night TR-3195 24,879.0 24,888.8 9.80 Hauling OB 15230 MARGONO 3 4 3 4 3 4 3 4 4 4 3 39 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 1,638 - 42 -
28-Sep-21 Night TR-3202 26,995.4 27,003.8 8.40 Hauling OB 11474 SARINDI 2 3 4 4 3 3 4 4 4 3 34 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 1,428 - 42 -
28-Sep-21 Night TR-3203 27,143.3 27,153.4 10.10 Hauling OB 8920 VERRY EKO SETIAWAN 3 4 2 4 4 3 4 4 4 4 3 39 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 1,638 - 42 -
28-Sep-21 Night TR-3204 26,459.9 26,469.0 9.10 Hauling OB 1303 EFENDI 2 4 3 4 2 3 4 4 4 4 2 36 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 1,512 - 42 -
28-Sep-21 Night TR-3205 26,018.1 26,027.6 9.50 Hauling OB 7170F TRI PRASETIYO 2 5 3 4 2 3 4 4 3 5 2 37 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 1,554 - 42 -
28-Sep-21 Night TR-3206 24,977.3 24,986.8 9.50 Hauling OB 1354 SUDIYANTO 3 4 3 4 3 4 3 4 4 4 3 39 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 1,638 - 42 -
28-Sep-21 Night TR-3220 26,140.8 26,150.6 9.80 Hauling OB 3669 SUYANTO 3 4 3 3 4 4 3 4 3 4 3 38 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 1,596 - 42 -
28-Sep-21 Night TR-1024 31,455.6 31,463.5 7.90 Hauling OB 15471 MULYADI 3 4 2 3 4 3 3 5 1 28 OB Outpit EX-6014 PIT 5 EXT IPD 10 24 672 - 24 -
28-Sep-21 Night TR-1024 31,463.5 31,464.9 1.40 Hauling OB 15471 MULYADI 3 4 2 9 OB Outpit EX-5037 PIT 5 EXT IPD 10 24 216 - 24 -
28-Sep-21 Night TR-1025 47,365.5 47,374.8 9.30 Hauling OB 15469 BASUNI 4 5 2 4 4 3 4 2 28 OB Outpit EX-5022 PIT 5 EXT IPD 10 24 672 - 24 -
28-Sep-21 Night TR-1031 49,578.9 49,581.3 2.37 Hauling OB 15466 SUPRIYANTO 4 4 8 OB Outpit EX-6014 PIT 5 EXT IPD 10 24 192 - 24 -
28-Sep-21 Night TR-1031 49,581.3 49,585.7 4.44 Hauling OB 15466 SUPRIYANTO 3 3 3 4 2 15 OB Outpit EX-5022 PIT 5 EXT IPD 10 24 360 - 24 -
28-Sep-21 Night TR-1031 49,585.7 49,586.9 1.19 Hauling OB 15466 SUPRIYANTO 2 2 4 OB Outpit EX-5037 PIT 5 EXT IPD 10 24 96 - 24 -
28-Sep-21 Night TR-1032 51,413.6 51,415.3 1.70 Hauling OB 15377 RIZALI RAHMAN 1 3 1 5 OB Outpit EX-6014 PIT 5 EXT IPD 10 24 120 - 24 -
28-Sep-21 Night TR-1032 51,415.3 51,419.9 4.60 Hauling OB 15377 RIZALI RAHMAN 2 1 3 4 3 2 15 OB Outpit EX-5022 PIT 5 EXT IPD 10 24 360 - 1 24 24
28-Sep-21 Night TR-1032 51,419.9 51,420.8 0.90 Hauling OB 15377 RIZALI RAHMAN 3 2 5 OB Outpit EX-5037 PIT 5 EXT IPD 10 24 120 - 24 -
28-Sep-21 Night TR-1033 51,737.0 51,737.0 - Unscheduled - IPD 11 - - -
28-Sep-21 Night TR-1034 49,563.6 49,565.7 2.10 Hauling OB 15471 MULYADI 1 5 2 8 OB Outpit EX-5037 PIT 5 EXT IPD 10 24 192 - 24 -
28-Sep-21 Night TR-1036 50,883.1 50,890.0 6.90 Hauling OB 15346 MUSA 3 4 3 3 3 3 4 2 25 OB Outpit EX-5022 PIT 5 EXT IPD 10 24 600 - 24 -
28-Sep-21 Night TR-1036 50,890.0 50,891.4 1.40 Hauling OB 15346 MUSA 3 2 5 OB Outpit EX-5037 PIT 5 EXT IPD 10 24 120 - 24 -
28-Sep-21 Night TR-1048 52,217.8 52,218.7 0.87 Hauling OB 16024 QORI 2 2 4 OB Outpit EX-5037 PIT 5 EXT IPD 10 24 96 - 24 -
28-Sep-21 Night TR-1048 52,218.7 52,223.0 4.33 Hauling OB 16024 QORI 2 2 3 4 11 OB Outpit EX-5022 PIT 5 EXT IPD 10 24 264 - 24 -
28-Sep-21 Night TR-1049 46,312.3 46,319.7 7.40 Hauling OB 15375 A JEFRI M 4 3 3 4 3 4 4 2 27 OB Outpit EX-5022 PIT 5 EXT IPD 10 24 648 - 24 -
28-Sep-21 Night TR-1049 46,319.7 46,320.6 0.90 Hauling OB 15375 A JEFRI M 3 2 5 OB Outpit EX-5037 PIT 5 EXT IPD 10 24 120 - 24 -
28-Sep-21 Night TR-1050 45,983.6 45,986.4 2.80 Hauling OB 15467 HUSNI 4 4 3 11 OB Outpit EX-5022 PIT 5 EXT IPD 10 24 264 - 24 -
28-Sep-21 Night TR-1050 45,986.4 45,989.0 2.60 Hauling OB 15467 HUSNI 3 4 3 10 OB Outpit EX-5037 PIT 5 EXT IPD 10 24 240 - 24 -
28-Sep-21 Night TA-7009 27,927.1 27,928.1 1.00 Hauling OB 15818 AGUS SUGIANTO 1 3 4 OB Outpit EX-5022 PIT 5 EXT IPD 10 14 56 - 14 -
28-Sep-21 Night TA-7009 27,928.1 27,931.0 2.90 Hauling OB 15818 AGUS SUGIANTO 3 4 3 10 OB Outpit EX-5037 PIT 5 EXT IPD 10 14 140 - 14 -
28-Sep-21 Night TA-7010 25,393.8 25,395.3 1.50 Hauling OB 15861 AGUSTIAN 1 3 4 OB Outpit EX-5022 PIT 5 EXT IPD 10 14 56 - 14 -
28-Sep-21 Night TA-7010 25,395.3 25,397.8 2.50 Hauling OB 15653 M. ILIAS 2 5 2 9 OB Outpit EX-5037 PIT 5 EXT IPD 10 14 126 - 14 -
28-Sep-21 Night TA-7022 30,877.7 30,877.7 - Unscheduled - WORKSHOP - - -
28-Sep-21 Night TA-7029 28,645.5 28,645.5 - Unscheduled - WORKSHOP - - -
28-Sep-21 Night TA-7030 28,323.9 28,328.1 4.20 Hauling OB 15819 AHNIANSYAH 4 2 5 3 14 OB Outpit EX-5037 PIT 5 EXT IPD 10 14 196 - 14 -
28-Sep-21 Night BD-4005 13,782.7 13,792.6 9.90 Front maintenance 9339F ANTON WIBOWO - PIT 5 EXT - - -
28-Sep-21 Night BD-5035 3,654.9 3,660.9 6.00 Front maintenance 14963 MAULANA ISHAK - PIT 5 EXT - - -
28-Sep-21 Night BD-6025 2,761.9 2,761.9 - Scheduled - KCP - - -
28-Sep-21 Night BD-6026 30,198.7 30,198.7 - Standby - WORKSHOP - - -
28-Sep-21 Night BD-6028 4,323.3 4,329.5 6.20 Unit Rental - KCP - - -
28-Sep-21 Night BD-6036 34,382.0 34,387.8 5.80 Unit Rental 15569 SUJIONO - KCP - - -
28-Sep-21 Night BD-6038 34,162.7 34,168.0 5.30 Unit Rental 14708 ADEFI P - KCP - - -
28-Sep-21 Night BD-6069 10,416.5 10,416.5 - Unscheduled - PIT 5 EXT - - -
28-Sep-21 Night BD-7013 40,183.3 40,183.3 - Unscheduled - PIT 5 EXT - - -
28-Sep-21 Night BD-7026 26,760.0 26,760.0 - Unscheduled - WORKSHOP - - -
28-Sep-21 Night BD-7034 10,299.2 10,311.0 11.80 Disposal maintenance 9978 KARSIANTO - IPD 10 - - -
28-Sep-21 Night GR-2012 22,363.9 22,367.8 3.90 Road Maintenance Support 9426 ADE SUPIANA - PIT 5 EXT - - -
28-Sep-21 Night GR-3007 39,356.9 39,356.9 - Unscheduled - PIT 5 EXT - - -
28-Sep-21 Night GR-3008 47,120.0 47,128.4 8.40 Road Maintenance Support 15571 YOHANIS L - PIT 5 EXT - - -
28-Sep-21 Night TW-3001 8,615.0 8,616.0 1.00 Road Maintenance Support 15409 YOSEF SALEMBE - PIT 5 EXT - - -
28-Sep-21 Night TW-4001 18,762.0 18,762.00 - Standby - WORKSHOP - - -
28-Sep-21 Night PU-4002 19,080.0 19,080.0 - Scheduled - ROM TEMPORARY - - -
28-Sep-21 Night PU-2026 6,203.1 6,203.1 - Dewatering - PIT 11 - - -
28-Sep-21 Night PU-3026 12,395.9 12,395.9 - Unscheduled - PIT 11 - - -
28-Sep-21 Night PU-3015 1,696.0 1,696.0 - Standby - PIT 11 - - -
28-Sep-21 Night PU-3014 27,240.4 27,240.4 - Standby - ROM TEMPORARY - - -
28-Sep-21 Night LP-2165 13,672.0 13,672.0 - Unit Rental 4671 NURUDIN - KCP - - -
28-Sep-21 Night LP-2166 13,200.0 13,212.0 12.00 Unit Rental 4671 NURUDIN - KCP - - -
28-Sep-21 Night LP-2167 14,174.0 14,186.0 12.00 Unit Rental 4671 NURUDIN - KCP - - -
28-Sep-21 Night LP-2168 12,964.0 12,974.0 10.00 Unit Rental 4671 NURUDIN - KCP - - -
28-Sep-21 Night LP-2169 12,684.0 12,696.0 12.00 Unit Rental 4671 NURUDIN - KCP - - -
28-Sep-21 Night TS-4007 - - - Standby - KCP - - -
28-Sep-21 Night TS-4017 16,331.0 16,333.0 2.00 Unit Rental 15310 ALDI ALFI SAPUTRA - KCP - - -
28-Sep-21 Night TF-4013 20,560.0 20,563.0 3.00 Unit Rental 15745 SURYANATA - KCP - - -
28-Sep-21 Night TF-4014 34,550.0 34,550.0 - Standby - KCP - - -
29-Sep-21 Day EX-2037 22,297.0 22,303.2 6.20 Side casting 11330 EKO PURWANTO - - - -
29-Sep-21 Day EX-2058 17,769.2 17,780.1 10.90 Side casting 15617 ZAENAL - - - -
29-Sep-21 Day EX-4006 35,344.0 35,344.0 - Unscheduled - PIT 5 EXT - 1,382 -
29-Sep-21 Day EX-5014 38,862.0 38,867.0 5.00 Unit Rental 15375 A JEFRI M - KCP - - -
29-Sep-21 Day EX-5022 11,549.0 11,555.0 6.00 Loading Waste 12534 PUJIYANTO - OB Outpit PIT 5 EXT - 1,327 -
29-Sep-21 Day EX-5037 19,156.0 19,165.0 9.00 Loading Waste 15567 ARIF WAHYUDI - OB Outpit PIT 5 EXT - 1,471 -
29-Sep-21 Day EX-6014 57,880.0 57,888.0 8.00 Loading Waste 9423 BILMAR SIMANJUNTAK - OB Outpit PIT 5 EXT - - -
29-Sep-21 Day EX-6016 44,387.0 44,390.0 3.00 Loading Waste 15567 ARIF WAHYUDI - OB Outpit PIT 5 EXT - 768 -
29-Sep-21 Day EX-6022 18,773.0 18,781.0 8.00 Loading Waste 9864 UJANG FERNANDES GUCIANO - OB Outpit PIT 5 EXT - - -
29-Sep-21 Day TR-3080 42,919.0 42,926.7 7.67 Hauling OB 9214 MUSTOFA ADI PRAYITNO 3 1 1 1 1 3 4 3 3 3 23 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 966 - 42 -
29-Sep-21 Day TR-3080 42,926.7 42,927.0 0.33 Hauling OB 9214 MUSTOFA ADI PRAYITNO 1 1 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 42 - 42 -
29-Sep-21 Day TR-3174 41,595.0 41,600.4 5.40 Hauling OB 8958 MUKHROMIN 3 2 2 1 1 3 3 3 2 3 23 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 966 - 42 -
29-Sep-21 Day TR-3175 39,025.0 39,025.0 - Scheduled - WORKSHOP - - -
29-Sep-21 Day TR-3195 24,888.8 24,896.1 7.30 Hauling OB 15347 TAHMID 2 2 2 1 1 4 4 4 3 4 27 OB Outpit PIT 5 EXT IPD 10 42 1,134 - 42 -
29-Sep-21 Day TR-3202 27,003.8 27,011.0 7.20 Hauling OB 15350 HERMAN 3 1 2 2 1 4 4 3 3 4 27 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 1,134 - 42 -
29-Sep-21 Day TR-3203 27,153.4 27,160.7 7.30 Hauling OB 8892 BAGUS PURWONO 4 1 2 1 1 3 4 3 3 3 25 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 1,050 - 42 -
29-Sep-21 Day TR-3204 26,469.0 26,477.0 8.00 Hauling OB 9043 SAMSUL ARIF 4 1 2 2 3 4 3 3 3 25 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 1,050 - 42 -
29-Sep-21 Day TR-3205 26,027.6 26,035.0 7.40 Hauling OB 10695 SUPIYANDI 3 2 2 1 1 3 4 4 3 3 26 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 1,092 - 42 -
29-Sep-21 Day TR-3206 24,986.8 24,987.3 0.54 Hauling OB 10969 JOKO PRIONO 2 2 OB Outpit EX-5022 PIT 5 EXT IPD 10 42 84 - 42 -
29-Sep-21 Day TR-3206 24,987.3 24,994.6 7.23 Hauling OB 10969 JOKO PRIONO 2 1 3 1 1 4 4 4 3 4 27 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 1,134 - 42 -
29-Sep-21 Day TR-3220 26,150.6 26,157.8 7.20 Hauling OB 10968 SUKIRNO 3 2 3 1 4 5 4 3 3 28 OB Outpit EX-6022 PIT 5 EXT IPD 10 42 1,176 - 42 -
29-Sep-21 Day TR-1024 31,464.9 31,465.5 0.57 Hauling OB 15744 MARYANTO 2 2 OB Outpit EX-5037 PIT 5 EXT IPD 10 24 48 - 24 -
29-Sep-21 Day TR-1024 31,465.5 31,469.4 3.96 Hauling OB 15744 MARYANTO 1 1 1 5 3 3 14 OB Outpit EX-6016 PIT 5 EXT IPD 10 24 336 - 24 -
29-Sep-21 Day TR-1024 31,469.4 31,471.4 1.98 Hauling OB 15744 MARYANTO 3 4 7 OB Outpit EX-6016 PIT 5 EXT IPD 10 24 168 - 24 -
29-Sep-21 Day TR-1025 47,374.8 47,376.9 2.07 Hauling OB 15420 M ABD MADI 1 2 1 2 3 1 10 OB Outpit EX-5022 PIT 5 EXT IPD 10 24 240 - 2 24 48
29-Sep-21 Day TR-1025 47,376.9 47,379.1 2.27 Hauling OB 15420 M ABD MADI 5 4 2 11 OB Outpit EX-5037 PIT 5 EXT IPD 10 24 264 - 24 -
29-Sep-21 Day TR-1025 47,379.1 47,381.0 1.86 Hauling OB 15420 M ABD MADI 5 4 9 OB Outpit EX-6016 PIT 5 EXT IPD 10 24 216 - 24 -
29-Sep-21 Day TR-1031 49,586.9 49,588.7 1.75 Hauling OB 15485 ROBY TM 2 1 2 1 6 OB Outpit EX-5022 PIT 5 EXT IPD 10 24 144 - 24 -
29-Sep-21 Day TR-1031 49,588.7 49,590.1 1.45 Hauling OB 15485 ROBY TM 2 3 5 OB Outpit EX-5037 PIT 5 EXT IPD 10 24 120 - 24 -
29-Sep-21 Day TR-1031 49,590.1 49,595.0 4.90 Hauling OB 16047 NAULI 4 4 5 3 3 19 OB Outpit EX-5022 PIT 5 EXT IPD 10 24 456 - 24 -
29-Sep-21 Day TR-1032 51,420.8 51,426.1 5.25 Hauling OB 15468 PADLIANSYAH 2 2 3 1 1 5 3 4 21 OB Outpit EX-5022 PIT 5 EXT IPD 10 24 504 - 24 -
29-Sep-21 Day TR-1032 51,426.1 51,426.8 0.75 Hauling OB 15468 PADLIANSYAH 3 3 OB Outpit EX-5037 PIT 5 EXT IPD 10 24 72 - 24 -
29-Sep-21 Day TR-1032 51,426.8 51,427.8 1.00 Hauling OB 15468 PADLIANSYAH 3 1 4 OB Outpit EX-6016 PIT 5 EXT IPD 10 24 96 - 24 -
29-Sep-21 Day TR-1033 51,737.0 51,737.0 - Unscheduled - IPD 11 - - -
29-Sep-21 Day TR-1034 49,565.7 49,567.9 2.22 Hauling OB 15395 ANDRI SUSANTO 2 3 4 9 OB Outpit EX-5022 PIT 5 EXT IPD 10 24 216 - 24 -
29-Sep-21 Day TR-1034 49,567.9 49,569.2 1.24 Hauling OB 15395 ANDRI SUSANTO 1 4 5 OB Outpit EX-5037 PIT 5 EXT IPD 10 24 120 - 24 -
29-Sep-21 Day TR-1034 49,569.2 49,569.9 0.74 Hauling OB 15395 ANDRI SUSANTO 3 3 OB Outpit EX-6016 PIT 5 EXT IPD 10 24 72 - 24 -
29-Sep-21 Day TR-1036 50,891.4 50,891.8 0.40 Hauling OB 15398 SIGIT SUSANTO 1 1 OB Outpit EX-5022 PIT 5 EXT IPD 10 24 24 - 24 -
29-Sep-21 Day TR-1036 50,891.8 50,894.2 2.40 Hauling OB 15398 SIGIT SUSANTO 1 2 2 1 6 OB Outpit EX-6014 PIT 5 EXT IPD 10 24 144 - 24 -
29-Sep-21 Day TR-1036 50,894.2 50,898.5 4.30 Hauling OB 16025 IMTIKAN 3 4 4 3 3 17 OB Outpit EX-6014 PIT 5 EXT IPD 10 24 408 - 24 -
29-Sep-21 Day TR-1048 52,223.0 52,223.0 - Unscheduled - OB Outpit PIT 5 EXT IPD 10 24 - - 24 -
29-Sep-21 Day TR-1049 46,320.6 46,324.4 3.79 Hauling OB 15576 JOKO SANTOSO 1 1 1 1 3 1 3 3 14 OB Outpit EX-5022 PIT 5 EXT IPD 10 24 336 - 24 -
29-Sep-21 Day TR-1049 46,324.4 46,325.2 0.81 Hauling OB 15576 JOKO SANTOSO 2 1 3 OB Outpit EX-6022 PIT 5 EXT IPD 10 24 72 - 24 -
29-Sep-21 Day TR-1049 46,325.2 46,326.0 0.81 Hauling OB 15576 JOKO SANTOSO 3 3 OB Outpit EX-5037 PIT 5 EXT IPD 10 24 72 - 24 -
29-Sep-21 Day TR-1049 46,326.0 46,327.1 1.08 Hauling OB 15576 JOKO SANTOSO 4 4 OB Outpit EX-6016 PIT 5 EXT IPD 10 24 96 - 24 -
29-Sep-21 Day TR-1050 45,989.0 45,997.0 8.00 Hauling OB 15955 RIZKY IHWAN 3 2 3 5 3 5 3 5 29 OB Outpit EX-5037 PIT 5 EXT IPD 10 24 696 - 24 -
29-Sep-21 Day TA-7009 27,931.0 27,939.4 8.43 Hauling OB 15862 RUDY AMRIYADI 2 2 3 4 4 3 3 5 26 OB Outpit EX-5037 PIT 5 EXT IPD 10 14 364 - 14 -
29-Sep-21 Day TA-7009 27,939.4 27,940.4 0.97 Hauling Solid Mud 15862 RUDY AMRIYADI 1 1 1 3 Solid Mud Outpit EX-2058 PIT 5 EXT IPD 10 11 34 - 11 -
29-Sep-21 Day TA-7010 25,397.8 25,407.3 9.50 Hauling OB 15816 M. YUSUF 2 2 3 3 4 3 3 4 24 OB Outpit EX-5037 PIT 5 EXT IPD 10 14 336 - 3 14 42
29-Sep-21 Day TA-7022 30,877.7 30,877.7 - Unscheduled - WORKSHOP - - -
29-Sep-21 Day TA-7029 28,645.5 28,645.5 - Unscheduled - WORKSHOP - - -
29-Sep-21 Day TA-7030 28,328.1 28,336.2 8.05 Hauling OB 1 3 2 3 4 3 4 3 23 OB Outpit EX-5037 PIT 5 EXT IPD 10 14 322 - 14 -
29-Sep-21 Day TA-7030 28,336.2 28,337.2 1.05 Hauling Solid Mud 1 1 1 3 Solid Mud Outpit EX-2058 PIT 5 EXT IPD 10 11 34 - 11 -
29-Sep-21 Day BD-4005 13,792.6 13,801.9 9.30 Front maintenance 15639 A. BUDIMAN - PIT 5 EXT - - -
k 29-Sep-21 Day BD-5035 3,660.9 3,668.1 7.20 Front maintenance 10013 ADI SUSANTO - PIT 5 EXT - - -
29-Sep-21 Day BD-6025 2,761.9 2,761.9 - Scheduled - KCP - - -
29-Sep-21 Day BD-6026 30,198.7 30,198.7 - Standby - WORKSHOP - - -
29-Sep-21 Day BD-6028 4,329.5 4,332.8 3.30 Unit Rental - KCP - - -
29-Sep-21 Day BD-6036 34,387.8 34,391.5 3.70 Unit Rental - KCP - - -
29-Sep-21 Day BD-6038 34,168.0 34,168.0 - Standby - KCP - - -
29-Sep-21 Day BD-6069 10,416.5 10,416.5 - Unscheduled - PIT 5 EXT - - -
29-Sep-21 Day BD-7013 40,183.3 40,190.5 7.19 Front maintenance 10013 ADI SUSANTO - PIT 5 EXT - - -
29-Sep-21 Day BD-7026 26,760.0 26,760.0 - Unscheduled - WORKSHOP - - -
29-Sep-21 Day BD-7034 10,311.0 10,322.0 11.00 Disposal maintenance 9492 MAHFUDI - IPD 10 - - -
29-Sep-21 Day GR-2012 22,367.8 22,367.8 - Unscheduled - PIT 5 EXT - - -
29-Sep-21 Day GR-3007 39,356.9 39,356.9 - Unscheduled - PIT 5 EXT - - -
29-Sep-21 Day GR-3008 47,128.4 47,139.0 10.60 Road Maintenance Support 8925 AGUS SUNARWAN - PIT 5 EXT - - -
29-Sep-21 Day TW-3001 8,616.0 8,617.0 1.00 Road Maintenance Support 15743 LANA - PIT 5 EXT - - -
29-Sep-21 Day TW-4001 18,762.0 18,762.00 - Standby - WORKSHOP - - -
29-Sep-21 Day PU-4002 19,080.0 19,080.00 - Scheduled - ROM TEMPORARY - - -
29-Sep-21 Day PU-2026 6,203.1 6,203.1 - Standby - PIT 11 - - -
29-Sep-21 Day PU-3026 12,395.9 12,400.00 4.10 Dewatering 10847 FAUZI AHMAD - PIT 11 - - -
29-Sep-21 Day PU-3015 1,696.0 1,696.00 - Standby - PIT 11 - - -
29-Sep-21 Day PU-3014 27,240.4 27,240.40 - Standby - ROM TEMPORARY - - -
29-Sep-21 Day LP-2165 13,672.0 13,673.00 1.00 Unit Rental - KCP - - -
29-Sep-21 Day LP-2166 13,212.0 13,212.00 - Unit Rental - KCP - - -
29-Sep-21 Day LP-2167 14,186.0 14,186.00 - Unit Rental - KCP - - -
29-Sep-21 Day LP-2168 12,974.0 12,974.00 - Unit Rental - KCP - - -
29-Sep-21 Day LP-2169 12,696.0 12,696.00 - Unit Rental - KCP - - -
29-Sep-21 Day TS-4007 - - - Standby - KCP - - -
29-Sep-21 Day TS-4017 16,333.0 16,335.0 2.00 Unit Rental - KCP - - -
29-Sep-21 Day TF-4013 20,563.0 20,565.0 2.00 Unit Rental - KCP - - -
29-Sep-21 Day TF-4014 34,550.0 34,550.0 - Standby - KCP - - -
29-Sep-21 Night EX-2037 22,303.2 22,303.2 - Standby - - - -
29-Sep-21 Night EX-2058 17,780.1 17,789.9 9.80 Drainage - - - -
29-Sep-21 Night EX-4006 35,344.0 35,344.0 - Unscheduled - PIT 5 EXT - 1,382 -
29-Sep-21 Night EX-5014 38,867.0 38,877.0 10.00 Unit Rental 15345 SUTONO - KCP - - -
29-Sep-21 Night EX-5022 11,555.0 11,562.0 7.00 Loading Waste - OB Outpit PIT 5 EXT - 1,327 -
29-Sep-21 Night EX-5037 19,165.0 19,167.0 2.00 Loading Waste - OB Outpit PIT 5 EXT - 1,471 -
29-Sep-21 Night EX-6014 57,888.0 57,896.0 8.00 Loading Waste - OB Outpit PIT 5 EXT - - -
29-Sep-21 Night EX-6016 44,390.0 44,395.0 5.00 Loading Waste - OB Outpit PIT 5 EXT - 768 -
29-Sep-21 Night EX-6022 18,781.0 18,782.0 1.00 Moving - pindah lokasi kerja - OB Outpit PIT 5 EXT - - -
29-Sep-21 Night TR-3080 42,927.0 42,933.2 6.20 Hauling OB 10881 BURHANUDDIN 3 4 2 3 3 3 2 20 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 840 - 42 -
29-Sep-21 Night TR-3174 41,600.4 41,606.7 6.30 Hauling OB 15230 MARGONO 1 1 3 3 3 3 2 3 1 20 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 840 - 42 -
29-Sep-21 Night TR-3175 39,025.0 39,025.0 - Scheduled - WORKSHOP - - -
29-Sep-21 Night TR-3195 24,896.1 24,900.9 4.80 Hauling OB 15229 ARDIANSYAH 4 4 3 3 2 16 OB Outpit EX-6016 PIT 5 EXT IPD 10 42 672 - 42 -
29-Sep-21 Night TR-3202 27,011.0 27,016.3 5.30 Hauling OB 10882 SABIRIN 3 3 3 2 2 2 2 17 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 714 - 42 -
29-Sep-21 Night TR-3203 27,160.7 27,166.6 5.90 Hauling OB 8920 VERRY EKO SETIAWAN 3 4 2 3 3 3 2 20 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 840 - 42 -
29-Sep-21 Night TR-3204 26,477.0 26,481.0 4.00 Hauling OB 1303 EFENDI 3 3 3 3 1 13 OB Outpit EX-6014 PIT 5 EXT IPD 10 42 546 - 42 -
29-Sep-21 Night TR-3205 26,035.0 26,039.3 4.30 Hauling OB 7170f TRI PRASETIYO 3 4 3 3 2 15 OB Outpit EX-6016 PIT 5 EXT IPD 10 42 630 - 42 -
29-Sep-21 Night TR-3206 24,994.6 24,999.0 4.43 Hauling OB 1354 SUDIYANTO 3 3 3 4 2 15 OB Outpit EX-6016 PIT 5 EXT IPD 10 42 630 - 42 -
29-Sep-21 Night TR-3220 26,157.8 26,161.5 3.70 Hauling OB - OB Outpit PIT 5 EXT IPD 10 42 - - 42 -
29-Sep-21 Night TR-1024 31,471.4 31,471.4 - Standby - OB Outpit PIT 5 EXT IPD 10 24 - - 24 -
29-Sep-21 Night TR-1025 47,381.0 47,381.0 - Standby - OB Outpit PIT 5 EXT IPD 10 24 - - 24 -
29-Sep-21 Night TR-1031 49,595.0 49,597.3 2.32 Hauling OB 15419 HUSEN 1 4 5 10 OB Outpit EX-5037 PIT 5 EXT IPD 10 24 240 - 24 -
29-Sep-21 Night TR-1031 49,597.3 49,601.5 4.18 Hauling OB 15419 HUSEN 3 3 4 5 3 18 OB Outpit EX-5022 PIT 5 EXT IPD 10 24 432 - 24 -
29-Sep-21 Night TR-1032 51,427.8 51,430.7 2.90 Hauling OB 15377 RIZALI RAHMAN 1 4 4 1 10 OB Outpit EX-5022 PIT 5 EXT IPD 10 24 240 - 24 -
29-Sep-21 Night TR-1033 51,737.0 51,737.0 - Unscheduled - IPD 11 - - -
29-Sep-21 Night TR-1034 49,569.9 49,575.9 6.00 Hauling OB 15397 YUSUF 1 4 3 4 4 3 2 21 OB Outpit EX-5022 PIT 5 EXT IPD 10 24 504 - 24 -
29-Sep-21 Night TR-1036 50,898.5 50,901.3 2.80 Hauling OB 15346 MUSA 1 5 3 1 10 OB Outpit EX-5022 PIT 5 EXT IPD 10 24 240 - 24 -
29-Sep-21 Night TR-1048 52,223.0 52,223.0 - Hauling OB - OB Outpit PIT 5 EXT IPD 10 24 - - 24 -
29-Sep-21 Night TR-1049 46,327.1 46,332.8 5.71 Hauling OB 15376 EKO FAJAR S 1 4 3 3 4 5 3 23 OB Outpit EX-5022 PIT 5 EXT IPD 10 24 552 - 24 -
29-Sep-21 Night TR-1050 45,997.0 46,003.0 6.00 Hauling OB 16024 QORI - OB Outpit PIT 5 EXT IPD 10 24 - - 24 -
29-Sep-21 Night TR-1050 45,997.0 46,003.0 6.00 Hauling OB 16024 QORI - OB Outpit PIT 5 EXT IPD 10 24 - - 24 -
29-Sep-21 Night TR-1050 45,997.0 46,003.0 6.00 Hauling OB 16024 QORI - OB Outpit PIT 5 EXT IPD 10 24 - - 24 -
29-Sep-21 Night TA-7009 27,940.4 27,943.2 2.80 Hauling OB 16026 BAHRUNI 2 4 4 10 OB Outpit EX-5037 PIT 5 EXT IPD 10 14 140 - 14 -
29-Sep-21 Night TA-7009 27,943.2 27,944.4 1.20 Rehandling Coal 16026 BAHRUNI 3 2 5 Coal Outpit EX-2058 PIT 5 EXT IPD 10 11 55 - 11 -
29-Sep-21 Night TA-7010 25,407.3 25,410.1 2.80 Hauling OB 15653 M. ILIAS 2 5 4 11 OB Outpit EX-5037 PIT 5 EXT IPD 10 14 154 - 14 -
29-Sep-21 Night TA-7010 25,410.1 25,411.5 1.40 Rehandling Coal 15653 M. ILIAS 4 2 6 Coal Outpit EX-2058 PIT 5 EXT IPD 10 11 66 - 11 -
29-Sep-21 Night TA-7022 30,877.7 30,877.7 - Unscheduled - WORKSHOP - - -
29-Sep-21 Night TA-7029 28,645.5 28,645.5 - Unscheduled - WORKSHOP - - -
29-Sep-21 Night TA-7030 28,337.2 28,340.0 2.80 Hauling OB 15819 AHNIANSYAH 2 4 4 10 OB Outpit EX-5037 PIT 5 EXT IPD 10 14 140 - 14 -
29-Sep-21 Night BD-4005 13,801.9 13,811.1 9.20 Front maintenance 9339f ANTON WIBOWO - PIT 5 EXT - - -
29-Sep-21 Night BD-5035 3,668.1 3,677.0 8.90 Front maintenance 14963 MAULANA ISHAK - PIT 5 EXT - - -
29-Sep-21 Night BD-6025 2,761.9 2,761.9 - Scheduled - KCP - - -
29-Sep-21 Night BD-6026 30,198.7 30,198.7 - Standby - WORKSHOP - - -
29-Sep-21 Night BD-6028 4,332.8 4,332.8 - Unit Rental - KCP - - -
29-Sep-21 Night BD-6036 34,391.5 34,391.6 0.10 Unit Rental - KCP - - -
29-Sep-21 Night BD-6038 34,168.0 34,168.1 0.10 Unit Rental - KCP - - -
29-Sep-21 Night BD-6069 10,416.5 10,416.5 - Unscheduled - PIT 5 EXT - - -
29-Sep-21 Night BD-7013 40,190.5 40,201.1 10.60 Front maintenance 11676 SUDARSONO - PIT 5 EXT - - -
29-Sep-21 Night BD-7026 26,760.0 26,760.0 - Unscheduled - WORKSHOP - - -
29-Sep-21 Night BD-7034 10,322.0 10,333.3 11.30 Disposal maintenance 14709 A. FATHONI - IPD 10 - - -
29-Sep-21 Night GR-2012 22,367.8 22,369.8 2.00 Road Maintenance Support 15571 YOHANIS L - PIT 5 EXT - - -
29-Sep-21 Night GR-3007 39,361.4 39,370.6 9.20 Road Maintenance Support 12344 M FAJRI - PIT 5 EXT - - -
29-Sep-21 Night GR-3008 47,139.0 47,143.4 4.40 Road Maintenance Support 15571 YOHANIS L - PIT 5 EXT - - -
29-Sep-21 Night TW-3001 8,617.0 8,617.0 - Standby - PIT 5 EXT - - -
29-Sep-21 Night TW-4001 18,762.0 18,762.00 - Standby - WORKSHOP - - -
29-Sep-21 Night PU-4002 19,080.0 19,080.0 - Scheduled - ROM TEMPORARY - - -
29-Sep-21 Night PU-2026 6,203.1 6,203.1 - Standby - PIT 11 - - -
29-Sep-21 Night PU-3026 12,400.0 12,412.0 12.00 Dewatering - PIT 11 - - -
29-Sep-21 Night PU-3015 1,696.0 1,696.0 - Standby - PIT 11 - - -
29-Sep-21 Night PU-3014 27,240.4 27,240.4 - Standby - ROM TEMPORARY - - -
29-Sep-21 Night LP-2165 13,673.0 13,685.0 12.00 Unit Rental - KCP - - -
29-Sep-21 Night LP-2166 13,212.0 13,224.0 12.00 Unit Rental - KCP - - -
29-Sep-21 Night LP-2167 14,186.0 14,198.0 12.00 Unit Rental - KCP - - -
29-Sep-21 Night LP-2168 12,974.0 12,974.0 - Unit Rental - KCP - - -
29-Sep-21 Night LP-2169 12,696.0 12,708.0 12.00 Unit Rental - KCP - - -
29-Sep-21 Night TS-4007 - - - Standby - KCP - - -
29-Sep-21 Night TS-4017 16,335.0 16,335.0 - Unit Rental - KCP - - -
29-Sep-21 Night TF-4013 20,565.0 20,565.0 - Unit Rental - KCP - - -
29-Sep-21 Night TF-4014 34,550.0 34,550.0 - Standby - KCP - - -
30-Sep-21 Day EX-2037 - - - - -
30-Sep-21 Day EX-2058 - - - - -
30-Sep-21 Day EX-4006 - - - - -
30-Sep-21 Day EX-5014 - - - - -
30-Sep-21 Day EX-5022 - - - - -
30-Sep-21 Day EX-5037 - - - - -
30-Sep-21 Day EX-6014 - - - - -
30-Sep-21 Day EX-6016 - - - - -
30-Sep-21 Day EX-6022 - - - - -
30-Sep-21 Day TR-3080 - - - - -
30-Sep-21 Day TR-3174 - - - - -
30-Sep-21 Day TR-3175 - - - - -
30-Sep-21 Day TR-3195 - - - - -
30-Sep-21 Day TR-3202 - - - - -
30-Sep-21 Day TR-3203 - - - - -
30-Sep-21 Day TR-3204 - - - - -
30-Sep-21 Day TR-3205 - - - - -
30-Sep-21 Day TR-3206 - - - - -
30-Sep-21 Day TR-3220 - - - - -
30-Sep-21 Day TR-1024 - - - - -
30-Sep-21 Day TR-1025 - - - - -
30-Sep-21 Day TR-1031 - - - - -
30-Sep-21 Day TR-1032 - - - - -
30-Sep-21 Day TR-1033 - - - - -
30-Sep-21 Day TR-1034 - - - - -
30-Sep-21 Day TR-1036 - - - - -
30-Sep-21 Day TR-1048 - - - - -
30-Sep-21 Day TR-1049 - - - - -
30-Sep-21 Day TR-1050 - - - - -
30-Sep-21 Day TA-7009 - - - - -
30-Sep-21 Day TA-7010 - - - - -
30-Sep-21 Day TA-7022 - - - - -
30-Sep-21 Day TA-7029 - - - - -
30-Sep-21 Day TA-7030 - - - - -
30-Sep-21 Day BD-4005 - - - - -
k 30-Sep-21 Day BD-5035 - - - - -
30-Sep-21 Day BD-6025 - - - - -
30-Sep-21 Day BD-6026 - - - - -
30-Sep-21 Day BD-6028 - - - - -
30-Sep-21 Day BD-6036 - - - - -
30-Sep-21 Day BD-6038 - - - - -
30-Sep-21 Day BD-6069 - - - - -
30-Sep-21 Day BD-7013 - - - - -
30-Sep-21 Day BD-7026 - - - - -
30-Sep-21 Day BD-7034 - - - - -
30-Sep-21 Day GR-2012 - - - - -
30-Sep-21 Day GR-3007 - - - - -
30-Sep-21 Day GR-3008 - - - - -
30-Sep-21 Day TW-3001 - - - - -
30-Sep-21 Day TW-4001 - - - - -
30-Sep-21 Day PU-4002 - - - - -
30-Sep-21 Day PU-2026 - - - - -
30-Sep-21 Day PU-3026 - - - - -
30-Sep-21 Day PU-3015 - - - - -
30-Sep-21 Day PU-3014 - - - - -
30-Sep-21 Day LP-2165 - - - - -
30-Sep-21 Day LP-2166 - - - - -
30-Sep-21 Day LP-2167 - - - - -
30-Sep-21 Day LP-2168 - - - - -
30-Sep-21 Day LP-2169 - - - - -
30-Sep-21 Day TS-4007 - - - - -
30-Sep-21 Day TS-4017 - - - - -
30-Sep-21 Day TF-4013 - - - - -
30-Sep-21 Day TF-4014 - - - - -
30-Sep-21 Night EX-2037 - - - - -
30-Sep-21 Night EX-2058 - - - - -
30-Sep-21 Night EX-4006 - - - - -
30-Sep-21 Night EX-5014 - - - - -
30-Sep-21 Night EX-5022 - - - - -
30-Sep-21 Night EX-5037 - - - - -
30-Sep-21 Night EX-6014 - - - - -
30-Sep-21 Night EX-6016 - - - - -
30-Sep-21 Night EX-6022 - - - - -
30-Sep-21 Night TR-3080 - - - - -
30-Sep-21 Night TR-3174 - - - - -
30-Sep-21 Night TR-3175 - - - - -
30-Sep-21 Night TR-3195 - - - - -
30-Sep-21 Night TR-3202 - - - - -
30-Sep-21 Night TR-3203 - - - - -
30-Sep-21 Night TR-3204 - - - - -
30-Sep-21 Night TR-3205 - - - - -
30-Sep-21 Night TR-3206 - - - - -
30-Sep-21 Night TR-3220 - - - - -
30-Sep-21 Night TR-1024 - - - - -
30-Sep-21 Night TR-1025 - - - - -
30-Sep-21 Night TR-1031 - - - - -
30-Sep-21 Night TR-1032 - - - - -
30-Sep-21 Night TR-1033 - - - - -
30-Sep-21 Night TR-1034 - - - - -
30-Sep-21 Night TR-1036 - - - - -
30-Sep-21 Night TR-1048 - - - - -
30-Sep-21 Night TR-1049 - - - - -
30-Sep-21 Night TR-1050 - - - - -
30-Sep-21 Night TA-7009 - - - - -
30-Sep-21 Night TA-7010 - - - - -
30-Sep-21 Night TA-7022 - - - - -
30-Sep-21 Night TA-7029 - - - - -
30-Sep-21 Night TA-7030 - - - - -
30-Sep-21 Night BD-4005 - - - - -
30-Sep-21 Night BD-5035 - - - - -
30-Sep-21 Night BD-6025 - - - - -
30-Sep-21 Night BD-6026 - - - - -
30-Sep-21 Night BD-6028 - - - - -
30-Sep-21 Night BD-6036 - - - - -
30-Sep-21 Night BD-6038 - - - - -
30-Sep-21 Night BD-6069 - - - - -
30-Sep-21 Night BD-7013 - - - - -
30-Sep-21 Night BD-7026 - - - - -
30-Sep-21 Night BD-7034 - - - - -
30-Sep-21 Night GR-2012 - - - - -
30-Sep-21 Night GR-3007 - - - - -
30-Sep-21 Night GR-3008 - - - - -
30-Sep-21 Night TW-3001 - - - - -
30-Sep-21 Night TW-4001 - - - - -
30-Sep-21 Night PU-4002 - - - - -
30-Sep-21 Night PU-2026 - - - - -
30-Sep-21 Night PU-3026 - - - - -
30-Sep-21 Night PU-3015 - - - - -
30-Sep-21 Night PU-3014 - - - - -
30-Sep-21 Night LP-2165 - - - - -
30-Sep-21 Night LP-2166 - - - - -
30-Sep-21 Night LP-2167 - - - - -
30-Sep-21 Night LP-2168 - - - - -
30-Sep-21 Night LP-2169 - - - - -
30-Sep-21 Night TS-4007 - - - - -
30-Sep-21 Night TS-4017 - - - - -
30-Sep-21 Night TF-4013 - - - - -
30-Sep-21 Night TF-4014 - - - - -